<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="cfr.xsl"?>
<CFRGRANULE xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:noNamespaceSchemaLocation="CFRMergedXML.xsd">
  <FDSYS>
    <CFRTITLE>33</CFRTITLE>
    <CFRTITLETEXT>Navigation and Navigable Waters</CFRTITLETEXT>
    <VOL>1</VOL>
    <DATE>2008-07-01</DATE>
    <ORIGINALDATE>2008-07-01</ORIGINALDATE>
    <COVERONLY>false</COVERONLY>
    <TITLE>Sabine Lake.</TITLE>
    <GRANULENUM>117.979</GRANULENUM>
    <HEADING>Section 117.979</HEADING>
    <ANCESTORS>
      <PARENT HEADING="Title 33" SEQ="5">Navigation and Navigable Waters</PARENT>
      <PARENT HEADING="CHAPTER I" SEQ="4">COAST GUARD, DEPARTMENT OF HOMELAND SECURITY</PARENT>
      <PARENT HEADING="SUBCHAPTER J" SEQ="3">BRIDGES</PARENT>
      <PARENT HEADING="PART 117" SEQ="2">DRAWBRIDGE OPERATION REGULATIONS</PARENT>
      <PARENT HEADING="Subpart B" SEQ="1">Specific Requirements</PARENT>
      <PARENT HEADING="" SEQ="0">Texas</PARENT>
    </ANCESTORS>
  </FDSYS>
  <SECTION>
    <SECTNO>§ 117.979</SECTNO>
    <SUBJECT>Sabine Lake.</SUBJECT>
    <P>The draw of the S82 bridge, mile 10.0 at Port Arthur, shall open on signal; except that, from 9 p.m. to 5 a.m., the draw shall open on signal if at least six hours notice is given to the Maintenance Construction Supervisor or the Maintenance Foreman at Port Arthur.</P>
  </SECTION>
</CFRGRANULE>
