<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="cfr.xsl"?>
<CFRGRANULE xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:noNamespaceSchemaLocation="CFRMergedXML.xsd">
  <FDSYS>
    <CFRTITLE>23</CFRTITLE>
    <CFRTITLETEXT>Highways</CFRTITLETEXT>
    <VOL>1</VOL>
    <DATE>1999-04-01</DATE>
    <ORIGINALDATE>1999-04-01</ORIGINALDATE>
    <COVERONLY>false</COVERONLY>
    <TITLE>RIGHT-OF-WAY AND ENVIRONMENT</TITLE>
    <GRANULENUM>H</GRANULENUM>
    <HEADING>SUBCHAPTER H</HEADING>
    <ANCESTORS>
      <PARENT HEADING="" SEQ="1"/>
    </ANCESTORS>
  </FDSYS>
  <SUBCHAP TYPE="P">
    <PRTPAGE P="340"/>
    <HD SOURCE="HED">SUBCHAPTER H—RIGHT-OF-WAY AND ENVIRONMENT</HD>
    <PART>
      <EAR>PT. 710</EAR>
      <HD SOURCE="HED">PART 710—RIGHT-OF-WAY—GENERAL</HD>
      <CONTENTS>
        <SUBPART>
          <HD SOURCE="HED">Subpart A—[Reserved]</HD>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart B—State Highway Department Responsibilities</HD>
          <SECHD>Sec.</SECHD>
          <SECTNO>710.201</SECTNO>
          <SUBJECT>Purpose.</SUBJECT>
          <SECTNO>710.202</SECTNO>
          <SUBJECT>Applicability.</SUBJECT>
          <SECTNO>710.203</SECTNO>
          <SUBJECT>General responsibilities.</SUBJECT>
          <SECTNO>710.204</SECTNO>
          <SUBJECT>State approvals.</SUBJECT>
          <SECTNO>710.205</SECTNO>
          <SUBJECT>Right-of-way manuals.</SUBJECT>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart C—Reimbursement Provisions</HD>
          <SECTNO>710.301</SECTNO>
          <SUBJECT>Purpose.</SUBJECT>
          <SECTNO>710.302</SECTNO>
          <SUBJECT>Applicability.</SUBJECT>
          <SECTNO>710.303</SECTNO>
          <SUBJECT>Reimbursement requirements and limitations.</SUBJECT>
          <SECTNO>710.304</SECTNO>
          <SUBJECT>Reimbursement policy.</SUBJECT>
          <SECTNO>710.305</SECTNO>
          <SUBJECT>Support for claims.</SUBJECT>
          <SECTNO>710.306</SECTNO>
          <SUBJECT>Withholding Federal participation.</SUBJECT>
        </SUBPART>
      </CONTENTS>
      <AUTH>
        <HD SOURCE="HED">Authority:</HD>
        <P>23 U.S.C. 101(a) and 315; 42 U.S.C. 2000d <E T="03">et seq.</E>, 4633, 4651-4655; 49 CFR 1.48 (b) and (cc) and parts 21 and 24; 23 CFR 1.32.</P>
      </AUTH>
      <SOURCE>
        <HD SOURCE="HED">Source:</HD>
        <P>39 FR 26416, July 19, 1974, unless otherwise noted.</P>
      </SOURCE>
      <SUBPART>
        <HD SOURCE="HED">Subpart A—[Reserved]</HD>
      </SUBPART>
      <SUBPART>
        <HD SOURCE="HED">Subpart B—State Highway Department Responsibilities</HD>
        <SECTION>
          <SECTNO>§ 710.201</SECTNO>
          <SUBJECT>Purpose.</SUBJECT>
          <P>(a) To prescribe the general responsibility of a State highway department (SHD) relative to acquisition of rights-of-way for the Federal-aid highway systems.</P>
          <P>(b) [Reserved]</P>
          <P>(c) To prescribe the requirements for the preparation of an operational right-of-way manual by each SHD.</P>
          <CITA>[39 FR 26416, July 19, 1974, as amended at 50 FR 34092, Aug. 23, 1985]</CITA>
        </SECTION>
        <SECTION>
          <SECTNO>§ 710.202</SECTNO>
          <SUBJECT>Applicability.</SUBJECT>
          <P>The provisions of this subpart are applicable to all States which receive Federal financial assistance in connection with the Federal-aid highway program.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 710.203</SECTNO>
          <SUBJECT>General responsibilities.</SUBJECT>
          <P>(a) <E T="03">Acquisition.</E> The SHD has overall responsibility for the acquisition of right-of-way on all Federal-aid highway systems.</P>
          <P>(b) <E T="03">Right-of-way organization.</E> Each SHD shall have a right-of-way organization adequately staffed, equipped, and organized to discharge its right-of-way responsibilities.</P>
          <P>(c) <E T="03">Use of other public right-of-way organizations.</E> The SHD may, by means of a written agreement, use the services of land acquisition organizations of counties, municipalities, or other State or local governmental agencies for acquiring rights-of-way for Federal-aid projects. Any such organization may be used only if it is adequately staffed, equipped, and organized to provide such services and if its practices and procedures are in substantial conformity with the SHD's accepted procedures or it will follow the SHD's accepted procedures. It is the responsibility of the SHD to fully inform political subdivisions of their responsibilities in connection with federally assisted highway projects. The SHD shall monitor real property acquisition activities conducted by political subdivisions to ascertain that right-of-way is acquired in accordance with provisions of State and Federal laws and as required by Federal Highway Administration (FHWA) directives.</P>
          <P>(d) <E T="03">Adequacy of right-of-way.</E> The interest acquired in all rights-of-way for Federal-aid highways shall be adequate for the construction, operation, and maintenance of the highway and for the protection of both the transportation facilities and the traveling public.</P>
          <P>(e) <E T="03">Staff and fee negotiators.</E> (1) Negotiations shall be conducted by qualified staff employees of the State highway department (SHD) or political subdivision of a State, except as provided in paragraph (a)(3) of this section.</P>
          <P>(2) The SHD shall establish qualification standards for staff negotiators.</P>

          <P>(3) Firms and individuals meeting the SHD's qualification standards may be employed by contract for negotiating <PRTPAGE P="341"/>purposes in accordance with SHD procedures that have been approved by the FHWA.</P>
          <P>(4) The negotiator shall maintain timely adequate records of negotiation on a parcel basis. The record shall be written in permanent form and completed within a reasonable time after each contact with the property owner. The report shall be signed and dated by the assigned negotiator.</P>
          <P>(f) <E T="03">Additional requirements.</E> Additional requirements governing federally assisted real property acquisition, based upon the Uniform Relocation Assistance and Real Property Acquisition Policies Act, are contained in 49 CFR part 24, subpart B.</P>
          <CITA>[39 FR 26416, July 19, 1974, as amended at 50 FR 34092, Aug. 23, 1985; 54 FR 47075, Nov. 9, 1989; 59 FR 25327, May 16, 1994]</CITA>
        </SECTION>
        <SECTION>
          <SECTNO>§ 710.204</SECTNO>
          <SUBJECT>State approvals.</SUBJECT>
          <P>Notwithstanding any other provision of this title, the FHWA authorizations or approvals prescribed by §§ 712.203(b)(1), 713.204, 713.305, and 620.203 (d) through (i) of this chapter may, except in the case of facilities or projects on the National Highway System (described in 23 U.S.C. 103), be made by the SHD in accordance with procedures that have been approved by the FHWA.</P>
          <CITA>[59 FR 25327, May 16, 1994]]</CITA>
        </SECTION>
        <SECTION>
          <SECTNO>§ 710.205</SECTNO>
          <SUBJECT>Right-of-way manuals.</SUBJECT>
          <P>(a) Each SHD shall submit in duplicate to FHWA for acceptance a manual which clearly describes the SHD's right-of-way organization and the policies, procedures, and practices it will follow where right-of-way is acquired for Federal-aid highway projects.</P>
          <P>(b) In general, the manual should be developed for the SHD's internal use and be designed to assist SHD right-of-way personnel in complying with both State and Federal laws, regulations, directives and standards. The manual must be in sufficient detail to adequately describe particular functions, and the operational procedures through which those functions will be accomplished. It should be in sufficient depth to guide the operating right-of-way employee in how he is to perform his assigned duties. All phases of the acquisition program shall be covered.</P>
          <P>(c) The SHD may use a format that meets its own needs.</P>
          <P>(d) Until the SHD's manual is accepted under the provisions of this subpart, previously accepted policy and procedure statements currently applicable will remain in effect.</P>
          <P>(e) The SHD is responsible for full compliance with FHWA requirements whether or not its manual currently reflects proper coverage of the requirements. Changes to a manual, because of new FHWA requirements or changes in State law, etc., shall be submitted to FHWA for acceptance within a reasonable period of time. FHWA approval of manual changes is not required prior to implementation by the SHD. In-house administrative type manual changes should be transmitted to FHWA for informational purposes.</P>
        </SECTION>
      </SUBPART>
      <SUBPART>
        <HD SOURCE="HED">Subpart C—Reimbursement Provisions</HD>
        <SECTION>
          <SECTNO>§ 710.301</SECTNO>
          <SUBJECT>Purpose.</SUBJECT>
          <P>To set forth provisions governing reimbursement to a State highway department (SHD) for right-of-way costs incurred in connection with a Federal or Federal-aid highway project.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 710.302</SECTNO>
          <SUBJECT>Applicability.</SUBJECT>
          <P>The provisions of this subpart are applicable to all State claims for Federal-aid right-of-way reimbursement.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 710.303</SECTNO>
          <SUBJECT>Reimbursement requirements and limitations.</SUBJECT>
          <P>Participation in right-of-way costs incurred by the SHD for highway or highway related projects shall be under the circumstances and to the extent set forth below:</P>
          <P>(a) When there has been approval of a program and the SHD has been authorized to proceed with right-of-way activities and, after the effective date of the authorization, the SHD legally obligates itself under State law to pay right-of-way costs.</P>

          <P>(b) When costs are incurred in conformity with State law and Federal Highway Administration (FHWA) di-rectives.<PRTPAGE P="342"/>
          </P>
          <P>(c) When costs are recognized and recorded as an obligation in the accounts of the SHD.</P>
          <P>(d) Federal-aid participation may not exceed the statutory limitation for the particular Federal-aid funds used.</P>
          <P>(e) On projects financed under 23 U.S.C. 120(d) for the elimination of hazards of railway-highway crossings, participation in the right-of-way cost may not exceed 70 percent, with no increase in public land States.</P>
          <P>(f) On public land highways and on defense access roads as defined in title 23 U.S.C. 101a and 210, the extent of Federal participation will be in accordance with specific agreements between FHWA and the SHD.</P>
          <P>(g) Reimbursement of costs shall be made only after the project agreement has been executed.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 710.304</SECTNO>
          <SUBJECT>Reimbursement policy.</SUBJECT>
          <P>(a) <E T="03">Real property acquisition.</E> Federal funds may participate in payments made by the SHD for real property or interests therein acquired in accordance with applicable State and Federal law and FHWA directives. Unless otherwise provided, Federal funds may not participate in the costs of real property not incorporated into the final highway right-of-way.</P>
          <P>(b) <E T="03">Incidental expenses.</E> (1) Federal funds may participate in any expenditure of a type normal to the operation of the SHD and incidental to the acquisition of rights-of-way, whether the acquisition is by negotiation or condemnation.</P>
          <P>(2) Federal participation will not be allowed in charges for the administrative and overhead expenses of either the headquarters or field offices of the SHD or other publicly maintained land acquisition organizations. When a supervisory or administrative employee is engaged in work chargeable to a specific project, Federal participation may be allowed in claims for salary and related expenses on that project in accordance with part 140, subpart G of this chapter.</P>
          <P>(3) Federal funds may participate in the usual costs and disbursements chargeable to a condemning authority under State law as part of a valid bill of costs approved by a court in a condemnation proceeding. However, whether or not the costs are included in court judgments or awarded as court costs in litigated cases, Federal participation will not be permitted in the cost of a property owner's attorney fees, appraiser fees, expert witness fees, or similar costs which are paid by the SHD in connection with acquisition of rights-of-way, with the following exceptions:</P>
          <P>(i) Where the final judgment is that the property cannot be acquired by condemnation, or</P>
          <P>(ii) The proceeding is abandoned by the acquiring agency, or</P>
          <P>(iii) An inverse condemnation proceeding is successfully maintained.</P>
          <FP>In any of the foregoing exceptions, participation will be limited to such sum as will in the opinion of the court or the head of the agency on whose behalf the proceeding was instituted, reimburse the owner for reasonable costs, disbursements, and expenses he actually incurred, including reasonable attorney, appraisal, and engineering fees.</FP>
          <P>(4) Federal funds may participate in payments by the SHD to a property owner for the following costs necessarily incurred in transferring property to the State:</P>
          <P>(i) Recording fees, transfer taxes, and similar expenses incidental to conveying real property.</P>
          <P>(ii) Penalty costs for prepayment of preexisting recorded mortgage entered into in good faith.</P>
          <P>(iii) The pro rata portion of real property taxes paid which are allocable to a period subsequent to vesting of title in the SHD or effective date of possession by the SHD, whichever is earlier.</P>
          <P>(5) <E T="03">Technical guidance and training costs.</E> Where State employees are directly engaged in project activities or provide technical guidance, consultation, training, or otherwise work directly on specific projects with employees of a political subdivision to accomplish real property acquisition or in escalating such project operations to an acceptable level of performance, Federal funds may participate in the costs of such project activity.</P>
          <P>(c) <E T="03">Taxes.</E> Federal participation will not be permitted in the payment of special assessments or in the payment of taxes, except as provided in paragraphs (b)(4) and (d)(1) of this section.<PRTPAGE P="343"/>
          </P>
          <P>(d) <E T="03">Property management.</E> (1) Federal funds may participate in the net cost incurred by the SHD in the leasing, rental, maintenance, disposal of improvements, protection, rodent control, and clearance of real property acquired for right-of-way purposes. Taxes or payments in lieu of taxes required to be paid by a SHD are a legitimate property management expense and may be deducted from the gross rentals received.</P>
          <P>(2) Federal funds may not participate in property management or demolition costs on excess lands acquired by the SHD when Federal participation in the costs of the related right-of-way acquisition is based on the provisions of paragraph (m)(1) of this section.</P>
          <P>(3) Federal funds may participate in the net costs incurred by the SHD in the leasing, rental, maintenance, rodent control, protection and sale of excess lands when Federal participation in the cost of the related right-of-way acquisition is in accordance with paragraph (m)(2) of this section. In such instances, Federal funds may participate in the disposal or removal of improvements only when required by law or when such action will clearly enhance the value of the excess.</P>
          <P>(4) Where right-of-way is acquired for future construction, the SHD may desire to close out the project before the net amount of rentals or salvage has been established. In such event, Federal participation may be established on the basis of the present worth of the estimated future net rentals and salvage.</P>
          <P>(e) <E T="03">Access rights.</E> (1) Where full or partial control of access is obtained on an existing highway, Federal funds may participate in the cost of access rights, whether or not other real property interest is acquired, providing the payments for the loss or impairment of access is based upon elements of damage generally compensable in eminent domain. Participation in these costs is not contingent upon further construction of the highway facility.</P>
          <P>(2) Federal funds may not participate in payments for access rights where the controlled access highway is on a new location.</P>
          <P>(f) <E T="03">Material sites.</E> Subject to the provisions of part 635, subpart A of this chapter, Federal funds may participate as either a right-of-way or construction item in the costs of acquiring land or interests therein outside the normal right-of-way for the purpose of obtaining road building material to be made available to the contractor.</P>
          <P>(g) <E T="03">Permanent and temporary easements.</E> The cost of acquiring interests in lands outside the normal right-of-way is eligible for Federal participation as a right-of-way or construction item:</P>
          <P>(1) For permanent use; such as for drainage or slope easements.</P>
          <P>(2) For temporary use; such as for construction purposes or for right-of-way clearance.</P>
          <P>(h) <E T="03">Damages.</E> Federal funds may participate in severance or consequential damages, or both resulting from a highway project upon an affirmative showing that the acquiring agency is obligated to pay such damages under applicable law, provided that such damages are of a type generally compensable in eminent domain, and are determined by FHWA to be generally reimbursable on Federal-aid highway projects. Payments made for personal property (except as otherwise provided), loss of business or goodwill, circuity of travel, diversion of traffic, and other items of damage not generally compensable in eminent domain are not eligible for Federal participation.</P>
          <P>(i) <E T="03">Utility and railroad real property.</E> (1) If a utility or railroad is displaced by a federally assisted highway project, Federal funds may participate in the cost of real property acquired by a SHD, utility, or railroad to replace real property owned by the railroad or utility and conveyed to the SHD for highway right-of-way as provided in part 140, subpart I and part 645, subpart A of this chapter.</P>
          <P>(2) Federal funds may participate in the cost of acquisition of non-operating real property of a utility or railroad in the same manner as for other privately owned property.</P>
          <P>(j) <E T="03">Court deposits and interest thereon.</E> (1) Federal funds may participate in the amount deposited in court in connection with the condemnation of a parcel when the deposit is:</P>

          <P>(i) The amount of the SHD's approved estimate of just compensation, or<PRTPAGE P="344"/>
          </P>
          <P>(ii) The amount established by court order, or</P>
          <P>(iii) The amount established by other means required under State law as a condition of the SHD's obtaining possession of the right-of-way.</P>
          <FP>When the amount deposited exceeds the amount of the final settlement or award, the Federal share of the excess deposit shall be promptly credited to the project or be deducted from any payment due the SHD from FHWA on any Federal-aid project.</FP>
          <P>(2) Where, in the opinion of FHWA, the total payments on progress vouchers for the Federal share of court deposits become excessive, further payment may be withheld until the situation is remedied. The Federal share of the total amount of court deposits, plus the Federal share of other eligible expenses incurred on a project may not exceed the Federal funds included in the project agreement.</P>
          <P>(3) Federal funds may participate in the cost of interest on the amount of the deposit into court for a period of not to exceed 45 days, from the date of deposit, where due to court procedures the deposit is not immediately available to the owner. Federal funds may not participate in such interest costs where the deposit is available but the owner chooses not to withdraw it.</P>
          <P>(4) Where a condemnation settlement or award exceeds the amount deposited into court, Federal participation may be allowed in interest paid on the amount in excess of the deposit from the date of the original deposit until the date of settlement or award. Where court procedures prevent the amount from being delivered immediately following settlement or award, Federal participation may be allowed in interest paid on the excess amount for a period not to exceed 45 days following such settlement or award. When the SHD appeals an award, Federal participation may be allowed in the required interest payment on the excess until 45 days after the final determination.</P>
          <P>(5) Federal participation shall not be allowed in interest cost on payments to an owner where the SHD accepts a voluntary right of entry instead of making such payment available to the owner directly or by deposit with the court, except in cases of unusual circumstances in accordance with SHD procedures that have been approved by the FHWA. Where the final settlement or award exceeds the amount which could have been deposited or paid, Federal participation in interest costs on the amount of the excess may be allowed from the date of physical entry upon the parcel, in accordance with paragraph (j)(4) of this section.</P>
          <P>(k) <E T="03">Tenant owned improvements.</E> Federal participation may be allowed in payments made to a tenant for his buildings, structures, or other improvements which are acquired by a State to the extent that such payment is not a duplication of any payments otherwise authorized by law.</P>
          <P>(l) <E T="03">Exchanges of State owned lands.</E> When State owned lands are exchanged for lands required for highway purposes, Federal funds may participate in the current fair market value of the land being exchanged. This concept is conditioned in that participation in the total consideration, including land, any cash payments, and any construction features to mitigate damages, may not exceed the pro rata share of the fair market value of the land required for highway purposes plus damages.</P>
          <P>(m) <E T="03">Excess acquisitions.</E> When only a portion of a property is required for highway right-of-way or highway related needs and the SHD elects to acquire a larger portion or the whole property, Federal participation will be in accordance with one of the following alternatives selected by the SHD for statewide application, as set forth in its Right-of-Way Operations Manual. The provisions of this paragraph do not apply to uneconomic remnants.</P>
          <P>(1) <E T="03">First alternative.</E> Federal participation in the fair market value of the portion of the property required for the highway project plus damages, if any, to the remainder.</P>
          <P>(2) <E T="03">Second alternative.</E> (i) The purpose of this alternative is only to provide an alternative means of establishing the amount of damages where only a part of a property is required for federally assisted highway project purposes. There will be no Federal participation in any relocation costs associated with that part of the tract acquired which is outside the right-of-way.<PRTPAGE P="345"/>
          </P>
          <P>(ii) An initial installment of the Federal pro rata share of the cost of the land required for the project determined by apportioning the land cost of the entire tract between the part required and part remaining solely on the basis of area, plus the cost of improvements necessarily removed for the project, less salvage value of the improvements.</P>
          <P>(iii) A final installment, representing the Federal share of damages to the remainder, will be the difference between the initial costs of the excess property, prorated as in paragraph (m)(2)(ii) of this section, and the price realized at a public sale of the excess property. The sale must be accomplished prior to submission of the final voucher for the project or not later than 2 years from the time the highway facility is opened to traffic, whichever is earlier. Should condemnation proceedings prevent sale of the excess property within the time limits described, the excess may be disposed of within 12 months of when the SHD can legally do so.</P>
          <P>(iv) Two or more excess areas may be combined and sold in one transaction if the SHD anticipates a higher overall return by such action.</P>
          <P>(v) Should the SHD not dispose of the excess property within the time limits set forth in paragraph (m)(2)(iii) of this section, Federal participation shall be limited as under paragraph (m)(2)(ii) of this section unless an exception is granted by FHWA or unless an alternative disposal procedure has been accepted by FHWA.</P>
          <P>(n) <E T="03">Uneconomic remnants.</E> Federal funds may participate in the acquisition costs of uneconomic remnants whether or not the remnants are incorporated in the highway right-of-way.</P>
          <P>(o) <E T="03">Acquisition in connection with other Federal or federally-assisted programs.</E> (1) Rights-of-way may be acquired by the SHD for a Federal-aid highway in coordination or cooperation with other Federal or federally assisted programs. The SHD and the agency involved shall set forth in an agreement or memorandum of understanding the responsibilities of each in the acquisition of real property involved and the basis for the sharing of costs. Such agreements should be executed during early stages of project development, and will not jeopardize future Federal participation in costs to the SHD, if the agreement does not constitute a binding request for conveyance of specified lands. The agreement should be in effect when a request for authorization to acquire is submitted to FHWA.</P>
          <P>(2) Federal funds may participate in obligations for costs incurred by a SHD after FHWA authorization to proceed. For purposes of paragraph (o) of this section an obligation is incurred by the SHD on the date that the SHD commits itself to the acquiring agency through a binding request for conveyance of specified lands.</P>
          <P>(3) Federal (FHWA) participation in costs incurred by the SHD shall be determined on the following basis, unless prior approval is obtained from FHWA for participation on some other basis:</P>
          <P>(i) Where the project of the acquiring agency, such as an urban renewal agency, is developed without consideration of the highway project, and the land has been cleared at the time the SHD requests conveyance of specified lands, Federal (FHWA) participation may not exceed its pro rata share of the appraised value of the cleared land required. The appraised value shall be mutually acceptable to the SHD and the other agency involved. Where the same conditions exist except that improvements have not been removed at the time of request for conveyance, Federal (FHWA) participation may not exceed the fair market value as determined by costs to the acquiring agency.</P>

          <P>(ii) Where the project of the acquiring agency, such as an urban renewal agency, was continued after written knowledge that highway project would be involved, whether or not the exact location thereof was known, Federal (FHWA) participation may not exceed the fair market value as determined by cost to the acquiring agency. It would not matter whether any improvements were removed before or after a request for conveyance is submitted. The SHD must assure itself that such real property acquisitions are in compliance with title III of the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 (42 U.S.C. 4651, <E T="03">et seq.</E>).<PRTPAGE P="346"/>
          </P>
          <P>(iii) “Cost to the acquiring agency,” for purposes of Federal (FHWA) participation, may include the fair market value payment, incidental acquisition expenses, settlement costs, and clearance and demolition costs, subject to the agreement between the parties, but shall exclude interest on borrowed money, and administrative and overhead expenses. (See also 49 CFR 24.6 regarding relocation matters.)</P>
          <P>(iv) When the “cost to acquiring agency” forms the basis of value for participation, FHWA may accept either a parcel by parcel cost or an overall proration based on total area without regard to location of improvements within the acquiring agency's project area. Where a parcel by parcel basis is used, costs may be prorated on an area basis where only a part of a parcel is required for highway purposes.</P>
          <P>(4) Where an urban renewal or any other such federally assisted agency performs work in connection with acquisition of rights-of-way for Federal or Federal-aid highway projects, FHWA may accept certifications of another Federal agency that the work has been performed in accordance with its governing regulations.</P>
          <P>(p) <E T="03">Separation of functions.</E> (1) Except as provided in 23 CFR part 750, subpart D, Federal funds may not participate in the cost of acquisition of a property, or related incidental costs, where:</P>
          <P>(i) [Reserved]</P>
          <P>(ii) Payments have been delivered in person by those who have negotiated, appraised, or acted as reviewing appraiser for the property, or</P>
          <P>(iii) Payments have been delivered in person by the attorney who negotiated a settlement with the owner.</P>
          <P>(2) The provisions of paragraph (p)(1) of this section apply whether such person was a salaried employee of the SHD or other acquiring agency, or was retained on a fee basis.</P>
          <P>(q) <E T="03">Construction in mitigation of damages.</E> Costs of construction performed by the SHD in order to mitigate damages to a remainder of real property are eligible for Federal participation, provided that such construction results in an appropriate reduction in compensation to be paid the owner.</P>
          <P>(r) <E T="03">Appraisal costs and minimum payment</E>. (1) If otherwise eligible, Federal funds may participate in the cost of appraisal and specialty reports obtained by the State in accordance with its accepted plan of operation.</P>
          <P>(2) Where the State prescribes a minimum payment, not to exceed $500, for the acquisition of a parcel, although the approved appraisal estimate of just compensation reflects a lesser or even a zero consideration, Federal participation shall be allowed if such payment is otherwise eligible.</P>
          <CITA>[39 FR 26416, July 19, 1974; 39 FR 45215, Dec. 31, 1974, as amended at 40 FR 41524, Sept. 8, 1975; 41 FR 9321, Mar. 4, 1976; 50 FR 34092, 34093, Aug. 23, 1985; 54 FR 47075, Nov. 9, 1989; 59 FR 25327, May 16, 1994]</CITA>
        </SECTION>
        <SECTION>
          <SECTNO>§ 710.305</SECTNO>
          <SUBJECT>Support for claims.</SUBJECT>
          <P>(a) <E T="03">Progress and final claims.</E> (1) Any progress or final claim for Federal fund reimbursement of expenditures made for right-of-way shall be supported by the following documents and information:</P>
          <P>(i) A right-of-way map or plan showing the rights-of-way authorized and actually acquired including parcel identification numbers, area acquired, property lines of the area acquired, and any other pertinent data affecting the cost of right-of-way such as structures, improvements, and fences.</P>
          <P>(ii) Statement of cost of right-of-way showing:</P>
          <P>(A) Parcel number.</P>
          <P>(B) Cost of parcel.</P>
          <P>(C) Cost of excess land, if any, acquired from same ownership.</P>
          <P>(D) Credits by parcel or project.</P>
          <P>(E) Incidental expenses by parcel or project.</P>
          <P>(F) Cost of construction performed in mitigation of damages on a parcel basis, if claimed as a right-of-way item.</P>

          <P>(2) The required documents and information may be submitted with the claim or made available in the SHD's files in readily identifiable form as determined appropriate by the FHWA in consultation with the SHD. Further, where a right-of-way map or plan which meets the requirements set forth in paragraph (a)(1)(i) of this section has been previously submitted, the FHWA may accept such map or plan for final or progress claim purposes.<PRTPAGE P="347"/>
          </P>
          <P>(3) The information required in paragraph (a)(1)(ii) of this section may be submitted under current billing procedures where a memorandum of understanding on such procedures is in effect between the SHD and FHWA.</P>
          <P>(b) <E T="03">Document availability.</E> All plats, appraisals, options, purchase agreements, title evidence, negotiation records, deeds, relocation assistance and payment records, and other data and documents relative to the acquisition of the right-of-way shall be available for inspection at reasonable times by authorized representatives of the FHWA and other authorized Federal representatives.</P>
          <P>(c) <E T="03">Federal-aid project numbers.</E> Right-of-way plans, contracts, deeds, appraisals, options, vouchers, correspondence, and all other documents and papers to which FHWA needs to refer shall carry the Federal-aid project number for ready identification.</P>
          <CITA>[39 FR 26416, July 19, 1974; 39 FR 45215, Dec. 31, 1974]</CITA>
        </SECTION>
        <SECTION>
          <SECTNO>§ 710.306</SECTNO>
          <SUBJECT>Withholding Federal participation.</SUBJECT>
          <P>(a) If the FHWA determines that any amount claimed is not adequately supported, it may approve Federal participation in the amount it determines is adequately supported and shall notify the SHD, in writing, citing the reasons why items and amounts are not eligible for Federal participation. Where correctable noncompliance with provisions of law or FHWA requirements exists, Federal funds may be withheld until compliance is obtained. Where the noncompliance is not correctable, the FHWA may deny participation in parcel or project costs in part or in total.</P>
          <P>(b) If, at any time, the FHWA determines that the organization, practices, and procedures actually applied by the SHD are not in substantial conformity with those accepted by the FHWA, or are otherwise not acceptable, the FHWA shall notify the SHD in writing. No further authorizations for acquisition of right-of-way shall be issued by the FHWA after the date of such notification until:</P>
          <P>(1) A review of the facts substantiates to the satisfaction of FHWA that the SHD's accepted practices and procedures are satisfactory and will be adhered to by the SHD, or</P>
          <P>(2) Revised practices and procedures have been submitted by the SHD and accepted by FHWA. The FHWA may participate in claims made or to be made by the SHD following review of the facts pertaining to the matter.</P>
        </SECTION>
      </SUBPART>
    </PART>
    <PART>
      <EAR>PT. 712</EAR>
      <HD SOURCE="HED">PART 712—THE ACQUISITION FUNCTION</HD>
      <CONTENTS>
        <SUBPART>
          <HD SOURCE="HED">Subpart A—[Reserved]</HD>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart B—General Provisions and Project Procedures</HD>
          <SECHD>Sec.</SECHD>
          <SECTNO>712.201</SECTNO>
          <SUBJECT>Purpose.</SUBJECT>
          <SECTNO>712.202</SECTNO>
          <SUBJECT>Applicability.</SUBJECT>
          <SECTNO>712.203</SECTNO>
          <SUBJECT>General provisions.</SUBJECT>
          <SECTNO>712.204</SECTNO>
          <SUBJECT>Project procedures.</SUBJECT>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart C—[Reserved]</HD>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart D—Administrative Settlements, Legal Settlements, and Court Awards</HD>
          <SECTNO>712.401</SECTNO>
          <SUBJECT>Purpose.</SUBJECT>
          <SECTNO>712.402</SECTNO>
          <SUBJECT>Definitions.</SUBJECT>
          <SECTNO>712.403</SECTNO>
          <SUBJECT>Applicability.</SUBJECT>
          <SECTNO>712.404</SECTNO>
          <SUBJECT>Administrative settlements.</SUBJECT>
          <SECTNO>712.405</SECTNO>
          <SUBJECT>Legal settlements.</SUBJECT>
          <SECTNO>712.406</SECTNO>
          <SUBJECT>Court awards.</SUBJECT>
          <SECTNO>712.407</SECTNO>
          <SUBJECT>Noncompensable items.</SUBJECT>
          <SECTNO>712.408</SECTNO>
          <SUBJECT>Special counsel.</SUBJECT>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart E—Federal Land Transfers and Direct Federal Acquisition</HD>
          <SECTNO>712.501</SECTNO>
          <SUBJECT>Purpose.</SUBJECT>
          <SECTNO>712.502</SECTNO>
          <SUBJECT>Applicability.</SUBJECT>
          <SECTNO>712.503</SECTNO>
          <SUBJECT>Federal land transfers.</SUBJECT>
          <SECTNO>712.504</SECTNO>
          <SUBJECT>Direct Federal acquisition.</SUBJECT>
          <APP>Appendix 1 to Subpart E—Application for Federal Land Transfers</APP>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart F—Functional Replacement of Real Property in Public Ownership</HD>
          <SECTNO>712.601</SECTNO>
          <SUBJECT>Purpose.</SUBJECT>
          <SECTNO>712.602</SECTNO>
          <SUBJECT>Applicability.</SUBJECT>
          <SECTNO>712.603</SECTNO>
          <SUBJECT>Federal lands.</SUBJECT>
          <SECTNO>712.604</SECTNO>
          <SUBJECT>Functional replacement.</SUBJECT>
          <SECTNO>712.605</SECTNO>
          <SUBJECT>Federal participation.</SUBJECT>
          <SECTNO>712.606</SECTNO>
          <SUBJECT>Procedures.</SUBJECT>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart G—Right-of-Way Revolving Fund</HD>
          <SECTNO>712.701</SECTNO>
          <SUBJECT>Purpose.</SUBJECT>
          <SECTNO>712.702</SECTNO>
          <SUBJECT>Policies.</SUBJECT>
          <SECTNO>712.703</SECTNO>
          <SUBJECT>Procedures.</SUBJECT>
        </SUBPART>
      </CONTENTS>
      <AUTH>
        <HD SOURCE="HED">Authority:</HD>

        <P>23 U.S.C. 101(a), 107, 108, 111, 114, 204, 210, 308, 315, 317, and 323; 42 U.S.C. <PRTPAGE P="348"/>2000d-1, 4633, 4651-4655; 49 CFR 1.48-(b) and (cc) and part 24; 23 CFR 1.32.</P>
      </AUTH>
      <SUBPART>
        <HD SOURCE="HED">Subpart A—[Reserved]</HD>
      </SUBPART>
      <SUBPART>
        <HD SOURCE="HED">Subpart B—General Provisions and Project Procedures</HD>
        <SECTION>
          <SECTNO>§ 712.201</SECTNO>
          <SUBJECT>Purpose.</SUBJECT>
          <P>This subpart prescribes Federal Highway Administration (FHWA) project provisions and procedures relating to the acquisition of real property for highway and highway related projects.</P>
          <CITA>[39 FR 29591, Aug. 16, 1974]</CITA>
        </SECTION>
        <SECTION>
          <SECTNO>§ 712.202</SECTNO>
          <SUBJECT>Applicability.</SUBJECT>
          <P>(a) The provisions of § 712.203 of this subpart are applicable to all States and political subdivisions thereof that acquire real property for any highway or highway related project where Federal funds will participate in any part of the cost of the project.</P>
          <P>(b) The provisions of § 712.204 of this subpart are applicable to all States and political subdivisions thereof where Federal funds will participate in any part of the right-of-way costs of the project.</P>
          <CITA>[39 FR 29591, Aug. 16, 1974]</CITA>
        </SECTION>
        <SECTION>
          <SECTNO>§ 712.203</SECTNO>
          <SUBJECT>General provisions.</SUBJECT>
          <P>(a) <E T="03">Real property interest to be acquired.</E> (1) On federally assisted highway projects, the acquiring agency shall acquire rights-of-way of such nature and extent as are adequate for the construction, operation, and maintenance of the project.</P>
          <P>(2) Where State law permits, rights-of-way for Federal-aid highways shall be acquired in unlimited vertical dimension unless savings in the overall cost of a project, or other considerations in the public interest, such as plans for community development or multiple use, support the acquisition of rights-of-way of limited vertical dimension. Where the acquisition is in limited vertical dimension, the rights acquired shall be sufficient to encumber the unacquired realty with provisions which will ensure full use and safety of the highway facility to be constructed.</P>
          <P>(3) Subsurface mineral rights may be reserved to the owner thereof where the acquisition of such rights is not reasonably necessary for the construction, protection, support, and preservation of the highway facility to be constructed.</P>
          <P>(b) <E T="03">Use and occupancy of right-of-way.</E> (1) All real property, including airspace, within the right-of-way boundaries of a project shall be exclusively devoted to public highway purposes and preserved free of all public and private installations, facilities, and encroachments except as authorized by FHWA.</P>
          <P>(2) Use of airspace for nonhighway purposes shall be in accordance with the provisions of 23 CFR part 713, subpart B.</P>
          <P>(3) Joint development and multiple use of highway rights-of-way shall be in accordance with the provisions of Volume 7, Chapter 7, section 8, of the Federal-Aid Highway Program Manual. <SU>1</SU>
            <FTREF/>
          </P>
          <FTNT>
            <P>
              <SU>1</SU> Copy of this directive is available at FHWA offices listed in 49 CFR part 7, appendix D.</P>
          </FTNT>
          <P>(4) Railroads and utilities may be accommodated in accordance with the provisions of 23 CFR part 645, subpart B.</P>
          <P>(5) Bikeways and pedestrian walkways may be accommodated in accordance with the provisions of 23 CFR part 652.</P>
          <P>(c) <E T="03">Public information brochure.</E> The State highway department shall prepare a brochure adequately describing the land acquisition process under State law, and the owner's rights, privileges, and obligations thereunder. The information contained therein should be clearly presented in nontechnical terms to the extent practicable. Where appropriate, such brochure should be written in a language in addition to English.</P>
          <P>(d) <E T="03">Reviewing appraiser</E>. The reviewing appraiser shall place in the parcel file a signed and dated statement setting forth:</P>

