<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="cfr.xsl"?>
<CFRGRANULE xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:noNamespaceSchemaLocation="CFRMergedXML.xsd">
  <FDSYS>
    <CFRTITLE>40</CFRTITLE>
    <CFRTITLETEXT>Protection of Environment</CFRTITLETEXT>
    <VOL>14</VOL>
    <DATE>2011-07-01</DATE>
    <ORIGINALDATE>2011-07-01</ORIGINALDATE>
    <COVERONLY>false</COVERONLY>
    <TITLE>AIR PROGRAMS (CONTINUED)</TITLE>
    <GRANULENUM>C</GRANULENUM>
    <HEADING>SUBCHAPTER C</HEADING>
    <ANCESTORS>
      <PARENT HEADING="Title 40" SEQ="1">Protection of Environment</PARENT>
      <PARENT HEADING="CHAPTER I" SEQ="0">ENVIRONMENTAL PROTECTION AGENCY (CONTINUED)</PARENT>
    </ANCESTORS>
  </FDSYS>
  <SUBCHAP TYPE="N">
    <PRTPAGE P="5"/>
    <HD SOURCE="HED">SUBCHAPTER C—AIR PROGRAMS (CONTINUED)</HD>
    <PART>
      <EAR>Pt. 63</EAR>
      <HD SOURCE="HED">PART 63—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED)</HD>
      <CONTENTS>
        <SUBPART>
          <HD SOURCE="HED">Subpart NNNNN—National Emission Standards for Hazardous Air Pollutants: Hydrochloric Acid Production</HD>
          <SUBJGRP>
            <HD SOURCE="HED">What This Subpart Covers</HD>
            <SECHD>Sec.</SECHD>
            <SECTNO>63.8980</SECTNO>
            <SUBJECT>What is the purpose of this subpart?</SUBJECT>
            <SECTNO>63.8985</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <SECTNO>63.8990</SECTNO>
            <SUBJECT>What parts of my plant does this subpart cover?</SUBJECT>
            <SECTNO>63.8995</SECTNO>
            <SUBJECT>When do I have to comply with this subpart?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Emission Limitations and Work Practice Standards</HD>
            <SECTNO>63.9000</SECTNO>
            <SUBJECT>What emission limitations and work practice standards must I meet?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">General Compliance Requirements</HD>
            <SECTNO>63.9005</SECTNO>
            <SUBJECT>What are my general requirements for complying with this subpart?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Testing and Initial Compliance Requirements</HD>
            <SECTNO>63.9010</SECTNO>
            <SUBJECT>By what date must I conduct performance tests?</SUBJECT>
            <SECTNO>63.9015</SECTNO>
            <SUBJECT>When must I conduct subsequent performance tests?</SUBJECT>
            <SECTNO>63.9020</SECTNO>
            <SUBJECT>What performance tests and other procedures must I use?</SUBJECT>
            <SECTNO>63.9025</SECTNO>
            <SUBJECT>What are my monitoring installation, operation, and maintenance requirements?</SUBJECT>
            <SECTNO>63.9030</SECTNO>
            <SUBJECT>How do I demonstrate initial compliance with the emission limitations and work practice standards?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Continuous Compliance Requirements</HD>
            <SECTNO>63.9035</SECTNO>
            <SUBJECT>How do I monitor and collect data to demonstrate continuous compliance?</SUBJECT>
            <SECTNO>63.9040</SECTNO>
            <SUBJECT>How do I demonstrate continuous compliance with the emission limitations and work practice standards?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Notifications, Reports, and Records</HD>
            <SECTNO>63.9045</SECTNO>
            <SUBJECT>What notifications must I submit and when?</SUBJECT>
            <SECTNO>63.9050</SECTNO>
            <SUBJECT>What reports must I submit and when?</SUBJECT>
            <SECTNO>63.9055</SECTNO>
            <SUBJECT>What records must I keep?</SUBJECT>
            <SECTNO>63.9060</SECTNO>
            <SUBJECT>In what form and how long must I keep my records?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.9065</SECTNO>
            <SUBJECT>What parts of the General Provisions apply to me?</SUBJECT>
            <SECTNO>63.9070</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <SECTNO>63.9075</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <APP>Table 1 to Subpart NNNNN of Part 63—Emission Limits and Work Practice Standards</APP>
            <APP>Table 2 to Subpart NNNNN of Part 63—Operating Limits</APP>
            <APP>Table 3 to Subpart NNNNN of Part 63—Performance Test Requirements for HCl Production Affected Sources</APP>
            <APP>Table 4 to Subpart NNNNN of Part 63—Initial Compliance with Emission Limitations and Work Practice Standards</APP>
            <APP>Table 5 to Subpart NNNNN of Part 63—Continuous Compliance with Emission Limitations and Work Practice Standards</APP>
            <APP>Table 6 to Subpart NNNNN of Part 63—Requirements for Reports</APP>
            <APP>Table 7 to Subpart NNNNN of Part 63—Applicability of General Provisions to Subpart NNNNN</APP>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <RESERVED>Subpart OOOOO [Reserved]</RESERVED>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart PPPPP—National Emission Standards for Hazardous Air Pollutants for Engine Test Cells/Stands</HD>
          <SUBJGRP>
            <HD SOURCE="HED">What This Subpart Covers</HD>
            <SECTNO>63.9280</SECTNO>
            <SUBJECT>What is the purpose of subpart PPPPP?</SUBJECT>
            <SECTNO>63.9285</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <SECTNO>63.9290</SECTNO>
            <SUBJECT>What parts of my plant does this subpart cover?</SUBJECT>
            <SECTNO>63.9295</SECTNO>
            <SUBJECT>When do I have to comply with this subpart?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Emission Limitations</HD>
            <SECTNO>63.9300</SECTNO>
            <SUBJECT>What emission limitation must I meet?</SUBJECT>
            <SECTNO>63.9301</SECTNO>
            <SUBJECT>What are my options for meeting the emission limits?</SUBJECT>
            <SECTNO>63.9302</SECTNO>
            <SUBJECT>What operating limits must I meet?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">General Compliance Requirements</HD>
            <SECTNO>63.9305</SECTNO>
            <SUBJECT>What are my general requirements for complying with this subpart?</SUBJECT>
            <SECTNO>63.9306</SECTNO>
            <SUBJECT>What are my continuous parameter monitoring system (CPMS) installation, operation, and maintenance requirements?</SUBJECT>
            <SECTNO>63.9307</SECTNO>
            <SUBJECT>What are my continuous emissions monitoring system installation, operation, and maintenance requirements?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <PRTPAGE P="6"/>
            <HD SOURCE="HED">Testing and Initial Compliance Requirements</HD>
            <SECTNO>63.9310</SECTNO>
            <SUBJECT>By what date must I conduct the initial compliance demonstrations?</SUBJECT>
            <SECTNO>63.9320</SECTNO>
            <SUBJECT>What procedures must I use?</SUBJECT>
            <SECTNO>63.9321</SECTNO>
            <SUBJECT>What are the general requirements for performance tests?</SUBJECT>
            <SECTNO>63.9322</SECTNO>
            <SUBJECT>How do I determine the emission capture system efficiency?</SUBJECT>
            <SECTNO>63.9323</SECTNO>
            <SUBJECT>How do I determine the add-on control device emission destruction or removal efficiency?</SUBJECT>
            <SECTNO>63.9324</SECTNO>
            <SUBJECT>How do I establish the emission capture system and add-on control device operating limits during the performance test?</SUBJECT>
            <SECTNO>63.9330</SECTNO>
            <SUBJECT>How do I demonstrate initial compliance with the emission limitation?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Continuous Compliance Requirements</HD>
            <SECTNO>63.9335</SECTNO>
            <SUBJECT>How do I monitor and collect data to demonstrate continuous compliance?</SUBJECT>
            <SECTNO>63.9340</SECTNO>
            <SUBJECT>How do I demonstrate continuous compliance with the emission limitation?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Notifications, Reports, and Records</HD>
            <SECTNO>63.9345</SECTNO>
            <SUBJECT>What notifications must I submit and when?</SUBJECT>
            <SECTNO>63.9350</SECTNO>
            <SUBJECT>What reports must I submit and when?</SUBJECT>
            <SECTNO>63.9355</SECTNO>
            <SUBJECT>What records must I keep?</SUBJECT>
            <SECTNO>63.9360</SECTNO>
            <SUBJECT>In what form and how long must I keep my records?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.9365</SECTNO>
            <SUBJECT>What parts of the General Provisions apply to me?</SUBJECT>
            <SECTNO>63.9370</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <SECTNO>63.9375</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <APP>Table 1 to Subpart PPPPP of Part 63—Emission Limitations</APP>
            <APP>Table 2 to Subpart PPPPP of Part 63—Operating Limits</APP>
            <APP>Table 3 to Subpart PPPPP of Part 63—Requirements for Initial Compliance Demonstrations</APP>
            <APP>Table 4 to Subpart PPPPP of Part 63—Initial Compliance with Emission Limitations</APP>
            <APP>Table 5 to Subpart PPPPP of Part 63—Continuous Compliance with Emission Limitations</APP>
            <APP>Table 6 to Subpart PPPPP of Part 63—Requirements for Reports</APP>
            <APP>Table 7 to Subpart PPPPP of Part 63—Applicability of General Provisions to Subpart PPPPP</APP>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart QQQQQ—National Emission Standards for Hazardous Air Pollutants for Friction Materials Manufacturing Facilities</HD>
          <SUBJGRP>
            <HD SOURCE="HED">What This Subpart Covers</HD>
            <SECTNO>63.9480</SECTNO>
            <SUBJECT>What is the purpose of this subpart?</SUBJECT>
            <SECTNO>63.9485</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <SECTNO>63.9490</SECTNO>
            <SUBJECT>What parts of my plant does this subpart cover?</SUBJECT>
            <SECTNO>63.9495</SECTNO>
            <SUBJECT>When do I have to comply with this subpart?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Emission Limitations</HD>
            <SECTNO>63.9500</SECTNO>
            <SUBJECT>What emission limitations must I meet?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">General Compliance Requirements</HD>
            <SECTNO>63.9505</SECTNO>
            <SUBJECT>What are my general requirements for complying with this subpart?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Initial Compliance Demonstration Requirements</HD>
            <SECTNO>63.9510</SECTNO>
            <SUBJECT>By what date must I conduct my initial compliance demonstration?</SUBJECT>
            <SECTNO>63.9515</SECTNO>
            <SUBJECT>How do I demonstrate initial compliance with the emission limitation that applies to me?</SUBJECT>
            <SECTNO>63.9520</SECTNO>
            <SUBJECT>What procedures must I use to demonstrate initial compliance?</SUBJECT>
            <SECTNO>63.9525</SECTNO>
            <SUBJECT>What are the installation, operation, and maintenance requirements for my weight measurement device?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Continuous Compliance Requirements</HD>
            <SECTNO>63.9530</SECTNO>
            <SUBJECT>How do I demonstrate continuous compliance with the emission limitation that applies to me?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Notifications, Reports, and Records</HD>
            <SECTNO>63.9535</SECTNO>
            <SUBJECT>What notifications must I submit and when?</SUBJECT>
            <SECTNO>63.9540</SECTNO>
            <SUBJECT>What reports must I submit and when?</SUBJECT>
            <SECTNO>63.9545</SECTNO>
            <SUBJECT>What records must I keep?</SUBJECT>
            <SECTNO>63.9550</SECTNO>
            <SUBJECT>In what form and how long must I keep my records?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.9555</SECTNO>
            <SUBJECT>What parts of the General Provisions apply to me?</SUBJECT>
            <SECTNO>63.9560</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <SECTNO>63.9565</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <SECTNO>63.9570</SECTNO>
            <SUBJECT>How do I apply for alternative compliance requirements?</SUBJECT>
            <SECTNO>63.9571-63.9579</SECTNO>
            <SUBJECT>[Reserved]<PRTPAGE P="7"/>
            </SUBJECT>
            <APP>Table 1 to Subpart QQQQQ—Applicability of General Provisions to Subpart QQQQQ</APP>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart RRRRR—National Emission Standards for Hazardous Air Pollutants: Taconite Iron Ore Processing</HD>
          <SUBJGRP>
            <HD SOURCE="HED">What This Subpart Covers</HD>
            <SECTNO>63.9580</SECTNO>
            <SUBJECT>What is the purpose of this subpart?</SUBJECT>
            <SECTNO>63.9581</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <SECTNO>63.9582</SECTNO>
            <SUBJECT>What parts of my plant does this subpart cover?</SUBJECT>
            <SECTNO>63.9583</SECTNO>
            <SUBJECT>When do I have to comply with this subpart?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Emission Limitations and Work Practice Standards</HD>
            <SECTNO>63.9590</SECTNO>
            <SUBJECT>What emission limitations must I meet?</SUBJECT>
            <SECTNO>63.9591</SECTNO>
            <SUBJECT>What work practice standards must I meet?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Operation and Maintenance Requirements</HD>
            <SECTNO>63.9600</SECTNO>
            <SUBJECT>What are my operation and maintenance requirements?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">General Compliance Requirements</HD>
            <SECTNO>63.9610</SECTNO>
            <SUBJECT>What are my general requirements for complying with this subpart?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Initial Compliance Requirements</HD>
            <SECTNO>63.9620</SECTNO>
            <SUBJECT>On which units and by what date must I conduct performance tests or other initial compliance demonstrations?</SUBJECT>
            <SECTNO>63.9621</SECTNO>
            <SUBJECT>What test methods and other procedures must I use to demonstrate initial compliance with the emission limits for particulate matter?</SUBJECT>
            <SECTNO>63.9622</SECTNO>
            <SUBJECT>What test methods and other procedures must I use to establish and demonstrate initial compliance with the operating limits?</SUBJECT>
            <SECTNO>63.9623</SECTNO>
            <SUBJECT>How do I demonstrate initial compliance with the emission limitations that apply to me?</SUBJECT>
            <SECTNO>63.9624</SECTNO>
            <SUBJECT>How do I demonstrate initial compliance with the work practice standards that apply to me?</SUBJECT>
            <SECTNO>63.9625</SECTNO>
            <SUBJECT>How do I demonstrate initial compliance with the operation and maintenance requirements that apply to me?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Continuous Compliance Requirements</HD>
            <SECTNO>63.9630</SECTNO>
            <SUBJECT>When must I conduct subsequent performance tests?</SUBJECT>
            <SECTNO>63.9631</SECTNO>
            <SUBJECT>What are my monitoring requirements?</SUBJECT>
            <SECTNO>63.9632</SECTNO>
            <SUBJECT>What are the installation, operation, and maintenance requirements for my monitoring equipment?</SUBJECT>
            <SECTNO>63.9633</SECTNO>
            <SUBJECT>How do I monitor and collect data to demonstrate continuous compliance?</SUBJECT>
            <SECTNO>63.9634</SECTNO>
            <SUBJECT>How do I demonstrate continuous compliance with the emission limitations that apply to me?</SUBJECT>
            <SECTNO>63.9635</SECTNO>
            <SUBJECT>How do I demonstrate continuous compliance with the work practice standards that apply to me?</SUBJECT>
            <SECTNO>63.9636</SECTNO>
            <SUBJECT>How do I demonstrate continuous compliance with the operation and maintenance requirements that apply to me?</SUBJECT>
            <SECTNO>63.9637</SECTNO>
            <SUBJECT>What other requirements must I meet to demonstrate continuous compliance?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Notifications, Reports, and Records</HD>
            <SECTNO>63.9640</SECTNO>
            <SUBJECT>What notifications must I submit and when?</SUBJECT>
            <SECTNO>63.9641</SECTNO>
            <SUBJECT>What reports must I submit and when?</SUBJECT>
            <SECTNO>63.9642</SECTNO>
            <SUBJECT>What records must I keep?</SUBJECT>
            <SECTNO>63.9643</SECTNO>
            <SUBJECT>In what form and how long must I keep my records?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.9650</SECTNO>
            <SUBJECT>What parts of the General Provisions apply to me?</SUBJECT>
            <SECTNO>63.9651</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <SECTNO>63.9652</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <APP>Table 1 to Subpart RRRRR of Part 63—Emission Limits</APP>
            <APP>Table 2 to Subpart RRRRR of Part 63—Applicability of General Provisions to Subpart RRRRR of Part 63</APP>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart SSSSS—National Emission Standards for Hazardous Air Pollutants for Refractory Products Manufacturing</HD>
          <SUBJGRP>
            <HD SOURCE="HED">What This Subpart Covers</HD>
            <SECTNO>63.9780</SECTNO>
            <SUBJECT>What is the purpose of this subpart?</SUBJECT>
            <SECTNO>63.9782</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <SECTNO>63.9784</SECTNO>
            <SUBJECT>What parts of my plant does this subpart cover?</SUBJECT>
            <SECTNO>63.9786</SECTNO>
            <SUBJECT>When do I have to comply with this subpart?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Emission Limitations and Work Practice Standards</HD>
            <SECTNO>63.9788</SECTNO>
            <SUBJECT>What emission limits, operating limits, and work practice standards must I meet?</SUBJECT>
            <SECTNO>63.9790</SECTNO>
            <SUBJECT>What are my options for meeting the emission limits?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">General Compliance Requirements</HD>
            <SECTNO>63.9792</SECTNO>
            <SUBJECT>What are my general requirements for complying with this subpart?</SUBJECT>
            <SECTNO>63.9794</SECTNO>
            <SUBJECT>What do I need to know about operation, maintenance, and monitoring plans?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <PRTPAGE P="8"/>
            <HD SOURCE="HED">Testing and Initial Compliance Requirements</HD>
            <SECTNO>63.9796</SECTNO>
            <SUBJECT>By what date must I conduct performance tests?</SUBJECT>
            <SECTNO>63.9798</SECTNO>
            <SUBJECT>When must I conduct subsequent performance tests?</SUBJECT>
            <SECTNO>63.9800</SECTNO>
            <SUBJECT>How do I conduct performance tests and establish operating limits?</SUBJECT>
            <SECTNO>63.9802</SECTNO>
            <SUBJECT>How do I develop an emissions profile?</SUBJECT>
            <SECTNO>63.9804</SECTNO>
            <SUBJECT>What are my monitoring system installation, operation, and maintenance requirements?</SUBJECT>
            <SECTNO>63.9806</SECTNO>
            <SUBJECT>How do I demonstrate initial compliance with the emission limits, operating limits, and work practice standards?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Continuous Compliance Requirements</HD>
            <SECTNO>63.9808</SECTNO>
            <SUBJECT>How do I monitor and collect data to demonstrate continuous compliance?</SUBJECT>
            <SECTNO>63.9810</SECTNO>
            <SUBJECT>How do I demonstrate continuous compliance with the emission limits, operating limits, and work practice standards?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Notifications, Reports, and Records</HD>
            <SECTNO>63.9812</SECTNO>
            <SUBJECT>What notifications must I submit and when?</SUBJECT>
            <SECTNO>63.9814</SECTNO>
            <SUBJECT>What reports must I submit and when?</SUBJECT>
            <SECTNO>63.9816</SECTNO>
            <SUBJECT>What records must I keep?</SUBJECT>
            <SECTNO>63.9818</SECTNO>
            <SUBJECT>In what form and how long must I keep my records?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.9820</SECTNO>
            <SUBJECT>What parts of the General Provisions apply to me?</SUBJECT>
            <SECTNO>63.9822</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <SECTNO>63.9824</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <APP>Table 1 to Subpart SSSSS of Part 63—Emission Limits</APP>
            <APP>Table 2 to Subpart SSSSS of Part 63—Operating Limits</APP>
            <APP>Table 3 to Subpart SSSSS of Part 63—Work Practice Standards</APP>
            <APP>Table 4 to Subpart SSSSS of Part 63—Requirements for Performance Tests</APP>
            <APP>Table 5 to Subpart SSSSS of Part 63—Initial Compliance with Emission Limits</APP>
            <APP>Table 6 to Subpart SSSSS of Part 63—Initial Compliance with Work Practice Standards</APP>
            <APP>Table 7 to Subpart SSSSS of Part 63—Continuous Compliance with Emission Limits</APP>
            <APP>Table 8 to Subpart SSSSS of Part 63—Continuous Compliance with Operating Limits</APP>
            <APP>Table 9 to Subpart SSSSS of Part 63—Continuous Compliance with Work Practice Standards</APP>
            <APP>Table 10 to Subpart SSSSS of Part 63—Requirements for Reports</APP>
            <APP>Table 11 to Subpart SSSSS of Part 63—Applicability of General Provisions to Subpart SSSSS</APP>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart TTTTT—National Emissions Standards for Hazardous Air Pollutants for Primary Magnesium Refining</HD>
          <SUBJGRP>
            <HD SOURCE="HED">What This Subpart Covers</HD>
            <SECTNO>63.9880</SECTNO>
            <SUBJECT>What is the purpose of this subpart?</SUBJECT>
            <SECTNO>63.9881</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <SECTNO>63.9882</SECTNO>
            <SUBJECT>What parts of my plant does this subpart cover?</SUBJECT>
            <SECTNO>63.9883</SECTNO>
            <SUBJECT>When do I have to comply with this subpart?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Emission Limitations and Work Practice Standards</HD>
            <SECTNO>63.9890</SECTNO>
            <SUBJECT>What emission limitations must I meet?</SUBJECT>
            <SECTNO>63.9891</SECTNO>
            <SUBJECT>What work practice standards must I meet for my fugitive dust sources?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Operation and Maintenance Requirements</HD>
            <SECTNO>63.9900</SECTNO>
            <SUBJECT>What are my operation and maintenance requirements?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">General Compliance Requirements</HD>
            <SECTNO>63.9910</SECTNO>
            <SUBJECT>What are my general requirements for complying with this subpart?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Initial Compliance Requirements</HD>
            <SECTNO>63.9911</SECTNO>
            <SUBJECT>By what date must I conduct performance tests or other initial compliance demonstrations?</SUBJECT>
            <SECTNO>63.9912</SECTNO>
            <SUBJECT>When must I conduct subsequent performance tests?</SUBJECT>
            <SECTNO>63.9913</SECTNO>

            <SUBJECT>What test methods and other procedures must I use to demonstrate initial compliance with the emission limits for particulate matter and PM<E T="52">10</E>?</SUBJECT>
            <SECTNO>63.9914</SECTNO>
            <SUBJECT>What test methods and other procedures must I use to demonstrate initial compliance with chlorine and hydrochloric acid emission limits?</SUBJECT>
            <SECTNO>63.9915</SECTNO>
            <SUBJECT>What test methods and other procedures must I use to demonstrate initial compliance with dioxin/furan emission limits?</SUBJECT>
            <SECTNO>63.9916</SECTNO>
            <SUBJECT>What test methods and other procedures must I use to establish and demonstrate initial compliance with the operating limits?</SUBJECT>
            <SECTNO>63.9917</SECTNO>
            <SUBJECT>How do I demonstrate initial compliance with the emission limitations and work practice standards that apply to me?</SUBJECT>
            <SECTNO>63.9918</SECTNO>
            <SUBJECT>How do I demonstrate initial compliance with the operation and maintenance requirements that apply to me?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Continuous Compliance Requirements</HD>
            <SECTNO>63.9920</SECTNO>
            <SUBJECT>What are my monitoring requirements?<PRTPAGE P="9"/>
            </SUBJECT>
            <SECTNO>63.9921</SECTNO>
            <SUBJECT>What are the installation, operation, and maintenance requirements for my monitors?</SUBJECT>
            <SECTNO>63.9922</SECTNO>
            <SUBJECT>How do I monitor and collect data to demonstrate continuous compliance?</SUBJECT>
            <SECTNO>63.9923</SECTNO>
            <SUBJECT>How do I demonstrate continuous compliance with the emission limitations and work practice standards that apply to me?</SUBJECT>
            <SECTNO>63.9924</SECTNO>
            <SUBJECT>How do I demonstrate continuous compliance with the operation and maintenance requirements that apply to me?</SUBJECT>
            <SECTNO>63.9925</SECTNO>
            <SUBJECT>What other requirements must I meet to demonstrate continuous compliance?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Notifications, Reports, and Records</HD>
            <SECTNO>63.9930</SECTNO>
            <SUBJECT>What notifications must I submit and when?</SUBJECT>
            <SECTNO>63.9931</SECTNO>
            <SUBJECT>What reports must I submit and when?</SUBJECT>
            <SECTNO>63.9932</SECTNO>
            <SUBJECT>What records must I keep?</SUBJECT>
            <SECTNO>63.9933</SECTNO>
            <SUBJECT>In what form and how long must I keep my records?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.9940</SECTNO>
            <SUBJECT>What parts of the General Provisions apply to me?</SUBJECT>
            <SECTNO>63.9941</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <SECTNO>63.9942</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <APP>Table 1 to Subpart TTTTT of Part 63—Emission Limits</APP>
            <APP>Table 2 to Subpart TTTTT of Part 63—Toxic Equivalency Factors</APP>
            <APP>Table 3 to Subpart TTTTT of Part 63—Initial Compliance with Emission Limits</APP>
            <APP>Table 4 to Subpart TTTTT of Part 63—Continuous Compliance with Emission Limits</APP>
            <APP>Table 5 to Subpart TTTTT of Part 63—Applicability of General Provisions to Subpart TTTTT of Part 63</APP>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <RESERVED>Subparts UUUUU-VVVVV [Reserved]</RESERVED>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart WWWWW—National Emission Standards for Hospital Ethylene Oxide Sterilizers</HD>
          <SUBJGRP>
            <HD SOURCE="HED">Applicability and Compliance Dates</HD>
            <SECTNO>63.10382</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <SECTNO>63.10384</SECTNO>
            <SUBJECT>What are my compliance dates?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Standards</HD>
            <SECTNO>63.10390</SECTNO>
            <SUBJECT>What management practice standards must I meet?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Initial Compliance Requirements</HD>
            <SECTNO>63.10400</SECTNO>
            <SUBJECT>How do I demonstrate initial compliance?</SUBJECT>
            <SECTNO>63.10402</SECTNO>
            <SUBJECT>By what date must I demonstrate initial compliance?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Monitoring—Continuous Compliance Requirements</HD>
            <SECTNO>63.10420</SECTNO>
            <SUBJECT>How do I demonstrate continuous compliance with the management practice requirements?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Notifications, Reports, and Records</HD>
            <SECTNO>63.10430</SECTNO>
            <SUBJECT>What notifications must I submit and by when?</SUBJECT>
            <SECTNO>63.10432</SECTNO>
            <SUBJECT>What records must I keep?</SUBJECT>
            <SECTNO>63.10434</SECTNO>
            <SUBJECT>In what form and for how long must I keep my records?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.10440</SECTNO>
            <SUBJECT>What parts of the General Provisions apply to me?</SUBJECT>
            <SECTNO>63.10442</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <SECTNO>63.10446</SECTNO>
            <SUBJECT>Do title V permitting requirements apply to area sources subject to this subpart?</SUBJECT>
            <SECTNO>63.10448</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <APP>Table 1 to Subpart WWWWW of Part 63—Applicability of General Provisions to Subpart WWWWW</APP>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <RESERVED>Subpart XXXXX [Reserved]</RESERVED>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart YYYYY—National Emission Standards for Hazardous Air Pollutants for Area Sources: Electric Arc Furnace Steelmaking Facilities</HD>
          <SUBJGRP>
            <HD SOURCE="HED">Applicability and Compliance Dates</HD>
            <SECTNO>63.10680</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <SECTNO>63.10681</SECTNO>
            <SUBJECT>What are my compliance dates?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Standards and Compliance Requirements</HD>
            <SECTNO>63.10685</SECTNO>
            <SUBJECT>What are the requirements for the control of contaminants from scrap?</SUBJECT>
            <SECTNO>63.10686</SECTNO>
            <SUBJECT>What are the requirements for electric arc furnaces and argon-oxygen decarburization vessels?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Information and Requirements</HD>
            <SECTNO>63.10690</SECTNO>
            <SUBJECT>What parts of the General Provisions apply to this subpart??</SUBJECT>
            <SECTNO>63.10691</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <SECTNO>63.10692</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <APP>Table 1 to Subpart YYYYY of Part 63—Applicability of General Provisions to Subpart YYYYY</APP>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart ZZZZZ—National Emission Standards for Hazardous Air Pollutants for Iron and Steel Foundries Area Sources</HD>
          <SUBJGRP>
            <HD SOURCE="HED">Applicability and Compliance Dates</HD>
            <SECTNO>63.10880</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <SECTNO>63.10881</SECTNO>
            <SUBJECT>What are my compliance dates?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <PRTPAGE P="10"/>
            <HD SOURCE="HED">Pollution Prevention Management Practices for New and Existing Affected Sources</HD>
            <SECTNO>63.10885</SECTNO>
            <SUBJECT>What are my management practices for metallic scrap and mercury switches?</SUBJECT>
            <SECTNO>63.10886</SECTNO>
            <SUBJECT>What are my management practices for binder formulations?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Requirements for New and Existing Affected Sources Classified as Small Foundries</HD>
            <SECTNO>63.10890</SECTNO>
            <SUBJECT>What are my management practices and compliance requirements?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Requirements for New and Existing Affected Sources Classified as Large Foundries</HD>
            <SECTNO>63.10895</SECTNO>
            <SUBJECT>What are my standards and management practices?</SUBJECT>
            <SECTNO>63.10896</SECTNO>
            <SUBJECT>What are my operation and maintenance requirements?</SUBJECT>
            <SECTNO>63.10897</SECTNO>
            <SUBJECT>What are my monitoring requirements?</SUBJECT>
            <SECTNO>63.10898</SECTNO>
            <SUBJECT>What are my performance test requirements?</SUBJECT>
            <SECTNO>63.10899</SECTNO>
            <SUBJECT>What are my recordkeeping and reporting requirements?</SUBJECT>
            <SECTNO>63.10900</SECTNO>
            <SUBJECT>What parts of the General Provisions apply to my large foundry?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.10905</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <SECTNO>63.10906</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <APP>Table 1 to Subpart ZZZZZ of Part 63—Performance Test Requirements for New and Existing Affected Sources Classified as Large Foundries</APP>
            <APP>Table 2 to Subpart ZZZZZ of Part 63—Procedures for Establishing Operating Limits for New Affected Sources Classified as Large Foundries</APP>
            <APP>Table 3 to Subpart ZZZZZ of Part 63—Applicability of General Provisions to New and Existing Affected Sources Classified as Large Foundries</APP>
            <APP>Table 4 to Subpart ZZZZZ of Part 63—Compliance Certifications for New and Existing Affected Sources Classified as Large Iron and Steel Foundries</APP>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <RESERVED>Subpart AAAAAA [Reserved]</RESERVED>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart BBBBBB—National Emission Standards for Hazardous Air Pollutants for Source Category: Gasoline Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities</HD>
          <SUBJGRP>
            <HD SOURCE="HED">What This Subpart Covers</HD>
            <SECTNO>63.11080</SECTNO>
            <SUBJECT>What is the purpose of this subpart?</SUBJECT>
            <SECTNO>63.11081</SECTNO>
            <SUBJECT>Am I subject to the requirements in this subpart?</SUBJECT>
            <SECTNO>63.11082</SECTNO>
            <SUBJECT>What parts of my affected source does this subpart cover?</SUBJECT>
            <SECTNO>63.11083</SECTNO>
            <SUBJECT>When do I have to comply with this subpart?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Emission Limitations and Management Practices</HD>
            <SECTNO>63.11085</SECTNO>
            <SUBJECT>What are my general duties to minimize emissions?</SUBJECT>
            <SECTNO>63.11086</SECTNO>
            <SUBJECT>What requirements must I meet if my facility is a bulk gasoline plant?</SUBJECT>
            <SECTNO>63.11087</SECTNO>
            <SUBJECT>What requirements must I meet for gasoline storage tanks if my facility is a bulk gasoline terminal, pipeline breakout station, or pipeline pumping station?</SUBJECT>
            <SECTNO>63.11088</SECTNO>
            <SUBJECT>What requirements must I meet for gasoline loading racks if my facility is a bulk gasoline terminal, pipeline breakout station, or pipeline pumping station?</SUBJECT>
            <SECTNO>63.11089</SECTNO>
            <SUBJECT>What requirements must I meet for equipment leak inspections if my facility is a bulk gasoline terminal, pipeline breakout station, or pipeline pumping station?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Testing and Monitoring Requirements</HD>
            <SECTNO>63.11092</SECTNO>
            <SUBJECT>What testing and monitoring requirements must I meet?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Notification, Records, and Reports</HD>
            <SECTNO>63.11093</SECTNO>
            <SUBJECT>What notifications must I submit and when?</SUBJECT>
            <SECTNO>63.11094</SECTNO>
            <SUBJECT>What are my recordkeeping requirements?</SUBJECT>
            <SECTNO>63.11095</SECTNO>
            <SUBJECT>What are my reporting requirements?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.11098</SECTNO>
            <SUBJECT>What parts of the General Provisions apply to me?</SUBJECT>
            <SECTNO>63.11099</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <SECTNO>63.11100</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <APP>Table 1 to Subpart BBBBBB of Part 63—Applicability Criteria, Emission Limits, and Management Practices for Storage Tanks</APP>
            <APP>Table 2 to Subpart BBBBBB of Part 63—Applicability Criteria, Emission Limits, and Management Practices for Loading Racks</APP>
            <APP>Table 3 to Subpart BBBBBB of Part 63—Applicability of General Provisions</APP>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart CCCCCC—National Emission Standards for Hazardous Air Pollutants for Source Category: Gasoline Dispensing Facilities</HD>
          <SUBJGRP>
            <HD SOURCE="HED">What This Subpart Covers</HD>
            <SECTNO>63.11110</SECTNO>
            <SUBJECT>What is the purpose of this subpart?</SUBJECT>
            <SECTNO>63.11111</SECTNO>

            <SUBJECT>Am I subject to the requirements in this subpart?<PRTPAGE P="11"/>
            </SUBJECT>
            <SECTNO>63.11112</SECTNO>
            <SUBJECT>What parts of my affected source does this subpart cover?</SUBJECT>
            <SECTNO>63.11113</SECTNO>
            <SUBJECT>When do I have to comply with this subpart?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Emission Limitations and Management Practices</HD>
            <SECTNO>63.11115</SECTNO>
            <SUBJECT>What are my general duties to minimize emissions?</SUBJECT>
            <SECTNO>63.11116</SECTNO>
            <SUBJECT>Requirements for facilities with monthly throughput of less than 10,000 gallons of gasoline.</SUBJECT>
            <SECTNO>63.11117</SECTNO>
            <SUBJECT>Requirements for facilities with monthly throughput of 10,000 gallons of gasoline or more.</SUBJECT>
            <SECTNO>63.11118</SECTNO>
            <SUBJECT>Requirements for facilities with monthly throughput of 100,000 gallons of gasoline or more.</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Testing and Monitoring Requirements</HD>
            <SECTNO>63.11120</SECTNO>
            <SUBJECT>What testing and monitoring requirements must I meet?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Notification, Records, and Reports</HD>
            <SECTNO>63.11124</SECTNO>
            <SUBJECT>What notifications must I submit and when?</SUBJECT>
            <SECTNO>63.11125</SECTNO>
            <SUBJECT>What are my recordkeeping requirements?</SUBJECT>
            <SECTNO>63.11126</SECTNO>
            <SUBJECT>What are my reporting requirements?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.11130</SECTNO>
            <SUBJECT>What parts of the General Provisions apply to me?</SUBJECT>
            <SECTNO>63.11131</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <SECTNO>63.11132</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <APP>Table 1 to Subpart CCCCCC of Part 63—Applicability Criteria and Management Practices for Gasoline Dispensing Facilities with Monthly Throughput of 100,000 Gallons of Gasoline or More</APP>
            <APP>Table 2 to Subpart CCCCCC of Part 63—Applicability Criteria and Management Practices for Gasoline Cargo Tanks Unloading at Gasoline Dispensing Facilities with Monthly Throughput of 100,000 Gallons of Gasoline or More</APP>
            <APP>Table 3 to Subpart CCCCCC of Part 63—Applicability of General Provisions</APP>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart DDDDDD—National Emission Standards for Hazardous Air Pollutants for Polyvinyl Chloride and Copolymers Production Area Sources</HD>
          <SUBJGRP>
            <HD SOURCE="HED">Applicability and Compliance Dates</HD>
            <SECTNO>63.11140</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <SECTNO>63.11141</SECTNO>
            <SUBJECT>What are my compliance dates?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Standards and Compliance Requirements</HD>
            <SECTNO>63.11142</SECTNO>
            <SUBJECT>What are the standards and compliance requirements for new and existing sources?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.11143</SECTNO>
            <SUBJECT>What General Provisions apply to this subpart?</SUBJECT>
            <SECTNO>63.11144</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <SECTNO>63.11145</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart EEEEEE—National Emission Standards for Hazardous Air Pollutants for Primary Copper Smelting Area Sources</HD>
          <SUBJGRP>
            <HD SOURCE="HED">Applicability and Compliance Dates</HD>
            <SECTNO>63.11146</SECTNO>
            <SUBJECT>What are the applicability provisions and compliance dates?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Standards and Compliance Requirements</HD>
            <SECTNO>63.11147</SECTNO>
            <SUBJECT>What are the standards and compliance requirements for existing sources not using batch copper converters?</SUBJECT>
            <SECTNO>63.11148</SECTNO>
            <SUBJECT>What are the standards and compliance requirements for existing sources using batch copper converters?</SUBJECT>
            <SECTNO>63.11149</SECTNO>
            <SUBJECT>What are the standards and compliance requirements for new sources?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.11150</SECTNO>
            <SUBJECT>What General Provisions apply to this subpart?</SUBJECT>
            <SECTNO>63.11151</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <SECTNO>63.11152</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <APP>Table 1 to Subpart EEEEEE of Part 63—Applicability of General Provisions to Subpart EEEEEE</APP>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart FFFFFF—National Emission Standards for Hazardous Air Pollutants for Secondary Copper Smelting Area Sources</HD>
          <SUBJGRP>
            <HD SOURCE="HED">Applicability and Compliance Dates</HD>
            <SECTNO>63.11153</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <SECTNO>63.11154</SECTNO>
            <SUBJECT>What are my compliance dates?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Standards and Compliance Requirements</HD>
            <SECTNO>63.11155</SECTNO>
            <SUBJECT>What are the standards and compliance requirements for new sources?</SUBJECT>
            <SECTNO>63.11156</SECTNO>
            <SUBJECT>[Reserved]</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.11157</SECTNO>
            <SUBJECT>What General Provisions apply to this subpart?</SUBJECT>
            <SECTNO>63.11158</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <SECTNO>63.11159</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?<PRTPAGE P="12"/>
            </SUBJECT>
            <APP>Table 1 to Subpart FFFFFF of Part 63—Applicability of General Provisions to Subpart FFFFFF</APP>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart GGGGGG—National Emission Standards for Hazardous Air Pollutants for Primary Nonferrous Metals Area Sources—Zinc, Cadmium, and Beryllium</HD>
          <SUBJGRP>
            <HD SOURCE="HED">Applicability and Compliance Dates</HD>
            <SECTNO>63.11160</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <SECTNO>63.11161</SECTNO>
            <SUBJECT>What are my compliance dates?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Primary Zinc Production Facilities</HD>
            <SECTNO>63.11162</SECTNO>
            <SUBJECT>What are the standards and compliance requirements for existing sources?</SUBJECT>
            <SECTNO>63.11163</SECTNO>
            <SUBJECT>What are the standards and compliance requirements for new sources?</SUBJECT>
            <SECTNO>63.11164</SECTNO>
            <SUBJECT>What General Provisions apply to primary zinc production facilities?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Primary Beryllium Production Facilities</HD>
            <SECTNO>63.11165</SECTNO>
            <SUBJECT>What are the standards and compliance requirements for new and existing sources?</SUBJECT>
            <SECTNO>63.11166</SECTNO>
            <SUBJECT>What General Provisions apply to primary beryllium production facilities?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.11167</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <SECTNO>63.11168</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <APP>Table 1 to Subpart GGGGGG of Part 63—Applicability of General Provisions to Primary Zinc Production Area Sources</APP>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart HHHHHH—National Emission Standards for Hazardous Air Pollutants: Paint Stripping and Miscellaneous Surface Coating Operations at Area Sources</HD>
          <SUBJGRP>
            <HD SOURCE="HED">What This Subpart Covers</HD>
            <SECTNO>63.11169</SECTNO>
            <SUBJECT>What is the purpose of this subpart?</SUBJECT>
            <SECTNO>63.11170</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <SECTNO>63.11171</SECTNO>
            <SUBJECT>How do I know if my source is considered a new source or an existing source?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">General Compliance Requirements</HD>
            <SECTNO>63.11172</SECTNO>
            <SUBJECT>When do I have to comply with this subpart?</SUBJECT>
            <SECTNO>63.11173</SECTNO>
            <SUBJECT>What are my general requirements for complying with this subpart?</SUBJECT>
            <SECTNO>63.11174</SECTNO>
            <SUBJECT>What parts of the General Provisions apply to me?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Notifications, Reports, and Records</HD>
            <SECTNO>63.11175</SECTNO>
            <SUBJECT>What notifications must I submit?</SUBJECT>
            <SECTNO>63.11176</SECTNO>
            <SUBJECT>What reports must I submit?</SUBJECT>
            <SECTNO>63.11177</SECTNO>
            <SUBJECT>What records must I keep?</SUBJECT>
            <SECTNO>63.11178</SECTNO>
            <SUBJECT>In what form and for how long must I keep my records?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.11179</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <SECTNO>63.11180</SECTNO>
            <SUBJECT>What definitions do I need to know?</SUBJECT>
            <APP>Table 1 to Subpart HHHHHH of Part 63—Applicability of General Provisions to Subpart HHHHHH of Part 63</APP>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <RESERVED>Subpart IIIIII [Reserved]</RESERVED>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart JJJJJJ—National Emission Standards for Hazardous Air Pollutants for Industrial, Commercial, and Institutional Boilers Area Sources</HD>
          <SUBJGRP>
            <HD SOURCE="HED">What This Subpart Covers</HD>
            <SECTNO>63.11193</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <SECTNO>63.11194</SECTNO>
            <SUBJECT>What is the affected source of this subpart?</SUBJECT>
            <SECTNO>63.11195</SECTNO>
            <SUBJECT>Are any boilers not subject to this subpart?</SUBJECT>
            <SECTNO>63.11196</SECTNO>
            <SUBJECT>What are my compliance dates?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Emission Limits, Work Practice Standards, Emission Reduction Measures, and Management Practices</HD>
            <SECTNO>63.11200</SECTNO>
            <SUBJECT>What are the subcategories of boilers?</SUBJECT>
            <SECTNO>63.11201</SECTNO>
            <SUBJECT>What standards must I meet?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">General Compliance Requirements</HD>
            <SECTNO>63.11205</SECTNO>
            <SUBJECT>What are my general requirements for complying with this subpart?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Initial Compliance Requirements</HD>
            <SECTNO>63.11210</SECTNO>
            <SUBJECT>What are my initial compliance requirements and by what date must I conduct them?</SUBJECT>
            <SECTNO>63.11211</SECTNO>
            <SUBJECT>How do I demonstrate initial compliance with the emission limits?</SUBJECT>
            <SECTNO>63.11212</SECTNO>
            <SUBJECT>What stack tests and procedures must I use for the performance tests?</SUBJECT>
            <SECTNO>63.11213</SECTNO>
            <SUBJECT>What fuel analyses and procedures must I use for the performance tests?</SUBJECT>
            <SECTNO>63.11214</SECTNO>
            <SUBJECT>How do I demonstrate initial compliance with the work practice standard, emission reduction measures, and management practice?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Continuous Compliance Requirements</HD>
            <SECTNO>63.11220</SECTNO>
            <SUBJECT>When must I conduct subsequent performance tests?</SUBJECT>
            <SECTNO>63.11221</SECTNO>
            <SUBJECT>How do I monitor and collect data to demonstrate continuous compliance?</SUBJECT>
            <SECTNO>63.11222</SECTNO>
            <SUBJECT>How do I demonstrate continuous compliance with the emission limits?</SUBJECT>
            <SECTNO>63.11223</SECTNO>
            <SUBJECT>How do I demonstrate continuous compliance with the work practice and management practice standards?</SUBJECT>
            <SECTNO>63.11224</SECTNO>
            <SUBJECT>What are my monitoring, installation, operation, and maintenance requirements?</SUBJECT>
            <SECTNO>63.11225</SECTNO>

