<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="cfr.xsl"?>
<CFRGRANULE xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:noNamespaceSchemaLocation="CFRMergedXML.xsd">
  <FDSYS>
    <CFRTITLE>49</CFRTITLE>
    <CFRTITLETEXT>Transportation</CFRTITLETEXT>
    <VOL>3</VOL>
    <DATE>2007-10-01</DATE>
    <ORIGINALDATE>2007-10-01</ORIGINALDATE>
    <COVERONLY>false</COVERONLY>
    <TITLE>Transmission lines: General requirements for repair procedures.</TITLE>
    <GRANULENUM>192.711</GRANULENUM>
    <HEADING>Section 192.711</HEADING>
    <ANCESTORS>
      <PARENT HEADING="Title 49" SEQ="4">Transportation</PARENT>
      <PARENT HEADING="Subtitle B" SEQ="3">Other Regulations Relating to Transportation (Continued)</PARENT>
      <PARENT HEADING="SUBCHAPTER D" SEQ="2">PIPELINE SAFETY</PARENT>
      <PARENT HEADING="PART 192" SEQ="1">TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS</PARENT>
      <PARENT HEADING="Subpart M" SEQ="0">Maintenance</PARENT>
    </ANCESTORS>
  </FDSYS>
  <SECTION>
    <SECTNO>§ 192.711</SECTNO>
    <SUBJECT>Transmission lines: General requirements for repair procedures.</SUBJECT>
    <P>(a) Each operator shall take immediate temporary measures to protect the public whenever:</P>
    <P>(1) A leak, imperfection, or damage that impairs its serviceability is found in a segment of steel transmission line operating at or above 40 percent of the SMYS; and</P>
    <P>(2) It is not feasible to make a permanent repair at the time of discovery.</P>
    <FP>As soon as feasible, the operator shall make permanent repairs.</FP>
    <P>(b) Except as provided in § 192.717(b)(3), no operator may use a welded patch as a means of repair.</P>
    <CITA>[35 FR 13257, Aug. 19, 1970, as amended by Amdt. 192-27B, 45 FR 3272, Jan. 17, 1980; Amdt. 192-88, 64 FR 69665, Dec. 14, 1999]</CITA>
  </SECTION>
</CFRGRANULE>