          <P>(1) The estimate of just compensation including, where appropriate, the allocation of compensation for the real property acquired and for damages to remaining real property, and an identification or listing of the buildings, structures and other improvements on <PRTPAGE P="349"/>the land as well as the fixtures which he considered to be a part of the real property to be acquired if such allocation or listing differs from that of the appraisal(s).</P>
          <P>(2) The value estimate of items compensable under State law but not eligible for Federal reimbursement, if any.</P>
          <CITA>[39 FR 29591, Aug. 16, 1974, as amended at 50 FR 34093, Aug. 23, 1985]</CITA>
        </SECTION>
        <SECTION>
          <SECTNO>§ 712.204</SECTNO>
          <SUBJECT>Project procedures.</SUBJECT>
          <P>(a) <E T="03">Programming.</E> Any phase of right-of-way related work in which Federal funds are to participate shall be programmed in accordance with the provisions of 23 CFR part 630, subpart A.</P>
          <P>(b) <E T="03">Authorizations—general.</E> (1) The SHD shall request, in writing, FHWA authorization to proceed with right-of-way acquisition if Federal funds are to participate in the costs related thereto.</P>
          <P>(2) Acquisition of real property or interests therein for highway or highway related purposes which are determined necessary by project design requirements or other FHWA policy requirements may be authorized by FHWA, including:</P>
          <P>(i) Real property or interests therein pursuant to 23 CFR part 772, and</P>
          <P>(ii) Whole properties or portions thereof to a logical boundary or barrier, thus avoiding severance damage payments and providing a highway facility more in conformity with the neighborhood through which it passes.</P>
          <P>(c) <E T="03">Authorizations.</E> Concurrent with or subsequent to program approval, FHWA may, in response to a SHD's request:</P>
          <P>(1) Authorize the SHD to proceed with those right-of-way activities necessary for the completion of the final environmental impact statement or environmental assessment and preparation for public hearings, or</P>
          <P>(2) Authorize the SHD to proceed with all preliminary right-of-way activities, including property appraisals, up to but not including negotiations, with the condition that appraisals of partial takings will not be made until the SHD has prepared right-of-way plans, or</P>
          <P>(3) Authorize the SHD to proceed with those right-of-way activities enumerated in paragraph (c)(2) of this section, and authorize the acquisition of rights-of-way on a project with the stipulation that the following requirements will be met before acquisition will commence:</P>
          <P>(i) [Reserved]</P>
          <P>(ii) The provisions of 23 CFR part 771 of this chapter have been met relative to environmental impact statements, findings of no significant impact, and public hearing transcripts and certifications, and</P>
          <P>(iii) Where applicable, the provisions of 23 CFR part 771 of this chapter have been met relative to section 4(f) evaluations.</P>
          <P>(d) <E T="03">Authorizations—hardship acquisition and protective buying.</E> (1) In extraordinary cases or emergency situations the State highway department may request and the Federal Highway Administrator may approve Federal participation in the acquisition of a particular parcel or a limited number of particular parcels within the limits of a proposed highway corridor prior to completion of processing of the final environmental impact statement or adoption of the negative declaration, but only after (i) the State highway department has given official notice to the public that it has selected a particular location to be the preferred or recommended alignment for a proposed highway, or (ii) a public hearing has been held or an opportunity for such a hearing has been afforded. Proper documentation shall be submitted to show that the acquisition is in the public interest and is necessary to:</P>
          <P>(A) Alleviate particular hardship to a property owner, on his request, in contrast to others because of an inability to sell his property;</P>
          <P>(B) Prevent imminent development and increased costs of a parcel which would tend to limit the choice of highway alternatives.</P>

          <P>(2) Hardship acquisition and protective buying procedures shall not apply to properties subject to the provisions of 49 U.S.C. 1653(f) (commonly known as section 4(f)) or 16 U.S.C. 470(f) (historic properties) until the required section 4(f) determination and the procedures of the Advisory Council on Historic Preservation are completed.<PRTPAGE P="350"/>
          </P>
          <P>(3) Acquisition of property under § 712.204(d) shall not influence the environmental assessment of a project, including the decision relative to the need to construct the project or the selection of a specific location.</P>
          <P>(4) Ultimate Federal participation in the cost of property acquired under § 712.204(d) is dependent upon the incorporation of such property in the final highway right-of-way. Where a parcel is partially incorporated, Federal participation will be in accordance with the alternative selected for statewide application pursuant to 23 CFR 710.304(m).</P>

          <P>(5) Subject to paragraphs (d)(2) and (3) of this section, a SHD may acquire property with its own funds under § 712.204(d) before FHWA program approval and not jeopardize Federal participation in subsequent project costs provided the SHD's acquisition activities comply with the provisions of Title VI of the Civil Rights Act of 1964 (42 U.S.C. 2000(d) <E T="03">et seq.</E>), the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 (42 U.S.C. 4601 <E T="03">et seq.</E>), and 49 CFR part 24. Costs so incurred are not eligible for Federal participation.</P>
          <P>(e) <E T="03">Public hearings.</E> Information shall be presented and an opportunity provided for discussion of the land acquisition process at public hearings, in order to assure that the public is adequately informed.</P>
          <P>(f) <E T="03">Project field inspections.</E> Right-of-way personnel shall make project field inspections at appropriate times throughout the development of a project to assure that adequate consideration is given to significant right-of-way elements involved in the location and design of the project including possible social, economic, and environmental effects.</P>
          <P>(g) <E T="03">Right-of-way project agreements.</E> (1) Project agreements and modifications thereof shall be prepared and executed in accordance with part 630, subpart C of this chapter.</P>
          <P>(2) Project agreements may be entered into at any time after Federal funds have been obligated on the project. The estimate of cost of right-of-way required for programming a project may be used for project agreement purposes, provided a more accurate and up-to-date estimate is not available.</P>
          <P>(3) Project agreements covering acquisition of right-of-way shall, pursuant to 23 U.S.C. 108(a), contain a clause providing for the refund of any payments made by the FHWA in the event that actual construction of a road on such rights-of-way is not undertaken by the close of the 10th fiscal year following the fiscal year in which the agreement was executed. Pursuant to a State's written request, FHWA may approve a longer period which is determined to be reasonable. The SHD will be considered in compliance with the statutory requirements where, before the expiration of the approved period, it has taken all of the following actions:</P>
          <P>(i) Awarded a contract for construction of a reasonable section of the highway covered by the agreement,</P>
          <P>(ii) Proceeded with sufficient actual work to give visual evidence thereof at the construction site, and</P>
          <P>(iii) Provided evidence of good faith to proceed without delay to complete construction of the highway upon the entire length of right-of-way covered by such project agreement.</P>
          <CITA>[39 FR 29591, Aug. 16, 1974, as amended at 40 FR 33445, Aug. 8, 1975; 41 FR 9321, Mar. 4, 1976; 41 FR 24347, June 16, 1976; 42 FR 26652, May 25, 1977; 50 FR 34092, 34093, Aug. 23, 1985; 52 FR 32669, Aug. 28, 1987; 54 FR 47076, Nov. 9, 1989]</CITA>
        </SECTION>
      </SUBPART>
      <SUBPART>
        <HD SOURCE="HED">Subpart C—[Reserved]</HD>
      </SUBPART>
      <SUBPART>
        <HD SOURCE="HED">Subpart D—Administrative Settlements, Legal Settlements, and Court Awards</HD>
        <SOURCE>
          <HD SOURCE="HED">Source:</HD>
          <P>39 FR 29593, Aug. 16, 1974, unless otherwise noted.</P>
        </SOURCE>
        <SECTION>
          <SECTNO>§ 712.401</SECTNO>
          <SUBJECT>Purpose.</SUBJECT>
          <P>This subpart prescribes Federal Highway Administration (FHWA) policies relating to settlement of acquisitions through administrative means and legal processes.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 712.402</SECTNO>
          <SUBJECT>Definitions.</SUBJECT>
          <P>As used in this subpart:</P>
          <P>(a) <E T="03">Administrative settlement.</E> Any settlement, made or authorized to be made by the responsible State highway <PRTPAGE P="351"/>department (SHD) official, which is in excess of the SHD's approved estimate of just compensation.</P>
          <P>(b) <E T="03">Legal settlement.</E> Any settlement made by the responsible State legal representative. This includes stipulated settlements approved by the court in which the condemnation action has been filed.</P>
          <P>(c) <E T="03">Court award.</E> Any decision following a contested trial or hearing before a jury, commission, judge, or other legal entity having the authority to establish the amount of compensation for a taking under the laws of eminent domain.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 712.403</SECTNO>
          <SUBJECT>Applicability.</SUBJECT>
          <P>The provisions of this subpart are applicable in the acquisition of real property for a highway or highway related project in which Federal funds will participate in any part of the right-of-way costs of the project.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 712.404</SECTNO>
          <SUBJECT>Administrative settlements.</SUBJECT>
          <P>Administrative settlements on Federal and federally-assisted highway projects are governed by the provisions of 49 CFR 24.102(i).</P>
          <CITA>[50 FR 34092, Aug. 23, 1985, as amended at 54 FR 47076, Nov. 9, 1989]</CITA>
        </SECTION>
        <SECTION>
          <SECTNO>§ 712.405</SECTNO>
          <SUBJECT>Legal settlements.</SUBJECT>
          <P>(a) The SHD shall identify the legal office or official responsible for making legal settlements. The coordination which will be followed between the legal office and the right-of-way office prior to making any settlement shall be described.</P>
          <P>(b) The legal office or official may make a legal settlement when it is determined that such action is in the public interest. Legal settlements which are based upon new or revised appraisal data as the principal justification shall be coordinated with and approved by the responsible official of the acquiring agency having final authority over the right-of-way matters.</P>
          <P>(c) The appropriate State file shall be documented whenever a legal settlement in excess of the amount established as just compensation is made. The rationale for the settlement shall be set forth in writing. Federal funds may participate in legal settlements made and documented in accordance with the provisions of this paragraph.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 712.406</SECTNO>
          <SUBJECT>Court awards.</SUBJECT>
          <P>Federal funds may participate in excess of the amount established as just compensation if there is supporting documentation in the appropriate State file which includes:</P>
          <P>(a) A trial report, signed by the trial attorney.</P>
          <P>(b) A signed statement of the legal counsel in charge of representing the State in condemnation litigation stating his concurrence in the reasoning and disposition of the case.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 712.407</SECTNO>
          <SUBJECT>Noncompensable items.</SUBJECT>
          <P>Should the administrative settlement, legal settlement or the court award include an apparent payment for items considered ineligible for Federal participation, the amount paid for such items shall be determined by the SHD and excluded from the SHD's claim for Federal participation in the settlement or award.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 712.408</SECTNO>
          <SUBJECT>Special counsel.</SUBJECT>
          <P>(a) If part-time assistants or legal counsel are employed for Federal-aid right-of-way procurements, reimbursement may be claimed for the eligible cost of the services of such attorney, provided that such assistants or counsel are employed in accordance with SHD procedures that have been approved by the FHWA.</P>
          <P>(b) Federal participation shall not be permitted in payment made to a city or county attorney for work performed in connection with the acquisition of rights-of-way where he is obligated to perform such work without additional compensation. In those cases where the normal duties of the attorney for which he is compensated do not include the acquisition of property for highway purposes, Federal funds may participate in payments to him for services performed upon a proper showing of the facts.</P>
          <CITA>[39 FR 29593, Aug. 16, 1974; 39 FR 34277, Sept. 24, 1974, as amended at 59 FR 25327, May 16, 1994]</CITA>
        </SECTION>
      </SUBPART>
      <SUBPART>
        <PRTPAGE P="352"/>
        <HD SOURCE="HED">Subpart E—Federal Land Transfers and Direct Federal Acquisition</HD>
        <SECTION>
          <SECTNO>§ 712.501</SECTNO>
          <SUBJECT>Purpose.</SUBJECT>
          <P>This regulation prescribes Federal Highway Administration (FHWA) policies and procedures relating to Federal land transfers and direct Federal acquisition.</P>
          <CITA>[39 FR 32604, Sept. 10, 1974]</CITA>
        </SECTION>
        <SECTION>
          <SECTNO>§ 712.502</SECTNO>
          <SUBJECT>Applicability.</SUBJECT>
          <P>The provisions of § 712.503 of this subpart apply to all projects on a Federal-aid system, direct Federal projects, or federally assisted highway projects. The provisions of § 712.504 apply only to Interstate, Defense Access, and Forest highways.</P>
          <CITA>[39 FR 32604, Sept. 10, 1974, as amended at 41 FR 9321, Mar. 4, 1976]</CITA>
        </SECTION>
        <SECTION>
          <SECTNO>§ 712.503</SECTNO>
          <SUBJECT>Federal land transfers.</SUBJECT>
          <P>(a) Title 23 U.S.C., sections 107(d) and 317, provide for the transfer of lands or interests in lands owned by the United States to a State Highway Department (SHD) or its nominee for highway purposes.</P>
          <P>(b) If lands or interests in lands owned by the United States are needed for highway purposes, the SHD shall pursuant to 23 U.S.C. 107(d) and 317 file an application with the FHWA except that if such lands or interests therein are managed or controlled by the Army, Air Force, Navy, Veterans Administration, or Bureau of Indian Affairs, the SHD may make applications directly to said agencies or their land acquisition agent as indicated in appendix 1. All applications shall include or be accompanied by the information shown in appendix 1.</P>
          <P>(c) Deeds for conveyance of lands or interests in lands owned by the United States shall be prepared by the SHD, unless the FHWA at its discretion chooses to prepare them. Such deeds shall contain the clauses required by the FHWA and 49 CFR 21.7(a)(2). When the SHD prepares the deed, it will submit the proposed deed to the FHWA for review and execution. Following execution, the grantee shall record the deed in the appropriate land record office and so advise the FHWA of the recording data.</P>
          <P>(d) When the need for the lands or the materials acquired under this subpart no longer exists, notice of that fact must be given by the SHD to the FHWA and to the concerned Federal agency, and such lands or materials will revert to the control of the Federal agency from which they were appropriated or to its assigns. The notice, in a form suitable for recording, shall state that the need for the lands or materials no longer exists for the purposes for which acquired.</P>
          <CITA>[39 FR 32604, Sept. 10, 1974; 39 FR 33797, Sept. 20, 1974, as amended at 40 FR 2179, Jan. 10, 1975]</CITA>
        </SECTION>
        <SECTION>
          <SECTNO>§ 712.504</SECTNO>
          <SUBJECT>Direct Federal acquisition.</SUBJECT>
          <P>(a) Title 23 U.S.C. 101(a), 107, and 210(e) authorize Federal acquisition of lands and interests in lands for any project authorized for Interstate, defense Access or Forest highways where the State is unable to acquire the required rights-of-way or it is unable to obtain possession with sufficient promptness.</P>
          <P>(b) To enable the FHWA to make the necessary findings to proceed with the acquisition of the rights-of-way, the SHD's written application for Federal acquisition shall include:</P>
          <P>(1) Justification for the Federal acquisition of the lands or interests in lands;</P>
          <P>(2) The date FHWA authorized the SHD to commence right-of-way acquisition, the date the project was advanced to Stage 2 program status, the date of the project agreement and a statement that the agreement contains the provisions required by sections 108(a), 108(b), and 111 of Title 23, U.S.C.;</P>
          <P>(3) The necessity for acquisition of the particular lands under request;</P>
          <P>(4) A statement of the specific interests in lands to be acquired, including the proposed treatment of control of access;</P>
          <P>(5) The SHD's intentions with respect to the acquisition, subordination, or exclusion of outstanding interests, such as minerals and utility easements, in connection with the proposed acquisition;</P>

          <P>(6) A statement on compliance with the provisions of part 771 of this chapter;<PRTPAGE P="353"/>
          </P>
          <P>(7) Adequate legal descriptions, plats, appraisals, and title data;</P>
          <P>(8) An outline of the negotiations which have been conducted by the agency with landowners;</P>
          <P>(9) An agreement that the SHD will pay its pro rata share of costs, including but not limited to those set forth in § 712.504(f) incurred in the acquisition of, or the attempt to acquire rights-of-way; and</P>

          <P>(10) A statement that assures compliance with the applicable provisions of the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 (42 U.S.C. 4601, <E T="03">et seq.</E>).</P>
          <P>(c) If the landowner tenders a right-of-entry at any time before the FHWA makes a determination that the SHD is unable to acquire the rights-of-way with sufficient promptness, the SHD is legally obligated to accept such tender and the FHWA may not proceed with Federal acquisition.</P>
          <P>(d) If the SHD obtains title to a parcel prior to the filing of the Declaration of Taking, it shall notify the FHWA and immediately furnish the appropriate U.S. Attorney with a disclaimer together with a request that the action against the landowner be dismissed (ex parte) from the proceeding and the estimated just compensation deposited into the registry of the Court for the affected parcel be withdrawn after the appropriate motions are approved by the Court.</P>
          <P>(e) When the United States obtains a court order granting possession of the real property, the FHWA shall authorize the SHD to take over supervision of the property. The authorization shall include, but need not be limited to, the following:</P>
          <P>(1) The right to take possession of unoccupied properties;</P>
          <P>(2) The right to give 90 days notice to owners to vacate occupied properties and the right to take possession of such properties when vacated;</P>
          <P>(3) The right to permit continued occupancy of a property until it is required for construction and, in those instances where such occupancy is to be for a substantial period of time, the right to enter into rental agreements, as appropriate, to protect the public interest;</P>
          <P>(4) The right to request assistance from the U.S. Attorney in obtaining physical possession where an owner declines to comply with the court order of possession;</P>
          <P>(5) The right to clear improvements and other obstructions;</P>
          <P>(6) Instructions that the U.S. Attorney be notified prior to actual clearing, so as to afford him an opportunity to view the lands and improvements, to obtain appropriate photographs, and to secure appraisals in connection with the preparation of the case for trial;</P>
          <P>(7) The requirement for appropriate credits to the United States for any net salvage or net rentals obtained by the State, as in the case of right-of-way acquired by the State for Federal-aid projects; and</P>
          <P>(8) Instructions that the authority granted to the SHD is not intended to preclude the U.S. Attorney from taking action, before the SHD has made arrangements for removal, to reach a settlement with the former owner which would include provision for removal.</P>
          <P>(f) If the Federal Government initiates condemnation proceedings against the owner of real property in a Federal Court and the final judgment is that the Federal agency cannot acquire the real property by condemnation, or the proceeding is abandoned, the court is required by law to award such a sum to the owner of the real property as will in the opinion of the court reimburse him for his reasonable costs, disbursements, and expenses, including reasonable attorney, appraisal, and engineering fees, actually incurred because of the condemnation proceedings.</P>
          <P>(g) As soon as practicable after the date of payment of the purchase price or the date of deposit in court of funds to satisfy the award of the compensation in a Federal condemnation, the FHWA shall reimburse the owner to the extent deemed fair and reasonable, the following costs:</P>
          <P>(1) Recording fees, transfer taxes, and similar expenses incidental to conveying such real property to the United States;</P>

          <P>(2) Penalty costs for prepayment of any preexisting recorded mortgage entered into in good faith encumbering such real property; and<PRTPAGE P="354"/>
          </P>
          <P>(3) The pro rata portion of real property taxes paid which are allocable to a period subsequent to the date of vesting title in the United States or the effective date of possession, whichever is the earlier.</P>
          <P>(h) The lands or interests in lands, acquired under these provisions, will be conveyed to the State or the appropriate political subdivision thereof, upon agreement by the SHD, or said subdivision to:</P>
          <P>(1) Maintain control of access where applicable;</P>
          <P>(2) Accept title thereto;</P>
          <P>(3) Maintain the project constructed thereon;</P>
          <P>(4) Abide by any conditions which may be set forth in the deed; and</P>
          <P>(5) Notify FHWA at the appropriate time that all the conditions have been performed by the State.</P>
          <P>(i) The Deed from the United States to the State, or to the appropriate political subdivision thereof, shall include the conditions required by 49 CFR part 21. The deed shall be recorded by the grantee in the appropriate land record office, and the FHWA shall be advised of the recording date.</P>
          <CITA>[39 FR 32604, Sept. 10, 1974, as amended at 41 FR 9321, Mar. 4, 1976]</CITA>
        </SECTION>
        <APPENDIX>
          <EAR>Pt. 712, Subpt. E, App. 1</EAR>
          <HD SOURCE="HED">Appendix 1 to Subpart E of Part 712—Application for Federal Land Transfers</HD>
          <FP SOURCE="FP-2">(1) <E T="03">Preparation of application</E>
          </FP>
          <P>The State's application, referenced in § 712.503, shall include or be accompanied by the following information:</P>
          <P>(a) The purpose for which the lands are to be used.</P>
          <P>(b) The estate or interest in the land required by State statute.</P>
          <P>(c) The Federal-aid project number.</P>
          <P>(d) The name of the Federal agency exercising jurisdiction over the land and identity of the installation or activity in possession of the land.</P>
          <P>(e) A commitment to construct the highway on or to remove materials from the lands to be transferred within a period of not more than 10 years following the transfer of the lands to the State.</P>
          <P>(f) A map showing the survey of the lands to be acquired.</P>
          <P>(g) A legal description of the lands desired.</P>

          <P>(h) A statement on compliance with the National Environmental Policy Act of 1969 (42 U.S.C. 4332, <E T="03">et seq.</E>), the Historic Preservation Act (16 U.S.C. 470(f)), and with provisions for Preservation of Parklands (49 U.S.C. 1653(f)), if applicable.
          </P>
          <FP SOURCE="FP-2">(2) <E T="03">Submission of application.</E>
          </FP>
          
          <P>The application referenced in § 712.503 shall be submitted to FHWA, except as otherwise prescribed herein. Certain Federal agencies have special legislation for granting rights-of-way over lands under their jurisdictions and may proceed under their own laws. In those cases, the SHD should file its application directly with the Federal agency. Although they have special authority, the Federal agencies sometimes wish to proceed under 23 U.S.C. 107(d) and 317 and, in such cases, the application should be filed with the FHWA. The agencies having special authority which would permit the State to file its application directly are as follows:</P>
          <P>(a) <E T="03">Bureau of Indian Affairs.</E> Application should be submitted directly to the Bureau of Indian Affairs, Washington, DC, for rights-of-way across tribal lands or individually owned lands held in trust by the United States or encumbered by Federal restrictions. All other lands held by the Bureau of Indian Affairs are transferred under 23 U.S.C. 107(d) and 317.</P>
          <P>(b) <E T="03">Army or Air Force.</E> State should submit its application directly to the installation commander and the appropriate District Engineer, Corps of Engineers, Department of the Army.</P>
          <P>(c) <E T="03">Navy.</E> State should submit its application directly to the District Public Works Officer of the Naval District involved.</P>
          <P>(d) <E T="03">Veterans Administration.</E> State should submit its application directly to the Director, Veterans Administration, Washington, DC.</P>
          <CITA>[39 FR 32604, Sept. 10, 1974]</CITA>
        </APPENDIX>
      </SUBPART>
      <SUBPART>
        <HD SOURCE="HED">Subpart F—Functional Replacement of Real Property in Public Ownership</HD>
        <SOURCE>
          <HD SOURCE="HED">Source:</HD>
          <P>39 FR 33312, Sept. 17, 1974, unless otherwise noted.</P>
        </SOURCE>
        <SECTION>
          <SECTNO>§ 712.601</SECTNO>
          <SUBJECT>Purpose.</SUBJECT>
          <P>This regulation prescribes Federal Highway Administration (FHWA) policies on functional replacement of real property in public ownership.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 712.602</SECTNO>
          <SUBJECT>Applicability.</SUBJECT>

          <P>The provisions of this regulation are applicable, to the extent practicable under State law, to all States and political subdivisions thereof that acquire real property for any highway or highway related project in which Federal funds will participate in any part <PRTPAGE P="355"/>of the right-of-way costs of the project. The provisions of this regulation do not apply to real property owned by utilities or railroads.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 712.603</SECTNO>
          <SUBJECT>Federal lands.</SUBJECT>

          <P>Acquisition of real property in Federal ownership shall be in accordance with FHWA regulations on Federal land transfers in 23 CFR 712.501 <E T="03">et seq.</E>
          </P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 712.604</SECTNO>
          <SUBJECT>Functional replacement.</SUBJECT>
          <P>(a) Where the State highway department (SHD) so requests, and can, pursuant to State law, incur costs for the functional replacement of real property in public ownership, Federal funds may participate in such replacement costs provided that it is demonstrated, and FHWA concurs, that functional replacement is in the public interest. Application of functional replacement procedures is at the SHD's election, subject to FHWA approval of a SHD's request.</P>
          <P>(b) For the purpose of this regulation, functional replacement is defined as the replacement of real property, either lands or facilities, or both, acquired as a result of a highway or highway related project with lands or facilities, or both, which will provide equivalent utility.</P>
          <P>(c) Application of this policy, and Federal participation in costs pursuant thereto require that:</P>
          <P>(1) The property to be functionally replaced is in public ownership,</P>
          <P>(2) State law permits the incurrence of functional replacement costs,</P>
          <P>(3) FHWA has concurred that functional replacement is in the public interest,</P>
          <P>(4) FHWA has granted authorization to proceed on such basis prior to incurrence of costs,</P>
          <P>(5) The functional replacement actually takes place, and the costs of replacement are actually incurred, and</P>
          <P>(6) Replacement sites and construction are in compliance with existing codes, laws, and zoning regulations for the area in which the facility is located.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 712.605</SECTNO>
          <SUBJECT>Federal participation.</SUBJECT>
          <P>(a) Federal funds may participate in functional replacement costs on the following basis:</P>
          <P>(1) The actual functional replacement cost of the facilities required to be replaced, and</P>
          <P>(2) The appraised current fair market value of the land to be acquired for highway purposes when the owning agency has land on which to relocate the facilities, or the reasonable costs of acquiring a functionally equivalent substitute site where lands in the same public ownership are not available or suitable.</P>
          <P>(b) Costs of increases in capacity and other betterments are not eligible for Federal participation except those necessary to replace utility; those required by existing codes, laws, and zoning regulations; and those related to reasonable prevailing standards for the type of facility being replaced.</P>
          <P>(c) Where it is found that the appraised fair market value of the property to be acquired exceeds the cost of functional replacement. Federal funds may participate in the fair market value amount.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 712.606</SECTNO>
          <SUBJECT>Procedures.</SUBJECT>
          <P>(a) During the early stages of project development, SHD officials should meet with the owning agency to discuss the effect of a possible acquisition and potential application of functional replacement procedures. The results of discussions and decisions concerning functional replacement should be included in negative declarations and environmental impact and section 4(f) statements if required on a project.</P>
          <P>(b) At the earliest practicable time, the SHD shall have the property appraised and establish an amount it believes to be just compensation, and shall advise the owning agency of the amount established. Subject to the requirements of this regulation, the owning agency has the option of accepting the amount of compensation established by the appraisal process or accepting functional replacement. The owning agency may waive its right to have an estimate of compensation established by the appraisal process if it prefers functional replacement.</P>

          <P>(c) If the owning agency desires functional replacement, it should initiate a formal request to the SHD, and fully explain why it would be in the public interest.<PRTPAGE P="356"/>
          </P>
          <P>(d) If the SHD agrees that functional replacement is necessary and in the public interest, it must submit a specific request for FHWA concurrence. The request should include:</P>
          <P>(1) Cost estimate data relative to contemplated solutions,</P>
          <P>(2) Agreements reached at meetings between the SHD and the owning agency, and</P>
          <P>(3) An explanation of the basis for its request.</P>
          <FP>The request shall include a statement that replacement property will be acquired in accordance with the provisions of the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 and applicable FHWA regulations.</FP>
          <P>(e) After concurrence by FHWA that functional replacement is in the public interest, FHWA may, at SHD request, authorize the SHD to proceed with the acquisition of the substitute site and to proceed with physical construction of minor structures, or, in the case of major improvements, to proceed with development of detailed plans, specifications and estimates.</P>
          <P>(f) The plans, specifications, and estimates, and modifications thereof, shall be submitted to FHWA for review and approval in accordance with established procedures. Where major improvements are involved, advertising for bids and letting of the contract to construct the replacement facility may follow the general procedures utilized by the owning agency, if acceptable to the SHD and FHWA. The submission, where applicable, shall include provisions for SHD inspection during construction of the replacement facility.</P>
          <P>(g) Prior to FHWA concurrence in the awarrd for actual construction, an agreement shall be entered into setting forth the rights, obligations and duties of each party with regard to the faculty being acquired, the acquisition of the replacement site, and the construction of the replacement facility. The executed agreement shall also set forth how the costs of the new facility are to be shared between the parties.</P>
          <P>(h) The SHD's request for final payment shall include:</P>
          <P>(1) A statement signed by an appropriate official of the owning agency and the SHD certifying that the cost of the replacement facility has actually been incurred in accordance with the provisions of the executed agreement.</P>
          <P>(2) The statement shall also certify that a final inspection of the facility was made by the SHD and owning agency and that the SHD is released from any further responsibility.</P>
        </SECTION>
      </SUBPART>
      <SUBPART>
        <HD SOURCE="HED">Subpart G—Right-of-Way Revolving Fund</HD>
        <SECTION>
          <SECTNO>§ 712.701</SECTNO>
          <SUBJECT>Purpose.</SUBJECT>
          <P>To prescribe Federal Highway Administration (FHWA) policy and procedure for the advance acquisition of rights-of-way using the right-of-way revolving fund established under 23 U.S.C. 108(c).</P>
          <CITA>[39 FR 26421, July 19, 1974. Redesignated at 39 FR 28629, Aug. 9, 1974]</CITA>
        </SECTION>
        <SECTION>
          <SECTNO>§ 712.702</SECTNO>
          <SUBJECT>Policies.</SUBJECT>
          <P>(a) A revolving fund has been established for the purpose of acquiring rights-of-way for future construction of highways on any Federal-aid system.</P>
          <P>(b) The funds advanced may be used to pay the entire costs (State and Federal share) of projects for the acquisition of rights-of-way, including related moving and relocation payments and last resort housing, utility relocations, and the net cost to the State of property management. Advancement of cash, repayment of cash, and accounting requirements shall be in accordance with 23 CFR part 130, subpart D.</P>
          <P>(c) Revolving funds and obligational authority will be allocated by FHWA to individual projects on a need-for-and-ability-to-use basis.</P>
          <P>(d) Actual construction of a highway on rights-of-way, with respect to which revolving funds are advanced, shall be commenced within a period of not less than 2 years nor more than 10 years following the end of the fiscal year in which the advance of funds is made to the right-of-way project, unless FHWA in its discretion shall provide an earlier or later termination date.</P>
          <CITA>[39 FR 26421, July 19, 1974. Redesignated at 39 FR 28629, Aug. 9, 1974, and amended at 41 FR 9321, Mar. 4, 1976; 41 FR 24347, June 16, 1976]</CITA>
        </SECTION>
        <SECTION>
          <PRTPAGE P="357"/>
          <SECTNO>§ 712.703</SECTNO>
          <SUBJECT>Procedures.</SUBJECT>
          <P>(a) When a State highway department has a project it wishes to finance from the revolving fund or additional funds are needed for an existing revolving fund project, a letter asking for allocation of funds shall be submitted to FHWA.</P>
          <P>(b) If funds are available, FHWA will allocate them to a specific project and authorize obligation of such funds.</P>
          <P>(c) After the State has been advised of fund allocation, the project shall be programed, and right-of-way work shall be authorized by FHWA under regular Federal-aid procedures. Each regular project prefix number shall be preceded by the letter Q. The FHWA letter of authorization to proceed shall constitute an obligation of the right-of-way revolving fund. Revolving fund projects are subject to environmental, location, and design requirements in the same manner as regular Federal-aid projects.</P>
          <P>(d) All right-of-way work on revolving fund projects shall be accomplished in accordance with procedures and requirements applicable to regular Federal-aid projects.</P>
          <P>(e) If situations should develop which prevent work from progressing on individual right-of-way revolving fund projects in a timely manner, the State shall notify FHWA so that the obligational authority may be withdrawn.</P>
          <CITA>[39 FR 26421, July 19, 1974. Redesignated at 39 FR 28629, Aug. 9, 1974, and amended at 47 FR 10530, Mar. 11, 1982]</CITA>
        </SECTION>
      </SUBPART>
    </PART>
    <PART>
      <EAR>PT. 713</EAR>
      <HD SOURCE="HED">PART 713—RIGHT-OF-WAY—THE PROPERTY MANAGEMENT FUNCTION</HD>
      <CONTENTS>
        <SUBPART>
          <HD SOURCE="HED">Subpart A—Property Management</HD>
          <SECHD>Sec.</SECHD>
          <SECTNO>713.101</SECTNO>
          <SUBJECT>Purpose.</SUBJECT>
          <SECTNO>713.102</SECTNO>
          <SUBJECT>Applicability.</SUBJECT>
          <SECTNO>713.103</SECTNO>
          <SUBJECT>Policies and procedures.</SUBJECT>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart B—Management of Airspace</HD>
          <SECTNO>713.201</SECTNO>
          <SUBJECT>Purpose.</SUBJECT>
          <SECTNO>713.202</SECTNO>
          <SUBJECT>Applicability.</SUBJECT>
          <SECTNO>713.203</SECTNO>
          <SUBJECT>Definition.</SUBJECT>
          <SECTNO>713.204</SECTNO>
          <SUBJECT>Policies.</SUBJECT>
          <SECTNO>713.205</SECTNO>
          <SUBJECT>Inventory.</SUBJECT>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart C—Disposal of Rights-of-Way</HD>
          <SECTNO>713.301</SECTNO>
          <SUBJECT>Purpose.</SUBJECT>
          <SECTNO>713.302</SECTNO>
          <SUBJECT>Applicability.</SUBJECT>
          <SECTNO>713.303</SECTNO>
          <SUBJECT>Definitions.</SUBJECT>
          <SECTNO>713.304</SECTNO>
          <SUBJECT>General requirements.</SUBJECT>
          <SECTNO>713.305</SECTNO>
          <SUBJECT>Application for approval.</SUBJECT>
          <SECTNO>713.306</SECTNO>
          <SUBJECT>Excess right-of-way resulting from plan changes.</SUBJECT>
          <SECTNO>713.307</SECTNO>
          <SUBJECT>Credit to Federal funds.</SUBJECT>
          <SECTNO>713.308</SECTNO>
          <SUBJECT>Uneconomic remnants.</SUBJECT>
        </SUBPART>
      </CONTENTS>
      <AUTH>
        <HD SOURCE="HED">Authority:</HD>
        <P>23 U.S.C. 101(a), 142(f), 156, and 315; 42 U.S.C. 4633 and 4651-4655; 23 CFR 1.32; 49 CFR 1.48 (b) and (cc), 18.31 and parts 21 and 24.</P>
      </AUTH>
      <SOURCE>
        <HD SOURCE="HED">Source:</HD>
        <P>39 FR 34651, Sept. 27, 1974, unless otherwise noted.</P>
      </SOURCE>
      <SUBPART>
        <HD SOURCE="HED">Subpart A—Property Management</HD>
        <SECTION>
          <SECTNO>§ 713.101</SECTNO>
          <SUBJECT>Purpose.</SUBJECT>
          <P>This subpart prescribes Federal Highway Administration (FHWA) policies and procedures for the management of real property acquired in connection with Federal-aid highway projects.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 713.102</SECTNO>
          <SUBJECT>Applicability.</SUBJECT>
          <P>The policies in § 713.103 are applicable to all State and political subdivisions thereof that manage real property acquired for any highway or highway related project in which Federal funds will participate in any part of the right-of-way costs of the project. States are encouraged to adopt these procedures for all projects in which Federal funds will participate in any part of the project.</P>
          <CITA>[50 FR 34093, Aug. 23, 1985]</CITA>
        </SECTION>
        <SECTION>
          <SECTNO>§ 713.103</SECTNO>
          <SUBJECT>Policies and procedures.</SUBJECT>
          <P>(a) The State highway department (SHD) shall establish property management policies and procedures that will assure control and administration of lands and improvements acquired for right-of-way purposes. These procedures shall establish:</P>
          <P>(1) Property records showing:</P>
          <P>(i) An inventory of all improvements acquired as a part of the right-of-way;</P>
          <P>(ii) An accounting of the property management expenses and the rental payments received; and</P>