            <SUBJECT>What are my notification, reporting, and recordkeeping requirements?<PRTPAGE P="13"/>
            </SUBJECT>
            <SECTNO>63.11226</SECTNO>
            <SUBJECT>How can I assert an affirmative defense if I exceed an emission limit during a malfunction?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.11235</SECTNO>
            <SUBJECT>What parts of the General Provisions apply to me?</SUBJECT>
            <SECTNO>63.11236</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <SECTNO>63.11237</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <APP>Table 1 to Subpart JJJJJJ of Part 63—Emission Limits</APP>
            <APP>Table 2 to Subpart JJJJJJ of Part 63—Work Practice Standards, Emission Reduction Measures, and Management Practices</APP>
            <APP>Table 3 to Subpart JJJJJJ of Part 63—Operating Limits for Boilers With Emission Limits</APP>
            <APP>Table 4 to Subpart JJJJJJ of Part 63—Performance (Stack) Testing Requirements</APP>
            <APP>Table 5 to Subpart JJJJJJ of Part 63—Fuel Analysis Requirements</APP>
            <APP>Table 6 to Subpart JJJJJJ of Part 63—Establishing Operating Limit</APP>
            <APP>Table 7 to Subpart JJJJJJ of Part 63—Demonstrating Continuous Compliance</APP>
            <APP>Table 8 to Subpart JJJJJJ of Part 63—Applicability of General Provisions to Subpart JJJJJJ</APP>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <RESERVED>Subpart KKKKKK [Reserved]</RESERVED>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart LLLLLL—National Emission Standards for Hazardous Air Pollutants for Acrylic and Modacrylic Fibers Production Area Sources</HD>
          <SUBJGRP>
            <HD SOURCE="HED">Applicability and Compliance Dates</HD>
            <SECTNO>63.11393</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <SECTNO>63.11394</SECTNO>
            <SUBJECT>What are my compliance dates?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Standards and Compliance Requirements</HD>
            <SECTNO>63.11395</SECTNO>
            <SUBJECT>What are the standards and compliance requirements for existing sources?</SUBJECT>
            <SECTNO>63.11396</SECTNO>
            <SUBJECT>What are the standards and compliance requirements for new sources?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.11397</SECTNO>
            <SUBJECT>What General Provisions apply to this subpart?</SUBJECT>
            <SECTNO>63.11398</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <SECTNO>63.11399</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <APP>Table 1 to Subpart LLLLLL of Part 63—Applicability of General Provisions to Subpart LLLLLL</APP>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart MMMMMM—National Emission Standards for Hazardous Air Pollutants for Carbon Black Production Area Sources</HD>
          <SUBJGRP>
            <HD SOURCE="HED">Applicability and Compliance Dates</HD>
            <SECTNO>63.11400</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <SECTNO>63.11401</SECTNO>
            <SUBJECT>What are my compliance dates?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Standards and Compliance Requirements</HD>
            <SECTNO>63.11402</SECTNO>
            <SUBJECT>What are the standards and compliance requirements for new and existing sources?</SUBJECT>
            <SECTNO>63.11403</SECTNO>
            <SUBJECT>[Reserved]</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.11404</SECTNO>
            <SUBJECT>What General Provisions apply to this subpart?</SUBJECT>
            <SECTNO>63.11405</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <SECTNO>63.11406</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart NNNNNN—National Emission Standards for Hazardous Air Pollutants for Chemical Manufacturing Area Sources: Chromium Compounds</HD>
          <SUBJGRP>
            <HD SOURCE="HED">Applicability and Compliance Dates</HD>
            <SECTNO>63.11407</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <SECTNO>63.11408</SECTNO>
            <SUBJECT>What are my compliance dates?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Standards and Compliance Requirements</HD>
            <SECTNO>63.11409</SECTNO>
            <SUBJECT>What are the standards?</SUBJECT>
            <SECTNO>63.11410</SECTNO>
            <SUBJECT>What are the compliance requirements?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.11411</SECTNO>
            <SUBJECT>What General Provisions apply to this subpart?</SUBJECT>
            <SECTNO>63.11412</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <SECTNO>63.11413</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <APP>Table 1 to Subpart NNNNNN of Part 63—HAP Emissions Units</APP>
            <APP>Table 2 to Subpart NNNNNN of Part 63—Applicability of General Provisions to Subpart NNNNNN</APP>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart OOOOOO—National Emission Standards for Hazardous Air Pollutants for Flexible Polyurethane Foam Production and Fabrication Area Sources</HD>
          <SUBJGRP>
            <HD SOURCE="HED">Applicability and Compliance Dates</HD>
            <SECTNO>63.11414</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <SECTNO>63.11415</SECTNO>
            <SUBJECT>What are my compliance dates?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <PRTPAGE P="14"/>
            <HD SOURCE="HED">Standards and Compliance Requirements</HD>
            <SECTNO>63.11416</SECTNO>
            <SUBJECT>What are the standards for new and existing sources?</SUBJECT>
            <SECTNO>63.11417</SECTNO>
            <SUBJECT>What are the compliance requirements for new and existing sources?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.11418</SECTNO>
            <SUBJECT>What General Provisions apply to this subpart?</SUBJECT>
            <SECTNO>63.11419</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <SECTNO>63.11420</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <APP>Table 1 to Subpart OOOOOO of Part 63—Applicability of General Provisions to Subpart OOOOOO</APP>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart PPPPPP—National Emission Standards for Hazardous Air Pollutants for Lead Acid Battery Manufacturing Area Sources</HD>
          <SUBJGRP>
            <HD SOURCE="HED">Applicability and Compliance Dates</HD>
            <SECTNO>63.11421</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <SECTNO>63.11422</SECTNO>
            <SUBJECT>What are my compliance dates?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Standards and Compliance Requirements</HD>
            <SECTNO>63.11423</SECTNO>
            <SUBJECT>What are the standards and compliance requirements for new and existing sources?</SUBJECT>
            <SECTNO>63.11424</SECTNO>
            <SUBJECT>[Reserved]</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.11425</SECTNO>
            <SUBJECT>What General Provisions apply to this subpart?</SUBJECT>
            <SECTNO>63.11426</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <SECTNO>63.11427</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <APP>Table 1 to Subpart PPPPPPP of Part 63—Applicability of General Provisions to Subpart PPPPPP</APP>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart QQQQQQ—National Emission Standards for Hazardous Air Pollutants for Wood Preserving Area Sources</HD>
          <SUBJGRP>
            <HD SOURCE="HED">Applicability and Compliance Dates</HD>
            <SECTNO>63.11428</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <SECTNO>63.11429</SECTNO>
            <SUBJECT>What are my compliance dates?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Standards</HD>
            <SECTNO>63.11430</SECTNO>
            <SUBJECT>What are the standards?</SUBJECT>
            <SECTNO>63.11431</SECTNO>
            <SUBJECT>[Reserved]</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.11432</SECTNO>
            <SUBJECT>What General Provisions apply to this subpart?</SUBJECT>
            <SECTNO>63.11433</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <SECTNO>63.11434</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <APP>Table 1 to Subpart QQQQQQ of Part 63—Applicability of General Provisions of Subpart QQQQQQ</APP>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart RRRRRR—National Emission Standards for Hazardous Air Pollutants for Clay Ceramics Manufacturing Area Sources</HD>
          <SUBJGRP>
            <HD SOURCE="HED">Applicability and Compliance Dates</HD>
            <SECTNO>63.11435</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <SECTNO>63.11436</SECTNO>
            <SUBJECT>What parts of my plant does this subpart cover?</SUBJECT>
            <SECTNO>63.11437</SECTNO>
            <SUBJECT>What are my compliance dates?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Standards, Compliance, and Monitoring Requirements</HD>
            <SECTNO>63.11438</SECTNO>
            <SUBJECT>What are the standards for new and existing sources?</SUBJECT>
            <SECTNO>63.11439</SECTNO>
            <SUBJECT>What are the initial compliance demonstration requirements for new and existing sources?</SUBJECT>
            <SECTNO>63.11440</SECTNO>
            <SUBJECT>What are the monitoring requirements for new and existing sources?</SUBJECT>
            <SECTNO>63.11441</SECTNO>
            <SUBJECT>What are the notification requirements?</SUBJECT>
            <SECTNO>63.11442</SECTNO>
            <SUBJECT>What are the recordkeeping requirements?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.11443</SECTNO>
            <SUBJECT>What General Provisions apply to this subpart?</SUBJECT>
            <SECTNO>63.11444</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <SECTNO>63.11445</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <SECTNO>63.11446—63.11447</SECTNO>
            <SUBJECT>[Reserved]</SUBJECT>
            <APP>Table 1 to Subpart RRRRRR of Part 63—Applicability of General Provisions to Subpart RRRRRR</APP>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart SSSSSS—National Emission Standards for Hazardous Air Pollutants for Glass Manufacturing Area Sources</HD>
          <SUBJGRP>
            <HD SOURCE="HED">Applicability and Compliance Dates</HD>
            <SECTNO>63.11448</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <SECTNO>63.11449</SECTNO>
            <SUBJECT>What parts of my plant does this subpart cover?</SUBJECT>
            <SECTNO>63.11450</SECTNO>
            <SUBJECT>What are my compliance dates?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Standards, Compliance, and Monitoring Requirements</HD>
            <SECTNO>63.11451</SECTNO>
            <SUBJECT>What are the standards for new and existing sources?</SUBJECT>
            <SECTNO>63.11452</SECTNO>
            <SUBJECT>What are the performance test requirements for new and existing sources?</SUBJECT>
            <SECTNO>63.11453</SECTNO>
            <SUBJECT>What are the initial compliance demonstration requirements for new and existing sources?</SUBJECT>
            <SECTNO>63.11454</SECTNO>
            <SUBJECT>What are the monitoring requirements for new and existing sources?</SUBJECT>
            <SECTNO>63.11455</SECTNO>
            <SUBJECT>What are the continuous compliance requirements for new and existing sources?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <PRTPAGE P="15"/>
            <HD SOURCE="HED">Notifications and Records</HD>
            <SECTNO>63.11456</SECTNO>
            <SUBJECT>What are the notification requirements?</SUBJECT>
            <SECTNO>63.11457</SECTNO>
            <SUBJECT>What are the recordkeeping requirements?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.11458</SECTNO>
            <SUBJECT>What General Provisions apply to this subpart?</SUBJECT>
            <SECTNO>63.11459</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <SECTNO>63.11460</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <SECTNO>63.11461</SECTNO>
            <SUBJECT>[Reserved]</SUBJECT>
            <APP>Table 1 to Subpart SSSSSS of Part 63—Emission Limits</APP>
            <APP>Table 2 to Subpart SSSSSS of Part 63—Applicability of General Provisions to Subpart SSSSSS</APP>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart TTTTTT—National Emission Standards for Hazardous Air Pollutants for Secondary Nonferrous Metals Processing Area Sources</HD>
          <SUBJGRP>
            <HD SOURCE="HED">Applicability and Compliance Dates</HD>
            <SECTNO>63.11462</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <SECTNO>63.11463</SECTNO>
            <SUBJECT>What parts of my plant does this subpart cover?</SUBJECT>
            <SECTNO>63.11464</SECTNO>
            <SUBJECT>What are my compliance dates?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Standards, Compliance, and Monitoring Requirements</HD>
            <SECTNO>63.11465</SECTNO>
            <SUBJECT>What are the standards for new and existing sources?</SUBJECT>
            <SECTNO>63.11466</SECTNO>
            <SUBJECT>What are the performance test requirements for new and existing sources?</SUBJECT>
            <SECTNO>63.11467</SECTNO>
            <SUBJECT>What are the initial compliance demonstration requirements for new and existing sources?</SUBJECT>
            <SECTNO>63.11468</SECTNO>
            <SUBJECT>What are the monitoring requirements for new and existing sources?</SUBJECT>
            <SECTNO>63.11469</SECTNO>
            <SUBJECT>What are the notification requirements?</SUBJECT>
            <SECTNO>63.11470</SECTNO>
            <SUBJECT>What are the recordkeeping requirements?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.11471</SECTNO>
            <SUBJECT>What General Provisions apply to this subpart?</SUBJECT>
            <SECTNO>63.11472</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <SECTNO>63.11473</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <SECTNO>63.11474</SECTNO>
            <SUBJECT>[Reserved]</SUBJECT>
            <APP>Table 1 to Subpart TTTTTT of Part 63—Applicability of General Provisions to Subpart TTTTTT</APP>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <RESERVED>Subpart UUUUUU [Reserved]</RESERVED>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart VVVVVV—National Emission Standards for Hazardous Air Pollutants for Chemical Manufacturing Area Sources</HD>
          <SUBJGRP>
            <HD SOURCE="HED">Applicability and Compliance Dates</HD>
            <SECTNO>63.11494</SECTNO>
            <SUBJECT>What are the applicability requirements and compliance dates?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Standards and Compliance Requirements</HD>
            <SECTNO>63.11495</SECTNO>
            <SUBJECT>What are the management practices and other requirements?</SUBJECT>
            <SECTNO>63.11496</SECTNO>
            <SUBJECT>What are the standards and compliance requirements for process vents?</SUBJECT>
            <SECTNO>63.11497</SECTNO>
            <SUBJECT>What are the standards and compliance requirements for storage tanks?</SUBJECT>
            <SECTNO>63.11498</SECTNO>
            <SUBJECT>What are the standards and compliance requirements for wastewater systems?</SUBJECT>
            <SECTNO>63.11499</SECTNO>
            <SUBJECT>What are the standards and compliance requirements for heat exchange systems?</SUBJECT>
            <SECTNO>63.11500</SECTNO>
            <SUBJECT>What compliance options do I have if part of my plant is subject to both this subpart and another Federal standard?</SUBJECT>
            <SECTNO>63.11501</SECTNO>
            <SUBJECT>What are the notification, recordkeeping, and reporting requirements?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.11502</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <SECTNO>63.11503</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <APP>Table 1 to Subpart VVVVVV of Part 63—Hazardous Air Pollutants Used to Determine Applicability of Chemical Manufacturing Operations</APP>
            <APP>Table 2 to Subpart VVVVVV of Part 63—Emission Limits and Compliance Requirements for Batch Process Vents</APP>
            <APP>Table 3 to Subpart VVVVVV of Part 63—Emission Limits and Compliance Requirements for Continuous Process Vents</APP>
            <APP>Table 4 to Subpart VVVVVV of Part 63—Emission Limits and Compliance Requirements for Metal HAP Process Vents</APP>
            <APP>Table 5 to Subpart VVVVVV of Part 63—Emission Limits and Compliance Requirements for Storage Tanks</APP>
            <APP>Table 6 to Subpart VVVVVV of Part 63—Emission Limits and Compliance Requirements for Wastewater Systems</APP>
            <APP>Table 7 to subpart VVVVVV of Part 63—Partially Soluble HAP</APP>

            <APP>Table 8 to Subpart VVVVVV of Part 63—Emission Limits and Compliance Requirements for Heat Exchange Systems<PRTPAGE P="16"/>
            </APP>
            <APP>Table 9 to Subpart VVVVVV of Part 63—Applicability of General Provisions to Subpart VVVVVV</APP>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart WWWWWW—National Emission Standards for Hazardous Air Pollutants: Area Source Standards for Plating and Polishing Operations</HD>
          <SUBJGRP>
            <HD SOURCE="HED">Applicability and Compliance Dates</HD>
            <SECTNO>63.11504</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <SECTNO>63.11505</SECTNO>
            <SUBJECT>What parts of my plant does this subpart cover?</SUBJECT>
            <SECTNO>63.11506</SECTNO>
            <SUBJECT>What are my compliance dates?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Standards and Compliance Requirements</HD>
            <SECTNO>63.11507</SECTNO>
            <SUBJECT>What are my standards and management practices?</SUBJECT>
            <SECTNO>63.11508</SECTNO>
            <SUBJECT>What are my compliance requirements?</SUBJECT>
            <SECTNO>63.11509</SECTNO>
            <SUBJECT>What are my notification, reporting, and recordkeeping requirements?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.11510</SECTNO>
            <SUBJECT>What General Provisions apply to this subpart?</SUBJECT>
            <SECTNO>63.11511</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <SECTNO>63.11512</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <SECTNO>63.11513</SECTNO>
            <SUBJECT>[Reserved]</SUBJECT>
            <APP>Table 1 to Subpart WWWWWW of Part 63—Applicability of General Provisions to Plating and Polishing Area Sources</APP>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart XXXXXX—National Emission Standards for Hazardous Air Pollutants Area Source Standards for Nine Metal Fabrication and Finishing Source Categories</HD>
          <SUBJGRP>
            <HD SOURCE="HED">Applicability and Compliance Dates</HD>
            <SECTNO>63.11514</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <SECTNO>63.11515</SECTNO>
            <SUBJECT>What are my compliance dates?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Standards and Compliance Requirements</HD>
            <SECTNO>63.11516</SECTNO>
            <SUBJECT>What are my standards and management practices?</SUBJECT>
            <SECTNO>63.11517</SECTNO>
            <SUBJECT>What are my monitoring requirements?</SUBJECT>
            <SECTNO>63.11518</SECTNO>
            <SUBJECT>[Reserved]</SUBJECT>
            <SECTNO>63.11519</SECTNO>
            <SUBJECT>What are my notification, recordkeeping, and reporting requirements?</SUBJECT>
            <SECTNO>63.11520</SECTNO>
            <SUBJECT>[Reserved]</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.11521</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <SECTNO>63.11522</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <SECTNO>63.11523</SECTNO>
            <SUBJECT>What General Provisions apply to this subpart?</SUBJECT>
            <APP>Table 1 to Subpart XXXXXX of Part 63—Description of Source Categories Affected by This Subpart</APP>
            <APP>Table 2 to Subpart XXXXXX of Part 63—Applicability of General Provisions to Metal Fabrication or Finishing Area Sources</APP>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart YYYYYY—National Emission Standards for Hazardous Air Pollutants for Area Sources: Ferroalloys Production Facilities</HD>
          <SUBJGRP>
            <HD SOURCE="HED">Applicability and Compliance Dates</HD>
            <SECTNO>63.11524</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <SECTNO>63.11525</SECTNO>
            <SUBJECT>What are my compliance dates?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Standards, Monitoring, and Compliance Requirements</HD>
            <SECTNO>63.11526</SECTNO>
            <SUBJECT>What are the standards for new and existing ferroalloys production facilities?</SUBJECT>
            <SECTNO>63.11527</SECTNO>
            <SUBJECT>What are the monitoring requirements for new and existing sources?</SUBJECT>
            <SECTNO>63.11528</SECTNO>
            <SUBJECT>What are the performance test and compliance requirements for new and existing sources?</SUBJECT>
            <SECTNO>63.11529</SECTNO>
            <SUBJECT>What are the notification, reporting, and recordkeeping requirements?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.11530</SECTNO>
            <SUBJECT>What parts of the General Provisions apply to my facility?</SUBJECT>
            <SECTNO>63.11531</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <SECTNO>63.11532</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <SECTNO>63.11533-63.11543</SECTNO>
            <SUBJECT>[Reserved]</SUBJECT>
            <APP>Table 1 to Subpart YYYYYY of Part 63—Applicability of General Provisions to Subpart YYYYYY</APP>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart ZZZZZZ—National Emission Standards for Hazardous Air Pollutants: Area Source Standards for Aluminum, Copper, and Other Nonferrous Foundries</HD>
          <SUBJGRP>
            <HD SOURCE="HED">Applicability and Compliance Dates</HD>
            <SECTNO>63.11544</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <SECTNO>63.11545</SECTNO>
            <SUBJECT>What are my compliance dates?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Standards and Compliance Requirements</HD>
            <SECTNO>63.11550</SECTNO>
            <SUBJECT>What are my standards and management practices?</SUBJECT>
            <SECTNO>63.11551</SECTNO>
            <SUBJECT>What are my initial compliance requirements?</SUBJECT>
            <SECTNO>63.11552</SECTNO>
            <SUBJECT>What are my monitoring requirements?</SUBJECT>
            <SECTNO>63.11553</SECTNO>
            <SUBJECT>What are my notification, reporting, and recordkeeping requirements?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.11555</SECTNO>
            <SUBJECT>What General Provisions apply to this subpart?</SUBJECT>
            <SECTNO>63.11556</SECTNO>
            <SUBJECT>What definitions apply to this subpart?<PRTPAGE P="17"/>
            </SUBJECT>
            <SECTNO>63.11557</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <SECTNO>63.11558</SECTNO>
            <SUBJECT>[Reserved]</SUBJECT>
            <APP>Table 1 to Subpart ZZZZZZ of Part 63—Applicability of General Provisions to Aluminum, Copper, and Other Nonferrous Foundries Area Sources</APP>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart AAAAAAA—National Emission Standards for Hazardous Air Pollutants for Area Sources: Asphalt Processing and Asphalt Roofing Manufacturing</HD>
          <SUBJGRP>
            <HD SOURCE="HED">Applicability and Compliance Dates</HD>
            <SECHD>Sec.</SECHD>
            <SECTNO>63.11559</SECTNO>
            <SUBJECT>Am I Subject to this subpart?</SUBJECT>
            <SECTNO>63.11560</SECTNO>
            <SUBJECT>What are my compliance dates?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Standards and Compliance Requirements</HD>
            <SECTNO>63.11561</SECTNO>
            <SUBJECT>What are my standards and management practices?</SUBJECT>
            <SECTNO>63.11562</SECTNO>
            <SUBJECT>What are my initial compliance requirements?</SUBJECT>
            <SECTNO>63.11563</SECTNO>
            <SUBJECT>What are my monitoring requirements?</SUBJECT>
            <SECTNO>63.11564</SECTNO>
            <SUBJECT>What are my notification, recordkeeping, and reporting requirements?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.11565</SECTNO>
            <SUBJECT>What general provisions sections apply to this subpart?</SUBJECT>
            <SECTNO>63.11566</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <SECTNO>63.11567</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <APP>Table 1 of Subpart AAAAAAA—Emission Limits for Asphalt Processing (Refining) Operations</APP>
            <APP>Table 2 of Subpart AAAAAAA—Emission Limits for Asphalt Roofing Manufacturing (Coating) Operations</APP>
            <APP>Table 3 of Subpart AAAAAAA—Test Methods</APP>
            <APP>Table 4 of Subpart AAAAAAA—Operating Limits</APP>
            <APP>Table 5 of Subpart AAAAAAA—Applicability of General Provisions to Subpart AAAAAAA</APP>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart BBBBBBB—National Emission Standards for Hazardous Air Pollutants for Area Sources: Chemical Preparations Industry</HD>
          <SUBJGRP>
            <HD SOURCE="HED">Applicability and Compliance Dates</HD>
            <SECTNO>63.11579</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <SECTNO>63.11580</SECTNO>
            <SUBJECT>What are my compliance dates?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Standards and Compliance Requirements</HD>
            <SECTNO>63.11581</SECTNO>
            <SUBJECT>What are my standards?</SUBJECT>
            <SECTNO>63.11582</SECTNO>
            <SUBJECT>What are my compliance requirements?</SUBJECT>
            <SECTNO>63.11583</SECTNO>
            <SUBJECT>What are my monitoring requirements?</SUBJECT>
            <SECTNO>63.11584</SECTNO>
            <SUBJECT>What are my initial and continuous compliance management practice requirements?</SUBJECT>
            <SECTNO>63.11585</SECTNO>
            <SUBJECT>What are my notification, recordkeeping, and reporting requirements?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.11586</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <SECTNO>63.11587</SECTNO>
            <SUBJECT>What General Provisions sections apply to this subpart?</SUBJECT>
            <SECTNO>63.11588</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <APP>Table 1 of Subpart BBBBBBB of Part 63—Emission Reduction and PM Concentration Requirements</APP>
            <APP>Table 2 of Subpart BBBBBBB of Part 63—Initial Compliance Demonstration Methods With the Emission Reduction and PM Concentration Requirements in Table 1</APP>
            <APP>Table 3 of Subpart BBBBBBB of Part 63—Test Methods</APP>
            <APP>Table 4 of Subpart BBBBBBB of Part 63—Continuous Compliance Demonstration Methods With the Emission Reduction and PM Concentration Requirements in Table 1</APP>
            <APP>Table 5 of Subpart BBBBBBB of Part 63—Reporting Requirements</APP>
            <APP>Table 6 of Subpart BBBBBBB of Part 63—General Provisions</APP>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart CCCCCCC—National Emission Standards for Hazardous Air Pollutants for Area Sources: Paints and Allied Products Manufacturing</HD>
          <SUBJGRP>
            <HD SOURCE="HED">Applicability and Compliance Dates</HD>
            <SECTNO>63.11599</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <SECTNO>63.11600</SECTNO>
            <SUBJECT>What are my compliance dates?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Standards, Monitoring, and Compliance Requirements</HD>
            <SECTNO>63.11601</SECTNO>
            <SUBJECT>What are the standards for new and existing paints and allied products manufacturing facilities?</SUBJECT>
            <SECTNO>63.11602</SECTNO>
            <SUBJECT>What are the performance test and compliance requirements for new and existing sources?</SUBJECT>
            <SECTNO>63.11603</SECTNO>
            <SUBJECT>What are the notification, reporting, and recordkeeping requirements?</SUBJECT>
            <SECTNO>63.11604</SECTNO>
            <SUBJECT>[Reserved]</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.11605</SECTNO>
            <SUBJECT>What General Provisions apply to this subpart?</SUBJECT>
            <SECTNO>63.11606</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <SECTNO>63.11607</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <SECTNO>63.11608-63.11628</SECTNO>
            <SUBJECT>[Reserved]<PRTPAGE P="18"/>
            </SUBJECT>
            <APP>Table 1 to Subpart CCCCCCC of Part 63—Applicability of General Provisions to Subpart CCCCCCC</APP>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart DDDDDDD—National Emission Standards for Hazardous Air Pollutants for Area Sources: Prepared Feeds Manufacturing</HD>
          <SUBJGRP>
            <HD SOURCE="HED">Applicability and Compliance Dates</HD>
            <SECTNO>63.11619</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <SECTNO>63.11620</SECTNO>
            <SUBJECT>What are my compliance dates?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Standards, Monitoring, and Compliance Requirements</HD>
            <SECTNO>63.11621</SECTNO>
            <SUBJECT>What are the standards for new and existing prepared feeds manufacturing facilities?</SUBJECT>
            <SECTNO>63.11622</SECTNO>
            <SUBJECT>What are the monitoring requirements for new and existing sources?</SUBJECT>
            <SECTNO>63.11623</SECTNO>
            <SUBJECT>What are the testing requirements?</SUBJECT>
            <SECTNO>63.11624</SECTNO>
            <SUBJECT>What are the notification, reporting, and recordkeeping requirements?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.11625</SECTNO>
            <SUBJECT>What parts of the General Provisions apply to my facility?</SUBJECT>
            <SECTNO>63.11626</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <SECTNO>63.11627</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <SECTNO>63.11628—63.11638</SECTNO>
            <SUBJECT>[Reserved]</SUBJECT>
            <APP>Table 1 to Subpart DDDDDDD of Part 63—Applicability of General Provisions to Prepared Feeds Manufacturing Area Sources</APP>
          </SUBJGRP>
        </SUBPART>
        <SUBPART>
          <HD SOURCE="HED">Subpart EEEEEEE—National Emission Standards for Hazardous Air Pollutants: Gold Mine Ore Processing and Production Area Source Category</HD>
          <SUBJGRP>
            <HD SOURCE="HED">Applicability and Compliance Dates</HD>
            <SECTNO>63.11640</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <SECTNO>63.11641</SECTNO>
            <SUBJECT>What are my compliance dates?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Standards and Compliance Requirements</HD>
            <SECTNO>63.11645</SECTNO>
            <SUBJECT>What are my mercury emission standards?</SUBJECT>
            <SECTNO>63.11646</SECTNO>
            <SUBJECT>What are my compliance requirements?</SUBJECT>
            <SECTNO>63.11647</SECTNO>
            <SUBJECT>What are my monitoring requirements?</SUBJECT>
            <SECTNO>63.11648</SECTNO>
            <SUBJECT>What are my notification, reporting, and recordkeeping requirements?</SUBJECT>
          </SUBJGRP>
          <SUBJGRP>
            <HD SOURCE="HED">Other Requirements and Information</HD>
            <SECTNO>63.11650</SECTNO>
            <SUBJECT>What General Provisions apply to this subpart?</SUBJECT>
            <SECTNO>63.11651</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <SECTNO>63.11652</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <SECTNO>63.11653</SECTNO>
            <SUBJECT>[Reserved]</SUBJECT>
            <APP>Table 1 to Subpart EEEEEEE of Part 63—Applicability of General Provisions to Subpart EEEEEEE</APP>
            <APP>Appendix A to Part 63—Test Methods</APP>
            <APP>Appendix B to Part 63—Sources Defined for Early Reduction Provisions</APP>

            <APP>Appendix C to Part 63—Determination of the Fraction Biodegraded (F<E T="52">bio</E>) in a Biological Treatment Unit</APP>
            <APP>Appendix D to Part 63—Alternative Validation Procedure for EPA Waste and Wastewater Methods</APP>
            <APP>Appendix E to Part 63—Monitoring Procedure for Nonthoroughly Mixed Open Biological Treatment Systems at Kraft Pulp Mills Under Unsafe Sampling Conditions</APP>
          </SUBJGRP>
        </SUBPART>
      </CONTENTS>
      <AUTH>
        <HD SOURCE="HED">Authority:</HD>
        <P>42 U.S.C. 7401 et seq.</P>
      </AUTH>
      <SOURCE>
        <HD SOURCE="HED">Source:</HD>
        <P>57 FR 61992, Dec. 29, 1992, unless otherwise noted.</P>
      </SOURCE>
      <SUBPART>
        <HD SOURCE="HED">Subpart NNNNN—National Emission Standards for Hazardous Air Pollutants: Hydrochloric Acid Production</HD>
        <SOURCE>
          <HD SOURCE="HED">Source:</HD>
          <P>68 FR 19090, Apr. 17, 2003, unless otherwise noted.</P>
        </SOURCE>
        <SUBJGRP>
          <HD SOURCE="HED">What This Subpart Covers</HD>
          <SECTION>
            <SECTNO>§ 63.8980</SECTNO>
            <SUBJECT>What is the purpose of this subpart?</SUBJECT>
            <P>This subpart establishes national emission standards for hazardous air pollutants (NESHAP) and work practice standards for hazardous air pollutants (HAP) emitted from hydrochloric acid (HCl) production. This subpart also establishes requirements to demonstrate initial and continuous compliance with the emission limitations and work practice standards.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.8985</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <P>(a) You are subject to this subpart if you own or operate an HCl production facility that produces a liquid HCl product at a concentration of 30 weight percent or greater during its normal operations and is located at, or is part of, a major source of HAP. This does not include HCl production facilities that only produce occasionally liquid HCl product at a concentration of 30 weight percent or greater.</P>

            <P>(1) An HCl production facility is the collection of unit operations and equipment associated with the production of liquid HCl product. The HCl production <PRTPAGE P="19"/>facility begins at the point where a gaseous stream containing HCl enters the HCl production unit. The HCl production facility includes all HCl storage tanks that contain liquid HCl product that is produced in the HCl production unit, with the exceptions noted in paragraph (a)(2) of this section. The HCl production facility also includes all HCl transfer operations that load HCl product produced in the HCl production unit into a tank truck, rail car, ship, or barge, along with the piping and other equipment in HCl service used to transfer liquid HCl product from the HCl production unit to the HCl storage tanks and/or HCl transfer operations. The HCl production facility ends at the point that the liquid HCl product produced in the HCl production unit is loaded into a tank truck, rail car, ship, or barge, at the point the HCl product enters another process on the plant site, or at the point the HCl product leaves the plant site via pipeline.</P>
            <P>(2) Storage tanks that are dedicated feedstock tanks for another process and storage tanks that store HCl dedicated for use in wastewater treatment are not considered part of an HCl production facility.</P>
            <P>(3) A major source of HAP emissions is any stationary source or group of stationary sources within a contiguous area under common control that emits or has the potential to emit any single HAP at a rate of 9.07 megagrams (10 tons) or more per year or any combination of HAP at a rate of 22.68 megagrams (25 tons) or more per year.</P>
            <P>(b) An HCl production facility is not subject to this subpart if it is also subject to NESHAP under one of the subparts listed in paragraphs (b)(1) through (5) of this section.</P>
            <P>(1) 40 CFR part 63, subpart S, National Emission Standards for Hazardous Air Pollutants from the Pulp and Paper Industry.</P>
            <P>(2) 40 CFR part 63, subpart CCC, National Emission Standards for Hazardous Air Pollutants for Steel Pickling—HCl Process Facilities and Hydrochloric Acid Regeneration Plants.</P>
            <P>(3) 40 CFR part 63, subpart MMM, National Emission Standards for Hazardous Air Pollutants for Pesticide Active Ingredient Production.</P>
            <P>(4) 40 CFR part 63, section 63.994, subpart SS, National Emission Standards for Closed Vent Systems, Control Devices, Recovery Devices and Routing to a Fuel Gas System or a Process.</P>
            <P>(5) 40 CFR part 63, subpart GGG, National Emission Standards for Pharmaceuticals Production.</P>
            <P>(c) An HCl production facility is not subject to this subpart if it is located following the incineration of chlorinated waste gas streams, waste liquids, or solid wastes, and the emissions from the HCl production facility are subject to section 63.113(c), subpart G, National Emission Standards for Organic Hazardous Air Pollutants from the Synthetic Organic Chemical Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and Wastewater.</P>
            <P>(d) An HCl production facility is not subject to this subpart if it produces HCl through the direct synthesis of hydrogen and chlorine and is part of a chlor-alkali facility.</P>
            <P>(e) An HCl production facility is not subject to this subpart if it is a research and development facility.</P>

            <P>(f) An HCl production facility is not subject to this subpart if all of the gaseous streams containing HCl and chlorine (Cl<E T="52">2</E>) from HCl process vents, HCl storage tanks, and HCl transfer operations are recycled or routed to another process prior to being discharged to the atmosphere.</P>
            <CITA>[68 FR 19090, Apr. 17, 2003, as amended at 71 FR 17745, Apr. 7, 2006]</CITA>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.8990</SECTNO>
            <SUBJECT>What parts of my plant does this subpart cover?</SUBJECT>
            <P>(a) This subpart applies to each new, reconstructed, or existing affected source at an HCl production facility.</P>
            <P>(b) The affected source is the group of one or more HCl production facilities at a plant site that are subject to this subpart, and all associated wastewater operations, which contain the collection of emission streams listed in paragraphs (b)(1) through (5) of this section.</P>
            <P>(1) Each emission stream from an HCl process vent.</P>
            <P>(2) Each emission stream from an HCl storage tank.</P>

            <P>(3) Each emission stream from an HCl transfer operation.<PRTPAGE P="20"/>
            </P>
            <P>(4) Each emission stream resulting from leaks from equipment in HCl service.</P>
            <P>(5) Each emission stream from HCl wastewater operations. There are no emission limitations or other requirements in this subpart that apply to HCl wastewater operations.</P>
            <P>(c) An affected source is a new affected source if you commenced construction of the affected source after September 18, 2001 and you met the applicability criteria of § 63.8985 at the time you commenced construction.</P>
            <P>(d) An affected source is reconstructed if you meet the criteria as defined in § 63.2.</P>
            <P>(e) An affected source is existing if it is not new or reconstructed.</P>
            <CITA>[68 FR 19090, Apr. 17, 2003, as amended at 71 FR 17745, Apr. 7, 2006]</CITA>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.8995</SECTNO>
            <SUBJECT>When do I have to comply with this subpart?</SUBJECT>
            <P>(a) If you have a new or reconstructed affected source, you must comply with this subpart according to paragraphs (a)(1) or (2) of this section.</P>
            <P>(1) If you start up your affected source before April 17, 2003, you must comply with the emission limitations and work practice standards in this subpart no later than April 17, 2003.</P>
            <P>(2) If you start up your affected source after April 17, 2003, you must comply with the emission limitations and work practice standards in this subpart upon startup of your affected source.</P>
            <P>(b) If you have an existing affected source, you must comply with the emission limitations and work practice standards no later than 3 years after April 17, 2003.</P>
            <P>(c) If you have an area source that increases its emissions or its potential to emit such that it becomes a major source of HAP, the provisions in paragraphs (c)(1) and (2) of this section apply.</P>
            <P>(1) Any portion of the existing facility that is a new affected source or a new reconstructed source must be in compliance with this subpart upon startup.</P>
            <P>(2) All other parts of the source must be in compliance with this subpart no later than the date 3 years after the area source becomes a major source.</P>
            <P>(d) You must meet the notification requirements in § 63.9045 according to the schedule in § 63.9045 and in subpart A of this part. Some of the notifications must be submitted before you are required to comply with the emission limitations in this subpart.</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Emission Limitations and Work Practice Standards</HD>
          <SECTION>
            <SECTNO>§ 63.9000</SECTNO>
            <SUBJECT>What emission limitations and work practice standards must I meet?</SUBJECT>
            <P>(a) With the exceptions noted in paragraphs (c) and (d) of this section, you must meet the applicable emission limit and work practice standard in table 1 to this subpart for each emission stream listed under § 63.8990(b)(1) through (4) that is part of your affected source.</P>
            <P>(b) With the exceptions noted in paragraph (c) of this section, you must meet the applicable operating limit in Table 2 to this subpart for each emission stream listed under § 63.8990(b)(1) through (3) that is part of your affected source.</P>
            <P>(c) The emission streams listed in paragraphs (c)(1) through (4) of this section are exempt from the emission limitations, work practice standards, and all other requirements of this subpart.</P>
            <P>(1) Emission streams from HCl storage tanks that never store liquid HCl product with a concentration of 30 weight percent or greater.</P>
            <P>(2) Emission streams from HCl transfer operations that never load liquid HCl product with a concentration of 30 weight percent or greater.</P>
            <P>(3) Emission streams from HCl wastewater operations.</P>
            <P>(4) Emission streams from HCl process vents, HCl storage tanks, and HCl transfer operations that are also subject to 40 CFR part 63, subpart EEE, National Emission Standards for Hazardous Air Pollutants for Hazardous Waste Combustors, or 40 CFR 266.107, subpart H, Burning of Hazardous Waste in Boilers and Industrial Furnaces.</P>

            <P>(d) The emission limits for HCl storage tanks in table 1 to this subpart do not apply during periods of planned routine maintenance of HCl storage tank control devices. Periods of planned routine maintenance of each <PRTPAGE P="21"/>HCl storage tank control device, during which the control device does not meet the emission limits specified in table 1 to this subpart, shall not exceed 240 hours per year.</P>
            <CITA>[68 FR 19090, Apr. 17, 2003, as amended at 71 FR 17745, Apr. 7, 2006]</CITA>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">General Compliance Requirements</HD>
          <SECTION>
            <SECTNO>§ 63.9005</SECTNO>
            <SUBJECT>What are my general requirements for complying with this subpart?</SUBJECT>
            <P>(a) You must be in compliance with the emission limitations and work practice standards in this subpart at all times, except during periods of startup, shutdown, and malfunction.</P>
            <P>(b) You must always operate and maintain your affected source, including air pollution control and monitoring equipment, according to the provisions in § 63.6(e)(1)(i).</P>
            <P>(c) You must develop a written startup, shutdown, and malfunction plan according to the provisions in § 63.6(e)(3).</P>
            <P>(d) All monitoring equipment shall be installed, calibrated, maintained, and operated according to manufacturer's specifications or other written procedures that provide adequate assurance that the equipment would reasonably be expected to monitor accurately. For each monitoring system required in this section, you must develop, implement, and submit to the Administrator a site-specific monitoring plan that addresses the installation requirements in paragraphs (d)(1) through (3) of this section, the ongoing procedures in paragraphs (d)(4) through (6) of this section, and the requirements in § 63.9025, as applicable. You must submit the plan with your Notification of Compliance Status. Upon request of the Administrator, you must promptly correct any deficiencies in a site-specific monitoring plan and submit the revised plan.</P>
            <P>(1) Installation of the continuous monitoring system (CMS) sampling probe or other interface at a measurement location relative to each affected process unit such that the measurement is representative of control of the exhaust emissions (e.g., on or downstream of the last control device).</P>
            <P>(2) Performance and equipment specifications for the sample interface, the pollutant concentration or parametric signal analyzer, and the data collection and reduction system.</P>
            <P>(3) Performance evaluation procedures and acceptance criteria (e.g., calibrations).</P>
            <P>(4) Ongoing operation and maintenance (O&amp;M) procedures in accordance with the general requirements of §§ 63.8(c)(1), (3), (4)(ii), (7), and (8), and 63.9025.</P>
            <P>(5) Ongoing data quality assurance procedures in accordance with the general requirements of § 63.8(d).</P>
            <P>(6) Ongoing recordkeeping and reporting procedures in accordance with the general requirements of § 63.10(c) and (e)(1) and (2)(i).</P>
            <CITA>[68 FR 19090, Apr. 17, 2003, as amended at 71 FR 20470, Apr. 20, 2006]</CITA>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Testing and Initial Compliance Requirements</HD>
          <SECTION>
            <SECTNO>§ 63.9010</SECTNO>
            <SUBJECT>By what date must I conduct performance tests?</SUBJECT>
            <P>(a) If you have a new or reconstructed affected source, you must conduct performance tests within 180 calendar days after the compliance date that is specified for your source in § 63.8995(a) and according to the provisions in § 63.7(a)(2).</P>
            <P>(b) If you have an existing affected source, you must conduct performance tests within 180 calendar days after the compliance date that is specified for your existing affected source in § 63.8995(b) and according to the provisions in § 63.7(a)(2).</P>
            <P>(c) If you commenced construction or reconstruction between September 18, 2001 and April 17, 2003, you must demonstrate initial compliance with either the proposed emission limitation or the promulgated emission limitation no later than 180 calendar days after April 17, 2003 or within 180 calendar days after startup of the source, whichever is later, according to § 63.7(a)(2)(ix).</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9015</SECTNO>
            <SUBJECT>When must I conduct subsequent performance tests?</SUBJECT>

            <P>(a) You must conduct all applicable performance tests according to the procedures in § 63.9020 on the earlier of your title V operating permit renewal or within 5 years of issuance of your title V permit. For emission points <PRTPAGE P="22"/>meeting the outlet concentration limits in table 1 to this subpart without the use of a control device, all applicable performance tests must also be conducted whenever process changes are made that could reasonably be expected to increase the outlet concentration. Examples of process changes include, but are not limited to, changes in production capacity, production rate, feedstock type, or catalyst type, or whenever there is replacement, removal, or addition of recovery equipment. For purposes of this paragraph, process changes do not include: process upsets and unintentional, temporary process changes.</P>
            <P>(b) You must report the results of subsequent performance tests within 60 days after the completion of the test. This report should also verify that the operating limits for your affected source have not changed or provide documentation of revised operating limits established as specified in Table 2 to this subpart. The reports for all subsequent performance tests should include all applicable information required in § 63.9050.</P>
            <CITA>[68 FR 19090, Apr. 17, 2003, as amended at 71 FR 17745, Apr. 7, 2006]</CITA>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9020</SECTNO>
            <SUBJECT>What performance tests and other procedures must I use?</SUBJECT>
            <P>(a) You must conduct each performance test in Table 3 to this subpart that applies to you as directed in paragraphs (a)(1) through (4) of this section, except as noted in paragraphs (b) and (c) of this section.</P>
            <P>(1) You must develop a site-specific test plan according to § 63.7(c)(2) and conduct each performance test according to the site-specific test plan.</P>
            <P>(2) You must conduct each performance test under representative conditions according to the requirements in § 63.7(e)(1) and under the specific conditions that this subpart specifies in Table 3.</P>
            <P>(3) You may not conduct performance tests during periods of startup, shutdown, or malfunction, as specified in § 63.7(e)(1).</P>
            <P>(4) You must conduct at least three separate test runs for each performance test required in this section, as specified in § 63.7(e)(3). Each test run must last at least 1 hour.</P>
            <P>(b) If you are complying with a percent reduction emission limitation, you must determine the percent reduction in accordance with paragraphs (b)(1) and (2) of this section.</P>
            <P>(1) Calculate the mass rate of either HCl or chlorine using Equations 1 and 2 of this section:</P>
            <MATH DEEP="35" SPAN="1">
              <MID>ER17AP03.000</MID>
            </MATH>
            <EXTRACT>
              <FP>where:</FP>
              
              <FP SOURCE="FP-1">C<E T="52">i</E>, C<E T="52">o</E> = Concentration of HCl or Cl<E T="52">2</E> in the gas stream at the inlet and outlet of the control device(s), respectively, dry basis, parts per million by volume.</FP>
              <FP SOURCE="FP-1">E<E T="52">i</E>, E<E T="52">o</E> = Mass rate of HCl or Cl<E T="52">2</E> at the inlet and outlet of the control device(s), respectively, dry basis, kilogram per hour.</FP>
              <FP SOURCE="FP-1">M<E T="52">i</E>, M<E T="52">o</E> = Molecular weight of HCl or Cl<E T="52">2</E> at the inlet and outlet of the control device(s), respectively, gram/gram-mole.</FP>
              <FP SOURCE="FP-1">Q<E T="52">i</E>, Q<E T="52">o</E> = Flow rate of gas stream at the inlet and outlet of the control device(s), respectively, dry standard cubic meter per minute.</FP>
              <FP SOURCE="FP-1">K<E T="52">2</E> = Constant, 2.494 × 10<E T="51">−6</E> (parts per million)<SU>-1</SU> (gram-mole per standard cubic meter) (kilogram/gram) (minute/hour), where standard temperature (gram-mole per standard cubic meter) is 20 °C.</FP>
            </EXTRACT>
            
            <P>(2) Calculate the percent reduction of HCl or Cl<E T="52">2</E> using Equation 3 of this section:</P>
            <MATH DEEP="27" SPAN="1">
              <MID>ER17AP03.001</MID>
            </MATH>
            <EXTRACT>
              <FP>where:</FP>
              
              <FP SOURCE="FP-1">R = Control efficiency of control device(s).</FP>
              <FP SOURCE="FP-1">E<E T="52">i</E> = Mass rate of HCl or Cl<E T="52">2</E> to the inlet to the control device(s), kilograms per hour.</FP>
              <FP SOURCE="FP-1">E<E T="52">o</E> = Mass rate of HCl or Cl<E T="52">2</E> at the outlet of the control device(s), kilograms per hour.</FP>
            </EXTRACT>
            

            <P>(c) You may prepare a design evaluation in lieu of conducting a performance test for HCl storage tanks and HCl transfer operations that are not routed to a control device that also controls HCl process vent emissions or any other continuous vent stream. The design evaluation shall include documentation demonstrating that the control technique being used achieves the required control efficiency when a liquid HCl product with a concentration of 30 weight percent or greater is being loaded into the storage tank, or a tank truck, rail car, ship, or barge.<PRTPAGE P="23"/>
            </P>
            <P>(1) If you use a caustic scrubber control device or a water scrubber control device, the design evaluation shall address the vent stream composition, constituent concentrations, liquid-to-vapor ratio, scrubbing liquid flow rate and concentration, temperature, and the reaction kinetics of the constituents with the scrubbing liquid. The design evaluation shall establish the design exhaust vent concentration level and shall include the additional information in paragraphs (c)(1)(i) and (ii) of this section for trays and a packed column scrubber.</P>
            <P>(i) Type and total number of theoretical and actual trays.</P>
            <P>(ii) Type and total surface area of packing for entire column and for individual packed sections, if the column contains more than one packed section.</P>
            <P>(2) If you use any other control device, the design evaluation shall address the composition and HAP concentration of the vent stream immediately preceding the control device, as well as other parameters necessary to demonstrate that the control technique being used achieves the required control efficiency when a liquid HCl product with a concentration of 30 weight percent or greater is being loaded into the storage tank, or a tank truck, rail car, ship, or barge.</P>
            <P>(d) You are not required to conduct a performance test for an emission point for which a performance test was conducted within the previous 5-year period, using the same test methods specified in this section and for which either no deliberate process changes have been made since the test, or the owner or operator can demonstrate that the results of the performance test, with or without adjustments, reliably demonstrate compliance despite process changes. The operating limits reported under the previous performance test shall be sufficient to meet the monitoring requirements in this subpart.</P>
            <P>(e) You must establish all operating limits with which you will demonstrate continuous compliance with the applicable emission limits in Table 1 to this subpart as described in paragraphs (e)(1) through (3) of this section.</P>
            <P>(1) If you use a caustic scrubber control device or water scrubber control device and you conduct a performance test, you must establish operating limits according to paragraphs (e)(1)(i) and (ii) of this section. If a series of control devices are used, you must establish separate operating limits for each device.</P>
            <P>(i) You must establish the minimum value as the operating limit for scrubber inlet liquid or recirculating liquid flow rate, as appropriate. The minimum value shall be based on the scrubber inlet liquid or recirculating liquid flow rate, as appropriate, values measured during the performance test.</P>
            <P>(ii) You must establish the minimum and maximum values as the operating limits for scrubber effluent pH. The minimum and maximum values shall be based on the scrubber effluent pH values measured during the performance test.</P>
            <P>(2) If you use any other control device and you conduct a performance test, you must establish operating limits according to your site-specific test plan submitted in accordance with § 63.7(c)(2)(i). The operating limits shall be based on the operating parameter values measured during the performance test. If a series of control devices are used, you must establish separate operating limits for each device.</P>
            <P>(3) If you do not conduct a performance test for a HCl storage tank or HCl transfer operation, you must use engineering assessments and/or manufacturer's recommendations to establish the operating limits specified in paragraphs (e)(1)(i) and (ii), or (e)(2), of this section.</P>
            <P>(4) As needed in applicability determinations, you must use ASTM E224 to determine the HCl concentration in liquid products.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9025</SECTNO>
            <SUBJECT>What are my monitoring installation, operation, and maintenance requirements?</SUBJECT>
            <P>(a) For each operating parameter that you are required by § 63.9020(e) to monitor, you must install, operate, and maintain each CMS according to the requirements in paragraphs (a)(1) through (6) of this section.</P>

            <P>(1) You must operate your CMS and collect data at all times the process is operating.<PRTPAGE P="24"/>
            </P>
            <P>(2) You must collect data from at least four equally spaced periods each hour.</P>
            <P>(3) For at least 75 percent of the operating hours in a 24-hour period, you must have valid data (as defined in your site-specific monitoring plan) for at least 4 equally spaced periods each hour.</P>
            <P>(4) For each hour that you have valid data from at least four equally spaced periods, you must calculate the hourly average value using all valid data or, where data are collected from an automated CMS, using at least one measured value per minute if measured more frequently than once per minute.</P>
            <P>(5) You must calculate the daily average using all of the hourly averages calculated according to paragraph (a)(4) of this section for the 24-hour period.</P>
            <P>(6) You must record the results for each inspection, calibration, and validation check as specified in your site-specific monitoring plan.</P>
            <P>(b) For scrubber control devices, you may request approval, in accordance with § 63.8(f), to monitor parameters other than those specified in § 63.9020(e). In accordance with § 63.8(f), you must submit a monitoring plan to the Administrator and the plan must meet the requirements in paragraphs (a) and (b)(1) through (3) of this section. You must conduct monitoring in accordance with the plan submitted to the Administrator unless comments received from the Administrator require an alternate monitoring scheme.</P>
            <P>(1) Identify the operating parameter to be monitored to ensure that the control or capture efficiency measured during the initial compliance test is maintained.</P>
            <P>(2) Discuss why this parameter is appropriate for demonstrating ongoing compliance.</P>
            <P>(3) Identify the specific monitoring procedures.</P>
            <P>(c) For any other control device, you must ensure that the CMS is operated according to a monitoring plan submitted to the Administrator as required by § 63.8(f). The monitoring plan must meet the requirements in paragraphs (a) and (c)(1) through (3) of this section. You must conduct monitoring in accordance with the plan submitted to the Administrator, as amended, unless comments received from the Administrator require an alternate monitoring scheme.</P>
            <P>(1) Identify the operating parameter to be monitored to ensure that the control or capture efficiency measured during the initial compliance test is maintained.</P>
            <P>(2) Discuss why this parameter is appropriate for demonstrating ongoing compliance.</P>
            <P>(3) Identify the specific monitoring procedures.</P>
            <CITA>[68 FR 19090, Apr. 17, 2003, as amended at 71 FR 17745, Apr. 7, 2006]</CITA>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9030</SECTNO>
            <SUBJECT>How do I demonstrate initial compliance with the emission limitations and work practice standards?</SUBJECT>
            <P>(a) You must demonstrate initial compliance with each emission limit and work practice standard that applies to you according to Table 4 to this subpart.</P>
            <P>(b) You must establish each site-specific operating limit in Table 2 to this subpart that applies to you according to the requirements in § 63.9020 and Table 3 to this subpart.</P>
            <P>(c) You must submit the Notification of Compliance Status containing the results of the initial compliance demonstration according to the requirements in § 63.9045(e).</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Continuous Compliance Requirements</HD>
          <SECTION>
            <SECTNO>§ 63.9035</SECTNO>
            <SUBJECT>How do I monitor and collect data to demonstrate continuous compliance?</SUBJECT>
            <P>(a) You must monitor and collect data according to this section.</P>
            <P>(b) If you use a caustic scrubber or a water scrubber/absorber to meet the emission limits in Table 1 to this subpart, you must keep the records specified in paragraphs (b)(1) and (2) of this section to support your compliance demonstration.</P>
            <P>(1) Records of daily average scrubber inlet liquid or recirculating liquid flow rate, as appropriate.</P>
            <P>(2) Records of the daily average scrubber effluent pH.</P>

            <P>(c) If you use any other control device to meet the emission limits in Table 1 to this subpart, you must keep <PRTPAGE P="25"/>records of the operating parameter values identified in your monitoring plan in § 63.9025(c) to support your compliance demonstration.</P>
            <P>(d) Except for monitor malfunctions, associated repairs, and required quality assurance or control activities (including, as applicable, calibration checks and required zero and span adjustments), you must monitor continuously (or collect data at all required intervals) at all times that the affected source is operating. This includes periods of startup, shutdown, or malfunction when the affected source is operating. A monitoring malfunction includes, but is not limited to, any sudden, infrequent, not reasonably preventable failure of the monitoring equipment to provide valid data. Monitoring failures that are caused in part by poor maintenance or careless operation are not malfunctions.</P>
            <P>(e) You may not use data recorded during monitoring malfunctions, associated repairs, and required quality assurance or control activities in data averages and calculations used to report emission or operating levels, nor may such data be used in fulfilling a minimum data availability requirement, if applicable. You must use all the data collected during all other periods in assessing the operation of the control device and associated control system.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9040</SECTNO>
            <SUBJECT>How do I demonstrate continuous compliance with the emission limitations and work practice standards?</SUBJECT>
            <P>(a) You must demonstrate continuous compliance with each emission limit and work practice standard in Table 1 to this subpart that applies to you according to Table 4 to this subpart.</P>
            <P>(b) You must demonstrate continuous compliance with each operating limit in Table 2 of this subpart that applies to you according to Tables 4 and 5 to this subpart.</P>
            <P>(c) You must report each instance in which you did not meet an emission limit, work practice standard or operating limit in Table 1 or 2 to this subpart, respectively, that applies to you. This includes periods of startup, shutdown, and malfunction. These instances are deviations from the emission limitations in this subpart. These deviations must be reported according to the requirements in § 63.9050.</P>
            <P>(d) [Reserved]</P>
            <P>(e) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you demonstrate to the Administrator's satisfaction that you were operating in accordance with § 63.6(e)(1). The Administrator will determine whether deviations that occur during a period of startup, shutdown, or malfunction are violations, according to the provisions in § 63.6(e).</P>
            <CITA>[68 FR 19090, Apr. 17, 2003, as amended at 71 FR 20470, Apr. 20, 2006]</CITA>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Notifications, Reports, and Records</HD>
          <SECTION>
            <SECTNO>§ 63.9045</SECTNO>
            <SUBJECT>What notifications must I submit and when?</SUBJECT>
            <P>(a) You must submit all of the notifications in §§ 63.7(b) and (c), 63.8(f)(4) and (6), and 63.9 (b) through (h) that apply to you by the dates specified.</P>
            <P>(b) As specified in § 63.9(b)(2), if you start up your affected source before April 17, 2003, you must submit an Initial Notification not later than 120 calendar days after April 17, 2003.</P>
            <P>(c) As specified in § 63.9(b)(4), if you start up your new or reconstructed affected source on or after April 17, 2003, you must submit the application for construction or reconstruction required by § 63.9(b)(1)(iii) in lieu of the initial notification.</P>
            <P>(d) You must submit a notification of intent to conduct a performance test at least 60 calendar days before the performance test is scheduled to begin, as required in § 63.7(b)(1).</P>
            <P>(e) [Reserved]</P>
            <P>(f) You must submit the Notification of Compliance Status, including the performance test results, within 240 calendar days after the applicable compliance dates specified in § 63.8995.</P>
            <P>(g) The Notification of Compliance Status must also include the information in paragraphs (g)(1) through (2) of this section that applies to you.</P>

            <P>(1) Each operating parameter value averaged over the full period of the performance test (for example, average pH).<PRTPAGE P="26"/>
            </P>
            <P>(2) Each operating parameter range within which HAP emissions are reduced to the level corresponding to meeting the applicable emission limits in Table 1 to this subpart.</P>
            <CITA>[68 FR 19090, Apr. 17, 2003, as amended at 71 FR 17745, Apr. 7, 2006]</CITA>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9050</SECTNO>
            <SUBJECT>What reports must I submit and when?</SUBJECT>
            <P>(a) You must submit each report in Table 6 to this subpart that applies to you.</P>
            <P>(b) Unless the Administrator has approved a different schedule for submission of reports under § 63.10(a), you must submit each report according to paragraphs (b)(1) through (5) of this section.</P>
            <P>(1) The first compliance report must cover the period beginning on the compliance date that is specified for your affected source in § 63.8995 and ending on June 30 or December 31, whichever date is the first date following the end of the first calendar half after the compliance date that is specified for your source in § 63.8995 (i.e., June 30, 2006, for sources existing on April 17, 2006).</P>
            <P>(2) The first compliance report must be postmarked or delivered no later than July 31 or January 31, whichever date follows the end of the first calendar half after the compliance date that is specified for your affected source in § 63.8995 (i.e., July 31, 2006, for sources existing on April 17, 2006).</P>
            <P>(3) Each subsequent compliance report must cover the semiannual reporting period from January 1 through June 30 or the semiannual reporting period from July 1 through December 31.</P>
            <P>(4) Each subsequent compliance report must be postmarked or delivered no later than July 31 or January 31, whichever date is the first date following the end of the semiannual reporting period.</P>
            <P>(5) For each affected source that is subject to permitting regulations pursuant to 40 CFR part 70 or 71, and if the permitting authority has established dates for submitting semiannual reports pursuant to 40 CFR 70.6 (a)(3)(iii)(A) or 71.6 (a)(3)(iii)(A), you may submit the first and subsequent compliance reports according to the dates the permitting authority has established instead of according to the dates in paragraphs (b)(1) through (4) of this section.</P>
            <P>(c) The compliance report must contain the following information in paragraphs (c)(1) through (10) of this section.</P>
            <P>(1) Company name and address.</P>
            <P>(2) Statement by a responsible official with that official's name, title, and signature, certifying the truth, accuracy, and completeness of the content of the report.</P>
            <P>(3) Date of report and beginning and ending dates of the reporting period.</P>
            <P>(4) If you had a startup, shutdown, or malfunction during the reporting period and you took actions consistent with your startup, shutdown, and malfunction plan, the compliance report must include the information in § 63.10(d)(5)(i).</P>
            <P>(5) If there are no deviations from any emission limitations that apply to you, a statement that there were no deviations from the emission limitations during the reporting period.</P>
            <P>(6) If there were no periods during which the CMS was out-of-control in accordance with the monitoring plan, a statement that there were no periods during which the CMS was out-of-control during the reporting period.</P>
            <P>(7) Verification that you continue to use the equipment LDAR plan and information that explains any periods when the procedures in the plan were not followed and the corrective actions were not taken.</P>
            <P>(8) If you did not make revisions to your site-specific monitoring plan and/or LDAR plan during the reporting period, a statement that you did not make any revisions to your site-specific monitoring plan and/or LDAR plan during the reporting period. If you made revisions to your site-specific monitoring plan and/or LDAR plan during the reporting period, a copy of the revised plan.</P>

