<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="cfr.xsl"?>
<CFRGRANULE xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:noNamespaceSchemaLocation="CFRMergedXML.xsd">
  <FDSYS>
    <CFRTITLE>33</CFRTITLE>
    <CFRTITLETEXT>Navigation and Navigable Waters</CFRTITLETEXT>
    <VOL>1</VOL>
    <DATE>2006-07-01</DATE>
    <ORIGINALDATE>2006-07-01</ORIGINALDATE>
    <COVERONLY>false</COVERONLY>
    <TITLE>Lake Washington.</TITLE>
    <GRANULENUM>117.1049</GRANULENUM>
    <HEADING>Section 117.1049</HEADING>
    <ANCESTORS>
      <PARENT HEADING="Title 33" SEQ="5">Navigation and Navigable Waters</PARENT>
      <PARENT HEADING="CHAPTER I" SEQ="4">COAST GUARD, DEPARTMENT OF HOMELAND SECURITY</PARENT>
      <PARENT HEADING="SUBCHAPTER J" SEQ="3">BRIDGES</PARENT>
      <PARENT HEADING="PART 117" SEQ="2">DRAWBRIDGE OPERATION REGULATIONS</PARENT>
      <PARENT HEADING="Subpart B" SEQ="1">Specific Requirements</PARENT>
      <PARENT HEADING="" SEQ="0">Washington</PARENT>
    </ANCESTORS>
  </FDSYS>
  <SECTION>
    <SECTNO>§ 117.1049</SECTNO>
    <SUBJECT>Lake Washington.</SUBJECT>
    <P>The draw of the Evergreen Point Floating Bridge between Seattle and Bellevue shall operate as follows:</P>
    <P>(a) The draw shall open on signal if at least two hours notice is given.</P>
    <P>(b) Telephone requests for bridge opening may be directed as collect calls to the Highway Radio or made by direct telephone communication through the Seattle Marine Operator, Station KOH, or through other marine wire or radiotelephone service.</P>
    <P>(c) The draw need not be opened from 5 a.m. to 9 p.m. Monday through Friday, except for all Federal holidays other than Columbus Day.</P>
    <CITA>[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD13 84-13, 49 FR 35628, Sept. 11, 1984; CGD13-94-039, 60 FR 54434, Oct. 24, 1995]</CITA>
  </SECTION>
</CFRGRANULE>