          <P>(iii) An accounting of the disposition of improvements and the recovery payments received.<PRTPAGE P="358"/>
          </P>
          <P>(2) Methods for accomplishing the clearing of right-of-way when such clearance is performed separately from the contract for the physical construction of the project.</P>
          <P>(3) The methods for managing the rodent control program.</P>
          <P>(4) The methods for employing private firms or public agencies for the management of real property.</P>
          <P>(5) The methods for accomplishing the disposition of improvements through resale, salvage, owner retention, or other means.</P>
          <P>(b) [Reserved]</P>
          <P>(c) Property management activities shall be handled in a manner consistent with the public interest and designed to reflect the maximum long-range public benefit.</P>
          <P>(d) The acquiring agency is responsible for the preservation of the improvements and for reasonable safety measures when it has acquired ownership and possession of the property.</P>
          <P>(e) Clearing acquired improvements under a clearing contract is considered:</P>
          <P>(1) A right-of-way item when the clearing is performed separately from the contract for physical construction. The applicability of the provisions of volume 6, chapter 4, of the Federal-Aid Highway Program Manual <SU>1</SU>
            <FTREF/> shall be determined in accordance with the criteria set forth for the requirement of wage determinations in the FHWA Labor Compliance Manual. <SU>2</SU>
            <FTREF/>
          </P>
          <FTNT>
            <P>
              <SU>1</SU> The Federal-Aid Highway Program Manual may be examined at the Federal Highway Administration; 400 7th Street SW., Washington, DC 20590.</P>
          </FTNT>
          <FTNT>
            <P>
              <SU>2</SU> The FHWA Labor Compliance Manual may be examined at the Federal Highway Administration; 400 7th Street SW., Washington, DC 20590.</P>
          </FTNT>
          <P>(2) A construction item within the provisions of volume 6, chapter 4, of the Federal-Aid Highway Program Manual <SU>2</SU> when the clearing is performed as a part of the physical construction contract.</P>
          <P>(f) Rodent control procedures shall assure that the acquiring agency:</P>
          <P>(1) Determines and documents the need for extermination services through periodic field inspections.</P>
          <P>(2) Coordinates with other interested agencies, such as State, county, and city health departments, and</P>
          <P>(3) Completes required extermination measures prior to demolition or removal of improvements.</P>
          <P>(g) Acquired rights-of-way shall be maintained in a manner which will prevent or correct problems such as illegal dumping or disposal of rubble, debris, and garbage on cleared Federal-aid highway right-of-way until needed for construction.</P>
          <P>(h) Where the acquired right-of-way includes areas for future construction, in addition to that required for immediate construction, the SHD may permit or lease the temporary use of this area until it is needed for highway purposes. The SHD may allow this temporary use when:</P>
          <P>(1) The SHD has approved temporary right-of-way limits within the overall right-of-way in accordance with SHD procedures approved by the FHWA;</P>
          <P>(2) The integrity and safety of the highway facility constructed elsewhere on the right-of-way are assured; and</P>
          <P>(3) There is no decrease in the extent of access control to the highway facility constructed elsewhere on the right-of-way.</P>
          <CITA>[39 FR 34651, Sept. 27, 1974, as amended at 50 FR 34093, Aug. 23, 1985; 59 FR 25327, May 16, 1994]</CITA>
        </SECTION>
      </SUBPART>
      <SUBPART>
        <HD SOURCE="HED">Subpart B—Management of Airspace</HD>
        <SECTION>
          <SECTNO>§ 713.201</SECTNO>
          <SUBJECT>Purpose.</SUBJECT>
          <P>To prescribe Federal Highway Administration (FHWA) policies relating to the management of airspace on Federal-aid highway systems for nonhighway purposes.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 713.202</SECTNO>
          <SUBJECT>Applicability.</SUBJECT>
          <P>(a) The provisions of this subpart apply to the use of airspace on the Federal-aid highway systems, except as provided in paragraph (b) of this section.</P>

          <P>(b) This subpart does not apply to railroads and public utilities which cross or otherwise occupy Federal-aid highway rights-of-way, nor to relocations of railroads or utilities for which reimbursement is claimed under subparts H and E of part 140 of this chapter; joint development and multiple <PRTPAGE P="359"/>use of highway rights-of-way as covered in volume 7, chapter 7, section 8 of the Federal-Aid Highway Program Manual; <SU>3</SU>
            <FTREF/> and bikeways and pedestrian walkways as covered in part 652 of this chapter.</P>
          <FTNT>
            <P>
              <SU>3</SU> The Federal-Aid Highway Program Manual may be examined at the Federal Highway Administration; 400 7th Street SW., Washington, DC 20590.</P>
          </FTNT>
        </SECTION>
        <SECTION>
          <SECTNO>§ 713.203</SECTNO>
          <SUBJECT>Definition.</SUBJECT>
          <P>Air space, as used in this subpart, is that space located above, at, or below the highway's established gradeline, lying within the approved right-of-way limits.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 713.204</SECTNO>
          <SUBJECT>Policies.</SUBJECT>
          <P>(a) Where a State highway department (SHD) has acquired sufficient legal right, title, and interest in the right-of-way of a highway on a Federal-aid system to permit the use of certain airspace for nonhighway purposes, and where such airspace is not required presently or in the foreseeable future for the safe and proper operation and maintenance of the highway facility, the right to temporary or permanent occupancy or use of such airspace may be granted by the SHD subject to prior FHWA approval.</P>
          <P>(b) The airspace required to accommodate foreseeable future expansion of the highway facility may not be used for nonhighway purposes except under the provisions of subpart A of this part, relating to property management.</P>
          <P>(c) In any case where sufficient land exists within the publicly acquired rights-of-way of any Federal-aid highway system to accommodate needed rail or nonhighway public mass transit facilities and where this can be accomplished without impairing automotive safety or future highway improvements, the FHWA may authorize a SHD to make such lands and rights-of-way available without charge to a publicly owned mass transit authority for such purposes whenever it may deem that the public interest will be served thereby.</P>
          <P>(d) If found to be consistent with highway designs, any portion of right-of-way may be used for green strips, small parks, play areas, parking or other highway related public use, or for any other public or quasi-public use which would assist in integrating the highway into the local environment and enhancing other publicly supported programs. Normally, the SHD should retain supervision and jurisdiction over such lands but could enter into agreements with local political subdivisions relative thereto.</P>
          <P>(e) An individual, company, organization, or public agency desiring to use airspace as defined herein shall submit an application therefor to the SHD in a manner and form deemed appropriate by the SHD. Applications, including a proposed airspace agreement, shall be forwarded to the FHWA together with SHD recommendations for approval and any necessary supplemental information. The submission shall affirmatively provide for adherence to all policy requirements contained in this subpart where such are appropriate to the intended use.</P>
          <P>(f) All nonhighway use of airspace shall be covered by a properly executed airspace agreement. The agreement shall contain the following:</P>
          <P>(1) The party responsible for developing and operating the airspace.</P>
          <P>(2) A general statement of the proposed use.</P>
          <P>(3) The general design for the use of the space, including any facilities to be constructed, and such maps, plans, or sketches as are necessary to set out pertinent features in relation to the highway facility.</P>
          <P>(4) A detailed three-dimensional description of the space to be used, except when the surface area beneath an elevated highway structure or adjacent to a highway roadway is to be used for recreation, public park, beautification, parking of motor vehicles, public mass transit facilities, and other similar uses. In such cases, a metes and bounds description of the surface area, together with appropriate plans or cross sections clearly defining the vertical use limits may be furnished in lieu of a three-dimensional description.</P>

          <P>(5) Provision that any significant revision in the design or construction of a facility described in subsection 5f(3) above shall receive prior approval by the SHD subject to concurrence by the FHWA.<PRTPAGE P="360"/>
          </P>
          <P>(6) Provision that any change in the authorized use of airspace shall receive prior approval by the SHD subject to concurrence by the FHWA.</P>
          <P>(7) Provision that such airspace shall not be transferred, assigned, or conveyed to another party without prior SHD approval subject to concurrence by the FHWA.</P>
          <P>(8) Provision that the agreement will be revocable in the event that the airspace facility ceases to be used or is abandoned.</P>
          <P>(9) Provision for the agreement to be revoked if the agreement is violated and such violation is not corrected within a reasonable length of time after written notice of noncompliance has been given. Further, that in the event the agreement is revoked and the SHD deems it necessary to request the removal of the facility occupying the airspace, the removal shall be accomplished by the responsible party in a manner prescribed by the SHD at no cost to the FHWA. An exception to this provision is permitted when the improvements revert to the State upon termination of the agreement.</P>
          <P>(10) When deemed necessary by the SHD or the FHWA, provision for adequate insurance by the responsible party for the payment of any damages which may occur during or after construction of the airspace facilities to hold the State harmless. Exception to this requirement may be made where the proposal is for the use by a public or quasi-public agency, when such agency is assigned the specific responsibility for payment of any related damages occurring to the highway facility and to the public for personal injury, loss of life, and property damage.</P>
          <P>(11) Provision for the SHD and authorized FHWA representatives to enter the airspace facility for the purpose of inspection, maintenance, or reconstruction of the highway facility when necessary.</P>
          <P>(12) Provision that the facility to occupy the airspace will be maintained so as to assure that the structures and the area within the highway right-of-way boundaries will be kept in good condition, both as to safety and appearance, and that such maintenance will be accomplished in a manner so as to cause no unreasonable interference with highway use. In the event the responsible party fails in its maintenance obligations, there will be provision for the SHD to enter the premises to perform such work.</P>
          <P>(13) Appropriate provisions of Appendix “C” of the State's Civil Rights Assurances <SU>4</SU>
            <FTREF/> with respect to title VI of the Civil Rights Act of 1964 and 49 CFR part 21.</P>
          <FTNT>
            <P>
              <SU>4</SU> Appendix “C” of the State's Civil Rights Assurances may be examined at any office of the State Highway Department or at the Federal Highway Administration; 400 7th Street SW., Washington, DC 20590.</P>
          </FTNT>
          <P>(g) Use of air space beneath the established gradeline of the highway shall provide sufficient vertical and horizontal clearances for the construction, operation, maintenance, ventilation, and safety of the highway facility.</P>
          <P>(h) The proposed use of airspace above the established gradeline of the highway shall not, at any point between two points established 15 feet beyond the two outer edges of the geometric section (highway prism) of the highway, extend below a horizontal plane which is at least 16 feet 4 inches above the gradeline of the highway, or the minimum vertical clearance plus 4 inches as approved by the State, except as necessary for columns, foundations or other support structures. Where control and directional signs needed for the highway are to be installed beneath an overhead structure, vertical clearance will be at least 20 feet from the gradeline of the highway to the lowest point of the soffit of the overhead structure. Exceptions to the lateral limits set forth above, when justified by the SHD, may be considered on an individual basis by the FHWA.</P>
          <P>(i) Piers, columns, or any other portion of the airspace structure shall not be erected in a location which will interfere with visibility or reduce sight distance or in any other way interfere materially with the safety and free flow of traffic on the highway facility.</P>

          <P>(j) The structural supports for the airspace facility shall be located to clear all horizontal and vertical dimensions established by the SHD. Supports shall be clear of the shoulder or safety walks of the outer roadway. However, supports may be located in the median <PRTPAGE P="361"/>or outer separation when the SHD determines and the FHWA concurs that such medians and outer separations are of sufficient width. All supports are to be back of or flush with the face of any wall at the same location. Supports shall be adequately protected by means acceptable to the SHD and the FHWA. No supports shall be located in the ramp gores, or in a position so as to interfere with the signing necessary for the proper use of the ramp.</P>
          <P>(k) The use of airspace shall not result in either highway or nonhighway users being unduly exposed to hazardous conditions because of highway location, design, maintenance, and operation features.</P>
          <P>(l) Appropriate safety precautions and features necessary to minimize the possibility of injury to users of either the highway facility or airspace due to traffic accidents occurring on the highway or accidents resulting from nonhighway uses shall be provided. Airspace facilities shall not be approved for construction over or under the highways, unless the plans therefor contain adequate provisions, acceptable to the SHD and the FHWA, for evacuation of the structures or facilities in case of a major accident endangering the occupants of such structures or facilities.</P>
          <P>(m) Any airspace facility shall be fire resistant in accordance with the provisions of the local applicable building codes found to be acceptable by the SHD and the FHWA. Such airspace facility shall not be used for the manufacture or storage of flammable, explosive, or hazardous material or for any occupation which is deemed by the SHD or the FHWA to be a hazard to highway or nonhighway users. Proposals involving the construction of improvements in airspace should be approved by the State authority responsible for fire protection standards. In cases where the SHD or the FHWA questions the acceptability of the existing code, conformance with a nationally accepted model building code will be required.</P>
          <P>(n) No structure or structures built over a highway facility shall occupy more length of the highway than will permit adequate natural ventilation of the enclosed section of the highway for the conditions at the location, assuming a volume of traffic equal to capacity. Each such covered length shall be preceded and followed by uncovered lengths of highway that will safely affect natural ventilation. The SHD shall determine such lengths for each particular case, subject to FHWA concurrence. Exceptions may be considered when complete tunnel ventilation is provided. Unless tunnel ventilation is provided, structures over highways shall be so designed and constructed as to facilitate natural ventilation of the highway. To this end, the underside and any supports for such structures shall have smooth and easily cleanable surfaces. Supports for such structures shall leave as much open space on the sides of the highway as feasible. Such space shall be appropriately graded where deemed necessary or desirable by the SHD.</P>
          <P>(o) The design, occupancy, and use of any structure over or under a highway facility shall be such that neither the use, safety, appearance, nor the enjoyment of the highway will be adversely affected by fumes, vapors, odors, drippings, droppings, or discharges of any kind therefrom.</P>
          <P>(p) On-premise signs, displays, or devices may be erected on structures occupying highway airspace, but shall be restricted to those indicating ownership and type of on-premise activities and shall be subject to regulation by the SHD and the FHWA with respect to number, size, location, and design.</P>
          <P>(q) Construction of any structure above or below a highway facility shall not require any temporary or permanent change in alignment or profile of an existing highway without prior approval by the SHD and the FHWA.</P>

          <P>(r) Where either the SHD or the FHWA is of the opinion that the proposed use of airspace requires changes in or additions to existing highway facilities for the proper operation and maintenance of highways, such facilities shall be provided without cost to Federal funds. There may be exception to this policy when the proposed use is for highway related or other public or quasi-public use which would assist in integrating the highway into the local <PRTPAGE P="362"/>environment and enhance other publicly supported programs. This provision is not intended to expand existing limitations upon expenditures from the highway trust fund, nor is it intended to conflict with the provisions of volume 7, chapter 7, section 8, of the Federal-Aid Highway Program Manual, <SU>5</SU>
            <FTREF/> relating to joint development of highway corridors and multiple use of roadway properties.</P>
          <FTNT>
            <P>
              <SU>5</SU> The Federal-Aid Highway Program Manual may be examined at the Federal Highway Administration; 400 7th Street SW., Washington, DC 20590.</P>
          </FTNT>
          <P>(s) Proposed airspace facilities shall be designed and constructed in a manner which will permit access to the highway facility for the purpose of inspection, maintenance, and reconstruction when necessary.</P>
          <P>(t) Permission shall not be granted for any use of airspace which does not conform with the provisions of current, appropriate Federal Aviation Administration regulations.</P>
          <P>(u) Approval for the use and occupancy of highway right-of-way for the parking of motor vehicles shall be granted only if proper consideration has been given to the need for the following:</P>
          <P>(1) Parking design or arrangement to assure orderly and functional parking.</P>
          <P>(2) Plantings or other screening measures to improve the esthetics and appearance of the area.</P>
          <P>(3) Surfacing, lighting, fencing, striping, curbs, wheel stops, pier protection devices, etc.</P>
          <P>(4) Access for fire protection and fire fighting equipment.</P>
          <P>(v) Disposition of income received from the authorized use of airspace shall be the SHD's responsibility and credit to Federal funds is not required.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 713.205</SECTNO>
          <SUBJECT>Inventory.</SUBJECT>
          <P>The SHD shall maintain an inventory of all authorized uses of airspace. This inventory which shall be available for review by appropriate Federal and State agencies shall include but not be limited to the following items for each authorized use of airspace:</P>
          <P>(a) Location by project, survey station, or other appropriate method.</P>
          <P>(b) Identification of the authorized user of the airspace.</P>
          <P>(c) A three-dimensional description or a metes and bounds description.</P>
          <P>(d) As-built construction plans of the highway facility at the location where the use of airspace was authorized.</P>
          <P>(e) Pertinent construction plans of the facility authorized to occupy the airspace.</P>
          <P>(f) A copy of the executed airspace agreement.</P>
        </SECTION>
      </SUBPART>
      <SUBPART>
        <HD SOURCE="HED">Subpart C—Disposal of Rights-of-Way</HD>
        <SECTION>
          <SECTNO>§ 713.301</SECTNO>
          <SUBJECT>Purpose.</SUBJECT>
          <P>This subpart prescribes Federal Highway Administration (FHWA) policies and procedures for disposal of portions of highway rights-of-way no longer needed for highway purposes.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 713.302</SECTNO>
          <SUBJECT>Applicability.</SUBJECT>
          <P>(a) The provisions of this subpart apply to disposals of rights-of-way where Federal-aid highway funds have participated in either the right-of-way or physical construction costs of a project.</P>
          <P>(b) The provisions of this subpart do not apply to the matters covered in part 620, subpart B of this chapter.</P>
          <P>(1) Where a section of highway including the right-of-way is abandoned;</P>
          <P>(2) Where only changes in access control are involved; and</P>
          <P>(3) To relinquishments of highway facilities for continued use for highway purposes.</P>
          <P>(c) The provisions of this section do not apply:</P>
          <P>(1) Where whole sections of the Interstate System are withdrawn under the provisions of 23 U.S.C. 103(e)(2) and (4), or</P>
          <P>(2) Where real property has been acquired for planned highway purposes, but because of environmental concerns, widespread public objections, or other similar considerations, the State highway department (SHD) or other appropriate State authority determines not to construct the planned highway facility.</P>
          <CITA>[39 FR 34651, Sept. 27, 1974, as amended at 40 FR 3767, Jan. 24, 1975; 41 FR 9321, Mar. 4, 1976]</CITA>
        </SECTION>
        <SECTION>
          <PRTPAGE P="363"/>
          <SECTNO>§ 713.303</SECTNO>
          <SUBJECT>Definitions.</SUBJECT>
          <P>For purposes of this subpart the following definitions apply:</P>
          <P>(a) <E T="03">Disposal.</E> The conveyance for uses other than for highways of unneeded portions of highway rights-of-way (in contrast to relinquishment, which is the conveyance of a portion of a highway right-of-way or facility by a State highway department (SHD) to another government agency for highway use).</P>
          <P>(b) <E T="03">Final acceptance.</E> (1) On Federal-aid construction projects, the date of acceptance of the physical construction by FHWA; and</P>
          <P>(2) On Federal-aid right-of-way projects, where there is no Federal-aid construction, the date the FHWA determines to be the date of completion of the acquisition of the right-of-way authorized by FHWA to be acquired for the project.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 713.304</SECTNO>
          <SUBJECT>General requirements.</SUBJECT>
          <P>(a) The conveyance may be to any public entity or private party.</P>
          <P>(b) When disposal of unneeded portions of highway rights-of-way involve a change in the access control line, provisions of part 620, subpart B of this chapter also apply.</P>
          <P>(c) Federal, State and local conservation, recreation, park, or other appropriate agencies shall be afforded the opportunity to acquire by purchase or donation in accordance with the State law, tracts of right-of-way being considered for disposal when there is indication that such tracts have a present or potential use for parks, conservation, recreational or related purposes. The SHD shall notify the appropriate agencies of its intention to dispose of unneeded portions of right-of-way which it considers to have present or potential use for the aforementioned purposes.</P>
          <P>(d) Lands or interests therein are not to be disposed of if they are suitable for retention in order to restore, preserve, or improve the scenic beauty and environmental quality adjacent to the highway.</P>
          <P>(e) When right-of-way which has been acquired with Federal-aid participation is disposed of without requiring a credit to Federal funds, the instrument of conveyance shall contain appropriate provisions of “Appendix C” of the State's title VI Civil Rights Assurances <SU>6</SU>
            <FTREF/> with respect to the Civil Rights Act of 1964, and the Department of Transportation Regulations (49 CFR part 21).</P>
          <FTNT>
            <P>
              <SU>6</SU> Appendix “C” of the State's Civil Rights Assurances may be examined at any office of the State Highway Department or at the Federal Highway Administration; 400 7th Street, SW., Washington, DC 20590.</P>
          </FTNT>
          <CITA>[39 FR 34651, Sept. 27, 1974, as amended at 41 FR 9321, Mar. 4, 1976]</CITA>
        </SECTION>
        <SECTION>
          <SECTNO>§ 713.305</SECTNO>
          <SUBJECT>Application for approval.</SUBJECT>
          <P>(a) A SHD shall submit a request to FHWA for prior approval to dispose of highway rights-of-way when the determination that the property is no longer needed for highway purposes occurs after:</P>
          <P>(1) Final acceptance of a Federal-aid physical construction project, where Federal funds have participated in the right-of-way and construction costs, or construction costs only; or</P>
          <P>(2) Final acceptance of a right-of-way acquisition project where Federal-aid highway funds do not participate in the cost of the physical construction.</P>
          <P>(b) The request shall include:</P>
          <P>(1) An explanation of why the right-of-way is not needed; and</P>
          <P>(2) A plan which identifies the right-of-way proposed for disposition in relation to construction features and to the remaining right-of-way.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 713.306</SECTNO>
          <SUBJECT>Excess right-of-way resulting from plan changes.</SUBJECT>
          <P>(a) Prior to final acceptance of a project, a portion of the right-of-way authorized by FHWA and acquired by the SHD may become unnecessary for the highway project. The unneeded portion usually results from plan changes. Right-of-way authorized and acquired to a natural boundary, but not incorporated into the right-of-way at the time of final acceptance of the project, is considered to be in the nature of a plan change.</P>
          <P>(b) When the plan change results in excess right-of-way, a separate request for prior approval of disposal need not be submitted.</P>

          <P>(c) Where credit to Federal funds is required in accordance with § 713.307 and the determination as to the <PRTPAGE P="364"/>unneeded right-of-way is made prior to final acceptance of the project, the disposal shall be accomplished prior to submission of the final voucher for the project or not later than 2 years from the time the highway facility is opened to traffic, whichever is earlier. However, prior to expiration of the specified time period, the SHD may request and the FHWA may approve an extension of the time. If the property is not sold within the approved time limit, the cost of acquisition of the unneeded portion must be credited to the project if Federal reimbursement has been made therefor.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 713.307</SECTNO>
          <SUBJECT>Credit to Federal funds.</SUBJECT>
          <P>(a) When right-of-way is disposed of to another governmental agency for public use, FHWA does not require a charge to the agency and no credit to Federal funds is required. If, for any reason, there is a payment to the State for the land transferred and Federal funds participated in the cost of acquisition of the right-of-way, the amount received shall be credited to Federal funds at the same pro rata share as Federal funds participated in the cost of acquisition of the right-of-way.</P>
          <P>(b) If the disposal is to a part other than a Federal, State, or local governmental agency for public use, and Federal funds participated in the cost of acquisition of the right-of-way, there shall be a credit to Federal funds at the same pro rata share as Federal funds participated in the cost of acquisition of the right-of-way. The amount credited shall be the result of disposal by one of the following means:</P>
          <P>(1) Public sale; or</P>
          <P>(2) Negotiations based on current appraised fair market value.</P>
          <P>(c) When a credit to Federal funds is required, the cost of disposition may be deducted from the sales price.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 713.308</SECTNO>
          <SUBJECT>Uneconomic remnants.</SUBJECT>
          <P>(a) An uneconomic remnant incorporated within the right-of-way limits loses its identity and becomes part of the right-of-way. Should it no longer be needed for highway purposes, disposal of the area would be in the same manner as any other portion of highway rights-of-way.</P>
          <P>(b) When the uneconomic remnant is not incorporated within the approved right-of-way limits, no FHWA approval to dispose of it is required. Upon disposal of such remnant, a credit to Federal funds is required in accordance with the provisions of § 713.307 of this part.</P>
          <CITA>[39 FR 34651, Sept. 27, 1974, as amended at 44 FR 73019, Dec. 17, 1979]</CITA>
        </SECTION>
      </SUBPART>
    </PART>
    <PART>
      <EAR>Pt. 750</EAR>
      <HD SOURCE="HED">PART 750—HIGHWAY BEAUTIFICATION</HD>
      <CONTENTS>
        <SUBPART>
          <HD SOURCE="HED">Subpart A—National Standards for Regulation by States of Outdoor Advertising Adjacent to the Interstate System Under the 1958 Bonus Program</HD>
          <SECHD>Sec.</SECHD>
          <SECTNO>750.101</SECTNO>
          <SUBJECT>Purpose.</SUBJECT>
          <SECTNO>750.102</SECTNO>
          <SUBJECT>Definitions.</SUBJECT>
          <SECTNO>750.103</SECTNO>
          <SUBJECT>Measurements of distance.</SUBJECT>
          <SECTNO>750.104</SECTNO>
          <SUBJECT>Signs that may not be permitted in protected areas.</SUBJECT>
          <SECTNO>750.105</SECTNO>
          <SUBJECT>Signs that may be permitted in protected areas.</SUBJECT>
          <SECTNO>750.106</SECTNO>
          <SUBJECT>Class 3 and 4 signs within informational sites.</SUBJECT>
          <SECTNO>750.107</SECTNO>
          <SUBJECT>Class 3 and 4 signs outside informational sites.</SUBJECT>
          <SECTNO>750.108</SECTNO>
          <SUBJECT>General provisions.</SUBJECT>
          <SECTNO>750.109</SECTNO>
          <SUBJECT>Exclusions.</SUBJECT>
          <SECTNO>750.110</SECTNO>
          <SUBJECT>State regulations.</SUBJECT>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart B—National Standards for Directional and Official Signs</HD>
          <SECTNO>750.151</SECTNO>
          <SUBJECT>Purpose.</SUBJECT>
          <SECTNO>750.152</SECTNO>
          <SUBJECT>Application.</SUBJECT>
          <SECTNO>750.153</SECTNO>
          <SUBJECT>Definitions.</SUBJECT>
          <SECTNO>750.154</SECTNO>
          <SUBJECT>Standards for directional signs.</SUBJECT>
          <SECTNO>750.155</SECTNO>
          <SUBJECT>State standards.</SUBJECT>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart C—[Reserved]</HD>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart D—Outdoor Advertising (Acquisition of Rights of Sign and Sign Site Owners)</HD>
          <SECTNO>750.301</SECTNO>
          <SUBJECT>Purpose.</SUBJECT>
          <SECTNO>750.302</SECTNO>
          <SUBJECT>Policy.</SUBJECT>
          <SECTNO>750.303</SECTNO>
          <SUBJECT>Definitions.</SUBJECT>
          <SECTNO>750.304</SECTNO>
          <SUBJECT>State policies and procedures.</SUBJECT>
          <SECTNO>750.305</SECTNO>
          <SUBJECT>Federal participation.</SUBJECT>
          <SECTNO>750.306</SECTNO>
          <SUBJECT>Documentation for Federal participation.</SUBJECT>
          <SECTNO>750.307</SECTNO>
          <SUBJECT>FHWA project approval.</SUBJECT>
          <SECTNO>750.308</SECTNO>
          <SUBJECT>Reports.</SUBJECT>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart E—Signs Exempt From Removal in Defined Areas</HD>
          <SECTNO>750.501</SECTNO>
          <SUBJECT>Purpose.<PRTPAGE P="365"/>
          </SUBJECT>
          <SECTNO>750.502</SECTNO>
          <SUBJECT>Applicability.</SUBJECT>
          <SECTNO>750.503</SECTNO>
          <SUBJECT>Exemptions.</SUBJECT>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart F—[Reserved]</HD>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart G—Outdoor Advertising Control</HD>
          <SECTNO>750.701</SECTNO>
          <SUBJECT>Purpose.</SUBJECT>
          <SECTNO>750.702</SECTNO>
          <SUBJECT>Applicability.</SUBJECT>
          <SECTNO>750.703</SECTNO>
          <SUBJECT>Definitions.</SUBJECT>
          <SECTNO>750.704</SECTNO>
          <SUBJECT>Statutory requirements.</SUBJECT>
          <SECTNO>750.705</SECTNO>
          <SUBJECT>Effective control.</SUBJECT>
          <SECTNO>750.706</SECTNO>
          <SUBJECT>Sign control in zoned and unzoned commercial and industrial areas.</SUBJECT>
          <SECTNO>750.707</SECTNO>
          <SUBJECT>Nonconforming signs.</SUBJECT>
          <SECTNO>750.708</SECTNO>
          <SUBJECT>Acceptance of state zoning.</SUBJECT>
          <SECTNO>750.709</SECTNO>
          <SUBJECT>On-property or on-premise advertising.</SUBJECT>
          <SECTNO>750.710</SECTNO>
          <SUBJECT>Landmark signs.</SUBJECT>
          <SECTNO>750.711</SECTNO>
          <SUBJECT>Structures which have never displayed advertising material.</SUBJECT>
          <SECTNO>750.712</SECTNO>
          <SUBJECT>Reclassification of signs.</SUBJECT>
          <SECTNO>750.713</SECTNO>
          <SUBJECT>Bonus provisions. </SUBJECT>
        </SUBPART>
      </CONTENTS>
      <SOURCE>
        <HD SOURCE="HED">Source:</HD>
        <P>38 FR 16044, June 20, 1973, unless otherwise noted.</P>
      </SOURCE>
      <SUBPART>
        <HD SOURCE="HED">Subpart A—National Standards for Regulation by States of Outdoor Advertising Adjacent to the Interstate System Under the 1958 Bonus Program</HD>
        <AUTH>
          <HD SOURCE="HED">Authority:</HD>
          <P>Sec. 12, Pub. L. 85-381, 72 Stat. 95, as amended; 23 U.S.C. 131; delegation of authority in 49 CFR 1.48(b).</P>
        </AUTH>
        <SECTION>
          <SECTNO>§ 750.101</SECTNO>
          <SUBJECT>Purpose.</SUBJECT>

          <P>(a) In section 12 of the Federal-Aid Highway Act of 1958, Pub. L. 85-381, 72 Stat. 95, hereinafter called the <E T="03">act,</E> the Congress declared that:</P>

          <P>(1) To promote the safety, convenience, and enjoyment of public travel and the free flow of interstate commerce and to protect the public investment in the National System of Interstate and Defense Highways, hereinafter called the <E T="03">Interstate System,</E> it is in the public interest to encourage and assist the States to control the use of and to improve areas adjacent to such system by controlling the erection and maintenance of outdoor advertising signs, displays, and devices adjacent to that system.</P>
          <P>(2) It is a national policy that the erection and maintenance of outdoor advertising signs, displays, or devices within 660 feet of the edge of the right-of-way and visible from the main-traveled way of all portions of the Interstate System constructed upon any part of right-of-way, the entire width of which is acquired subsequent to July 1, 1956, should be regulated, consistent with national standards to be prepared and promulgated by the Secretary of Transportation.</P>
          <P>(b) The standards in this part are hereby promulgated as provided in the act.</P>
          <CITA>[38 FR 16044, June 20, 1973, as amended at 39 FR 28629, Aug. 9, 1974]</CITA>
        </SECTION>
        <SECTION>
          <SECTNO>§ 750.102</SECTNO>
          <SUBJECT>Definitions.</SUBJECT>
          <P>The following terms when used in the standards in this part have the following meanings:</P>
          <P>(a) <E T="03">Acquired for right-of-way</E> means acquired for right-of-way for any public road by the Federal Government, a State, or a county, city, or other political subdivision of a State, by donation, dedication, purchase, condemnation, use, or otherwise. The date of acquisition shall be the date upon which title (whether fee title or a lesser interest) vested in the public for right-of-way purposes under applicable Federal or State law.</P>
          <P>(b) <E T="03">Centerline of the highway</E> means a line equidistant from the edges of the median separating the main-traveled ways of a divided Interstate Highway, or the centerline of the main-traveled way of a nondivided Interstate Highway.</P>
          <P>(c) <E T="03">Controlled portion of the Interstate System</E> means any portion which:</P>
          <P>(1) Is constructed upon any part of right-of-way, the entire width of which is acquired for right-of-way subsequent to July 1, 1956 (a portion shall be deemed so constructed if, within such portion, no line normal or perpendicular to the centerline of the highway and extending to both edges of the right-of-way will intersect any right-of-way acquired for right-of-way on or before July 1, 1956);</P>
          <P>(2) Lies within a State, the highway department of which has entered into an agreement with the Secretary of Transportation as provided in the act; and</P>