            <P>(9) If you meet the outlet concentration limit in table 1 to this subpart without the use of a control device for any emission point, verification that you have not made any process changes that could reasonably be expected to increase the outlet concentration since your most recent performance test for that emission point.<PRTPAGE P="27"/>
            </P>
            <P>(10) The information specified in paragraphs (c)(10)(i) and (ii) of this section for those planned routine maintenance operations that caused or may cause an HCl storage tank control device not to meet the emission limits in table 1 to this subpart, as applicable.</P>
            <P>(i) A description of the planned routine maintenance that was performed for each HCl storage tank control device during the reporting period. This description shall include the type of maintenance performed and the total number of hours during the reporting period that the HCl storage tank control device did not meet the emission limits in table 1 to this subpart, as applicable, due to planned routine maintenance.</P>
            <P>(ii) A description of the planned routine maintenance that is anticipated to be performed for each HCl storage tank control device during the next reporting period. This description shall include the type of maintenance necessary, planned frequency of maintenance, and lengths of maintenance periods.</P>
            <P>(d) For each deviation from an emission limitation occurring at an affected source where you are using a CMS to comply with the emission limitation in this subpart, you must include the information in paragraphs (c)(1) through (6) of this section and the following information in paragraphs (d)(1) through (9) of this section. This includes periods of startup, shutdown, and malfunction.</P>
            <P>(1) The date and time that each malfunction started and stopped.</P>
            <P>(2) The date and time that each CMS was inoperative, except for zero (low-level) and high-level checks.</P>
            <P>(3) The date, time, and duration that each CMS was out-of-control, including the information in § 63.8(c)(8).</P>
            <P>(4) The date and time that each deviation started and stopped, and whether each deviation occurred during a period of startup, shutdown, or malfunction or during another period.</P>
            <P>(5) A summary of the total duration of the deviation during the reporting period and the total duration as a percent of the total source operating time during that reporting period.</P>
            <P>(6) A breakdown of the total duration of the deviations during the reporting period into those that are due to startup, shutdown, control equipment problems, process problems, other known causes, and other unknown causes.</P>
            <P>(7) A summary of the total duration of CMS downtime during the reporting period, and the total duration of CMS downtime as a percent of the total source operating time during that reporting period.</P>
            <P>(8) A brief description of the process units.</P>
            <P>(9) A description of any changes in CMS, processes, or controls since the last reporting period.</P>
            <P>(e) Each affected source that has obtained a title V operating permit pursuant to 40 CFR part 70 or 71 must report all deviations as defined in this subpart in the semiannual monitoring report required by 40 CFR 70.6(a)(3)(iii)(A) or 71.6(a)(3)(iii)(A). If an affected source submits a compliance report pursuant to Table 6 to this subpart along with, or as part of, the semiannual monitoring report required by 40 CFR 70.6(a)(3)(iii)(A) or 71.6(a)(3)(iii)(A), and the compliance report includes all required information concerning deviations from any emission limitation in this subpart, submission of the compliance report shall be deemed to satisfy any obligation to report the same deviations in the semiannual monitoring report. However, submission of a compliance report shall not otherwise affect any obligation the affected source may have to report deviations from permit requirements to the permit authority.</P>
            <P>(f) For each startup, shutdown, or malfunction during the reporting period that is not consistent with your startup, shutdown, and malfunction plan you must submit an immediate startup, shutdown and malfunction report. Unless the Administrator has approved a different schedule for submission of reports under § 63.10(a), you must submit each report according to paragraphs (f)(1) and (2) of this section.</P>
            <P>(1) An initial report containing a description of the actions taken for the event must be submitted by fax or telephone within 2 working days after starting actions inconsistent with the plan.</P>

            <P>(2) A follow-up report containing the information listed in § 63.10(d)(5)(ii) <PRTPAGE P="28"/>must be submitted within 7 working days after the end of the event unless you have made alternative reporting arrangements with the permitting authority.</P>
            <CITA>[68 FR 19090, Apr. 17, 2003, as amended at 71 FR 17745, Apr. 7, 2006]</CITA>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9055</SECTNO>
            <SUBJECT>What records must I keep?</SUBJECT>
            <P>(a) You must keep a copy of each notification and report that you submitted to comply with this subpart, including all documentation supporting any Initial Notification or Notification of Compliance Status that you submitted, as required in § 63.10(b)(2)(xiv).</P>
            <P>(b) You must also keep the following records specified in paragraphs (b)(1) through (5) of this section.</P>
            <P>(1) The records in § 63.6(e)(3)(iii) through (v) related to startup, shutdown, and malfunction.</P>
            <P>(2) Records of performance tests as required in § 63.10(b)(2)(viii).</P>
            <P>(3) Records of operating parameter values that are consistent with your monitoring plan.</P>
            <P>(4) Records of the date and time that each deviation started and stopped and whether the deviation occurred during a period of startup, shutdown, or malfunction or during another period.</P>
            <P>(5) Copies of the current versions of the site-specific monitoring plan and the equipment LDAR plan. You also must submit copies of these plans and any revisions or updates to the Administrator for comment only (not for approval).</P>
            <P>(6) Records of the planned routine maintenance performed on each HCl storage tank control device including the duration of each time the control device does not meet the emission limits in table 1 to this subpart, as applicable, due to planned routine maintenance. Such a record shall include the information specified in paragraphs (b)(6)(i) and (ii) of this section.</P>
            <P>(i) The first time of day and date the emission limits in table 1 to this subpart, as applicable, were not met at the beginning of the planned routine maintenance, and</P>
            <P>(ii) The first time of day and date the emission limits in table 1 to this subpart, as applicable, were met at the conclusion of the planned routine maintenance.</P>
            <CITA>[68 FR 19090, Apr. 17, 2003, as amended at 71 FR 17746, Apr. 7, 2006]</CITA>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9060</SECTNO>
            <SUBJECT>In what form and how long must I keep my records?</SUBJECT>
            <P>(a) Your records must be in a form suitable and readily available for expeditious inspection and review, according to § 63.10(b)(1).</P>
            <P>(b) As specified in § 63.10(b)(1), you must keep each record for 5 years following the date of each occurrence, measurement, maintenance, corrective action, report, or record.</P>
            <P>(c) You must keep each record on site, or readily accessible from on site through a computer or other means, for at least 2 years after the date of each occurrence, measurement, maintenance, corrective action, report, or record, according to § 63.10(b)(1). You can keep the records off site for the remaining 3 years. Records may be maintained in hard copy or computer-readable format including, but not limited to, on paper, microfilm, hard disk drive, floppy disk, compact disk, magnetic tape, or microfiche.</P>
            <P>(d) You must keep each previous (i.e., superseded) version of the site-specific monitoring plan and the LDAR plan for a period of 5 years after revision of the plan. If, at any time after adoption of a site-specific monitoring plan or an LDAR plan, your affected source ceases operation or is otherwise no longer subject to the provisions of this subpart, you must retain a copy of the most recent plan for 5 years from the date your source ceases operation or is no longer subject to this subpart.</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Other Requirements and Information</HD>
          <SECTION>
            <SECTNO>§ 63.9065</SECTNO>
            <SUBJECT>What parts of the General Provisions apply to me?</SUBJECT>
            <P>(a) Table 7 to this subpart shows which parts of the General Provisions in §§ 63.1 through 63.15 apply to you.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9070</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>

            <P>(a) This subpart can be implemented and enforced by us, the U.S. EPA, or a delegated authority such as your State, local, or tribal agency. If the U.S. EPA Administrator has delegated <PRTPAGE P="29"/>authority to your State, local, or tribal agency, then that agency, as well as U.S. EPA, has the authority to implement and enforce this subpart. You should contact your U.S. EPA Regional Office to find out if this subpart is delegated to your State, local, or tribal agency.</P>
            <P>(b) In delegating implementation and enforcement authority of this subpart to a State, local, or tribal agency under section 40 CFR part 63, subpart E, the authorities contained in paragraph (c) of this section are retained by the Administrator of U.S. EPA and are not transferred to the State, local, or tribal agency.</P>
            <P>(c) The authorities in paragraphs (c)(1) through (4) of this section that cannot be delegated to State, local, or tribal agencies are as follows.</P>
            <P>(1) Approval of alternatives to requirements in §§ 63.8980, 63.8985, 63.8990, 63.8995, and 63.9000.</P>
            <P>(2) Approval of major changes to test methods under § 63.7(e)(2)(ii) and (f) and as defined in § 63.90.</P>
            <P>(3) Approval of major changes to monitoring under § 63.8(f) and as defined in § 63.90.</P>
            <P>(4) Approval of major changes to recordkeeping and reporting under § 63.10(f) and as defined in § 63.90.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9075</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <P>Terms used in this subpart are defined in the Clean Air Act in 40 CFR 63.2 and in this section as follows:</P>
            <P>
              <E T="03">Caustic scrubber control device</E> means any add-on device that mixes an aqueous stream or slurry containing a caustic substance with the exhaust gases from an HCl process vent, HCl storage tank, or HCl transfer operation to control emissions of HCl and/or Cl<E T="52">2</E>.</P>
            <P>
              <E T="03">Chlor-alkali facility</E> means a facility where chlorine and sodium or potassium hydroxide are produced as co-products and hydrogen is produced as a by-product in an electrolytic process using either mercury cells, diaphragm cells, or membrane cells.</P>
            <P>
              <E T="03">Continuous monitoring system,</E> for purposes of the final rule, means liquid flow monitoring devices that meet the performance specifications given in § 63.9025(a); or pH monitoring devices that meet the performance specifications given in § 63.9025(a); or other control devices as mentioned in 63.9025(a) and (b) or § 63.9025(a) and (c).</P>
            <P>
              <E T="03">Control device</E> means an add-on device used to reduce HCl and/or Cl<E T="52">2</E> emissions from an HCl process vent, HCl storage tank, or HCl transfer operation at an HCl production facility. An HCl production unit is not a control device.</P>
            <P>
              <E T="03">Deviation</E> means any instance in which an affected source subject to this subpart, or an owner or operator of such a source:</P>
            <P>(1) Fails to meet any requirement or obligation established by this subpart, including but not limited to any emission limitation or work practice standard;</P>
            <P>(2) Fails to meet any term or condition that is adopted to implement an applicable requirement in this subpart and that is included in the operating permit for any affected source required to obtain such a permit; or</P>
            <P>(3) Fails to meet any emission limitation or work practice standard in this subpart during startup, shutdown, or malfunction, regardless of whether or not such failure is permitted by this subpart.</P>
            <P>
              <E T="03">Emission limitation</E> means any emission limit or operating limit.</P>
            <P>
              <E T="03">Emission stream</E> means a gaseous stream from an HCl process vent, an HCl storage tank, an HCl transfer operation, leaking equipment in HCl service, or HCl wastewater operations that is discharged to the atmosphere. Gaseous streams from HCl process vents, HCl storage tanks, and HCl transfer operations that are routed to another process or recycled for reaction or other use (i.e., for pH control) of the HCl and/or Cl<E T="52">2</E> are not emission streams. Gaseous streams from HCl transfer operations that are vapor balanced to an HCl storage tank subject to this subpart are not emission streams.</P>
            <P>
              <E T="03">Equipment in HCl service</E> means each pump, compressor, agitator, pressure relief device, sampling connection system, open-ended valve or line, valve, connector, and instrumentation system in an HCl production facility that contains 30 weight percent or greater of liquid HCl or 5 weight percent or greater of gaseous HCl at any time.<PRTPAGE P="30"/>
            </P>
            <P>
              <E T="03">HCl process vent</E> means the point of discharge to the atmosphere, or point of entry into a control device, of a gaseous stream that originates from an HCl production unit. The following points of discharge are not HCl process vents:</P>
            <P>(1) A leak from equipment in HCl service subject to this subpart.</P>
            <P>(2) An exit from a control device used to comply with this subpart.</P>
            <P>(3) An HCl storage tank vent or HCl transfer operation vent subject to this subpart.</P>
            <P>(4) A HCl wastewater operation vent subject to this subpart.</P>
            <P>(5) A point of discharge from a relief valve.</P>
            <P>(6) A point of discharge from an analyzer.</P>
            <P>
              <E T="03">HCl production facility</E> is defined in § 63.8985(a)(1).</P>
            <P>
              <E T="03">HCl production unit</E> means an absorber or other vessel in which a liquid HCl product is manufactured by absorbing gaseous HCl into either water or an aqueous HCl solution.</P>
            <P>
              <E T="03">HCl storage tank</E> means a tank or other vessel that is used to store liquid HCl product. Tanks or vessels permanently attached to motor vehicles (such as trucks, railcars, barges, or ships) are not HCl storage tanks.</P>
            <P>
              <E T="03">HCl transfer operation</E> means the loading, into a tank truck, railcar, ship, or barge, of liquid HCl from a transfer (or loading) rack (as defined in this section) for which the predominant use is liquid HCl. The predominant use of a transfer (or loading) rack is the material that is loaded by the transfer (or loading) rack in the greatest amount.</P>
            <P>
              <E T="03">HCl wastewater operation</E> means an operation that handles and processes water containing HCl that is discarded from an HCl production facility.</P>
            <P>
              <E T="03">Plant site</E> means all contiguous or adjoining property that is under common control, including properties that are separated only by a road or other public right-of-way. Common control includes properties that are owned, leased, or operated by the same entity, parent entity, subsidiary, or any combination thereof.</P>
            <P>
              <E T="03">Research and development facility</E> means laboratory and pilot plant operations whose primary purpose is to conduct research and development into new processes and products, where the operations are under close supervision of technically trained personnel, and the operations are not engaged in the manufacture of products for commercial sale, except in a <E T="03">de minimis</E> manner.</P>
            <P>
              <E T="03">Responsible official</E> means responsible official as defined in 40 CFR 70.2 of this chapter.</P>
            <P>
              <E T="03">Transfer (or loading) rack</E> means the collection of loading arms and loading hoses, at a single loading rack, that are used to fill tank trucks, railcars, ships, and/or barges. Transfer rack includes the associated pumps, meters, shutoff valves, relief valves, and other piping and valves.</P>
            <P>
              <E T="03">Vapor balanced</E> means connected to a piping system that is designed to collect vapors displaced from tank trucks, rail cars, ships, or barges during loading, and to route the collected vapors to the storage vessel from which the liquid being loaded originated, or to another storage vessel connected by a common header.</P>
            <P>
              <E T="03">Vent</E> means the point of discharge to the atmosphere or to a control device from either an HCl process vent, an HCl storage tank, or an HCl transfer operation.</P>
            <P>
              <E T="03">Water scrubber control device</E> means any add-on device that mixes an aqueous stream not containing a caustic substance with the exhaust gases from an HCl process vent, HCl storage tank, or HCl transfer operation to control emissions of HCl and/or Cl<E T="52">2</E>.</P>
            <CITA>[68 FR 19090, Apr. 17, 2003, as amended at 71 FR 17746, Apr. 7, 2006]</CITA>
          </SECTION>
        </SUBJGRP>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. NNNNN, Table 1</EAR>
          <HD SOURCE="HED">Table 1 to Subpart NNNNN of Part 63—Emission Limits and Work Practice Standards</HD>

          <P>As stated in § 63.9000(a), you must comply with the following emission limits and work practice standards for each emission stream that is part of an affected source.<PRTPAGE P="31"/>
          </P>
          <GPOTABLE CDEF="s150,r150" COLS="2" OPTS="L2">
            <BOXHD>
              <CHED H="1" O="L">For each . . .</CHED>
              <CHED H="1" O="L">You must meet the following emission limit and work practice standard</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">1. Emission stream from an HCl process vent at an existing source</ENT>
              <ENT>a. Reduce HCl emissions by 99 percent or greater or achieve an outlet concentration of 20 ppm by volume or less; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. Reduce Cl<E T="52">2</E> emissions by 99 percent or greater or achieve an outlet concentration of 100 ppm by volume or less.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">2. Emission stream from an HCl storge tank at an existing source</ENT>
              <ENT>Reduce HCl emissions by 99 percent or greater or achieve an outlet concentration of 120 ppm by volume or less.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">3. Emission stream from an HCl transfer operation at an existing source</ENT>
              <ENT>Reduce HCl emissions by 99 percent or greater or achieve an outlet concentration of 120 ppm by volume or less.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">4. Emission stream from leaking equipment in HCl service at existing and new sources</ENT>
              <ENT>a. Prepare and operate at all times according to an equipment LDAR plan that describes in detail the measures that will be put in place to detect leaks and repair them in a timely fashion; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. Submit the plan to the Administrator for comment only with your Notification of Compliance Status; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>c. You may incorporate by reference in such plan existing manuals that describe the measures in place to control leaking equipment emissions required as part of other federally enforceable requirements, provided that all manuals that are incorporated by reference are submitted to the Administrator.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">5. Emission stream from an HCl process vent at a new source</ENT>
              <ENT>a. Reduce HCl emissions by 99.4 percent or greater or achieve an outlet concentration of 12 ppm by volume or less; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. Reduce Cl<E T="52">2</E> emissions by 99.8 percent or greater or achieve an outlet concentration of 20 ppm by volume or less.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">6. Emission stream from an HCl storage tank at a new source</ENT>
              <ENT>Reduce HCl emissions by 99.9 percent or greater or achieve an outlet concentration of 12 ppm by volume or less.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">7. Emission stream from an HCl transfer operation at a new source</ENT>
              <ENT>Reduce HCl emissions by 99 percent or greater or achieve an outlet concentration of 120 ppm by volume or less.</ENT>
            </ROW>
          </GPOTABLE>
          <CITA>[68 FR 19090, Apr. 17, 2003, as amended at 71 FR 17746, Apr. 7, 2006]</CITA>
        </APPENDIX>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. NNNNN, Table 2</EAR>
          <HD SOURCE="HED">Table 2 to Subpart NNNNN of Part 63—Operating Limits</HD>
          <P>As stated in § 63.9000(b), you must comply with the following operating limits for each emission stream that is part of an affected source that is vented to a control device.</P>
          <GPOTABLE CDEF="s75,r100" COLS="2" OPTS="L2">
            <BOXHD>
              <CHED H="1" O="L">For each . . .</CHED>
              <CHED H="1" O="L">You must . . .</CHED>
            </BOXHD>
            <ROW RUL="s">
              <ENT I="01">1. Caustic scrubber or water scrubber/absorber</ENT>
              <ENT>a. Maintain the daily average scrubber inlet liquid or recirculating liquid flow rate, as appropriate, above the operating limit; and<LI>b. Maintain the daily average scrubber effluent pH within the operating limits; or</LI>
                <LI>c. Instead of a. and b., maintain your operating parameter(s) within the operating limits established according to your monitoring plan established under § 63.8(f).</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="01">2. Other type of control device to which HCl emissions are ducted</ENT>
              <ENT>Maintain your operating parameter(s) within the limits established during the performance test and according to your monitoring plan.</ENT>
            </ROW>
          </GPOTABLE>
        </APPENDIX>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. NNNNN, Table 3</EAR>
          <HD SOURCE="HED">Table 3 to Subpart NNNNN of Part 63—Performance Test Requirements for HCl Production Affected Sources</HD>
          <P>As stated in § 63.9020, you must comply with the following requirements for performance tests for HCl production for each affected source.</P>
          <GPOTABLE CDEF="s100,r50,r100" COLS="3" OPTS="L2">
            <BOXHD>
              <CHED H="1" O="L">For each HCl process vent and each HCl storage tank and HCl transfer operation for which you are conducting a performance test, you must . . .</CHED>
              <CHED H="1" O="L">Using . . .</CHED>
              <CHED H="1" O="L">Additional Information . . .</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">1. Select sampling port location(s) and the number of traverse points</ENT>
              <ENT>a. Method 1 or 1A in appendix A to 40 CFR part 60 of this chapter</ENT>
              <ENT>i. If complying with a percent reduction emission limitation, sampling sites must located at the inlet and outlet of the control device prior to any releases to the atmosphere (or, if a series of control devices are used, at the inlet of the first control device and at the outlet of the final control device prior to any releases to the atmosphere); or</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="32"/>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>ii. If complying with an outlet concentration emission limitation, the sampling site must be located at the outlet of the final control device and prior to any releases to the atmosphere or, if no control device is used, prior to any releases to the atmosphere.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">2. Determine velocity and volumetric flow rate</ENT>
              <ENT O="xl">Method 2, 2A, 2C, 2D, 2F, or 2G in appendix A to 40 CFR part 60 of this chapter.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">3. Determine gas molecular weight</ENT>
              <ENT>a. Not applicable</ENT>
              <ENT>i. Assume a molecular weight of 29 (after moisture correction) for calculation purposes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">4. Measure moisture content of the stack gas</ENT>
              <ENT O="xl">Method 4 in appendix A to 40 CFR part 60 of this chapter.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">5. Measure HCl concentration and Cl<E T="52">2</E> concentration from HCl process vents</ENT>
              <ENT>a. Method 26A in appendix A to 40 CFR part 60 of this chapter</ENT>

              <ENT>i. An owner or operator may be exempted from measuring the Cl<E T="52">2</E> concentration from an HCl process vent provided that a demonstration that Cl<E T="52">2</E> is not likely to be present in the stream is submitted as part of the site-specific test plan required by § 63.9020(a)(2). This demonstration may be based on process knowledge, engineering judgment, or previous test results.</ENT>
            </ROW>
            <ROW>
              <ENT I="01" O="xl">6. Establish operating limits with which you will demonstrate continuous compliance with the emission limits in Table 1 to this subpart, in accordance with § 63.9020(e)(1) or (2).</ENT>
            </ROW>
          </GPOTABLE>
          <CITA>[68 FR 19090, Apr. 17, 2003, as amended at 71 FR 17747, Apr. 7, 2006]</CITA>
        </APPENDIX>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. NNNNN, Table 4</EAR>
          <HD SOURCE="HED">Table 4 to Subpart NNNNN of Part 63—Initial Compliance With Emission Limitations and Work Practice Standards</HD>
          <P>As stated in § 63.9030, you must comply with the following requirements to demonstrate initial compliance with the applicable emission limits for each affected source vented to a control device and each work practice standard.</P>
          <GPOTABLE CDEF="s100,r100,r100" COLS="3" OPTS="L2">
            <BOXHD>
              <CHED H="1" O="L">For each . . .</CHED>
              <CHED H="1" O="L">For the following emission limit or work practice standard . . .</CHED>
              <CHED H="1" O="L">You have demonstrated initial compliance if . . .</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">1. HCl process vent and each HCl storage tank and HCl transfer operation for which you are conducting a performance test</ENT>
              <ENT>a. In Table 1 to this subpart</ENT>
              <ENT>i. The average percent reduction of HCl and Cl<E T="52">2</E> (if applicable), measured over the period of the performance test conducted according to Table 3 of this subpart and determined in accordance with § 63.9020(b), is greater than or equal to the applicable percent reduction emission limitation specified in Table 1 of this subpart; or</ENT>
            </ROW>
            <ROW RUL="s">
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>ii. The average HCl and Cl<E T="52">2</E> (if applicable) concentration, measured over the period of the performance test conducted according to Table 3 of this subpart, is less than or equal to the applicable concentration emission limitation specified in Table 1 of this subpart.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">2. HCl storage tank and HCl transfer operation for which you are preparing a design evaluation in lieu of conducting a performance test</ENT>
              <ENT>a. In Table 1 to this subpart</ENT>
              <ENT>i. The percent reduction of HCl, demonstrated by a design evaluation prepared in accordance with § 63.9020(c), is greater than or equal to the applicable percent reduction emission limitation specified in Table 1 of this subpart; or</ENT>
            </ROW>
            <ROW RUL="s">
              <PRTPAGE P="33"/>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>ii. The HCl concentration, demonstrated by a design evaluation prepared in accordance with § 63.9020(c), is less than or equal to the applicable concentration emission limitation specified in Table 1 of this subpart.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">3. Leaking equipment</ENT>
              <ENT>a. In Table 1 to this subpart</ENT>

              <ENT>i. You certify in your Notification of Compliance Status that you have developed and implemented your LDAR plan and submitted it to the Administrator <E T="02">for comment only.</E>
              </ENT>
            </ROW>
          </GPOTABLE>
        </APPENDIX>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. NNNNN, Table 5</EAR>
          <HD SOURCE="HED">Table 5 to Subpart NNNNN of Part 63—Continuous Compliance With Emission Limitations and Work Practice Standards</HD>
          <P>As stated in § 63.9040, you must comply with the following requirements to demonstrate continuous compliance with the applicable emission limitations for each affected source vented to a control device and each work practice standard.</P>
          <GPOTABLE CDEF="s100,r50,r100" COLS="3" OPTS="L2">
            <BOXHD>
              <CHED H="1" O="L">For each . . .</CHED>
              <CHED H="1" O="L">For the following emission limitation and work practice standard . . .</CHED>
              <CHED H="1" O="L">You must demonstrate continuous compliance by . . .</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">1. Affected source using a caustic scrubber or water scrubber/adsorber</ENT>
              <ENT>a. In Tables 1 and 2 to this subpart</ENT>
              <ENT>i. Collecting the scrubber inlet liquid or recirculating liquid flow rate, as appropriate, and effluent pH monitoring data according to § 63.9025, consistent with your monitoring plan; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>ii. Reducing the data to 1-hour and daily block averages according to the requirements in § 63.9025; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>iii. Maintaining the daily average scrubber inlet liquid or recirculating liquid flow rate, as appropriate, above the operating limit; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>iv. Maintaining the daily average scrubber effluent pH within the operating limits.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">2. Affected source using any other control device</ENT>
              <ENT>a. In Tables 1 and 2 to this subpart</ENT>
              <ENT>i. Conducting monitoring according to your monitoring plan established under § 63.8(f) in accordance with § 63.9025(c); and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>ii. Collecting the parameter data according to your monitoring plan established under § 63.8(f); and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>iii. Reducing the data to 1-hour and daily block averages according to the requirements in § 63.9025; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>iv. Maintaining the daily average parameter values within the operating limits established according to your monitoring plan established under § 63.8(f).</ENT>
            </ROW>
            <ROW>
              <ENT I="01">3. Affected source using no control device</ENT>
              <ENT>a. In Tables 1 and 2 to this subpart.</ENT>
              <ENT>i. Verifying that you have not made any process changes that could reasonably be expected to change the outlet concentration since your most recent performance test for an emission point.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">4. Leaking equipment affected source</ENT>
              <ENT>a. In Table 1 to this subpart</ENT>
              <ENT>i. Verifying that you continue to use a LDAR plan; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>ii. Reporting any instances where you deviated from the plan and the corrective actions taken.</ENT>
            </ROW>
          </GPOTABLE>
          <CITA>[68 FR 19090, Apr. 17, 2003, as amended at 71 FR 17747, Apr. 7, 2006]</CITA>
        </APPENDIX>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. NNNNN, Table 6</EAR>
          <HD SOURCE="HED">Table 6 to Subpart NNNNN of Part 63—Requirements for Reports</HD>

          <P>As stated in § 63.9050(a), you must submit a compliance report that includes the information in § 63.9050(c) through (e) as well as the information in the following table. You must also submit startup, shutdown, and malfunction (SSM) reports according to the requirements in § 63.9050(f) and the following:<PRTPAGE P="34"/>
          </P>
          <GPOTABLE CDEF="s100,r100" COLS="2" OPTS="L2">
            <BOXHD>
              <CHED H="1" O="L">If...</CHED>
              <CHED H="1" O="L">Then you must submit a report or statement that:</CHED>
            </BOXHD>
            <ROW RUL="s">
              <ENT I="01">1. There are no deviations from any emission limitations that apply to you</ENT>
              <ENT>There were no deviations from any emission limitations that apply to you during the reporting period.</ENT>
            </ROW>
            <ROW RUL="s">
              <ENT I="01">2. There were no periods during which the operating parameter monitoring systems were out-of-control in accordance with the monitoring plan</ENT>
              <ENT>There were no periods during which the CMS were out-of-control during the reporting period.</ENT>
            </ROW>
            <ROW RUL="s">
              <ENT I="01">3. There was a deviation from any emission limitation during the reporting period</ENT>
              <ENT>Contains the information in § 63.9050(d).</ENT>
            </ROW>
            <ROW RUL="s">
              <ENT I="01">4. There were periods during which the operating parameter monitoring systems were out-of-control in accordance with the monitoring plan</ENT>
              <ENT>Contains the information in § 63.9050(d).</ENT>
            </ROW>
            <ROW RUL="s">
              <ENT I="01">5. There was a SSM during the reporting period that is not consistent with your SSM plan</ENT>
              <ENT>Contains the information in § 63.9050(f).</ENT>
            </ROW>
            <ROW>
              <ENT I="01">6. There were periods when the procedures in the LDAR plan were not followed</ENT>
              <ENT>Contains the information in § 63.9050(c)(7).</ENT>
            </ROW>
          </GPOTABLE>
        </APPENDIX>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. NNNNN, Table 7</EAR>
          <HD SOURCE="HED">Table 7 to Subpart NNNNN of Part 63—Applicability of General Provisions to Subpart NNNNN</HD>
          <P>As stated in § 63.9065, you must comply with the applicable General Provisions requirements according to the following:</P>
          <GPOTABLE CDEF="xs50,r100,xs40,r50" COLS="4" OPTS="L2">
            <BOXHD>
              <CHED H="1">Citation</CHED>
              <CHED H="1">Requirement</CHED>
              <CHED H="1">Applies to subpart NNNNN</CHED>
              <CHED H="1">Explanation</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">§ 63.1</ENT>
              <ENT>Initial applicability determination; applicability after standard established; permit requirements; extensions; notifications</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.2</ENT>
              <ENT>Definitions</ENT>
              <ENT>Yes</ENT>
              <ENT>Additional definitions are found in § 63.9075.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.3</ENT>
              <ENT>Units and abbreviations</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.4</ENT>
              <ENT>Prohibited activities; compliance date; circumvention, severability</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.5</ENT>
              <ENT>Construction/reconstruction applicability; applications; approvals</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(a)</ENT>
              <ENT>Compliance with standards and maintenance requirements-applicability</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(b)(1)-(4)</ENT>
              <ENT>Compliance dates for new or reconstructed sources</ENT>
              <ENT>Yes</ENT>
              <ENT>§ 63.8995 specifies compliance dates.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(b)(5)</ENT>
              <ENT>Notification if commenced construction or reconstruction after proposal</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(b)(6)</ENT>
              <ENT>[Reserved]</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(b)(7)</ENT>
              <ENT>Compliance dates for new or reconstructed area sources that become major</ENT>
              <ENT>Yes</ENT>
              <ENT>§ 63.8995 specifies compliance dates.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(c)(1)-(2)</ENT>
              <ENT>Compliance dates for existing sources</ENT>
              <ENT>Yes</ENT>
              <ENT>§ 63.8995 specifies compliance dates.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(c)(3)-(4)</ENT>
              <ENT>[Reserved]</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(c)(5)</ENT>
              <ENT>Compliance dates for existing area sources that become major</ENT>
              <ENT>Yes</ENT>
              <ENT>§ 63.8995 specifies compliance dates.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(d)</ENT>
              <ENT>[Reserved]</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(e)(1)-(2)</ENT>
              <ENT>Operation and maintenance requirements</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(e)(3)</ENT>
              <ENT>SSM plans</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(f)(1)</ENT>
              <ENT>Compliance except during SSM</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(f)(2)-(3)</ENT>
              <ENT>Methods for determining compliance</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(g)</ENT>
              <ENT>Use of an alternative non-opacity emission standard</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(h)</ENT>
              <ENT>Compliance with opacity/visible emission standards</ENT>
              <ENT>No</ENT>
              <ENT>Subpart NNNNN does not specify opacity or visible emission standards.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(i)</ENT>
              <ENT>Extension of compliance with emission standards</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(j)</ENT>
              <ENT>Presidential compliance exemption</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(a)(1)-(2)</ENT>
              <ENT>Performance test dates</ENT>
              <ENT>Yes</ENT>
              <ENT>Except for existing affected sources as specified in § 63.9010(b).</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(a)(3)</ENT>
              <ENT>Administrator's Clean Air Act section 114 authority to require a performance test</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(b)</ENT>
              <ENT>Notification of performance test and rescheduling</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(c)</ENT>
              <ENT>Quality assurance program and site-specific test plans</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(d)</ENT>
              <ENT>Performance testing facilities</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(e)(1)</ENT>
              <ENT>Conditions for conducting performance tests</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="35"/>
              <ENT I="01">§ 63.7(f)</ENT>
              <ENT>Use of an alternative test method</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(g)</ENT>
              <ENT>Performance test data analysis, recordkeeping, and reporting</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(h)</ENT>
              <ENT>Waiver of performance tests</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(a)(1)-(3)</ENT>
              <ENT>Applicability of monitoring requirements</ENT>
              <ENT>Yes</ENT>
              <ENT>Additional monitoring requirements are found in § 63.9005(d) and 63.9035.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.8(a)(4)</ENT>
              <ENT>Monitoring with flares</ENT>
              <ENT>No</ENT>
              <ENT>Subpart NNNNN does not refer directly or indirectly to § 63.11.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(b)</ENT>
              <ENT>Conduct of monitoring and procedures when there are multiple effluents and multiple monitoring systems</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c)(1)-(3)</ENT>
              <ENT>Continuous monitoring system O&amp;M</ENT>
              <ENT>Yes</ENT>
              <ENT>Applies as modified by § 63.9005(d).</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c)(4)</ENT>
              <ENT>Continuous monitoring system requirements during breakdown, out-of-control, repair, maintenance, and high-level calibration drifts</ENT>
              <ENT>Yes</ENT>
              <ENT>Applies as modified by § 63.9005(d).</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c)(5)</ENT>
              <ENT>Continuous opacity monitoring system (COMS) minimum procedures</ENT>
              <ENT>No</ENT>
              <ENT>Subpart NNNNN does not have opacity or visible emission standards.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c)(6)</ENT>
              <ENT>Zero and high level calibration checks</ENT>
              <ENT>Yes</ENT>
              <ENT>Applies as modified by § 63.9005(d).</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c)(7)-(8)</ENT>
              <ENT>Out-of-control periods, including reporting</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(d)-(e)</ENT>
              <ENT>Quality control program and CMS performance evaluation</ENT>
              <ENT>No</ENT>
              <ENT>Applies as modified by § 63.9005(d).</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(f)(1)-(5)</ENT>
              <ENT>Use of an alternative monitoring method</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(f)(6)</ENT>
              <ENT>Alternative to relative accuracy test</ENT>
              <ENT>No</ENT>
              <ENT>Only applies to sources that use continuous emissions monitoring systems (CEMS).</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(g)</ENT>
              <ENT>Data reduction</ENT>
              <ENT>Yes</ENT>
              <ENT>Applies as modified by § 63.9005(d).</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(a)</ENT>
              <ENT>Notification requirements—applicability</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(b)</ENT>
              <ENT>Initial notifications</ENT>
              <ENT>Yes</ENT>
              <ENT>Except § 63.9045(c) requires new or reconstructed affected sources to submit the application for construction or reconstruction required by § 63.9(b)(1)(iii) in lieu of the initial notification.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(c)</ENT>
              <ENT>Request for compliance extension</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(d)</ENT>
              <ENT>Notification that a new source is subject to special compliance requirements</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(e)</ENT>
              <ENT>Notification of performance test</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(f)</ENT>
              <ENT>Notification of visible emissions/opacity test</ENT>
              <ENT>No</ENT>
              <ENT>Subpart NNNNN does not have opacity or visible emission standards.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(g)(1)</ENT>
              <ENT>Additional CMS notifications—date of CMS performance evaluation</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(g)(2)</ENT>
              <ENT>Use of COMS data</ENT>
              <ENT>No</ENT>
              <ENT>Subpart NNNNN does not require the use of COMS.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(g)(3)</ENT>
              <ENT>Alternative to relative accuracy testing</ENT>
              <ENT>No</ENT>
              <ENT>Applies only to sources with CEMS.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(h)</ENT>
              <ENT>Notification of compliance status</ENT>
              <ENT>Yes</ENT>
              <ENT>Except the submission date specified in § 63.9(h)(2)(ii) is superseded by the date specified in § 63.9045(f).</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(i)</ENT>
              <ENT>Adjustment of submittal deadlines</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(j)</ENT>
              <ENT>Change in previous information</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(a)</ENT>
              <ENT>Recordkeeping/reporting applicability</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(1)</ENT>
              <ENT>General recordkeeping requirements</ENT>
              <ENT>Yes</ENT>
              <ENT>§§ 63.9055 and 63.9060 specify additional recordkeeping requirements.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(2)(i)-(xi)</ENT>
              <ENT>Records related to SSM periods and CMS</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(2)(xii)</ENT>
              <ENT>Records when under waiver</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(2)(xiii)</ENT>
              <ENT>Records when using alternative to relative accuracy test</ENT>
              <ENT>No</ENT>
              <ENT>Applies only to sources with CEMS.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(2)(xiv)</ENT>
              <ENT>All documentation supporting initial notification and notification of compliance status</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(3)</ENT>
              <ENT>Recordkeeping requirements for applicability determinations</ENT>
              <ENT O="xl">Yes.</ENT>
              <ENT/>
            </ROW>
            <ROW>
              <PRTPAGE P="36"/>
              <ENT I="01">§ 63.10(c)</ENT>
              <ENT>Additional recordkeeping requirements for sources with CMS</ENT>
              <ENT>Yes</ENT>
              <ENT>Applies as modified by § 63.9005 (d).</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(d)(1)</ENT>
              <ENT>General reporting requirements</ENT>
              <ENT>Yes</ENT>
              <ENT>§ 63.9050 specifies additional reporting requirements.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(d)(2)</ENT>
              <ENT>Performance test results</ENT>
              <ENT>Yes</ENT>
              <ENT>§ 63.9045(f) specifies submission date.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(d)(3)</ENT>
              <ENT>Opacity or visible emissions observations</ENT>
              <ENT>No</ENT>
              <ENT>Subpart NNNNN does not specify opacity or visible emission standards.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(d)(4)</ENT>
              <ENT>Progress reports for sources with compliance extensions</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(d)(5)</ENT>
              <ENT>SSM reports</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(e)(1)</ENT>
              <ENT>Additional CMS reports—general</ENT>
              <ENT>Yes</ENT>
              <ENT>Applies as modified by § 63.9005(d).</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(e)(2)(i)</ENT>
              <ENT>Results of CMS performance evaluations</ENT>
              <ENT>Yes</ENT>
              <ENT>Applies as modified by § 63.9005(d).</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(e)(2)</ENT>
              <ENT>Results of COMS performance evaluations</ENT>
              <ENT>No</ENT>
              <ENT>Subpart NNNNN does not require the use of COMS.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(e)(3)</ENT>
              <ENT>Excess emissions/CMS performance reports</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(e)(4)</ENT>
              <ENT>Continuous opacity monitoring system data reports</ENT>
              <ENT>No</ENT>
              <ENT>Subpart NNNNN does not require the use of COMS.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(f)</ENT>
              <ENT>Recordkeeping/reporting waiver</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.11</ENT>
              <ENT>Control device requirements—applicability</ENT>
              <ENT>No</ENT>
              <ENT>Facilities subject to subpart NNNNN do not use flares as control devices.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.12</ENT>
              <ENT>State authority and delegations</ENT>
              <ENT>Yes</ENT>
              <ENT>§ 63.9070 lists those sections of subparts NNNNN and A that are not delegated.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.13</ENT>
              <ENT>Addresses</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.14</ENT>
              <ENT>Incorporation by reference</ENT>
              <ENT>Yes</ENT>
              <ENT>Subpart NNNNN does not incorporate any material by reference.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.15</ENT>
              <ENT>Availability of information/confidentiality</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
          </GPOTABLE>
          <CITA>[68 FR 19090, Apr. 17, 2003, as amended at 71 FR 17748, Apr. 7, 2006]</CITA>
        </APPENDIX>
      </SUBPART>
      <SUBPART>
        <RESERVED>Subpart OOOOO [Reserved]</RESERVED>
      </SUBPART>
      <SUBPART>
        <HD SOURCE="HED">Subpart PPPPP—National Emission Standards for Hazardous Air Pollutants for Engine Test Cells/Stands</HD>
        <SOURCE>
          <HD SOURCE="HED">Source:</HD>
          <P>68 FR 28785, May 27, 2003, unless otherwise noted.</P>
        </SOURCE>
        <SUBJGRP>
          <HD SOURCE="HED">What This Subpart Covers</HD>
          <SECTION>
            <SECTNO>§ 63.9280</SECTNO>
            <SUBJECT>What is the purpose of subpart PPPPP?</SUBJECT>
            <P>This subpart PPPPP establishes national emission standards for hazardous air pollutants (NESHAP) for engine test cells/stands located at major sources of hazardous air pollutants (HAP) emissions. This subpart also establishes requirements to demonstrate initial and continuous compliance with the emission limitations contained in this NESHAP.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9285</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <P>You are subject to this subpart if you own or operate an engine test cell/stand that is located at a major source of HAP emissions.</P>
            <P>(a) An engine test cell/stand is any apparatus used for testing uninstalled stationary or uninstalled mobile (motive) engines.</P>
            <P>(b) An uninstalled engine is an engine that is not installed in, or an integrated part of, the final product.</P>
            <P>(c) A major source of HAP emissions is a plant site that emits or has the potential to emit any single HAP at a rate of 10 tons (9.07 megagrams) or more per year or any combination of HAP at a rate of 25 tons (22.68 megagrams) or more per year.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9290</SECTNO>
            <SUBJECT>What parts of my plant does this subpart cover?</SUBJECT>

            <P>This subpart applies to each new, reconstructed, or existing affected source.<PRTPAGE P="37"/>
            </P>
            <P>(a) <E T="03">Affected source.</E> An affected source is the collection of all equipment and activities associated with engine test cells/stands used for testing uninstalled stationary or uninstalled mobile (motive) engines located at a major source of HAP emissions.</P>
            <P>(1) <E T="03">Existing affected source.</E> An affected source is existing if you commenced construction or reconstruction of the affected source on or before May 14, 2002. A change in ownership of an existing affected source does not make that affected source a new or reconstructed affected source.</P>
            <P>(2) <E T="03">New affected source.</E> An affected source is new if you commenced construction of the affected source after May 14, 2002.</P>
            <P>(3) <E T="03">Reconstructed affected source.</E> An affected source is reconstructed if you meet the definition of reconstruction in § 63.2 of subpart A of this part and reconstruction is commenced after May 14, 2002. Changes made to an existing affected source primarily for the purpose of complying with revisions to engine testing requirements under 40 CFR parts 80, 86, 89, 90, 91, or 92 are not considered a modification or reconstruction. In addition, passive measurement and control instrumentation and electronics are not included as part of any affected source reconstruction evaluation.</P>
            <P>(b) Existing affected sources do not have to meet the requirements of this subpart and of subpart A of this part.</P>
            <P>(c) Any portion of a new or reconstructed affected source located at a major source that is used exclusively for testing internal combustion engines with rated power of less than 25 horsepower (hp) (19 kilowatts(kW)) does not have to meet the requirements of this subpart and of subpart A of this part except for the initial notification requirements of § 63.9345(b).</P>
            <P>(d) Any portion of a new or reconstructed affected source located at a major source that meets any of the criteria specified in paragraphs (d)(1) through (4) of this section does not have to meet the requirements of this subpart and of subpart A of this part.</P>
            <P>(1) Any portion of the affected source used exclusively for testing combustion turbine engines.</P>
            <P>(2) Any portion of the affected source used exclusively for testing rocket engines.</P>
            <P>(3) Any portion of the affected source used in research and teaching activities at facilities that are not engaged in the development of engines or engine test services for commercial purposes.</P>
            <P>(4) Any portion of the affected source operated to test or evaluate fuels (such as knock engines), transmissions, or electronics.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9295</SECTNO>
            <SUBJECT>When do I have to comply with this subpart?</SUBJECT>
            <P>(a) <E T="03">Affected sources.</E> (1) If you start up your new or reconstructed affected source before May 27, 2003, you must comply with the emission limitations in this subpart no later than May 27, 2003.</P>
            <P>(2) If you start up your new or reconstructed affected source on or after May 27, 2003, you must comply with the emission limitations in this subpart upon startup.</P>
            <P>(b) <E T="03">Area sources that become major sources.</E> If your new or reconstructed affected source is located at an area source that increases its emissions or its potential to emit such that it becomes a major source of HAP, your new or reconstructed affected source must be in compliance with this subpart when the area source becomes a major source.</P>
            <P>(c) You must meet the notification requirements in § 63.9345 and in 40 CFR part 63, subpart A.</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Emission Limitations</HD>
          <SECTION>
            <SECTNO>§ 63.9300</SECTNO>
            <SUBJECT>What emission limitations must I meet?</SUBJECT>
            <P>For each new or reconstructed affected source that is used in whole or in part for testing internal combustion engines with rated power of 25 hp (19 kW) or more and that is located at a major source, you must comply with the emission limitations in Table 1 to this subpart. (Tables are found at the end of this subpart.)</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9301</SECTNO>
            <SUBJECT>What are my options for meeting the emission limits?</SUBJECT>

            <P>You may use either a continuous parameter monitoring system (CPMS) or <PRTPAGE P="38"/>a continuous emission monitoring system (CEMS) to demonstrate compliance with the emission limitations. Continuous monitoring systems must meet the requirements in § 63.9306 (CPMS) and § 63.9307 (CEMS).</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9302</SECTNO>
            <SUBJECT>What operating limits must I meet?</SUBJECT>
            <P>(a) For any new or reconstructed affected source on which you use add-on controls, you must meet the operating limits specified in Table 2 to this subpart. These operating limits must be established during the performance test according to the requirements in § 63.9324. You must meet the operating limits at all times after you establish them.</P>
            <P>(b) If you use an add-on control device other than those listed in Table 2 to this subpart, or wish to monitor an alternative parameter and comply with a different operating limit, you must apply to the Administrator for approval of alternative monitoring under § 63.8(f).</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">General Compliane Requirements</HD>
          <SECTION>
            <SECTNO>§ 63.9305</SECTNO>
            <SUBJECT>What are my general requirements for complying with this subpart?</SUBJECT>
            <P>(a) You must be in compliance with the emission limitation that applies to you at all times, except during periods of startup, shutdown, or malfunction (SSM) of your control device or associated monitoring equipment.</P>
            <P>(b) If you must comply with the emission limitation, you must operate and maintain your engine test cell/stand, air pollution control equipment, and monitoring equipment in a manner consistent with good air pollution control practices for minimizing emissions at all times.</P>
            <P>(c) You must develop a written SSM plan (SSMP) for emission control devices and associated monitoring equipment according to the provisions in § 63.6(e)(3). The plan will apply only to emission control devices, and not to engine test cells/stands.</P>
            <CITA>[68 FR 28785, May 27, 2003, as amended at 71 FR 20470, Apr. 20, 2006]</CITA>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9306</SECTNO>
            <SUBJECT>What are my continuous parameter monitoring system (CPMS) installation, operation, and maintenance requirements?</SUBJECT>
            <P>(a) <E T="03">General.</E> You must install, operate, and maintain each CPMS specified in paragraphs (c) and (d) of this section according to paragraphs (a)(1) through (7) of this section. You must install, operate, and maintain each CPMS specified in paragraph (b) of this section according to paragraphs (a)(3) through (5) of this section.</P>
            <P>(1) The CPMS must complete a minimum of one cycle of operation for each successive 15-minute period. You must have a minimum of four equally spaced successive cycles of CPMS operation in 1 hour.</P>
            <P>(2) You must determine the average of all recorded readings for each successive 3-hour period of the emission capture system and add-on control device operation.</P>
            <P>(3) You must record the results of each inspection, calibration, and validation check of the CPMS.</P>
            <P>(4) You must maintain the CPMS at all times and have available necessary parts for routine repairs of the monitoring equipment.</P>
            <P>(5) You must operate the CPMS and collect emission capture system and add-on control device parameter data at all times that an engine test cell/stand is operating, except during monitoring malfunctions, associated repairs, and required quality assurance or control activities (including, if applicable, calibration checks and required zero and span adjustments).</P>
            <P>(6) You must not use emission capture system or add-on control device parameter data recorded during monitoring malfunctions, associated repairs, out-of-control periods, or required quality assurance or control activities when calculating data averages. You must use all the data collected during all other periods in calculating the data averages for determining compliance with the emission capture system and add-on control device operating limits.</P>

            <P>(7) A monitoring malfunction is any sudden, infrequent, not reasonably preventable failure of the CPMS to provide valid data. Monitoring failures <PRTPAGE P="39"/>that are caused in part by poor maintenance or careless operation are not malfunctions. Any period for which the monitoring system is out-of-control and data are not available for required calculations is a deviation from the monitoring requirements.</P>
            <P>(b) <E T="03">Capture system bypass line.</E> You must meet the requirements of paragraphs (b)(1) and (2) of this section for each emission capture system that contains bypass lines that could divert emissions away from the add-on control device to the atmosphere.</P>
            <P>(1) You must monitor or secure the valve or closure mechanism controlling the bypass line in a nondiverting position in such a way that the valve or closure mechanism cannot be opened without creating a record that the valve was opened. The method used to monitor or secure the valve or closure mechanism must meet one of the requirements specified in paragraphs (b)(1)(i) through (iv) of this section.</P>
            <P>(i) <E T="03">Flow control position indicator.</E> Install, calibrate, maintain, and operate according to the manufacturer's specifications a flow control position indicator that takes a reading at least once every 15 minutes and provides a record indicating whether the emissions are directed to the add-on control device or diverted from the add-on control device. The time of occurrence and flow control position must be recorded, as well as every time the flow direction is changed. The flow control position indicator must be installed at the entrance to any bypass line that could divert the emissions away from the add-on control device to the atmosphere.</P>
            <P>(ii) <E T="03">Car-seal or lock-and-key valve closures.</E> Secure any bypass line valve in the closed position with a car-seal or a lock-and-key type configuration. You must visually inspect the seal or closure mechanism at least once every month to ensure that the valve is maintained in the closed position, and the emissions are not diverted away from the add-on control device to the atmosphere.</P>
            <P>(iii) <E T="03">Valve closure monitoring.</E> Ensure that any bypass line valve is in the closed (nondiverting) position through monitoring of valve position at least once every 15 minutes. You must inspect the monitoring system at least once every month to verify that the monitor will indicate valve position.</P>
            <P>(iv) <E T="03">Automatic shutdown system.</E> Use an automatic shutdown system in which the engine testing operation is stopped when flow is diverted by the bypass line away from the add-on control device to the atmosphere when an engine test cell/stand is operating. You must inspect the automatic shutdown system at least once every month to verify that it will detect diversions of flow and shut down the engine test cell/stand in operation.</P>
            <P>(2) If any bypass line is opened, you must include a description of why the bypass line was opened and the length of time it remained open in the semiannual compliance reports required in § 63.9350.</P>
            <P>(c) <E T="03">Thermal oxidizers and catalytic oxidizers.</E> If you are using a thermal oxidizer or catalytic oxidizer as an add-on control device, you must comply with the requirements in paragraphs (c)(1) through (3) of this section.</P>
            <P>(1) For a thermal oxidizer, install a gas temperature monitor in the firebox of the thermal oxidizer or in the duct immediately downstream of the firebox before any substantial heat exchange occurs.</P>
            <P>(2) For a catalytic oxidizer, you must install a gas temperature monitor in the gas stream immediately before the catalyst bed, and if you established operating limits according to § 63.9324(b)(1) and (2), also install a gas temperature monitor in the gas stream immediately after the catalyst bed.</P>
            <P>(i) If you establish operating limits according to § 63.9324(b)(1) and (2), then you must install the gas temperature monitors both upstream and downstream of the catalyst bed. The temperature monitors must be in the gas stream immediately before and after the catalyst bed to measure the temperature difference across the bed.</P>
            <P>(ii) If you establish operating limits according to § 63.9324(b)(3) and (4), then you must install a gas temperature monitor upstream of the catalyst bed. The temperature monitor must be in the gas stream immediately before the catalyst bed to measure the temperature.</P>

