    <TITLE>Requirements for preparation and implementation of Spill Prevention Control and Countermeasure Plans.</TITLE>
    <GRANULENUM>112.3</GRANULENUM>
    <HEADING>Section 112.3</HEADING>
    <ANCESTORS>
      <PARENT HEADING="Title 40" SEQ="3">Protection of Environment</PARENT>
      <PARENT HEADING="CHAPTER I" SEQ="2">ENVIRONMENTAL PROTECTIONAGENCY (CONTINUED)</PARENT>
      <PARENT HEADING="Subchapter D" SEQ="1">Water Programs</PARENT>
      <PARENT HEADING="PART 112" SEQ="0">OIL POLLUTION PREVENTION</PARENT>
    </ANCESTORS>
  </FDSYS>
  <SECTION>
    <SECTNO>§ 112.3</SECTNO>
    <SUBJECT>Requirements for preparation and implementation of Spill Prevention Control and Countermeasure Plans.</SUBJECT>

    <P>(a) Owners or operators of onshore and offshore facilities in operation on or before the effective date of this part that have discharged or, due to their <PRTPAGE P="775"/>location, could reasonably be expected to discharge oil in harmful quantities, as defined in 40 CFR part 110, into or upon the navigable waters of the United States or adjoining shorelines, shall prepare a Spill Prevention Control and Countermeasure Plan (hereinafter “SPCC Plan”), in writing and in accordance with § 112.7. Except as provided for in paragraph (f) of this section, such SPCC Plan shall be prepared within six months after the effective date of this part and shall be fully implemented as soon as possible, but not later than one year after the effective date of this part.</P>
    <P>(b) Owners or operators of onshore and offshore facilities that become operational after the effective date of this part, and that have discharged or could reasonably be expected to discharge oil in harmful quantities, as defined in 40 CFR part 110, into or upon the navigable waters of the United States or adjoining shorelines, shall prepare an SPCC Plan in accordance with § 112.7. Except as provided for in paragraph (f) of this section, such SPCC Plan shall be prepared within six months after the date such facility begins operations and shall be fully implemented as soon as possible, but not later than one year after such facility begins operations.</P>
    <P>(c) Owners or operators of onshore and offshore mobile or portable facilities, such as onshore drilling or workover rigs, barge mounted offshore drilling or workover rigs, and portable fueling facilities shall prepare and implement an SPCC Plan as required by paragraphs (a), (b) and (d) of this section. The owners or operators of such facility need not prepare a new SPCC Plan each time the facility is moved to a new site. The SPCC Plan may be a general plan, prepared in accordance with § 112.7, using good engineering practice. When the mobile or portable facility is moved, it must be located and installed using the spill prevention practices outlined in the SPCC Plan for the facility. No mobile or portable facility subject to this regulation shall operate unless the SPCC Plan has been implemented. The SPCC Plan shall only apply while the facility is in a fixed (non-transportation) operating mode.</P>
    <P>(d) No SPCC Plan shall be effective to satisfy the requirements of this part unless it has been reviewed by a Registered Professional Engineer and certified to by such Professional Engineer. By means of this certification the engineer, having examined the facility and being familiar with the provisions of this part, shall attest that the SPCC Plan has been prepared in accordance with good engineering practices. Such certification shall in no way relieve the owner or operator of an onshore or offshore facility of his duty to prepare and fully implement such Plan in accordance with § 112.7, as required by paragraphs (a), (b) and (c) of this section.</P>
    <P>(e) Owners or operators of a facility for which an SPCC Plan is required pursuant to paragraph (a), (b) or (c) of this section shall maintain a complete copy of the Plan at such facility if the facility is normally attended at least 8 hours per day, or at the nearest field office if the facility is not so attended, and shall make such Plan available to the Regional Administrator for on-site review during normal working hours.</P>
    <P>(f) <E T="03">Extensions of time.</E> (1) The Regional Administrator may authorize an extension of time for the preparation and full implementation of an SPCC Plan beyond the time permitted for the preparation and implementation of an SPCC Plan pursuant to paragraph (a), (b) or (c) of this section where he finds that the owner or operator of a facility subject to paragraphs (a), (b) or (c) of this section cannot fully comply with the requirements of this part as a result of either nonavailability of qualified personnel, or delays in construction or equipment delivery beyond the control and without the fault of such owner or operator or their respective agents or employees.</P>
    <P>(2) Any owner or operator seeking an extension of time pursuant to paragraph (f)(1) of this section may submit a letter of request to the Regional Administrator. Such letter shall include:</P>
    <P>(i) A complete copy of the SPCC Plan, if completed;</P>

    <P>(ii) A full explanation of the cause for any such delay and the specific aspects of the SPCC Plan affected by the delay;<PRTPAGE P="776"/>
    </P>
    <P>(iii) A full discussion of actions being taken or contemplated to minimize or mitigate such delay;</P>
    <P>(iv) A proposed time schedule for the implementation of any corrective actions being taken or contemplated, including interim dates for completion of tests or studies, installation and operation of any necessary equipment or other preventive measures.</P>
    <FP>In addition, such owner or operator may present additional oral or written statements in support of his letter of request.</FP>
    <P>(3) The submission of a letter of request for extension of time pursuant to paragraph (f)(2) of this section shall in no way relieve the owner or operator from his obligation to comply with the requirements of § 112.3 (a), (b) or (c). Where an extension of time is authorized by the Regional Administrator for particular equipment or other specific aspects of the SPCC Plan, such extension shall in no way affect the owner's or operator's obligation to comply with the requirements of § 112.3 (a), (b) or (c) with respect to other equipment or other specific aspects of the SPCC Plan for which an extension of time has not been expressly authorized.</P>
    <CITA>[38 FR 34165, Dec. 11, 1973, as amended at 41 FR 12657, Mar. 26, 1976]</CITA>