          <P>(3) Is not excluded under the terms of the act which provide that agreements entered into between the Secretary of Transportation and the State highway department shall not apply to those <PRTPAGE P="366"/>segments of the Interstate System which traverse commercial or industrial zones within the boundaries of incorporated municipalities, as such boundaries existed on September 21, 1959, wherein the use of real property adjacent to the Interstate System is subject to municipal regulation or control, or which traverse other areas where the land use as of September 21, 1959, was clearly established by State law as industrial or commercial.</P>
          <P>(d) <E T="03">Entrance roadway</E> means any public road or turning roadway, including acceleration lanes, by which traffic may enter the main-traveled way of an Interstate Highway from the general road system within a State, irrespective of whether traffic may also leave the main-traveled way by such road or turning roadway.</P>
          <P>(e) <E T="03">Erect</E> means to construct, build, raise, assemble, place, affix, attach, create, paint, draw, or in any other way bring into being or establish.</P>
          <P>(f) <E T="03">Exit roadway</E> means any public road or turning roadway including deceleration lanes, by which traffic may leave the main-traveled way of an Interstate Highway to reach the general road system within a State, irrespective of whether traffic may also enter the main-traveled way by such road or turning roadway.</P>
          <P>(g) <E T="03">Informational site</E> means an area or site established and maintained within or adjacent to the right-of-way of a highway on the Interstate System by or under the supervision or control of a State highway department, wherein panels for the display of advertising and informational signs may be erected and maintained.</P>
          <P>(h) <E T="03">Legible</E> means capable of being read without visual aid by a person of normal visual acuity.</P>
          <P>(i) <E T="03">Maintain</E> means to allow to exist.</P>
          <P>(j) <E T="03">Main-traveled way</E> means the traveled way of an Interstate Highway on which through traffic is carried. In the case of a divided highway, the traveled way of each of the separated roadways for traffic in opposite directions is a main-traveled way. It does not include such facilities as frontage roads, turning roadways, or parking areas.</P>
          <P>(k) <E T="03">Protected areas</E> means all areas inside the boundaries of a State which are adjacent to and within 660 feet of the edge of the right-of-way of all controlled portions of the Interstate System within that State. Where a controlled portion of the Interstate System terminates at a State boundary which is not perpendicular or normal to the centerline of the highway, protected areas also means all areas inside the boundary of such State which are within 660 feet of the edge of the right-of-way of the Interstate Highway in the adjoining State.</P>
          <P>(l) <E T="03">Scenic area</E> means any public park or area of particular scenic beauty or historical significance designated by or pursuant to State law as a scenic area.</P>
          <P>(m) <E T="03">Sign</E> means any outdoor sign, display, device, figure, painting, drawing, message, placard, poster, billboard, or other thing which is designed, intended, or used to advertise or inform, any part of the advertising or informative contents of which is visible from any place on the main-traveled way of a controlled portion of the Interstate System.</P>
          <P>(n) <E T="03">State</E> means the District of Columbia and any State of the United States within the boundaries of which a portion of the Interstate System is located.</P>
          <P>(o) <E T="03">State law</E> means a State constitutional provision or statute, or an ordinance, rule, or regulation enacted or adopted by a State agency or political subdivision of a State pursuant to State constitution or statute.</P>
          <P>(p) <E T="03">Trade name</E> shall include brand name, trademark, distinctive symbol, or other similar device or thing used to identify particular products or services.</P>
          <P>(q) <E T="03">Traveled way</E> means the portion of a roadway for the movement of vehicles, exclusive of shoulders.</P>
          <P>(r) <E T="03">Turning roadway</E> means a connecting roadway for traffic turning between two intersection legs of an interchange.</P>
          <P>(s) <E T="03">Visible</E> means capable of being seen (whether or not legible) without visual aid by a person of normal visual acuity.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 750.103</SECTNO>
          <SUBJECT>Measurements of distance.</SUBJECT>

          <P>(a) Distance from the edge of a right-of-way shall be measured horizontally along a line normal or perpendicular to the centerline of the highway.<PRTPAGE P="367"/>
          </P>
          <P>(b) All distances under § 750.107 (a)(2) and (b) shall be measured along the centerline of the highway between two vertical planes which are normal or perpendicular to and intersect the centerline of the highway, and which pass through the termini of the measured distance.</P>
          <CITA>[38 FR 16044, June 20, 1973, as amended at 41 FR 9321, Mar. 4, 1976]</CITA>
        </SECTION>
        <SECTION>
          <SECTNO>§ 750.104</SECTNO>
          <SUBJECT>Signs that may not be permitted in protected areas.</SUBJECT>
          <P>Erection or maintenance of the following signs may not be permitted in protected areas:</P>
          <P>(a) Signs advertising activities that are illegal under State or Federal laws or regulations in effect at the location of such signs or at the location of such activities.</P>
          <P>(b) Obsolete signs.</P>
          <P>(c) Signs that are not clean and in good repair.</P>
          <P>(d) Signs that are not securely affixed to a substantial structure, and</P>
          <P>(e) Signs that are not consistent with the standards in this part.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 750.105</SECTNO>
          <SUBJECT>Signs that may be permitted in protected areas.</SUBJECT>

          <P>(a) Erection or maintenance of the following signs may be permitted in protected areas:
          </P>
          <EXTRACT>
            <P>
              <E T="03">Class 1—Official signs.</E> Directional or other official signs or notices erected and maintained by public officers or agencies pursuant to and in accordance with direction or authorization contained in State of Federal law, for the purpose of carrying out an official duty or responsibility.</P>
            <P>
              <E T="03">Class 2—On-premise signs.</E> Signs not prohibited by State law which are consistent with the applicable provisions of this section and § 750.108 and which advertise the sale or lease of, or activities being conducted upon, the real property where the signs are located.</P>
            <P>Not more than one such sign advertising the sale or lease of the same property may be permitted under this class in such manner as to be visible to traffic proceeding in any one direction on any one Interstate Highway.</P>
            <P>Not more than one such sign, visible to traffic proceeding in any one direction on any one Interstate Highway and advertising activities being conducted upon the real property where the sign is located, may be permitted under this class more than 50 feet from the advertised activity.</P>
            <P>
              <E T="03">Class 3—Signs within 12 miles of advertised activities.</E> Signs not prohibited by State law which are consistent with the applicable provisions of this section and §§ 750.106, 750.107, and 750.108 and which advertise activities being conducted within 12 air miles of such signs.</P>
            <P>
              <E T="03">Class 4—Signs in the specific interest of the traveling public.</E> Signs authorized to be erected or maintained by State law which are consistent with the applicable provisions of this section and §§ 750.106, 750.107, and 750.108 and which are designed to give information in the specific interest of the traveling public.</P>
          </EXTRACT>
          
          <P>(b) A Class 2 or 3 sign, except a Class 2 sign not more than 50 feet from the advertised activity, that displays any trade name which refers to or identifies any service rendered or product sold, used, or otherwise handled more than 12 air miles from such sign may not be permitted unless the name of the advertised activity which is within 12 air miles of such sign is displayed as conspicuously as such trade name.</P>
          <P>(c) Only information about public places operated by Federal, State, or local governments, natural phenomena, historic sites, areas of natural scenic beauty or naturally suited for outdoor recreation and places for camping, lodging, eating, and vehicle service and repair is deemed to be in the specific interest of the traveling public. For the purposes of the standards in this part, a trade name is deemed to be information in the specific interest of the traveling public only if it identifies or characterizes such a place or identifies vehicle service, equipment, parts, accessories, fuels, oils, or lubricants being offered for sale at such a place. Signs displaying any other trade name may not be permitted under Class 4.</P>
          <P>(d) Notwithstanding the provisions of paragraph (b) of this section, Class 2 or Class 3 signs which also qualify as Class 4 signs may display trade names in accordance with the provisions of paragraph (c) of this section.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 750.106</SECTNO>
          <SUBJECT>Class 3 and 4 signs within informational sites.</SUBJECT>

          <P>(a) Informational sites for the erection and maintenance of Class 3 and 4 advertising and informational signs may be established in accordance with § 1.35 of this chapter. The location and frequency of such sites shall be as determined by agreements between the Secretary of Transportation and the State highway departments.<PRTPAGE P="368"/>
          </P>
          <P>(b) Class 3 and 4 signs may be permitted within such informational sites in protected areas in a manner consistent with the following provisions:</P>
          <P>(1) No sign may be permitted which is not placed upon a panel.</P>
          <P>(2) No panel may be permitted to exceed 13 feet in height or 25 feet in length, including border and trim, but excluding supports.</P>
          <P>(3) No sign may be permitted to exceed 12 square feet in area, and nothing on such sign may be permitted to be legible from any place on the main-traveled way or a turning roadway.</P>
          <P>(4) Not more than one sign concerning a single activity or place may be permitted within any one informational site.</P>
          <P>(5) Signs concerning a single activity or place may be permitted within more than one informational site, but no Class 3 sign which does not also qualify as a Class 4 sign may be permitted within any informational site more than 12 air miles from the advertised activity.</P>
          <P>(6) No sign may be permitted which moves or has any animated or moving parts.</P>
          <P>(7) Illumination of panels by other than white lights may not be permitted, and no sign placed on any panel may be permitted to contain, include, or be illuminated by any other lights, or any flashing, intermittent, or moving lights.</P>
          <P>(8) No lighting may be permitted to be used in any way in connection with any panel unless it is so effectively shielded as to prevent beams or rays of light from being directed at any portion of the main-traveled way of the Interstate System, or is of such low intensity or brilliance as not to cause glare or to impair the vision of the driver of any motor vehicle, or to otherwise interfere with any driver's operation of a motor vehicle.</P>
          <CITA>[23 FR 8793, Nov. 13, 1958, as amended at 35 FR 18719, Dec. 10, 1970; 41 FR 9321, Mar. 4, 1976]</CITA>
        </SECTION>
        <SECTION>
          <SECTNO>§ 750.107</SECTNO>
          <SUBJECT>Class 3 and 4 signs outside informational sites.</SUBJECT>
          <P>(a) The erection or maintenance of the following signs may be permitted within protected areas, outside informational sites:</P>
          <P>(1) Class 3 signs which are visible only to Interstate highway traffic not served by an informational site within 12 air miles of the advertised activity;</P>
          <P>(2) Class 4 signs which are more than 12 miles from the nearest panel within an informational site serving Interstate highway traffic to which such signs are visible.</P>
          <P>(3) Signs that qualify both as Class 3 and 4 signs may be permitted in accordance with either paragraph (a)(1) or (2) of this section.</P>
          <P>(b) The erection or maintenance of signs permitted under paragraph (a) of this section may not be permitted in any manner inconsistent with the following:</P>
          <P>(1) In protected areas in advance of an intersection of the main-traveled way of an Interstate highway and an exit roadway, such signs visible to Interstate highway traffic approaching such intersection may not be permitted to exceed the following number:</P>
          <GPOTABLE CDEF="s60,r80" COLS="2" OPTS="L2">
            <BOXHD>
              <CHED H="1">Distance from intersection</CHED>
              <CHED H="1">Number of signs</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">0-2 miles</ENT>
              <ENT>0.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">2-5 miles</ENT>
              <ENT>6.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">More than 5 miles</ENT>
              <ENT>Average of one sign per mile.</ENT>
            </ROW>
          </GPOTABLE>
          <FP>The specified distances shall be measured to the nearest point of the intersection of the traveled way of the exit roadway and the main-traveled way of the Interstate highway.</FP>
          <P>(2) Subject to the other provisions of this paragraph, not more than two such signs may be permitted within any mile distance measured from any point, and no such signs may be permitted to be less than 1,000 feet apart.</P>
          <P>(3) Such signs may not be permitted in protected areas adjacent to any Interstate highway right-of-way upon any part of the width of which is constructed an entrance or exit roadway.</P>
          <P>(4) Such signs visible to Interstate highway traffic which is approaching or has passed an entrance roadway may not be permitted in protected areas for 1,000 feet beyond the furthest point of the intersection between the traveled way of such entrance roadway and the main-traveled way of the Interstate highway.</P>
          <P>(5) No such signs may be permitted in scenic areas.</P>

          <P>(6) Not more than one such sign advertising activities being conducted as <PRTPAGE P="369"/>a single enterprise or giving information about a single place may be permitted to be erected or maintained in such manner as to be visible to traffic moving in any one direction on any one Interstate highway.</P>
          <P>(c) No Class 3 or 4 signs other than those permitted by this section may be permitted to be erected or maintained within protected areas, outside informational sites.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 750.108</SECTNO>
          <SUBJECT>General provisions.</SUBJECT>
          <P>No Class 3 or 4 signs may be permitted to be erected or maintained pursuant to § 750.107, and no Class 2 sign may be permitted to be erected or maintained, in any manner inconsistent with the following:</P>
          <P>(a) No sign may be permitted which attempts or appears to attempt to direct the movement of traffic or which interferes with, imitates or resembles any official traffic sign, signal or device.</P>
          <P>(b) No sign may be permitted which prevents the driver of a vehicle from having a clear and unobstructed view of official signs and approaching or merging traffic.</P>
          <P>(c) No sign may be permitted which contains, includes, or is illuminated by any flashing, intermittent or moving light or lights.</P>
          <P>(d) No lighting may be permitted to be used in any way in connection with any sign unless it is so effectively shielded as to prevent beams or rays of light from being directed at any portion of the main-traveled way of the Interstate System, or is of such low intensity or brilliance as not to cause glare or to impair the vision of the driver of any motor vehicle, or to otherwise interfere with any driver's operation of a motor vehicle.</P>
          <P>(e) No sign may be permitted which moves or has any animated or moving parts.</P>
          <P>(f) No sign may be permitted to be erected or maintained upon trees or painted or drawn upon rocks or other natural features.</P>
          <P>(g) No sign may be permitted to exceed 20 feet in length, width or height, or 150 square feet in area, including border and trim but excluding supports, except Class 2 signs not more than 50 feet from, and advertising activities being conducted upon, the real property where the sign is located.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 750.109</SECTNO>
          <SUBJECT>Exclusions.</SUBJECT>
          <P>The standards in this part shall not apply to markers, signs and plaques in appreciation of sites of historical significance for the erection of which provisions are made in an agreement between a State and the Secretary of Transportation, as provided in the Act, unless such agreement expressly makes all or any part of the standards applicable.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 750.110</SECTNO>
          <SUBJECT>State regulations.</SUBJECT>
          <P>A State may elect to prohibit signs permissible under the standards in this part without forfeiting its rights to any benefits provided for in the act.</P>
        </SECTION>
      </SUBPART>
      <SUBPART>
        <HD SOURCE="HED">Subpart B—National Standards for Directional and Official Signs</HD>
        <AUTH>
          <HD SOURCE="HED">Authority:</HD>
          <P>23 U.S.C. 131, 315, 49 U.S.C. 1651; 49 CFR 1.48(b).</P>
        </AUTH>
        <SECTION>
          <SECTNO>§ 750.151</SECTNO>
          <SUBJECT>Purpose.</SUBJECT>
          <P>(a) In section 131 of title 23 U.S.C., Congress has declared that:</P>
          <P>(1) The erection and maintenance of outdoor advertising signs, displays, and devices in areas adjacent to the Interstate System and the primary system should be controlled in order to protect the public investment in such highways, to promote safety and recreational value of public travel, and to preserve natural beauty.</P>
          <P>(2) Directional and official signs and notices, which signs and notices shall include, but not be limited to, signs and notices pertaining to natural wonders, scenic and historical attractions, which are required or authorized by law, shall conform to national standards authorized to be promulgated by the Secretary, which standards shall contain provisions concerning the lighting, size, number and spacing of signs, and such other requirements as may be appropriate to implement the section.</P>
          <P>(b) The standards in this part are issued as provided in section 131 of title 23 U.S.C.</P>
          <CITA>[38 FR 16044, June 30, 1973, as amended at 40 FR 21934, May 20, 1975]</CITA>
        </SECTION>
        <SECTION>
          <PRTPAGE P="370"/>
          <SECTNO>§ 750.152</SECTNO>
          <SUBJECT>Application.</SUBJECT>
          <P>The following standards apply to directional and official signs and notices located within six hundred and sixty (660) feet of the right-of-way of the Interstate and Federal-aid primary systems and to those located beyond six hundred and sixty (660) feet of the right-of-way of such systems, outside of urban areas, visible from the main traveled way of such systems and erected with the purpose of their message being read from such main traveled way. These standards do not apply to directional and official signs erected on the highway right-of-way.</P>
          <CITA>[40 FR 21934, May 20, 1975]</CITA>
        </SECTION>
        <SECTION>
          <SECTNO>§ 750.153</SECTNO>
          <SUBJECT>Definitions.</SUBJECT>
          <P>For the purpose of this part:</P>
          <P>(a) <E T="03">Sign</E> means an outdoor sign, light, display, device, figure, painting, drawing, message, placard, poster, billboard, or other thing which is designed, intended, or used to advertise or inform, any part of the advertising or informative contents of which is visible from any place on the main traveled way of the Interstate or Federal-aid primary highway.</P>
          <P>(b) <E T="03">Main traveled way</E> means the through traffic lanes of the highway, exclusive of frontage roads, auxiliary lanes, and ramps.</P>
          <P>(c) <E T="03">Interstate System</E> means the National System of Interstate and Defence Highways described in section 103(d) of title 23 U.S.C.</P>
          <P>(d) <E T="03">Primary system</E> means the Federal-aid highway system described in section 103(b) of title 23 U.S.C.</P>
          <P>(e) <E T="03">Erect</E> means to construct, build, raise, assemble, place, affix, attach, create, paint, draw, or in any other way bring into being or establish.</P>
          <P>(f) <E T="03">Maintain</E> means to allow to exist.</P>
          <P>(g) <E T="03">Scenic area</E> means any area of particular scenic beauty or historical significance as determined by the Federal, State, or local officials having jurisdiction thereof, and includes interests in land which have been acquired for the restoration, preservation, and enhancement of scenic beauty.</P>
          <P>(h) <E T="03">Parkland</E> means any publicly owned land which is designated or used as a public park, recreation area, wildlife or waterfowl refuge or historic site.</P>
          <P>(i) <E T="03">Federal or State law</E> means a Federal or State constitutional provision or statute, or an ordinance, rule, or regulation enacted or adopted by a State or Federal agency or a political subdivision of a State pursuant to a Federal or State constitution or statute.</P>
          <P>(j) <E T="03">Visible</E> means capable of being seen (whether or not legible) without visual aid by a person of normal visual acuity.</P>
          <P>(k) <E T="03">Freeway</E> means a divided arterial highway for through traffic with full control of access.</P>
          <P>(l) <E T="03">Rest area</E> means an area or site established and maintained within or adjacent to the highway right-of-way by or under public supervision or control for the convenience of the traveling public.</P>
          <P>(m) <E T="03">Directional and official signs and notices</E> includes only official signs and notices, public utility signs, service club and religious notices, public service signs, and directional signs.</P>
          <P>(n) <E T="03">Official signs and notices</E> means signs and notices erected and maintained by public officers or public agencies within their territorial or zoning jurisdiction and pursuant to and in accordance with direction or authorization contained in Federal, State, or local law for the purposes of carrying out an official duty or responsibility. Historical markers authorized by State law and erected by State or local government agencies or nonprofit historical societies may be considered official signs.</P>
          <P>(o) <E T="03">Public utility signs</E> means warning signs, informational signs, notices, or markers which are customarily erected and maintained by publicly or privately owned public utilities, as essential to their operations.</P>
          <P>(p) <E T="03">Service club and religious notices</E> means signs and notices, whose erection is authorized by law, relating to meetings of nonprofit service clubs or charitable associations, or religious services, which signs do not exceed 8 square feet in area.</P>
          <P>(q) <E T="03">Public service signs</E> means signs located on school bus stop shelters, which signs:</P>

          <P>(1) Identify the donor, sponsor, or contributor of said shelters;<PRTPAGE P="371"/>
          </P>
          <P>(2) Contain public service messages, which shall occupy not less than 50 percent of the area of the sign;</P>
          <P>(3) Contain no other message;</P>
          <P>(4) Are located on schoolbus shelters which are authorized or approved by city, county, or State law, regulation, or ordinance, and at places approved by the city, county, or State agency controlling the highway involved; and</P>
          <P>(5) May not exceed 32 square feet in area. Not more than one sign on each shelter shall face in any one direction.</P>
          <P>(r) <E T="03">Directional signs</E> means signs containing directional information about public places owned or operated by Federal, State, or local governments or their agencies; publicly or privately owned natural phenomena, historic, cultural, scientific, educational, and religious sites; and areas of natural scenic beauty or naturally suited for outdoor recreation, deemed to be in the interest of the traveling public.</P>
          <P>(s) <E T="03">State</E> means any one of the 50 States, the District of Columbia, or Puerto Rico.</P>
          <P>(t) <E T="03">Urban area</E> means an urbanized area or, in the case of an urbanized area encompassing more than one State, that part of the urbanized areas in each such State, or an urban place as designated by the Bureau of the Census having a population of five thousand or more and not within any urbanized area, within boundaries to be fixed by responsible State and local officials in cooperation with each other, subject to approval by the Secretary. Such boundaries shall, as a minimum, encompass the entire urban place designated by the Bureau of the Census.</P>
          <CITA>[38 FR 16044, June 30, 1973, as amended at 40 FR 21934, May 20, 1975]</CITA>
        </SECTION>
        <SECTION>
          <SECTNO>§ 750.154</SECTNO>
          <SUBJECT>Standards for directional signs.</SUBJECT>
          <P>The following apply only to directional signs:</P>
          <P>(a) <E T="03">General.</E> The following signs are prohibited:</P>
          <P>(1) Signs advertising activities that are illegal under Federal or State laws or regulations in effect at the location of those signs or at the location of those activities.</P>
          <P>(2) Signs located in such a manner as to obscure or otherwise interfere with the effectiveness of an official traffic sign, signal, or device, or obstruct or interfere with the driver's view of approaching, merging, or intersecting traffic.</P>
          <P>(3) Signs which are erected or maintained upon trees or painted or drawn upon rocks or other natural features.</P>
          <P>(4) Obsolete signs.</P>
          <P>(5) Signs which are structurally unsafe or in disrepair.</P>
          <P>(6) Signs which move or have any animated or moving parts.</P>
          <P>(7) Signs located in rest areas, parklands or scenic areas.</P>
          <P>(b) <E T="03">Size.</E> (1) No sign shall exceed the following limits:</P>
          <P>(i) Maximum area—150 square feet.</P>
          <P>(ii) Maximum height—20 feet.</P>
          <P>(iii) Maximum length—20 feet.</P>
          <P>(2) All dimensions include border and trim, but exclude supports.</P>
          <P>(c) <E T="03">Lighting.</E> Signs may be illuminated, subject to the following:</P>
          <P>(1) Signs which contain, include, or are illuminated by any flashing, intermittent, or moving light or lights are prohibited.</P>
          <P>(2) Signs which are not effectively shielded so as to prevent beams or rays of light from being directed at any portion of the traveled way of an Interstate or primary highway or which are of such intensity or brilliance as to cause glare or to impair the vision of the driver of any motor vehicle, or which otherwise interfere with any driver's operation of a motor vehicle are prohibited.</P>
          <P>(3) No sign may be so illuminated as to interfere with the effectiveness of or obscure an official traffic sign, device, or signal.</P>
          <P>(d) <E T="03">Spacing.</E> (1) Each location of a directional sign must be approved by the State highway department.</P>
          <P>(2) No directional sign may be located within 2,000 feet of an interchange, or intersection at grade along the Interstate System or other freeways (measured along the Interstate or freeway from the nearest point of the beginning or ending of pavement widening at the exit from or entrance to the main traveled way).</P>

          <P>(3) No directional sign may be located within 2,000 feet of a rest area, parkland, or scenic area.<PRTPAGE P="372"/>
          </P>
          <P>(4)(i) No two directional signs facing the same direction of travel shall be spaced less than 1 mile apart;</P>
          <P>(ii) Not more than three directional signs pertaining to the same activity and facing the same direction of travel may be erected along a single route approaching the activity;</P>
          <P>(iii) Signs located adjacent to the Interstate System shall be within 75 air miles of the activity; and</P>
          <P>(iv) Signs located adjacent to the primary system shall be within 50 air miles of the activity.</P>
          <P>(e) <E T="03">Message content.</E> The message on directional signs shall be limited to the identification of the attraction or activity and directional information useful to the traveler in locating the attraction, such as mileage, route numbers, or exit numbers. Descriptive words or phrases, and pictorial or photographic representations of the activity or its environs are prohibited.</P>
          <P>(f) <E T="03">Selection method and criteria.</E> (1) Privately owned activities or attractions eligible for directional signing are limited to the following: natural phenomena; scenic attractions; historic, educational, cultural, scientific, and religious sites; and outdoor recreational areas.</P>
          <P>(2) To be eligible, privately owned attractions or activities must be nationally or regionally known, and of outstanding interest to the traveling public.</P>
          <P>(3) Each State shall develop specific selection methods and criteria to be used in determining whether or not an activity qualifies for this type of signing. A statement as to selection methods and criteria shall be furnished to the Secretary of Transportation before the State permits the erection of any such signs under section 131(c) of title 23 U.S.C., and this part.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 750.155</SECTNO>
          <SUBJECT>State standards.</SUBJECT>
          <P>This part does not prohibit a State from establishing and maintaining standards which are more restrictive with respect to directional and official signs and notices along the Federal-aid highway systems than these national standards.</P>
          <CITA>[38 FR 16044, June 20, 1973, as amended at 40 FR 21934, May 20, 1975]</CITA>
        </SECTION>
      </SUBPART>
      <SUBPART>
        <HD SOURCE="HED">Subpart C—[Reserved]</HD>
      </SUBPART>
      <SUBPART>
        <HD SOURCE="HED">Subpart D—Outdoor Advertising (Acquisition of Rights of Sign and Sign Site Owners)</HD>
        <AUTH>
          <HD SOURCE="HED">Authority:</HD>
          <P>23 U.S.C. 131 and 315; 23 CFR 1.32 and 1.48(b).</P>
        </AUTH>
        <SOURCE>
          <HD SOURCE="HED">Source:</HD>
          <P>39 FR 27436, July 29, 1974, unless otherwise noted.</P>
        </SOURCE>
        <SECTION>
          <SECTNO>§ 750.301</SECTNO>
          <SUBJECT>Purpose.</SUBJECT>
          <P>To prescribe the Federal Highway Administration (FHWA) policies relating to Federal participation in the costs of acquiring the property interests necessary for removal of nonconforming advertising signs, displays and devices on the Federal-aid Primary and Interstate Systems, including toll sections on such systems, regardless of whether Federal funds participated in the construction thereof. This regulation should not be construed to authorize any additional rights in eminent domain not already existing under State law or under 23 U.S.C. 131(g).</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 750.302</SECTNO>
          <SUBJECT>Policy.</SUBJECT>
          <P>(a) Just compensation shall be paid for the rights and interests of the sign and site owner in those outdoor advertising signs, displays, or devices which are lawfully existing under State law, in conformance with the terms of 23 U.S.C. 131.</P>
          <P>(b)(1) Federal reimbursement will be made on the basis of 75 percent of the acquisition, removal and incidental costs legally incurred or obligated by the State.</P>

          <P>(2) Federal funds will participate in 100 percent of the costs of removal of those signs which were removed prior to January 4, 1975, by relocation, pursuant to the provisions of 23 CFR § 750.305(a)(2), and which are required to be removed as a result of the amendments made to 23 U.S.C. 131 by the Federal-Aid Highway Amendments of 1974, Pub. L. 93-643, section 109, January 4, 1975. Such signs must have been relocated to a legal site, must have been legally maintained since the relocation, and must not have been substantially changed, as defined by the State maintenance standards, issued pursuant to 23 CFR 750.707(b).<PRTPAGE P="373"/>
          </P>

          <P>(c) Title III of the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 (42 U.S.C. 4651, <E T="03">et seq</E>.) applies except where complete conformity would defeat the purposes set forth in 42 U.S.C. 4651, would impede the expeditious implementation of the sign removal program or would increase administrative costs out of proportion to the cost of the interests being acquired or extinguished.</P>
          <P>(d) Projects for the removal of outdoor advertising signs including hardship acquisitions should be programed and authorized in accordance with normal program procedures for right-of-way projects.</P>
          <CITA>[39 FR 27436, July 29, 1974; 39 FR 30349, Aug. 22, 1974, as amended at 41 FR 31198, July 27, 1976]</CITA>
        </SECTION>
        <SECTION>
          <SECTNO>§ 750.303</SECTNO>
          <SUBJECT>Definitions.</SUBJECT>
          <P>(a) <E T="03">Sign.</E> An outdoor sign, light, display, device, figure, painting, drawing, message, placard, poster, billboard or other thing which is designed, intended of the advertising or informative contents of which is visible from any place on the main-traveled way of the Interstate or Primary Systems, whether the same be permanent or portable installation.</P>
          <P>(b) <E T="03">Lease (license, permit, agreement, contract or easement)</E>. An agreement, oral or in writing, by which possession or use of land or interests therein is given by the owner or other person to another person for a specified purpose.</P>
          <P>(c) <E T="03">Leasehold value.</E> The leasehold value is the present worth of the difference between the contractual rent and the current market rent at the time of the appraisal.</P>
          <P>(d) <E T="03">Illegal sign.</E> One which was erected and/or maintained in violation of State law.</P>
          <P>(e) <E T="03">Nonconforming sign.</E> One which was lawfully erected, but which does not comply with the provisions of State law or State regulations passed at a later date or which later fails to comply with State law or State regulations due to changed conditions. Illegally erected or maintained signs are not nonconforming signs.</P>
          <P>(f) <E T="03">1966 inventory.</E> The record of the survey of advertising signs and junk-yards compiled by the State highway department.</P>
          <P>(g) <E T="03">Abandoned sign.</E> One in which no one has an interest, or as defined by State law.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 750.304</SECTNO>
          <SUBJECT>State policies and procedures.</SUBJECT>
          <P>The State's written policies and operating procedures for implementing its sign removal program under State law and complying with 23 U.S.C. 131 and its proposed time schedule for sign removal and procedure for reporting its accomplishments shall be submitted to the FHWA for approval within 90 days of the date of this regulation. This statement should be supported by the State's regulations implementing its program. Revisions to the State's policies and procedures shall be submitted to the FHWA for approval. The statement should contain provisions for the review of its policies and procedure to meet changing conditions, adoption of improved procedures, and for internal review to assure compliance. The statement shall include as a minimum the following:</P>
          <P>(a) <E T="03">Project priorities.</E> The following order of priorities is recommended.</P>
          <P>(1) Illegal and abandoned signs.</P>
          <P>(2) Hardship situations.</P>
          <P>(3) Nominal value signs.</P>
          <P>(4) Signs in areas which have been designated as scenic under authority of State law.</P>
          <P>(5) Product advertising on:</P>
          <P>(i) Rural interstate highway.</P>
          <P>(ii) Rural primary highway.</P>
          <P>(iii) Urban areas.</P>
          <P>(6) Nontourist-oriented directional advertising.</P>
          <P>(7) Tourist-oriented directional advertising.</P>
          <P>(b) <E T="03">Programing.</E> (1) A sign removal project may consist of any group of proposed sign removals. The signs may be those belonging to one company or those located along a single route, all of the signs in a single county or other locality, hardship situations, individually or grouped, such as those involving vandalized signs, or all of a sign owner's signs in a given State or area, or any similar grouping.</P>

          <P>(2) A project for sign removal on other than a Federal-aid primary route basis e.g., a countywide project or a project involving only signs owned by one company, should be identified as <PRTPAGE P="374"/>CAF-000B( ), continuing the numbering sequence which began with the sign inventory project in 1966.</P>
          <P>(3) Where it would not interfere with the State's operations, the State should program sign removal projects to minimize disruption of business.</P>
          <P>(c) <E T="03">Valuation and review methods</E>—(1) <E T="03">Schedules—formulas.</E> Schedules, formulas or other methods to simplify valuation of signs and sites are recommended for the purpose of minimizing administrative and legal expenses necessarily involved in determining just compensation by individual appraisals and litigation. They do not purport to be a basis for the determination of just compensation under eminent domain.</P>
          <P>(2) <E T="03">Appraisals.</E> Where appropriate, the State may use its approved appraisal report forms including those for abbreviated or short form appraisals. Where a sign or site owner does not accept the amount computed under an approved schedule, formula, or other simplified method, an appraisal shall be utilized.</P>
          <P>(3) <E T="03">Leaseholds.</E> When outdoor advertising signs and sign sites involve a leasehold value, the State's procedures should provide for determining value in the same manner as any other real estate leasehold that has value to the lessee.</P>
          <P>(4) <E T="03">Severance damages.</E> The State has the responsibility of justifying the recognition of severance damages pursuant to 23 CFR 710.304(h), and the law of the State before Federal participation will be allowed. Generally, Federal participation will not be allowed in the payment of severance damages to remaining signs, or other property of a sign company alleged to be due to the taking of certain of the company's signs. Unity of use of the separate properties, as required by applicable principles of eminent domain law, must be shown to exist before participation in severance damages will be allowed. Moreover, the value of the remaining signs or other real property must be diminished by virtue of the taking of such signs. Payments for severance damages to economic plants or loss of business profits are not compensable. Severance damage cases must be submitted to the FHWA for prior concurrence, together with complete legal and appraisal justification for payment of these damages. To assist the FHWA in its evaluation, the following data will accompany any submission regarding severance:</P>
          <P>(i) One copy of each appraisal in which this was analyzed. One copy of the State's review appraiser analysis and determination of market value.</P>
          <P>(ii) A plan or map showing the location of each sign.</P>
          <P>(iii) An opinion by the State highway department's chief legal officer that severance is appropriate in accordance with State law together with a legal opinion that, in the instant case, the damages constitute severance as opposed to consequential damage as a matter of law. The opinion shall include a determination, and the basis therefor, that the specific taking of some of an outdoor advertiser's signs constitutes a distinct economic unit, and that unity of use of the separate properties in conformity with applicable principles of eminent domain law had been satisfactorily established. A legal memorandum must be furnished citing and discussing cases and other authorities supporting the State's position.</P>
          <P>(5) <E T="03">Review of value estimates.</E> All estimates of value shall be reviewed by a person other than the one who made the estimate. Appraisal reports shall be reviewed and approved prior to initiation of negotiations. All other estimates shall be reviewed before the agreement becomes final.</P>
          <P>(d) <E T="03">Nominal value plan.</E> (1) This plan may provide for the removal costs of eligible nominal value signs and for payments up to $250 for each nonconforming sign, and up to $100 for each nonconforming sign site.</P>
          <P>(2) The State's procedures may provide for negotiations for sign sites and sign removals to be accomplished simultaneously without prior review.</P>
          <P>(3) Releases or agreements executed by the sign and/or site owner should include the identification of the sign, statement of ownership, price to be paid, interest acquired, and removal rights.</P>

          <P>(4) It is not expected that salvage value will be a consideration in most acquisitions; however, the State's procedures may provide that the sign may <PRTPAGE P="375"/>be turned over to the sign owner, site owner, contractor, or individual as all or a part of the consideration for its removal, without any project credits.</P>
          <P>(5) Programing and authorizations will be in accord with § 750.308 of this regulation. A detailed estimate of value of each individual sign is not necessary. The project may be programed and authorized as one project.</P>
          <P>(e) <E T="03">Sign removal.</E> The State's procedural statement should include provision for:</P>
          <P>(1) Owner retention.</P>
          <P>(2) Salvage value.</P>
          <P>(3) State removal.</P>
          <CITA>[39 FR 27436, July 29, 1974; 42 FR 30835, June 17, 1977, as amended at 50 FR 34093, Aug. 23, 1985]</CITA>
        </SECTION>
        <SECTION>
          <SECTNO>§ 750.305</SECTNO>
          <SUBJECT>Federal participation.</SUBJECT>
          <P>(a) Federal funds may participate in:</P>
          <P>(1) Payments made to a sign owner for his right, title and interest in a sign, and where applicable, his leasehold value in a sign site, and to a site owner for his right and interest in a site, which is his right to erect and maintain the existing nonconforming sign on such site.</P>
          <P>(2) The cost of relocating a sign to the extent of the cost to acquire the sign, less salvage value if any.</P>
          <P>(3) A duplicate payment for the site owner's interest of $2,500 or less because of a bona fide error in ownership, provided the State has followed its title search procedures as set forth in its policy and procedure submission.</P>
          <P>(4) The cost of removal of signs, partially completed sign structures, supporting poles, abandoned signs and those which are illegal under State law within the controlled areas, provided such costs are incurred in accordance with State law. Removal may be by State personnel on a force account basis or by contract. Documentation for Federal participation in such removal projects should be in accord with the State's normal force account and contractual reimbursement procedures. The State should maintain a record of the number of signs removed. These data should be retained in project records and reported on the periodic report required under § 750.308 of this regulation.</P>
          <P>(5) Signs materially damaged by vandals. Federal funds shall be limited to the Federal pro-rata share of the fair market value of the sign immediately before the vandalism occurred minus the estimated cost of repairing and reerecting the sign. If the State chooses, it may use its FHWA approved nominal value plan procedure to acquire these signs.</P>
          <P>(6) The cost of acquiring and removing completed sign structures which have been blank or painted out beyond the period of time established by the State for normal maintenance and change of message, provided the sign owner can establish that his nonconforming use was not abandoned or discontinued, and provided such costs are incurred in accordance with State law, or regulation. The evidence considered by the State as acceptable for establishing or showing that the nonconforming use has not been abandoned or voluntarily discontinued shall be set forth in the State's policy and procedures.</P>
          <P>(7) In the event a sign was omitted in the 1966 inventory, and the State supports a determination that the sign was in existence prior to October 22, 1965, the costs are eligible for Federal participation.</P>
          <P>(b) Federal funds may not participate in:</P>
          <P>(1) Cost of title certificates, title insurance, title opinion or similar evidence or proof of title in connection with the acquisition of a landowner's right to erect and maintain a sign or signs when the amount of payment to the landowner for his interest is $2,500 or less, unless required by State law. However, Federal funds may participate in the costs of securing some lesser evidence or proof of title such as searches and investigations by State highway department personnel to the extent necessary to determine ownership, affidavit of ownership by the owner, bill of sale, etc. The State's procedure for determining evidence of title should be set forth in the State's policy and procedure submission.</P>