            <P>(3) For all thermal oxidizers and catalytic oxidizers, you must meet the <PRTPAGE P="40"/>requirements in paragraphs (a) and (c)(3)(i) through (vii) of this section for each gas temperature monitoring device.</P>
            <P>(i) Locate the temperature sensor in a position that provides a representative temperature.</P>
            <P>(ii) Use a temperature sensor with a measurement sensitivity of 4 degrees Fahrenheit or 0.75 percent of the temperature value, whichever is larger.</P>
            <P>(iii) Shield the temperature sensor system from electromagnetic interference and chemical contaminants.</P>
            <P>(iv) If a gas temperature chart recorder is used, it must have a measurement sensitivity in the minor division of at least 20 degrees Fahrenheit.</P>
            <P>(v) Perform an electronic calibration at least semiannually according to the procedures in the manufacturer's owner's manual. Following the electronic calibration, you must conduct a temperature sensor validation check in which a second or redundant temperature sensor placed near the process temperature sensor must yield a reading within 30 degrees Fahrenheit of the process temperature sensor reading.</P>
            <P>(vi) Conduct calibration and validation checks anytime the sensor exceeds the manufacturer's specified maximum operating temperature range or install a new temperature sensor.</P>
            <P>(vii) At least monthly, inspect components for integrity and electrical connections for continuity, oxidation, and galvanic corrosion.</P>
            <P>(d) Emission capture systems. The capture system monitoring system must comply with the applicable requirements in paragraphs (d)(1) and (2) of this section.</P>
            <P>(1) For each flow measurement device, you must meet the requirements in paragraphs (a) and (d)(1)(i) through (iv) of this section.</P>
            <P>(i) Locate a flow sensor in a position that provides a representative flow measurement in the duct from each capture device in the emission capture system to the add-on control device.</P>
            <P>(ii) Reduce swirling flow or abnormal velocity distributions due to upstream and downstream disturbances.</P>
            <P>(iii) Conduct a flow sensor calibration check at least semiannually.</P>
            <P>(iv) At least monthly, inspect components for integrity, electrical connections for continuity, and mechanical connections for leakage.</P>
            <P>(2) For each pressure drop measurement device, you must comply with the requirements in paragraphs (a) and (d)(2)(i) through (vi) of this section.</P>
            <P>(i) Locate the pressure sensor(s) in or as close to a position that provides a representative measurement of the pressure drop across each opening you are monitoring.</P>
            <P>(ii) Minimize or eliminate pulsating pressure, vibration, and internal and external corrosion.</P>
            <P>(iii) Check pressure tap pluggage daily.</P>
            <P>(iv) Using an inclined manometer with a measurement sensitivity of 0.0002 inch water, check gauge calibration quarterly and transducer calibration monthly.</P>
            <P>(v) Conduct calibration checks any time the sensor exceeds the manufacturer's specified maximum operating pressure range or install a new pressure sensor.</P>
            <P>(vi) At least monthly, inspect components for integrity, electrical connections for continuity, and mechanical connections for leakage.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9307</SECTNO>
            <SUBJECT>What are my continuous emissions monitoring system installation, operation, and maintenance requirements?</SUBJECT>

            <P>(a) You must install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and oxygen (O<E T="52">2</E>) at the outlet of the exhaust system of the engine test cell/stand or at the outlet of the emission control device.</P>

            <P>(b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O<E T="52">2</E> at both the inlet and the outlet of the emission control device.</P>
            <P>(c) To comply with either emission limitations, the CEMS must be installed and operated according to the requirements described in paragraphs (c)(1) through (4) of this section.</P>
            <P>(1) You must install, operate, and maintain each CEMS according to the applicable Performance Specification (PS) of 40 CFR part 60, appendix B (PS-3 or PS-4A).</P>

            <P>(2) You must conduct a performance evaluation of each CEMS according to <PRTPAGE P="41"/>the requirements in 40 CFR 63.8 and according to PS-3 of 40 CFR part 60, appendix B, using Reference Method 3A or 3B for the O<E T="52">2</E> CEMS, and according to PS-4A of 40 CFR part 60, appendix B, using Reference Method 10 or 10B for the CO CEMS. If the fuel used in the engines being tested is natural gas, you may use ASTM D 6522-00, Standard Test Method for Determination of Nitrogen Oxides, Carbon Monoxide and Oxygen Concentrations in Emissions from Natural Gas Fired Reciprocating Engines, Combustion Turbines, Boilers, and Process Heaters Using Portable Analyzers (incorporated by reference, see § 63.14). As an alternative to Method 3B, you may use ANSI/ASME PTC 19.10-1981, “Flue and Exhaust Gas Analyses [Part 10, Instruments and Apparatus],” (incorporated by reference, see § 63.14).</P>
            <P>(3) As specified in § 63.8(c)(4)(ii), each CEMS must complete a minimum of one cycle of operation (sampling, analyzing, and data recording) for each successive 15-minute period. You must have at least two data points, each representing a different 15-minute period within the same hour, to have a valid hour of data.</P>

            <P>(4) All CEMS data must be reduced as specified in § 63.8(g)(2) and recorded as CO concentration in parts per million by volume, dry basis (ppmvd), corrected to 15 percent O<E T="52">2</E> content.</P>
            <P>(d) If you have CEMS that are subject to paragraph (a) or (b) of this section, you must properly maintain and operate the monitors continuously according to the requirements described in paragraphs (d)(1) and (2) of this section.</P>
            <P>(1) <E T="03">Proper maintenance.</E> You must maintain the monitoring equipment at all times that the engine test cell/stand is operating, including but not limited to, maintaining necessary parts for routine repairs of the monitoring equipment.</P>
            <P>(2) <E T="03">Continued operation.</E> You must operate your CEMS according to paragraphs (d)(2)(i) and (ii) of this section.</P>
            <P>(i) You must conduct all monitoring in continuous operation at all times that the engine test cell/stand is operating, except for, as applicable, monitoring malfunctions, associated repairs, and required quality assurance or control activities (including, as applicable, calibration drift checks and required zero and high-level adjustments). Quality assurance or control activities must be performed according to procedure 1 of 40 CFR part 60, appendix F.</P>
            <P>(ii) Data recorded during monitoring malfunctions, associated repairs, out-of-control periods, and required quality assurance or control activities must not be used for purposes of calculating data averages. You must use all of the data collected from all other periods in assessing compliance. A monitoring malfunction is any sudden, infrequent, not reasonably preventable failure of the monitoring equipment to provide valid data. Monitoring failures that are caused in part by poor maintenance or careless operation are not malfunctions. Any period for which the monitoring system is out-of-control and data are not available for required calculations constitutes a deviation from the monitoring requirements.</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Testing and Initial Compliance Requirements</HD>
          <SECTION>
            <SECTNO>§ 63.9310</SECTNO>
            <SUBJECT>By what date must I conduct the initial compliance demonstrations?</SUBJECT>
            <P>You must conduct the initial compliance demonstrations that apply to you in Table 3 to this subpart within 180 calendar days after the compliance date that is specified for your new or reconstructed affected source in § 63.9295 and according to the provisions in § 63.7(a)(2).</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9320</SECTNO>
            <SUBJECT>What procedures must I use?</SUBJECT>
            <P>(a) You must conduct each initial compliance demonstration that applies to you in Table 3 to this subpart.</P>
            <P>(b) You must conduct an initial performance evaluation of each capture and control system according to §§ 63.9321, 63.9322, 63.9323 and 63.9324, and each CEMS according to the requirements in 40 CFR 63.8 and according to the applicable Performance Specification of 40 CFR part 60, appendix B (PS-3 or PS-4A).</P>

            <P>(c) The initial demonstration of compliance with the carbon monoxide (CO) or total hydrocarbon (THC) concentration limitation consists of the first 4-<PRTPAGE P="42"/>hour rolling average CO or THC concentration recorded after completion of the CEMS performance evaluation. You must correct the CO or THC concentration at the outlet of the engine test cell/stand or the emission control device to a dry basis and to 15 percent O<E T="52">2</E> content according to Equation 1 of this section:</P>
            <MATH DEEP="33" SPAN="1">
              <MID>ER27MY03.002</MID>
            </MATH>
            <EXTRACT>
              <FP>Where:</FP>
              
              <FP SOURCE="FP-1">C<E T="52">c</E> = concentration of CO or THC, corrected to 15 percent oxygen, ppmvd</FP>
              <FP SOURCE="FP-1">C<E T="52">unc</E> = total uncorrected concentration of CO or THC, ppmvd</FP>
              <FP SOURCE="FP-1">%O<E T="52">2d</E> = concentration of oxygen measured in gas stream, dry basis, percent by volume.</FP>
            </EXTRACT>
            
            <P>(d) The initial demonstration of compliance with the CO or THC percent reduction emission limitation consists of the first 4-hour rolling average percent reduction in CO or THC recorded after completion of the performance evaluation of the capture/control system and/or CEMS. You must complete the actions described in paragraphs (d)(1) through (2) of this section.</P>

            <P>(1) Correct the CO or THC concentrations at the inlet and outlet of the emission control device to a dry basis and to 15 percent O<E T="52">2</E> content using Equation 1 of this section.</P>
            <P>(2) Calculate the percent reduction in CO or THC using Equation 2 of this section:</P>
            <MATH DEEP="27" SPAN="1">
              <MID>ER27MY03.003</MID>
            </MATH>
            <EXTRACT>
              <FP>Where:</FP>
              
              <FP SOURCE="FP-1">R = percent reduction in CO or THC</FP>
              <FP SOURCE="FP-1">C<E T="52">i</E> = corrected CO or THC concentration at inlet of the emission control device</FP>
              <FP SOURCE="FP-1">C<E T="52">o</E> = corrected CO or THC concentration at the outlet of the emission control device.</FP>
            </EXTRACT>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9321</SECTNO>
            <SUBJECT>What are the general requirements for performance tests?</SUBJECT>
            <P>(a) You must conduct each performance test required by § 63.9310 according to the requirements in § 63.7(e)(1) and under the conditions in this section unless you obtain a waiver of the performance test according to the provisions in § 63.7(h).</P>
            <P>(1) <E T="03">Representative engine testing conditions.</E> You must conduct the performance test under representative operating conditions for the test cell/stand. Operations during periods of SSM, and during periods of nonoperation do not constitute representative conditions. You must record the process information that is necessary to document operating conditions during the test and explain why the conditions represent normal operation.</P>
            <P>(2) <E T="03">Representative emission capture system and add-on control device operating conditions.</E> You must conduct the performance test when the emission capture system and add-on control device are operating at a representative flow rate, and the add-on control device is operating at a representative inlet concentration. You must record information that is necessary to document emission capture system and add-on control device operating conditions during the test and explain why the conditions represent normal operation.</P>
            <P>(b) You must conduct each performance test of an emission capture system according to the requirements in § 63.9322. You must conduct each performance test of an add-on control device according to the requirements in § 63.9323.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9322</SECTNO>
            <SUBJECT>How do I determine the emission capture system efficiency?</SUBJECT>
            <P>You must use the procedures and test methods in this section to determine capture efficiency as part of the performance test required by § 63.9310.</P>
            <P>(a) <E T="03">Assuming 100 percent capture efficiency.</E> You may assume the capture system efficiency is 100 percent if both conditions in paragraphs (a)(1) and (2) of this section are met:</P>
            <P>(1) The capture system meets the criteria in Method 204 of appendix M to 40 CFR part 51 for a potential to emit (PTE) and directs all the exhaust gases from the enclosure to an add-on control device.</P>
            <P>(2) All engine test operations creating exhaust gases for which the test is applicable are conducted within the capture system.</P>
            <P>(b) <E T="03">Measuring capture efficiency.</E> If the capture system does not meet the criteria in paragraphs (a)(1) and (2) of this section, then you must use one of the <PRTPAGE P="43"/>two protocols described in paragraphs (c) and (d) of this section to measure capture efficiency. The capture efficiency measurements use total volatile hydrocarbon (TVH) capture efficiency as a surrogate for organic HAP capture efficiency. For the protocol in paragraph (c) of this section, the capture efficiency measurement must consist of three test runs. Each test run must be at least 3 hours in duration or the length of a production run, whichever is longer, up to 8 hours. For the purposes of this test, a production run means the time required for a single engine test to go from the beginning to the end.</P>
            <P>(c) <E T="03">Gas-to-gas protocol using a temporary total enclosure or a building enclosure.</E> The gas-to-gas protocol compares the mass of TVH emissions captured by the emission capture system to the mass of TVH emissions not captured. Use a temporary total enclosure or a building enclosure and the procedures in paragraphs (c)(1) through (5) of this section to measure emission capture system efficiency using the gas-to-gas protocol.</P>
            <P>(1) Either use a building enclosure or construct an enclosure around the engine test cell/stand and all areas where emissions from the engine testing subsequently occur. The enclosure must meet the applicable definition of a temporary total enclosure or building enclosure in Method 204 of appendix M to 40 CFR part 51.</P>
            <P>(2) Use Method 204B or 204C of appendix M to 40 CFR part 51 to measure the total mass, kg, of TVH emissions captured by the emission capture system during each capture efficiency test run as measured at the inlet to the add-on control device. To make the measurement, substitute TVH for each occurrence of the term VOC in the methods.</P>
            <P>(i) The sampling points for the Method 204B or 204C of appendix M to 40 CFR part 51 measurement must be upstream from the add-on control device and must represent total emissions routed from the capture system and entering the add-on control device.</P>
            <P>(ii) If multiple emission streams from the capture system enter the add-on control device without a single common duct, then the emissions entering the add-on control device must be simultaneously measured in each duct, and the total emissions entering the add-on control device must be determined.</P>
            <P>(3) Use Method 204D or 204E of appendix M to 40 CFR part 51 to measure the total mass, kg, of TVH emissions that are not captured by the emission capture system; they are measured as they exit the temporary total enclosure or building enclosure during each capture efficiency test run. To make the measurement, substitute TVH for each occurrence of the term VOC in the methods.</P>
            <P>(i) Use Method 204D of appendix M to 40 CFR part 51 if the enclosure is a temporary total enclosure.</P>
            <P>(ii) Use Method 204E of appendix M to 40 CFR part 51 if the enclosure is a building enclosure. During the capture efficiency measurement, all organic compound emitting operations inside the building enclosure, other than the engine test cell/stand operation for which capture efficiency is being determined, must be shut down, but all fans and blowers must be operating normally.</P>
            <P>(4) For each capture efficiency test run, determine the percent capture efficiency of the emission capture system using Equation 1 of this section:</P>
            <MATH DEEP="31" SPAN="2">
              <MID>ER27MY03.004</MID>
            </MATH>
            <EXTRACT>
              <FP>Where:</FP>
              
              <FP SOURCE="FP-1">CE = capture efficiency of the emission capture system vented to the add-on control device, percent</FP>
              <FP SOURCE="FP-1">TVH<E T="52">captured</E> = total mass of TVH captured by the emission capture system as measured at the inlet to the add-on control device during the emission capture efficiency test <PRTPAGE P="44"/>run, kg, determined according to paragraph (c)(2) of this section</FP>
              <FP SOURCE="FP-1">TVH<E T="52">uncaptured</E> = total mass of TVH that is not captured by the emission capture system and that exits from the temporary total enclosure or building enclosure during the capture efficiency test run, kg, determined according to paragraph (c)(3) of this section.</FP>
            </EXTRACT>
            
            <P>(5) Determine the capture efficiency the emission capture system as the average of the capture efficiencies measured in the three test runs.</P>
            <P>(d) <E T="03">Alternative capture efficiency protocol.</E> As an alternative to the procedure specified in paragraph (c) of this section, you may determine capture efficiency using any other capture efficiency protocol and test methods that satisfy the criteria of either the data quality objective or lower control limit approach as described in appendix A to subpart KK of this part.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9323</SECTNO>
            <SUBJECT>How do I determine the add-on control device emission destruction or removal efficiency?</SUBJECT>
            <P>You must use the procedures and test methods in this section to determine the add-on control device emission destruction or removal efficiency as part of the performance test required by § 63.9310. You must conduct three test runs as specified in § 63.7(e)(3), and each test run must last at least 1 hour.</P>
            <P>(a) For all types of add-on control devices, use the test methods specified in paragraphs (a)(1) through (5) of this section.</P>
            <P>(1) Use Method 1 or 1A of appendix A to 40 CFR part 60, as appropriate, to select sampling sites and velocity traverse points.</P>
            <P>(2) Use Method 2, 2A, 2C, 2D, 2F, or 2G of appendix A to 40 CFR part 60, as appropriate, to measure gas volumetric flow rate.</P>
            <P>(3) Use Method 3, 3A, or 3B of appendix A to 40 CFR part 60, as appropriate, for gas analysis to determine dry molecular weight. The ANSI/ASME PTC 19.10-1981 Part 10 is an acceptable alternative to Method 3B (incorporated by reference, see § 63.14).</P>
            <P>(4) Use Method 4 of appendix A to 40 CFR part 60, to determine stack gas moisture.</P>
            <P>(5) Methods for determining gas volumetric flow rate, dry molecular weight, and stack gas moisture must be performed, as applicable, during each test run.</P>
            <P>(b) Measure total gaseous organic mass emissions as carbon at the inlet and outlet of the add-on control device simultaneously, using either Method 25 or 25A of appendix A to 40 CFR part 60, as specified in paragraphs (b)(1) through (3) of this section. You must use the same method for both the inlet and outlet measurements.</P>
            <P>(1) Use Method 25 of appendix A to 40 CFR part 60 if the add-on control device is an oxidizer, and you expect the total gaseous organic concentration as carbon to be more than 50 parts per million at the control device outlet.</P>
            <P>(2) Use Method 25A of appendix A to 40 CFR part 60 if the add-on control device is an oxidizer, and you expect the total gaseous organic concentration as carbon to be 50 ppm or less at the control device outlet.</P>
            <P>(c) For each test run, determine the total gaseous organic emissions mass flow rates for the inlet and the outlet of the add-on control device, using Equation 1 of this section. If there is more than one inlet or outlet to the add-on control device, you must calculate the total gaseous organic mass flow rate using Equation 1 of this section for each inlet and each outlet and then total all of the inlet emissions and total all of the outlet emissions.</P>
            <MATH DEEP="19" SPAN="2">
              <MID>ER27MY03.005</MID>
            </MATH>
            <EXTRACT>
              <FP>Where:</FP>
              
              <FP SOURCE="FP-1">M<E T="52">f</E> = total gaseous organic emissions mass flow rate, kg/hour (kg/h)</FP>
              <FP SOURCE="FP-1">C<E T="52">c</E> = concentration of organic compounds as carbon in the vent gas, as determined by Method 25 or Method 25A, parts per million by volume (ppmv), dry basis</FP>
              <FP SOURCE="FP-1">Q<E T="52">sd</E> = volumetric flow rate of gases entering or exiting the add-on control device, as determined by Method 2, 2A, 2C, 2D, 2F, or <PRTPAGE P="45"/>2G, dry standard cubic meters/hour (dscm/h)</FP>
              <FP SOURCE="FP-1">0.0416 = conversion factor for molar volume, kg-moles per cubic meter (mol/m<SU>3</SU>) (@ 293 Kelvin [K] and 760 millimeters of mercury [mmHg]).</FP>
            </EXTRACT>
            
            <P>(d) For each test run, determine the add-on control device organic emissions destruction or removal efficiency, using Equation 2 of this section:</P>
            <MATH DEEP="27" SPAN="1">
              <MID>ER27MY03.006</MID>
            </MATH>
            <EXTRACT>
              <FP>Where:</FP>
              
              <FP SOURCE="FP-1">DRE = organic emissions destruction or removal efficiency of the add-on control device, percent</FP>
              <FP SOURCE="FP-1">M<E T="52">fi</E> = total gaseous organic emissions mass flow rate at the inlet(s) to the add-on control device, using Equation 1 of this section, kg/h</FP>
              <FP SOURCE="FP-1">M<E T="52">fo</E> = total gaseous organic emissions mass flow rate at the outlet(s) of the add-on control device, using Equation 1 of this section, kg/h.</FP>
            </EXTRACT>
            
            <P>(e) Determine the emission destruction or removal efficiency of the add-on control device as the average of the efficiencies determined in the three test runs and calculated in Equation 2 of this section.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9324</SECTNO>
            <SUBJECT>How do I establish the emission capture system and add-on control device operating limits during the performance test?</SUBJECT>
            <P>During the performance test required by § 63.9310, you must establish the operating limits required by § 63.9302 according to this section, unless you have received approval for alternative monitoring and operating limits under § 63.8(f) as specified in § 63.9302.</P>
            <P>(a) <E T="03">Thermal oxidizers.</E> If your add-on control device is a thermal oxidizer, establish the operating limits according to paragraphs (a)(1) and (2) of this section.</P>
            <P>(1) During the performance test, you must monitor and record the combustion temperature at least once every 15 minutes during each of the three test runs. You must monitor the temperature in the firebox of the thermal oxidizer or immediately downstream of the firebox before any substantial heat exchange occurs.</P>
            <P>(2) Use the data collected during the performance test to calculate and record the average combustion temperature maintained during the performance test. This average combustion temperature is the minimum operating limit for your thermal oxidizer.</P>
            <P>(b) <E T="03">Catalytic oxidizers.</E> If your add-on control device is a catalytic oxidizer, establish the operating limits according to either paragraphs (b)(1) and (2) or paragraphs (b)(3) and (4) of this section.</P>
            <P>(1) During the performance test, you must monitor and record the temperature just before the catalyst bed and the temperature difference across the catalyst bed at least once every 15 minutes during each of the three test runs.</P>
            <P>(2) Use the data collected during the performance test to calculate and record the average temperature just before the catalyst bed and the average temperature difference across the catalyst bed maintained during the performance test. These are the minimum operating limits for your catalytic oxidizer.</P>
            <P>(3) As an alternative to monitoring the temperature difference across the catalyst bed, you may monitor the temperature at the inlet to the catalyst bed and implement a site-specific inspection and maintenance plan for your catalytic oxidizer as specified in paragraph (b)(4) of this section. During the performance test, you must monitor and record the temperature just before the catalyst bed at least once every 15 minutes during each of the three test runs. Use the data collected during the performance test to calculate and record the average temperature just before the catalyst bed during the performance test. This is the minimum operating limit for your catalytic oxidizer.</P>
            <P>(4) You must develop and implement an inspection and maintenance plan for your catalytic oxidizer(s) for which you elect to monitor according to paragraph (b)(3) of this section. The plan must address, at a minimum, the elements specified in paragraphs (b)(4)(i) through (iii) of this section.</P>

            <P>(i) Annual sampling and analysis of the catalyst activity (i.e., conversion <PRTPAGE P="46"/>efficiency) following the manufacturer's or catalyst supplier's recommended procedures.</P>
            <P>(ii) Monthly inspection of the oxidizer system, including the burner assembly and fuel supply lines for problems and, as necessary, adjust the equipment to assure proper air-to-fuel mixtures.</P>
            <P>(iii) Annual internal and monthly external visual inspection of the catalyst bed to check for channeling, abrasion, and settling. If problems are found, you must take corrective action consistent with the manufacturer's recommendation and conduct a new performance test to determine destruction efficiency according to § 63.9323.</P>
            <P>(c) <E T="03">Emission capture system.</E> For each capture device that is not part of a PTE that meets the criteria of § 63.9322(a), establish an operating limit for either the gas volumetric flow rate or duct static pressure, as specified in paragraphs (c)(1) and (2) of this section. The operating limit for a PTE is specified in Table 3 to this subpart.</P>
            <P>(1) During the capture efficiency determination required by § 63.9310, you must monitor and record either the gas volumetric flow rate or the duct static pressure for each separate capture device in your emission capture system at least once every 15 minutes during each of the three test runs at a point in the duct between the capture device and the add-on control device inlet.</P>
            <P>(2) Calculate and record the average gas volumetric flow rate or duct static pressure for the three test runs for each capture device. This average gas volumetric flow rate or duct static pressure is the minimum operating limit for that specific capture device.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9330</SECTNO>
            <SUBJECT>How do I demonstrate initial compliance with the emission limitation?</SUBJECT>
            <P>(a) You must demonstrate initial compliance with the emission limitation that applies to you according to Table 3 to this subpart.</P>
            <P>(b) You must submit the Notification of Compliance Status containing results of the initial compliance demonstration according to the requirements in § 63.9345(c).</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Continuous Compliance Requirements</HD>
          <SECTION>
            <SECTNO>§ 63.9335</SECTNO>
            <SUBJECT>How do I monitor and collect data to demonstrate continuous compliance?</SUBJECT>
            <P>(a) Except for monitor malfunctions, associated repairs, and required quality assurance or quality control activities (including, as applicable, calibration drift checks and required zero and high-level adjustments of the monitoring system), you must conduct all monitoring in continuous operation at all times the engine test cell/stand is operating.</P>
            <P>(b) Do not use data recorded during monitor malfunctions, associated repairs, and required quality assurance or quality control activities for meeting the requirements of this subpart, including data averages and calculations. You must use all the data collected during all other periods in assessing the performance of the emission control device or in assessing emissions from the new or reconstructed affected source.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9340</SECTNO>
            <SUBJECT>How do I demonstrate continuous compliance with the emission limitations?</SUBJECT>
            <P>(a) You must demonstrate continuous compliance with the emission limitation in Table 1 to this subpart that applies to you according to methods specified in Table 5 to this subpart.</P>
            <P>(b) You must report each instance in paragraphs (b)(1) and (2) of this section. These instances are deviations from the emission limitation in this subpart and must be reported according to the requirements in § 63.9350.</P>
            <P>(1) You must report each instance in which you did not meet the emission limitation that applies to you.</P>
            <P>(2) You must report each instance in which you did not meet the requirements in Table 7 to this subpart that apply to you.</P>
            <P>(c) <E T="03">Startups, shutdowns, and malfunctions.</E> (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of SSM of control devices and associated monitoring equipment are not violations if you demonstrate to the Administrator's satisfaction that you were operating in accordance with § 63.6(e)(1).<PRTPAGE P="47"/>
            </P>
            <P>(2) The Administrator will determine whether deviations that occur during a period of SSM of control devices and associated monitoring equipment are violations, according to the provisions in § 63.6(e).</P>
            <CITA>[68 FR 28785, May 27, 2003, as amended at 71 FR 20470, Apr. 20, 2006]</CITA>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Notifications, Reports, and Records</HD>
          <SECTION>
            <SECTNO>§ 63.9345</SECTNO>
            <SUBJECT>What notifications must I submit and when?</SUBJECT>
            <P>(a) You must submit all of the notifications in §§ 63.8(e), 63.8(f)(4) and (6), and 63.9(b), (g)(1), (g)(2) and (h) that apply to you by the dates specified.</P>
            <P>(b) If you own or operate a new or reconstructed test cell/stand used for testing internal combustion engines, you are required to submit an Initial Notification as specified in paragraphs (b)(1) through (3) of this section.</P>
            <P>(1) As specified in § 63.9(b)(2), if you start up your new or reconstructed affected source before the effective date of this subpart, you must submit an Initial Notification not later than 120 calendar days after May 27, 2003.</P>
            <P>(2) As specified in § 63.9(b), if you start up your new or reconstructed affected source on or after the effective date of this subpart, you must submit an Initial Notification not later than 120 calendar days after you become subject to this subpart.</P>
            <P>(3) If you are required to submit an Initial Notification but are otherwise not affected by the requirements of this subpart, in accordance with § 63.9290(c), your notification should include the information in § 63.9(b)(2)(i) through (v) and a statement that your new or reconstructed engine test cell/stand has no additional requirements and explain the basis of the exclusion (for example, that the test cell/stand is used exclusively for testing internal combustion engines with rated power of less than 25 hp (19 kW)).</P>
            <P>(c) If you are required to comply with the emission limitations in Table 1 to this subpart, you must submit a Notification of Compliance Status according to § 63.9(h)(2)(ii). For each initial compliance demonstration with the emission limitation, you must submit the Notification of Compliance Status before the close of business on the 30th calendar day following the completion of the initial compliance demonstration.</P>
            <P>(d) You must submit a notification of initial performance evaluation of your CEMS or performance testing of your control device at least 60 calendar days before the performance testing/evaluation is scheduled to begin as required in § 63.8(e)(2).</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9350</SECTNO>
            <SUBJECT>What reports must I submit and when?</SUBJECT>
            <P>(a) If you own or operate a new or reconstructed affected source that must meet the emission limitation, you must submit a semiannual compliance report according to Table 6 to this subpart by the applicable dates specified in paragraphs (a)(1) through (6) of this section, unless the Administrator has approved a different schedule.</P>
            <P>(1) The first semiannual compliance report must cover the period beginning on the compliance date specified in § 63.9295 and ending on June 30 or December 31, whichever date is the first date following the end of the first calendar half after the compliance date specified in § 63.9295.</P>
            <P>(2) The first semiannual compliance report must be postmarked or delivered no later than July 31 or January 31, whichever date follows the end of the first calendar half after the compliance date that is specified in § 63.9295.</P>
            <P>(3) Each subsequent semiannual compliance report must cover the semiannual reporting period from January 1 through June 30 or the semiannual reporting period from July 1 through December 31.</P>
            <P>(4) Each subsequent semiannual compliance report must be postmarked or delivered no later than July 31 or January 31, whichever date is the first date following the end of the semiannual reporting period.</P>

            <P>(5) For each new or reconstructed engine test cell/stand that is subject to permitting regulations pursuant to 40 CFR part 70 or 71, and if the permitting authority has established the date for submitting semiannual reports pursuant to 40 CFR 70.6(a)(3)(iii)(A) or 40 CFR 71.6(a)(3)(iii)(A), you may submit <PRTPAGE P="48"/>the first and subsequent compliance reports according to the dates the permitting authority has established instead of according to the dates in paragraphs (a)(1) through (4) of this section.</P>
            <P>(6) If you had an SSM of a control device or associated monitoring equipment during the reporting period and you took actions consistent with your SSMP, the compliance report must include the information in paragraphs § 63.10(d)(5)(i).</P>
            <P>(b) If there is no deviation from the applicable emission limitation and the CEMS or CPMS was not out-of-control, according to § 63.8(c)(7), the semiannual compliance report must contain the information described in paragraphs (b)(1) through (4) of this section.</P>
            <P>(1) Company name and address.</P>
            <P>(2) Statement by a responsible official, with that official's name, title, and signature, certifying the truth, accuracy, and completeness of the content of the report.</P>
            <P>(3) Date of report and beginning and ending dates of the reporting period.</P>
            <P>(4) A statement that no deviation from the emission limit occurred during the reporting period and that no CEMS or CPMS was out-of-control, according to § 63.8(c)(7).</P>
            <P>(c) For each deviation from an emission limit, the semiannual compliance report must include the information in paragraphs (b)(1) through (3) of this section and the information included in paragraphs (c)(1) through (4) of this section.</P>
            <P>(1) The date and time that each deviation started and stopped.</P>
            <P>(2) The total operating time of each new or reconstructed engine test cell/stand during the reporting period.</P>
            <P>(3) A summary of the total duration of the deviation during the reporting period (recorded in 4-hour periods), and the total duration as a percent of the total operating time during that reporting period.</P>
            <P>(4) A breakdown of the total duration of the deviations during the reporting period into those that are due to control equipment problems, process problems, other known causes, and other unknown causes.</P>
            <P>(d) For each CEMS or CPMS deviation, the semiannual compliance report must include the information in paragraphs (b)(1) through (3) of this section and the information included in paragraphs (d)(1) through (10) of this section.</P>
            <P>(1) The date and time that each CEMS or CPMS was inoperative except for zero (low-level) and high-level checks.</P>
            <P>(2) The date and time that each CEMS or CPMS was out-of-control including the information in § 63.8(c)(8).</P>
            <P>(3) A summary of the total duration of CEMS or CPMS downtime during the reporting period (reported in 4-hour periods), and the total duration of CEMS or CPMS downtime as a percent of the total engine test cell/stand operating time during that reporting period.</P>
            <P>(4) A breakdown of the total duration of CEMS or CPMS downtime during the reporting period into periods that are due to monitoring equipment malfunctions, nonmonitoring equipment malfunctions, quality assurance/quality control calibrations, other known causes and other unknown causes.</P>
            <P>(5) The monitoring equipment manufacturer(s) and model number(s) of each monitor.</P>
            <P>(6) The date of the latest CEMS or CPMS certification or audit.</P>
            <P>(7) The date and time period of each deviation from an operating limit in Table 2 to this subpart; date and time period of any bypass of the add-on control device; and whether each deviation occurred during a period of SSM or during another period.</P>
            <P>(8) A summary of the total duration of each deviation from an operating limit in Table 2 to this subpart, each bypass of the add-on control device during the semiannual reporting period, and the total duration as a percent of the total source operating time during that semiannual reporting period.</P>
            <P>(9) A breakdown of the total duration of the deviations from the operating limits in Table 2 to this subpart and bypasses of the add-on control device during the semiannual reporting period by identifying deviations due to startup, shutdown, control equipment problems, process problems, other known causes, and other unknown causes.</P>

            <P>(10) A description of any changes in CEMS, CPMS, or controls since the last reporting period.<PRTPAGE P="49"/>
            </P>
            <P>(e) If you had an SSM of a control device or associated monitoring equipment during the semiannual reporting period that was not consistent with your SSMP, you must submit an immediate SSM report according to the requirements in § 63.10(d)(5)(ii).</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9355</SECTNO>
            <SUBJECT>What records must I keep?</SUBJECT>
            <P>(a) You must keep the records as described in paragraphs (a)(1) through (5) of this section.</P>
            <P>(1) A copy of each notification and report that you submitted to comply with this subpart, including all documentation supporting any Initial Notification or Notification of Compliance Status that you submitted, according to the requirements in § 63.10(b)(2)(xiv).</P>
            <P>(2) Records of performance evaluations as required in § 63.10(b)(2)(viii).</P>
            <P>(3) Records of the occurrence and duration of each malfunction of the air pollution control equipment, if applicable, as required in § 63.10(b)(2)(ii).</P>
            <P>(4) Records of all maintenance on the air pollution control equipment, if applicable, as required in § 63.10(b)(iii).</P>
            <P>(5) The calculation of the mass of organic HAP emission reduction by emission capture systems and add-on control devices.</P>
            <P>(b) For each CPMS, you must keep the records as described in paragraphs (b)(1) through (7) of this section.</P>
            <P>(1) For each deviation, a record of whether the deviation occurred during a period of SSM of the control device and associated monitoring equipment.</P>
            <P>(2) The records in § 63.6(e)(3)(iii) through (v) related to SSM.</P>
            <P>(3) The records required to show continuous compliance with each operating limit specified in Table 2 to this subpart that applies to you.</P>
            <P>(4) For each capture system that is a PTE, the data and documentation you used to support a determination that the capture system meets the criteria in Method 204 of appendix M to 40 CFR part 51 for a PTE and has a capture efficiency of 100 percent, as specified in § 63.9322(a).</P>
            <P>(5) For each capture system that is not a PTE, the data and documentation you used to determine capture efficiency according to the requirements specified in §§ 63.9321 and 63.9322(b) through (e), including the records specified in paragraphs (b)(5)(i) and (ii) of this section that apply to you.</P>
            <P>(i) Records for a gas-to-gas protocol using a temporary total enclosure or a building enclosure. Records of the mass of TVH emissions captured by the emission capture system as measured by Method 204B or C of appendix M to 40 CFR part 51 at the inlet to the add-on control device, including a copy of the test report. Records of the mass of TVH emissions not captured by the capture system that exited the temporary total enclosure or building enclosure during each capture efficiency test run as measured by Method 204D or E of appendix M to 40 CFR part 51, including a copy of the test report. Records documenting that the enclosure used for the capture efficiency test met the criteria in Method 204 of appendix M to 40 CFR part 51 for either a temporary total enclosure or a building enclosure.</P>
            <P>(ii) Records for an alternative protocol. Records needed to document a capture efficiency determination using an alternative method or protocol as specified in § 63.9322(e), if applicable.</P>
            <P>(6) The records specified in paragraphs (b)(6)(i) and (ii) of this section for each add-on control device organic HAP destruction or removal efficiency determination as specified in § 63.9323.</P>
            <P>(i) Records of each add-on control device performance test conducted according to §§ 63.9321, 63.9322, and 63.9323.</P>
            <P>(ii) Records of the engine testing conditions during the add-on control device performance test showing that the performance test was conducted under representative operating conditions.</P>
            <P>(7) Records of the data and calculations you used to establish the emission capture and add-on control device operating limits as specified in § 63.9324 and to document compliance with the operating limits as specified in Table 2 to this subpart.</P>
            <P>(c) For each CEMS, you must keep the records as described in paragraphs (c)(1) through (4) of this section.</P>
            <P>(1) Records described in § 63.10(b)(2)(vi) through (xi).</P>

            <P>(2) Previous (i.e., superceded) versions of the performance evaluation plan as required in § 63.8(d)(3).<PRTPAGE P="50"/>
            </P>
            <P>(3) Request for alternatives to the relative accuracy test for CEMS as required in § 63.8(f)(6)(i), if applicable.</P>
            <P>(4) The records in § 63.6(e)(3)(iii) through (v) related to SSM of the control device and associated monitoring equipment.</P>
            <P>(d) You must keep the records required in Table 5 to this subpart to show continuous compliance with each emission limitation that applies to you.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9360</SECTNO>
            <SUBJECT>In what form and how long must I keep my records?</SUBJECT>
            <P>(a) You must maintain all applicable records in such a manner that they can be readily accessed and are suitable for inspection according to § 63.10(b)(1).</P>
            <P>(b) As specified in § 63.10(b)(1), you must keep each records for 5 years following the date of each occurrence, measurement, maintenance, corrective action, report, or record.</P>
            <P>(c) You must retain your records of the most recent 2 years on site, or your records must be accessible on site. Your records of the remaining 3 years may be retained off site.</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Other Requirements and Information</HD>
          <SECTION>
            <SECTNO>§ 63.9365</SECTNO>
            <SUBJECT>What parts of the General Provisions apply to me?</SUBJECT>
            <P>Table 7 to this subpart shows which parts of the General Provisions in §§ 63.1 through 63.15 apply to you.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9370</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <P>(a) This subpart can be implemented and enforced by us, the U.S. EPA, or a delegated authority such as your State, local, or tribal agency. If the U.S. EPA Administrator has delegated authority to your State, local, or tribal agency, then that agency, in addition to the U.S. EPA, has the authority to implement and enforce this subpart. You should contact your U.S. EPA Regional Office to find out if implementation and enforcement of this subpart is delegated to your State, local, or tribal agency.</P>
            <P>(b) In delegating implementation and enforcement authority of this subpart to a State, local, or tribal agency under section 40 CFR part 63, subpart E, the authorities contained in paragraph (c) of this section are retained by the Administrator of U.S. EPA and are not transferred to the State, local, or tribal agency.</P>
            <P>(c) The authorities that cannot be delegated to State, local, or tribal agencies are described in paragraphs (c)(1) through (4) of this section.</P>
            <P>(1) Approval of alternatives to the emission limitations in § 63.9300 under § 63.6(g).</P>
            <P>(2) Approval of major changes to test methods under § 63.7(e)(2)(ii) and (f) and as defined in § 63.90.</P>
            <P>(3) Approval of major changes to monitoring under § 63.8(f) and as defined in § 63.90.</P>
            <P>(4) Approval of major changes to recordkeeping and reporting under § 63.10(f) and as defined in § 63.90.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9375</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <P>Terms used in this subpart are defined in the CAA; in 40 CFR 63.2, and in this section:</P>
            <P>
              <E T="03">CAA</E> means the Clean Air Act (42 U.S.C. 7401 et seq., as amended by Public Law 101-549, 104 Statute 2399).</P>
            <P>
              <E T="03">Area source</E> means any stationary source of HAP that is not a major source as defined in this part.</P>
            <P>
              <E T="03">Combustion turbine engine</E> means a device in which air is compressed in a compressor, enters a combustion chamber, and is compressed further by the combustion of fuel injected into the combustion chamber. The hot compressed combustion gases then expand over a series of curved vanes or blades arranged on a central spindle that rotates.</P>
            <P>
              <E T="03">Deviation</E> means any instance in which an affected source subject to this subpart, or an owner or operator of such a source:</P>
            <P>(1) Fails to meet any requirement or obligation established by this subpart, including but not limited to any emission limitations;</P>

            <P>(2) Fails to meet any term or condition that is adopted to implement an applicable requirement in this subpart and that is included in the operating permit for any affected source required to obtain such a permit; or<PRTPAGE P="51"/>
            </P>
            <P>(3) Fails to meet any emission limitation in this subpart during malfunction, regardless or whether or not such failure is permitted by this subpart.</P>
            <P>
              <E T="03">Engine</E> means any internal combustion engine, any combustion turbine engine, or any rocket engine.</P>
            <P>
              <E T="03">Engine Test Cell/Stand</E> means any apparatus used for testing uninstalled stationary or uninstalled mobile (motive) engines.</P>
            <P>
              <E T="03">Hazardous Air Pollutant (HAP)</E> means any air pollutant listed in or pursuant to section 112(b) of the CAA.</P>
            <P>
              <E T="03">Internal combustion engine</E> means a device in which air enters a combustion chamber, is mixed with fuel, compressed in the chamber, and combusted. Fuel may enter the combustion chamber with the air or be injected into the combustion chamber. Expansion of the hot combustion gases in the chamber rotates a shaft, either through a reciprocating or rotary action. For purposes of this subpart, this definition does not include combustion turbine engines.</P>
            <P>
              <E T="03">Major source,</E> as used in this subpart, shall have the same meaning as in § 63.2.</P>
            <P>
              <E T="03">Malfunction</E> means any sudden, infrequent, and not reasonably preventable failure of air pollution control equipment, process equipment, or a process to operate in a normal or usual manner which causes, or has the potential to cause, the emission limitations in an applicable standard to be exceeded. Failures that are caused in part by poor maintenance or careless operation are not malfunctions.</P>
            <P>
              <E T="03">Rated power</E> means the maximum power output of an engine in use.</P>
            <P>
              <E T="03">Potential to emit</E> means the maximum capacity of a stationary source to emit a pollutant under its physical and operational design. Any physical or operational limitation on the capacity of the stationary source to emit a pollutant, including air pollution control equipment and restrictions on hours of operation or on the type or amount of material combusted, stored, or processed, shall be treated as part of its design if the limitation or the effect it would have on emissions is federally enforceable.</P>
            <P>
              <E T="03">Responsible official</E> means responsible official as defined by 40 CFR 70.2.</P>
            <P>
              <E T="03">Rocket engine</E> means a device consisting of a combustion chamber in which materials referred to as propellants, which provide both the fuel and the oxygen for combustion, are burned. Combustion gases escape through a nozzle, providing thrust.</P>
            <P>
              <E T="03">Uninstalled engine</E> means an engine not installed in, or an integrated part of, the final product.</P>
            <CITA>[68 FR 28785, May 27, 2003, as amended at 71 FR 20470, Apr. 20, 2006]</CITA>
          </SECTION>
        </SUBJGRP>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. PPPPP, Table 1</EAR>
          <HD SOURCE="HED">Table 1 to Subpart PPPPP of Part 63—Emission Limitations</HD>
          <P>You must comply with the emission limits that apply to your affected source in the following table as required by § 63.9300.</P>
          <GPOTABLE CDEF="s100,r100" COLS="2" OPTS="L2">
            <BOXHD>
              <CHED H="1" O="L">For each new or reconstructed affected source located at a major source facility that is used in whole or in part for testing . . .</CHED>
              <CHED H="1" O="L">You must meet one of the following emission limitations:</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">1. internal combustion engines with rated power of 25 hp (19 kW) or more</ENT>

              <ENT>a. limit the concentration of CO or THC to 20 ppmvd or less (corrected to 15 percent O<E T="52">2</E> content); or<LI>b. achieve a reduction in CO or THC of 96 percent or more between the inlet and outlet concentrations (corrected to 15 percent O<E T="52">2</E> content) of the emission control device.</LI>
              </ENT>
            </ROW>
          </GPOTABLE>
        </APPENDIX>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. PPPPP, Table 2</EAR>
          <HD SOURCE="HED">Table 2 to Subpart PPPPP of Part 63—Operating Limits</HD>

          <P>If you are required to comply with operating limits in § 63.9302, you must comply with the applicable operating limits in the following table:<PRTPAGE P="52"/>
          </P>
          <GPOTABLE CDEF="s100,r100,r100" COLS="3" OPTS="L2">
            <BOXHD>
              <CHED H="1" O="L">For the following device . . .</CHED>
              <CHED H="1" O="L">You must meet the following operating limit . . .</CHED>
              <CHED H="1" O="L">and you must demonstrate continuous compliance with the operating limit by . . .</CHED>
            </BOXHD>
            <ROW RUL="s">
              <ENT I="01">1. Thermal oxidizer</ENT>
              <ENT>a. The average combustion temperature in any 3-hour period must not fall below the combustion temperature limit established according to § 63.9324(a)</ENT>
              <ENT>i. Collecting the combustion temperature data according to § 63.9306(c);<LI>ii. Reducing the data to 3-hour block averages; and</LI>
                <LI>iii. Maintaining the 3-hour average combustion temperature at or above the temperature limit.</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="01">2. Catalytic oxidizer</ENT>
              <ENT>a. The average temperature measured just before the catalyst bed in any 3-hour period must not fall below the limit established according to § 63.9324(b)</ENT>
              <ENT>i. Collecting the temperature data according to § 63.9306(c);<LI>ii. Reducing the data to 3-hour block averages; and</LI>
                <LI>iii. Maintaining the 3-hour average temperature before the catalyst bed at or above the temperature limit.</LI>
              </ENT>
            </ROW>
            <ROW RUL="s">
              <ENT I="22"/>
              <ENT>b. Either ensure that the average temperature difference across the catalyst bed in any 3-hour period does not fall below the temperature difference limit established according to § 63.9324(b)(2) or develop and implement an inspection and maintenance plan according to § 63.9324(b)(3) and (4)</ENT>
              <ENT>i. Either collecting the temperature data according to § 63.9306(c), reducing the data to 3-hour block averages, and maintaining the 3-hour average temperature difference at or above the temperature difference limit; or<LI>ii. Complying with the inspection and maintenance plan developed according to § 63.9324(b)(3) and (4).</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="01">3. Emission capture system that is a PTE according to § 63.9322(a)</ENT>
              <ENT O="xl">a. The direction of the air flow at all times must be into the enclosure; and either</ENT>
              <ENT>i. Collecting the direction of air flow; and either the facial velocity of air through all natural draft openings according to § 63.9306(d)(1) or the pressure drop across the enclosure according to § 63.9306(d)(2); and<LI>ii. Maintaining the facial velocity of air flow through all natural draft openings or the pressure drop at or above the facial velocity limit or pressure drop limit, and maintaining the direction of air flow into the enclosure at all times.</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl">b. The average facial velocity of air through all natural draft openings in the enclosure must be at least 200 feet per minute; or</ENT>
              <ENT>Follow the requirements in 3ai and ii of this table.</ENT>
            </ROW>
            <ROW RUL="s">
              <ENT I="22"/>

              <ENT>c. The pressure drop across the enclosure must be at least 0.007 inch H<E T="52">2</E>O, as established in Method 204 of appendix M to 40 CFR part 51</ENT>
              <ENT>Follow the requirements in 3ai and ii of this table.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">4. Emission capture system that is not a PTE according to § 63.9322(a)</ENT>
              <ENT>a. The average gas volumetric flow rate or duct static pressure in each duct between a capture device and add-on control device inlet in any 3-hour period must not fall below the average volumetric flow rate or duct static pressure limit established for that capture device according § 63.9306(d)</ENT>
              <ENT>i. Collecting the gas volumetric flow rate or duct static pressure for each capture device according to § 63.9306(d);<LI>ii. Reducing the data to 3-hour block averages; and</LI>
                <LI>iii. Maintaining the 3-hour average gas volumetric flow rate or duct static pressure for each capture device at or above the gas volumetric flow rate or duct static pressure limit.</LI>
              </ENT>
            </ROW>
          </GPOTABLE>
        </APPENDIX>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. PPPPP, Table 3</EAR>
          <HD SOURCE="HED">Table 3 to Subpart PPPPP of Part 63—Requirements for Initial Compliance Demonstrations</HD>

          <P>As stated in § 63.9321, you must demonstrate initial compliance with each emission limitation that applies to you according to the following table:<PRTPAGE P="53"/>
          </P>
          <GPOTABLE CDEF="s50,r50,r50,r50" COLS="4" OPTS="L2">
            <BOXHD>
              <CHED H="1" O="L">For each new or reconstructed affected source complying with . . .</CHED>
              <CHED H="1" O="L">You must . . .</CHED>
              <CHED H="1" O="L">Using . . .</CHED>
              <CHED H="1" O="L">According to the following requirements . . .</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">1. The CO or THC outlet concentration emission limitation</ENT>
              <ENT>a. Demonstrate CO or THC emissions are 20 ppmvd or less</ENT>
              <ENT O="xl">i. EPA Methods 3A and 10 of appendix A to 40 CFR part 60 for CO measurement or EPA Method 25A of appendix A to 40 CFR part 60 for THC measurement; or</ENT>

              <ENT>You must demonstrate that the outlet concentration of CO or THC emissions from the test cell/stand or emission control device is 20 ppmvd or less, corrected to 15 percent O<E T="52">2</E> content, using the first 4-hour rolling average after a successful performance evaluation.</ENT>
            </ROW>
            <ROW RUL="s">
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>ii. A CEMS for CO or THC and O<E T="52">2</E> at the outlet of the engine test cell/stand or emission control device</ENT>

              <ENT>This demonstration is conducted immediately following a successful performance evaluation of the CEMS as required in § 63.9320(b). The demonstration consists of the first 4-hour rolling average of measurements. The CO or THC concentration must be corrected to 15 percent O<E T="52">2</E> content, dry basis using Equation 1 in § 63.9320.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">2. The CO or THC percent reduction emission limitation</ENT>
              <ENT>a. Demonstrate a reduction in CO or THC of 96 percent or more</ENT>
              <ENT O="xl">i. You must conduct an initial performance test to determine the capture and control efficiencies of the equipment and to establish operating limits to be achieved on a continuous basis; or</ENT>

