<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="cfr.xsl"?>
<CFRGRANULE xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:noNamespaceSchemaLocation="CFRMergedXML.xsd">
  <FDSYS>
    <CFRTITLE>40</CFRTITLE>
    <CFRTITLETEXT>Protection of Environment</CFRTITLETEXT>
    <VOL>8</VOL>
    <DATE>2008-07-01</DATE>
    <ORIGINALDATE>2008-07-01</ORIGINALDATE>
    <COVERONLY>false</COVERONLY>
    <TITLE>How do I comply with the increment of progress for submittal of a control plan?</TITLE>
    <GRANULENUM>62.14560</GRANULENUM>
    <HEADING>Section 62.14560</HEADING>
    <ANCESTORS>
      <PARENT HEADING="Title 40" SEQ="5">Protection of Environment</PARENT>
      <PARENT HEADING="CHAPTER I" SEQ="4">ENVIRONMENTAL PROTECTION AGENCY (CONTINUED)</PARENT>
      <PARENT HEADING="SUBCHAPTER C" SEQ="3">AIR PROGRAMS (CONTINUED)</PARENT>
      <PARENT HEADING="PART 62" SEQ="2">APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS</PARENT>
      <PARENT HEADING="Subpart III" SEQ="1">Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999</PARENT>
      <PARENT HEADING="" SEQ="0">Compliance Schedule and Increments of Progress</PARENT>
    </ANCESTORS>
  </FDSYS>
  <SECTION>
    <SECTNO>§ 62.14560</SECTNO>
    <SUBJECT>How do I comply with the increment of progress for submittal of a control plan?</SUBJECT>
    <P>For your control plan increment of progress, you must satisfy the two requirements specified in paragraphs (a) and (b) of this section.</P>
    <P>(a) Submit the final control plan that includes the six items described in paragraphs (a)(1) through (6) of this section.</P>
    <P>(1) A description of the devices for air pollution control and process changes that you will use to comply with the emission limitations and other requirements of this subpart.</P>
    <P>(2) The type(s) of waste to be burned.</P>
    <P>(3) The maximum design waste burning capacity.</P>
    <P>(4) The anticipated maximum charge rate.</P>
    <P>(5) If applicable, the petition for site-specific operating limits under § 62.14640.</P>

    <P>(6) A schedule that includes the date by which you will award the contracts to procure emission control equipment or related materials, initiate on-site construction, initiate on-site installation of emission control equipment, and/or incorporate process changes, <PRTPAGE P="476"/>and the date by which you will initiate on-site construction.</P>
    <P>(b) Maintain an on-site copy of the final control plan.</P>