          <P>(2) Payments to a sign owner where the sign was erected without permission of the property owner unless the sign owner can establish his legal right <PRTPAGE P="376"/>to erect and maintain the sign. However, such signs may be removed by State personnel on a force account basis or by contract with Federal participation except where the sign owner reimburses the State for removal.</P>
          <P>(3) Acquisition costs paid for abandoned or illegal signs, potential sign sites, or signs which were built during a period of time which makes them ineligible for compensation under 23 U.S.C. 131, or for rights in sites on which signs have been abandoned or illegally erected by a sign owner.</P>
          <P>(4) The acquisition cost of supporting poles or partially completed sign structures in nonconforming areas which do not have advertising or informative content thereon unless the owner can show to the State's satisfaction he has not abandoned the structure. When the State has determined the sign structure has not been abandoned, Federal funds will participate in the acquisition of the structure, provided the cost are incurred in accordance with State law.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 750.306</SECTNO>
          <SUBJECT>Documentation for Federal participation.</SUBJECT>
          <P>The following information concerning each sign must be available in the State's files to be eligible for Federal participation.</P>
          <P>(a) <E T="03">Payment to sign owner.</E> (1) A photograph of the sign in place. Exceptions may be made in cases where in one transaction the State has acquired a number of a company's nominal value signs similar in size, condition and shape. In such cases, only a sample of representative photographs need be provided to document the type and condition of the signs.</P>
          <P>(2) Evidence showing the sign was nonconforming as of the date of taking.</P>
          <P>(3) Value documentation and proof of obligation of funds.</P>
          <P>(4) Satisfactory indication of ownership of the sign and compensable interest therein (e.g., lease or other agreement with the property owner, or an affidavit, certification, or other such evidence of ownership).</P>
          <P>(5) Evidence that the sign falls within one of the three categories shown in § 750.302 of this regulation. The specific category should be identified.</P>
          <P>(6) Evidence that the right, title, or interest pertaining to the sign has passed to the State, or that the sign has been removed.</P>
          <P>(b) <E T="03">Payment to the site owner.</E> (1) Evidence that an agreement has been reached between the State and owner.</P>
          <P>(2) Value documentation and proof of obligation of funds.</P>
          <P>(3) Satisfactory indication of ownership or compensable interest.</P>
          <P>(c) In those cases where Federal funds participate in 100 percent of the cost of removal, the State file shall contain the records of the relocation made prior to January 4, 1975.</P>
          <CITA>[39 FR 27436, July 29, 1974, as amended at 41 FR 31198, July 27, 1976]</CITA>
        </SECTION>
        <SECTION>
          <SECTNO>§ 750.307</SECTNO>
          <SUBJECT>FHWA project approval.</SUBJECT>
          <P>Authorization to proceed with acquisitions on a sign removal project shall not be issued until such time as the State has submitted to FHWA the following:</P>
          <P>(a) A general description of the proj-ect.</P>
          <P>(b) The total number of signs to be acquired.</P>
          <P>(c) The total estimated cost of the sign removal project, including a breakdown of incidental, acquisition and removal costs.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 750.308</SECTNO>
          <SUBJECT>Reports.</SUBJECT>
          <P>Periodic reports on site acquisitions and actual sign removals shall be submitted on FHWA Form 1424 and as prescribed. <SU>1</SU>
            <FTREF/>
          </P>
          <FTNT>
            <P>
              <SU>1</SU> Forms are available at FHWA Division Offices located in each State.</P>
          </FTNT>
          <CITA>[39 FR 27436, July 29, 1974, as amended at 41 FR 9321, Mar. 4, 1976]</CITA>
        </SECTION>
      </SUBPART>
      <SUBPART>
        <HD SOURCE="HED">Subpart E—Signs Exempt From Removal in Defined Areas</HD>
        <AUTH>
          <HD SOURCE="HED">Authority:</HD>
          <P>23 U.S.C. 131 and 315, 49 CFR 1.48, 23 CFR 1.32.</P>
        </AUTH>
        <SOURCE>
          <HD SOURCE="HED">Source:</HD>
          <P>41 FR 45827, Oct. 18, 1976, unless otherwise noted.</P>
        </SOURCE>
        <SECTION>
          <SECTNO>§ 750.501</SECTNO>
          <SUBJECT>Purpose.</SUBJECT>

          <P>This subpart sets forth the procedures pursuant to which a State may, if it desires, seek an exemption from the acquisition requirements of 23 <PRTPAGE P="377"/>U.S.C. 131 for signs giving directional information about goods and services in the interest of the traveling public in defined areas which would suffer substantial economic hardship if such signs were removed. This exemption may be granted pursuant to the provisions of 23 U.S.C. 131(o).</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 750.502</SECTNO>
          <SUBJECT>Applicability.</SUBJECT>
          <P>The provisions of this subpart apply to signs adjacent to the Interstate and primary systems which are required to be controlled under 23 U.S.C. 131.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 750.503</SECTNO>
          <SUBJECT>Exemptions.</SUBJECT>
          <P>(a) The Federal Highway Administration (FHWA) may approve a State's request to exempt certain nonconforming signs, displays, and devices (hereinafter called signs) within a defined area from being acquired under the provisions of 23 U.S.C. 131 upon a showing that removal would work a substantial economic hardship throughout that area. A defined area is an area with clearly established geographical boundaries defined by the State which the State can evaluate as an economic entity. Neither the States nor FHWA shall rely on individual claims of economic hardship. Exempted signs must:</P>
          <P>(1) Have been lawfully erected prior to May 5, 1976, and must continue to be lawfully maintained.</P>
          <P>(2) Continue to provide the directional information to goods and services offered at the same enterprise in the defined area in the interest of the traveling public that was provided on May 5, 1976. Repair and maintenance of these signs shall conform with the State's approved maintenance standards as required by subpart G of this part.</P>
          <P>(b) To obtain the exemption permitted by 23 U.S.C. 131(o), the State shall establish:</P>
          <P>(1) Its requirements for the directional content of signs to qualify the signs as directional signs to goods and services in the defined area.</P>
          <P>(2) A method of economic analysis clearly showing that the removal of signs would work a substantial economic hardship throughout the defined area.</P>
          <P>(c) In support of its request for exemption, the State shall submit to the FHWA:</P>
          <P>(1) Its requirements and method (see § 750.503(b)).</P>
          <P>(2) The limits of the defined area(s) requested for exemption, a listing of signs to be exempted, their location, and the name of the enterprise advertised on May 5, 1976.</P>
          <P>(3) The application of the requirements and method to the defined areas, demonstrating that the signs provide directional information to goods and services of interest to the traveling public in the defined area, and that removal would work a substantial economic hardship in the defined area(s).</P>
          <P>(4) A statement that signs in the defined area(s) not meeting the exemption requirements will be removed in accordance with State law.</P>
          <P>(5) A statement that the defined area will be reviewed and evaluated at least every three (3) years to determine if an exemption is still warranted.</P>
          <P>(d) The FHWA, upon receipt of a State's request for exemption, shall prior to approval:</P>
          <P>(1) Review the State's requirements and methods for compliance with the provisions of 23 U.S.C. 131 and this subpart.</P>
          <P>(2) Review the State's request and the proposed exempted area for compliance with State requirements and methods.</P>
          <P>(e) Nothing herein shall prohibit the State from acquiring signs in the defined area at the request of the sign owner.</P>
          <P>(f) Nothing herein shall prohibit the State from imposing or maintaining stricter requirements.</P>
        </SECTION>
      </SUBPART>
      <SUBPART>
        <HD SOURCE="HED">Subpart F—[Reserved]</HD>
      </SUBPART>
      <SUBPART>
        <HD SOURCE="HED">Subpart G—Outdoor Advertising Control</HD>
        <AUTH>
          <HD SOURCE="HED">Authority:</HD>
          <P>23 U.S.C. 131 and 315; 49 CFR 1.48.</P>
        </AUTH>
        <SOURCE>
          <HD SOURCE="HED">Source:</HD>
          <P>40 FR 42844, Sept. 16, 1975, unless otherwise noted.</P>
        </SOURCE>
        <SECTION>
          <SECTNO>§ 750.701</SECTNO>
          <SUBJECT>Purpose.</SUBJECT>

          <P>This subpart prescribes the Federal Highway Administration (FHWA) policies and requirements relating to the <PRTPAGE P="378"/>effective control of outdoor advertising under 23 U.S.C. 131. The purpose of these policies and requirements is to assure that there is effective State control of outdoor advertising in areas adjacent to Interstate and Federal-aid primary highways. Nothing in this subpart shall be construed to prevent a State from establishing more stringent outdoor advertising control requirements along Interstate and Primary Systems than provided herein.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 750.702</SECTNO>
          <SUBJECT>Applicability.</SUBJECT>
          <P>The provisions of this subpart are applicable to all areas adjacent to the Federal-aid Interstate and Primary Systems, including toll sections thereof, except that within urban areas, these provisions apply only within 660 feet of the nearest edge of the right-of-way. These provisions apply regardless of whether Federal funds participated in the costs of such highways. The provisions of this subpart do not apply to the Federal-aid Secondary or Urban Highway System.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 750.703</SECTNO>
          <SUBJECT>Definitions.</SUBJECT>
          <P>The terms as used in this subpart are defined as follows:</P>
          <P>(a) <E T="03">Commercial and industrial zones</E> are those districts established by the zoning authorities as being most appropriate for commerce, industry, or trade, regardless of how labeled. They are commonly categorized as commercial, industrial, business, manufacturing, highway service or highway business (when these latter are intended for highway-oriented business), retail, trade, warehouse, and similar classifications.</P>
          <P>(b) <E T="03">Erect</E> means to construct, build, raise, assemble, place, affix, attach, create, paint, draw, or in any other way bring into being or establish.</P>
          <P>(c) <E T="03">Federal-aid Primary Highway</E> means any highway on the system designated pursuant to 23 U.S.C. 103(b).</P>
          <P>(d) <E T="03">Interstate Highway</E> means any highway on the system defined in and designated, pursuant to 23 U.S.C. 103(e).</P>
          <P>(e) <E T="03">Illegal sign</E> means one which was erected or maintained in violation of State law or local law or ordinance.</P>
          <P>(f) <E T="03">Lease</E> means an agreement, license, permit, or easement, oral or in writing, by which possession or use of land or interests therein is given for a specified purpose, and which is a valid contract under the laws of a State.</P>
          <P>(g) <E T="03">Maintain</E> means to allow to exist.</P>
          <P>(h) <E T="03">Main-traveled way</E> means the traveled way of a highway on which through traffic is carried. In the case of a divided highway, the traveled way of each of the separate roadways for traffic in opposite directions is a main-traveled way. It does not include such facilities as frontage roads, turning roadways, or parking areas.</P>
          <P>(i) <E T="03">Sign, display or device</E>, hereinafter referred to as “sign,” means an outdoor advertising sign, light, display, device, figure, painting, drawing, message, placard, poster, billboard, or other thing which is designed, intended, or used to advertise or inform, any part of the advertising or informative contents of which is visible from any place on the main-traveled way of the Interstate or Primary Systems, whether the same be permanent or portable installation.</P>
          <P>(j) <E T="03">State law</E> means a State constitutional provision or statute, or an ordinance, rule or regulation, enacted or adopted by a State.</P>
          <P>(k) <E T="03">Unzoned area</E> means an area where there is no zoning in effect. It does not include areas which have a rural zoning classification or land uses established by zoning variances or special exceptions.</P>
          <P>(l) <E T="03">Unzoned commercial or industrial areas</E> are unzoned areas actually used for commercial or industrial purposes as defined in the agreements made between the Secretary, U.S. Department of Transportation (Secretary), and each State pursuant to 23 U.S.C. 131(d).</P>
          <P>(m) <E T="03">Urban area</E> is as defined in 23 U.S.C. 101(a).</P>
          <P>(n) <E T="03">Visible</E> means capable of being seen, wehter or not readable, without visual aid by a person of normal visual acuity.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 750.704</SECTNO>
          <SUBJECT>Statutory requirements.</SUBJECT>

          <P>(a) 23 U.S.C. 131 provides that signs adjacent to the Interstate and Federal-aid Primary Systems which are visible from the main-traveled way and within 660 feet of the nearest edge of the right-of-way, and those additional signs beyond 660 feet outside of urban areas <PRTPAGE P="379"/>which are visible from the main-traveled way and erected with the purpose of their message being read from such main-traveled way, shall be limited to the following:</P>
          <P>(1) Directional and official signs and notice which shall conform to national standards promulgated by the Secretary in subpart B, part 750, chapter I, 23 CFR, National Standards for Directional and Official Signs;</P>
          <P>(2) Signs advertising the sale or lease of property upon which they are located;</P>
          <P>(3) Signs advertising activities conducted on the property on which they are located;</P>
          <P>(4) Signs within 660 feet of the nearest edge of the right-of-way within areas adjacent to the Interstate and Federal-aid Primary Systems which are zoned industrial or commercial under the authority of State law;</P>
          <P>(5) Signs within 660 feet of the nearest edge of the right-of-way within areas adjacent to the Interstate and Federal-aid Primary Systems which are unzoned commercial or industrial areas, which areas are determined by agreement between the State and the Secretary; and</P>
          <P>(6) Signs lawfully in existence on October 22, 1965, which are determined to be landmark signs.</P>
          <P>(b) 23 U.S.C. 131(d) provides that signs in § 750.704(a) (4) and (5) must comply with size, lighting, and spacing requirements, to be determined by agreement between the State and the Secretary.</P>
          <P>(c) 23 U.S.C. 131 does not permit signs to be located within zoned or unzoned commercial or industrial areas beyond 660 feet of the right-of-way adjacent to the Interstate or Federal-aid Primary System, outside of urban areas.</P>
          <P>(d) 23 U.S.C. 131 provides that signs not permitted under § 750.704 of this regulation must be removed by the State.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 750.705</SECTNO>
          <SUBJECT>Effective control.</SUBJECT>
          <P>In order to provide effective control of outdoor advertising, the State must:</P>
          <P>(a) Prohibit the erection of new signs other than those which fall under § 750.704(a)(1) through (6);</P>
          <P>(b) Assure that signs erected under § 750.704(a)(4) and (5) comply, at a minimum, with size, lighting, and spacing criteria contained in the agreement between the Secretary and the State;</P>
          <P>(c) Assure that signs erected under § 750.704(a)(1) comply with the national standards contained in subpart B, part 750, chapter I, 23 CFR;</P>
          <P>(d) Remove illegal signs expeditiously;</P>
          <P>(e) Remove nonconforming signs with just compensation within the time period set by 23 U.S.C. 131 (subpart D, part 750, chapter I, 23 CFR, sets forth policies for the acquisition and compensation for such signs);</P>
          <P>(f) Assure that signs erected under § 750.704(a)(6) comply with § 750.710, Landmark Signs, if landmark signs are allowed;</P>
          <P>(g) Establish criteria for determining which signs have been erected with the purpose of their message being read from the main-traveled way of an Interstate or primary highway, except where State law makes such criteria unnecessary. Where a sign is erected with the purpose of its message being read from two or more highways, one or more of which is a controlled highway, the more stringent of applicable control requirements will apply;</P>
          <P>(h) Develop laws, regulations, and procedures to accomplish the requirements of this subpart;</P>
          <P>(i) Establish enforcement procedures sufficient to discover illegally erected or maintained signs shortly after such occurrence and cause their prompt removal; and</P>
          <P>(j) Submit regulations and enforcement procedures to FHWA for approval.</P>
          <CITA>[40 FR 42844, Sept. 16, 1975; 40 FR 49777, Oct. 24, 1975]</CITA>
        </SECTION>
        <SECTION>
          <SECTNO>§ 750.706</SECTNO>
          <SUBJECT>Sign control in zoned and unzoned commercial and industrial areas.</SUBJECT>
          <P>The following requirements apply to signs located in zoned and unzoned commercial and industrial areas within 660 feet of the nearest edge of the right-of-way adjacent to the Interstate and Federal-aid primary highways.</P>

          <P>(a) The State by law or regulation shall, in conformity with its agreement with the Secretary, set criteria for size, lighting, and spacing of outdoor advertising signs located in commercial or industrial zoned or unzoned <PRTPAGE P="380"/>areas, as defined in the agreement, adjacent to Interstate and Federal-aid primary highways. If the agreement between the Secretary and the State includes a grandfather clause, the criteria for size, lighting, and spacing will govern only those signs erected subsequent to the date specified in the agreement. The States may adopt more restrictive criteria than are presently contained in agreements with the Secretary.</P>
          <P>(b) Agreement criteria which permit multiple sign structures to be considered as one sign for spacing purposes must limit multiple sign structures to signs which are physically contiguous, or connected by the same structure or cross-bracing, or located not more than 15 feet apart at their nearest point in the case of back-to-back or “V” type signs.</P>
          <P>(c) Where the agreement and State law permits control by local zoning authorities, these controls may govern in lieu of the size, lighting, and spacing controls set forth in the agreement, subject to the following:</P>
          <P>(1) The local zoning authority's controls must include the regulation of size, of lighting and of spacing of outdoor advertising signs, in all commercial and industrial zones.</P>
          <P>(2) The regulations established by local zoning authority may be either more restrictive or less restrictive than the criteria contained in the agreement, unless State law or regulations require equivalent or more restrictive local controls.</P>
          <P>(3) If the zoning authority has been delegated, extraterritorial, jurisdiction under State law, and exercises control of outdoor advertising in commercial and industrial zones within this extraterritorial jurisdiction, control by the zoning authority may be accepted in lieu of agreement controls in such areas.</P>
          <P>(4) The State shall notify the FHWA in writing of those zoning jurisdictions wherein local control applies. It will not be necessary to furnish a copy of the zoning ordinance. The State shall periodically assure itself that the size, lighting, and spacing control provisions of zoning ordinances accepted under this section are actually being enforced by the local authorities.</P>
          <P>(5) Nothing contained herein shall relieve the State of the responsibility of limiting signs within controlled areas to commercial and industrial zones.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 750.707</SECTNO>
          <SUBJECT>Nonconforming signs.</SUBJECT>
          <P>(a) <E T="03">General.</E> The provisions of § 750.707 apply to nonconforming signs which must be removed under State laws and regulations implementing 23 U.S.C. 131. These provisions also apply to nonconforming signs located in commercial and industrial areas within 660 feet of the nearest edge of the right-of-way which come under the so-called grandfather clause contained in State-Federal agreements. These provisions do not apply to conforming signs regardless of when or where they are erected.</P>
          <P>(b) <E T="03">Nonconforming signs.</E> A nonconforming sign is a sign which was lawfully erected but does not comply with the provisions of State law or State regulations passed at a later date or later fails to comply with State law or State regulations due to changed conditions. Changed conditions include, for example, signs lawfully in existence in commercial areas which at a later date become noncommercial, or signs lawfully erected on a secondary highway later classified as a primary highway.</P>
          <P>(c) <E T="03">Grandfather clause.</E> At the option of the State, the agreement may contain a grandfather clause under which criteria relative to size, lighting, and spacing of signs in zoned and unzoned commercial and industrial areas within 660 feet of the nearest edge of the right-of-way apply only to new signs to be erected after the date specified in the agreement. Any sign lawfully in existence in a commercial or industrial area on such date may remain even though it may not comply with the size, lighting, or spacing criteria. This clause only allows an individual sign at its particular location for the duration of its normal life subject to customary maintenance. Preexisting signs covered by a grandfather clause, which do not comply with the agreement criteria have the status of nonconforming signs.</P>
          <P>(d) <E T="03">Maintenance and continuance.</E> In order to maintain and continue a nonconforming sign, the following conditions apply:<PRTPAGE P="381"/>
          </P>
          <P>(1) The sign must have been actually in existence at the time the applicable State law or regulations became effective as distinguished from a contemplated use such as a lease or agreement with the property owner. There are two exceptions to actual existence as follows:</P>
          <P>(i) Where a permit or similar specific State governmental action was granted for the construction of a sign prior to the effective date of the State law or regulations and the sign owner acted in good faith and expended sums in reliance thereon. This exception shall not apply in instances where large numbers of permits were applied for and issued to a single sign owner, obviously in anticipation of the passage of a State control law.</P>
          <P>(ii) Where the State outdoor advertising control law or the Federal-State agreement provides that signs in commercial and industrial areas may be erected within six (6) months after the effective date of the law or agreement provided a lease dated prior to such effective date was filed with the State and recorded within thirty (30) days following such effective date.</P>
          <P>(2) There must be existing property rights in the sign affected by the State law or regulations. For example, paper signs nailed to trees, abandoned signs and the like are not protected.</P>
          <P>(3) The sign may be sold, leased, or otherwise transferred without affecting its status, but its location may not be changed. A nonconforming sign removed as a result of a right-of-way taking or for any other reason may be relocated to a conforming area but cannot be reestablished at a new location as a nonconforming use.</P>
          <P>(4) The sign must have been lawful on the effective date of the State law or regulations, and must continue to be lawfully maintained.</P>
          <P>(5) The sign must remain substantially the same as it was on the effective date of the State law or regulations. Reasonable repair and maintenance of the sign, including a change of advertising message, is not a change which would terminate nonconforming rights. Each State shall develop its own criteria to determine when customary maintenance ceases and a substantial change has occurred which would terminate nonconforming rights.</P>
          <P>(6) The sign may continue as long as it is not destroyed, abandoned, or discontinued. If permitted by State law and reerected in kind, exception may be made for signs destroyed due to vandalism and other criminal or tortious acts.</P>
          <P>(i) Each state shall develop criteria to define destruction, abandonment and discontinuance. These criteria may provide that a sign which for a designated period of time has obsolete advertising matter or is without advertising matter or is in need of substantial repair may constitute abandonment or discontinuance. Similarly, a sign damaged in excess of a certain percentage of its replacement cost may be considered destroyed.</P>
          <P>(ii) Where an existing nonconforming sign ceases to display advertising matter, a reasonable period of time to replace advertising content must be established by each State. Where new content is not put on a structure within the established period, the use of the structure as a nonconforming outdoor advertising sign is terminated and shall constitute an abandonment or discontinuance. Where a State establishes a period of more than one (1) year as a reasonable period for change of message, it shall justify that period as a customary enforcement practice within the State. This established period may be waived for an involuntary discontinuance such as the closing of a highway for repair in front of the sign.</P>
          <P>(e) <E T="03">Just compensation.</E> The States are required to pay just compensation for the removal of nonconforming lawfully existing signs in accordance with the terms of 23 U.S.C. 131 and the provisions of subpart D, part 750, chapter I, 23 CFR. The conditions which establish a right to maintain a nonconforming sign and therefore the right to compensation must pertain at the time it is acquired or removed.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 750.708</SECTNO>
          <SUBJECT>Acceptance of state zoning.</SUBJECT>

          <P>(a) 23 U.S.C. 131(d) provide that signs “may be erected and maintained within 660 feet of the nearest edge of the right-of-way within areas . . . which are zoned industrial or commercial under authority of State law.” Section 131(d) <PRTPAGE P="382"/>further provides, “The States shall have full authority under their own zoning laws to zone areas for commercial or industrial purposes, and the actions of the States in this regard will be accepted for the purposes of this Act.”</P>
          <P>(b) State and local zoning actions must be taken pursuant to the State's zoning enabling statute or constitutional authority and in accordance therewith. Action which is not a part of comprehensive zoning and is created primarily to permit outdoor advertising structures, is not recognized as zoning for outdoor advertising control purposes.</P>
          <P>(c) Where a unit of government has not zoned in accordance with statutory authority or is not authorized to zone, the definition of an unzoned commercial or industrial area in the State-Federal agreement will apply within that political subdivision or area.</P>
          <P>(d) A zone in which limited commercial or industrial activities are permitted as an incident to other primary land uses is not considered to be a commercial or industrial zone for outdoor advertising control purposes.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 750.709</SECTNO>
          <SUBJECT>On-property or on-premise advertising.</SUBJECT>
          <P>(a) A sign which consists solely of the name of the establishment or which identifies the establishment's principal or accessory products or services offered on the property is an on-property sign.</P>
          <P>(b) When a sign consists principally of brand name or trade name advertising and the product or service advertised is only incidental to the principal activity, or if it brings rental income to the property owner, it shall be considered the business of outdoor advertising and not an on-property sign.</P>
          <P>(c) A sale or lease sign which also advertises any product or service not conducted upon and unrelated to the business or selling or leasing the land on which the sign is located is not an on-property sign.</P>
          <P>(d) Signs are exempt from control under 23 U.S.C. 131 if they solely advertise the sale or lease of property on which they are located or advertise activities conducted on the property on which they are located. These signs are subject to regulation (subpart A, part 750, chapter I, 23 CFR) in those States which have executed a bonus agreement, 23 U.S.C. 131(j). State laws or regulations shall contain criteria for determining exemptions. These criteria may include:</P>
          <P>(1) A property test for determining whether a sign is located on the same property as the activity or property advertised; and</P>
          <P>(2) A purpose test for determining whether a sign has as its sole purpose the identification of the activity located on the property or its products or services, or the sale or lease of the property on which the sign is located.</P>
          <P>(3) The criteria must be sufficiently specific to curb attempts to improperly qualify outdoor advertising as “on-property” signs, such as signs on narrow strips of land contiguous to the advertised activity when the purpose is clearly to circumvent 23 U.S.C. 131.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 750.710</SECTNO>
          <SUBJECT>Landmark signs.</SUBJECT>
          <P>(a) 23 U.S.C. 131(c) permits the existence of signs lawfully in existence on October 22, 1965, determined by the State, subject to the approval of the Secretary, to be landmark signs, including signs on farm structures or natural surfaces, of historic or artistic significance, the preservation of which is consistent with the purpose of 23 U.S.C. 131.</P>
          <P>(b) States electing to permit landmark signs under 23 U.S.C. 131(c) shall submit a one-time list to the Federal Highway Administration for approval. The list should identify each sign as being in the original 1966 inventory. In the event a sign was omitted in the 1966 inventory, the State may submit other evidence to support a determination that the sign was in existence on October 22, 1965.</P>
          <P>(c) Reasonable maintenance, repair, and restoration of a landmark sign is permitted. Substantial change in size, lighting, or message content will terminate its exempt status.</P>
        </SECTION>
        <SECTION>
          <PRTPAGE P="383"/>
          <SECTNO>§ 750.711</SECTNO>
          <SUBJECT>Structures which have never displayed advertising material.</SUBJECT>
          <P>Structures, including poles, which have never displayed advertising or informative content are subject to control or removal when advertising content visible from the main-traveled way is added or affixed. When this is done, an “outdoor advertising sign” has then been erected which must comply with the State law in effect on that date.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 750.712</SECTNO>
          <SUBJECT>Reclassification of signs.</SUBJECT>
          <P>Any sign lawfully erected after the effective date of a State outdoor advertising control law which is reclassified from legal-conforming to nonconforming and subject to removal under revised State statutes or regulations and policy pursuant to this regulation is eligible for Federal participation in just compensation payments and other eligible costs.</P>
        </SECTION>
        <SECTION>
          <SECTNO>§ 750.713</SECTNO>
          <SUBJECT>Bonus provisions.</SUBJECT>
          <P>23 U.S.C. 131(j) specifically provides that any State which had entered into a bonus agreement before June 30, 1965, will be entitled to remain eligible to receive bonus payments provided it continues to carry out its bonus agreement. Bonus States are not exempt from the other provisions of 23 U.S.C. 131. If a State elects to comply with both programs, it must extend controls to the Primary System, and continue to carry out its bonus agreement along the Interstate System except where 23 U.S.C. 131, as amended, imposes more stringent requirements.</P>
        </SECTION>
      </SUBPART>
    </PART>
    <PART>
      <EAR>PT. 751</EAR>
      <HD SOURCE="HED">PART 751—JUNKYARD CONTROL AND ACQUISITION</HD>
      <CONTENTS>
        <SECHD>Sec.</SECHD>
        <SECTNO>751.1</SECTNO>
        <SUBJECT>Purpose.</SUBJECT>
        <SECTNO>751.3</SECTNO>
        <SUBJECT>Applicability.</SUBJECT>
        <SECTNO>751.5</SECTNO>
        <SUBJECT>Policy.</SUBJECT>
        <SECTNO>751.7</SECTNO>
        <SUBJECT>Definitions.</SUBJECT>
        <SECTNO>751.9</SECTNO>
        <SUBJECT>Effective control.</SUBJECT>
        <SECTNO>751.11</SECTNO>
        <SUBJECT>Nonconforming junkyards.</SUBJECT>
        <SECTNO>751.13</SECTNO>
        <SUBJECT>Control measures.</SUBJECT>
        <SECTNO>751.15</SECTNO>
        <SUBJECT>Just compensation.</SUBJECT>
        <SECTNO>751.17</SECTNO>
        <SUBJECT>Federal participation.</SUBJECT>
        <SECTNO>751.19</SECTNO>
        <SUBJECT>Documentation for Federal participation.</SUBJECT>
        <SECTNO>751.21</SECTNO>
        <SUBJECT>Relocation assistance.</SUBJECT>
        <SECTNO>751.23</SECTNO>
        <SUBJECT>Concurrent junkyard control and right-of-way projects.</SUBJECT>
        <SECTNO>751.25</SECTNO>
        <SUBJECT>Programming and authorization.</SUBJECT>
      </CONTENTS>
      <AUTH>
        <HD SOURCE="HED">Authority:</HD>
        <P>23 U.S.C. 136 and 315, 42 U.S.C. 4321-4347 and 4601-4655, 23 CFR 1.32, 49 CFR 1.48, unless otherwise noted.</P>
      </AUTH>
      <SOURCE>
        <HD SOURCE="HED">Source:</HD>
        <P>40 FR 8551, Feb. 28, 1975, unless otherwise noted.</P>
      </SOURCE>
      <SECTION>
        <SECTNO>§ 751.1</SECTNO>
        <SUBJECT>Purpose.</SUBJECT>
        <P>Pursuant to 23 U.S.C. 136, this part prescribes Federal Highway Administration [FHWA] policies and procedures relating to the exercise of effective control by the States of junkyards in areas adjacent to the Interstate and Federal-aid primary systems. Nothing in this part shall be construed to prevent a State from establishing more stringent junkyard control requirements than provided herein.</P>
        <CITA>[40 FR 12260, Mar. 18, 1975]</CITA>
      </SECTION>
      <SECTION>
        <SECTNO>§ 751.3</SECTNO>
        <SUBJECT>Applicability.</SUBJECT>
        <P>The provisions of this part are applicable to all areas within 1,000 feet of the nearest edge of the right-of-way and visible from the main traveled way of all Federal-aid Primary and Interstate Systems regardless of whether Federal funds participated in the construction thereof, including toll sections of such highways. This part does not apply to the Urban System.</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 751.5</SECTNO>
        <SUBJECT>Policy.</SUBJECT>
        <P>In carrying out the purposes of this part:</P>

        <P>(a) Emphasis should be placed on encouraging recycling of scrap and junk where practicable, in accordance with the National Environmental Policy Act of 1969 (42 U.S.C. 4321, <E T="03">et seq.</E>);</P>
        <P>(b) Every effort should be made to screen nonconforming junkyards which are to continue as ongoing businesses; and</P>
        <P>(c) Nonconforming junkyards should be relocated only as a last resort.</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 751.7</SECTNO>
        <SUBJECT>Definitions.</SUBJECT>
        <P>For purposes of this part, the following definitions shall apply:</P>
        <P>(a) <E T="03">Junkyard.</E> (1) A Junkyard is an establishment or place of business which is maintained, operated or used for storing, keeping, buying, or selling junk, or for the maintenance or operation of an automobile graveyard. This <PRTPAGE P="384"/>definition includes scrap metal processors, auto-wrecking yards, salvage yards, scrap yards, autorecycling yards, used auto parts yards and temporary storage of automobile bodies and parts awaiting disposal as a normal part of a business operation when the business will continually have like materials located on the premises. The definition includes garbage dumps and sanitary landfills. The definition does not include litter, trash, and other debris scattered along or upon the highway, or temporary operations and outdoor storage of limited duration.</P>
        <P>(2) An Automobile Graveyard is an establishment or place of business which is maintained, used, or operated for storing, keeping, buying, or selling wrecked, scrapped, ruined, or dismantled motor vehicles or motor vehicle parts. Ten or more such vehicles will constitute an automobile graveyard.</P>
        <P>(3) An Illegal Junkyard is one which was established or is maintained in violation of State law.</P>
        <P>(4) A Nonconforming Junkyard is one which was lawfully established, but which does not comply with the provisions of State law or State regulations passed at a later date or which later fails to comply with State regulations due to changed conditions. Illegally established junkyards are not nonconforming junkyards.</P>
        <P>(b) <E T="03">Junk.</E> Old or scrap metal, rope, rags, batteries, paper, trash, rubber, debris, waste, or junked, dismantled, or wrecked automobiles, or parts thereof.</P>
        <P>(c) <E T="03">Main traveled way.</E> The traveled way of a highway on which through traffic is carried. In the case of a divided highway, the traveled way of each of the separated roadways for traffic in opposite directions is a main traveled way. It does not include such facilities as frontage roads, turning roadways, or parking areas.</P>
        <P>(d) <E T="03">Industrial zones.</E> Those districts established by zoning authorities as being most appropriate for industry or manufacturing. A zone which simply permits certain industrial activities as an incident to the primary land use designation is not considered to be an industrial zone. The provisions of part 750, subpart G of this chapter relative to Outdoor Advertising Control shall apply insofar as industrial zones are concerned.</P>
        <P>(e) <E T="03">Unzoned industrial areas.</E> An area where there is no zoning in effect and which is used primarily for industrial purposes as determined by the State and approved by the FHWA. An unzoned area cannot include areas which may have a rural zoning classification or land uses established by zoning variances or special exceptions.</P>
        <CITA>[40 FR 8551, Feb. 28, 1975, as amended at 41 FR 9321, Mar. 4, 1976]</CITA>
      </SECTION>
      <SECTION>
        <SECTNO>§ 751.9</SECTNO>
        <SUBJECT>Effective control.</SUBJECT>
        <P>(a) In order to provide effective control of junkyards located within 1,000 feet of Interstate and Federal-aid primary highways, the State must:</P>
        <P>(1) Require such junkyards located outside of zoned and unzoned industrial areas to be screened or located so as not to be visible from the main traveled way, or be removed from sight.</P>
        <P>(2) Require the screening or removal of nonconforming junkyards within a reasonable time, but no later than 5 years after the date the junkyard becomes nonconforming unless Federal funds are not available in adequate amounts to participate in the cost of such screening or removal as provided in 23 U.S.C. 136(j).</P>
        <P>(3) Prohibit the establishment of new junkyards unless they comply with the requirements of paragraph (a)(1) of this section.</P>
        <P>(4) Expeditiously require junkyards which are illegally established or maintained to conform to the requirements of paragraph (a)(1) of this section.</P>