              <ENT>You must demonstrate that the reduction in CO or THC emissions is at least 96 percent using the first 4-hour rolling average after a successful performance evaluation. Your inlet and outlet measurements must be on a dry basis and corrected to 15 percent O<E T="52">2</E> content.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>ii. A CEMS for CO or THC and O<E T="52">2</E> at both the inlet and outlet of the emission control device</ENT>

              <ENT>This demonstration is conducted immediately following a successful performance evaluation of the CEMS as required in § 63.9320(b). The demonstration consists of the first 4-hour rolling average of measurements. The inlet and outlet CO or THC concentrations must be corrected to 15 percent O<E T="52">2</E> content using Equation 1 in § 63.9320. The reduction in CO or THC is calculated using Equation 2 in § 63.9320.</ENT>
            </ROW>
          </GPOTABLE>
        </APPENDIX>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. PPPPP, Table 4</EAR>
          <HD SOURCE="HED">Table 4 to Subpart PPPPP of Part 63—Initial Compliance With Emission Limitations</HD>
          <P>As stated in § 63.9330, you must demonstrate initial compliance with each emission limitation that applies to you according to the following table:</P>
          <GPOTABLE CDEF="s100,r100" COLS="2" OPTS="L2">
            <BOXHD>
              <CHED H="1">For the . . .</CHED>
              <CHED H="1" O="L">You have demonstrated initial compliance if . . .</CHED>
            </BOXHD>
            <ROW RUL="s">
              <ENT I="01">1. CO or THC concentration emission limitation</ENT>

              <ENT>The first 4-hour rolling average CO or THC concentration is 20 ppmvd or less, corrected to 15 percent O<E T="52">2</E> content.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">2. CO or THC percent reduction emission limitation</ENT>

              <ENT>The first 4-hour rolling average reduction in CO or THC is 96 percent or more, dry basis, corrected to 15 percent O<E T="52">2</E> content.</ENT>
            </ROW>
          </GPOTABLE>
        </APPENDIX>
        <APPENDIX>
          <PRTPAGE P="54"/>
          <EAR>Pt. 63, Subpt. PPPPP, Table 5</EAR>
          <HD SOURCE="HED">Table 5 to Subpart PPPPP of Part 63—Continuous Compliance With Emission Limitations</HD>
          <P>As stated in § 63.9340, you must demonstrate continuous compliance with each emission limitation that applies to you according to the following table:</P>
          <GPOTABLE CDEF="s100,r100,r100" COLS="3" OPTS="L2">
            <BOXHD>
              <CHED H="1" O="L">For the . . .</CHED>
              <CHED H="1" O="L">You must . . .</CHED>
              <CHED H="1" O="L">By . . .</CHED>
            </BOXHD>
            <ROW RUL="s">
              <ENT I="01">1. CO or THC concentration emission limitation</ENT>
              <ENT>a. Demonstrate CO or THC emissions are 20 ppmvd or less over each 4-hour rolling averaging period</ENT>

              <ENT>i. Collecting the CPMS data according to § 63.9306(a), reducing the measurements to 1-hour averages; or<LI>ii. Collecting the CEMS data according to § 63.9307(a), reducing the measurements to 1-hour averages, correcting them to 15 percent O<E T="52">2</E> content, dry basis, according to § 63.9320;</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="01">2. CO or THC percent reduction emission limitation</ENT>
              <ENT>a. Demonstrate a reduction in CO or THC of 96 percent or more over each 4-hour rolling averaging period</ENT>

              <ENT>i. Collecting the CPMS data according to § 63.9306(a), reducing the measurements to 1-hour averages; or<LI>ii. Collecting the CEMS data according to § 63.9307(b), reducing the measurements to 1-hour averages, correcting them to 15 percent O<E T="52">2</E> content, dry basis, calculating the CO or THC percent reduction according to § 63.9320.</LI>
              </ENT>
            </ROW>
          </GPOTABLE>
        </APPENDIX>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. PPPPP, Table 6</EAR>
          <HD SOURCE="HED">Table 6 to Subpart PPPPP of Part 63—Requirements for Reports</HD>
          <P>As stated in § 63.9350, you must submit each report that applies to you according to the following table:</P>
          <GPOTABLE CDEF="s100,r100,r100" COLS="3" OPTS="L2">
            <BOXHD>
              <CHED H="1" O="L">If you own or operate a new or reconstructed affected source that must comply with emission limitations, you must submit a . . .</CHED>
              <CHED H="1" O="L">The report must contain . . .</CHED>
              <CHED H="1" O="L">You must submit the report . . .</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">1. Compliance report</ENT>
              <ENT>a. If there are no deviations from the emission limitations that apply to you, a statement that there were no deviations from the emission limitations during the reporting period</ENT>
              <ENT>Semiannually, according to the requirements in § 63.9350.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. If there were no periods during which the CEMS or CPMS were out of control as specified in § 63.8(c)(7), a statement that there were no periods during which the CEMS or CPMS was out of control during the reporting period</ENT>
              <ENT>Semiannually, according to the requirements in § 63.9350.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>c. If you have a deviation from any emission limitation during the reporting period, the report must contain the information in § 63.9350(c)</ENT>
              <ENT>Semiannually, according to the requirements in § 63.9350.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>d. If there were periods during which the CEMS or CPMS were out of control, as specified in § 63.8(c)(7), that report must contain the information in § 63.9350(d)</ENT>
              <ENT>Semiannually, according to the requirements in § 63.9350.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>e. If you had an SSM of a control device or associated monitoring equipment during the reporting period, the report must include the information in § 63.10(d)(5)(i)</ENT>
              <ENT>Semiannually, according to the requirements in § 63.9350.</ENT>
            </ROW>
          </GPOTABLE>
        </APPENDIX>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. PPPPP, Table 7</EAR>
          <HD SOURCE="HED">Table 7 to Subpart PPPPP of Part 63—Applicability of General Provisions to Subpart PPPPP</HD>

          <P>As stated in 63.9365, you must comply with the General Provisions in §§ 63.1 through 63.15 that apply to you according to the following table:<PRTPAGE P="55"/>
          </P>
          <GPOTABLE CDEF="s50,r50,r50,r50" COLS="4" OPTS="L2">
            <BOXHD>
              <CHED H="1">Citation</CHED>
              <CHED H="1">Subject</CHED>
              <CHED H="1">Brief description</CHED>
              <CHED H="1">Applies to subpart PPPPP</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">§ 63.1(a)(1)</ENT>
              <ENT>Applicability</ENT>
              <ENT>General applicability of the General Provisions</ENT>
              <ENT>Yes. Additional terms defined in § 63.9375.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.1(a)(2)-(4)</ENT>
              <ENT>Applicability</ENT>
              <ENT>Applicability of source categories</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.1(a)(5)</ENT>
              <ENT>[Reserved]</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.1(a)(6)-(7)</ENT>
              <ENT>Applicability</ENT>
              <ENT>Contact for source category information; extension of compliance through early reduction</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.1(a)(8)</ENT>
              <ENT>Applicability</ENT>
              <ENT>Establishment of State rules or programs</ENT>
              <ENT>No. Refers to State programs.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.1(a)(9)</ENT>
              <ENT>[Reserved]</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.1(a)(10)-(14)</ENT>
              <ENT>Applicability</ENT>
              <ENT>Explanation of time periods, postmark deadlines</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.1(b)(1)</ENT>
              <ENT>Applicability</ENT>
              <ENT>Initial applicability</ENT>
              <ENT>Yes. Subpart PPPPP clarifies applicability at § 63.9285.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.1(b)(2)</ENT>
              <ENT>Applicability</ENT>
              <ENT>Title V operating permit-reference to part 70</ENT>
              <ENT>Yes. All major affected sources are required to obtain a Title V permit.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.1(b)(3)</ENT>
              <ENT>Applicability</ENT>
              <ENT>Record of applicability determination</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.1(c)(1)</ENT>
              <ENT>Applicability</ENT>
              <ENT>Applicability after standards are set</ENT>
              <ENT>Yes. Subpart PPPPP clarifies the applicability of each paragraph of subpart A to sources subject to subpart PPPPP.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.1(c)(2)</ENT>
              <ENT>Applicability</ENT>
              <ENT>Title V permit requirement for area sources</ENT>
              <ENT>No. Area sources are not subject to subpart PPPPP.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.1(c)(3)</ENT>
              <ENT>[Reserved]</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.1(c)(4)</ENT>
              <ENT>Applicability</ENT>
              <ENT>Extension of compliance for existing sources</ENT>
              <ENT>No. Existing sources are not covered by the substantive control requirements of subpart PPPPP.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.1(c)(5)</ENT>
              <ENT>Applicability</ENT>
              <ENT>Notification requirements for an area source becoming a major source</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.1(d)</ENT>
              <ENT>[Reserved]</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.1(e)</ENT>
              <ENT>Applicability</ENT>
              <ENT>Applicability of permit program before a relevant standard has been set</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.2</ENT>
              <ENT>Definitions</ENT>
              <ENT>Definitions for Part 63 standards</ENT>
              <ENT>Yes. Additional definitions are specified in § 63.9375.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.3</ENT>
              <ENT>Units and Abbreviations</ENT>
              <ENT>Units and abbreviations for Part 63 standards</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.4</ENT>
              <ENT>Prohibited Activities</ENT>
              <ENT>Prohibited activities; compliance date; circumvention, severability</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.5(a)</ENT>
              <ENT>Construction/Reconstruction</ENT>
              <ENT>Construction and reconstruction—applicability</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.5(b)(1)</ENT>
              <ENT>Construction/Reconstruction</ENT>
              <ENT>Requirements upon construction or reconstruction</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.5(b)(2)</ENT>
              <ENT O="xl">[Reserved].</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.5(b)(3)</ENT>
              <ENT>Construction/Reconstruction</ENT>
              <ENT>Approval of construction</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.5(b)(4)</ENT>
              <ENT>Construction/Reconstruction</ENT>
              <ENT>Notification of construction</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.5(b)(5)</ENT>
              <ENT>Construction/Reconstruction</ENT>
              <ENT>Compliance</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.5(b)(6)</ENT>
              <ENT>Construction/Reconstruction</ENT>
              <ENT>Addition of equipment</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.5(c)</ENT>
              <ENT O="xl">[Reserved]</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.5(d)</ENT>
              <ENT>Construction/Reconstruction</ENT>
              <ENT>Application for construction reconstruction</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.5(e)</ENT>
              <ENT>Construction/Reconstruction</ENT>
              <ENT>Approval of construction or reconstruction</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.5(f)</ENT>
              <ENT>Construction/Reconstruction</ENT>
              <ENT>Approval of construction or reconstruction based on prior State review</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(a)</ENT>
              <ENT>Applicability</ENT>
              <ENT>Applicability of standards and monitoring requirements</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(b)(1)-(2)</ENT>
              <ENT>Compliance Dates for New and Reconstructed Sources</ENT>
              <ENT>Standards apply at effective date; 3 years after effective date; upon startup; 10 years after construction or reconstruction commences for 112(f)</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="56"/>
              <ENT I="01">§ 63.6(b)(3)</ENT>
              <ENT>Compliance Dates for New and Reconstructed Sources</ENT>
              <ENT>Compliance dates for sources constructed or reconstructed before effective date</ENT>
              <ENT>No. Compliance is required by startup or effective date.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(b)(4)</ENT>
              <ENT>Compliance Dates for New and Reconstructed Sources</ENT>
              <ENT>Compliance dates for sources also subject to § 112(f) standards</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(b)(5)</ENT>
              <ENT>Compliance Dates for New and Reconstructed Sources</ENT>
              <ENT>Notification</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(b)(6)</ENT>
              <ENT O="xl">[Reserved].</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(b)(7)</ENT>
              <ENT>Compliance Dates for New and Reconstructed Sources</ENT>
              <ENT>Compliance dates for new and reconstructed area sources that become major</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(c)(1)-(2)</ENT>
              <ENT>Compliance Dates for Existing Sources</ENT>
              <ENT>Effective date establishes compliance date</ENT>
              <ENT>No. Existing sources are not covered by the substantive control requirements of subpart PPPPP.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(c)(3)-(4)</ENT>
              <ENT O="xl">[Reserved].</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(c)(5)</ENT>
              <ENT>Compliance Dates for Existing Sources</ENT>
              <ENT>Compliance dates for existing area sources that becomes major</ENT>
              <ENT>Yes. If the area source become a major source by addition or reconstruction, the added or reconstructed portion will be subject to subpart PPPPP.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(d)</ENT>
              <ENT O="xl">[Reserved].</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(e)(1)-(2)</ENT>
              <ENT>Operation and Maintenance Requirements</ENT>
              <ENT>Operation and maintenance</ENT>
              <ENT>Yes. Except that you are not required to have an SSMP for control devices and associated monitoring equipment.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(e)(3)</ENT>
              <ENT>SSMP</ENT>
              <ENT>1. Requirement for SSM and SSMP<LI O="xl">2. Content of SSMP.</LI>
              </ENT>
              <ENT>Yes. You must develop an SSMP for each control device and associated monitoring equipment.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(f)(1)</ENT>
              <ENT>Compliance Except During SSM</ENT>
              <ENT>You must comply with emission standards at all times except during SSM of control devices or associated monitoring equipment</ENT>
              <ENT>Yes, but you must comply with emission standards at all times except during SSM of control devices and associated monitoring equipment only.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(f)(2)-(3)</ENT>
              <ENT>Methods for Determining Compliance</ENT>
              <ENT>Compliance based on performance test, operation and maintenance plans, records, inspection</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(g)(1)-(3)</ENT>
              <ENT>Alternative Standard</ENT>
              <ENT>Procedures for getting an alternative standard</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(h)</ENT>
              <ENT>Opacity/Visible Emission (VE) Standards</ENT>
              <ENT>Requirements for opacity/VE standards</ENT>
              <ENT>No. Subpart PPPPP does not establish opacity/VE standards and does not require continuous opacity monitoring systems (COMS).</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(i)(1)-(14)</ENT>
              <ENT>Compliance Extension</ENT>
              <ENT>Procedures and criteria for Administrator to grant compliance extension</ENT>
              <ENT>No. Compliance extension provisions apply to existing sources, which do not have emission limitations in subpart PPPPP.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(j)</ENT>
              <ENT>Presidential Compliance Exemption</ENT>
              <ENT>President may exempt source category from requirement to comply with rule</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(a)(1)-(2)</ENT>
              <ENT>Performance Test Dates</ENT>
              <ENT>Dates for conducting initial performance testing and other compliance demonstrations: Must conduct within 180 days after first subject to rule</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(a)(3)</ENT>
              <ENT>Section 114 Authority</ENT>
              <ENT>Administrator may require a performance test under CAA Section 114 at any time</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(b)(1)</ENT>
              <ENT>Notification Performance Test</ENT>
              <ENT>Must notify Administrator 60 days before the test</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="57"/>
              <ENT I="01">§ 63.7(b)(2)</ENT>
              <ENT>Notification of Rescheduling</ENT>
              <ENT>If have to reschedule performance test, must notify Administrator 5 days before schedule date of rescheduled date</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(c)</ENT>
              <ENT>Quality Assurance/Test Plan</ENT>
              <ENT>1. Requirement to submit site-specific test plan 60 days before the test or on date Administrator agrees with</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>2. Test plan approval procedures</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>3. Performance audit requirements</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>4. Internal and external QA procedures for testing</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(d)</ENT>
              <ENT>Testing Facilities</ENT>
              <ENT>Requirements for testing facilities</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(e)(1)</ENT>
              <ENT>Conditions for Conducting Performance Tests</ENT>
              <ENT>Performance tests must be conducted under representative conditions; cannot conduct performance tests during SSM; not a violation to exceed standard during SSM</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(e)(2)</ENT>
              <ENT>Conditions for Conducting Performance Tests</ENT>
              <ENT>Must conduct according to rule and EPA test methods unless Administrator approves alternative</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(e)(3)</ENT>
              <ENT>Test Run Duration</ENT>
              <ENT>1. Must have three test runs of at least 1 hour each</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>2. Compliance is based on arithmetic mean of three runs</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>3. Conditions when data from an additional test run can be used</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(e)(4)</ENT>
              <ENT>Other Performance Testing</ENT>
              <ENT>Administrator may require other testing under section 114 of the CAA</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(f)</ENT>
              <ENT>Alternative Test Method</ENT>
              <ENT>Procedures by which Administrator can grant approval to use an alternative test method</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(g)</ENT>
              <ENT>Performance Test Data Analysis</ENT>
              <ENT>1. Must include raw data in performance test report</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>2. Must submit performance test data 60 days after end of test with the Notification of Compliance Status</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>3. Keep data for 5 years</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(h)</ENT>
              <ENT>Waiver of Tests</ENT>
              <ENT>Procedures for Administrator to waive performance test</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(a)(1)</ENT>
              <ENT>Applicability of Monitoring Requirements</ENT>
              <ENT>Subject to all monitoring requirements in standard</ENT>
              <ENT>Yes. Subpart PPPPP contains specific requirements for monitoring at § 63.9325.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(a)(2)</ENT>
              <ENT>Performance Specifications</ENT>
              <ENT>Performance Specifications in appendix B of part 60 apply</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(a)(3)</ENT>
              <ENT O="xl">[Reserved]</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(a)(4)</ENT>
              <ENT>Monitoring with Flares</ENT>
              <ENT>Unless your rule says otherwise, the requirements for flares in 63.11 apply</ENT>
              <ENT>No. Subpart PPPPP does not have monitoring requirements for flares.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(b)(1)</ENT>
              <ENT>Monitoring</ENT>
              <ENT>Must conduct monitoring according to standard unless Administrator approves alternative</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(b)(2)-(3)</ENT>
              <ENT>Multiple Effluents and Multiple Monitoring Systems</ENT>
              <ENT>1. Specific requirements for installing monitoring systems</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="58"/>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>2. Must install on each effluent before it is combined and before it is released to the atmosphere unless Administrator approves otherwise</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>3. If more than one monitoring system on an emission point, must report all monitoring system results, unless one monitoring system is a backup</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c)(1)</ENT>
              <ENT>Monitoring System Operation and Maintenance</ENT>
              <ENT>Maintain monitoring system in a manner consistent with good air pollution control practices</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c)(1)(i)</ENT>
              <ENT>Routine and predictable CMS malfunctions</ENT>
              <ENT>1. Keep parts for routine repairs of CMS readily available<LI>2. Reporting requirements for SSM when action is described in SSMP</LI>
              </ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>3. Reporting requirements for SSM when action is described in SSMP</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c)(1)(ii)</ENT>
              <ENT>SSM of CMS Not in SSMP</ENT>
              <ENT>Reporting requirements for SSM of CMS when action is not described in SSMP</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c)(1)(iii)</ENT>
              <ENT>Compliance with Operation and Maintenance Requirements</ENT>

              <ENT>1. How Administrator determines if source complying with operation and maintenance requirements<LI O="xl">2. Review of source O&amp;M procedures, records, manufacturer's instructions and recommendations, and inspection</LI>
              </ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c)(2)-(3)</ENT>
              <ENT>Monitoring System Installation</ENT>
              <ENT>1. Must install to get representative emission of parameter measurements</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>2. Must verify operational status before or at performance test</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c)(4)</ENT>
              <ENT>Continuous Monitoring System (CMS) Requirements</ENT>
              <ENT>1. CMS must be operating except during breakdown, out of control, repair, maintenance, and high-level calibration drifts</ENT>
              <ENT>No. Follow specific requirements in § 63.9335(a) and (b) of subpart PPPPP.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>2. COMS must have a minimum of one cycle of sampling and analysis for each successive 10-second period and one cycle of data recording for each successive 6-minute period</ENT>
              <ENT>No. Follow specific requirements in § 63.9335(a) and (b) of subpart PPPP.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>3. CEMS must have a minimum of one cycle of operation for each successive 15-minute period</ENT>
              <ENT>No. Follow specific requirements in § 63.9335(a) and (b) of subpart PPPPP.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c)(5)</ENT>
              <ENT>COMS Minimum Procedures</ENT>
              <ENT>COMS minimum procedures</ENT>
              <ENT>No. Subpart PPPPP does not have opacity/VE standards.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c)(6)-(8)</ENT>
              <ENT>CMS Requirements</ENT>
              <ENT>Zero and high-level calibration check requirements, out-of-control periods</ENT>
              <ENT>Yes. Except that PPPP does not require COMS.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(d)</ENT>
              <ENT>CMS Quality Control</ENT>
              <ENT>1. Requirements for CMS quality control, including calibration, etc</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>2. Must keep quality control plan on record for 5 years. Keep old versions for 5 years after revisions</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(e)</ENT>
              <ENT>CMS Performance Evaluation</ENT>
              <ENT>Notification, performance evaluation test plan, reports</ENT>
              <ENT>Yes. Except for § 63.8(e)(5)(ii), which applies to COMS.</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="59"/>
              <ENT I="01">§ 63.8(f)(1)-(5)</ENT>
              <ENT>Alternative Monitoring Method</ENT>
              <ENT>Procedures for Administrator to approve alternative monitoring</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(f)(6)</ENT>
              <ENT>Alternative to Relative Accuracy Test</ENT>
              <ENT>Procedures for Administrator to approve alternative relative accuracy tests for CEMS</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(g)</ENT>
              <ENT>Data Reduction</ENT>

              <ENT>1. COMS 6-minute averages calculated over at least 36 evenly spaced data points<LI O="xl">2. CEMS 1-hour averages computed over at least 4 equally spaced data points</LI>
              </ENT>
              <ENT>Yes. Except that provisions for COMS are not applicable. Averaging periods for demonstrating compliance are specified at § 63.9340.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(g)(5)</ENT>
              <ENT>Data Reduction</ENT>
              <ENT>Data that cannot be used in computing averages for CEMS and COMS</ENT>
              <ENT>No. Specific language is located at § 63.9335(a).</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(a)</ENT>
              <ENT>Notification Requirements</ENT>
              <ENT>Applicability and State delegation</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(b)(1)-(5)</ENT>
              <ENT>Initial Notifications</ENT>
              <ENT>1. Submit notification subject 120 days after effective date</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>2. Notification of intent to construct/ reconstruct; notification of commencement of construct/ reconstruct; notification of startup</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>3. Contents of each</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(c)</ENT>
              <ENT>Request for Compliance Extension</ENT>
              <ENT>Can request if cannot comply by date or if installed BACT/LAER</ENT>
              <ENT>No. Compliance extensions do not apply to new or reconstructed sources.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(d)</ENT>
              <ENT>Notification of Special Compliance Requirements for New Source</ENT>
              <ENT>For sources that commence construction between proposal and promulgation and want to comply 3 years after effective date</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(e)</ENT>
              <ENT>Notification of Performance Test</ENT>
              <ENT>Notify Administrator 60 days prior</ENT>
              <ENT>No. Subpart PPPPP does not require performance testing.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(f)</ENT>
              <ENT>Notification of Opacity/VE Test</ENT>
              <ENT>Notify Administrator 30 days prior</ENT>
              <ENT>No. Subpart PPPPP does not have opacity/VE standards.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(g)(1)</ENT>
              <ENT>Additional Notifications when Using CMS</ENT>
              <ENT>Notification of performance evaluation</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(g)(2)</ENT>
              <ENT>Additional Notifications when Using CMS</ENT>
              <ENT>Notification of use of COMS data</ENT>
              <ENT>No. Subpart PPPPP does not contain opacity or VE standards.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(g)(3)</ENT>
              <ENT>Additional Notifications when Using CMS</ENT>
              <ENT>Notification that exceeded criterion for relative accuracy</ENT>
              <ENT>Yes. If alternative is in use.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(h)(1)-(6)</ENT>
              <ENT>Notification of Compliance Status</ENT>
              <ENT>1. Contents</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>2. Due 60 days after end of performance test or other compliance demonstration, except for opacity/VE, which are due 30 days after</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>3. When to submit to Federal vs. State authority</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(i)</ENT>
              <ENT>Adjustment of Submittal Deadlines</ENT>
              <ENT>Procedures for Administrator to approve change in when notifications must be submitted</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(j)</ENT>
              <ENT>Change in Previous Information</ENT>
              <ENT>Must submit within 15 days after the change</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(a)</ENT>
              <ENT>Recordkeeping/Reporting</ENT>
              <ENT>1. Applies to all, unless compliance extension</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>2. When to submit to Federal vs. State authority</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>3. Procedures for owners of more than one source</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(1)</ENT>
              <ENT>Recordkeeping/Reporting</ENT>
              <ENT>1. General requirements</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>2. Keep all records readily available</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>3. Keep for 5 years</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(2)(i)-(v)</ENT>
              <ENT>Records Related to SSM</ENT>
              <ENT>1. Occurrence of each of operation (process equipment)</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="60"/>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>2. Occurrence of each malfunction of air pollution equipment</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>3. Maintenance on air pollution control equipment</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>4. Actions during SSM</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>5. All information necessary to demonstrate conformance with the SSMP</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(2)(vi)-(xi)</ENT>
              <ENT>CMS Records</ENT>
              <ENT>Malfunctions, inoperative, out of control</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(2)(xii)</ENT>
              <ENT>Records</ENT>
              <ENT>Records when under waiver</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(2)(xiii)</ENT>
              <ENT>Records</ENT>
              <ENT>Records when using alternative to relative accuracy test</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(2)(xiv)</ENT>
              <ENT>Records</ENT>
              <ENT>All documentation supporting initial notification and notification of compliance status</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(3)</ENT>
              <ENT>Records</ENT>
              <ENT>Applicability determinations</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(c)(1)-(6), (9)-(15)</ENT>
              <ENT>Records</ENT>
              <ENT>Additional records for CEMS</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(c)(7)-(8)</ENT>
              <ENT>Records</ENT>
              <ENT>Records of excess emissions and parameter monitoring exceedances for CMS</ENT>
              <ENT>No. Specific language is located at § 63.9355 of subpart PPPPP.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(d)(1)</ENT>
              <ENT>General Reporting Requirements</ENT>
              <ENT>Requirement to report</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(d)(2)</ENT>
              <ENT>Report of Performance Test Results</ENT>
              <ENT>When to submit to Federal or State authority</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(d)(3)</ENT>
              <ENT>Reporting Opacity or VE Observations</ENT>
              <ENT>What to report and when</ENT>
              <ENT>No. Subpart PPPPP does not have opacity/VE standards.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(d)(4)</ENT>
              <ENT>Progress Reports</ENT>
              <ENT>Must submit progress reports on schedule if under compliance extension</ENT>
              <ENT>No. Compliance extensions do not apply to new or reconstructed sources.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(d)(5)</ENT>
              <ENT>SSM Reports</ENT>
              <ENT>Contents and submission</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(e)(1) and (2)(i)</ENT>
              <ENT>Additional CMS Reports</ENT>
              <ENT>Additional CMS reports</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(e)(2)(ii)</ENT>
              <ENT>Additional CMS Reports</ENT>
              <ENT>COMS-related report</ENT>
              <ENT>No. Subpart PPPPP does not require COMS.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(e)(3)</ENT>
              <ENT>Additional CMS Reports</ENT>
              <ENT>Excess emissions and parameter exceedances reports</ENT>
              <ENT>No. Specific language is located in § 63.9350 of subpart PPPPP.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(e)(4)</ENT>
              <ENT>Additional CMS Reports</ENT>
              <ENT>Reporting COMS data</ENT>
              <ENT>No. Subpart PPPPP does not require COMS.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(f)</ENT>
              <ENT>Waiver for Recordkeeping/Reporting</ENT>
              <ENT>Procedures for Administrator to waive</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.11</ENT>
              <ENT>Control Device Requirements</ENT>
              <ENT>Requirements for flares</ENT>
              <ENT>No. Subpart PPPPP does not specify use of flares for compliance.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.12</ENT>
              <ENT>State Authority and Delegations</ENT>
              <ENT>State authority to enforce standards</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.13</ENT>
              <ENT>Addresses of State Air Pollution Control Offices and EPA Regional Offices</ENT>
              <ENT>Addresses where reports, notifications, and requests are sent</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.14</ENT>
              <ENT>Incorporations by Reference</ENT>
              <ENT>Test methods incorporated by reference</ENT>
              <ENT>Yes. ASTM D 6522-00 and ANSI/ASME PTC 19.10-1981 (incorporated by reference-See § 63.14).</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.15</ENT>
              <ENT>Availability of Information and Confidentiality</ENT>
              <ENT>Public and confidential information</ENT>
              <ENT>Yes.</ENT>
            </ROW>
          </GPOTABLE>
          <CITA>[68 FR 28785, May 27, 2003, as amended at 71 FR 20470, Apr. 20, 2006]</CITA>
        </APPENDIX>
      </SUBPART>
      <SUBPART>
        <HD SOURCE="HED">Subpart QQQQQ—National Emission Standards for Hazardous Air Pollutants for Friction Materials Manufacturing Facilities</HD>
        <SOURCE>
          <HD SOURCE="HED">Source:</HD>
          <P>67 FR 64506, Oct. 18, 2002, unless otherwise noted.</P>
        </SOURCE>
        <SUBJGRP>
          <HD SOURCE="HED">What This Subpart Covers</HD>
          <SECTION>
            <SECTNO>§ 63.9480</SECTNO>
            <SUBJECT>What is the purpose of this subpart?</SUBJECT>

            <P>This subpart establishes national emission standards for hazardous air pollutants (NESHAP) for friction materials manufacturing facilities that use <PRTPAGE P="61"/>a solvent-based process. This subpart also establishes requirements to demonstrate initial and continuous compliance with all applicable emission limitations in this subpart.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9485</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <P>(a) You are subject to this subpart if you own or operate a friction materials manufacturing facility (as defined in § 63.9565) that is (or is part of) a major source of hazardous air pollutants (HAP) emissions on the first compliance date that applies to you, as specified in § 63.9495. Your friction materials manufacturing facility is a major source of HAP if it emits or has the potential to emit any single HAP at a rate of 9.07 megagrams (10 tons) or more per year or any combination of HAP at a rate of 22.68 megagrams (25 tons) or more per year.</P>
            <P>(b) The requirements in this subpart do not apply to research and development facilities, as defined in section 112(c)(7) of the Clean Air Act.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9490</SECTNO>
            <SUBJECT>What parts of my plant does this subpart cover?</SUBJECT>
            <P>(a) This subpart applies to each new, reconstructed, or existing affected source at your friction materials manufacturing facility.</P>
            <P>(b) The affected source covered by this subpart is each new, reconstructed, or existing solvent mixer (as defined in § 63.9565) at your friction materials manufacturing facility.</P>
            <P>(c) A solvent mixer at your friction materials manufacturing facility is new if you commence construction of the solvent mixer after October 18, 2002. An affected source is reconstructed if it meets the definition of “reconstruction” in § 63.2, and reconstruction is commenced after October 18, 2002.</P>
            <P>(d) A solvent mixer at your friction materials manufacturing facility is existing if it is not new or reconstructed.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9495</SECTNO>
            <SUBJECT>When do I have to comply with this subpart?</SUBJECT>
            <P>(a) If you have an existing solvent mixer, you must comply with each of the requirements for existing sources no later than October 18, 2005.</P>
            <P>(b) If you have a new or reconstructed solvent mixer and its initial startup date is after October 18, 2002, you must comply with the requirements for new and reconstructed sources upon initial startup.</P>
            <P>(c) If your friction materials manufacturing facility is an area source that increases its emissions or its potential to emit such that it becomes a (or part of a) major source of HAP emissions, then paragraphs (c)(1) and (2) of this section apply.</P>
            <P>(1) For any portion of the area source that becomes a new or reconstructed affected source, you must comply with the requirements for new and reconstructed sources upon startup or no later than October 18, 2002, whichever is later.</P>
            <P>(2) For any portion of the area source that becomes an existing affected source, you must comply with the requirements for existing sources no later than 1 year after the area source becomes a major source or no later than October 18, 2005, whichever is later.</P>
            <P>(d) You must meet the notification and schedule requirements in § 63.9535. Several of the notifications must be submitted before the compliance date for your affected source.</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Emission Limitations</HD>
          <SECTION>
            <SECTNO>§ 63.9500</SECTNO>
            <SUBJECT>What emission limitations must I meet?</SUBJECT>
            <P>(a) For each new, reconstructed, or existing large solvent mixer at your friction materials manufacturing facility, you must limit HAP solvent emissions to the atmosphere to no more than 30 percent of that which would otherwise be emitted in the absence of solvent recovery and/or solvent substitution, based on a 7-day block average.</P>
            <P>(b) For each new, reconstructed, or existing small solvent mixer at your friction materials manufacturing facility, you must limit HAP solvent emissions to the atmosphere to no more than 15 percent of that which would otherwise be emitted in the absence of solvent recovery and/or solvent substitution, based on a 7-day block average.</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <PRTPAGE P="62"/>
          <HD SOURCE="HED">General Compliance Requirements</HD>
          <SECTION>
            <SECTNO>§ 63.9505</SECTNO>
            <SUBJECT>What are my general requirements for complying with this subpart?</SUBJECT>
            <P>(a) You must be in compliance with the emission limitation in this subpart at all times, except during periods of startup, shutdown, or malfunction.</P>
            <P>(b) You must always operate and maintain your affected source, including air pollution control and monitoring equipment, according to the provisions in § 63.6(e)(1)(i).</P>
            <P>(c) You must develop a written startup, shutdown, and malfunction plan according to the provisions in § 63.6(e)(3).</P>
            <CITA>[67 FR 64506, Oct. 18, 2002, as amended at 71 FR 20470, Apr. 20, 2006]</CITA>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Initial Compliance Demonstration Requirements</HD>
          <SECTION>
            <SECTNO>§ 63.9510</SECTNO>
            <SUBJECT>By what date must I conduct my initial compliance demonstration?</SUBJECT>
            <P>(a) If you use a solvent recovery system and/or solvent substitution, you must conduct your initial compliance demonstration within 7 calendar days after the compliance date that is specified for your source in § 63.9495.</P>
            <P>(b) If you use a control technique other than a solvent recovery system and/or solvent substitution, you must comply with the provisions in § 63.9570.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9515</SECTNO>
            <SUBJECT>How do I demonstrate initial compliance with the emission limitation that applies to me?</SUBJECT>
            <P>(a) You have demonstrated initial compliance for each new, reconstructed, or existing large solvent mixer subject to the emission limitation in § 63.9500(a) if the HAP solvent discharged to the atmosphere during the first 7 days after the compliance date, determined according to the provisions in § 63.9520, does not exceed a 7-day block average of 30 percent of that which would otherwise be emitted in the absence of solvent recovery and/or solvent substitution.</P>
            <P>(b) You have demonstrated initial compliance for each new, reconstructed, or existing small solvent mixer subject to the emission limitation in § 63.9500(b) if the HAP solvent discharged to the atmosphere during the first 7 days after the compliance date, determined according to the provisions in § 63.9520, does not exceed a 7-day block average of 15 percent of that which would otherwise be emitted in the absence of solvent recovery and/or solvent substitution.</P>
            <P>(c) You must submit a notification of compliance status containing the results of the initial compliance demonstration according to § 63.9535(e).</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9520</SECTNO>
            <SUBJECT>What procedures must I use to demonstrate initial compliance?</SUBJECT>
            <P>(a) If you use a solvent recovery system, you must use the procedures in paragraphs (a)(1) through (8) of this section to demonstrate initial compliance with the emission limitations in § 63.9500(a) and (b).</P>
            <P>(1) Record the date and time of each mix batch.</P>
            <P>(2) Record the identity of each mix batch using a unique batch ID, as defined in § 63.9565.</P>
            <P>(3) Measure and record the weight of HAP solvent loaded into the solvent mixer for each mix batch.</P>
            <P>(4) Measure and record the weight of HAP solvent recovered for each mix batch.</P>
            <P>(5) If you use a solvent recovery system, you must determine the percent of HAP solvent discharged to the atmosphere for each mix batch according to Equation 1 of this section as follows:</P>
            <FP>(Eq. 1)</FP>
            <GPH DEEP="31" SPAN="1">
              <GID>ER18OC02.002</GID>
            </GPH>
            <EXTRACT>
              <FP>Where:</FP>
              
              <FP SOURCE="FP-1">P<E T="52">b</E> = Percent of HAP solvent discharged to the atmosphere for each mix batch, percent;</FP>
              <FP SOURCE="FP-1">S<E T="52">rec</E> = Weight of HAP solvent recovered for each mix batch, lb;</FP>
              <FP SOURCE="FP-1">S<E T="52">mix</E> = Weight of HAP solvent loaded into the solvent mixer for each mix batch, lb.</FP>
            </EXTRACT>
            
            <P>(6) If you use solvent substitution for a mix batch, you must record the use of a non-HAP material as a substitute for a HAP solvent for that mix batch and assign a value of 0 percent to the percent of HAP solvent discharged to the atmosphere for that mix batch (Pb).</P>

            <P>(7) Determine the 7-day block average percent of HAP solvent discharged <PRTPAGE P="63"/>to the atmosphere according to Equation 2 of this section as follows:</P>
            <GPH DEEP="29" SPAN="1">
              <GID>ER18OC02.003</GID>
            </GPH>
            <EXTRACT>
              <FP>Where:</FP>
              
              <FP SOURCE="FP-1">%P<E T="52">7</E> = 7-day block average percent of HAP solvent discharged to the atmosphere, percent;</FP>
              <FP SOURCE="FP-1">i = mix batch;</FP>
              <FP SOURCE="FP-1">n = number of mix batches in 7-day block average.</FP>
            </EXTRACT>
            
            <P>(8) Have valid data for at least 90 percent of the mix batches over the 7-day averaging period.</P>
            <P>(b) If you use a control technique other than a solvent recovery system and/or solvent substitution, you may apply to EPA for approval to use an alternative method of demonstrating compliance with the emission limitations for solvent mixers in § 63.9500(a) and (b), as provided in § 63.9570.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9525</SECTNO>
            <SUBJECT>What are the installation, operation, and maintenance requirements for my weight measurement device?</SUBJECT>
            <P>(a) If you use a solvent recovery system, you must install, operate, and maintain a weight measurement device to measure the weight of HAP solvent loaded into the solvent mixer and the weight of HAP solvent recovered for each mix batch.</P>
            <P>(b) For each weight measurement device required by this section, you must develop and submit for approval a site-specific monitoring plan that addresses the requirements of paragraphs (b)(1) through (6) of this section:</P>
            <P>(1) Procedures for installing the weight measurement device;</P>
            <P>(2) The minimum accuracy of the weight measurement device in pounds and as a percent of the average weight of solvent to be loaded into the solvent mixer;</P>
            <P>(3) Site-specific procedures for how the measurements will be made;</P>
            <P>(4) How the measurement data will be recorded, reduced, and stored;</P>
            <P>(5) Procedures and acceptance criteria for calibration of the weight measurement device; and</P>
            <P>(6) How the measurement device will be maintained, including a routine maintenance schedule and spare parts inventory list.</P>
            <P>(c) The site-specific monitoring plan required in paragraph (b) of this section must include, at a minimum, the requirements of paragraphs (c)(1) through (3) of this section:</P>
            <P>(1) The weight measurement device must have a minimum accuracy of ±0.05 kilograms (±0.1 pounds) or ±1 percent of the average weight of solvent to be loaded into the solvent mixer, whichever is greater.</P>
            <P>(2) An initial multi-point calibration of the weight measurement device must be made using 5 points spanning the expected range of weight measurements before the weight measurement device can be used. The manufacturer's calibration results can be used to meet this requirement.</P>
            <P>(3) Once per day, an accuracy audit must be made using a single Class F calibration weight that corresponds to 20 to 80 percent of the average weight of solvent to be loaded into the solvent mixer. If the weight measurement device cannot reproduce the value of the calibration weight within ±0.05 kilograms (0.1 pounds) or ±1 percent of the average weight of solvent to be loaded into the solvent mixer, whichever is greater, the scale must be recalibrated before being used again. The recalibration must be performed with at least five Class F calibration weights spanning the expected range of weight measurements.</P>
            <P>(d) You must operate and maintain the weight measurement device according to the site-specific monitoring plan.</P>
            <P>(e) You must maintain records of all maintenance activities, calibrations, and calibration audits.</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Continuous Compliance Requirements</HD>
          <SECTION>
            <SECTNO>§ 63.9530</SECTNO>
            <SUBJECT>How do I demonstrate continuous compliance with the emission limitation that applies to me?</SUBJECT>
            <P>(a) If you use a solvent recovery system and/or solvent substitution, you must demonstrate continuous compliance with the emission limitations for solvent mixers in § 63.9500(a) and (b) according to the provisions in paragraphs (a)(1) through (3) of this section.</P>

            <P>(1) Except for during malfunctions of your weight measurement device and <PRTPAGE P="64"/>associated repairs, you must collect and record the information required in § 63.9520(a)(1) through (8) at all times that the affected source is operating and record all information needed to document conformance with these requirements.</P>
            <P>(2) For new, reconstructed, or existing large solvent mixers, maintain the 7-day block average percent of HAP solvent discharged to the atmosphere at or below 30 percent of that which would otherwise be emitted in the absence of solvent recovery and/or solvent substitution.</P>
            <P>(3) For new, reconstructed, or existing small solvent mixers, maintain the 7-day block average percent of HAP solvent discharged to the atmosphere at or below 15 percent of that which would otherwise be emitted in the absence of solvent recovery and/or solvent substitution.</P>
            <P>(b) If you use a control technique other than a solvent recovery system and/or solvent substitution, you must demonstrate continuous compliance with the emission limitations for solvent mixers in § 63.9500(a) and (b) according to the provisions in § 63.9570.</P>
            <P>(c) You must report each instance in which you did not meet the emission limitations for solvent mixers in § 63.9500(a) and (b). This includes periods of startup, shutdown, or malfunction. These instances are deviations from the emission limitations in this subpart. These deviations must be reported according to the requirements in § 63.9540.</P>
            <P>(d) [Reserved]</P>
            <P>(e) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you demonstrate to the Administrator's satisfaction that you were operating in accordance with § 63.6(e)(1). The Administrator will determine whether deviations that occur during a period of startup, shutdown, or malfunction are violations, according to the provisions in § 63.6(e).</P>
            <CITA>[67 FR 64506, Oct. 18, 2002, as amended at 71 FR 20470, Apr. 20, 2006]</CITA>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Notifications, Reports, and Records</HD>
          <SECTION>
            <SECTNO>§ 63.9535</SECTNO>
            <SUBJECT>What notifications must I submit and when?</SUBJECT>
            <P>(a) You must submit all of the notifications in §§ 63.8(f)(4) and 63.9(b), (c), (d), and (h) that apply to you by the specified dates.</P>
            <P>(b) If you use a control technique other than a solvent recovery system and/or solvent substitution, you must comply with the provisions in § 63.9570.</P>
            <P>(c) As specified in § 63.9(b)(2), if you start up your affected source before October 18, 2002, you must submit your initial notification no later than 120 calendar days after October 18, 2002.</P>
            <P>(d) As specified in § 63.9(b)(3), if you start up your new affected source on or after October 18, 2002, you must submit your initial notification no later than 120 calendar days after you become subject to this subpart.</P>
            <P>(e) You must submit a notification of compliance status according to § 63.9(h)(2)(ii). You must submit the notification of compliance status before the close of business on the 30th calendar day following the completion of the initial compliance demonstration.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9540</SECTNO>
            <SUBJECT>What reports must I submit and when?</SUBJECT>
            <P>(a) Unless the Administrator has approved a different schedule, you must submit each semiannual compliance report according to the requirements in paragraphs (a)(1) through (5) of this section.</P>
            <P>(1) The first compliance report must cover the period beginning on the compliance date that is specified for your affected source in § 63.9495 and ending on June 30 or December 31, whichever date comes first after the compliance date that is specified for your source in § 63.9495.</P>
            <P>(2) The first compliance report must be postmarked or delivered no later than July 31 or January 31, whichever date comes first after your first compliance report is due.</P>

            <P>(3) Each subsequent compliance report must cover the semiannual reporting period from January 1 through June 30 or the semiannual reporting period from July 1 through December 31.<PRTPAGE P="65"/>
            </P>
            <P>(4) Each subsequent compliance report must be postmarked or delivered no later than July 31 or January 31, whichever date comes first after the end of the semiannual reporting period.</P>
            <P>(5) For each affected source that is subject to permitting regulations pursuant to 40 CFR part 70 or 71 of this chapter, and if the permitting authority has established dates for submitting semiannual reports pursuant to 40 CFR 70.6(a)(3)(iii)(A) or 40 CFR 71.6(a)(3)(iii)(A) of this chapter, you may submit the first and subsequent compliance reports according to the dates the permitting authority has established instead of according to the dates in paragraphs (a)(1) through (4) of this section.</P>
            <P>(b) Each compliance report must include the information in paragraphs (b)(1) through (3) of this section, and if applicable, paragraphs (b)(4) through (6) of this section.</P>
            <P>(1) Company name and address.</P>
            <P>(2) Statement by a responsible official, with the official's name, title, and signature, certifying that, based on information and belief formed after reasonable inquiry, the statements and information in the report are true, accurate, and complete.</P>
            <P>(3) Date of report and beginning and ending dates of the reporting period.</P>
            <P>(4) If you had a startup, shutdown, or malfunction during the reporting period and you took actions consistent with your startup, shutdown, and malfunction plan, the compliance report must include the information in § 63.10(d)(5)(i).</P>
            <P>(5) If there were no deviations from the emission limitations for solvent mixers in § 63.9500(a) and (b), a statement that there were no deviations from the emission limitations during the reporting period.</P>
            <P>(6) If there were no periods during which a monitoring system was out-of-control as specified in § 63.8(c)(7), a statement that there were no periods during which a monitoring system was out-of-control during the reporting period.</P>
            <P>(c) For each deviation from an emission limitation occurring at an affected source, you must include the information in paragraphs (b)(1) through (4) and (c)(1) and (2) of this section. This includes periods of startup, shutdown, or malfunction.</P>
            <P>(1) The total operating time of each affected source during the reporting period.</P>
            <P>(2) Information on the number, duration, and cause of deviations (including unknown cause, if applicable), as applicable, and the corrective action taken.</P>
            <P>(d) If you had a startup, shutdown, or malfunction during the semiannual reporting period that was not consistent with your startup, shutdown, and malfunction plan, you must submit an immediate startup, shutdown, and malfunction report according to the requirements in § 63.10(d)(5)(ii).</P>
            <P>(e) If you have obtained a title V operating permit for an affected source pursuant to 40 CFR part 70 or 71 of this chapter, you must report all deviations as defined in this subpart in the semiannual monitoring report required by 40 CFR 70.6(a)(3)(iii)(A) or 40 CFR 71.6(a)(3)(iii)(A) of this chapter. If you submit a compliance report for an affected source along with, or as part of, the semiannual monitoring report required by 40 CFR 70.6(a)(3)(iii)(A) or 40 CFR 71.6(a)(3)(iii)(A) of this chapter, and the compliance report includes all the required information concerning deviations from any emission limitation in this subpart, then submission of the compliance report satisfies any obligation to report the same deviations in the semiannual monitoring report. However, submission of a compliance report does not otherwise affect any obligation you may have to report deviations from permit requirements to your permitting authority.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9545</SECTNO>
            <SUBJECT>What records must I keep?</SUBJECT>
            <P>(a) You must keep the records in paragraphs (a)(1) and (2) of this section that apply to you.</P>
            <P>(1) A copy of each notification and report that you submitted to comply with this subpart, including all documentation supporting any initial notification or notification of compliance status that you submitted, according to the requirements in § 63.10(b)(2)(xiv).</P>

            <P>(2) The records in § 63.6(e)(3)(iii) through (v) related to startup, shutdown, or malfunction.<PRTPAGE P="66"/>
            </P>
            <P>(b) You must keep the records required in § 63.9525 to show proper operation and maintenance of the weight measurement device.</P>
            <P>(c) You must keep the records required in § 63.9530 to show continuous compliance with the emission limitations for solvent mixers in § 63.9500(a) and (b).</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9550</SECTNO>
            <SUBJECT>In what form and how long must I keep my records?</SUBJECT>
            <P>(a) You must keep your records in a form suitable and readily available for expeditious review, according to § 63.10(b)(1).</P>
            <P>(b) As specified in § 63.10(b)(1), you must keep each record for 5 years following the date of each occurrence, measurement, maintenance, corrective action, report, or record.</P>
            <P>(c) You must keep each record on site for at least 2 years after the date of each occurrence, measurement, maintenance, corrective action, report, or record, according to § 63.10(b)(1). You can keep the records offsite for the remaining 3 years.</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Other Requirements and Information</HD>
          <SECTION>
            <SECTNO>§ 63.9555</SECTNO>
            <SUBJECT>What parts of the General Provisions apply to me?</SUBJECT>
            <P>Table 1 to this subpart shows which parts of the General Provisions in §§ 63.1 through 63.15 apply to you.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9560</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <P>(a) This subpart can be implemented and enforced by the U.S. EPA, or a delegated authority such as your State, local, or tribal agency. If the U.S. EPA Administrator has delegated authority to your State, local, or tribal agency, then that agency, in addition to the U.S. EPA, has the authority to implement and enforce this subpart. You should contact your U.S. EPA Regional Office to find out if this subpart is delegated to your State, local, or tribal agency.</P>
            <P>(b) In delegating implementation and enforcement authority of this subpart to a State, local, or tribal agency under 40 CFR part 63, subpart E, the authorities contained in paragraphs (c)(1) through (4) of this section are retained by the Administrator of the U.S. EPA and are not transferred to the State, local, or tribal agency.</P>
            <P>(c) The authorities that cannot be delegated to State, local or tribal agencies are as follows:</P>
            <P>(1) Approval of alternatives to the emission limitations in § 63.9500(a) and (b) under § 63.6(g).</P>
            <P>(2) Approval of major alternatives to test methods under § 63.7(e)(2)(ii) and (f) and as defined in § 63.90.</P>
            <P>(3) Approval of major alternatives to monitoring under § 63.8(f) and as defined in § 63.90.</P>
            <P>(4) Approval of major alternatives to recordkeeping and reporting under § 63.10(f) and as defined in § 63.90.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9565</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <P>Terms used in this subpart are defined in the Clean Air Act, in § 63.2, and in this section as follows:</P>
            <P>
              <E T="03">Batch ID</E> means a unique identifier used to differentiate each individual mix batch.</P>
            <P>
              <E T="03">Deviation</E> means any instance in which an affected source subject to this subpart, or an owner or operator of such a source:</P>
            <P>(1) Fails to meet any requirement or obligation established by this subpart, including, but not limited to, any emission limitation (including any operating limit);</P>
            <P>(2) Fails to meet any term or condition that is adopted to implement an applicable requirement in this subpart and that is included in the operating permit for any affected source required to obtain such a permit; or</P>
            <P>(3) Fails to meet any emission limitation (including any operating limit) in this subpart during startup, shutdown, or malfunction, regardless of whether or not such failure is permitted by this subpart.</P>
            <P>
              <E T="03">Friction ingredients</E> means any of the components used in the manufacture of friction materials, excluding the HAP solvent. Friction ingredients include, but are not limited to, reinforcement materials, property modifiers, resins, and other additives.</P>
            <P>
              <E T="03">Friction materials manufacturing facility</E> means a facility that manufactures friction materials using a solvent-based process. Friction materials are used in the manufacture of products <PRTPAGE P="67"/>used to accelerate or decelerate objects. Products that use friction materials include, but are not limited to, disc brake pucks, disc brake pads, brake linings, brake shoes, brake segments, brake blocks, brake discs, clutch facings, and clutches.</P>
            <P>
              <E T="03">HAP solvent</E> means a solvent that contains 10 percent or more of any one HAP, as listed in section 112(b) of the Clean Air Act, or any combination of HAP that is added to a solvent mixer. Examples include hexane, toluene, and trichloroethylene.</P>
            <P>
              <E T="03">Initial startup</E> means the first time that equipment is put into operation. Initial startup does not include operation solely for testing equipment. Initial startup does not include subsequent startups (as defined in this section) following malfunction or shutdowns or following changes in product or between batch operations.</P>
            <P>
              <E T="03">Large solvent mixer</E> means a solvent mixer with a design capacity greater than or equal to 2,000 pounds, including friction ingredients and HAP solvent.</P>
            <P>
              <E T="03">Mix batch</E> means each batch of friction materials manufactured in a solvent mixer.</P>
            <P>
              <E T="03">Responsible official</E> means responsible official as defined in § 63.2.</P>
            <P>
              <E T="03">7-day block average</E> means an averaging technique for a weekly compliance determination where the calculated values for percent HAP solvent discharged to the atmosphere are averaged together for all mix batches (for which there are valid data) in a 7-day block period according to the equation provided in § 63.9520(a)(6).</P>
            <P>
              <E T="03">Small solvent mixer</E> means a solvent mixer with a design capacity less than 2,000 pounds, including friction ingredients and HAP solvent.</P>
            <P>
              <E T="03">Solvent mixer</E> means a mixer used in the friction materials manufacturing process in which HAP solvent is used as one of the ingredients in at least one batch during a semiannual reporting period. Trace amounts of HAP solvents in resins or other friction ingredients do not qualify mixers as solvent mixers.</P>
            <P>
              <E T="03">Solvent recovery system</E> means equipment used for the purpose of recovering the HAP solvent from the exhaust stream. An example of a solvent recovery system is a condenser.</P>
            <P>
              <E T="03">Solvent substitution</E> means substitution of a non-HAP material for a HAP solvent.</P>
            <P>
              <E T="03">Startup</E> means bringing equipment online and starting the production process.</P>
            <P>
              <E T="03">Startup, shutdown, and malfunction plan</E> means a plan developed according to the provisions of § 63.6(e)(3).</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9570</SECTNO>
            <SUBJECT>How do I apply for alternative compliance requirements?</SUBJECT>
            <P>(a) If you use a control technique other than a solvent recovery system and/or solvent substitution, you may request approval to use an alternative method of demonstrating compliance with the emission limitations in § 63.9500(a) and (b) according to the procedures in this section.</P>
            <P>(b) You can request approval to use an alternative method of demonstrating compliance in the initial notification for existing sources, the notification of construction or reconstruction for new sources, or at any time.</P>
            <P>(c) You must submit a description of the proposed testing, monitoring, recordkeeping, and reporting that will be used and the proposed basis for demonstrating compliance.</P>
            <P>(1) If you have not previously performed testing, you must submit a proposed test plan. If you are seeking permission to use an alternative method of compliance based on previously performed testing, you must submit the results of testing, a description of the procedures followed in testing, and a description of pertinent conditions during testing.</P>

