10 CFR Appendix B to Part 50 - Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants


Download Files

Metadata

Document in Context
   
Collapse    Title 10 - Energy
Parts 1 - 1800. January 1, 2010.
Heading 2 - Table Of Contents
Collapse
Chapter I - NUCLEAR REGULATORY COMMISSION (Parts 1 - 199)
Heading 4 - Table Of Contents
Heading 1562 - Table Of Contents (Parts 50 - 50)
Appendix A to Part 50 - General Design Criteria for Nuclear Power Plants
Appendix B to Part 50 - Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants
Appendix C to Part 50 - A Guide for the Financial Data and Related Information Required To Establish Financial...
Appendix D to Part 50 - [Reserved]
Appendix E to Part 50 - Emergency Planning and Preparedness for Production and Utilization Facilities
Appendix F to Part 50 - Policy Relating to the Siting of Fuel Reprocessing Plants and Related Waste Management Facilities
Appendix G to Part 50 - Fracture Toughness Requirements
Appendix H to Part 50 - Reactor Vessel Material Surveillance Program Requirements
Appendix I to Part 50 - Numerical Guides for Design Objectives and Limiting Conditions for Operation To Meet the...
Appendix J to Part 50 - Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors
Appendix K to Part 50 - ECCS Evaluation Models
Appendix L to Part 50 - [Reserved]
Appendix M to Part 50 - [Reserved]
Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...
Appendix O to Part 50 - [Reserved]
Appendix P to Part 50 - [Reserved]
Appendix Q to Part 50 - Pre-Application Early Review of Site Suitability Issues
Appendix R to Part 50 - Fire Protection Program for Nuclear Power Facilities Operating Prior to January 1, 1979
Appendix S to Part 50 - Earthquake Engineering Criteria for Nuclear Power Plants
Expand
Chapter II - DEPARTMENT OF ENERGY (Parts 200 - 626)