        <P>(b) Sanitary landfills as described herein need not be screened to satisfy requirements of Title 23, U.S.C., but landscaping should be required when the fill has been completed and operations have ceased, unless the landfill area is to be used for immediate development purposes. A sanitary landfill, for the purposes of this part, is a method of disposing of refuse on land without creating a nuisance or hazards to public health or safety by utilizing the principles of engineering to confine the refuse to the smallest practical area, to reduce it to the smallest practical volume, and to cover it with a layer of earth at the conclusion of each day's <PRTPAGE P="385"/>operation or at such more frequent intervals as may be necessary.</P>
        <P>(c) The State shall have laws, rules, and procedures sufficient to provide effective control, to discover illegally established or maintained junkyards shortly after such occurrence, and to cause the compliance or removal of same promptly in accordance with State legal procedures.</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 751.11</SECTNO>
        <SUBJECT>Nonconforming junkyards.</SUBJECT>
        <P>Subject to the provisions of § 751.9 of this part, the following requirements for the maintenance and continuance of a nonconforming junkyard apply:</P>
        <P>(a) The junkyard must have been actually in existence at the time the State law or regulations became effective as distinguished from a contemplated use, except where a permit or similar specific State governmental action was granted for the establishment of a junkyard prior to the effective date of the State law or regulations, and the junkyard owner acted in good faith and expended sums in reliance thereon.</P>
        <P>(b) There must be existing property rights in the junkyard or junk affected by the State law or regulation. Abandoned junk and junkyards, worthless junk, and the like are not similarly protected.</P>
        <P>(c) If the location of a nonconforming junkyard is changed as a result of a right-of-way taking or for any other reason, it ceases to be a nonconforming junkyard, and shall be treated as a new junkyard at a new location.</P>
        <P>(d) The nonconforming junkyard must have been lawful on the effective date of the State law or regulations and must continue to be lawfully maintained.</P>
        <P>(e) The nonconforming junkyard may continue as long as it is not extended, enlarged, or changed in use. Once a junkyard has been made conforming, the placement of junk so that it may be seen above or beyond a screen, or otherwise becomes visible, shall be treated the same as the establishment of a new junkyard.</P>
        <P>(f) The nonconforming junkyard may continue as long as it is not abandoned, destroyed, or voluntarily discontinued. Each State should develop criteria to define these terms.</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 751.13</SECTNO>
        <SUBJECT>Control measures.</SUBJECT>
        <P>(a) Consistent with the goals of the National Environmental Policy Act of 1969 (42 U.S.C. 4321), recycling of junk and scrap is to be encouraged to the greatest extent practicable in the implementation of the junkyard control program. Recycling should be considered in conjunction with other control measures. To facilitate recycling, junk or scrap should be moved to an automobile wrecker, or a scrap processor, or put to some other useful purpose.</P>
        <P>(b) Every effort shall be made to screen where the junkyard is to continue as an ongoing business. Screening may be accomplished by use of natural objects, landscaping plantings, fences, and other appropriate means, including relocating inventory on site to utilize an existing natural screen or a screenable portion of the site.</P>
        <P>(c) Where screening is used, it must, upon completion of the screening proj-ect, effectively screen the junkyard from the main traveled way of the highway on a year-round basis, and be compatible with the surroundings. Each State shall establish criteria governing the location, design, construction, maintenance, and materials used in fencing or screening.</P>
        <P>(d) A junkyard should be relocated only when other control measures are not feasible. Junkyards should be relocated to a site not visible from the highway or to an industrial area, and should not be relocated to residential, commercial, or other areas where foreseeable environmental problems may develop.</P>
        <P>(e) The State may develop and use other methods of operation to carry out the purposes of this directive, subject to prior FHWA approval.</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 751.15</SECTNO>
        <SUBJECT>Just compensation.</SUBJECT>
        <P>(a) Just compensation shall be paid the owner for the relocation, removal, or disposal of junkyards lawfully established under State law, which are required to be removed, relocated, or disposed of pursuant to 23 U.S.C. 136.</P>

        <P>(b) No rights to compensation accrue until a taking or removal has occurred. The conditions which establish a right to maintain and continue a nonconforming junkyard as provided in § 751.11 must pertain at the time of the taking <PRTPAGE P="386"/>or removal in order to establish a right to just compensation.</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 751.17</SECTNO>
        <SUBJECT>Federal participation.</SUBJECT>
        <P>(a) Federal funds may participate in 75 percent of the costs of control measures incurred in carrying out the provisions of this part including necessary studies for particular projects, and the employment of fee landscape architects and other qualified consultants.</P>
        <P>(b) Where State control standards are more stringent than Federal control requirements along Interstate and primary highways, the FHWA may approve Federal participation in the costs of applying the State standards on a statewide basis. Where State standards require control of junkyards in zoned or unzoned industrial areas, Federal funds may participate only if such action will make an effective contribution to the character of the area as a whole and the cost is reasonable, but such projects should be deferred until the work in the areas where control is required has progressed well toward completion.</P>
        <P>(c) Generally, only costs associated with the acquisition of minimal real property interests, such as easements or temporary rights of entry, necessary to accomplish the purposes of this part are eligible for Federal participation. The State may request, on a case-by-case basis, participation in costs of other interests beyond the minimum necessary, including fee title.</P>
        <P>(d) Federal funds may participate in costs to correct the inadequacies of screening in prior control projects where the inadequacy is due to higher screening standards established in this part or due to changed conditions.</P>
        <P>(e) Federal funds may participate in the costs of moving junk or scrap to a recycling place of business, or in the case of junk with little or no recycling potential, to a site for permanent disposal. In the latter case, reasonable land rehabilitation costs or fees connected with the use of such a disposal site are also eligible. In a case where the acquisition of a permanent disposal site by the State would be the most economical method of disposal, Federal funds may participate in the net cost (cost of acquisition less a credit after disposal) of a site obtained for this purpose.</P>
        <P>(f) Federal funds may participate in control measure costs involved in any junkyard lawfully established or maintained under State law which is reclassified from conforming to nonconforming under revised State regulations and policy pursuant to this part.</P>
        <P>(g) Federal funds may participate in the costs of acquisition of a dwelling in exceptional cases where such acquisition is found necessary and in the public interest, and where acquisition of the dwelling can be accomplished without resort to eminent domain.</P>
        <P>(h) Federal funds shall not participate in:</P>
        <P>(1) Costs associated with the control of illegal junkyards except for removal by State personnel on a force account basis or by contract, or in costs of controlling junkyards established after the effective date of the State's compliance law except where a conforming junkyard later becomes nonconforming due to changed conditions;</P>
        <P>(2) Any costs associated with the acquisition of any dwelling or its related buildings if acquired through eminent domain in connection with the junk-yard control program;</P>
        <P>(3) Costs of acquisition of interests or rights as a measure for prohibition or control of the establishment of future junkyards;</P>
        <P>(4) Costs of maintaining screening devices after they have been erected; or</P>
        <P>(5) Costs of screening junk which has been or will be removed as a part of a junkyard control project.</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 751.19</SECTNO>
        <SUBJECT>Documentation for Federal participation.</SUBJECT>
        <P>The following information concerning each eligible junkyard must be available in the States' files to be eligible for Federal participation in the costs thereof:</P>
        <P>(a) Satisfactory evidence of ownership of the junk or junkyard or both.</P>
        <P>(b) Value or cost documentation (including separate interests if applicable) including proof of obligation or payment of funds.</P>

        <P>(c) Evidence that the necessary property interests have passed to the State and that the junk has been screened, <PRTPAGE P="387"/>relocated, removed or disposed of in accordance with the provisions of this part.</P>
        <P>(d) If a dwelling has been acquired by condemnation, evidence that the costs involved are not included in the State's claim for participation.</P>
        <CITA>[40 FR 8551, Feb. 28, 1975; 40 FR 12260, Mar. 18, 1975]</CITA>
      </SECTION>
      <SECTION>
        <SECTNO>§ 751.21</SECTNO>
        <SUBJECT>Relocation assistance.</SUBJECT>
        <P>Relocation assistance benefits pursuant to 49 CFR part 24 are available for:</P>
        <P>(a) The actual reasonable moving expenses of the junk, actual direct loss of tangible personal property and actual reasonable expenses in searching for a replacement business or, if the eligibility requirements are met, a payment in lieu of such expenses.</P>
        <P>(b) Relocation assistance in locating a replacement business.</P>
        <P>(c) Moving costs of personal property from a dwelling and relocation assistance in locating a replacement dwelling, provided the acquisition of the real property used for the business causes a person to vacate a dwelling.</P>
        <P>(d) Replacement housing payments if the acquisition of the dwelling is found by FHWA to be necessary for the federally assisted junkyard control project.</P>
        <CITA>[40 FR 8551, Feb. 28, 1975, as amended at 50 FR 34094, Aug. 23, 1985; 54 FR 47076, Nov. 9, 1989]</CITA>
      </SECTION>
      <SECTION>
        <SECTNO>§ 751.23</SECTNO>
        <SUBJECT>Concurrent junkyard control and right-of-way projects.</SUBJECT>
        <P>The State is encouraged to coordinate junkyard control and highway right-of-way projects. Expenses incurred in furtherance of concurrent projects shall be prorated between projects.</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 751.25</SECTNO>
        <SUBJECT>Programming and authorization.</SUBJECT>
        <P>(a) Junkyard control projects shall be programmed in accordance with the provisions of part 630, subpart A of this chapter. Such projects may include one or more junkyards.</P>
        <P>(b) Authorization to proceed with a junkyard control project may be given when the State submits a written request to FHWA which includes the following:</P>
        <P>(1) The zoning and validation of the legal status of each junkyard on the project;</P>
        <P>(2) The control measures proposed for each junkyard including, where applicable, information relative to permanent disposal sites to be acquired by the State;</P>
        <P>(3) The real property interest to be acquired in order to implement the control measures;</P>
        <P>(4) Plans or graphic displays indicating the location of the junkyard relative to the highway, the 1,000 foot control lines, property ownership boundaries, the general location of the junk or scrap material, and any buildings, structures, or improvement involved; and</P>
        <P>(5) Where screening is to be utilized, the type of screening, and adequately detailed plans and cross sections, or other adequate graphic displays which illustrate the relationship of the motorist, the screen, and the material to be screened at critical points of view.</P>
        <CITA>[40 FR 8551, Feb. 28, 1975, as amended at 41 FR 9321, Mar. 4, 1976]</CITA>
      </SECTION>
    </PART>
    <PART>
      <EAR>PT. 752</EAR>
      <HD SOURCE="HED">PART 752—LANDSCAPE AND ROADSIDE DEVELOPMENT</HD>
      <CONTENTS>
        <SECHD>Sec.</SECHD>
        <SECTNO>752.1</SECTNO>
        <SUBJECT>Purpose.</SUBJECT>
        <SECTNO>752.2</SECTNO>
        <SUBJECT>Policy.</SUBJECT>
        <SECTNO>752.3</SECTNO>
        <SUBJECT>Definitions.</SUBJECT>
        <SECTNO>752.4</SECTNO>
        <SUBJECT>Landscape development.</SUBJECT>
        <SECTNO>752.5</SECTNO>
        <SUBJECT>Safety rest areas.</SUBJECT>
        <SECTNO>752.6</SECTNO>
        <SUBJECT>Scenic overlooks.</SUBJECT>
        <SECTNO>752.7</SECTNO>
        <SUBJECT>Information centers and systems.</SUBJECT>
        <SECTNO>752.8</SECTNO>
        <SUBJECT>Privately operated information centers and systems.</SUBJECT>
        <SECTNO>752.9</SECTNO>
        <SUBJECT>Scenic lands.</SUBJECT>
        <SECTNO>752.10</SECTNO>
        <SUBJECT>Abandoned vehicles.</SUBJECT>
        <SECTNO>752.11</SECTNO>
        <SUBJECT>Federal participation.</SUBJECT>
      </CONTENTS>
      <AUTH>
        <HD SOURCE="HED">Authority:</HD>
        <P>23 U.S.C. 131, 315, 319; 42 U.S.C. 4321 <E T="03">et seq.;</E> 49 CFR 1.48(b), unless otherwise noted.</P>
      </AUTH>
      <SOURCE>
        <HD SOURCE="HED">Source:</HD>
        <P>43 FR 19390, May 5, 1978, unless otherwise noted.</P>
      </SOURCE>
      <SECTION>
        <SECTNO>§ 752.1</SECTNO>
        <SUBJECT>Purpose.</SUBJECT>

        <P>The purpose of this part is to furnish guidelines and prescribe policies regarding landscaping and scenic enhancement programs, safety rest areas, and scenic overlooks under 23 U.S.C. 319; information centers and systems <PRTPAGE P="388"/>under 23 U.S.C. 131(i); and vending machines in safety rest areas under 23 U.S.C. 111.</P>
        <CITA>[48 FR 38610, Aug. 25, 1983]</CITA>
      </SECTION>
      <SECTION>
        <SECTNO>§ 752.2</SECTNO>
        <SUBJECT>Policy.</SUBJECT>
        <P>(a) Highway esthetics is a most important consideration in the Federal-aid highway program. Highways must not only blend with our natural social, and cultural environment, but also provide pleasure and satisfaction in their use.</P>
        <P>(b) The FHWA will cooperate with State and local agencies and organizations to provide opportunities for the display of original works of art within the highway rights-of-way.</P>
        <P>(c) The development of the roadside to include landscape development, safety rest areas, and the preservation of valuable adjacent scenic lands is a necessary component of highway development. Planning and development of the roadside should be concurrent with or closely follow that of the highway. Further, the development of travel information centers and systems is encouraged as an effective method of providing necessary information to the traveling public.</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 752.3</SECTNO>
        <SUBJECT>Definitions.</SUBJECT>
        <P>(a) <E T="03">Safety rest area.</E> A roadside facility safely removed from the traveled way with parking and such facilities for the motorist deemed necessary for his rest, relaxation, comfort and information needs. The term is synonymous with “rest and recreation areas.”</P>
        <P>(b) <E T="03">Scenic overlook.</E> A roadside improvement for parking and other facilities to provide the motorist with a safe opportunity to stop and enjoy a view.</P>
        <P>(c) <E T="03">Information centers.</E> Facilities located at safety rest areas which provide information of interest to the traveling public.</P>
        <P>(d) <E T="03">Information systems.</E> Facilities located within the right-of-way which provide information of interest to the traveling public. An information system is not a sign, display or device otherwise permitted under 23 U.S.C. 131 or prohibited by any local, State or Federal law or regulation.</P>
        <P>(e) <E T="03">Landscape project.</E> Any action taken as part of a highway construction project or as a separate action to enhance the esthetics of a highway through the placement of plant materials consistent with a landscape design plan. Seeding undertaken for erosion control and planting vegetation for screening purposes shall not constitute a landscaping project.</P>
        <CITA>[43 FR 19390, May 5, 1978, as amended at 52 FR 34638, Sept. 14, 1987]</CITA>
      </SECTION>
      <SECTION>
        <SECTNO>§ 752.4</SECTNO>
        <SUBJECT>Landscape development.</SUBJECT>
        <P>(a) Landscape development, <E T="03">which includes landscaping projects and other highway planting programs</E> within the right-of-way of all federally funded highways or on adjoining scenic lands, shall be in general comformity with accepted concepts and principles of highway landscaping and environmental design.</P>
        <P>(b) <E T="03">Landscape development</E> should have provisions for plant establishment periods of a duration sufficient for expected survival in the highway environment. Normal 1-year plant establishment periods may be extended to 3-year periods where survival is considered essential to their function, such as junkyard screening or urban landscaping projects.</P>
        <P>(c) In urban areas new and major reconstructed highways and completed Interstate and expressway sections are to be landscaped as appropriate for the adjacent existing or planned environment.</P>
        <P>(d) In rural areas new and major reconstructed highways should be landscaped as appropriate for the adjacent environment. Planning should include the opportunity for natural regeneration of native growth and the management of that growth.</P>
        <P>(e) Landscaping projects shall include the planting of native wildflower seeds or seedlings or both, unless a waiver is granted as provided in § 752.11(b).</P>
        <CITA>[43 FR 19390, May 5, 1978, as amended at 52 FR 34638, Sept. 14, 1987]</CITA>
      </SECTION>
      <SECTION>
        <SECTNO>§ 752.5</SECTNO>
        <SUBJECT>Safety rest areas.</SUBJECT>

        <P>(a) Safety rest areas should provide facilities reasonably necessary for the comfort, convenience, relaxation, and information needs of the motorist. Caretakers' quarters may be provided in conjunction with a safety rest area <PRTPAGE P="389"/>at such locations where accommodations are deemed necessary. All facilities within the rest area are to provide full consideration and accommodation for the handicapped.</P>
        <P>(b) The State may permit the placement of vending machines in existing or new safety rest areas located on the rights-of-way of the Interstate system for the purpose of dispensing such food, drink, or other articles as the State determines are appropriate and desirable, except that the dispensing by any means, of petroleum products or motor vehicle replacement parts shall not be allowed. Such vending machines shall be operated by the State.</P>
        <P>(c) The State may operate the vending machines directly or may contract with a vendor for the installation, operation, and maintenance of the vending machines. In permitting the placement of vending machines the State shall give priority to vending machines which are operated through the State licensing agency designated pursuant to section 2(a)(5) of the Randolph-Sheppard Act, U.S.C. 107(a)(5).</P>
        <P>(d) Access from the safety rest areas to adjacent publicly owned conservation and recreation areas may be permitted if access to these areas is only available through the rest area and if these areas or their usage does not adversely affect the facilities of the safety rest area.</P>
        <P>(e) The scenic quality of the site, its accessibility and adaptability, and the availability of utilities are the prime considerations in the selection of rest area sites. A statewide safety rest area system plan should be maintained. This plan should include development priorities to ensure safety rest areas will be constructed first at locations most needed by the motorist. Proposals for safety rest areas or similar facilities on Federal-aid highways in suburban or urban areas shall be special case and must be fully justified before being authorized by the FHWA Regional Administrator.</P>
        <P>(f) Facilities within newly constructed safety rest areas should meet the forecast needs of the design year. Expansion and modernization of older existing rest areas that do not provide adequate service should be considered.</P>
        <P>(g) No charge to the public may be made for goods and services at safety rest areas except for telephone and articles dispensed by vending machines.</P>
        <CITA>[43 FR 19390, May 5, 1978, as amended at 48 FR 38611, Aug. 25, 1983]</CITA>
      </SECTION>
      <SECTION>
        <SECTNO>§ 752.6</SECTNO>
        <SUBJECT>Scenic overlooks.</SUBJECT>
        <P>Scenic overlooks shall be located and designed as appropriate to the site and the scenic view with consideration for safety, access, and convenience of the motorist. Scenic overlooks may provide facilities equivalent to those provided in safety rest area.</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 752.7</SECTNO>
        <SUBJECT>Information centers and systems.</SUBJECT>
        <P>(a) The State may establish at existing or new safety rest areas information centers for the purpose of providing specific information to the motorist as to services, as to places of interest within the State and such other information as the State may consider desirable.</P>
        <P>(b) The State may construct and operate the facilities, may construct and lease the operation of information facilities, or may lease the construction and operation of information facilities.</P>
        <P>(c) Where the information center or system includes an enclosed building, the identification of the operator and all advertising must be restricted to the interior of the building. Where a facility is in the nature of a bulletin board or partial enclosure, none of the advertising, including the trade name, logo, or symbol of the operator shall be legible from the main traveled way.</P>
        <P>(d) Subject to FHWA approval, States may establish or permit information systems within the right-of-way of federally funded highways which provide information of specific interest to the traveling public which do not visually intrude upon the main-traveled way of the highway in a manner violating 23 U.S.C. 131 and other applicable local, State, and Federal laws, rules, and regulations.</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 752.8</SECTNO>
        <SUBJECT>Privately operated information centers and systems.</SUBJECT>

        <P>(a) Subject to the FHWA Regional Administrator's approval of the lease or agreement, the State may permit privately operated information centers <PRTPAGE P="390"/>and systems which conform with the standards of this directive.</P>
        <P>(b) There shall be no violation of control of access, and no adverse effect on traffic in the main traveled way.</P>
        <P>(c) The agreement between the State and the private operator shall provide that:</P>
        <P>(1) The State shall have title to the information center or system upon completion of construction or termination of the lease.</P>
        <P>(2) Advertising must be limited to matters relating to and of interest to the traveling public.</P>
        <P>(3) Equal access must be provided at reasonable rates to all advertisers considered qualified by the State.</P>
        <P>(4) Forty percent or more of all display areas and audible communications shall be devoted free of charge to providing information to the traveling public and public service announcements.</P>
        <P>(5) No charge to the public may be made for goods or services except telephone and articles dispensed by vending machines.</P>
        <P>(6) Nondiscrimination provisions must be included in accordance with the State assurance with regard to 42 U.S.C. 2000d—2000d-5 (Civil Rights Act of 1964). The private operator may not permit advertising from advertisers who do not provide their services without regard to race, color, or national origin.</P>
        <P>(7) The center or system shall be adequately maintained and kept clean and sanitary.</P>
        <P>(8) The State may promulgate reasonable rules and regulations on the conduct of the information center or system in the interests of the public.</P>
        <P>(9) The State may terminate the lease or agreement for violation of its terms or for other cause.</P>
        <CITA>[43 FR 19390, May 5, 1978, as amended at 48 FR 38611, Aug. 25, 1983]</CITA>
      </SECTION>
      <SECTION>
        <SECTNO>§ 752.9</SECTNO>
        <SUBJECT>Scenic lands.</SUBJECT>
        <P>(a) Acquisition of interests in and improvement of strips of land or water areas adjacent to Federal-aid highways may be made as necessary for restoration, preservation, and enhancement of scenic beauty.</P>
        <P>(b) Scenic strip interests may be acquired in urban or rural areas, combined in one or more projects, authorized separately whether or not there is or has been a Federal-aid project on the adjoining Federal-aid highway.</P>
        <P>(c) Approval of acquisition and development of scenic strips on completed Interstate should be conditioned on a showing that the acquisition of scenic strips was considered under the Highway Beautification Program for that particular section of Interstate.</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 752.10</SECTNO>
        <SUBJECT>Abandoned vehicles.</SUBJECT>
        <P>(a) Abandoned motor vehicles may be removed from the right-of-way and from private lands adjacent to Federal-aid highways for the restoration, preservation, or enhancement of scenic beauty as seen from the traveled way of the highway as a landscape or roadside development project.</P>
        <P>(b) The State shall obtain permission or sufficient legal authority to go on private land to carry out this program. Where feasible, an agreement should be made with the owner that he will not in the future place junk, or allow junk to be placed, on his land so as to create an eyesore to the traveling public. The permission or authority and the agreement may be informal.</P>
        <P>(c) The collection of abandoned motor vehicles from within the right-of-way must be a development project and not a maintenance operation. Once a State completes a development project for the removal of abandoned motor vehicles from within the highway right-of-way, it is obligated to continue the removal of future abandoned motor vehicles from within the development project limits without further participation.</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 752.11</SECTNO>
        <SUBJECT>Federal participation.</SUBJECT>
        <P>(a) Federal-aid highway funds, but generally excluding Interstate construction funds, are available for landscape development; for the acquisition and development of safety rest areas, scenic overlooks, and scenic lands; for the development of information centers and systems; and for the removal of abandoned motor vehicles.</P>

        <P>(b) Federal-aid highway funds may participate in any landscaping project undertaken pursuant to paragraph (a) of this section provided that at least <PRTPAGE P="391"/>one-quarter of one percent of funds expended for such landscaping project is used to plant native wildflower seeds or seedlings or both. The Administrator may, upon the request of a State highway agency, grant a waiver to this requirement provided the State certifies that:</P>
        <P>(1) Native wildflowers or seedlings cannot be grown satisfactorily; or</P>
        <P>(2) There is a scarcity of available planting areas; or</P>
        <P>(3) The available planting areas will be used for agricultural purposes.</P>
        <P>(c) Subject to the requirement of paragraph (b) of this section, Federal-aid highway funds may participate in plant establishment periods in or associated with landscape development.</P>
        <P>(d) Notwithstanding the provisions of paragraph (b) of this section, Federal-aid highway funds may participate in the planting of flowering materials, including native wildflowers, donated by garden clubs and other organizations or individuals.</P>
        <P>(e) The value of donated plant materials shall not count toward the one-quarter of one percent minimum expenditure required by paragraph (b) of this section.</P>
        <P>(f) Federal-aid funds may not be used for assemblage, printing, or distribution of information materials; for temporary or portable information facilities; or for installation, operation, or maintenance of vending machines.</P>
        <CITA>[52 FR 34638, Sept. 14, 1987]</CITA>
      </SECTION>
    </PART>
    <PART>
      <EAR>Pt. 771</EAR>
      <HD SOURCE="HED">PART 771—ENVIRONMENTAL IMPACT AND RELATED PROCEDURES</HD>
      <CONTENTS>
        <SECHD>Sec.</SECHD>
        <SECTNO>771.101</SECTNO>
        <SUBJECT>Purpose.</SUBJECT>
        <SECTNO>771.103</SECTNO>
        <SUBJECT>[Reserved]</SUBJECT>
        <SECTNO>771.105</SECTNO>
        <SUBJECT>Policy.</SUBJECT>
        <SECTNO>771.107</SECTNO>
        <SUBJECT>Definitions.</SUBJECT>
        <SECTNO>771.109</SECTNO>
        <SUBJECT>Applicability and responsibilities.</SUBJECT>
        <SECTNO>771.111</SECTNO>
        <SUBJECT>Early coordination, public involvement, and project development.</SUBJECT>
        <SECTNO>771.113</SECTNO>
        <SUBJECT>Timing of Administration activities.</SUBJECT>
        <SECTNO>771.115</SECTNO>
        <SUBJECT>Classes of actions.</SUBJECT>
        <SECTNO>771.117</SECTNO>
        <SUBJECT>Categorical exclusions.</SUBJECT>
        <SECTNO>771.119</SECTNO>
        <SUBJECT>Environmental assessments.</SUBJECT>
        <SECTNO>771.121</SECTNO>
        <SUBJECT>Findings of no significant impact.</SUBJECT>
        <SECTNO>771.123</SECTNO>
        <SUBJECT>Draft environmental impact statements.</SUBJECT>
        <SECTNO>771.125</SECTNO>
        <SUBJECT>Final environmental impact statements.</SUBJECT>
        <SECTNO>771.127</SECTNO>
        <SUBJECT>Record of decision.</SUBJECT>
        <SECTNO>771.129</SECTNO>
        <SUBJECT>Re-evaluations.</SUBJECT>
        <SECTNO>771.130</SECTNO>
        <SUBJECT>Supplemental environmental impact statements.</SUBJECT>
        <SECTNO>771.131</SECTNO>
        <SUBJECT>Emergency action procedures.</SUBJECT>
        <SECTNO>771.133</SECTNO>
        <SUBJECT>Compliance with other requirements.</SUBJECT>
        <SECTNO>771.135</SECTNO>
        <SUBJECT>Section 4(f) (49 U.S.C. 303).</SUBJECT>
        <SECTNO>771.137</SECTNO>
        <SUBJECT>International actions.</SUBJECT>
      </CONTENTS>
      <AUTH>
        <HD SOURCE="HED">Authority:</HD>
        <P>42 U.S.C. 4321 <E T="03">et seq.</E>; 23 U.S.C. 109, 110, 128, 138 and 315; 49 U.S.C. 303(c), 5301(e), 5323, and 5324; 40 CFR part 1500 <E T="03">et seq.</E>; 49 CFR 1.48(b) and 1.51.</P>
      </AUTH>
      <SOURCE>
        <HD SOURCE="HED">Source:</HD>
        <P>52 FR 32660, Aug. 28, 1987, unless otherwise noted.</P>
      </SOURCE>
      <SECTION>
        <SECTNO>§ 771.101</SECTNO>
        <SUBJECT>Purpose.</SUBJECT>
        <P>This regulation prescribes the policies and procedures of the Federal Highway Administration (FHWA) and the Urban Mass Transportation Administration (UMTA) for implementing the National Environmental Policy Act of 1969 as amended (NEPA), and the regulation of the Council on Environmental Quality (CEQ), 40 CFR parts 1500 through 1508. This regulation sets forth all FHWA, UMTA, and Department of Transportation (DOT) requirements under NEPA for the processing of highway and urban mass transportation projects. This regulation also sets forth procedures to comply with 23 U.S.C. 109(h), 128, 138, and 49 U.S.C. 303, 1602(d), 1604(h), 1604(i), 1607a, 1607a-1 and 1610.</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 771.103</SECTNO>
        <RESERVED>[Reserved]</RESERVED>
      </SECTION>
      <SECTION>
        <SECTNO>§ 771.105</SECTNO>
        <SUBJECT>Policy.</SUBJECT>
        <P>It is the policy of the Administration that:</P>
        <P>(a) To the fullest extent possible, all environmental investigations, reviews, and consultations be coordinated as a single process, and compliance with all applicable environmental requirements be reflected in the environmental document required by this regulation.<SU>1</SU>
          <FTREF/>
        </P>
        <FTNT>
          <P>
            <SU>1</SU> FHWA and UMTA have supplementary guidance on the format and content of NEPA documents for their programs. This includes a list of various environmental laws, regulations, and Executive orders which may be applicable to projects. The FHWA Technical Advisory T6640.8A, October 30, 1987, and the UMTA supplementary guidance are available <PRTPAGE/>from the respective FHWA and UMTA headquarters and field offices as prescribed in 49 CFR part 7, Appendices D and G.</P>
        </FTNT>
        <PRTPAGE P="392"/>
        <P>(b) Alternative courses of action be evaluated and decisions be made in the best overall public interest based upon a balanced consideration of the need for safe and efficient transportation; of the social, economic, and environmental impacts of the proposed transportation improvement; and of national, State, and local environmental protection goals.</P>
        <P>(c) Public involvement and a systematic interdisciplinary approach be essential parts of the development process for proposed actions.</P>
        <P>(d) Measures necessary to mitigate adverse impacts be incorporated into the action. Measures necessary to mitigate adverse impacts are eligible for Federal funding when the Administration determines that:</P>
        <P>(1) The impacts for which the mitigation is proposed actually result from the Administration action; and</P>
        <P>(2) The proposed mitigation represents a reasonable public expenditure after considering the impacts of the action and the benefits of the proposed mitigation measures. In making this determination, the Administration will consider, among other factors, the extent to which the proposed measures would assist in complying with a Federal statute, Executive Order, or Administration regulation or policy.</P>
        <P>(e) Costs incurred by the applicant for the preparation of environmental documents requested by the Administration be eligible for Federal assistance.</P>
        <P>(f) No person, because of handicap, age, race, color, sex, or national origin, be excluded from participating in, or denied benefits of, or be subject to discrimination under any Administration program or procedural activity required by or developed pursuant to this regulation.</P>
        <CITA>[52 FR 32660, Aug. 28, 1987; 53 FR 11065, Apr. 5, 1988]</CITA>
      </SECTION>
      <SECTION>
        <SECTNO>§ 771.107</SECTNO>
        <SUBJECT>Definitions.</SUBJECT>
        <P>The definitions contained in the CEQ regulation and in Titles 23 and 49 of the United States Code are applicable. In addition, the following definitions apply.</P>
        <P>(a) <E T="03">Environmental studies</E>. The investigations of potential environmental impacts to determine the environmental process to be followed and to assist in the preparation of the environmental document.</P>
        <P>(b) <E T="03">Action</E>. A highway or transit project proposed for FHWA or UMTA funding. It also includes activities such as joint and multiple use permits, changes in access control, etc., which may or may not involve a commitment of Federal funds.</P>
        <P>(c) <E T="03">Administration action</E>. The approval by FHWA or UMTA of the applicant's request for Federal funds for construction. It also includes approval of activities such as joint and multiple use permits, changes in access control, etc., which may or may not involve a commitment of Federal funds.</P>
        <P>(d) <E T="03">Administration</E>. FHWA or UMTA, whichever is the designated lead agency for the proposed action.</P>
        <P>(e) <E T="03">Section 4(f).</E> Refers to 49 U.S.C. 303 and 23 U.S.C. 138.<SU>2</SU>
          <FTREF/>
        </P>
        <FTNT>
          <P>
            <SU>2</SU> Section 4(f), which protected certain public lands and all historic sites, technically was repealed in 1983 when it was codified, without substantive change, as 49 U.S.C. 303. This regulation continues to refer to section 4(f) because it would create needless confusion to do otherwise; the policies section 4(f) engendered are widely referred to as “section 4(f)” matters. A provision with the same meaning is found at 23 U.S.C. 138 and applies only to FHWA actions.</P>
        </FTNT>
      </SECTION>
      <SECTION>
        <SECTNO>§ 771.109</SECTNO>
        <SUBJECT>Applicability and responsibilities.</SUBJECT>
        <P>(a)(1) The provisions of this regulation and the CEQ regulation apply to actions where the Administration exercises sufficient control to condition the permit or project approval. Actions taken by the applicant which do not require Federal approvals, such as preparation of a regional transportation plan are not subject to this regulation.</P>
        <P>(2) This regulation does not apply to, or alter approvals by the Administration made prior to the effective date of this regulation.</P>

        <P>(3) Environmental documents accepted or prepared by the Administration <PRTPAGE P="393"/>after the effective date of this regulation shall be developed in accordance with this regulation.</P>
        <P>(b) It shall be the responsibility of the applicant, in cooperation with the Administration to implement those mitigation measures stated as commitments in the environmental documents prepared pursuant to this regulation. The FHWA will assure that this is accomplished as a part of its program management responsibilities that include reviews of designs, plans, specifications, and estimates (PS&amp;E), and construction inspections. The UMTA will assure implementation of committed mitigation measures through incorporation by reference in the grant agreement, followed by reviews of designs and contruction inspections.</P>
        <P>(c) The Administration, in cooperation with the applicant, has the responsibility to manage the preparation of the appropriate environmental document. The role of the applicant will be determined by the Administration accordance with the CEQ regulation:</P>
        <P>(1) <E T="03">Statewide agency.</E> If the applicant is a public agency that has statewide jurisdiction (for example, a State highway agency or a State department of transportation) or is a local unit of government acting through a statewide agency, and meets the requirements of section 102(2)(D) of NEPA, the applicant may prepare the environmental impact statement (EIS) and other environmental documents with the Administration furnishing guidance, participating in the preparation, and independently evaluating the document. All FHWA applicants qualify under this paragraph.</P>
        <P>(2) <E T="03">Joint lead agency.</E> If the applicant is a public agency and is subject to State or local requirements comparable to NEPA, then the Administration and the applicant may prepare the EIS and other environmental documents as joint lead agencies. The applicant shall initially develop substantive portions of the environmental document, although the Administration will be responsible for its scope and content.</P>
        <P>(3) <E T="03">Cooperating agency.</E> Local public agenices with special expertise in the proposed action may be cooperating agencies in the preparation of an environmental document. An applicant for capital assistance under the Urban Mass Transportation Act of 1964, as amended (UMT Act), is presumed to be a cooperating agency if the conditions in paragraph (c) (1) or (2) of this section do not apply. During the environmental process, the Administration will determine the scope and content of the environmental document and will direct the applicant, acting as a cooperating agency, to develop information and prepare those portions of the document concerning which it has special expertise.</P>
        <P>(4) <E T="03">Other.</E> In all other cases, the role of the applicant is limited to providing environmental studies and commenting on environmental documents. All private institutions or firms are limited to this role.</P>
        <P>(d) When entering into Federal-aid project agreements pursuant to 23 U.S.C. 110, it shall be the responsibility of the State highway agency to ensure that the project is constructed in accordance with and incorporates all committed environmental impact mitigation measures listed in approved environmental documents unless the State requests and receives written Federal Highway Administration approval to modify or delete such mitigation features.</P>
        <CITA>[52 FR 32660, Aug. 28, 1987; 53 FR 11065, Apr. 5, 1988, as amended at 62 FR 6873, Feb. 14, 1997]</CITA>
      </SECTION>
      <SECTION>
        <SECTNO>§ 771.111</SECTNO>
        <SUBJECT>Early coordination, public involvement, and project development.</SUBJECT>