            <P>(2) You must submit a monitoring plan that includes a description of the control technique, test results verifying the performance of the control technique, the appropriate operating parameters that will be monitored, and the frequency of measuring and recording to establish continuous compliance with the emission limitations in § 63.9500(a) and (b). You must also include the proposed performance specifications and quality assurance procedures for the monitors. The monitoring plan is subject to the Administrator's approval. You must install, calibrate, operate, and maintain the <PRTPAGE P="68"/>monitors in accordance with the monitoring plan approved by the Administrator.</P>
            <P>(d) Use of the alternative method of demonstrating compliance must not begin until approval is granted by the Administrator.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§§ 63.9571-63.9579</SECTNO>
            <RESERVED>[Reserved]</RESERVED>
          </SECTION>
        </SUBJGRP>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. QQQQQ, Table 1</EAR>
          <HD SOURCE="HED">Table 1 to Subpart QQQQQ of Part 63—Applicability of General Provisions to Subpart QQQQQ</HD>
          <P>As required in § 63.9505, you must comply with each applicable General Provisions requirement according to the following table:</P>
          <GPOTABLE CDEF="s55,r90,xs60,r90" COLS="4" OPTS="L2">
            <BOXHD>
              <CHED H="1">Citation</CHED>
              <CHED H="1">Subject</CHED>
              <CHED H="1">Applies to subpart<LI>QQQQQ?</LI>
              </CHED>
              <CHED H="1">Explanation</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">§ 63.1</ENT>
              <ENT>Applicability</ENT>
              <ENT>Yes</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.2</ENT>
              <ENT>Definitions</ENT>
              <ENT>Yes</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.3</ENT>
              <ENT>Units and Abbreviations</ENT>
              <ENT>Yes</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.4</ENT>
              <ENT>Prohibited Activities</ENT>
              <ENT>Yes</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.5</ENT>
              <ENT>Construction/Reconstruction</ENT>
              <ENT>Yes</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(a)-(c), (e)-(f), (i)-(j)</ENT>
              <ENT>Compliance with Standards and Maintenance Requirements</ENT>
              <ENT>Yes</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(d)</ENT>
              <ENT>[Reserved]</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(g)</ENT>
              <ENT>Use of an Alternative Nonopacity Emission Standard</ENT>
              <ENT>No</ENT>
              <ENT>Subpart QQQQQ contains no work practice standards.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(h)</ENT>
              <ENT>Compliance with Opacity and Visible Emission Standards</ENT>
              <ENT>No</ENT>
              <ENT>Subpart QQQQQ contains no opacity or VE limits.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(a)(1)-(2)</ENT>
              <ENT>Applicability and Performance Test Dates</ENT>
              <ENT>No</ENT>
              <ENT>Subpart QQQQQ includes dates for initial compliance demonstrations.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(a)(3), (b)-(h)</ENT>
              <ENT>Performance Testing Requirements</ENT>
              <ENT>No</ENT>
              <ENT>Subpart QQQQQ does not require performance tests.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(a)(1)-(2), (b), (c)(1)-(3), (f)(1)-(5)</ENT>
              <ENT>Monitoring Requirements</ENT>
              <ENT>Yes</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(a)(3)</ENT>
              <ENT>[Reserved]</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(a)(4)</ENT>
              <ENT>Additional Monitoring Requirements for Control Devices in § 63.11</ENT>
              <ENT>No</ENT>
              <ENT>Subpart QQQQQ does not require flares.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c)(4)</ENT>
              <ENT>Continuous Monitoring System (CMS) Requirements</ENT>
              <ENT>No</ENT>
              <ENT>Subpart QQQQQ does not require CMS.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c)(5)</ENT>
              <ENT>Continuous Opacity Monitoring System (COMS) Minimum Procedures</ENT>
              <ENT>No</ENT>
              <ENT>Subpart QQQQQ does not require COMS.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c)(6)</ENT>
              <ENT>Zero and High Level Calibration Check Requirements</ENT>
              <ENT>No</ENT>
              <ENT>Subpart QQQQQ specifies calibration requirements.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c)(7)-(8)</ENT>
              <ENT>Out-of-Control Periods</ENT>
              <ENT>No</ENT>
              <ENT>Subpart QQQQQ specifies out-of-control periods and reporting requirements.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(d)</ENT>
              <ENT>CMS Quality Control</ENT>
              <ENT>No</ENT>
              <ENT>Subpart QQQQQ requires a monitoring plan that specifies CMS quality control procedures.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(e)</ENT>
              <ENT>CMS Performance Evaluation</ENT>
              <ENT>No</ENT>
              <ENT>Subpart QQQQQ does not require CMS performance evaluations.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(f)(6)</ENT>
              <ENT>Relative Accuracy Test Audit (RATA) Alternative</ENT>
              <ENT>No</ENT>
              <ENT>Subpart QQQQQ does not require continuous emissions monitoring systems (CEMS).</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(g)(1)-(5)</ENT>
              <ENT>Data Reduction</ENT>
              <ENT>No</ENT>
              <ENT>Subpart QQQQQ specifies data reduction requirements.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(a)-(d), (h)-(j)</ENT>
              <ENT>Notification Requirements</ENT>
              <ENT>Yes</ENT>
              <ENT>Except that subpart QQQQQ does not require performance tests or CMS performance evaluations.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(e)</ENT>
              <ENT>Notification of Performance Test</ENT>
              <ENT>No</ENT>
              <ENT>Subpart QQQQQ does not require performance tests.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(f)</ENT>
              <ENT>Notification of VE/Opacity Test</ENT>
              <ENT>No</ENT>
              <ENT>Subpart QQQQQ contains no opacity or VE limits.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(g)</ENT>
              <ENT>Additional Notifications When Using CMS</ENT>
              <ENT>No</ENT>
              <ENT>Subpart QQQQQ does not require CMS performance evaluations.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(a), (b), (d)(1), (d)(4)-(5), (e)(3), (f)</ENT>
              <ENT>Recordkeeping and Reporting Requirements</ENT>
              <ENT>Yes</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(c)(1)-(6), (9)-(15)</ENT>
              <ENT>Additional Records for CMS</ENT>
              <ENT>No</ENT>
              <ENT>Subpart QQQQQ specifies record requirements.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(c)(7)-(8)</ENT>
              <ENT>Records of Excess Emissions and Parameter Monitoring Exceedances for CMS</ENT>
              <ENT>No</ENT>
              <ENT>Subpart QQQQQ specifies record requirements.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(d)(2)</ENT>
              <ENT>Reporting Results of Performance Tests</ENT>
              <ENT>No</ENT>
              <ENT>Subpart QQQQQ does not require performance tests.</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="69"/>
              <ENT I="01">§ 63.10(d)(3)</ENT>
              <ENT>Reporting Opacity or VE Observations</ENT>
              <ENT>No</ENT>
              <ENT>Subpart QQQQQ contains no opacity or VE limits.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(e)(1)-(2)</ENT>
              <ENT>Additional CMS Reports</ENT>
              <ENT>No</ENT>
              <ENT>Subpart QQQQQ does not require CMS.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(e)(4)</ENT>
              <ENT>Reporting COMS Data</ENT>
              <ENT>No</ENT>
              <ENT>Subpart QQQQQ does not require COMS.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.11</ENT>
              <ENT>Control Device Requirements</ENT>
              <ENT>No</ENT>
              <ENT>Subpart QQQQQ does not require flares.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§§ 63.12-63.15</ENT>
              <ENT>Delegation, Addresses, Incorporation by Reference Availability of Information</ENT>
              <ENT>Yes</ENT>
            </ROW>
          </GPOTABLE>
        </APPENDIX>
      </SUBPART>
      <SUBPART>
        <HD SOURCE="HED">Subpart RRRRR—National Emission Standards for Hazardous Air Pollutants: Taconite Iron Ore Processing</HD>
        <SOURCE>
          <HD SOURCE="HED">Source:</HD>
          <P>68 FR 61888, Oct. 30, 2003, unless otherwise noted.</P>
        </SOURCE>
        <SUBJGRP>
          <HD SOURCE="HED">What This Subpart Covers</HD>
          <SECTION>
            <SECTNO>§ 63.9580</SECTNO>
            <SUBJECT>What is the purpose of this subpart?</SUBJECT>
            <P>This subpart establishes national emission standards for hazardous air pollutants (NESHAP) for taconite iron ore processing. This subpart also establishes requirements to demonstrate initial and continuous compliance with all applicable emission limitations (emission limits and operating limits), work practice standards, and operation and maintenance requirements in this subpart.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9581</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <P>You are subject to this subpart if you own or operate a taconite iron ore processing plant that is (or is part of) a major source of hazardous air pollutant (HAP) emissions on the first compliance date that applies to you. Your taconite iron ore processing plant is a major source of HAP if it emits or has the potential to emit any single HAP at a rate of 10 tons or more per year or any combination of HAP at a rate of 25 tons or more per year.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9582</SECTNO>
            <SUBJECT>What parts of my plant does this subpart cover?</SUBJECT>
            <P>(a) This subpart applies to each new and existing affected source at your taconite iron ore processing plant.</P>
            <P>(b) The affected sources are each new or existing ore crushing and handling operation, ore dryer, indurating furnace, and finished pellet handling operation at your taconite iron ore processing plant, as defined in § 63.9652.</P>
            <P>(c) This subpart covers emissions from ore crushing and handling emission units, ore dryer stacks, indurating furnace stacks, finished pellet handling emission units, and fugitive dust emissions.</P>
            <P>(d) An ore crushing and handling operation, ore dryer, indurating furnace, or finished pellet handling operation at your taconite iron ore processing plant is existing if you commenced construction or reconstruction of the affected source before December 18, 2002.</P>
            <P>(e) An ore crushing and handling operation, ore dryer, indurating furnace, or finished pellet handling operation at your taconite iron ore processing plant is new if you commence construction or reconstruction of the affected source on or after December 18, 2002. An affected source is reconstructed if it meets the definition of reconstruction in § 63.2.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9583</SECTNO>
            <SUBJECT>When do I have to comply with this subpart?</SUBJECT>
            <P>(a) If you have an existing affected source, you must comply with each emission limitation, work practice standard, and operation and maintenance requirement in this subpart that applies to you no later than October 30, 2006.</P>

            <P>(b) If you have a new affected source and its initial startup date is on or before October 30, 2003, you must comply with each emission limitation, work practice standard, and operation and maintenance requirement in this subpart that applies to you by October 30, 2003.<PRTPAGE P="70"/>
            </P>
            <P>(c) If you have a new affected source and its initial startup date is after October 30, 2003, you must comply with each emission limitation, work practice standard, and operation and maintenance requirement in this subpart that applies to you upon initial startup.</P>
            <P>(d) If your taconite iron ore processing plant is an area source that becomes a major source of HAP, the compliance dates in paragraphs (d)(1) and (2) of this section apply to you.</P>
            <P>(1) Any portion of the taconite iron ore processing plant that is a new affected source or a new reconstructed source must be in compliance with this subpart upon startup.</P>
            <P>(2) All other parts of the taconite iron ore processing plant must be in compliance with this subpart no later than 3 years after the plant becomes a major source.</P>
            <P>(e) You must meet the notification and schedule requirements in § 63.9640. Several of these notifications must be submitted before the compliance date for your affected source.</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Emission Limitations and Work Practice Standards</HD>
          <SECTION>
            <SECTNO>§ 63.9590</SECTNO>
            <SUBJECT>What emission limitations must I meet?</SUBJECT>
            <P>(a) You must meet each emission limit in Table 1 to this subpart that applies to you.</P>
            <P>(b) You must meet each operating limit for control devices in paragraphs (b)(1) through (5) of this section that applies to you.</P>
            <P>(1) Except as provided in paragraph (b)(2) of this section, for each wet scrubber applied to meet any particulate matter emission limit in Table 1 to this subpart, you must maintain the daily average pressure drop and daily average scrubber water flow rate at or above the minimum levels established during the initial performance test.</P>
            <P>(2) For each dynamic wet scrubber applied to meet any particulate matter emission limit in Table 1 to this subpart, you must maintain the daily average scrubber water flow rate and either the daily average fan amperage (a surrogate for fan speed as revolutions per minute) or the daily average pressure drop at or above the minimum levels established during the initial performance test.</P>
            <P>(3) For each dry electrostatic precipitator applied to meet any particulate matter emission limit in Table 1 to this subpart, you must meet the operating limits in paragraph (b)(3)(i) or (ii) of this section.</P>
            <P>(i) Maintain the 6-minute average opacity of emissions exiting the control device stack at or below the level established during the initial performance test.</P>
            <P>(ii) Maintain the daily average secondary voltage and daily average secondary current for each field at or above the minimum levels established during the initial performance test.</P>
            <P>(4) For each wet electrostatic precipitator applied to meet any particulate matter emission limit in Table 1 to this subpart, you must meet the operating limits in paragraphs (b)(4)(i) through (iii) of this section.</P>
            <P>(i) Maintain the daily average secondary voltage for each field at or above the minimum levels established during the initial performance test.</P>
            <P>(ii) Maintain the daily average stack outlet temperature at or below the maximum levels established during the initial performance test.</P>
            <P>(iii) Maintain the daily average water flow rate at or above the minimum levels established during the initial performance test.</P>
            <P>(5) If you use any air pollution control device other than a baghouse, wet scrubber, dynamic scrubber, dry electrostatic precipitator, or wet electrostatic precipitator, you must submit a site-specific monitoring plan in accordance with § 63.9631(f).</P>
            <P>(c) You may petition the Administrator for approval of alternatives to the monitoring requirements in paragraphs (b)(1) through (4) of this section as allowed under § 63.8(f) and as defined in § 63.90.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9591</SECTNO>
            <SUBJECT>What work practice standards must I meet?</SUBJECT>

            <P>(a) You must prepare, and at all times operate according to, a fugitive dust emissions control plan that describes in detail the measures that will be put in place to control fugitive dust emissions from the locations listed in <PRTPAGE P="71"/>paragraphs (a)(1) through (6) of this section.</P>
            <P>(1) Stockpiles (includes, but is not limited to, stockpiles of uncrushed ore, crushed ore, or finished pellets);</P>
            <P>(2) Material transfer points;</P>
            <P>(3) Plant roadways;</P>
            <P>(4) Tailings basin;</P>
            <P>(5) Pellet loading areas; and</P>
            <P>(6) Yard areas.</P>
            <P>(b) A copy of your fugitive dust emissions control plan must be submitted for approval to the Administrator on or before the applicable compliance date for the affected source as specified in § 63.9583. The requirement for the plant to operate according to the fugitive dust emissions control plan must be incorporated by reference in the operating permit for the plant that is issued by the designated permitting authority under 40 CFR part 70 or 40 CFR part 71.</P>
            <P>(c) You can use an existing fugitive dust emissions control plan provided it meets the requirements in paragraphs (c)(1) through (3) of this section.</P>
            <P>(1) The plan satisfies the requirements of paragraph (a) of this section.</P>
            <P>(2) The plan describes the current measures to control fugitive dust emission sources.</P>
            <P>(3) The plan has been approved as part of a State implementation plan or title V permit.</P>
            <P>(d) You must maintain a current copy of the fugitive dust emissions control plan onsite, and it must be available for inspection upon request. You must keep the plan for the life of the affected source or until the affected source is no longer subject to the requirements of this subpart.</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Operation and Maintenance Requirements</HD>
          <SECTION>
            <SECTNO>§ 63.9600</SECTNO>
            <SUBJECT>What are my operation and maintenance requirements?</SUBJECT>
            <P>(a) As required by § 63.6(e)(1)(i), you must always operate and maintain your affected source, including air pollution control and monitoring equipment, in a manner consistent with good air pollution control practices for minimizing emissions at least to the levels required by this subpart.</P>
            <P>(b) You must prepare, and at all times operate according to, a written operation and maintenance plan for each control device applied to meet any particulate matter emission limit in Table 1 to this subpart and to meet the requirement of each indurating furnace subject to good combustion practices (GCP). Each site-specific operation and maintenance plan must be submitted to the Administrator on or before the compliance date that is specified in § 63.9583 for your affected source. The plan you submit must explain why the chosen practices (i.e., quantified objectives) are effective in performing corrective actions or GCP in minimizing the formation of formaldehyde (and other products of incomplete combustion). The Administrator will review the adequacy of the site-specific practices and objectives you will follow and the records you will keep to demonstrate compliance with your Plan. If the Administrator determines that any portion of your operation and maintenance plan is not adequate, we can reject those portions of the plan, and request that you provide additional information addressing the relevant issues. In the interim of this process, you will continue to follow your current site-specific practices and objectives, as submitted, until your revisions are accepted as adequate by the Administrator. You must maintain a current copy of the operation and maintenance plan onsite, and it must be available for inspection upon request. You must keep the plan for the life of the affected source or until the affected source is no longer subject to the requirements of this subpart. Each operation and maintenance plan must address the elements in paragraphs (b)(1) through (4) of this section.</P>
            <P>(1) Preventative maintenance for each control device, including a preventative maintenance schedule that is consistent with the manufacturer's instructions for routine and long-term maintenance.</P>

            <P>(2) Corrective action procedures for bag leak detection systems. In the event a bag leak detection system alarm is triggered, you must initiate corrective action to determine the cause of the alarm within 1 hour of the alarm, initiate corrective action to correct the cause of the problem within 24 hours of the alarm, and complete the <PRTPAGE P="72"/>corrective action as soon as practicable. Corrective actions may include, but are not limited to, the actions listed in paragraphs (b)(2)(i) through (vi) of this section.</P>
            <P>(i) Inspecting the baghouse for air leaks, torn or broken bags or filter media, or any other condition that may cause an increase in emissions.</P>
            <P>(ii) Sealing off defective bags or filter media.</P>
            <P>(iii) Replacing defective bags or filter media or otherwise repairing the control device.</P>
            <P>(iv) Sealing off a defective baghouse compartment.</P>
            <P>(v) Cleaning the bag leak detection system probe, or otherwise repairing the bag leak detection system.</P>
            <P>(vi) Adjusting the process operation producing the particulate emissions.</P>
            <P>(3) Corrective action procedures for continuous parameter monitoring systems (CPMS) for all air pollution control devices except for baghouses. In the event you exceed an established operating limit for an air pollution control device except for a baghouse, you must initiate corrective action to determine the cause of the operating limit exceedance and complete the corrective action within 10 calendar days. The corrective action procedures you take must be consistent with the installation, operation, and maintenance procedures listed in your site-specific CPMS monitoring plan in accordance with § 63.9632(b).</P>
            <P>(4) Good combustion practices for indurating furnaces. You must identify and implement a set of site-specific GCP for each type of indurating furnace at your plant. These GCP should correspond to your standard operating procedures for maintaining the proper and efficient combustion within each indurating furnace. Good combustion practices include, but are not limited to, the elements listed in paragraphs (b)(4)(i) through (v) of this section.</P>
            <P>(i) Proper operating conditions for each indurating furnace (e.g., minimum combustion temperature, maximum carbon monoxide concentration in the furnace exhaust gases, burner alignment, or proper fuel-air distribution/mixing).</P>
            <P>(ii) Routine inspection and preventative maintenance and corresponding schedules of each indurating furnace.</P>
            <P>(iii) Performance analyses of each indurating furnace.</P>
            <P>(iv) Keeping applicable operator logs.</P>
            <P>(v) Keeping applicable records to document compliance with each element.</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">General Compliance Requirements</HD>
          <SECTION>
            <SECTNO>§ 63.9610</SECTNO>
            <SUBJECT>What are my general requirements for complying with this subpart?</SUBJECT>
            <P>(a) You must be in compliance with the requirements in paragraphs (a)(1) through (6) in this section at all times, except during periods of startup, shutdown, and malfunction. The terms startup, shutdown, and malfunction are defined in § 63.2.</P>
            <P>(1) The emission limitations in § 63.9590.</P>
            <P>(2) The work practice standards in § 63.9591.</P>
            <P>(3) The operation and maintenance requirements in § 63.9600.</P>
            <P>(4) The notification requirements in § 63.9640.</P>
            <P>(5) The reporting requirements in § 63.9641.</P>
            <P>(6) The recordkeeping requirements in § 63.9642.</P>
            <P>(b) During the period between the compliance date specified for your affected source in § 63.9583 and the date upon which continuous monitoring systems have been installed and certified and any applicable operating limits have been set, you must maintain a log detailing the operation and maintenance of the process and emissions control equipment. This includes the daily monitoring and recordkeeping of air pollution control device operating parameters as specified in § 63.9590(b).</P>
            <P>(c) You must develop a written startup, shutdown, and malfunction plan according to the provisions in § 63.6(e)(3).</P>
            <CITA>[68 FR 61888, Oct. 30, 2003, as amended at 71 FR 20470, Apr. 20, 2006]</CITA>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <PRTPAGE P="73"/>
          <HD SOURCE="HED">Initial Compliance Requirements</HD>
          <SECTION>
            <SECTNO>§ 63.9620</SECTNO>
            <SUBJECT>On which units and by what date must I conduct performance tests or other initial compliance demonstrations?</SUBJECT>
            <P>(a) For each ore crushing and handling affected source, you must demonstrate initial compliance with the emission limits in Table 1 to this subpart by conducting an initial performance test for particulate matter as specified in paragraphs (a)(1) and (2) of this section.</P>
            <P>(1) Except as provided in paragraph (e) of this section, an initial performance test must be performed on all stacks associated with ore crushing and handling.</P>
            <P>(2) Initial performance tests must be completed no later than 180 calendar days after the compliance date specified in § 63.9583. Performance tests conducted between October 30, 2003 and no later than 180 days after the corresponding compliance date can be used for initial compliance demonstration, provided the tests meet the initial performance testing requirements of this subpart.</P>
            <P>(b) For each indurating furnace affected source, you must demonstrate initial compliance with the emission limits in Table 1 to this subpart by conducting an initial performance test for particulate matter as specified in paragraphs (b)(1) and (2) of this section.</P>
            <P>(1) An initial performance test must be performed on all stacks associated with each indurating furnace.</P>
            <P>(2) Initial performance tests must be completed no later than 180 calendar days after the compliance date specified in § 63.9583. Performance tests conducted between October 30, 2003 and no later than 180 days after the corresponding compliance date can be used for initial compliance demonstration, provided the tests meet the initial performance testing requirements of this subpart. For indurating furnaces with multiple stacks, the performance tests for all stacks must be completed within a reasonable period of time, such that the indurating furnace operating characteristics remain representative for the duration of the stack tests.</P>
            <P>(c) For each finished pellet handling affected source, you must demonstrate initial compliance with the emission limits in Table 1 to this subpart by conducting an initial performance test for particulate matter as specified in paragraphs (c)(1) and (2) of this section.</P>
            <P>(1) Except as provided in paragraph (e) of this section, an initial performance test must be performed on all stacks associated with finished pellet handling.</P>
            <P>(2) Initial performance tests must be completed no later than 180 calendar days after the compliance date specified in § 63.9583. Performance tests conducted between October 30, 2003 and no later than 180 days after the corresponding compliance date can be used for initial compliance demonstration, provided the tests meet the initial compliance testing requirements of this subpart.</P>
            <P>(d) For each ore dryer affected source, you must demonstrate initial compliance with the emission limits in Table 1 to this subpart by conducting an initial performance test for particulate matter as specified in paragraphs (d)(1) and (2) of this section.</P>
            <P>(1) An initial performance test must be performed on all stacks associated with each ore dryer.</P>
            <P>(2) Initial performance tests must be completed no later than 180 calendar days after the compliance date specified in § 63.9583. Performance tests conducted between October 30, 2003 and no later than 180 days after the corresponding compliance date can be used for initial compliance demonstration, provided the tests meet the initial compliance testing requirements of this subpart. For ore dryers with multiple stacks, the performance tests for all stacks must be completed within a reasonable period of time, such that the ore dryer operating characteristics remain representative for the duration of the stack tests.</P>

            <P>(e) For ore crushing and handling affected sources and finished pellet handling affected sources, in lieu of conducting initial performance tests for particulate matter on all stacks, you may elect to group a maximum of six similar emission units together and conduct an initial compliance test on <PRTPAGE P="74"/>one representative emission unit within each group of similar emission units. The determination of whether emission units are similar must meet the criteria in paragraph (f) of this section. If you decide to test representative emission units, you must prepare and submit a testing plan as described in paragraph (g) of this section.</P>
            <P>(f) If you elect to test representative emission units as provided in paragraph (e) of this section, the units that are grouped together as similar units must meet the criteria in paragraphs (f)(1) through (3) of this section.</P>
            <P>(1) All emission units within a group must be of the same process type (e.g., primary crushers, secondary crushers, tertiary crushers, fine crushers, ore conveyors, ore bins, ore screens, grate feed, pellet loadout, hearth layer, cooling stacks, pellet conveyor, and pellet screens). You cannot group emission units from different process types together for the purposes of this section.</P>
            <P>(2) All emission units within a group must also have the same type of air pollution control device (e.g., wet scrubbers, dynamic wet scrubbers, rotoclones, multiclones, wet and dry electrostatic precipitators, and baghouses). You cannot group emission units with different air pollution control device types together for the purposes of this section.</P>
            <P>(3) The site-specific operating limits established for the emission unit selected as representative of a group of similar emission units will be used as the operating limit for each emission unit within the group. The operating limit established for the representative unit must be met by each emission unit within the group.</P>
            <P>(g) If you plan to conduct initial performance tests on representative emission units within an ore crushing and handling affected source or a finished pellet handling affected source, you must submit a testing plan for initial performance tests. This testing plan must be submitted to the Administrator or delegated authority no later than 90 days prior to the first scheduled initial performance test. The testing plan must contain the information specified in paragraphs (g)(1) through (3) of this section.</P>
            <P>(1) A list of all emission units. This list must clearly identify all emission units that have been grouped together as similar emission units. Within each group of emission units, you must identify the emission unit that will be the representative unit for that group and subject to initial performance testing.</P>
            <P>(2) A list of the process type and type of air pollution control device on each emission unit.</P>
            <P>(3) A schedule indicating when you will conduct an initial performance test for particulate matter for each representative emission unit.</P>
            <P>(h) For each work practice standard and operation and maintenance requirement that applies to you where initial compliance is not demonstrated using a performance test, you must demonstrate initial compliance within 30 calendar days after the compliance date that is specified for your affected source in § 63.9583.</P>
            <P>(i) If you commenced construction or reconstruction of an affected source between December 18, 2002 and October 30, 2003 , you must demonstrate initial compliance with either the proposed emission limit or the promulgated emission limit no later than 180 calendar days after October 30, 2003 or no later than 180 calendar days after startup of the source, whichever is later, according to § 63.7(a)(2)(ix).</P>
            <P>(j) If you commenced construction or reconstruction of an affected source between December 18, 2002 and October 30, 2003, and you chose to comply with the proposed emission limit when demonstrating initial compliance, you must conduct a second performance test to demonstrate compliance with the promulgated emission limit by 3 years and 180 calendar days after October 30, 2003, or after startup of the source, whichever is later, according to § 63.7(a)(2)(ix).</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9621</SECTNO>
            <SUBJECT>What test methods and other procedures must I use to demonstrate initial compliance with the emission limits for particulate matter?</SUBJECT>

            <P>(a) You must conduct each performance test that applies to your affected source according to the requirements in § 63.7(e)(1) and paragraphs (b) and (c) of this section.<PRTPAGE P="75"/>
            </P>
            <P>(b) For each ore crushing and handling affected source and each finished pellet handling affected source, you must determine compliance with the applicable emission limit for particulate matter in Table 1 to this subpart by following the test methods and procedures in paragraphs (b)(1) through (3) of this section.</P>
            <P>(1) Except as provided in § 63.9620(e), determine the concentration of particulate matter in the stack gas for each emission unit according to the test methods in appendix A to part 60 of this chapter. The applicable test methods are listed in paragraphs (b)(1)(i) through (v) of this section.</P>
            <P>(i) Method 1 or 1A to select sampling port locations and the number of traverse points. Sampling ports must be located at the outlet of the control device and prior to any releases to the atmosphere.</P>
            <P>(ii) Method 2, 2A, 2C, 2D, 2F, or 2G, as applicable, to determine the volumetric flow rate of the stack gas.</P>
            <P>(iii) Method 3, 3A, or 3B to determine the dry molecular weight of the stack gas.</P>
            <P>(iv) Method 4 to determine the moisture content of the stack gas.</P>
            <P>(v) Method 5, 5D, or 17 to determine the concentration of particulate matter.</P>
            <P>(2) Each Method 5, 5D, or 17 performance test must consist of three separate runs. Each run must be conducted for a minimum of 2 hours. The average particulate matter concentration from the three runs will be used to determine compliance, as shown in Equation 1 of this section.</P>
            <MATH DEEP="24" SPAN="1">
              <MID>ER30oc03.000</MID>
            </MATH>
            <EXTRACT>
              <FP>Where:</FP>
              
              <FP SOURCE="FP-1">C<E T="52">i</E> = Average particulate matter concentration for emission unit, grains per dry standard cubic foot, (gr/dscf);</FP>
              <FP SOURCE="FP-1">C<E T="52">1</E> = Particulate matter concentration for run 1 corresponding to emission unit, gr/dscf;</FP>
              <FP SOURCE="FP-1">C<E T="52">2</E> = Particulate matter concentration for run 2 corresponding to emission unit, gr/dscf; and</FP>
              <FP SOURCE="FP-1">C<E T="52">3</E> = Particulate matter concentration for run 3 corresponding to emission unit, gr/dscf.</FP>
            </EXTRACT>
            
            <P>(3) For each ore crushing and handling affected source and each finished pellet handling affected source, you must determine the flow-weighted mean concentration of particulate matter emissions from all emission units in each affected source following the procedure in paragraph (b)(3)(i) or (ii) of this section.</P>
            <P>(i) If an initial performance test is conducted on all emission units within an affected source, calculate the flow-weighted mean concentration of particulate matter emissions from the affected source using Equation 2 of this section.</P>
            <MATH DEEP="58" SPAN="1">
              <MID>ER30oc03.001</MID>
            </MATH>
            <EXTRACT>
              <FP>Where:</FP>
              
              <FP SOURCE="FP-1">C<E T="52">a</E> = Flow-weighted mean concentration of particulate matter for all emission units within affected source, (gr/dscf);</FP>
              <FP SOURCE="FP-1">C<E T="52">i</E> = Average particulate matter concentration measured during the performance test from emission unit “i” in affected source, as determined using Equation 1 of this section, gr/dscf;</FP>
              <FP SOURCE="FP-1">Q<E T="52">i</E> = Average volumetric flow rate of stack gas measured during the performance test from emission unit “i” in affected source, dscf/hr; and</FP>
              <FP SOURCE="FP-1">n = Number of emission units in affected source.</FP>
            </EXTRACT>
            
            <P>(ii) If you are grouping similar emission units together in accordance with § 63.9620(e), you must follow the procedures in paragraphs (b)(3)(ii)(A) through (C) of this section.</P>
            <P>(A) Assign the average particulate matter concentration measured from the representative unit, as determined from Equation 1 of this section, to each emission unit within the corresponding group of similar units.</P>
            <P>(B) Establish the maximum operating volumetric flow rate of exhaust gas from each emission unit within each group of similar units.</P>
            <P>(C) Using the data from paragraphs (b)(3)(ii)(A) and (B) of this section, calculate the flow-weighted mean concentration of particulate matter emissions from the affected source using Equation 3 of this section.</P>
            <MATH DEEP="58" SPAN="1">
              <PRTPAGE P="76"/>
              <MID>ER30oc03.002</MID>
            </MATH>
            <EXTRACT>
              <FP>Where:</FP>
              
              <FP SOURCE="FP-1">C<E T="52">a</E> = Flow-weighted mean concentration of particulate matter for all emission units within affected source, gr/dscf;</FP>
              <FP SOURCE="FP-1">C<E T="52">k</E> = Average particulate matter concentration measured during the performance test from the representative emission unit in group “k” of affected source “a,” as determined using Equation 1 of this section, gr/dscf;</FP>
              <FP SOURCE="FP-1">Q<E T="52">k</E> = Sum of the maximum operating volumetric flow rates of stack gas from all similar emission units within group “k” of affected source, dscf/hr; and</FP>
              <FP SOURCE="FP-1">m = Number of similar emission unit groups in affected source.</FP>
            </EXTRACT>
            
            <P>(c) For each ore dryer affected source and each indurating furnace affected source, you must determine compliance with the applicable emission limit for particulate matter in Table 1 to this subpart by following the test methods and procedures in paragraphs (c)(1) through (3) of this section.</P>
            <P>(1) Determine the concentration of particulate matter for each stack according to the test methods in 40 CFR part 60, appendix A. The applicable test methods are listed in paragraphs (c)(1)(i) through (v) of this section.</P>
            <P>(i) Method 1 or 1A to select sampling port locations and the number of traverse points. Sampling ports must be located at the outlet of the control device and prior to any releases to the atmosphere.</P>
            <P>(ii) Method 2, 2A, 2C, 2D, 2F, or 2G, as applicable, to determine the volumetric flow rate of the stack gas.</P>
            <P>(iii) Method 3, 3A, or 3B to determine the dry molecular weight of the stack gas.</P>
            <P>(iv) Method 4 to determine the moisture content of the stack gas.</P>
            <P>(v) Method 5, 5D, or 17 to determine the concentration of particulate matter.</P>
            <P>(2) Each Method 5, 5D, or 17 performance test must consist of three separate runs. Each run must be conducted for a minimum of 2 hours. The average particulate matter concentration from the three runs will be used to determine compliance, as shown in Equation 1 of this section.</P>
            <P>(3) For each ore dryer and each indurating furnace with multiple stacks, calculate the flow-weighted mean concentration of particulate matter emissions using Equation 4 of this section.</P>
            <MATH DEEP="61" SPAN="1">
              <MID>ER30OC03.003</MID>
            </MATH>
            <EXTRACT>
              <FP>Where:</FP>
              
              <FP SOURCE="FP-1">C<E T="52">b</E> = Flow-weighted mean concentration of particulate matter for all stacks associated with affected source, gr/dscf;</FP>
              <FP SOURCE="FP-1">C<E T="52">j</E> = Average particulate matter concentration measured during the performance test from stack “j” in affected source, as determined using Equation 1 of this section, gr/dscf;</FP>
              <FP SOURCE="FP-1">Q<E T="52">j</E> = Average volumetric flow rate of stack gas measured during the performance test from stack “j” in affected source, dscf/hr;</FP>
              <FP SOURCE="FP-1">n = Number of stacks associated with affected source.</FP>
            </EXTRACT>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9622</SECTNO>
            <SUBJECT>What test methods and other procedures must I use to establish and demonstrate initial compliance with the operating limits?</SUBJECT>
            <P>(a) For wet scrubbers subject to performance testing in § 63.9620 and operating limits for pressure drop and scrubber water flow rate in § 63.9590(b)(1), you must establish site-specific operating limits according to the procedures in paragraphs (a)(1) through (3) of this section.</P>
            <P>(1) Using the CPMS required in § 63.9631(b), measure and record the pressure drop and scrubber water flow rate every 15 minutes during each run of the particulate matter performance test.</P>
            <P>(2) Calculate and record the average pressure drop and scrubber water flow rate for each individual test run. Your operating limits are established as the lowest average pressure drop and the lowest average scrubber water flow rate corresponding to any of the three test runs.</P>

            <P>(3) If a rod-deck venturi scrubber is applied to an indurating furnace to meet any particulate matter emission limit in Table 1 to this subpart, you <PRTPAGE P="77"/>may establish a lower average pressure drop operating limit by using historical average pressure drop data from a certified performance test completed on or after December 18, 2002 instead of using the average pressure drop value determined during the initial performance test, as specified in paragraph (a)(2) of this section. If historical average pressure drop data are used to establish an operating limit (i.e., using data from a certified performance test conducted prior to the promulgation date of the final rule), then the average particulate matter concentration corresponding to the historical performance test must be at or below the applicable indurating furnace emission limit, as listed in Table 1 to this subpart.</P>
            <P>(b) For dynamic wet scrubbers subject to performance testing in § 63.9620 and operating limits for scrubber water flow rate and either fan amperage or pressure drop in § 63.9590(b)(2), you must establish site-specific operating limits according to the procedures in paragraphs (b)(1) and (2) of this section.</P>
            <P>(1) Using the CPMS required in § 63.9631(b), measure and record the scrubber water flow rate and either the fan amperage or pressure drop every 15 minutes during each run of the particulate matter performance test.</P>
            <P>(2) Calculate and record the average scrubber water flow rate and either the average fan amperage or average pressure drop for each individual test run. Your operating limits are established as the lowest average scrubber water flow rate and either the lowest average fan amperage or pressure drop value corresponding to any of the three test runs.</P>
            <P>(c) For a dry electrostatic precipitator subject to performance testing in § 63.9620 and operating limits in § 63.9590(b)(3), you must establish a site-specific operating limit according to the procedures in paragraphs (c)(1) or (2) of this section.</P>
            <P>(1) If the operating limit for your dry electrostatic precipitator is a 6-minute average opacity of emissions value, then you must follow the requirements in paragraphs (c)(1)(i) through (iii) of this section.</P>
            <P>(i) Using the continuous opacity monitoring system (COMS) required in § 63.9631(d)(1), measure and record the opacity of emissions from each control device stack during the particulate matter performance test.</P>
            <P>(ii) Compute and record the 6-minute opacity averages from 24 or more data points equally spaced over each 6-minute period (e.g., at 15-second intervals) during the test runs.</P>
            <P>(iii) Using the opacity measurements from a performance test that meets the emission limit, determine the opacity value corresponding to the 99 percent upper confidence level of a normal distribution of the 6-minute opacity averages.</P>
            <P>(2) If the operating limit for your dry electrostatic precipitator is the daily average secondary voltage and daily average secondary current for each field, then you must follow the requirements in paragraphs (c)(2)(i) and (ii) of this section.</P>
            <P>(i) Using the CPMS required in § 63.9631(d)(2), measure and record the secondary voltage and secondary current for each dry electrostatic precipitator field every 15 minutes during each run of the particulate matter performance test.</P>
            <P>(ii) Calculate and record the average secondary voltage and secondary current for each dry electrostatic precipitator field for each individual test run. Your operating limits are established as the lowest average secondary voltage and secondary current value for each dry electrostatic precipitator field corresponding to any of the three test runs.</P>
            <P>(d) For a wet electrostatic precipitator subject to performance testing in § 63.9620 and operating limit in § 63.9590(b)(4), you must establish a site-specific operating limit according to the procedures in paragraphs (d)(1) and (2) of this section.</P>
            <P>(1) Using the CPMS required in § 63.9631(e), measure and record the parametric values in paragraphs (d)(1)(i) through (iii) of this section for each wet electrostatic precipitator field every 15 minutes during each run of the particulate matter performance test.</P>
            <P>(i) Secondary voltage;</P>
            <P>(ii) Water flow rate; and</P>
            <P>(iii) Stack outlet temperature.<PRTPAGE P="78"/>
            </P>
            <P>(2) For each individual test run, calculate and record the average value for each operating parameter in paragraphs (d)(1)(i) through (iii) of this section for each wet electrostatic precipitator field. Your operating limits are established as the lowest average value for each operating parameter corresponding to any of the three test runs.</P>
            <P>(e) If you use an air pollution control device other than a wet scrubber, dynamic wet scrubber, dry electrostatic precipitator, wet electrostatic precipitator, or baghouse, and it is subject to performance testing in § 63.9620, you must submit a site-specific monitoring plan in accordance with § 63.9631(f). The site-specific monitoring plan must include the site-specific procedures for demonstrating initial and continuous compliance with the corresponding operating limits.</P>
            <P>(f) You may change the operating limits for any air pollution control device as long as you meet the requirements in paragraphs (f)(1) through (3) of this section.</P>
            <P>(1) Submit a written notification to the Administrator of your request to conduct a new performance test to revise the operating limit.</P>
            <P>(2) Conduct a performance test to demonstrate compliance with the applicable emission limitation in Table 1 to this subpart.</P>
            <P>(3) Establish revised operating limits according to the applicable procedures in paragraphs (a) through (e) of this section.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9623</SECTNO>
            <SUBJECT>How do I demonstrate initial compliance with the emission limitations that apply to me?</SUBJECT>
            <P>(a) For each affected source subject to an emission limit in Table 1 to this subpart, you must demonstrate initial compliance by meeting the emission limit requirements in paragraphs (a)(1) through (4) of this section.</P>
            <P>(1) For ore crushing and handling, the flow-weighted mean concentration of particulate matter, determined according to the procedures in §§ 63.9620(a) and 63.9621(b), must not exceed the emission limits in Table 1 to this subpart.</P>
            <P>(2) For indurating furnaces, the flow-weighted mean concentration of particulate matter, determined according to the procedures in §§ 63.9620(b) and 63.9621(c), must not exceed the emission limits in Table 1 to this subpart.</P>
            <P>(3) For finished pellet handling, the flow-weighted mean concentration of particulate matter, determined according to the procedures in §§ 63.9620(c) and 63.9621(b), must not exceed the emission limits in Table 1 to this subpart.</P>
            <P>(4) For ore dryers, the flow-weighted mean concentration of particulate matter, determined according to the procedures in §§ 63.9620(d) and 63.9621(c), must not exceed the emission limits in Table 1 to this subpart.</P>
            <P>(b) For each affected source subject to an emission limit in Table 1 to this subpart, you must demonstrate initial compliance by meeting the operating limit requirements in paragraphs (b)(1) through (5) of this section.</P>
            <P>(1) For each wet scrubber subject to performance testing in § 63.9620 and operating limits for pressure drop and scrubber water flow rate in § 63.9590(b)(1), you have established appropriate site-specific operating limits and have a record of the pressure drop and scrubber water flow rate measured during the performance test in accordance with § 63.9622(a).</P>
            <P>(2) For each dynamic wet scrubber subject to performance testing in § 63.9620 and operating limits for scrubber water flow rate and either fan amperage or pressure drop in § 63.9590(b)(2), you have established appropriate site-specific operating limits and have a record of the scrubber water flow rate and either the fan amperage or pressure drop value, measured during the performance test in accordance with § 63.9622(b).</P>
            <P>(3) For each dry electrostatic precipitator subject to performance testing in § 63.9620 and one of the operating limits in § 63.9590(b)(3), you must meet the requirements in paragraph (b)(3)(i) or (ii) of this section.</P>
            <P>(i) If you are subject to the operating limit for opacity in § 63.9590(b)(3)(i), you have established appropriate site-specific operating limits and have a record of the opacity measured during the performance test in accordance with § 63.9622(c)(1).</P>

            <P>(ii) If you are subject to the operating limit for secondary voltage and <PRTPAGE P="79"/>secondary current in § 63.9590(b)(3)(ii), you have established appropriate site-specific operating limits and have a record of the secondary voltage and secondary current measured during the performance test in accordance with § 63.9622(c)(2).</P>
            <P>(4) For each wet electrostatic precipitator subject to performance testing in § 63.9620 and operating limits for secondary voltage, water flow rate, and stack outlet temperature in § 63.9590(b)(4), you have established appropriate site-specific operating limits and have a record of the secondary voltage, water flow rate, and stack outlet temperature measured during the performance test in accordance with § 63.9622(d).</P>
            <P>(5) For other air pollution control devices subject to performance testing in § 63.9620 and operating limits in accordance with § 63.9590(b)(5), you have submitted a site-specific monitoring plan in accordance with § 63.9631(f) and have a record of the site-specific operating limits as measured during the performance test in accordance with § 63.9622(e).</P>
            <P>(c) For each emission limitation and operating limit that applies to you, you must submit a notification of compliance status according to § 63.9640(e).</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9624</SECTNO>
            <SUBJECT>How do I demonstrate initial compliance with the work practice standards that apply to me?</SUBJECT>
            <P>You must demonstrate initial compliance with the work practice standards by meeting the requirements in paragraphs (a) through (c) of this section.</P>
            <P>(a) You must prepare a fugitive dust emissions control plan in accordance with the requirements in § 63.9591.</P>
            <P>(b) You must submit to the Administrator the fugitive dust emissions control plan in accordance with the requirements in § 63.9591.</P>
            <P>(c) You must implement each control practice according to the procedures specified in your fugitive dust emissions control plan.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9625</SECTNO>
            <SUBJECT>How do I demonstrate initial compliance with the operation and maintenance requirements that apply to me?</SUBJECT>
            <P>For each air pollution control device subject to operating limits in § 63.9590(b), you have demonstrated initial compliance if you meet all of the requirements in paragraphs (a) through (d) of this section.</P>
            <P>(a) You have prepared the operation and maintenance plan for air pollution control devices in accordance with § 63.9600(b).</P>
            <P>(b) You have operated each air pollution control device according to the procedures in the operation and maintenance plan.</P>
            <P>(c) You have submitted a notification of compliance status according to the requirements in § 63.9640(e).</P>
            <P>(d) You have prepared a site-specific monitoring plan in accordance with § 63.9632(b).</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Continuous Compliance Requirements</HD>
          <SECTION>
            <SECTNO>§ 63.9630</SECTNO>
            <SUBJECT>When must I conduct subsequent performance tests?</SUBJECT>
            <P>(a) You must conduct subsequent performance tests to demonstrate continued compliance with the ore crushing and handling emission limits in Table 1 to this subpart according to the schedule developed by your permitting authority and shown in your title V permit. If a title V permit has not been issued, you must submit a testing plan and schedule, containing the information specified in paragraph (e) of this section, to the permitting authority for approval.</P>

            <P>(b) You must conduct subsequent performance tests on all stacks associated with indurating furnaces to demonstrate continued compliance with the indurating furnace emission limits in Table 1 to this subpart according to the schedule developed by your permitting authority and shown in your title V permit, but no less frequent than twice per 5-year permit term. If a title V permit has not been issued, you must submit a testing plan and schedule, containing the information specified in paragraph (e) of this section, to the permitting authority for approval. For indurating furnaces with multiple stacks, the performance tests for all stacks associated with that indurating furnace must be conducted within a reasonable period of time, such that the indurating furnace operating characteristics remain representative for the duration of the stack tests.<PRTPAGE P="80"/>
            </P>
            <P>(c) You must conduct subsequent performance tests to demonstrate continued compliance with the finished pellet handling emission limits in Table 1 to this subpart according to the schedule developed by your permitting authority and shown in your title V permit. If a title V permit has not been issued, you must submit a testing plan and schedule, containing the information specified in paragraph (e) of this section, to the permitting authority for approval.</P>
            <P>(d) You must conduct subsequent performance tests on all stacks associated with ore dryers to demonstrate continued compliance with the ore dryer emission limits in Table 1 to this subpart according to the schedule developed by your permitting authority and shown in your title V permit. If a title V permit has not been issued, you must submit a testing plan and schedule, containing the information specified in paragraph (e) of this section, to the permitting authority for approval. For ore dryers with multiple stacks, the performance tests for all stacks associated with an ore dryer must be conducted within a reasonable period of time, such that the ore dryer operating characteristics remain representative for the duration of the stack tests.</P>
            <P>(e) If your plant does not have a title V permit, you must submit a testing plan for subsequent performance tests as required in paragraphs (a) through (d) of this section. This testing plan must be submitted to the Administrator on or before the compliance date that is specified in § 63.9583. The testing plan must contain the information specified in paragraphs (e)(1) and (2) of this section. You must maintain a current copy of the testing plan onsite, and it must be available for inspection upon request. You must keep the plan for the life of the affected source or until the affected source is no longer subject to the requirements of this subpart.</P>
            <P>(1) A list of all emission units.</P>
            <P>(2) A schedule indicating when you will conduct subsequent performance tests for particulate matter for each of the emission units.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9631</SECTNO>
            <SUBJECT>What are my monitoring requirements?</SUBJECT>
            <P>(a) For each baghouse applied to meet any particulate matter emission limit in Table 1 to this subpart, you must install, operate, and maintain a bag leak detection system to monitor the relative change in particulate matter loadings according to the requirements in § 63.9632(a), and conduct inspections at their specified frequencies according to the requirements in paragraphs (a)(1) through (8) of this section.</P>
            <P>(1) Monitor the pressure drop across each baghouse cell each day to ensure pressure drop is within the normal operating range.</P>
            <P>(2) Confirm that dust is being removed from hoppers through weekly visual inspections or other means of ensuring the proper functioning of removal mechanisms.</P>
            <P>(3) Check the compressed air supply of pulse-jet baghouses each day.</P>
            <P>(4) Monitor cleaning cycles to ensure proper operation using an appropriate methodology.</P>
            <P>(5) Check bag cleaning mechanisms for proper functioning through monthly visual inspections or equivalent means.</P>
            <P>(6) Make monthly visual checks of bag tension on reverse air and shaker-type baghouses to ensure that bags are not kinked (kneed or bent) or lying on their sides. You do not have to make this check for shaker-type baghouses that have self-tensioning (spring-loaded) devices.</P>
            <P>(7) Confirm the physical integrity of the baghouse through quarterly visual inspections of the baghouse interior for air leaks.</P>
            <P>(8) Inspect fans for wear, material buildup, and corrosion through quarterly visual inspections, vibration detectors, or equivalent means.</P>

