<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="cfr.xsl"?>
<CFRGRANULE xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:noNamespaceSchemaLocation="CFRMergedXML.xsd">
  <FDSYS>
    <CFRTITLE>47</CFRTITLE>
    <CFRTITLETEXT>Telecommunication</CFRTITLETEXT>
    <VOL>1</VOL>
    <DATE>2002-10-01</DATE>
    <ORIGINALDATE>2002-10-01</ORIGINALDATE>
    <COVERONLY>false</COVERONLY>
    <TITLE>Coordination requirements.</TITLE>
    <GRANULENUM>15.525</GRANULENUM>
    <HEADING>Section 15.525</HEADING>
    <ANCESTORS>
      <PARENT HEADING="Title 47" SEQ="4">Telecommunication</PARENT>
      <PARENT HEADING="CHAPTER I" SEQ="3">FEDERAL COMMUNICATIONS COMMISSION</PARENT>
      <PARENT HEADING="SUBCHAPTER A" SEQ="2">GENERAL</PARENT>
      <PARENT HEADING="PART 15" SEQ="1">RADIO FREQUENCY DEVICES</PARENT>
      <PARENT HEADING="Subpart F" SEQ="0">Ultra-Wideband Operation</PARENT>
    </ANCESTORS>
  </FDSYS>
  <SECTION>
    <SECTNO>§ 15.525</SECTNO>
    <SUBJECT>Coordination requirements.</SUBJECT>
    <P>(a) UWB imaging systems require coordination through the FCC before the equipment may be used. The operator shall comply with any constraints on equipment usage resulting from this coordination.</P>

    <P>(b) The users of UWB imaging devices shall supply detailed operational areas to the FCC Office of Engineering and Technology who shall coordinate this <PRTPAGE P="763"/>information with the Federal Government through the National Telecommunications and Information Administration. The information provided by the UWB operator shall include the name, address and other pertinent contact information of the user, the desired geographical area of operation, and the FCC ID number and other nomenclature of the UWB device. This material shall be submitted to the following address:
    </P>
    <FP SOURCE="FP-1">Frequency Coordination Branch, Office of Engineering and Technology, Federal Communications Commission, 445 12th Street, SW, Washington, DC 20554, ATTN: UWB Coordination.</FP>
    
    <P>(c) The manufacturers, or their authorized sales agents, must inform purchasers and users of their systems of the requirement to undertake detailed coordination of operational areas with the FCC prior to the equipment being operated.</P>
    <P>(d) Users of authorized, coordinated UWB systems may transfer them to other qualified users and to different locations upon coordination of change of ownership or location to the FCC and coordination with existing authorized operations.</P>
    <P>(e) The NTIA/FCC coordination report shall include any needed constraints that apply to day-to-day operations. Such constraints could specify prohibited areas of operations or areas located near authorized radio stations for which additional coordination is required before operation of the UWB equipment. If additional local coordination is required, a local coordination contact will be provided.</P>
    <P>(f) The coordination of routine UWB operations shall not take longer than 15 business days from the receipt of the coordination request by NTIA. Special temporary operations may be handled with an expedited turn-around time when circumstances warrant. The operation of UWB systems in emergency situations involving the safety of life or property may occur without coordination provided a notification procedure, similar to that contained in § 2.405(a) through (e) of this chapter, is followed by the UWB equipment user.</P>
  </SECTION>
</CFRGRANULE>