        <P>(a) Early coordination with appropriate agencies and the public aids in determining the type of environmental document an action requires, the scope of the document, the level of analysis, and related environmental requirements. This involves the exchange of information from the inception of a proposal for action to preparation of the environmental document. Applicants intending to apply for funds should notify the Administration at the time that a project concept is identified. When requested, the Administration will advise the applicant, insofar as possible, of the probable class of action and related environmental laws and requirements and of the need for <PRTPAGE P="394"/>specific studies and findings which would normally be developed concurrently with the environmental document.</P>
        <P>(b) The Administration will identify the probable class of action as soon as sufficient information is available to identify the probable impacts of the action. For UMTA, this is normally no later than the review of the transportation improvement program (TIP) and for FHWA, the approval of the 105 program (23 U.S.C. 105).</P>
        <P>(c) When FHWA and UMTA are involved in the development of joint projects, or when FHWA or UMTA acts as a joint lead agency with another Federal agency, a mutually acceptable process will be established on a case-by-case basis.</P>
        <P>(d) During the early coordination process, the Administration, in cooperation with the applicant, may request other agencies having special interest or expertise to become cooperating agencies. Agencies with jurisdiction by law must be requested to become cooperating agencies.</P>
        <P>(e) Other States, and Federal land management entities, that may be significantly affected by the action or by any of the alternatives shall be notified early and their views solicited by the applicant in cooperation with the Administration. The Administration will prepare a written evaluation of any significant unresolved issues and furnish it to the applicant for incorporation into the environmental assessment (EA) or draft EIS.</P>
        <P>(f) In order to ensure meaningful evaluation of alternatives and to avoid commitments to transportation improvements before they are fully evaluated, the action evaluated in each EIS or finding of no significant impact (FONSI) shall:</P>
        <P>(1) Connect logical termini and be of sufficient length to address environmental matters on a broad scope;</P>
        <P>(2) Have independent utility or independent significance, i.e., be usable and be a reasonable expenditure even if no additional transportation improvements in the area are made; and</P>
        <P>(3) Not restrict consideration of alternatives for other reasonably foreseeable transportation improvements.</P>
        <P>(g) For major transportation actions, the tiering of EISs as discussed in the CEQ regulation (40 CFR 1502.20) may be appropriate. The first tier EIS would focus on broad issues such as general location, mode choice, and areawide air quality and land use implications of the major alternatives. The second tier would address site-specific details on project impacts, costs, and mitigation measures.</P>
        <P>(h) For the Federal-aid highway program:</P>
        <P>(1) Each State must have procedures approved by the FHWA to carry out a public involvement/public hearing program pursuant to 23 U.S.C. 128 and 40 CFR parts 1500 through 1508.</P>
        <P>(2) State public involvement/public hearing procedures must provide for:</P>
        <P>(i) Coordination of public involvement activities and public hearings with the entire NEPA process.</P>
        <P>(ii) Early and continuing opportunities during project development for the public to be involved in the identification of social, economic, and environmental impacts, as well as impacts associated with relocation of individuals, groups, or institutions.</P>
        <P>(iii) One or more public hearings or the opportunity for hearing(s) to be held by the State highway agency at a convenient time and place for any Federal-aid project which requires significant amounts of right-of-way, substantially changes the layout or functions of connecting roadways or of the facility being improved, has a substantial adverse impact on abutting property, otherwise has a significant social, economic, environmental or other effect, or for which the FHWA determines that a public hearing is in the public interest.</P>
        <P>(iv) Reasonable notice to the public of either a public hearing or the opportunity for a public hearing. Such notice will indicate the availability of explanatory information. The notice shall also provide information required to comply with public involvement requirements of other laws, Executive orders, and regulations.</P>

        <P>(v) Explanation at the public hearing of the following information, as appropriate:<PRTPAGE P="395"/>
        </P>
        <P>(A) The project's purpose, need, and consistency with the goals and objectives of any local urban planning,</P>
        <P>(B) The project's alternatives, and major design features,</P>
        <P>(C) The social, economic, environmental, and other impacts of the project,</P>
        <P>(D) The relocation assistance program and the right-of-way acquisition process.</P>
        <P>(E) The State highway agency's procedures for receiving both oral and written statements from the public.</P>
        <P>(vi) Submission to the FHWA of a transcript of each public hearing and a certification that a required hearing or hearing opportunity was offered. The transcript will be accompanied by copies of all written statements from the public, both submitted at the public hearing or during an announced period after the public hearing.</P>
        <P>(3) Based on the reevaluation of project environmental documents required by § 771.129, the FHWA and the State highway agency will determine whether changes in the project or new information warrant additional public involvement.</P>
        <P>(4) Approvals or acceptances of public involvement/public hearing procedures prior to the publication date of this regulation remain valid.</P>
        <P>(i) Applicants for capital assistance in the UMTA program achieve public participation on proposed projects by holding public hearings and seeking input from the public through the scoping process for environmental documents. For projects requiring EISs, a public hearing will be held during the circulation period of the draft EIS. For all other projects, an opportunity for public hearings will be afforded with adequate prior notice pursuant to 49 U.S.C. 1602(d), 1604(i), 1607a(f) and 1607a-1(d), and such hearings will be held when anyone with a significant social, economic, or environmental interest in the matter requests it. Any hearing on the action must be coordinated with the NEPA process to the fullest extent possible.</P>
        <P>(j) Information on the UMTA environmental process may be obtained from: Director, Office of Planning Assistance, Urban Mass Transportation Administration, Washington, DC 20590. Information on the FHWA environmental process may be obtained from: Director, Office of Environmental Policy, Federal Highway Administration, Washington, DC 20590.</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 771.113</SECTNO>
        <SUBJECT>Timing of Administration activities.</SUBJECT>
        <P>(a) The Administration in cooperation with the applicant will perform the work necessary to complete a FONSI or an EIS and comply with other related environmental laws and regulations to the maximum extent possible during the NEPA process. This work includes environmental studies, related engineering studies, agency coordination and public involvement. However, final design activities, property acquisition (with the exception of hardship and protective buying, as defined in § 771.117(d)), purchase of construction materials or rolling stock, or project construction shall not proceed until the following have been completed:</P>
        <P>(1)(i) The action has been classified as a categorical exclusion (CE), or</P>
        <P>(ii) A FONSI has been approved, or</P>
        <P>(iii) A final EIS has been approved and available for the prescribed period of time and a record of decision has been signed;</P>
        <P>(2) For actions proposed for FHWA funding, the FHWA Division Administrator has received and accepted the certifications and any required public hearing transcripts required by 23 U.S.C. 128;</P>
        <P>(3) For activities proposed for FHWA funding, the programming requirements of 23 CFR part 450, subpart B, and 23 CFR part 630, subpart A, have been met.</P>
        <P>(b) For FHWA, the completion of the requirements set forth in paragraphs (a)(1) and (2) of this section is considered acceptance of the general project location and concepts described in the environmental document unless otherwise specified by the approving official. However, such approval does not commit the Administration to approve any future grant request to fund the preferred alternative.</P>

        <P>(c) Letters of Intent issued under the authority of section 3(a)(4) of the UMT Act are used by UMTA to indicate an intention to obligate future funds for <PRTPAGE P="396"/>multi-year capital transit projects. Letters of Intent will not be issued by UMTA until the NEPA process is completed.</P>
        <CITA>[52 FR 32660, Aug. 28, 1987; 53 FR 11066, Apr. 5, 1988]</CITA>
      </SECTION>
      <SECTION>
        <SECTNO>§ 771.115</SECTNO>
        <SUBJECT>Classes of actions.</SUBJECT>
        <P>There are three classes of actions which prescribe the level of documentation required in the NEPA process.</P>
        <P>(a) <E T="03">Class I (EISs).</E> Actions that significantly affect the environment require an EIS (40 CFR 1508.27). The following are examples of actions that normally required an EIS:</P>
        <P>(1) A new controlled access freeway.</P>
        <P>(2) A highway project of four or more lanes on a new location.</P>
        <P>(3) New construction or extension of fixed rail transit facilities (e.g., rapid rail, light rail, commuter rail, automated guideway transit).</P>
        <P>(4) New construction or extension of a separate roadway for buses or high occupancy vehicles not located within an existing highway facility.</P>
        <P>(b) <E T="03">Class II (CEs).</E> Actions that do not individually or cumulative have a significant environmental effect are excluded from the requirement to prepare an EA or EIS. A specific list of CEs normally not requiring NEPA documentation is set forth in § 771.117(c). When appropriately documented, additional projects may also qualify as CEs pursuant to § 771.117(d).</P>
        <P>(c) <E T="03">Class III (EAs)</E>. Actions in which the significance of the environmental impact is not clearly estabilished. All actions that are not Class I or II are Class III. All actions in this class require the preparation of an EA to determine the appropriate environmental document required.</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 771.117</SECTNO>
        <SUBJECT>Categorical exclusions.</SUBJECT>
        <P>(a) Categorical exclusions (CEs) are actions which meet the definition contained in 40 CFR 1508.4, and, based on past experience with similar actions, do not involve significnt environmental impacts. They are actions which: do not induce significant impacts to planned growth or land use for the area; do not require the relocation of significant numbers of people; do not have a significant impact on any natural, cultural, recreational, historic or other resource; do not involve significant air, noise, or water quality impacts; do not have significant impacts on travel patterns; or do not otherwise, either individually or cumulatively, have any significant environmental impacts.</P>
        <P>(b) Any action which normally would be classified as a CE but could involve unusual circumstances will require the Administration, in cooperation with the applicant, to conduct appropriate environmental studies to determine if the CE classification is proper. Such unusual circumstances include:</P>
        <P>(1) Significant environmental impacts;</P>
        <P>(2) Substantial controversy on environmental grounds;</P>
        <P>(3) Significant impact on properties protected by section 4(f) of the DOT Act or section 106 of the National Historic Preservation Act; or</P>
        <P>(4) Inconsistencies with any Federal, State, or local law, requirement or administrative determination relating to the environmental aspects of the action.</P>
        <P>(c) The following actions meet the criteria for CEs in the CEQ regulation (section 1508.4) and § 771.117(a) of this regulation and normally do not require any further NEPA approvals by the Administration:</P>
        <P>(1) Activities which do not involve or lead directly to construction, such as planning and technical studies; grants for training and research programs; research activities as defined in 23 U.S.C. 307; approval of a unified work program and any findings required in the planning process pursuant to 23 U.S.C. 134; approval of statewide programs under 23 CFR part 630; approval of project concepts under 23 CFR part 476; engineering to define the elements of a proposed action or alternatives so that social, economic, and environmental effects can be assessed; and Federal-aid system revisions which establish classes of highways on the Federal-aid highway system.</P>
        <P>(2) Approval of utility installations along or across a transportation facility.</P>

        <P>(3) Construction of bicycle and pedestrian lanes, paths, and facilities.<PRTPAGE P="397"/>
        </P>
        <P>(4) Activities included in the State's <E T="03">highway safety plan</E> under 23 U.S.C. 402.</P>
        <P>(5) Transfer of Federal lands pursuant to 23 U.S.C. 317 when the subsequent action is not an FHWA action.</P>
        <P>(6) The installation of noise barriers or alterations to existing publicly owned buildings to provide for noise reduction.</P>
        <P>(7) Landscaping.</P>
        <P>(8) Installation of fencing, signs, pavement markings, small passenger shelters, traffic signals, and railroad warning devices where no substantial land acquisition or traffic disruption will occur.</P>
        <P>(9) Emergency repairs under 23 U.S.C. 125.</P>
        <P>(10) Acquisition of scenic easements.</P>
        <P>(11) Determination of payback under 23 CFR part 480 for property previously acquired with Federal-aid participation.</P>
        <P>(12) Improvements to existing rest areas and truck weigh stations.</P>
        <P>(13) Ridesharing activities.</P>
        <P>(14) Bus and rail car rehabilitation.</P>
        <P>(15) Alterations to facilities or vehicles in order to make them accessible for elderly and handicapped persons.</P>
        <P>(16) Program administration, technical assistance activities, and operating assistance to transit authorities to continue existing service or increase service to meet routine changes in demand.</P>
        <P>(17) The purchase of vehicles by the applicant where the use of these vehicles can be accommodated by existing facilities or by new facilities which themselves are within a CE.</P>
        <P>(18) Track and railbed maintenance and improvements when carried out within the existing right-of-way.</P>
        <P>(19) Purchase and installation of operating or maintenance equipment to be located within the transit facility and with no significant impacts off the site.</P>
        <P>(20) Promulgation of rules, regulations, and directives.</P>
        <P>(d) Additional actions which meet the criteria for a CE in the CEQ regulations (40 CFR 1508.4) and paragraph (a) of this section may be designated as CEs only after Administration approval. The applicant shall submit documentation which demonstrates that the specific conditions or criteria for these CEs are satisfied and that significant environmental effects will not result. Examples of such actions include but are not limited to:</P>
        <P>(1) Modernization of a highway by resurfacing, restoration, rehabilitation, reconstruction, adding shoulders, or adding auxiliary lanes (e.g., parking, weaving, turning, climbing).</P>
        <P>(2) Highway safety or traffic operations improvement projects including the installation of ramp metering control devices and lighting.</P>
        <P>(3) Bridge rehabilitation, reconstruction or replacement or the construction of grade separation to replace existing at-grade railroad crossings.</P>
        <P>(4) Transportation corridor fringe parking facilities.</P>
        <P>(5) Construction of new truck weigh stations or rest areas.</P>
        <P>(6) Approvals for disposal of excess right-of-way or for joint or limited use of right-of-way, where the proposed use does not have significant adverse impacts.</P>
        <P>(7) Approvals for changes in access control.</P>
        <P>(8) Construction of new bus storage and maintenance facilities in areas used predominantly for industrial or transportation purposes where such construction is not inconsistent with existing zoning and located on or near a street with adequate capacity to handle anticipated bus and support vehicle traffic.</P>
        <P>(9) Rehabilitation or reconstruction of existing rail and bus buildings and ancillary facilities where only minor amounts of additional land are required and there is not a substantial increase in the number of users.</P>
        <P>(10) Construction of bus transfer facilities (an open area consisting of passenger shelters, boarding areas, kiosks and related street improvements) when located in a commercial area or other high activity center in which there is adequate street capacity for projected bus traffic.</P>

        <P>(11) Construction of rail storage and maintenance facilities in areas used predominantly for industrial or transportation purposes where such construction is not inconsistent with existing zoning and where there is no significant noise impact on the surrounding community.<PRTPAGE P="398"/>
        </P>
        <P>(12) Acquisition of land for hardship or protective purposes; advance land acquisition loans under section 3(b) of the UMT Act.<SU>3</SU>
          <FTREF/> Hardship and protective buying will be permitted only for a particular parcel or a limited number of parcels. These types of land acquisition quality for a CE only where the acquisition will not limit the evaluation of alternatives, including shifts in alignment for planned construction projects, which may be required in the NEPA process. No project development on such land may proceed until the NEPA process has been completed.</P>
        <FTNT>
          <P>
            <SU>3</SU> Hardship acquisition is early acquisition of property by the applicant at the property owner's request to alleviate particular hardship to the owner, in contrast to others, because of an inability to sell his property. This is justified when the property owner can document on the basis of health, safety or financial reasons that remaining in the property poses an undue hardship compared to others.</P>
          <P>Protective acquisition is done to prevent imminent development of a parcel which is needed for a proposed transportation corridor or site. Documentation must clearly demonstrate that development of the land would preclude future transportation use and that such development is imminent. Advance acquisition is not permitted for the sole purpose of reducing the cost of property for a proposed project.</P>
        </FTNT>
        <P>(e) Where a pattern emerges of granting CE status for a particular type of action, the Administration will initiate rulemaking proposing to add this type of action to the list of categorical exclusions in paragraph (c) or (d) of this section, as appropriate.</P>
        <CITA>[52 FR 32660, Aug. 28, 1987; 53 FR 11066, Apr. 5, 1988]</CITA>
      </SECTION>
      <SECTION>
        <SECTNO>§ 771.119</SECTNO>
        <SUBJECT>Environmental assessments.</SUBJECT>
        <P>(a) An EA shall be prepared by the applicant in consultation with the Administration for each action that is not a CE and does not clearly require the preparation of an EIS, or where the Administration believes an EA would assist in determining the need for an EIS.</P>
        <P>(b) For actions that require an EA, the applicant, in consultation with the Administration, shall, at the earliest appropriate time, begin consultation with interested agencies and others to advise them of the scope of the project and to achieve the following objectives: determine which aspects of the proposed action have potential for social, economic, or environmental impact; identify alternatives and measures which might mitigate adverse environmental impacts; and identify other environmental review and consultation requirements which should be performed concurrently with the EA. The applicant shall accomplish this through an early coordination process (i.e., procedures under § 771.111) or through a scoping process. Public involvement shall be summarized and the results of agency coordination shall be included in the EA.</P>
        <P>(c) The EA is subject to Administration approval before it is made available to the public as an Administration document. The UMTA applicants may circulate the EA prior to Administration approval provided that the document is clearly labeled as the applicant's document.</P>
        <P>(d) The EA need not be circulated for comment but the document must be made available for public inspection at the applicant's office and at the appropriate Administration field offices in accordance with paragraphs (e) and (f) of this section. Notice of availability of the EA, briefly describing the action and its impacts, shall be sent by the applicant to the affected units of Federal, State and local government. Notice shall also be sent to the State intergovernmental review contacts established under Executive Order 12372.</P>
        <P>(e) When a public hearing is held as part of the application for Federal funds, the EA shall be available at the public hearing and for a minimum of 15 days in advance of the public hearing. The notice of the public hearing in local newspapers shall announce the availability of the EA and where it may be obtained or reviewed. Comments shall be submitted in writing to the applicant or the Administration within 30 days of the availability of the EA unless the Administration determines, for good cause, that a different period is warranted. Public hearing requirements are as described in § 771.111.</P>

        <P>(f) When a public hearing is not held, the applicant shall place a notice in a newspaper(s) similar to a public hearing notice and at a similar stage of development of the action, advising the <PRTPAGE P="399"/>public of the availability of the EA and where information concerning the action may be obtained. The notice shall invite comments from all interested parties. Comments shall be submitted in writing to the applicant or the Administration within 30 days of the publication of the notice unless the Administration determines, for good cause, that a different period is warranted.</P>
        <P>(g) If no significant impacts are identified, the applicant shall furnish the administration a copy of the revised EA, as appropriate; the public hearing transcript, where applicable; copies of any comments received and responses thereto; and recommend a FONSI. The EA should also document compliance, to the extent possible, with all applicable environmental laws and Executive orders, or provide reasonable assurance that their requirements can be met.</P>
        <P>(h) When the Administration expects to issue a FONSI for an action described in § 771.115(a), copies of the EA shall be made available for public review (including the affected units of government) for a minimum of 30 days before the Administration makes its final decision (See 40 CFR 1501.4(e)(2).) This public availability shall be announced by a notice similar to a public hearing notice.</P>
        <P>(i) If, at any point in the EA process, the Administration determines that the action is likely to have a significant impact on the environment, the preparation of an EIS will be required.</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 771.121</SECTNO>
        <SUBJECT>Findings of no significant impact.</SUBJECT>
        <P>(a) The Administration will review the EA and any public hearing comments and other comments received regarding the EA. If the Administration agrees with the applicant's recommendations pursuant to § 771.119(g), it will make a separate written FONSI incorporating by reference the EA and any other appropriate environmental documents.</P>
        <P>(b) After a FONSI has been made by the Administration, a notice of availability of the FONSI shall be sent by the applicant to the affected units of Federal, State and local government and the document shall be available from the applicant and the Administration upon request by the public. Notice shall also be sent to the State intergovernmental review contacts established under Executive Order 12372.</P>
        <P>(c) If another Federal agency has issued a FONSI on an action which includes an element proposed for Administration funding, the Administration will evaluate the other agency's FONSI. If the Administration determines that this element of the project and its environmental impacts have been adequately identified and assessed, and concurs in the decision to issue a FONSI, the Administration will issue its own FONSI incorporating the other agency's FONSI. If environmental issues have not been adequately identified and assessed, the Administration will require appropriate environmental studies.</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 771.123</SECTNO>
        <SUBJECT>Draft environmental impact statements.</SUBJECT>

        <P>(a) A draft EIS shall be prepared when the Administration determines that the action is likely to cause significant impacts on the environment. When the decision has been made by the Administration to prepare an EIS, the Administration will issue a Notice of Intent (40 CFR 1508.22) for publication in the <E T="04">Federal Register.</E> Applicants are encouraged to announce the intent to prepare an EIS by apprpriate means at the local level.</P>
        <P>(b) After publication of the Notice of Intent, the Administration, in cooperation with the applicant, will begin a scoping process. The scoping process will be used to identify the range of alternatives and impacts and the significant issues to be addressed in the EIS and to achieve the other objectives of 40 CFR 1501.7. For FHWA, scoping is normally achieved through public and agency involvement procedures required by § 771.111. For UMTA, scoping is achieved by soliciting agency and public responses to the action by letter or by holding scoping meetings. If a scoping meeting is to be held, it should be announced in the Administration's Notice of Intent and by appropriate means at the local level.</P>

        <P>(c) The draft EIS shall be prepared by the Administration in cooperation with the applicant or, where permitted by law, by the applicant with appropriate <PRTPAGE P="400"/>guidance and participation by the Administration. The draft EIS shall evaluate all reasonable alternatives to the action and discuss the reasons why other alternatives, which may have been considered, were eliminated from detailed study. The draft EIS shall also summarize the studies, reviews, consultations, and coordination required by environmental laws or Executive orders to the extent appropriate at this stage in the environmental process.</P>
        <P>(d) An applicant which is a <E T="03">statewide agency</E> may select a consultant to assist in the preparation of an EIS in accordance with applicable contracting procedures. Where the applicant is a <E T="03">joint lead</E> or <E T="03">cooperating</E> agency, the applicant may select a consultant, after coordination with the Administration to assure compliance with 40 CFR 1506.5(c). The Administration will select any such consultant for <E T="03">other</E> applicants. (See § 771.109(c) for definitions of these terms.)</P>
        <P>(e) The Administration, when satisfied that the draft EIS complies with NEPA requirements, will approve the draft EIS for circulation by signing and dating the cover sheet.</P>
        <P>(f) A lead, joint lead, or a cooperating agency shall be responsible for printing the EIS. The initial printing of the draft EIS shall be in sufficient quantity to meet requirements for copies which can reasonably be expected from agencies, organizations, and individuals. Normally, copies will be furnished free of charge. However, with Administration concurrence, the party requesting the draft EIS may be charged a fee which is not more than the actual cost of reproducing the copy or may be directed to the nearest location where the statement may be reviewed.</P>
        <P>(g) The draft EIS shall be circulated for comment by the applicant on behalf of the Administration. The draft EIS shall be made available to the public and transmitted to agencies for comment no later than the time the document is filed with the Environmental Protection Agency in accordance with 40 CFR 1506.9. The draft EIS shall be transmitted to:</P>
        <P>(1) Public officials, interest groups, and members of the public known to have an interest in the proposed action or the draft EIS;</P>
        <P>(2) Federal, State and local government agencies expected to have jurisdiction or responsibility over, or interest or expertise in, the action. Copies shall be provided directly to appropriate State and local agencies, and to the State intergovernmental review contacts established under Executive Order 12372; and</P>
        <P>(3) States and Federal land management entities which may be significantly affected by the proposed action or any of the alternatives. These copies shall be accompanied by a request that such State or entity advise the Administration in writing of any disagreement with the evaluation of impacts in the statement. The Administration will furnish the comments received to the applicant along with a written assessment of any disagreements for incorporation into the final EIS.</P>
        <P>(h) The UMTA requires a public hearing during the circulation period of all draft EISs. FHWA public hearing requirements are as described in § 771.111(h). Whenever a public hearing is held, the draft EIS shall be available at the public hearing and for a minimum of 15 days in advance of the public hearing. The availability of the draft EIS shall be mentioned, and public comments requested, in any public hearing notice and at any public hearing presentation. If a public hearing on an action proposed for FHWA funding is not held, a notice shall be placed in a newspaper similar to a public hearing notice advising where the draft EIS is available for review, how copies may be obtained, and where the comments should be sent.</P>
        <P>(i) The <E T="04">Federal Register</E> public availability notice (40 CFR 1506.10) shall establish a period of not less than 45 days for the return of comments on the draft EIS. The notice and the draft EIS transmittal letter shall identify where comments are to be sent.</P>

        <P>(j) For UMTA funded major urban mass transportation investments, the applicant shall prepare a report identifying a locally preferred alternative at the conclusion of the Draft EIS circulation period. Approval may be given to begin preliminary engineering on the principal alternative(s) under consideration. During the course of such preliminary engineering, the applicant <PRTPAGE P="401"/>will refine project costs, effectiveness, and impact information with particular attention to alternative designs, operations, detailed location decisions and appropriate mitigation measures. These studies will be used to prepare the final EIS or, where appropriate, a supplemental draft EIS.</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 771.125</SECTNO>
        <SUBJECT>Final environmental impact statements.</SUBJECT>
        <P>(a)(1) After circulation of a draft EIS and consideration of comments received, a final EIS shall be prepared by the Administration in cooperation with the applicant or, where permitted by law, by the applicant with appropriate guidance and participation by the Administration. The final EIS shall identify the preferred alternative and evaluate all reasonable alternatives considered. It shall also discuss substantive comments received on the draft EIS and responses thereto, summarize public involvement, and describe the mitigation measures that are to be incorporated into the proposed action. Mitigation measures presented as commitments in the final EIS will be incorporated into the project as specified in § 771.109(b). The final EIS should also document compliance, to the extent possible, with all applicable environmental laws and Executive orders, or provide reasonable assurance that their requirements can be met.</P>
        <P>(2) Every reasonable effort shall be made to resolve interagency disagreements on actions before processing the final EIS. If significant issues remain unresolved, the final EIS shall identify those issues and the consultations and other efforts made to resolve them.</P>
        <P>(b) The final EIS will be reviewed for legal sufficiency prior to Administration approval.</P>
        <P>(c) The Administration will indicate approval of the EIS for an action by signing and dating the cover page. Final EISs prepared for actions in the following categories will be submitted to the Administration's Headquarters for prior concurrence:</P>
        <P>(1) Any action for which the Administration determines that the final EIS should be reviewed at the Headquarters office. This would typically occur when the Headquarters office determines that (i) additional coordination with other Federal, State or local governmental agencies is needed; (ii) the social, economic, or environmental impacts of the action may need to be more fully explored; (iii) the impacts of the proposed action are unusually great; (iv) major issues remain unresolved; or (v) the action involves national policy issues.</P>
        <P>(2) Any action to which a Federal, State or local government agency has indicated opposition on environmental grounds (which has not been resolved to the written satisfaction of the objecting agency).</P>
        <P>(3) Major urban mass transportation investments as defined by UMTA's policy on major investments (49 FR 21284; May 18, 1984).</P>
        <P>(d) The signature of the UMTA approving official on the cover sheet also indicates compliance with section 14 of the UMT Act and fulfillment of the grant application requirements of sections 3(d)(1) and (2), 5(h), and 5(i) of the UMT Act.</P>
        <P>(e) Approval of the final EIS is not an Administration Action (as defined in § 771.107(c)) and does not commit the Administration to approve any future grant request to fund the preferred alternative.</P>
        <P>(f) The initial printing of the final EIS shall be in sufficient quantity to meet the request for copies which can be reasonably expected from agencies, organizations, and individuals. Normally, copies will be furnished free of charge. However, with Administration concurrence, the party requesting the final EIS may be charged a fee which is not more than the actual cost of reproducing the copy or may be directed to the nearest location where the statement may be reviewed.</P>

        <P>(g) The final EIS shall be transmitted to any persons, organizations, or agencies that made substantive comments on the draft EIS or requested a copy, no later than the time the document is filed with EPA. In the case of lengthy documents, the agency may provide alternative circulation processes in accordance with 40 CFR 1502.19. The applicant shall also publish a notice of availability in local newspapers and make the final EIS available through the mechanism established pursuant to <PRTPAGE P="402"/>DOT Order 4600.13 which implements Executive Order 12372. When filed with EPA, the final EIS shall be available for public review at the applicant's offices and at appropriate Administration offices. A copy should also be made available for public review at institutions such as local government offices, libraries, and schools, as appropriate.</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 771.127</SECTNO>
        <SUBJECT>Record of decision.</SUBJECT>

        <P>(a) The Administration will complete and sign a record of decision (ROD) no sooner than 30 days after publication of the final EIS notice in the <E T="04">Federal Register</E> or 90 days after publication of a notice for the draft EIS, whichever is later. The ROD will present the basis for the decision as specified in 40 CFR 1505.2, summarize any mitigation measures that will be incorporated in the project and document any required section 4(f) approval in accordance with § 771.135(l). Until any required ROD has been signed, no further approvals may be given except for administrative activities taken to secure further project funding and other activities consistent with 40 CFR 1506.1.</P>
        <P>(b) If the Administration subsequently wishes to approve an alternative which was not identified as the preferred alternative but was fully evaluated in the final EIS, or proposes to make substantial changes to the mitigation measures or findings discussed in the ROD, a revised ROD shall be subject to review by those Administration offices which reviewed the final EIS under § 771.125(c). To the extent practicable the approved revised ROD shall be provided to all persons, organizations, and agencies that received a copy of the final EIS pursuant to § 771.125(g).</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 771.129</SECTNO>
        <SUBJECT>Re-evaluations.</SUBJECT>
        <P>(a) A written evaluation of the draft EIS shall be prepared by the applicant in cooperation with the Administration if an acceptable final EIS is not submitted to the Administration within 3 years from the date of the draft EIS circulation. The purpose of this evaluation is to determine whether or not a supplement to the draft EIS or a new draft EIS is needed.</P>
        <P>(b) A written evaluation of the final EIS will be required before further approvals may be granted if major steps to advance the action (e.g., authority to undertake final design, authority to acquire a significant portion of the right-of-way, or approval of the plans, specifications and estimates) have not occurred within three years after the approval of the final EIS, final EIS supplement, or the last major Administration approval or grant.</P>
        <P>(c) After approval of the EIS, FONSI, or CE designation, the applicant shall consult with the Administration prior to requesting any major approvals or grants to establish whether or not the approved environmental document or CE designation remains valid for the requested Administration action. These consultations will be documented when determined necessary by the Administration.</P>
        <CITA>[52 FR 32660, Aug. 28, 1987; 53 FR 11066, Apr. 5, 1988]</CITA>
      </SECTION>
      <SECTION>
        <SECTNO>§ 771.130</SECTNO>
        <SUBJECT>Supplemental environmental impact statements.</SUBJECT>
        <P>(a) A draft EIS, final EIS, or supplemental EIS may be supplemented at any time. An EIS shall be supplemented whenever the Administration determines that:</P>
        <P>(1) Changes to the proposed action would result in significant environmental impacts that were not evaluated in the EIS; or</P>
        <P>(2) New information or circumstances relevant to environmental concerns and bearings on the proposed action or its impacts would result in significant environmental impacts not evaluated in the EIS.</P>
        <P>(b) However, a supplemental EIS will not be necessary where:</P>
        <P>(1) The changes to the proposed action, new information, or new circumstances result in a lessening of adverse environmental impacts evaluated in the EIS without causing other environmental impacts that are significant and were not evaluated in the EIS; or</P>

        <P>(2) The Administration decides to approve an alternative fully evaluated in an approved final EIS but not identified as the preferred alternative. In such a case, a revised ROD shall be prepared and circulated in accordance with § 771.127(b).<PRTPAGE P="403"/>
        </P>
        <P>(c) Where the Administration is uncertain of the significance of the new impacts, the applicant will develop appropriate environmental studies or, if the Administration deems appropriate, an EA to assess the impacts of the changes, new information, or new circumstances. If, based upon the studies, the Administration determines that a supplemental EIS is not necessary, the Administration shall so indicate in the project file.</P>
        <P>(d) A supplement is to be developed using the same process and format (i.e., draft EIS, final EIS, and ROD) as an original EIS, except that scoping is not required.</P>
        <P>(e) A supplemental draft EIS may be necessary for UMTA major urban mass transportation investments if there is a substantial change in the level of detail on project impacts during project planning and development. The supplement will address site-specific impacts and refined cost estimates that have been developed since the original draft EIS.</P>
        <P>(f) In some cases, a supplemental EIS may be required to address issues of limited scope, such as the extent of proposed mitigation or the evaluation of location or design variations for a limited portion of the overall project. Where this is the case, the preparation of a supplemental EIS shall not necessarily:</P>
        <P>(1) Prevent the granting of new approvals;</P>
        <P>(2) Require the withdrawal of previous approvals; or</P>
        <P>(3) Require the suspension of project activities; for any activity not directly affected by the supplement. If the changes in question are of such magnitude to require a reassessment of the entire action, or more than a limited portion of the overall action, the Administration shall suspend any activities which would have an adverse environmental impact or limit the choice of reasonable alternatives, until the supplemental EIS is completed.</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 771.131</SECTNO>
        <SUBJECT>Emergency action procedures.</SUBJECT>
        <P>Requests for deviations from the procedures in this regulation because of emergency circumstances (40 CFR 1506.11) shall be referred to the Administration's headquarters for evaluation and decision after consultation with CEQ.</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 771.133</SECTNO>
        <SUBJECT>Compliance with other requirements.</SUBJECT>
        <P>The final EIS or FONSI should document compliance with requirements of all applicable environmental laws, Executive orders, and other related requirements. If full compliance is not possible by the time the final EIS or FONSI is prepared, the final EIS or FONSI should reflect consultation with the appropriate agencies and provide reasonable assurance that the requirements will be met. Approval of the environmental document constitutes adoption of any Administration findings and determinations that are contained therein. The FHWA approval of the appropriate NEPA document will constitute its finding of compliance with the report requirements of 23 U.S.C. 128.</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 771.135</SECTNO>
        <SUBJECT>Section 4(f) (49 U.S.C. 303).</SUBJECT>
        <P>(a)(l) The Administration may not approve the use of land from a significant publicly owned public park, recreation area, or wildlife and waterfowl refuge, or any significant historic site unless a determination is made that:</P>
        <P>(i) There is no feasible and prudent alternative to the use of land from the property; and</P>
        <P>(ii) The action includes all possible planning to minimize harm to the property resulting from such use.</P>
        <P>(2) Supporting information must demonstrate that there are unique problems or unusual factors involved in the use of alternatives that avoid these properties or that the cost, social, economic, and environmental impacts, or community disruption resulting from such alternatives reach extraordinary magnitudes.</P>
        <P>(b) The Administration will determine the application of section 4(f). Any use of lands from a section 4(f) property shall be evaluated early in the development of the action when alternatives to the proposed action are under study.</P>

        <P>(c) Consideration under section 4(f) is not required when the Federal, State, or local officials having jurisdiction over a park, recreation area or refuge <PRTPAGE P="404"/>determine that the entire site is not significant. In the absence of such a determination, the section 4(f) land will be presumed to be significant. The Administration will review the significance determination to assure its reasonableness.</P>
        <P>(d) Where Federal lands or other public land holdings (e.g., State forests) are administered under statutes permitting management for multiple uses, and, in fact, are managed for multiple uses, section 4(f) applies only to those portions of such lands which function for, or are designated in the plans of the administering agency as being for, significant park, recreation, or wildlife and waterfowl purposes. The determination as to which lands so function or are so designated, and the significance of those lands, shall be made by the officials having jurisdiction over the lands. The Administration will review this determination to assure its reasonableness. The determination of significance shall apply to the entire area of such park, recreation, or wildlife and waterfowl refuge sites.</P>
        <P>(e) In determining the application of section 4(f) to historic sites, the Administration, in cooperation with the applicant, will consult with the State Historic Preservation Officer (SHPO) and appropriate local officials to identify all properties on or eligible for the National Register of Historic Places (National Register). The section 4(f) requirements apply only to sites on or eligible for the National Register unless the Administration determines that the application of section 4(f) is otherwise appropriate.</P>
        <P>(f) The Administration may determine that section 4(f) requirements do not apply to restoration, rehabilitation, or maintenance of transportation facilities that are on or eligible for the National Register when:</P>
        <P>(1) Such work will not adversely affect the historic qualities of the facility that caused it to be on or eligible for the National Register, and</P>
        <P>(2) The SHPO and the Advisory Council on Historic Preservation (ACHP) have been consulted and have not objected to the Administration finding in paragraph (f)(1) of this section.</P>
        <P>(g)(1) Section 4(f) applies to all archeological sites on or eligible for inclusion on the National Register, including those discovered during construction except as set forth in paragraph (g)(2) of this section. Where section 4(f) applies to archeological sites discovered during construction, the section 4(f) process will be expedited. In such cases, the evaluation of feasible and prudent alternatives will take account of the level of investment already made. The review process, including the consultation with other agencies, will be shortened as appropriate.</P>
        <P>(2) Section 4(f) does not apply to archeological sites where the Administration, after consultation with the SHPO and the ACHP, determines that the archeological resource is important chiefly because of what can be learned by data recovery and has minimal value for preservation in place. This exception applies both to situations where data recovery is undertaken or where the Administration decides, with agreement of the SHPO and, where applicable, the ACHP not to recover the resource.</P>
        <P>(h) Designations of park and recreation lands, wildlife and waterfowl refuges, and historic sites are sometimes made and determinations of significance changed late in the development of a proposed action. With the exception of the treatment of archeological resources in paragraph (g) of this section, the Administration may permit a project to proceed without consideration under section 4(f) if the property interest in the section 4(f) lands was acquired for transportation purposes prior to the designation or change in the determination of significance and if an adequate effort was made to identify properties protected by section 4(f) prior to acquisition.</P>