            <P>(b) Except as provided in paragraph (c) of this section, for each wet scrubber subject to the operating limits for pressure drop and scrubber water flow rate in § 63.9590(b)(1), you must install, operate, and maintain a CPMS according to the requirements in § 63.9632(b) through (e) and monitor the daily average pressure drop and daily average scrubber water flow rate according to the requirements in § 63.9633.<PRTPAGE P="81"/>
            </P>
            <P>(c) For each dynamic wet scrubber subject to the scrubber water flow rate and either the fan amperage or pressure drop operating limits in § 63.9590(b)(2), you must install, operate, and maintain a CPMS according to the requirements in § 63.9632(b) through (e) and monitor the daily average scrubber water flow rate and either the daily average fan amperage or the daily average pressure drop according to the requirements in § 63.9633.</P>
            <P>(d) For each dry electrostatic precipitator subject to the operating limits in § 63.9590(b)(3), you must follow the monitoring requirements in paragraph (d)(1) or (2) of this section.</P>
            <P>(1) If the operating limit you choose to monitor is the 6-minute average opacity of emissions in accordance with § 63.9590(b)(3)(i), you must install, operate, and maintain a COMS according to the requirements in § 63.9632(f) and monitor the 6-minute average opacity of emissions exiting each control device stack according to the requirements in § 63.9633.</P>
            <P>(2) If the operating limit you choose to monitor is average secondary voltage and average secondary current for each dry electrostatic precipitator field in accordance with § 63.9590(b)(3)(ii), you must install, operate, and maintain a CPMS according to the requirements in § 63.9632(b) through (e) and monitor the daily average secondary voltage and daily average secondary current according to the requirements in § 63.9633.</P>
            <P>(e) For each wet electrostatic precipitator subject to the operating limits in § 63.9590(b)(4), you must install, operate, and maintain a CPMS according to the requirements in § 63.9632(b) through (e) and monitor the daily average secondary voltage, daily average stack outlet temperature, and daily average water flow rate according to the requirements in § 63.9633.</P>
            <P>(f) If you use any air pollution control device other than a baghouse, wet scrubber, dry electrostatic precipitator, or wet electrostatic precipitator, you must submit a site-specific monitoring plan that includes the information in paragraphs (f)(1) through (4) of this section. The monitoring plan is subject to approval by the Administrator. You must maintain a current copy of the monitoring plan onsite, and it must be available for inspection upon request. You must keep the plan for the life of the affected source or until the affected source is no longer subject to the requirements of this subpart.</P>
            <P>(1) A description of the device.</P>
            <P>(2) Test results collected in accordance with § 63.9621 verifying the performance of the device for reducing emissions of particulate matter to the atmosphere to the levels required by this subpart.</P>
            <P>(3) A copy of the operation and maintenance plan required in § 63.9600(b).</P>
            <P>(4) Appropriate operating parameters that will be monitored to maintain continuous compliance with the applicable emission limitation(s).</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9632</SECTNO>
            <SUBJECT>What are the installation, operation, and maintenance requirements for my monitoring equipment?</SUBJECT>
            <P>(a) For each negative pressure baghouse or positive pressure baghouse equipped with a stack, applied to meet any particulate emission limit in Table 1 to this subpart, you must install, operate, and maintain a bag leak detection system according to the requirements in paragraphs (a)(1) through (8) of this section.</P>
            <P>(1) The system must be certified by the manufacturer to be capable of detecting emissions of particulate matter at concentrations of 10 milligrams per actual cubic meter (0.0044 grains per actual cubic foot) or less.</P>
            <P>(2) The system must provide output of relative changes in particulate matter loadings.</P>
            <P>(3) The system must be equipped with an alarm that will sound when an increase in relative particulate loadings is detected over the alarm level set point established according to paragraph (a)(4) of this section. The alarm must be located such that it can be heard by the appropriate plant personnel.</P>

            <P>(4) For each bag leak detection system, you must develop and submit to the Administrator for approval, a site-specific monitoring plan that addresses the items identified in paragraphs (a)(4)(i) through (v) of this section. For each bag leak detection system that <PRTPAGE P="82"/>operates based on the triboelectric effect, the monitoring plan shall be consistent with the recommendations contained in the U.S. Environmental Protection Agency (U.S. EPA) guidance document, “Fabric Filter Bag Leak Detection Guidance” (EPA-454/R-98-015). This document is available on the EPA's Technology Transfer Network at <E T="03">http://www.epa.gov/ttn/emc/cem/tribo.pdf</E> (Adobe Acrobat version) or <E T="03">http://www.epa.gov/ttn/emc/cem/tribo.wpd</E> (WordPerfect version). You must operate and maintain the bag leak detection system according to the site-specific monitoring plan at all times. The plan shall describe all of the items in paragraphs (a)(4)(i) through (v) of this section.</P>
            <P>(i) Installation of the bag leak detection system.</P>
            <P>(ii) Initial and periodic adjustment of the bag leak detection system including how the alarm set-point will be established.</P>
            <P>(iii) Operation of the bag leak detection system including quality assurance procedures.</P>
            <P>(iv) How the bag leak detection system will be maintained including a routine maintenance schedule and spare parts inventory list.</P>
            <P>(v) How the bag leak detection system output shall be recorded and stored.</P>
            <P>(5) To make the initial adjustment of the system, establish the baseline output by adjusting the sensitivity (range) and the averaging period of the device. Then, establish the alarm set points and the alarm delay time (if applicable).</P>
            <P>(6) Following initial adjustment, do not adjust averaging period, alarm set point, or alarm delay time, without approval from the Administrator except as provided for in paragraph (a)(6)(i) of this section.</P>
            <P>(i) Once per quarter, you may adjust the sensitivity of the bag leak detection system to account for seasonal effects, including temperature and humidity, according to the procedures identified in the site-specific monitoring plan required under paragraph (a)(4) of this section.</P>
            <P>(ii) [Reserved]</P>
            <P>(7) Where multiple detectors are required, the system's instrumentation and alarm may be shared among detectors.</P>
            <P>(8) The bag leak detector sensor must be installed downstream of the baghouse and upstream of any wet scrubber.</P>
            <P>(b) For each CPMS required in § 63.9631, you must develop and make available for inspection upon request by the permitting authority a site-specific monitoring plan that addresses the requirements in paragraphs (b)(1) through (7) of this section.</P>
            <P>(1) Installation of the CPMS sampling probe or other interface at a measurement location relative to each affected emission unit such that the measurement is representative of control of the exhaust emissions (e.g., on or downstream of the last control device).</P>
            <P>(2) Performance and equipment specifications for the sample interface, the parametric signal analyzer, and the data collection and reduction system.</P>
            <P>(3) Performance evaluation procedures and acceptance criteria (e.g., calibrations).</P>
            <P>(4) Ongoing operation and maintenance procedures in accordance with the general requirements of § 63.8(c)(1), (3), (4)(ii), (7), and (8).</P>
            <P>(5) Ongoing data quality assurance procedures in accordance with the general requirements of § 63.8(d).</P>
            <P>(6) Ongoing recordkeeping and reporting procedures in accordance with the general requirements of § 63.10(c), (e)(1), and (e)(2)(i).</P>
            <P>(7) Corrective action procedures that you will follow in the event an air pollution control device, except for a baghouse, exceeds an established operating limit as required in § 63.9600(b)(3).</P>
            <P>(c) Unless otherwise specified, each CPMS must meet the requirements in paragraphs (c)(1) and (2) of this section.</P>
            <P>(1) Each CPMS must complete a minimum of one cycle of operation for each successive 15-minute period and must have valid data for at least 95 percent of every daily averaging period.</P>
            <P>(2) Each CPMS must determine and record the daily average of all recorded readings.</P>

            <P>(d) You must conduct a performance evaluation of each CPMS in accordance <PRTPAGE P="83"/>with your site-specific monitoring plan.</P>
            <P>(e) You must operate and maintain the CPMS in continuous operation according to the site-specific monitoring plan.</P>
            <P>(f) For each dry electrostatic precipitator subject to the opacity operating limit in § 63.9590(b)(3)(i), you must install, operate, and maintain each COMS according to the requirements in paragraphs (f)(1) through (4) of this section.</P>
            <P>(1) You must install each COMS and conduct a performance evaluation of each COMS according to § 63.8 and Performance Specification 1 in appendix B to 40 CFR part 60.</P>
            <P>(2) You must develop and implement a quality control program for operating and maintaining each COMS according to § 63.8. At a minimum, the quality control program must include a daily calibration drift assessment, quarterly performance audit, and annual zero alignment of each COMS.</P>
            <P>(3) You must operate and maintain each COMS according to § 63.8(e) and your quality control program. You must also identify periods the COMS is out of control, including any periods that the COMS fails to pass a daily calibration drift assessment, quarterly performance audit, or annual zero alignment audit.</P>
            <P>(4) You must determine and record the 6-minute average opacity for periods during which the COMS is not out of control.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9633</SECTNO>
            <SUBJECT>How do I monitor and collect data to demonstrate continuous compliance?</SUBJECT>
            <P>(a) Except for monitoring malfunctions, associated repairs, and required quality assurance or control activities (including as applicable, calibration checks and required zero and span adjustments), you must monitor continuously (or collect data at all required intervals) at all times an affected source is operating.</P>
            <P>(b) You may not use data recorded during monitoring malfunctions, associated repairs, and required quality assurance or control activities in data averages and calculations used to report emission or operating levels, or to fulfill a minimum data availability requirement. You must use all the data collected during all other periods in assessing compliance.</P>
            <P>(c) A monitoring malfunction is any sudden, infrequent, not reasonably preventable failure of the monitoring system to provide valid data. Monitoring failures that are caused in part by poor maintenance or careless operation are not considered malfunctions.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9634</SECTNO>
            <SUBJECT>How do I demonstrate continuous compliance with the emission limitations that apply to me?</SUBJECT>
            <P>(a) For each affected source subject to an emission limit in Table 1 to this subpart, you must demonstrate continuous compliance by meeting the requirements in paragraphs (b) through (f) of this section.</P>
            <P>(b) For ore crushing and handling affected sources and finished pellet handling affected sources, you must demonstrate continuous compliance by meeting the requirements in paragraphs (b)(1) through (3) of this section.</P>
            <P>(1) The flow-weighted mean concentration of particulate matter for all ore crushing and handling emission units and for all finished pellet handling emission units must be maintained at or below the emission limits in Table 1 to this subpart.</P>
            <P>(2) You must conduct subsequent performance tests for emission units in the ore crushing and handling and finished pellet handling affected sources following the schedule in your title V permit. If a title V permit has not been issued, you must conduct subsequent performance tests according to a testing plan approved by the Administrator or delegated authority.</P>
            <P>(3) For emission units not selected for initial performance testing and defined within a group of similar emission units in accordance with § 63.9620(e), you must calculate the daily average value of each operating parameter for the similar air pollution control device applied to each similar emission unit within a defined group using Equation 1 of this section.</P>
            <GPH DEEP="41" SPAN="1">
              <GID>ER30oc03.004</GID>
            </GPH>
            <EXTRACT>
              <FP>Where:</FP>
              
              <PRTPAGE P="84"/>
              <FP SOURCE="FP-1">P<E T="52">k</E> = Daily average operating parameter value for all emission units within group “k”;</FP>
              <FP SOURCE="FP-1">P<E T="52">i</E> = Daily average parametric monitoring parameter value corresponding to emission unit “i” within group “k”; and</FP>
              <FP SOURCE="FP-1">n = Total number of emission units within group, including emission units that have been selected for performance tests and those that have not been selected for performance tests.</FP>
            </EXTRACT>
            
            <P>(c) For ore dryers and indurating furnaces, you must demonstrate continuous compliance by meeting the requirements in paragraphs (c)(1) and (2) of this section.</P>
            <P>(1) The flow-weighted mean concentration of particulate matter for all stacks from the ore dryer or indurating furnace must be maintained at or below the emission limits in Table 1 to this subpart.</P>
            <P>(2) For ore dryers, you must conduct subsequent performance tests following the schedule in your title V permit. For indurating furnaces, you must conduct subsequent performance tests following the schedule in your title V permit, but no less frequent than twice per 5-year permit term. If a title V permit has not been issued, you must conduct subsequent performance tests according to a testing plan approved by the Administrator or delegated authority.</P>
            <P>(d) For each baghouse applied to meet any particulate emission limit in Table 1 to this subpart, you must demonstrate continuous compliance by completing the requirements in paragraphs (d)(1) and (2) of this section.</P>
            <P>(1) Maintaining records of the time you initiated corrective action in the event of a bag leak detection system alarm, the corrective action(s) taken, and the date on which corrective action was completed.</P>
            <P>(2) Inspecting and maintaining each baghouse according to the requirements in § 63.9631(a)(1) through (8) and recording all information needed to document conformance with these requirements. If you increase or decrease the sensitivity of the bag leak detection system beyond the limits specified in your site-specific monitoring plan, you must include a copy of the required written certification by a responsible official in the next semiannual compliance report.</P>
            <P>(e) Except as provided in paragraph (f) of this section, for each wet scrubber subject to the operating limits for pressure drop and scrubber water flow rate in § 63.9590(b)(1), you must demonstrate continuous compliance by completing the requirements of paragraphs (e)(1) through (4) of this section.</P>
            <P>(1) Maintaining the daily average pressure drop and daily average scrubber water flow rate at or above the minimum levels established during the initial or subsequent performance test.</P>
            <P>(2) Operating and maintaining each wet scrubber CPMS according to § 63.9632(b) and recording all information needed to document conformance with these requirements.</P>
            <P>(3) Collecting and reducing monitoring data for pressure drop and scrubber water flow rate according to § 63.9632(c) and recording all information needed to document conformance with these requirements.</P>
            <P>(4) If the daily average pressure drop or daily average scrubber water flow rate is below the operating limits established for a corresponding emission unit or group of similar emission units, you must then follow the corrective action procedures in paragraph (j) of this section.</P>
            <P>(f) For each dynamic wet scrubber subject to the operating limits for scrubber water flow rate and either the fan amperage or pressure drop in § 63.9590(b)(2), you must demonstrate continuous compliance by completing the requirements of paragraphs (f)(1) through (4) of this section.</P>
            <P>(1) Maintaining the daily average scrubber water flow rate and either the daily average fan amperage or the daily average pressure drop at or above the minimum levels established during the initial or subsequent performance test.</P>
            <P>(2) Operating and maintaining each dynamic wet scrubber CPMS according to § 63.9632(b) and recording all information needed to document conformance with these requirements.</P>

            <P>(3) Collecting and reducing monitoring data for scrubber water flow rate and either fan amperage or pressure drop according to § 63.9632(c) and recording all information needed to document conformance with these requirements.<PRTPAGE P="85"/>
            </P>
            <P>(4) If the daily average scrubber water flow rate, daily average fan amperage, or daily average pressure drop is below the operating limits established for a corresponding emission unit or group of similar emission units, you must then follow the corrective action procedures in paragraph (j) of this section.</P>
            <P>(g) For each dry electrostatic precipitator subject to operating limits in § 63.9590(b)(3), you must demonstrate continuous compliance by completing the requirements of paragraph (g)(1) or (2) of this section.</P>
            <P>(1) If the operating limit for your dry electrostatic precipitator is a 6-minute average opacity of emissions value, then you must follow the requirements in paragraphs (g)(1)(i) through (iii) of this section.</P>
            <P>(i) Maintaining the 6-minute average opacity of emissions at or below the maximum level established during the initial or subsequent performance test.</P>
            <P>(ii) Operating and maintaining each COMS and reducing the COMS data according to § 63.9632(f).</P>
            <P>(iii) If the 6-minute average opacity of emissions is above the operating limits established for a corresponding emission unit, you must then follow the corrective action procedures in paragraph (j) of this section.</P>
            <P>(2) If the operating limit for your dry electrostatic precipitator is the daily average secondary voltage and daily average secondary current for each field, then you must follow the requirements in paragraphs (g)(2)(i) through (iv) of this section.</P>
            <P>(i) Maintaining the daily average secondary voltage or daily average secondary current for each field at or above the minimum levels established during the initial or subsequent performance test.</P>
            <P>(ii) Operating and maintaining each dry electrostatic precipitator CPMS according to § 63.9632(b) and recording all information needed to document conformance with these requirements.</P>
            <P>(iii) Collecting and reducing monitoring data for secondary voltage or secondary current for each field according to § 63.9632(c) and recording all information needed to document conformance with these requirements.</P>
            <P>(iv) If the daily average secondary voltage or daily average secondary current for each field is below the operating limits established for a corresponding emission unit, you must then follow the corrective action procedures in paragraph (j) of this section.</P>
            <P>(h) For each wet electrostatic precipitator subject to the operating limits for secondary voltage, stack outlet temperature, and water flow rate in § 63.9590(b)(4), you must demonstrate continuous compliance by completing the requirements of paragraphs (h)(1) through (4) of this section.</P>
            <P>(1) Maintaining the daily average secondary voltage, daily average secondary current, and daily average scrubber water flow rate for each field at or above the minimum levels established during the initial or subsequent performance test. Maintaining the daily average stack outlet temperature at or below the maximum levels established during the initial or subsequent performance test.</P>
            <P>(2) Operating and maintaining each wet electrostatic precipitator CPMS according to § 63.9632(b) and recording all information needed to document conformance with these requirements.</P>
            <P>(3) Collecting and reducing monitoring data for secondary voltage, stack outlet temperature, and water flow rate according to § 63.9632(c) and recording all information needed to document conformance with these requirements.</P>
            <P>(4) If the daily average secondary voltage, stack outlet temperature, or water flow rate does not meet the operating limits established for a corresponding emission unit, you must then follow the corrective action procedures in paragraph (j) of this section.</P>
            <P>(i) If you use an air pollution control device other than a wet scrubber, dynamic wet scrubber, dry electrostatic precipitator, wet electrostatic precipitator, or baghouse, you must submit a site-specific monitoring plan in accordance with § 63.9631(f). The site-specific monitoring plan must include the site-specific procedures for demonstrating initial and continuous compliance with the corresponding operating limits.</P>

            <P>(j) If the daily average operating parameter value for an emission unit or group of similar emission units does <PRTPAGE P="86"/>not meet the corresponding established operating limit, you must then follow the procedures in paragraphs (j)(1) through (4) of this section.</P>
            <P>(1) You must initiate and complete initial corrective action within 10 calendar days and demonstrate that the initial corrective action was successful. During any period of corrective action, you must continue to monitor and record all required operating parameters for equipment that remains in operation. After 10 calendar days, measure and record the daily average operating parameter value for the emission unit or group of similar emission units on which corrective action was taken. After the initial corrective action, if the daily average operating parameter value for the emission unit or group of similar emission units meets the operating limit established for the corresponding unit or group, then the corrective action was successful and the emission unit or group of similar emission units is in compliance with the established operating limits.</P>
            <P>(2) If the initial corrective action required in paragraph (j)(1) of this section was not successful, then you must complete additional corrective action within 10 calendar days and demonstrate that the subsequent corrective action was successful. During any period of corrective action, you must continue to monitor and record all required operating parameters for equipment that remains in operation. After the second set of 10 calendar days allowed to implement corrective action, you must again measure and record the daily average operating parameter value for the emission unit or group of similar emission units. If the daily average operating parameter value for the emission unit or group of similar emission units meets the operating limit established for the corresponding unit or group, then the corrective action was successful and the emission unit or group of similar emission units is in compliance with the established operating limits.</P>
            <P>(3) If the second attempt at corrective action required in paragraph (j)(2) of this section was not successful, then you must repeat the procedures of paragraph (j)(2) of this section until the corrective action is successful. If the third attempt at corrective action is unsuccessful, you must conduct another performance test in accordance with the procedures in § 63.9622(f) and report to the Administrator as a deviation the third unsuccessful attempt at corrective action.</P>
            <P>(4) After the third unsuccessful attempt at corrective action, you must submit to the Administrator the written report required in paragraph (j)(3) of this section within 5 calendar days after the third unsuccessful attempt at corrective action. This report must notify the Administrator that a deviation has occurred and document the types of corrective measures taken to address the problem that resulted in the deviation of established operating parameters and the resulting operating limits.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9635</SECTNO>
            <SUBJECT>How do I demonstrate continuous compliance with the work practice standards that apply to me?</SUBJECT>
            <P>(a) You must demonstrate continuous compliance with the work practice standard requirements in § 63.9591 by operating in accordance with your fugitive dust emissions control plan at all times.</P>
            <P>(b) You must maintain a current copy of the fugitive dust emissions control plan required in § 63.9591 onsite and it must be available for inspection upon request. You must keep the plan for the life of the affected source or until the affected source is no longer subject to the requirements of this subpart.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9636</SECTNO>
            <SUBJECT>How do I demonstrate continuous compliance with the operation and maintenance requirements that apply to me?</SUBJECT>
            <P>(a) For each control device subject to an operating limit in § 63.9590(b), you must demonstrate continuous compliance with the operation and maintenance requirements in § 63.9600(b) by completing the requirements of paragraphs (a)(1) through (4) of this section.</P>

            <P>(1) Performing preventative maintenance for each control device in accordance with § 63.9600(b)(1) and recording all information needed to document conformance with these requirements;<PRTPAGE P="87"/>
            </P>
            <P>(2) Initiating and completing corrective action for a bag leak detection system alarm in accordance with § 63.9600(b)(2) and recording all information needed to document conformance with these requirements;</P>
            <P>(3) Initiating and completing corrective action for a CPMS when you exceed an established operating limit for an air pollution control device except for a baghouse in accordance with § 63.9600(b)(3) and recording all information needed to document conformance with these requirements; and</P>
            <P>(4) Implementing and maintaining site-specific good combustion practices for each indurating furnace in accordance with § 63.9600(b)(4) and recording all information needed to document conformance with these requirements.</P>
            <P>(b) You must maintain a current copy of the operation and maintenance plan required in § 63.9600(b) onsite, and it must be available for inspection upon request. You must keep the plan for the life of the affected source or until the affected source is no longer subject to the requirements of this subpart.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9637</SECTNO>
            <SUBJECT>What other requirements must I meet to demonstrate continuous compliance?</SUBJECT>
            <P>(a) <E T="03">Deviations.</E> You must report each instance in which you did not meet each emission limitation in Table 1 to this subpart that applies to you. This includes periods of startup, shutdown, and malfunction in accordance with paragraph (b) of this section. You also must report each instance in which you did not meet the work practice standards in § 63.9591 and each instance in which you did not meet each operation and maintenance requirement in § 63.9600 that applies to you. These instances are deviations from the emission limitations, work practice standards, and operation and maintenance requirements in this subpart. These deviations must be reported in accordance with the requirements in § 63.9641.</P>
            <P>(b) <E T="03">Startups, shutdowns, and malfunctions.</E> (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you demonstrate to the Administrator's satisfaction that you were operating in accordance with § 63.6(e)(1).</P>
            <P>(2) The Administrator will determine whether deviations that occur during a period of startup, shutdown, or malfunction are violations, according to the provisions in § 63.6(e).</P>
            <CITA>[68 FR 61888, Oct. 30, 2003, as amended at 71 FR 20471, Apr. 20, 2006]</CITA>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Notifications, Reports, and Records</HD>
          <SECTION>
            <SECTNO>§ 63.9640</SECTNO>
            <SUBJECT>What notifications must I submit and when?</SUBJECT>
            <P>(a) You must submit all of the notifications in §§ 63.7(b) and (c), 63.8(f)(4), and 63.9(b) through (h) that apply to you by the specified dates.</P>
            <P>(b) As specified in § 63.9(b)(2), if you start up your affected source before October 30, 2003, you must submit your initial notification no later than 120 calendar days after October 30, 2003.</P>
            <P>(c) As specified in § 63.9(b)(3), if you start up your new affected source on or after October 30, 2003, you must submit your initial notification no later than 120 calendar days after you become subject to this subpart.</P>
            <P>(d) If you are required to conduct a performance test, you must submit a notification of intent to conduct a performance test at least 60 calendar days before the performance test is scheduled to begin, as required in § 63.7(b)(1).</P>
            <P>(e) If you are required to conduct a performance test or other initial compliance demonstration, you must submit a notification of compliance status according to § 63.9(h)(2)(ii). The initial notification of compliance status must be submitted by the dates specified in paragraphs (e)(1) and (2) of this section.</P>
            <P>(1) For each initial compliance demonstration that does not include a performance test, you must submit the notification of compliance status before the close of business on the 30th calendar day following completion of the initial compliance demonstration.</P>
            <P>(2) For each initial compliance demonstration that does include a performance test, you must submit the notification of compliance status, including the performance test results, before the close of business on the 60th calendar day following the completion of the performance test according to § 63.10(d)(2).</P>
          </SECTION>
          <SECTION>
            <PRTPAGE P="88"/>
            <SECTNO>§ 63.9641</SECTNO>
            <SUBJECT>What reports must I submit and when?</SUBJECT>
            <P>(a) <E T="03">Compliance report due dates.</E> Unless the Administrator has approved a different schedule, you must submit a semiannual compliance report to your permitting authority according to the requirements in paragraphs (a)(1) through (5) of this section.</P>
            <P>(1) The first compliance report must cover the period beginning on the compliance date that is specified for your affected source in § 63.9583 and ending on June 30 or December 31, whichever date comes first after the compliance date that is specified for your source in § 63.9583.</P>
            <P>(2) The first compliance report must be postmarked or delivered no later than July 31 or January 31, whichever date comes first after your first compliance report is due.</P>
            <P>(3) Each subsequent compliance report must cover the semiannual reporting period from January 1 through June 30 or the semiannual reporting period from July 1 through December 31.</P>
            <P>(4) Each subsequent compliance report must be postmarked or delivered no later than July 31 or January 31, whichever date comes first after the end of the semiannual reporting period.</P>
            <P>(5) For each affected source that is subject to permitting regulations pursuant to 40 CFR part 70 or 40 CFR part 71, and if the permitting authority has established dates for submitting semiannual reports pursuant to 40 CFR 70.6(a)(3)(iii)(A) or 40 CFR 71.6(a)(3)(iii)(A), you may submit the first and subsequent compliance reports according to the dates the permitting authority has established instead of according to the dates in paragraphs (a)(1) through (4) of this section.</P>
            <P>(b) <E T="03">Compliance report contents.</E> Each compliance report must include the information in paragraphs (b)(1) through (3) of this section and, as applicable, in paragraphs (b)(4) through (8) of this section.</P>
            <P>(1) Company name and address.</P>
            <P>(2) Statement by a responsible official, with the official's name, title, and signature, certifying the truth, accuracy, and completeness of the content of the report.</P>
            <P>(3) Date of report and beginning and ending dates of the reporting period.</P>
            <P>(4) If you had a startup, shutdown, or malfunction during the reporting period and you took actions consistent with your startup, shutdown, and malfunction plan, the compliance report must include the information in § 63.10(d)(5)(i).</P>
            <P>(5) If there were no deviations from the continuous compliance requirements in §§ 63.9634 through 63.9636 that apply to you, then provide a statement that there were no deviations from the emission limitations, work practice standards, or operation and maintenance requirements during the reporting period.</P>
            <P>(6) If there were no periods during which a continuous monitoring system (including a CPMS or COMS) was out-of-control as specified in § 63.8(c)(7), then provide a statement that there were no periods during which a continuous monitoring system was out-of-control during the reporting period.</P>
            <P>(7) For each deviation from an emission limitation in Table 1 to this subpart that occurs at an affected source where you are not using a continuous monitoring system (including a CPMS or COMS) to comply with an emission limitation in this subpart, the compliance report must contain the information in paragraphs (b)(1) through (4) of this section and the information in paragraphs (b)(7)(i) and (ii) of this section. This includes periods of startup, shutdown, and malfunction.</P>
            <P>(i) The total operating time of each affected source during the reporting period.</P>
            <P>(ii) Information on the number, duration, and cause of deviations (including unknown cause) as applicable, and the corrective action taken.</P>

            <P>(8) For each deviation from an emission limitation occurring at an affected source where you are using a continuous monitoring system (including a CPMS or COMS) to comply with the emission limitation in this subpart, you must include the information in paragraphs (b)(1) through (4) of this section and the information in paragraphs (b)(8)(i) through (xi) of this section. This includes periods of startup, shutdown, and malfunction.<PRTPAGE P="89"/>
            </P>
            <P>(i) The date and time that each malfunction started and stopped.</P>
            <P>(ii) The date and time that each continuous monitoring system was inoperative, except for zero (low-level) and high-level checks.</P>
            <P>(iii) The date, time, and duration that each continuous monitoring system was out-of-control, including the information in § 63.8(c)(8).</P>
            <P>(iv) The date and time that each deviation started and stopped, and whether each deviation occurred during a period of startup, shutdown, or malfunction or during another period.</P>
            <P>(v) A summary of the total duration of the deviation during the reporting period and the total duration as a percent of the total source operating time during that reporting period.</P>
            <P>(vi) A breakdown of the total duration of the deviations during the reporting period including those that are due to startup, shutdown, control equipment problems, process problems, other known causes, and other unknown causes.</P>
            <P>(vii) A summary of the total duration of continuous monitoring system downtime during the reporting period and the total duration of continuous monitoring system downtime as a percent of the total source operating time during the reporting period.</P>
            <P>(viii) A brief description of the process units.</P>
            <P>(ix) A brief description of the continuous monitoring system.</P>
            <P>(x) The date of the latest continuous monitoring system certification or audit.</P>
            <P>(xi) A description of any changes in continuous monitoring systems, processes, or controls since the last reporting period.</P>
            <P>(c) <E T="03">Immediate startup, shutdown, and malfunction report.</E> If you had a startup, shutdown, or malfunction during the semiannual reporting period that was not consistent with your startup, shutdown, and malfunction plan, you must submit an immediate startup, shutdown, and malfunction report according to the requirements in § 63.10(d)(5)(ii).</P>
            <P>(d) <E T="03">Part 70 monitoring report.</E> If you have obtained a title V operating permit for an affected source pursuant to 40 CFR part 70 or 40 CFR part 71, you must report all deviations as defined in this subpart in the semiannual monitoring report required by 40 CFR 70.6(a)(3)(iii)(A) or 40 CFR 71.6(a)(3)(iii)(A). If you submit a compliance report for an affected source along with, or as part of, the semiannual monitoring report required by 40 CFR 70.6(a)(3)(iii)(A) or 40 CFR 71.6(a)(3)(iii)(A), and the compliance report includes all the required information concerning deviations from any emission limitation or operation and maintenance requirement in this subpart, submission of the compliance report satisfies any obligation to report the same deviations in the semiannual monitoring report. However, submission of a compliance report does not otherwise affect any obligation you may have to report deviations from permit requirements for an affected source to your permitting authority.</P>
            <P>(e) <E T="03">Immediate corrective action report.</E> If you had three unsuccessful attempts of applying corrective action as described in § 63.9634(j) on an emission unit or group of emission units, then you must submit an immediate corrective action report. Within 5 calendar days after the third unsuccessful attempt at corrective action, you must submit to the Administrator a written report in accordance with § 63.9634(j)(3) and (4). This report must notify the Administrator that a deviation has occurred and document the types of corrective measures taken to address the problem that resulted in the deviation of established operating parameters and the resulting operating limits.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9642</SECTNO>
            <SUBJECT>What records must I keep?</SUBJECT>
            <P>(a) You must keep the records listed in paragraphs (a)(1) through (3) of this section.</P>
            <P>(1) A copy of each notification and report that you submitted to comply with this subpart, including all documentation supporting any initial notification or notification of compliance status that you submitted, according to the requirements in § 63.10(b)(2)(xiv).</P>
            <P>(2) The records in § 63.6(e)(3)(iii) through (v) related to startup, shutdown, and malfunction.</P>

            <P>(3) Records of performance tests and performance evaluations as required in § 63.10(b)(2)(viii).<PRTPAGE P="90"/>
            </P>
            <P>(b) For each COMS, you must keep the records specified in paragraphs (b)(1) through (4) of this section.</P>
            <P>(1) Records described in § 63.10(b)(2)(vi) through (xi).</P>
            <P>(2) Monitoring data for COMS during a performance evaluation as required in § 63.6(h)(7)(i) and (ii).</P>
            <P>(3) Previous (that is, superceded) versions of the performance evaluation plan as required in § 63.8(d)(3).</P>
            <P>(4) Records of the date and time that each deviation started and stopped, and whether the deviation occurred during a period of startup, shutdown, or malfunction or during another period.</P>
            <P>(c) You must keep the records required in §§ 63.9634 through 63.9636 to show continuous compliance with each emission limitation, work practice standard, and operation and maintenance requirement that applies to you.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9643</SECTNO>
            <SUBJECT>In what form and how long must I keep my records?</SUBJECT>
            <P>(a) Your records must be in a form suitable and readily available for expeditious review, according to § 63.10(b)(1).</P>
            <P>(b) As specified in § 63.10(b)(1), you must keep each record for 5 years following the date of each occurrence, measurement, maintenance, corrective action, report, or record.</P>
            <P>(c) You must keep each record on site for at least 2 years after the date of each occurrence, measurement, maintenance, corrective action, report, or record according to § 63.10(b)(1). You can keep the records offsite for the remaining 3 years.</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Other Requirements and Information</HD>
          <SECTION>
            <SECTNO>§ 63.9650</SECTNO>
            <SUBJECT>What parts of the General Provisions apply to me?</SUBJECT>
            <P>Table 2 to this subpart shows which parts of the General Provisions in §§ 63.1 through 63.15 apply to you.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9651</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <P>(a) This subpart can be implemented and enforced by us, the EPA, or a delegated authority such as your State, local, or tribal agency. If the EPA Administrator has delegated authority to your State, local, or tribal agency, then that agency has the authority to implement and enforce this subpart. You should contact your EPA Regional Office to find out if this subpart is delegated to your State, local, or tribal agency.</P>
            <P>(b) In delegating implementation and enforcement authority of this subpart to a State, local, or tribal agency under subpart E of this part, the authorities contained in paragraph (c) of this section are retained by the Administrator of the EPA and are not transferred to the State, local, or tribal agency.</P>
            <P>(c) The authorities that will not be delegated to State, local, or tribal agencies are specified in paragraphs (c)(1) through (4) of this section.</P>
            <P>(1) Approval of non-opacity emission limitations and work practice standards under § 63.6(h)(9) and as defined in § 63.90.</P>
            <P>(2) Approval of major alternatives to test methods under § 63.7(e)(2)(ii) and (f) and as defined in § 63.90.</P>
            <P>(3) Approval of major alternatives to monitoring under § 63.8(f) and as defined in § 63.90.</P>
            <P>(4) Approval of major alternatives to recordkeeping and reporting under § 63.10(f) and as defined in § 63.90.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9652</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <P>Terms used in this subpart are defined in the Clean Air Act, in § 63.2, and in this section as follows.</P>
            <P>
              <E T="03">Affected source</E> means each new or existing ore crushing and handling operation, ore dryer, indurating furnace, or finished pellet handling operation, at your taconite iron ore processing plant.</P>
            <P>
              <E T="03">Bag leak detection system</E> means a system that is capable of continuously monitoring relative particulate matter (dust) loadings in the exhaust of a baghouse to detect bag leaks and other upset conditions. A bag leak detection system includes, but is not limited to, an instrument that operates on triboelectric, light scattering, light transmittance, or other effect to continuously monitor relative particulate matter loadings.</P>
            <P>
              <E T="03">Conveyor belt transfer point</E> means a point in the conveying operation where the taconite ore or taconite pellets are transferred to or from a conveyor belt, <PRTPAGE P="91"/>except where the taconite ore or taconite pellets are being transferred to a bin or stockpile.</P>
            <P>
              <E T="03">Crusher</E> means a machine used to crush taconite ore and includes feeders or conveyors located immediately below the crushing surfaces. Crushers include, but are not limited to, gyratory crushers and cone crushers.</P>
            <P>
              <E T="03">Deviation</E> means any instance in which an affected source subject to this subpart, or an owner or operator of such a source:</P>
            <P>(1) Fails to meet any requirement or obligation established by this subpart, including but not limited to any emission limitation (including operating limits) or operation and maintenance requirement;</P>
            <P>(2) Fails to meet any term or condition that is adopted to implement an applicable requirement in this subpart and that is included in the operating permit for any affected source required to obtain such a permit; or</P>
            <P>(3) Fails to meet any emission limitation in this subpart during startup, shutdown, or malfunction, regardless of whether or not such failure is permitted by this subpart.</P>
            <P>
              <E T="03">Dynamic wet scrubber</E> means an air emissions control device which utilizes a mechanically powered fan to cause contact between the process exhaust gas stream and the scrubbing liquid which are introduced concurrently into the fan inlet.</P>
            <P>
              <E T="03">Emission limitation</E> means any emission limit, opacity limit, or operating limit.</P>
            <P>
              <E T="03">Finished pellet handling</E> means the transfer of fired taconite pellets from the indurating furnace to the finished pellet stockpiles at the plant. Finished pellet handling includes, but is not limited to, furnace discharge or grate discharge, and finished pellet screening, transfer, and storage. The atmospheric pellet cooler vent stack and gravity conveyor gallery vents designed to remove heat and water vapor from the structure are not included as a part of the finished pellet handling affected source.</P>
            <P>
              <E T="03">Fugitive dust emission source</E> means a stationary source from which particles are discharged to the atmosphere due to wind or mechanical inducement such as vehicle traffic. Fugitive dust sources include, but are not limited to:</P>
            <P>(1) Stockpiles (includes, but is not limited to, stockpiles of uncrushed ore, crushed ore, or finished pellets);</P>
            <P>(2) Material transfer points;</P>
            <P>(3) Plant roadways;</P>
            <P>(4) Tailings basins;</P>
            <P>(5) Pellet loading areas; and</P>
            <P>(6) Yard areas.</P>
            <P>
              <E T="03">Grate feed</E> means the transfer of unfired taconite pellets from the pelletizer into the indurating furnace.</P>
            <P>
              <E T="03">Grate kiln indurating furnace</E> means a furnace system that consists of a traveling grate, a rotary kiln, and an annular cooler. The grate kiln indurating furnace begins at the point where the grate feed conveyor discharges the green balls onto the furnace traveling grate and ends where the hardened pellets exit the cooler. The atmospheric pellet cooler vent stack is not included as part of the grate kiln indurating furnace.</P>
            <P>
              <E T="03">Indurating</E> means the process whereby unfired taconite pellets, called green balls, are hardened at high temperature in an indurating furnace. Types of indurating furnaces include straight grate indurating furnaces and grate kiln indurating furnaces.</P>
            <P>
              <E T="03">Ore crushing and handling</E> means the process whereby dry taconite ore is crushed and screened. Ore crushing and handling includes, but is not limited to, all dry crushing operations (e.g., primary, secondary, and tertiary crushing), dry ore conveyance and transfer points, dry ore classification and screening, dry ore storage and stockpiling, dry milling, dry cobbing (i.e., dry magnetic separation), and the grate feed. Ore crushing and handling specifically excludes any operations where the dry crushed ore is saturated with water, such as wet milling and wet magnetic separation.</P>
            <P>
              <E T="03">Ore dryer</E> means a rotary dryer that repeatedly tumbles wet taconite ore concentrate through a heated air stream to reduce the amount of entrained moisture in the taconite ore concentrate.</P>
            <P>
              <E T="03">Pellet cooler vent stacks</E> means atmospheric vents in the cooler section of the grate kiln indurating furnace that exhaust cooling air that is not returned for recuperation. Pellet cooler <PRTPAGE P="92"/>vent stacks are not to be confused with the cooler discharge stack, which is in the pellet loadout or dumping area.</P>
            <P>
              <E T="03">Pellet loading area</E> means that portion of a taconite iron ore processing plant where taconite pellets are loaded into trucks or railcars.</P>
            <P>
              <E T="03">Responsible official</E> means responsible official as defined in § 63.2.</P>
            <P>
              <E T="03">Rod-deck venturi scrubber</E> means a wet scrubber emission control device in which the inlet air flows through a bed of parallel metal pipes spaced apart to produce a series of parallel venturi throats.</P>
            <P>
              <E T="03">Screen</E> means a device for separating material according to size by passing undersize material through one or more mesh surfaces (screens) in series and retaining oversize material on the mesh surfaces (screens).</P>
            <P>
              <E T="03">Storage bin</E> means a facility for storage (including surge bins and hoppers) of taconite ore or taconite pellets prior to further processing or loading.</P>
            <P>
              <E T="03">Straight grate indurating furnace</E> means a furnace system that consists of a traveling grate that carries the taconite pellets through different furnace temperature zones. In the straight grate indurating furnace a layer of fired pellets, called the hearth layer, is placed on the traveling grate prior to the addition of unfired pellets. The straight grate indurating furnace begins at the point where the grate feed conveyor discharges the green balls onto the furnace traveling grate and ends where the hardened pellets drop off of the traveling grate.</P>
            <P>
              <E T="03">Taconite iron ore processing</E> means the separation and concentration of iron ore from taconite, a low-grade iron ore, to produce taconite pellets.</P>
            <P>
              <E T="03">Taconite ore</E> means a low-grade iron ore suitable for concentration of magnetite or hematite by fine grinding and magnetic or flotation treatment, from which pellets containing iron can be produced.</P>
            <P>
              <E T="03">Tailings basin</E> means a natural or artificial impoundment in which gangue or other refuse material resulting from the washing, concentration or treatment of ground taconite iron ore is confined.</P>
            <P>
              <E T="03">Wet grinding and milling</E> means the process whereby wet taconite ore is finely ground using rod and/or ball mills.</P>
          </SECTION>
        </SUBJGRP>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. RRRRR, Table 1</EAR>
          <HD SOURCE="HED">Table 1 to Subpart RRRRR of Part 63—Emission Limits</HD>
          <P>As required in § 63.9590(a), you must comply with each applicable emission limit in the following table:</P>
          <GPOTABLE CDEF="s100,xs100,r100" COLS="3" OPTS="L2">
            <BOXHD>
              <CHED H="1" O="L">If your affected source is . . .</CHED>
              <CHED H="1" O="L">and the affected source is categorized as . . .</CHED>
              <CHED H="1" O="L">then you must comply with the flow-weighted mean concentration of particulate matter discharged to the atmosphere from the affected source, as determined using the procedures in § 63.9621(b), such that you must not exceed . . .</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">1. Ore crushing and handling emission units</ENT>
              <ENT>Existing</ENT>
              <ENT>0.008 grains per dry standard cubic foot (gr/dscf).</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>New</ENT>
              <ENT>0.005 gr/dscf.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">2. Straight grate indurating furnace processing magnetite</ENT>
              <ENT>Existing<LI>New</LI>
              </ENT>
              <ENT>0.01 gr/dscf.<LI>0.006 gr/dscf.</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="01">3. Grate kiln indurating furnace processing magnetite</ENT>
              <ENT>Existing<LI>New</LI>
              </ENT>
              <ENT>0.01 gr/dscf.<LI>0.006 gr/dscf.</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="01">4. Grate kiln indurating furnace processing hematite</ENT>
              <ENT>Existing<LI>New</LI>
              </ENT>
              <ENT>0.03 gr/dscf.<LI>0.018 gr/dscf.</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="01">5. Finished pellet handling emission units</ENT>
              <ENT>Existing<LI>New</LI>
              </ENT>
              <ENT>0.008 gr/dscf.<LI>0.005 gr/dscf.</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="01">6. Ore dryer</ENT>
              <ENT>Existing<LI>New</LI>
              </ENT>
              <ENT>0.052 gr/dscf.<LI>0.025 gr/dscf.</LI>
              </ENT>
            </ROW>
          </GPOTABLE>
        </APPENDIX>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. RRRRR, Table 2</EAR>
          <HD SOURCE="HED">Table 2 to Subpart RRRRR of Part 63—Applicability of General Provisions to Subpart RRRRR of Part 63</HD>

          <P>As required in § 63.9650, you must comply with the requirements of the NESHAP General Provisions (40 CFR part 63, subpart A) shown in the following table:<PRTPAGE P="93"/>
          </P>
          <GPOTABLE CDEF="s80,r80,xs70,r80" COLS="4" OPTS="L2">
            <BOXHD>
              <CHED H="1">Citation</CHED>
              <CHED H="1">Subject</CHED>
              <CHED H="1">Applies to Subpart RRRRR</CHED>
              <CHED H="1">Explanation</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">§ 63.1</ENT>
              <ENT>Applicability</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.2</ENT>
              <ENT>Definitions</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.3</ENT>
              <ENT>Units and Abbreviations</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.4</ENT>
              <ENT>Prohibited Activities</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.5</ENT>
              <ENT>Construction/Reconstruction</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(a)-(g)</ENT>
              <ENT>Compliance With Standards and Maintenance Requirements</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(h)</ENT>
              <ENT>Compliance With Opacity and Visible Emission (VE) Standards</ENT>
              <ENT>No</ENT>
              <ENT>Subpart RRRRR does not contain opacity and VE standards.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(i), (j)</ENT>
              <ENT>Extension of Compliance and Presidential Compliance Extension</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(a)(1)-(2)</ENT>
              <ENT>Applicability and Performance Test Dates</ENT>
              <ENT>No</ENT>
              <ENT>Subpart RRRRR specifies performance test applicability and dates.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(a)(3), (b)-(h)</ENT>
              <ENT>Performance Testing Requirements</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(a)(1)-(a)(3), (b), (c)(1)-(3), (c)(5)-(8), (d), (e), (f)(1)-(5), (g)(1)-(4)</ENT>
              <ENT>Monitoring Requirements</ENT>
              <ENT>Yes</ENT>
              <ENT>Continuous monitoring system (CMS) requirements in § 63.8(c)(5) and (6) apply only to COMS for dry electrostatic precipitators.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(a)(4)</ENT>
              <ENT>Additional Monitoring Requirements for Control Devices in § 63.11</ENT>
              <ENT>No</ENT>
              <ENT>Subpart RRRRR does not require flares.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c)(4)</ENT>
              <ENT>Continuous Monitoring System Requirements</ENT>
              <ENT>No</ENT>
              <ENT>Subpart RRRRR specifies requirements for operation of CMS.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(f)(6)</ENT>
              <ENT>Relative Accuracy Test Alternative (RATA)</ENT>
              <ENT>No</ENT>
              <ENT>Subpart RRRRR does not require continuous emission monitoring systems.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(g)(5)</ENT>
              <ENT>Data Reduction</ENT>
              <ENT>No</ENT>
              <ENT>Subpart RRRRR specifies data reduction requirements.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9</ENT>
              <ENT>Notification Requirements</ENT>
              <ENT>Yes</ENT>
              <ENT>Additional notifications for CMS in § 63.9(g) apply to COMS for dry electrostatic precipitators.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(a), (b)(1)-(2)(xii), (b)(2)(xiv), (b)(3), (c)(1)-(6), (c)(9)-(15), (d)(1)-(2), (d)(4)-(5), (e), (f)</ENT>
              <ENT>Recordkeeping and Reporting Requirements</ENT>
              <ENT>Yes</ENT>
              <ENT>Additional records for CMS in § 63.10(c)(1)-(6), (9)-(15), and reports in § 63.10(d)(1)-(2) apply only to COMS for dry electrostatic precipitators.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(2)(xiii)</ENT>
              <ENT>CMS Records for RATA Alternative</ENT>
              <ENT>No</ENT>
              <ENT>Subpart RRRRR doesn't require continuous emission monitoring systems.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(c)(7)-(8)</ENT>
              <ENT>Records of Excess Emissions and Parameter Monitoring Exceedances for CMS</ENT>
              <ENT>No</ENT>
              <ENT>Subpart RRRRR specifies record requirements.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(d)(3)</ENT>
              <ENT>Reporting opacity or VE observations</ENT>
              <ENT>No</ENT>
              <ENT>Subpart RRRRR does not have opacity and VE standards.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.11</ENT>
              <ENT>Control Device Requirements</ENT>
              <ENT>No</ENT>
              <ENT>Subpart RRRRR does not require flares.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.12</ENT>
              <ENT>State Authority and Delegations</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.13-§ 63.15</ENT>
              <ENT>Addresses, Incorporation by Reference, Availability of Information</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
          </GPOTABLE>
        </APPENDIX>
      </SUBPART>
      <SUBPART>
        <HD SOURCE="HED">Subpart SSSSS—National Emission Standards for Hazardous Air Pollutants for Refractory Products Manufacturing</HD>
        <SOURCE>
          <HD SOURCE="HED">Source:</HD>
          <P>68 FR 18747, Apr. 16, 2003, unless otherwise noted.</P>
        </SOURCE>
        <SUBJGRP>
          <HD SOURCE="HED">What This Subpart Covers</HD>
          <SECTION>
            <SECTNO>§ 63.9780</SECTNO>
            <SUBJECT>What is the purpose of this subpart?</SUBJECT>

            <P>This subpart establishes national emission standards for hazardous air pollutants (NESHAP) for refractory products manufacturing facilities. This <PRTPAGE P="94"/>subpart also establishes requirements to demonstrate initial and continuous compliance with the emission limitations.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9782</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <P>You are subject to this subpart if you own or operate a refractory products manufacturing facility that is, is located at, or is part of, a major source of hazardous air pollutant (HAP) emissions according to the criteria in paragraphs (a) and (b) of this section.</P>
            <P>(a) A refractory products manufacturing facility is a plant site that manufactures refractory products (refractory bricks, refractory shapes, monolithics, kiln furniture, crucibles, and other materials used for lining furnaces and other high temperature process units), as defined in § 63.9824. Refractory products manufacturing facilities typically process raw material by crushing, grinding, and screening; mixing the processed raw materials with binders and other additives; forming the refractory mix into shapes; and drying and firing the shapes.</P>
            <P>(b) A major source of HAP is a plant site that emits or has the potential to emit any single HAP at a rate of 9.07 megagrams (10 tons) or more per year or any combination of HAP at a rate of 22.68 megagrams (25 tons) or more per year.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9784</SECTNO>
            <SUBJECT>What parts of my plant does this subpart cover?</SUBJECT>
            <P>(a) This subpart applies to each new, reconstructed, or existing affected source at a refractory products manufacturing facility.</P>
            <P>(b) The existing affected sources are shape dryers, curing ovens, and kilns that are used to manufacture refractory products that use organic HAP; shape preheaters, pitch working tanks, defumers, and coking ovens that are used to produce pitch-impregnated refractory products; kilns that are used to manufacture chromium refractory products; and kilns that are used to manufacture clay refractory products.</P>
            <P>(c) The new or reconstructed affected sources are shape dryers, curing ovens, and kilns that are used to manufacture refractory products that use organic HAP; shape preheaters, pitch working tanks, defumers, and coking ovens used to produce pitch-impregnated refractory products; kilns that are used to manufacture chromium refractory products; and kilns that are used to manufacture clay refractory products.</P>