        <P>(i) The evaluations of alternatives to avoid the use of section 4(f) land and of possible measures to minimize harm to such lands shall be developed by the applicant in cooperation with the Administration. This information should be presented in the draft EIS, EA, or, for a project classified as a CE in a separate document. The section 4(f) evaluation shall be provided for coordination and comment to the officials having jurisdiction over the section 4(f) property and to the Department of the <PRTPAGE P="405"/>Interior, and as appropriate to the Department of Agriculture and the Department of Housing and Urban Development. A minimum of 45 days shall be established by the Administration for receipt of comments. Uses of section 4(f) land covered by a programmatic section 4(f) evaluation shall be documented and coordinated as specified in the programmatic section 4(f) evaluation.</P>
        <P>(j) When adequate support exists for a section 4(f) determination, the discussion in the final EIS, FONSI, or separate section 4(f) evaluation shall specifically address:</P>
        <P>(1) The reasons why the alternatives to avoid a section 4(f) property are not feasible and prudent; and</P>
        <P>(2) All measures which will be taken to minimize harm to the section 4(f) property.</P>
        <P>(k) The final Section 4(f) evaluation will be reviewed for legal sufficiency.</P>
        <P>(l) For actions processed with EISs, the Administration will make the section 4(f) approval either in its approval of the final EIS or in the ROD. Where the section 4(f) approval is documented in the final EIS, the Administration will summarize the basis for its section 4(f) approval in the ROD. Actions requiring the use of section 4(f) property, and proposed to be processed with a FONSI or classified as a CE, shall not proceed until notified by the Administration of section 4(f) approval. For these actions, any required section 4(f) approval will be documented separately.</P>
        <P>(m) Circulation of a separate section 4(f) evaluation will be required when:</P>
        <P>(1) A proposed modification of the alignment or design would require the use of section 4(f) property after the CE, FONSI, draft EIS, or final EIS has been processed;</P>
        <P>(2) The Administration determines, after processing the CE, FONSI, draft EIS, or final EIS that section 4(f) applies to a property;</P>
        <P>(3) A proposed modification of the alignment, design, or measures to minimize harm (after the original section 4(f) approval) would result in a substantial increase in the amount of section 4(f) land used, a substantial increase in the adverse impacts to section 4(f) land, or a substantial reduction in mitigation measures; or</P>
        <P>(4) Another agency is the lead agency for the NEPA process, unless another DOT element is preparing the section 4(f) evaluation.</P>
        <P>(n) If the Administration determines under § 771.135(m) or otherwise, that section 4(f) is applicable after the CE, FONSI, or final EIS has been processed, the decision to prepare and circulate a section 4(f) evaluation will not necessarily require the preparation of a new or supplemental environmental document. Where a separately circulated section 4(f) evaluation is prepared, such evaluation does not necessarily:</P>
        <P>(1) Prevent the granting of new approvals;</P>
        <P>(2) Require the withdrawal of previous approvals; or</P>
        <P>(3) Require the suspension of project activities; for any activity not affected by the section 4(f) evaluation.</P>
        <P>(o) An analysis required by section 4(f) may involve different levels of detail where the section 4(f) involvement is addressed in a tiered EIS.</P>

        <P>(1) When the first-tier, broad-scale EIS is prepared, the detailed information necessary to complete the section 4(f) evaluation may not be available at that stage in the development of the action. In such cases, an evaluation should be made on the potential impacts that a proposed action will have on section 4(f) land and whether those impacts could have a bearing on the decision to be made. A preliminary determination may be made at this time as to whether there are feasible and prudent locations or alternatives for the action to avoid the use of section 4(f) land. This preliminary determination shall consider all possible planning to minimize harm to the extent that the level of detail available at the first-tier EIS stage allows. It is recognized that such planning at this stage will normally be limited to ensuring that opportunities to minimize harm at subsequent stages in the development process have not been precluded by decisions made at the first-tier stage. This preliminary determination is then incorporated into the first-tier EIS.<PRTPAGE P="406"/>
        </P>
        <P>(2) A section 4(f) approval made when additional design details are available will include a determination that:</P>
        <P>(i) The preliminary section 4(f) determination made pursuant to paragraph (o)(1) of this section is still valid; and</P>
        <P>(ii) The criteria of paragraph (a) of this section have been met.</P>
        <P>(p) <E T="03">Use.</E> (1) Except as set forth in paragraphs (f), (g)(2), and (h) of this section, “use” (in paragraph (a)(1) of this section) occurs:</P>
        <P>(i) When land is permanently incorporated into a transportation facility;</P>
        <P>(ii) When there is a temporary occupancy of land that is adverse in terms of the statute's preservationist purposes as determined by the criteria in paragraph (p)(7) of this section; or</P>
        <P>(iii) When there is a constructive use of land.</P>
        <P>(2) Constructive use occurs when the transportation project does not incorporate land from a section 4(f) resource, but the project's proximity impacts are so severe that the protected activities, features, or attributes that qualify a resource for protection under section 4(f) are substantially impaired. Substantial impairment occurs only when the protected activities, features, or attributes of the resource are substantially diminished.</P>
        <P>(3) The Administration is not required to determine that there is no constructive use. However, such a determination could be made at the discretion of the Administration.</P>
        <P>(4) The Administration has reviewed the following situations and determined that a constructive use occurs when:</P>
        <P>(i) The projected noise level increase attributable to the project substantially interferes with the use and enjoyment of a noise-sensitive facility of a resource protected by section 4(f), such as hearing the performances at an outdoor amphitheater, sleeping in the sleeping area of a campground, enjoyment of a historic site where a quiet setting is a generally recognized feature or attribute of the site's significance, or enjoyment of an urban park where serenity and quiet are significant attributes;</P>
        <P>(ii) The proximity of the proposed project substantially impairs esthetic features or attributes of a resource protected by section 4(f), where such features or attributes are considered important contributing elements to the value of the resource. Examples of substantial impairment to visual or esthetic qualities would be the location of a proposed transportation facility in such proximity that it obstructs or eliminates the primary views of an architecturally significant historical building, or substantially detracts from the setting of a park or historic site which derives its value in substantial part due to its setting;</P>
        <P>(iii) The project results in a restriction on access which substantially diminishes the utility of a significant publicly owned park, recreation area, or a historic site;</P>
        <P>(iv) The vibration impact from operation of the project substantially impairs the use of a section 4(f) resource, such as projected vibration levels from a rail transit project that are great enough to affect the structural integrity of a historic building or substantially diminish the utility of the building; or</P>
        <P>(v) The ecological intrusion of the project substantially diminishes the value of wildlife habitat in a wildlife or waterfowl refuge adjacent to the project or substantially interferes with the access to a wildlife or waterfowl refuge, when such access is necessary for established wildlife migration or critical life cycle processes.</P>

        <P>(5) The Administration has reviewed the following situations and determined that a constructive use does <E T="03">not</E> occur when:</P>
        <P>(i) Compliance with the requirements of section 106 of the National Historic Preservation Act and 36 CFR part 800 for proximity impacts of the proposed action, on a site listed on or eligible for the National Register of Historic Places, results in an agreement of “no effect” or “no adverse effect”;</P>

        <P>(ii) The projected traffic noise levels of the proposed highway project do not exceed the FHWA noise abatement critieria as contained in Table 1, 23 CFR part 772, or the projected operational noise levels of the proposed transit project do not exceed the noise impact criteria in the UMTA guidelines;<PRTPAGE P="407"/>
        </P>
        <P>(iii) The projected noise levels exceed the relevant threshold in paragraph (p)(5)(ii) of this section because of high existing noise, but the increase in the projected noise levels if the proposed project is constructed, when compared with the projected noise levels if the project is not built, is barely perceptible (3 dBA or less);</P>
        <P>(iv) There are proximity impacts to a section 4(f) resource, but a governmental agency's right-of-way acquisition, an applicant's adoption of project location, or the Administration approval of a final environmental document, established the location for a proposed transportation project before the designation, establishment, or change in the significance of the resource. However, if the age of an historic site is close to, but less than, 50 years at the time of the governmental agency's acquisition, adoption, or approval, and except for its age would be eligible for the National Register, and construction would begin after the site was eligible, then the site is considered a historic site eligible for the National Register;</P>
        <P>(v) There are impacts to a proposed public park, recreation area, or wildlife refuge, but the proposed transportation project and the resource are concurrently planned or developed. Examples of such concurrent planning or development include, but are not limited to:</P>
        <P>(A) Designation or donation of property for the specific purpose of such concurrent development by the entity with jurisdiction or ownership of the property for both the potential transportation project and the section 4(f) resource, or</P>
        <P>(B) Designation, donation, planning or development of property by two or more governmental agencies, with jurisdiction for the potential transportation project and the section 4(f) resource, in consultation with each other;</P>
        <P>(vi) Overall (combined) proximity impacts caused by a proposed project do not substantially impair the activities, features, or attributes that qualify a resource for protection under section 4(f);</P>
        <P>(vii) Proximity impacts will be mitigated to a condition equivalent to, or better than, that which would occur under a no-build scenario;</P>
        <P>(viii) Change in accessibility will not substantially diminish the utilization of the section 4(f) resource; or</P>
        <P>(ix) Vibration levels from project construction activities are mitigated, through advance planning and monitoring of the activities, to levels that do not cause a substantial impairment of the section 4(f) resource.</P>
        <P>(6) When a constructive use determination is made, it will be based, to the extent it reasonably can, upon the following:</P>
        <P>(i) Identification of the current activities, features, or attributes of a resource qualified for protection under section 4(f) and which may be sensitive to proximity impacts;</P>
        <P>(ii) An analysis of the proximity impacts of the proposed project on the section 4(f) resource. If any of the proximity impacts will be mitigated, only the net impact need be considered in this analysis. The analysis should also describe and consider the impacts which could reasonably be expected if the proposed project were not implemented, since such impacts should not be attributed to the proposed project;</P>
        <P>(iii) Consultation, on the above identification and analysis, with the Federal, State, or local officials having jurisdiction over the park, recreation area, refuge, or historic site.</P>
        <P>(7) A temporary occupancy of land is so minimal that it does not constitute a use within the meaning of section 4(f) when the following conditions are satisfied:</P>
        <P>(i) Duration must be temporary, i.e., less than the time needed for construction of the project, and there should be no change in ownership of the land;</P>
        <P>(ii) Scope of the work must be minor, i.e., both the nature and the magnitude of the changes to the section 4(f) resource are minimal;</P>
        <P>(iii) There are no anticipated permanent adverse physical impacts, nor will there be interference with the activities or purposes of the resource, on either a temporary or permanent basis;</P>

        <P>(iv) The land being used must be fully restored, i.e., the resource must be returned to a condition which is at least as good as that which existed prior to the project; and<PRTPAGE P="408"/>
        </P>
        <P>(v) There must be documented agreement of the appropriate Federal, State, or local officials having jurisdiction over the resource regarding the above conditions.</P>
        <CITA>[52 FR 32660, Aug. 28, 1987; 53 FR 11066, Apr. 5, 1988, as amended at 56 FR 13279, Apr. 1, 1991; 57 FR 12411, Apr. 10, 1992]</CITA>
      </SECTION>
      <SECTION>
        <SECTNO>§ 771.137</SECTNO>
        <SUBJECT>International actions.</SUBJECT>
        <P>(a) The requirements of this part apply to:</P>
        <P>(1) Administration actions significantly affecting the environment of a foreign nation not participating in the action or not otherwise involved in the action.</P>
        <P>(2) Administration actions outside the U.S., its territories, and possessions which significantly affect natural resources of global importance designated for protection by the President or by international agreement.</P>
        <P>(b) If communication with a foreign government concerning environmental studies or documentation is anticipated, the Administration shall coordinate such communication with the Department of State through the Office of the Secretary of Transportation.</P>
      </SECTION>
    </PART>
    <PART>
      <EAR>PT. 772</EAR>
      <HD SOURCE="HED">PART 772—PROCEDURES FOR ABATEMENT OF HIGHWAY TRAFFIC NOISE AND CONSTRUCTION NOISE</HD>
      <CONTENTS>
        <SECHD>Sec.</SECHD>
        <SECTNO>772.1</SECTNO>
        <SUBJECT>Purpose.</SUBJECT>
        <SECTNO>772.3</SECTNO>
        <SUBJECT>Noise standards.</SUBJECT>
        <SECTNO>772.5</SECTNO>
        <SUBJECT>Definitions.</SUBJECT>
        <SECTNO>772.7</SECTNO>
        <SUBJECT>Applicability.</SUBJECT>
        <SECTNO>772.9</SECTNO>
        <SUBJECT>Analysis of traffic noise impacts and abatement measures.</SUBJECT>
        <SECTNO>772.11</SECTNO>
        <SUBJECT>Noise abatement.</SUBJECT>
        <SECTNO>772.13</SECTNO>
        <SUBJECT>Federal participation.</SUBJECT>
        <SECTNO>772.15</SECTNO>
        <SUBJECT>Information for local officials.</SUBJECT>
        <SECTNO>772.17</SECTNO>
        <SUBJECT>Traffic noise prediction.</SUBJECT>
        <SECTNO>772.19</SECTNO>
        <SUBJECT>Construction noise.</SUBJECT>
        <APP>Table 1 to Part 772—Noise Abatement Criteria</APP>
        <APP>Appendix A to Part 772—National Reference Energy Mean Emission Levels as a Function of Speed</APP>
      </CONTENTS>
      <AUTH>
        <HD SOURCE="HED">Authority:</HD>
        <P>23 U.S.C. 109(h), 109(i); 42 U.S.C. 4331, 4332; sec. 339(b), Pub. L. 104-59, 109 Stat. 568, 605; 49 CFR 1.48(b).</P>
      </AUTH>
      <SOURCE>
        <HD SOURCE="HED">Source:</HD>
        <P>47 FR 29654, July 8, 1982; 47 FR 33956, Aug. 5, 1982, unless otherwise noted.</P>
      </SOURCE>
      <SECTION>
        <SECTNO>§ 772.1</SECTNO>
        <SUBJECT>Purpose.</SUBJECT>
        <P>To provide procedures for noise studies and noise abatement measures to help protect the public health and welfare, to supply noise abatement criteria, and to establish requirements for information to be given to local officials for use in the planning and design of highways approved pursuant to title 23 U.S.C.</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 772.3</SECTNO>
        <SUBJECT>Noise standards.</SUBJECT>
        <P>The highway traffic noise prediction requirements, noise analyses, noise abatement criteria, and requirements for informing local officials in this regulation constitute the noise standards mandated by 23 U.S.C. 109(i). All highway projects which are developed in conformance with this regulation shall be deemed to be in conformance with the Federal Highway Administration (FHWA) noise standards.</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 772.5</SECTNO>
        <SUBJECT>Definitions.</SUBJECT>
        <P>(a) <E T="03">Design year</E>. The future year used to estimate the probable traffic volume for which a highway is designed. A time, 10 to 20 years, from the start of construction is usually used.</P>
        <P>(b) <E T="03">Existing noise levels</E>. The noise, resulting from the natural and mechanical sources and human activity, considered to be usually present in a particular area.</P>
        <P>(c) L<E T="54">10</E>. The sound level that is exceeded 10 percent of the time (the 90th percentile) for the period under consideration.</P>
        <P>(d) L<E T="54">10</E>(h). The hourly value of L<E T="54">10</E>.</P>
        <P>(e) <E T="03">Leq</E>—the equivalent steady-state sound level which in a stated period of time contains the same acoustic energy as the time-varying sound level during the same time period.</P>
        <P>(f) <E T="03">Leq</E>(h). The hourly value of Leq.</P>
        <P>(g) <E T="03">Traffic noise impacts</E>. Impacts which occur when the predicted traffic noise levels approach or exceed the noise abatement criteria (Table 1), or when the predicted traffic noise levels substantially exceed the existing noise levels.</P>
        <P>(h) <E T="03">Type I projects</E>. A proposed Federal or Federal-aid highway project for the construction of a highway on new location or the physical alteration of an existing highway which significantly changes either the horizonal or vertical <PRTPAGE P="409"/>alignment or increases the number of through-traffic lanes.</P>
        <P>(i) <E T="03">Type II projects</E>. A proposed Federal or Federal-aid highway project for noise abatement on an existing highway.</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 772.7</SECTNO>
        <SUBJECT>Applicability.</SUBJECT>
        <P>(a) <E T="03">Type I projects.</E> This regulation applies to all Type I projects unless it is specifically indicated that a section applies only to Type II projects.</P>
        <P>(b) <E T="03">Type II projects.</E> The development and implementation of Type II projects are not mandatory requirements of 23 U.S.C. 109(i) and are, therefore, not required by this regulation. When Type II projects are proposed for Federal-aid highway participation at the option of the highway agency, the provisions of §§ 772.9(c), 772.13, and 772.19 of this regulation shall apply.</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 772.9</SECTNO>
        <SUBJECT>Analysis of traffic noise impacts and abatement measures.</SUBJECT>
        <P>(a) The highway agency shall determine and analyze expected traffic noise impacts and alternative noise abatement measures to mitigate these impacts, giving weight to the benefits and cost of abatement, and to the overall social, economic and environmental effects.</P>
        <P>(b) The traffic noise analysis shall include the following for each alternative under detailed study:</P>
        <P>(1) Identification of existing activities, developed lands, and undeveloped lands for which development is planned, designed and programmed, which may be affected by noise from the highway;</P>
        <P>(2) Prediction of traffic noise levels;</P>
        <P>(3) Determination of existing noise levels;</P>
        <P>(4) Determination of traffic noise impacts; and</P>
        <P>(5) Examination and evaluation of alternative noise abatement measures for reducing or eliminating the noise impacts.</P>
        <P>(c) Highway agencies proposing to use Federal-aid highway funds for Type II projects shall perform a noise analysis of sufficient scope to provide information needed to make the determination required by § 772.13(a) of this chapter.</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 772.11</SECTNO>
        <SUBJECT>Noise abatement.</SUBJECT>
        <P>(a) In determining and abating traffic noise impacts, primary consideration is to be given to exterior areas. Abatement will usually be necessary only where frequent human use occurs and a lowered noise level would be of benefit.</P>
        <P>(b) In those situations where there are no exterior activities to be affected by the traffic noise, or where the exterior activities are far from or physically shielded from the roadway in a manner that prevents an impact on exterior activities, the interior criterion shall be used as the basis of determining noise impacts.</P>
        <P>(c) If a noise impact is identified, the abatement measures listed in § 772.13(c) of this chapter must be considered.</P>
        <P>(d) When noise abatement measures are being considered, every reasonable effort shall be made to obtain substantial noise reductions.</P>
        <P>(e) Before adoption of a final environmental impact statement or finding of no significant impact, the highway agency shall identify:</P>
        <P>(1) Noise abatement measures which are reasonable and feasible and which are likely to be incorporated in the project, and</P>
        <P>(2) Noise impacts for which no apparent solution is available.</P>
        <P>(f) The views of the impacted residents will be a major consideration in reaching a decision on the reasonableness of abatement measures to be provided.</P>
        <P>(g) The plans and specifications will not be approved by FHWA unless those noise abatement measures which are reasonable and feasible are incorporated into the plans and specifications to reduce or eliminate the noise impact on existing activities, developed lands, or undeveloped lands for which development is planned, designed, and programmed.</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 772.13</SECTNO>
        <SUBJECT>Federal participation.</SUBJECT>
        <P>(a) Federal funds may be used for noise abatement measures where:</P>
        <P>(1) A traffic noise impact has been identified,</P>
        <P>(2) The noise abatement measures will reduce the traffic noise impact, and</P>

        <P>(3) The overall noise abatement benefits are determined to outweigh the <PRTPAGE P="410"/>overall adverse social, economic, and environmental effects and the costs of the noise abatement measures.</P>
        <P>(b) For Type II projects, noise abatement measures will only be approved for projects that were approved before November 28, 1995, or are proposed along lands where land development or substantial construction predated the existence of any highway. The granting of a building permit, filing of a plat plan, or a similar action must have occurred prior to right-of-way acquisition or construction approval for the original highway. Noise abatement measures will not be approved at locations where such measures were previously determined not to be reasonable and feasible for a Type I project.</P>
        <P>(c) The noise abatement measures listed below may be incorporated in Type I and Type II projects to reduce traffic noise impacts. The costs of such measures may be included in Federal-aid participating project costs with the Federal share being the same as that for the system on which the project is located, except that Interstate construction funds may only participate in Type I projects.</P>
        <P>(1) Traffic management measures (e.g., traffic control devices and signing for prohibition of certain vehicle types, time-use restrictions for certain vehicle types, modified speed limits, and exclusive land designations).</P>
        <P>(2) Alteration of horizontal and vertical alignments.</P>
        <P>(3) Acquisition of property rights (either in fee or lesser interest) for construction of noise barriers.</P>
        <P>(4) Construction of noise barriers (including landscaping for esthetic purposes) whether within or outside the highway right-of-way. Interstate construction funds may not participate in landscaping.</P>
        <P>(5) Acquisition of real property or interests therein (predominantly unimproved property) to serve as a buffer zone to preempt development which would be adversely impacted by traffic noise. This measure may be included in Type I projects only.</P>
        <P>(6) Noise insulation of public use or nonprofit institutional structures.</P>
        <P>(d) There may be situations where (1) severe traffic noise impacts exist or are expected, and (2) the abatement measures listed above are physically infeasible or economically unreasonable. In these instances, noise abatement measures other than those listed in § 772.13(c) of this chapter may be proposed for Types I and II projects by the highway agency and approved by the Regional Federal Highway Administrator on a case-by-case basis when the conditions of § 772.13(a) of this chapter have been met.</P>
        <CITA>[47 FR 29654, July 8, 1982; 47 FR 33956, Aug. 5, 1982, as amended at 61 FR 45321, Aug. 29, 1996]</CITA>
      </SECTION>
      <SECTION>
        <SECTNO>§ 772.15</SECTNO>
        <SUBJECT>Information for local officials.</SUBJECT>
        <P>In an effort to prevent future traffic noise impacts on currently undeveloped lands, highway agencies shall inform local officials within whose jurisdiction the highway project is located of the following:</P>
        <P>(a) The best estimation of future noise levels (for various distances from the highway improvement) for both developed and undeveloped lands or properties in the immediate vicinity of the project,</P>
        <P>(b) Information that may be useful to local communities to protect future land development from becoming incompatible with anticipated highway noise levels, and</P>
        <P>(c) Eligibility for Federal-aid participation for Type II projects as described in § 772.13(b) of this chapter.</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 772.17</SECTNO>
        <SUBJECT>Traffic noise prediction.</SUBJECT>
        <P>(a) Any traffic noise prediction method is approved for use in any noise analysis required by this regulation if it generally meets the following two conditions:</P>
        <P>(1) The methodology is consistent with the methodology in the FHWA Highway Traffic Noise Prediction Model (Report No. FHWA-RD-77-108).*<FTREF/>
        </P>
        <FTNT>
          <P>*These documents are available for inspection and copying as prescribed in 49 CFR part 7, appendix D.</P>
        </FTNT>
        <P>(2) The prediction method uses noise emission levels obtained from one of the following:</P>
        <P>(i) National Reference Energy Mean Emission Levels as a Function of Speed (appendix A).</P>

        <P>(ii) Determination of reference energy mean emission levels in Sound <PRTPAGE P="411"/>Procedures for Measuring Highway Noise: Final Report, DP-45-1R.*</P>
        <P>(b) In predicting noise levels and assessing noise impacts, traffic characteristics which will yield the worst hourly traffic noise impact on a regular basis for the design year shall be used.</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 772.19</SECTNO>
        <SUBJECT>Construction noise.</SUBJECT>
        <P>The following general steps are to be performed for all Types I and II projects:</P>
        <P>(a) Identify land uses or activities which may be affected by noise from construction of the project. The identification is to be performed during the project development studies.</P>
        <P>(b) Determine the measures which are needed in the plans and specifications to minimize or eliminate adverse construction noise impacts to the community. This determination shall include a weighing of the benefits achieved and the overall adverse social, economic and environmental effects and the costs of the abatement measures.</P>
        <P>(c) Incorporate the needed abatement measures in the plans and specifications.</P>
        <GPOTABLE CDEF="s50,r40,r40,r132" COLS="4" OPTS="L2">
          <TTITLE>Table 1—Noise Abatement Criteria</TTITLE>
          <TDESC>[Hourly A-Weighted Sound Level—decibels (dBA)<SU>1</SU>]</TDESC>
          <BOXHD>
            <CHED H="1">Activity Category</CHED>
            <CHED H="1">Leq(h)</CHED>
            <CHED H="1">L<E T="22">10</E>(h)</CHED>
            <CHED H="1">Description of activity category</CHED>
          </BOXHD>
          <ROW>
            <ENT I="01">A</ENT>
            <ENT>57 (Exterior)</ENT>
            <ENT>60 (Exterior)</ENT>
            <ENT>Lands on which serenity and quiet are of extraordinary significance and serve an important public need and where the preservation of those qualities is essential if the area is to continue to serve its intended purpose.</ENT>
          </ROW>
          <ROW>
            <ENT I="01">B</ENT>
            <ENT>67 (Exterior)</ENT>
            <ENT>70 (Exterior)</ENT>
            <ENT>Picnic areas, recreation areas, playgrounds, active sports areas, parks, residences, motels, hotels, schools, churches, libraries, and hospitals.</ENT>
          </ROW>
          <ROW>
            <ENT I="01">C</ENT>
            <ENT>72 (Exterior)</ENT>
            <ENT>75 (Exterior)</ENT>
            <ENT>Developed lands, properties, or activities not included in Categories A or B above.</ENT>
          </ROW>
          <ROW>
            <ENT I="01">D</ENT>
            <ENT/>
            <ENT/>
            <ENT>Undeveloped lands.</ENT>
          </ROW>
          <ROW>
            <ENT I="01">E</ENT>
            <ENT>52 (Interior)</ENT>
            <ENT>55 (Interior)</ENT>
            <ENT>Residences, motels, hotels, public meeting rooms, schools, churches, libraries, hospitals, and auditoriums.</ENT>
          </ROW>
          <TNOTE>
            <SU>1</SU> Either L<E T="22">10</E>
            <E T="41">(h) or Leq(h) (but not both) may be used on a project.</E>
          </TNOTE>
        </GPOTABLE>
      </SECTION>
      <APPENDIX>
        <PRTPAGE P="412"/>
        <EAR>Pt. 772, App. A</EAR>
        <WHED>Appendix A to Part 772</WHED>
        <GPH DEEP="465" SPAN="2">
          <GID>EC14OC91.013</GID>
        </GPH>
      </APPENDIX>
    </PART>
    <PART>
      <PRTPAGE P="413"/>
      <EAR>Pt. 777</EAR>
      <HD SOURCE="HED">PART 777—MITIGATION OF ENVIRONMENTAL IMPACTS TO PRIVATELY OWNED WETLANDS</HD>
      <CONTENTS>
        <SECHD>Sec.</SECHD>
        <SECTNO>777.1</SECTNO>
        <SUBJECT>Purpose.</SUBJECT>
        <SECTNO>777.3</SECTNO>
        <SUBJECT>Background.</SUBJECT>
        <SECTNO>777.5</SECTNO>
        <SUBJECT>Federal participation policy.</SUBJECT>
        <SECTNO>777.7</SECTNO>
        <SUBJECT>Evaluation of impacts.</SUBJECT>
        <SECTNO>777.9</SECTNO>
        <SUBJECT>Mitigation of impacts.</SUBJECT>
        <SECTNO>777.11</SECTNO>
        <SUBJECT>Other considerations.</SUBJECT>
      </CONTENTS>
      <AUTH>
        <HD SOURCE="HED">Authority:</HD>
        <P>42 U.S.C. 4321 et seq.; 23 U.S.C. 109(h), 138, 315; E.O. 11990; DOT Order 5660.1A; 49 CFR 1.48(b).</P>
      </AUTH>
      <SOURCE>
        <HD SOURCE="HED">Source:</HD>
        <P>45 FR 50730, July 31, 1980, unless otherwise noted.</P>
      </SOURCE>
      <SECTION>
        <SECTNO>§ 777.1</SECTNO>
        <SUBJECT>Purpose.</SUBJECT>
        <P>To provide policy and procedures for the evaluation and mitigation of adverse environmental impacts to privately owned wetlands caused by new construction of Federal-aid highway projects.</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 777.3</SECTNO>
        <SUBJECT>Background.</SUBJECT>
        <P>Executive Order 11990, Protection of Wetlands, and DOT Order 5660.1A, preservation of the Nation's Wetlands, emphasize the important functions and values inherent in the Nation's wetlands. Federal agencies are required to avoid new construction in wetlands unless the head of the agency determines that: (a) There is no practicable alternative to such construction, and (b) the proposed action includes all practicable measures to minimize harm to wetlands which may result from such use.</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 777.5</SECTNO>
        <SUBJECT>Federal participation policy.</SUBJECT>
        <P>(a) Those measures which the Federal Highway Administration (FHWA) and a State highway agency (SHA) find to be appropriate and necessary to mitigate adverse environmental impacts to privately owned wetlands are eligible for Federal participation where the impacts actually result from an FHWA action. The justification for the cost of proposed mitigation measures should be considered in the same context as any other public expenditure; that is, the proposed mitigation represents a reasonable public expenditure when weighed against other social, economic, and environmental values, and the benefit realized is commensurate with the proposed expenditure. Mitigation measures shall give like consideration to traffic needs, safety, durability, and economy of maintenance of the highway.</P>
        <P>(b) It is FHWA policy to permit, consistent with the limits set forth in this part, the expenditure of Federal-aid highway funds for the acquisition of land or interests therein for the purpose of mitigating environmental damages when privately owned wetlands are directly affected by a Federal-aid highway project.</P>
        <CITA>[45 FR 50730, July 31, 1980, as amended at 52 FR 8250, Mar. 17, 1987]</CITA>
      </SECTION>
      <SECTION>
        <SECTNO>§ 777.7</SECTNO>
        <SUBJECT>Evaluation of impacts.</SUBJECT>
        <P>(a) The extent of Federal-aid participation in measures to mitigate adverse highway impacts to privately owned wetlands should be directly related to:</P>
        <P>(1) The importance of the impacted wetlands, and</P>
        <P>(2) The highway impact on the wetlands.</P>
        <P>(b) Evaluation of the importance of the impacted wetlands should consider:</P>
        <P>(1) The primary functions of the wetlands (e.g., flood control, wildlife habitat, erosion control, etc.);</P>
        <P>(2) The relative importance of these functions to the total wetland resource of the area; and</P>
        <P>(3) Other factors such as uniqueness, esthetics, etc.</P>
        <P>(c) A determination of the highway impact should focus on how the project affects the stability and quality of the wetlands. This evaluation should consider the short- and long-term effects on the wetlands and the importance of any loss such as:</P>
        <P>(1) Flood control capacity,</P>
        <P>(2) Erosion control potential,</P>
        <P>(3) Water pollution abatement capacity, and</P>
        <P>(4) Wildlife habitat value.</P>
        <CITA>[45 FR 50730, July 31, 1980, as amended at 52 FR 8250, Mar. 17, 1987]</CITA>
      </SECTION>
      <SECTION>
        <SECTNO>§ 777.9</SECTNO>
        <SUBJECT>Mitigation of impacts.</SUBJECT>

        <P>There are a number of actions that can be taken to minimize the impact of highway projects on privately owned wetlands. In order to qualify for Federal-aid highway funding, actions to <PRTPAGE P="414"/>minimize impacts should be considered in the order listed.</P>
        <P>(a) First consideration must be given to the mitigation of wetland impacts within the highway right-of-way limits. This should include the enhancement of existing wetlands and the creation of new wetlands in the highway median, borrow pit areas, interchange areas, and along the roadside.</P>
        <P>(b) There may, in some specific cases, be compelling reasons and sufficient justification to institute mitigation measures other than those set forth in paragraph (a) of this section. In these instances, the SHA may propose and the Regional Federal Highway Administrator may approve the following mitigation measures for implementation outside the highway right-of-way on a case-by-case basis. Such measures should be designed to reestablish, to the extent reasonable, a condition similar to that which would have existed if the project were not built.</P>
        <P>(1) The use of Federal-aid funds to improve existing publicly owned wetlands. Improvements to existing wetlands can take such forms as water-level control and planting of wetland vegetation.</P>
        <P>(2) The use of Federal-aid funds to purchase replacement wetlands. The first effort should be to create new wetlands or to restore wetlands. If this is not possible, then consideration should be given to the acquisition of interests in existing privately owned wetlands. In any case, the public interest in replacement wetlands must be sufficient to ensure that the area is maintained as a wetland.</P>
      </SECTION>
      <SECTION>
        <SECTNO>§ 777.11</SECTNO>
        <SUBJECT>Other considerations.</SUBJECT>
        <P>(a) The development of measures proposed to mitigate wetlands impacts should include consultation with appropriate State and Federal agencies.</P>
        <P>(b) The definition of wetlands on a project will be in accordance with the definition issued by the U.S. Army Corps of Engineers (33 CFR 323.2(c)).</P>
        <P>(c) The acquisition of proprietary interests in replacement wetlands as a mitigation measure may be in fee simple or by easement, as appropriate.</P>
        <P>(d) An SHA may acquire privately owned lands in cooperation with another public agency. Such an arrangement may accomplish greater benefits than would otherwise be accomplished by the individual agency acting alone.</P>
        <P>(e) An SHA may either transfer the title of lands acquired outside the right-of-way, without credit to Federal funds, to an appropriate public agency (e.g., U.S. Fish and Wildlife Service or State natural resource agency) or enter into an agreement with such agency to manage such lands. When such transfer occurs, there shall be an explicit agreement that the lands or interests therein transferred shall remain in the grantee agency's ownership or control so long as the lands continue to serve the purpose of the original acquisition. In the event the area transferred no longer serves the purpose of the original acquisition, the lands or interests therein transferred shall revert to the SHA for proper disposition.</P>
        <P>(f) The reasonable cost of acquiring lands, or interests therein, to provide replacement lands with equivalent wetlands functions for privately owned wetlands that are directly affected by a Federal-aid highway project is eligible for Federal participation.</P>
        <P>(g) Federal-aid funds are not eligible for use to maintain or manage wetlands areas. Therefore, construction, improvement or acquisition of wetlands should not be considered unless arrangements can be made to assure the maintenance and viability of the wetlands resource.</P>
        <P>(h) The acquisition of replacement wetlands as a mitigation measure is not mandatory and is applicable only where permitted by (or consistent with) State law.</P>
        <P>(i) The policy set forth in this part does not extend to the acquisition of interests in lands outside of the highway right-of-way for the purpose of mitigating impacts caused by the taking of privately owned lands (not wetlands) that have value as wildlife habitat which may be affected by a Federal-aid highway project.</P>
        <CITA>[45 FR 50730, July 31, 1980, as amended at 56 FR 14196, Apr. 8, 1991]</CITA>
      </SECTION>
    </PART>
  </SUBCHAP>
</CFRGRANULE>