            <P>(d) Shape dryers, curing ovens, kilns, coking ovens, defumers, shape preheaters, and pitch working tanks that are research and development (R&amp;D) process units are not subject to the requirements of this subpart. (See definition of <E T="03">research and development process unit</E> in § 63.9824).</P>
            <P>(e) A source is a new affected source if you began construction of the affected source after June 20, 2002, and you met the applicability criteria at the time you began construction.</P>
            <P>(f) An affected source is reconstructed if you meet the criteria as defined in § 63.2.</P>
            <P>(g) An affected source is existing if it is not new or reconstructed.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9786</SECTNO>
            <SUBJECT>When do I have to comply with this subpart?</SUBJECT>
            <P>(a) If you have a new or reconstructed affected source, you must comply with this subpart according to paragraphs (a)(1) and (2) of this section.</P>
            <P>(1) If the initial startup of your affected source is before April 16, 2003, then you must comply with the emission limitations for new and reconstructed sources in this subpart no later than April 16, 2003.</P>
            <P>(2) If the initial startup of your affected source is after April 16, 2003, then you must comply with the emission limitations for new and reconstructed sources in this subpart upon initial startup of your affected source.</P>
            <P>(b) If you have an existing affected source, you must comply with the emission limitations for existing sources no later than April 17, 2006.</P>
            <P>(c) You must be in compliance with this subpart when you conduct a performance test on an affected source.</P>
            <P>(d) If you have an existing area source that increases its emissions or its potential to emit such that it becomes a major source of HAP, you must be in compliance with this subpart according to paragraphs (d)(1) and (2) of this section.</P>

            <P>(1) Any portion of the existing facility that is a new affected source or a new reconstructed source must be in <PRTPAGE P="95"/>compliance with this subpart upon startup.</P>
            <P>(2) All other parts of the existing facility must be in compliance with this subpart by 3 years after the date the area source becomes a major source.</P>
            <P>(e) If you have a new area source (i.e., an area source for which construction or reconstruction was commenced after June 20, 2002) that increases its emissions or its potential to emit such that it becomes a major source of HAP, you must be in compliance with this subpart upon initial startup of your affected source as a major source.</P>
            <P>(f) You must meet the notification requirements in § 63.9812 according to the schedule in § 63.9812 and in 40 CFR part 63, subpart A. Some of the notifications must be submitted before you are required to comply with the emission limitations in this subpart.</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Emission Limitations and Work Practice Standards</HD>
          <SECTION>
            <SECTNO>§ 63.9788</SECTNO>
            <SUBJECT>What emission limits, operating limits, and work practice standards must I meet?</SUBJECT>
            <P>(a) You must meet each emission limit in Table 1 to this subpart that applies to you.</P>
            <P>(b) You must meet each operating limit in Table 2 to this subpart that applies to you.</P>
            <P>(c) You must meet each work practice standard in Table 3 to this subpart that applies to you.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9790</SECTNO>
            <SUBJECT>What are my options for meeting the emission limits?</SUBJECT>
            <P>To meet the emission limits in Table 1 to this subpart, you must use one or both of the options listed in paragraphs (a) and (b) of this section.</P>
            <P>(a) <E T="03">Emissions control system.</E> Use an emissions capture and collection system and an add-on air pollution control device (APCD) and demonstrate that the resulting emissions or emissions reductions meet the applicable emission limits in Table 1 to this subpart, and demonstrate that the capture and collection system and APCD meet the applicable operating limits in Table 2 to this subpart.</P>
            <P>(b) <E T="03">Process changes.</E> Use raw materials that have little or no potential to emit HAP during the refractory products manufacturing process or implement manufacturing process changes and demonstrate that the resulting emissions or emissions reductions meet the applicable emission limits in Table 1 to this subpart without an add-on APCD.</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">General Compliance Requirements</HD>
          <SECTION>
            <SECTNO>§ 63.9792</SECTNO>
            <SUBJECT>What are my general requirements for complying with this subpart?</SUBJECT>
            <P>(a) You must be in compliance with the emission limitations (including operating limits and work practice standards) in this subpart at all times, except during periods specified in paragraphs (a)(1) and (2) of this section.</P>
            <P>(1) Periods of startup, shutdown, and malfunction.</P>
            <P>(2) Periods of scheduled maintenance on a control device that is used on an affected continuous kiln, as specified in paragraph (e) of this section.</P>
            <P>(b) Except as specified in paragraph (e) of this section, you must always operate and maintain your affected source, including air pollution control and monitoring equipment, according to the provisions in § 63.6(e)(1)(i). During the period between the compliance date specified for your affected source in § 63.9786 and the date upon which continuous monitoring systems have been installed and validated and any applicable operating limits have been established, you must maintain a log detailing the operation and maintenance of the process and emissions control equipment.</P>
            <P>(c) You must develop a written startup, shutdown, and malfunction plan (SSMP) according to the provisions in § 63.6(e)(3).</P>
            <P>(d) You must prepare and implement a written operation, maintenance, and monitoring (OM&amp;M) plan according to the requirements in § 63.9794.</P>
            <P>(e) If you own or operate an affected continuous kiln and must perform scheduled maintenance on the control device for that kiln, you may bypass the kiln control device and continue operating the kiln upon approval by the Administrator, provided you satisfy the conditions listed in paragraphs (e)(1) through (3) of this section.</P>

            <P>(1) You must request approval from the Administrator to bypass the control device while the scheduled maintenance is performed. You must submit a <PRTPAGE P="96"/>separate request each time you plan to bypass the control device, and your request must include the information specified in paragraphs (e)(1)(i) through (vi) of this section.</P>
            <P>(i) Reason for the scheduled maintenance.</P>
            <P>(ii) Explanation for why the maintenance cannot be performed when the kiln is shut down.</P>
            <P>(iii) Detailed description of the maintenance activities.</P>
            <P>(iv) Time required to complete the maintenance.</P>
            <P>(v) How you will minimize HAP emissions from the kiln during the period when the control device is out of service.</P>
            <P>(vi) How you will minimize the time when the kiln is operating and the control device is out of service for scheduled maintenance.</P>
            <P>(2) You must minimize HAP emissions during the period when the kiln is operating and the control device is out of service.</P>
            <P>(3) You must minimize the time period during which the kiln is operating and the control device is out of service.</P>
            <P>(f) You must be in compliance with the provisions of subpart A of this part, except as noted in Table 11 to this subpart.</P>
            <CITA>[68 FR 18747, Apr. 16, 2003, as amended at 71 FR 20471, Apr. 20, 2006]</CITA>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9794</SECTNO>
            <SUBJECT>What do I need to know about operation, maintenance, and monitoring plans?</SUBJECT>
            <P>(a) For each continuous parameter monitoring system (CPMS) required by this subpart, you must develop, implement, make available for inspection, and revise, as necessary, an OM&amp;M plan that includes the information in paragraphs (a)(1) through (13) of this section.</P>
            <P>(1) A list and identification of each process and add-on APCD that is required by this subpart to be monitored, the type of monitoring device that will be used, and the operating parameters that will be monitored.</P>
            <P>(2) Specifications for the sensor, signal analyzer, and data collection system.</P>
            <P>(3) A monitoring schedule that specifies the frequency that the parameter values will be determined and recorded.</P>
            <P>(4) The operating limits for each parameter that represent continuous compliance with the emission limitations in § 63.9788, based on values of the monitored parameters recorded during performance tests.</P>
            <P>(5) Procedures for installing the CPMS at a measurement location relative to each process unit or APCD such that measurement is representative of control of emissions.</P>
            <P>(6) Procedures for the proper operation and routine and long-term maintenance of each process unit and APCD, including a maintenance and inspection schedule that is consistent with the manufacturer's recommendations.</P>
            <P>(7) Procedures for the proper operation and maintenance of monitoring equipment consistent with the requirements in §§ 63.8(c)(1), (3), (4)(ii), (7), and (8), and 63.9804.</P>
            <P>(8) Ongoing data quality assurance procedures in accordance with the general requirements of § 63.8(d).</P>
            <P>(9) Procedures for evaluating the performance of each CPMS.</P>
            <P>(10) Procedures for responding to operating parameter deviations, including the procedures in paragraphs (a)(10)(i) through (iii) of this section:</P>
            <P>(i) Procedures for determining the cause of the operating parameter deviation.</P>
            <P>(ii) Actions for correcting the deviation and returning the operating parameters to the allowable limits.</P>
            <P>(iii) Procedures for recording the times that the deviation began and ended, and when corrective actions were initiated and completed.</P>
            <P>(11) Procedures for keeping records to document compliance and reporting in accordance with the requirements of § 63.10(c), (e)(1), and (e)(2)(i).</P>
            <P>(12) If you operate a kiln that is subject to the limits on the type of fuel used, as specified in items 3 and 4 of Table 3 to subpart SSSSS, procedures for using alternative fuels.</P>

            <P>(13) If you operate an affected continuous kiln and you plan to take the kiln control device out of service for scheduled maintenance, as specified in § 63.9792(e), the procedures specified in paragraphs (a)(13)(i) and (ii) of this section.<PRTPAGE P="97"/>
            </P>
            <P>(i) Procedures for minimizing HAP emissions from the kiln during periods of scheduled maintenance of the kiln control device when the kiln is operating and the control device is out of service.</P>
            <P>(ii) Procedures for minimizing any period of scheduled maintenance on the kiln control device when the kiln is operating and the control device is out of service.</P>
            <P>(b) Changes to the operating limits in your OM&amp;M plan require a new performance test. If you are revising an operating limit parameter value, you must meet the requirements in paragraphs (b)(1) and (2) of this section.</P>
            <P>(1) Submit a Notification of Performance Test to the Administrator as specified in § 63.7(b).</P>
            <P>(2) After completing the performance tests to demonstrate that compliance with the emission limits can be achieved at the revised operating limit parameter value, you must submit the performance test results and the revised operating limits as part of the Notification of Compliance Status required under § 63.9(h).</P>
            <P>(c) If you are revising the inspection and maintenance procedures in your OM&amp;M plan, you do not need to conduct a new performance test.</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Testing and Initial Compliance Requirements</HD>
          <SECTION>
            <SECTNO>§ 63.9796</SECTNO>
            <SUBJECT>By what date must I conduct performance tests?</SUBJECT>
            <P>You must conduct performance tests within 180 calendar days after the compliance date that is specified for your source in § 63.9786 and according to the provisions in § 63.7(a)(2).</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9798</SECTNO>
            <SUBJECT>When must I conduct subsequent performance tests?</SUBJECT>
            <P>(a) You must conduct a performance test every 5 years following the initial performance test, as part of renewing your 40 CFR part 70 or 40 CFR part 71 operating permit.</P>
            <P>(b) You must conduct a performance test when you want to change the parameter value for any operating limit specified in your OM&amp;M plan.</P>
            <P>(c) If you own or operate a source that is subject to the emission limits specified in items 2 through 9 of Table 1 to this subpart, you must conduct a performance test on the source(s) listed in paragraphs (c)(1) and (2) of this section before you start production of any refractory product for which the organic HAP processing rate is likely to exceed by more than 10 percent the maximum organic HAP processing rate established during the most recent performance test on that same source.</P>
            <P>(1) Each affected shape dryer or curing oven that is used to process the refractory product with the higher organic HAP processing rate.</P>
            <P>(2) Each affected kiln that follows an affected shape dryer or curing oven and is used to process the refractory product with the higher organic HAP processing rate.</P>
            <P>(d) If you own or operate a kiln that is subject to the emission limits specified in item 5 or 9 of Table 1 to this subpart, you must conduct a performance test on the affected kiln following any process changes that are likely to increase organic HAP emissions from the kiln (e.g., a decrease in the curing cycle time for a curing oven that precedes the affected kiln in the process line).</P>
            <P>(e) If you own or operate a clay refractory products kiln that is subject to the emission limits specified in item 10 or 11 of Table 1 to this subpart and is controlled with a dry limestone adsorber (DLA), you must conduct a performance test on the affected kiln following any change in the source of limestone used in the DLA.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9800</SECTNO>
            <SUBJECT>How do I conduct performance tests and establish operating limits?</SUBJECT>
            <P>(a) You must conduct each performance test in Table 4 to this subpart that applies to you.</P>
            <P>(b) Before conducting the performance test, you must install and validate all monitoring equipment.</P>
            <P>(c) Each performance test must be conducted according to the requirements in § 63.7 and under the specific conditions in Table 4 to this subpart.</P>
            <P>(d) You may not conduct performance tests during periods of startup, shutdown, or malfunction, as specified in § 63.7(e)(1).</P>

            <P>(e) You must conduct separate test runs for at least the duration specified <PRTPAGE P="98"/>for each performance test required in this section, as specified in § 63.7(e)(3) and Table 4 to this subpart.</P>
            <P>(f) For batch process sources, you must satisfy the requirements specified in paragraphs (f)(1) through (5) of this section.</P>
            <P>(1) You must conduct at least two test runs.</P>
            <P>(2) Each test run must last an entire batch cycle unless you develop an emissions profile, as specified in items 8(a)(i)(4) and 17(b)(i)(4) of Table 4 to this subpart, or you satisfy the conditions for terminating a test run prior to the completion of a batch cycle as specified in item 8(a)(i)(5) of Table 4 to this subpart.</P>
            <P>(3) Each test run must be performed over a separate batch cycle unless you satisfy the conditions for conducting both test runs over a single batch cycle, as described in paragraphs (f)(3)(i) and (ii) of this section.</P>
            <P>(i) You do not produce the product that corresponds to the maximum organic HAP processing rate for that batch process source in consecutive batch cycles.</P>
            <P>(ii) To produce that product in two consecutive batch cycles would disrupt production of other refractory products.</P>
            <P>(4) If you want to conduct a performance test over a single batch cycle, you must include in your Notification of Performance Test the rationale for testing over a single batch cycle.</P>
            <P>(5) If you are granted approval to conduct a performance test over a single batch cycle, you must use paired sampling trains and collect two sets of emissions data. Each set of data can be considered a separate test run.</P>
            <P>(g) You must use the data gathered during the performance test and the equations in paragraphs (g)(1) through (3) of this section to determine compliance with the emission limitations.</P>
            <P>(1) To determine compliance with the total hydrocarbon (THC) emission concentration limit listed in Table 1 to this subpart, you must calculate your emission concentration corrected to 18 percent oxygen for each test run using Equation 1 of this section:</P>
            <MATH DEEP="31" SPAN="1">
              <MID>ER16AP03.000</MID>
            </MATH>
            <EXTRACT>
              <FP>Where:</FP>
              
              <FP SOURCE="FP-1">C <E T="52">THC-C</E>=THC concentration, corrected to 18 percent oxygen, parts per million by volume, dry basis (ppmvd)</FP>
              <FP SOURCE="FP-1">C <E T="52">THC</E>=THC concentration (uncorrected), ppmvd</FP>
              <FP SOURCE="FP-1">C<E T="52">O2</E>=oxygen concentration, percent.</FP>
            </EXTRACT>
            
            <P>(2) To determine compliance with any of the emission limits based on percentage reduction across an emissions control system specified in Table 1 to this subpart, you must calculate the percentage reduction for each test run using Equation 2 of this section:</P>
            <MATH DEEP="27" SPAN="1">
              <MID>ER16AP03.001</MID>
            </MATH>
            <EXTRACT>
              <FP>Where:</FP>
              
              <FP SOURCE="FP-1">PR=percentage reduction, percent</FP>
              <FP SOURCE="FP-1">ER<E T="52">i</E>=mass emissions rate of specific HAP or pollutant (THC, HF, or HCl) entering the control device, kilograms (pounds) per hour</FP>
              <FP SOURCE="FP-1">ER<E T="52">o</E>=mass emissions rate of specific HAP or pollutant (THC, HF, or HCl) exiting the control device, kilograms (pounds) per hour.</FP>
            </EXTRACT>
            
            <P>(3) To determine compliance with production-based hydrogen fluoride (HF) and hydrogen chloride (HCl) emission limits in Table 1 to this subpart, you must calculate your mass emissions per unit of uncalcined clay processed for each test run using Equation 3 of this section:</P>
            <MATH DEEP="24" SPAN="1">
              <MID>ER16AP03.002</MID>
            </MATH>
            <EXTRACT>
              <FP>Where:</FP>
              
              <FP SOURCE="FP-1">MP=mass per unit of production, kilograms of pollutant per megagram (pounds per ton) of uncalcined clay processed</FP>
              <FP SOURCE="FP-1">ER=mass emissions rate of specific HAP (HF or HCl) during each performance test run, kilograms (pounds) per hour</FP>
              <FP SOURCE="FP-1">P=average uncalcined clay processing rate for the performance test, megagrams (tons) of uncalcined clay processed per hour.</FP>
            </EXTRACT>
            
            <P>(h) You must establish each site-specific operating limit in Table 2 to this subpart that applies to you, as specified in Table 4 to this subpart.</P>

            <P>(i) For each affected source that is equipped with an add-on APCD that is <PRTPAGE P="99"/>not addressed in Table 2 to this subpart or that is using process changes as a means of meeting the emission limits in Table 1 to this subpart, you must meet the requirements in § 63.8(f) and paragraphs (i)(1) through (3) of this section.</P>
            <P>(1) For sources subject to the THC concentration limit specified in item 3 or 7 of Table 1 to this subpart, you must satisfy the requirements specified in paragraphs (i)(1)(i) through (iii) of this section.</P>
            <P>(i) You must install a THC continuous emissions monitoring system (CEMS) at the outlet of the control device or in the stack of the affected source.</P>
            <P>(ii) You must meet the requirements specified in Performance Specification (PS) 8 of 40 CFR part 60, appendix B.</P>
            <P>(iii) You must meet the requirements specified in Procedure 1 of 40 CFR part 60, appendix F.</P>
            <P>(2) For sources subject to the emission limits specified in item 3, 4, 7, or 8 of Table 1 to this subpart, you must submit a request for approval of alternative monitoring methods to the Administrator no later than the submittal date for the Notification of Performance Test, as specified in § 63.9812(d). The request must contain the information specified in paragraphs (i)(2)(i) through (v) of this section.</P>
            <P>(i) Description of the alternative add-on APCD or process changes.</P>
            <P>(ii) Type of monitoring device or method that will be used, including the sensor type, location, inspection procedures, quality assurance and quality control measures, and data recording device.</P>
            <P>(iii) Operating parameters that will be monitored.</P>
            <P>(iv) Frequency that the operating parameter values will be determined and recorded to establish continuous compliance with the operating limits.</P>
            <P>(v) Averaging time.</P>
            <P>(3) You must establish site-specific operating limits during the performance test based on the information included in the approved alternative monitoring methods request and, as applicable, as specified in Table 4 to this subpart.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9802</SECTNO>
            <SUBJECT>How do I develop an emissions profile?</SUBJECT>
            <P>If you decide to develop an emissions profile for an affected batch process source; as indicated in item 8(a)(i)(4) or 17(b)(i)(4) of Table 4 to this subpart, you must measure and record mass emissions of the applicable pollutant throughout a complete batch cycle of the affected batch process source according to the procedures described in paragraph (a) or (b) of this section.</P>
            <P>(a) If your affected batch process source is subject to the THC concentration limit specified in item 6(a), 7(a), 8, or 9 of Table 1 to this subpart or the THC percentage reduction limit specified in item 6(b) or 7(b) of Table 1 to this subpart, you must measure and record the THC mass emissions rate at the inlet to the control device using the test methods, averaging periods, and procedures specified in items 10(a) and (b) of Table 4 to this subpart for each complete hour of the batch process cycle.</P>
            <P>(b) If your affected batch process source is subject to the HF and HCl percentage reduction emission limits in item 11 of Table 1 to this subpart, you must measure and record the HF mass emissions rate at the inlet to the control device through a series of 1-hour test runs according to the test method specified in item 14(a) of Table 4 to this subpart for each complete hour of the batch process cycle.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9804</SECTNO>
            <SUBJECT>What are my monitoring system installation, operation, and maintenance requirements?</SUBJECT>
            <P>(a) You must install, operate, and maintain each CPMS required by this subpart according to your OM&amp;M plan and the requirements in paragraphs (a)(1) through (15) of this section.</P>
            <P>(1) You must satisfy all applicable requirements of performance specifications for CPMS specified in 40 CFR part 60, appendix B, upon promulgation of such performance specifications.</P>
            <P>(2) You must satisfy all applicable requirements of quality assurance (QA) procedures for CPMS specified in 40 CFR part 60, appendix F, upon promulgation of such QA procedures.</P>

            <P>(3) You must install each sensor of your CPMS in a location that provides <PRTPAGE P="100"/>representative measurement of the appropriate parameter over all operating conditions, taking into account the manufacturer's guidelines.</P>
            <P>(4) You must use a CPMS that is capable of measuring the appropriate parameter over a range that extends from a value of at least 20 percent less than the lowest value that you expect your CPMS to measure, to a value of at least 20 percent greater than the highest value that you expect your CPMS to measure.</P>
            <P>(5) You must use a data acquisition and recording system that is capable of recording values over the entire range specified in paragraph (a)(4) of this section.</P>
            <P>(6) You must use a signal conditioner, wiring, power supply, and data acquisition and recording system that are compatible with the output signal of the sensors used in your CPMS.</P>
            <P>(7) You must perform an initial calibration of your CPMS based on the procedures specified in the manufacturer's owner's manual.</P>
            <P>(8) You must use a CPMS that is designed to complete a minimum of one cycle of operation for each successive 15-minute period. To have a valid hour of data, you must have at least three of four equally-spaced data values (or at least 75 percent of the total number of values if you collect more than four data values per hour) for that hour (not including startup, shutdown, malfunction, or out-of-control periods).</P>
            <P>(9) You must record valid data from at least 90 percent of the hours during which the affected source or process operates.</P>
            <P>(10) You must determine and record the 15-minute block averages of all measurements, calculated after every 15 minutes of operation as the average of the previous 15 operating minutes (not including periods of startup, shutdown, or malfunction).</P>
            <P>(11) You must determine and record the 3-hour block averages of all 15-minute recorded measurements, calculated after every 3 hours of operation as the average of the previous 3 operating hours (not including periods of startup, shutdown, or malfunction).</P>
            <P>(12) You must record the results of each inspection, calibration, initial validation, and accuracy audit.</P>
            <P>(13) At all times, you must maintain your CPMS including, but not limited to, maintaining necessary parts for routine repairs of the CPMS.</P>
            <P>(14) You must perform an initial validation of your CPMS under the conditions specified in paragraphs (14)(i) and (ii) of this section.</P>
            <P>(i) Prior to the initial performance test on the affected source for which the CPMS is required.</P>
            <P>(ii) Within 180 days of your replacing or relocating one or more of the sensors of your CPMS.</P>
            <P>(15) Except for redundant sensors, as defined in § 63.9824, any device that you use to conduct an initial validation or accuracy audit of your CPMS must meet the accuracy requirements specified in paragraphs (15)(i) and (ii) of this section.</P>
            <P>(i) The device must have an accuracy that is traceable to National Institute of Standards and Technology (NIST) standards.</P>
            <P>(ii) The device must be at least three times as accurate as the required accuracy for the CPMS.</P>
            <P>(b) For each temperature CPMS that is used to monitor the combustion chamber temperature of a thermal oxidizer or the catalyst bed inlet temperature of a catalytic oxidizer, you must meet the requirements in paragraphs (a) and (b)(1) through (6) of this section.</P>
            <P>(1) Use a temperature CPMS with a minimum accuracy of ±1.0 percent of the temperature value or 2.8 degrees Celsius (°C) (5 degrees Fahrenheit (°F)), whichever is greater.</P>
            <P>(2) Use a data recording system with a minimum resolution of one-half or better of the required CPMS accuracy specified in paragraph (b)(1) of this section.</P>
            <P>(3) Perform an initial validation of your CPMS according to the requirements in paragraph (3)(i) or (ii) of this section.</P>

            <P>(i) Place the sensor of a calibrated temperature measurement device adjacent to the sensor of your temperature CPMS in a location that is subject to the same environment as the sensor of <PRTPAGE P="101"/>your temperature CPMS. The calibrated temperature measurement device must satisfy the accuracy requirements of paragraph (a)(15) of this section. While the process and control device that is monitored by your CPMS are operating normally, record concurrently and compare the temperatures measured by your temperature CPMS and the calibrated temperature measurement device. Using the calibrated temperature measurement device as the reference, the temperature measured by your CPMS must be within the accuracy specified in paragraph (b)(1) of this section.</P>
            <P>(ii) Perform any of the initial validation methods for temperature CPMS specified in performance specifications for CPMS established in 40 CFR part 60, appendix B.</P>
            <P>(4) Perform an accuracy audit of your temperature CPMS at least quarterly, according to the requirements in paragraph (b)(4)(i), (ii), or (iii) of this section.</P>
            <P>(i) If your temperature CPMS includes a redundant temperature sensor, record three pairs of concurrent temperature measurements within a 24-hour period. Each pair of concurrent measurements must consist of a temperature measurement by each of the two temperature sensors. The minimum time interval between any two such pairs of consecutive temperature measurements is 1 hour. The measurements must be taken during periods when the process and control device that is monitored by your temperature CPMS are operating normally. Calculate the mean of the three values for each temperature sensor. The mean values must agree within the required overall accuracy of the CPMS, as specified in paragraph (b)(1) of this section.</P>
            <P>(ii) If your temperature CPMS does not include a redundant temperature sensor, place the sensor of a calibrated temperature measurement device adjacent to the sensor of your temperature CPMS in a location that is subject to the same environment as the sensor of your temperature CPMS. The calibrated temperature measurement device must satisfy the accuracy requirements of paragraph (a)(15) of this section. While the process and control device that is monitored by your temperature CPMS are operating normally, record concurrently and compare the temperatures measured by your CPMS and the calibrated temperature measurement device. Using the calibrated temperature measurement device as the reference, the temperature measured by your CPMS must be within the accuracy specified in paragraph (b)(1) of this section.</P>
            <P>(iii) Perform any of the accuracy audit methods for temperature CPMS specified in QA procedures for CPMS established in 40 CFR part 60, appendix F.</P>
            <P>(5) Conduct an accuracy audit of your CPMS following any 24-hour period throughout which the temperature measured by your CPMS exceeds the manufacturer's specified maximum operating temperature range, or install a new temperature sensor.</P>
            <P>(6) If your CPMS is not equipped with a redundant temperature sensor, perform at least quarterly a visual inspection of all components of the CPMS for integrity, oxidation, and galvanic corrosion.</P>
            <P>(c) For each pressure CPMS that is used to monitor the pressure drop across a DLA or wet scrubber, you must meet the requirements in paragraphs (a) and (c)(1) through (7) of this section.</P>
            <P>(1) Use a pressure CPMS with a minimum accuracy of ±5.0 percent or 0.12 kilopascals (kPa) (0.5 inches of water column (in. w.c.)), whichever is greater.</P>
            <P>(2) Use a data recording system with a minimum resolution of one-half the required CPMS accuracy specified in paragraph (c)(1) of this section, or better.</P>
            <P>(3) Perform an initial validation of your pressure CPMS according to the requirements in paragraph (c)(3)(i) or (ii) of this section.</P>

            <P>(i) Place the sensor of a calibrated pressure measurement device adjacent to the sensor of your pressure CPMS in a location that is subject to the same environment as the sensor of your pressure CPMS. The calibrated pressure measurement device must satisfy the accuracy requirements of paragraph (a)(15) of this section. While the process and control device that is monitored by your CPMS are operating normally, record concurrently and compare the <PRTPAGE P="102"/>pressure measured by your CPMS and the calibrated pressure measurement device. Using the calibrated pressure measurement device as the reference, the pressure measured by your CPMS must be within the accuracy specified in paragraph (c)(1) of this section.</P>
            <P>(ii) Perform any of the initial validation methods for pressure CPMS specified in performance specifications for CPMS established in 40 CFR part 60, appendix B.</P>
            <P>(4) Perform an accuracy audit of your pressure CPMS at least quarterly, according to the requirements in paragraph (c)(4)(i), (ii), or (iii) of this section.</P>
            <P>(i) If your pressure CPMS includes a redundant pressure sensor, record three pairs of concurrent pressure measurements within a 24-hour period. Each pair of concurrent measurements must consist of a pressure measurement by each of the two pressure sensors. The minimum time interval between any two such pairs of consecutive pressure measurements is 1 hour. The measurements must be taken during periods when the process and control device that is monitored by your CPMS are operating normally. Calculate the mean of the three pressure measurement values for each pressure sensor. The mean values must agree within the required overall accuracy of the CPMS, as specified in paragraph (c)(1) of this section.</P>
            <P>(ii) If your pressure CPMS does not include a redundant pressure sensor, place the sensor of a calibrated pressure measurement device adjacent to the sensor of your pressure CPMS in a location that is subject to the same environment as the sensor of your pressure CPMS. The calibrated pressure measurement device must satisfy the accuracy requirements of paragraph (a)(15) of this section. While the process and control device that is monitored by your pressure CPMS are operating normally, record concurrently and compare the pressure measured by your CPMS and the calibrated pressure measurement device. Using the calibrated pressure measurement device as the reference, the pressure measured by your CPMS must be within the accuracy specified in paragraph (c)(1) of this section.</P>
            <P>(iii) Perform any of the accuracy audit methods for pressure CPMS specified in QA procedures for CPMS established in 40 CFR part 60, appendix F.</P>
            <P>(5) Conduct an accuracy audit of your CPMS following any 24-hour period throughout which the pressure measured by your CPMS exceeds the manufacturer's specified maximum operating pressure range, or install a new pressure sensor.</P>
            <P>(6) At least monthly, check all mechanical connections on your CPMS for leakage.</P>
            <P>(7) If your CPMS is not equipped with a redundant pressure sensor, perform at least quarterly a visual inspection of all components of the CPMS for integrity, oxidation, and galvanic corrosion.</P>
            <P>(d) For each liquid flow rate CPMS that is used to monitor the liquid flow rate in a wet scrubber, you must meet the requirements in paragraphs (a) and (d)(1) through (7) of this section.</P>
            <P>(1) Use a flow rate CPMS with a minimum accuracy of ±5.0 percent or 1.9 liters per minute (L/min) (0.5 gallons per minute (gal/min)), whichever is greater.</P>
            <P>(2) Use a data recording system with a minimum resolution of one-half the required CPMS accuracy specified in paragraph (d)(1) of this section, or better.</P>
            <P>(3) Perform an initial validation of your CPMS according to the requirements in paragraph (3)(i) or (ii) of this section.</P>

            <P>(i) Use a calibrated flow rate measurement system to measure the liquid flow rate in a location that is adjacent to the measurement location for your flow rate CPMS and is subject to the same environment as your flow rate CPMS. The calibrated flow rate measurement device must satisfy the accuracy requirements of paragraph (a)(15) of this section. While the process and control device that is monitored by your flow rate CPMS are operating normally, record concurrently and compare the flow rates measured by your flow rate CPMS and the calibrated flow rate measurement device. Using the calibrated flow rate measurement device as the reference, the flow rate measured by your CPMS must be within the accuracy specified in paragraph (d)(1) of this section.<PRTPAGE P="103"/>
            </P>
            <P>(ii) Perform any of the initial validation methods for liquid flow rate CPMS specified in performance specifications for CPMS established in 40 CFR part 60, appendix B.</P>
            <P>(4) Perform an accuracy audit of your flow rate CPMS at least quarterly, according to the requirements in paragraph (d)(4)(i), (ii), or (iii) of this section.</P>
            <P>(i) If your flow rate CPMS includes a redundant sensor, record three pairs of concurrent flow rate measurements within a 24-hour period. Each pair of concurrent measurements must consist of a flow rate measurement by each of the two flow rate sensors. The minimum time interval between any two such pairs of consecutive flow rate measurements is 1 hour. The measurements must be taken during periods when the process and control device that is monitored by your flow rate CPMS are operating normally. Calculate the mean of the three flow rate measurement values for each flow rate sensor. The mean values must agree within the required overall accuracy of the CPMS, as specified in paragraph (d)(1) of this section.</P>
            <P>(ii) If your flow rate CPMS does not include a redundant flow rate sensor, place the sensor of a calibrated flow rate measurement device adjacent to the sensor of your flow rate CPMS in a location that is subject to the same environment as the sensor of your flow rate CPMS. The calibrated flow rate measurement device must satisfy the accuracy requirements of paragraph (a)(15) of this section. While the process and control device that is monitored by your flow rate CPMS are operating normally, record concurrently and compare the flow rate measured by your pressure CPMS and the calibrated flow rate measurement device. Using the calibrated flow rate measurement device as the reference, the flow rate measured by your CPMS must be within the accuracy specified in paragraph (d)(1) of this section.</P>
            <P>(iii) Perform any of the accuracy audit methods for liquid flow rate CPMS specified in QA procedures for CPMS established in 40 CFR part 60, appendix F.</P>
            <P>(5) Conduct an accuracy audit of your flow rate CPMS following any 24-hour period throughout which the flow rate measured by your CPMS exceeds the manufacturer's specified maximum operating range, or install a new flow rate sensor.</P>
            <P>(6) At least monthly, check all mechanical connections on your CPMS for leakage.</P>
            <P>(7) If your CPMS is not equipped with a redundant flow rate sensor, perform at least quarterly a visual inspection of all components of the CPMS for integrity, oxidation, and galvanic corrosion.</P>
            <P>(e) For each pH CPMS that is used to monitor the pH of a wet scrubber liquid, you must meet the requirements in paragraphs (a) and (e)(1) through (5) of this section.</P>
            <P>(1) Use a pH CPMS with a minium accuracy of ±0.2 pH units.</P>
            <P>(2) Use a data recording system with a minimum resolution of 0.1 pH units, or better.</P>
            <P>(3) Perform an initial validation of your pH CPMS according to the requirements in paragraph (e)(3)(i) or (ii) of this section.</P>
            <P>(i) Perform a single-point calibration using an NIST-certified buffer solution that is accurate to within ±0.02 pH units at 25 °C (77 °F). If the expected pH of the liquid that is monitored lies in the acidic range (less than 7 pH), use a buffer solution with a pH value of 4.00. If the expected pH of the liquid that is monitored is neutral or lies in the basic range (equal to or greater than 7 pH), use a buffer solution with a pH value of 10.00. Place the electrode of your pH CPMS in the container of buffer solution. Record the pH measured by your CPMS. Using the certified buffer solution as the reference, the pH measured by your CPMS must be within the accuracy specified in paragraph (e)(1) of this section.</P>
            <P>(ii) Perform any of the initial validation methods for pH CPMS specified in performance specifications for CPMS established in 40 CFR part 60, appendix B.</P>
            <P>(4) Perform an accuracy audit of your pH CPMS at least weekly, according to the requirements in paragraph (e)(4)(i), (ii), or (iii) of this section.</P>

            <P>(i) If your pH CPMS includes a redundant pH sensor, record the pH measured by each of the two pH sensors. The measurements must be taken during <PRTPAGE P="104"/>periods when the process and control device that is monitored by your pH CPMS are operating normally. The two pH values must agree within the required overall accuracy of the CPMS, as specified in paragraph (e)(1) of this section.</P>
            <P>(ii) If your pH CPMS does not include a redundant pH sensor, perform a single point calibration using an NIST-certified buffer solution that is accurate to within ±0.02 pH units at 25 °C (77 °F). If the expected pH of the liquid that is monitored lies in the acidic range (less than 7 pH), use a buffer solution with a pH value of 4.00. If the expected pH of the liquid that is monitored is neutral or lies in the basic range (equal to or greater than 7 pH), use a buffer solution with a pH value of 10.00. Place the electrode of the pH CPMS in the container of buffer solution. Record the pH measured by your CPMS. Using the certified buffer solution as the reference, the pH measured by your CPMS must be within the accuracy specified in paragraph (e)(1) of this section.</P>
            <P>(iii) Perform any of the accuracy audit methods for pH CPMS specified in QA procedures for CPMS established in 40 CFR part 60, appendix F.</P>
            <P>(5) If your CPMS is not equipped with a redundant pH sensor, perform at least monthly a visual inspection of all components of the CPMS for integrity, oxidation, and galvanic corrosion.</P>
            <P>(f) For each bag leak detection system, you must meet the requirements in paragraphs (f)(1) through (11) of this section.</P>

            <P>(1) Each triboelectric bag leak detection system must be installed, calibrated, operated, and maintained according to the “Fabric Filter Bag Leak Detection Guidance” (EPA-454/R-98-015, September 1997). That document is available from the U.S. EPA; Office of Air Quality Planning and Standards; Emissions, Monitoring and Analysis Division; Emission Measurement Center (D205-02), Research Triangle Park, NC 27711. It is also available on the Technology Transfer Network (TTN) at the following address: <E T="03">http://www.epa.gov/ttn/emc/cem.html.</E> Other types of bag leak detection systems must be installed, operated, calibrated, and maintained in a manner consistent with the manufacturer's written specifications and recommendations.</P>
            <P>(2) The bag leak detection system must be certified by the manufacturer to be capable of detecting particulate matter (PM) emissions at concentrations of 10 milligrams per actual cubic meter (0.0044 grains per actual cubic foot) or less.</P>
            <P>(3) The bag leak detection system sensor must provide an output of relative PM loadings.</P>
            <P>(4) The bag leak detection system must be equipped with a device to continuously record the output signal from the sensor.</P>
            <P>(5) The bag leak detection system must be equipped with an alarm system that will be engaged automatically when an increase in relative PM emissions over a preset level is detected. The alarm must be located where it is easily recognized by plant operating personnel.</P>
            <P>(6) For positive pressure fabric filter systems, a bag leak detector must be installed in each baghouse compartment or cell.</P>
            <P>(7) For negative pressure or induced air fabric filters, the bag leak detector must be installed downstream of the fabric filter.</P>
            <P>(8) Where multiple detectors are required, the system's instrumentation and alarm may be shared among detectors.</P>
            <P>(9) The baseline output must be established by adjusting the range and the averaging period of the device and establishing the alarm set points and the alarm delay time according to section 5.0 of the “Fabric Filter Bag Leak Detection Guidance.”</P>

            <P>(10) Following initial adjustment of the system, the owner or operator must not adjust the sensitivity or range, averaging period, alarm set points, or alarm delay time except as detailed in the OM&amp;M plan. In no case may the sensitivity be increased by more than 100 percent or decreased by more than 50 percent over a 365-day period unless such adjustment follows a complete fabric filter inspection that demonstrates that the fabric filter is in good operating condition. You must record each adjustment of your bag leak detection system.<PRTPAGE P="105"/>
            </P>
            <P>(11) Record the results of each inspection, calibration, and validation check.</P>
            <P>(g) For each lime feed rate measurement device that is used to monitor the lime feed rate of a dry injection fabric filter (DIFF) or dry lime scrubber/fabric filter (DLS/FF), or the chemical feed rate of a wet scrubber, you must meet the requirements in paragraph (a) of this section.</P>
            <P>(h) For each affected source that is subject to the emission limit specified in item 3, 4, 7, or 8 of Table 1 to this subpart, you must satisfy the requirements of paragraphs (h)(1) through (3) of this section.</P>
            <P>(1) Install a THC CEMS at the outlet of the control device or in the stack of the affected source.</P>
            <P>(2) Meet the requirements of PS-8 of 40 CFR part 60, appendix B.</P>
            <P>(3) Meet the requirements of Procedure 1 of 40 CFR part 60, appendix F.</P>
            <P>(i) Requests for approval of alternate monitoring methods must meet the requirements in §§ 63.9800(i)(2) and 63.8(f).</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9806</SECTNO>
            <SUBJECT>How do I demonstrate initial compliance with the emission limits, operating limits, and work practice standards?</SUBJECT>
            <P>(a) You must demonstrate initial compliance with each emission limit that applies to you according to the requirements specified in Table 5 to this subpart.</P>
            <P>(b) You must establish each site-specific operating limit in Table 2 to this subpart that applies to you according to the requirements specified in § 63.9800 and Table 4 to this subpart.</P>
            <P>(c) You must demonstrate initial compliance with each work practice standard that applies to you according to the requirements specified in Table 6 to this subpart.</P>
            <P>(d) You must submit the Notification of Compliance Status containing the results of the initial compliance demonstration according to the requirements in § 63.9812(e).</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Continuous Compliance Requirements</HD>
          <SECTION>
            <SECTNO>§ 63.9808</SECTNO>
            <SUBJECT>How do I monitor and collect data to demonstrate continuous compliance?</SUBJECT>
            <P>(a) You must monitor and collect data according to this section.</P>
            <P>(b) At all times, you must maintain your monitoring systems including, but not limited to, maintaining necessary parts for routine repairs of the monitoring equipment.</P>
            <P>(c) Except for, as applicable, monitoring system malfunctions, associated repairs, and required quality assurance or quality control activities, you must monitor continuously whenever your affected process unit is operating. For purposes of calculating data averages, you must not use data recorded during monitoring system malfunctions, associated repairs, and required quality assurance or quality control activities. You must use all the data collected during all other periods in assessing compliance. A monitoring system malfunction is any sudden, infrequent, not reasonably preventable failure of the monitoring system to provide valid data. Monitoring system malfunctions include out of control continuous monitoring systems (CMS), such as a CPMS. Any averaging period for which you do not have valid monitoring data as a result of a monitoring system malfunction and for which such data are required constitutes a deviation, and you must notify the Administrator in accordance with § 63.9814(e). Monitoring system failures are different from monitoring system malfunctions in that they are caused in part by poor maintenance or careless operation. Any period for which there is a monitoring system failure and data are not available for required calculations constitutes a deviation and you must notify the Administrator in accordance with § 63.9814(e).</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9810</SECTNO>
            <SUBJECT>How do I demonstrate continuous compliance with the emission limits, operating limits, and work practice standards?</SUBJECT>
            <P>(a) You must demonstrate continuous compliance with each emission limit specified in Table 1 to this subpart that applies to you according to the requirements specified in Table 7 to this subpart.</P>

            <P>(b) You must demonstrate continuous compliance with each operating limit specified in Table 2 to this subpart that applies to you according to the requirements specified in Table 8 to this subpart.<PRTPAGE P="106"/>
            </P>
            <P>(c) You must demonstrate continuous compliance with each work practice standard specified in Table 3 to this subpart that applies to you according to the requirements specified in Table 9 to this subpart.</P>
            <P>(d) For each affected source that is equipped with an add-on APCD that is not addressed in Table 2 to this subpart or that is using process changes as a means of meeting the emission limits in Table 1 to this subpart, you must demonstrate continuous compliance with each emission limit in Table 1 to this subpart and each operating limit established as required in § 63.9800(i)(3) according to the methods specified in your approved alternative monitoring methods request as described in § 63.9800(i)(2).</P>
            <P>(e) You must report each instance in which you did not meet each emission limit and each operating limit in this subpart that applies to you. This includes periods of startup, shutdown, and malfunction. These instances are deviations from the emission limitations in this subpart. These deviations must be reported according to the requirements in § 63.9814.</P>
            <P>(1) [Reserved]</P>
            <P>(2) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you demonstrate to the Administrator's satisfaction that you were operating in accordance with § 63.6(e)(1) and your OM&amp;M plan. The Administrator will determine whether deviations that occur during a period of startup, shutdown, or malfunction are violations, according to the provisions in § 63.6(e).</P>
            <CITA>[68 FR 18747, Apr. 16, 2003, as amended at 71 FR 20471, Apr. 20, 2006]</CITA>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Notifications, Reports, and Records</HD>
          <SECTION>
            <SECTNO>§ 63.9812</SECTNO>
            <SUBJECT>What notifications must I submit and when?</SUBJECT>
            <P>(a) You must submit all of the notifications in §§ 63.7(b) and (c), 63.8(f)(4), and 63.9 (b) through (e) and (h) that apply to you by the dates specified.</P>
            <P>(b) As specified in § 63.9(b)(2) and (3), if you start up your affected source before April 16, 2003, you must submit an Initial Notification not later than 120 calendar days after April 16, 2003.</P>
            <P>(c) As specified in § 63.9(b)(3), if you start up your new or reconstructed affected source on or after April 16, 2003, you must submit an Initial Notification not later than 120 calendar days after you become subject to this subpart.</P>
            <P>(d) If you are required to conduct a performance test, you must submit a Notification of Performance Test at least 60 calendar days before the performance test is scheduled to begin, as required in § 63.7(b)(1).</P>
            <P>(e) If you are required to conduct a performance test, you must submit a Notification of Compliance Status as specified in § 63.9(h) and paragraphs (e)(1) and (2) of this section.</P>
            <P>(1) For each compliance demonstration that includes a performance test conducted according to the requirements in Table 4 to this subpart, you must submit the Notification of Compliance Status, including the performance test results, before the close of business on the 60th calendar day following the completion of the performance test, according to § 63.10(d)(2).</P>
            <P>(2) In addition to the requirements in § 63.9(h)(2)(i), you must include the information in paragraphs (e)(2)(i) through (iv) of this section in your Notification of Compliance Status.</P>
            <P>(i) The operating limit parameter values established for each affected source with supporting documentation and a description of the procedure used to establish the values.</P>
            <P>(ii) Design information and analysis with supporting documentation demonstrating conformance with requirements for capture/collection systems in Table 2 to this subpart.</P>
            <P>(iii) A description of the methods used to comply with any applicable work practice standard.</P>
            <P>(iv) For each APCD that includes a fabric filter, analysis and supporting documentation demonstrating conformance with EPA guidance and specifications for bag leak detection systems in § 63.9804(f).</P>

            <P>(f) If you operate a clay refractory products kiln or a chromium refractory products kiln that is subject to the work practice standard specified in item 3 or 4 of Table 3 to this subpart, and you intend to use a fuel other than <PRTPAGE P="107"/>natural gas or equivalent to fire the affected kiln, you must submit a notification of alternative fuel use within 48 hours of the declaration of a period of natural gas curtailment or supply interruption, as defined in § 63.9824. The notification must include the information specified in paragraphs (f)(1) through (5) of this section.</P>
            <P>(1) Company name and address.</P>
            <P>(2) Identification of the affected kiln.</P>
            <P>(3) Reason you are unable to use natural gas or equivalent fuel, including the date when the natural gas curtailment was declared or the natural gas supply interruption began.</P>
            <P>(4) Type of alternative fuel that you intend to use.</P>
            <P>(5) Dates when the alternative fuel use is expected to begin and end.</P>
            <P>(g) If you own or operate an affected continuous kiln and must perform scheduled maintenance on the control device for that kiln, you must request approval from the Administrator before bypassing the control device, as specified in § 63.9792(e). You must submit a separate request for approval each time you plan to bypass the kiln control device.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9814</SECTNO>
            <SUBJECT>What reports must I submit and when?</SUBJECT>
            <P>(a) You must submit each report in Table 10 to this subpart that applies to you.</P>
            <P>(b) Unless the Administrator has approved a different schedule for submission of reports under § 63.10(a), you must submit each report by the date in Table 10 to this subpart and as specified in paragraphs (b)(1) through (5) of this section.</P>
            <P>(1) The first compliance report must cover the period beginning on the compliance date that is specified for your affected source in § 63.9786 and ending on June 30 or December 31 and lasting at least 6 months but less than 12 months. For example, if your compliance date is March 1, then the first semiannual reporting period would begin on March 1 and end on December 31.</P>
            <P>(2) The first compliance report must be postmarked or delivered no later than July 31 or January 31 for compliance periods ending on June 30 and December 31, respectively.</P>
            <P>(3) Each subsequent compliance report must cover the semiannual reporting period from January 1 through June 30 or the semiannual reporting period from July 1 through December 31.</P>
            <P>(4) Each subsequent compliance report must be postmarked or delivered no later than July 31 or January 31 for compliance periods ending on June 30 and December 31, respectively.</P>
            <P>(5) For each affected source that is subject to permitting regulations pursuant to 40 CFR part 70 or 40 CFR part 71 and, if the permitting authority has established dates for submitting semiannual reports pursuant to 40 CFR 70.6(a)(3)(iii)(A) or 40 CFR 71.6(a)(3)(iii)(A), you may submit the first and subsequent compliance reports according to the dates the permitting authority has established instead of according to the dates in paragraphs (b)(1) through (4) of this section. In such cases, you must notify the Administrator of this change.</P>
            <P>(c) The compliance report must contain the information in paragraphs (c)(1) through (6) of this section.</P>
            <P>(1) Company name and address.</P>
            <P>(2) Statement by a responsible official with that official's name, title, and signature, certifying that, based on information and belief formed after reasonable inquiry, the statements and information in the report are true, accurate, and complete.</P>
            <P>(3) Date of report and beginning and ending dates of the reporting period.</P>
            <P>(4) If you had a startup, shutdown, or malfunction during the reporting period, and you took actions consistent with your SSMP and OM&amp;M plan, the compliance report must include the information specified in § 63.10(d)(5)(i).</P>
            <P>(5) If there are no deviations from any emission limitations (emission limit, operating limit, or work practice standard) that apply to you, the compliance report must include a statement that there were no deviations from the emission limitations during the reporting period.</P>

            <P>(6) If there were no periods during which any affected CPMS was out of control as specified in § 63.8(c)(7), the compliance report must include a statement that there were no periods <PRTPAGE P="108"/>during which the CPMS was out of control during the reporting period.</P>
            <P>(d) For each deviation from an emission limitation (emission limit, operating limit, or work practice standard) that occurs at an affected source where you are not using a CPMS to comply with the emission limitations in this subpart, the compliance report must contain the information in paragraphs (c)(1) through (4) and (d)(1) and (2) of this section. This includes periods of startup, shutdown, and malfunction.</P>
            <P>(1) The compliance report must include the total operating time of each affected source during the reporting period.</P>
            <P>(2) The compliance report must include information on the number, duration, and cause of deviations (including unknown cause, if applicable) and the corrective action taken.</P>
            <P>(e) For each deviation from an emission limitation (emission limit, operating limit, or work practice standard) occurring at an affected source where you are using a CPMS to comply with the emission limitation in this subpart, the compliance report must include the information in paragraphs (c)(1) through (4) and (e)(1) through (13) of this section. This includes periods of startup, shutdown, and malfunction.</P>
            <P>(1) The total operating time of each affected source during the reporting period.</P>
            <P>(2) The date and time that each startup, shutdown, or malfunction started and stopped.</P>
            <P>(3) The date, time, and duration that each CPMS was inoperative.</P>
            <P>(4) The date, time and duration that each CPMS was out of control, including the information in § 63.8(c)(8), as required by your OM&amp;M plan.</P>
            <P>(5) The date and time that each deviation from an emission limitation (emission limit, operating limit, or work practice standard) started and stopped, and whether each deviation occurred during a period of startup, shutdown, or malfunction.</P>
            <P>(6) A description of corrective action taken in response to a deviation.</P>
            <P>(7) A summary of the total duration of the deviations during the reporting period and the total duration as a percentage of the total source operating time during that reporting period.</P>
            <P>(8) A breakdown of the total duration of the deviations during the reporting period into those that are due to startup, shutdown, control equipment problems, process problems, other known causes, and other unknown causes.</P>
            <P>(9) A summary of the total duration of CPMS downtime during the reporting period and the total duration of CPMS downtime as a percentage of the total source operating time during that reporting period.</P>
            <P>(10) A brief description of the process units.</P>
            <P>(11) A brief description of the CPMS.</P>
            <P>(12) The date of the latest CPMS initial validation or accuracy audit.</P>
            <P>(13) A description of any changes in CPMS, processes, or controls since the last reporting period.</P>
            <P>(f) If you have obtained a title V operating permit pursuant to 40 CFR part 70 or 40 CFR part 71, you must report all deviations as defined in this subpart in the semiannual monitoring report required by 40 CFR 70.6(a)(3)(iii)(A) or 40 CFR 71.6(a)(3)(iii)(A). If you submit a compliance report according to Table 10 to this subpart along with, or as part of, the semiannual monitoring report required by 40 CFR 70.6(a)(3)(iii)(A) or 40 CFR 71.6(a)(3)(iii)(A), and the compliance report includes all required information concerning deviations from any emission limitation (including any operating limit), then submitting the compliance report will satisfy any obligation to report the same deviations in the semiannual monitoring report. However, submitting a compliance report will not otherwise affect any obligation you may have to report deviations from permit requirements to the permit authority.</P>
            <P>(g) If you operate a clay refractory products kiln or a chromium refractory products kiln that is subject to the work practice standard specified in item 3 or 4 of Table 3 to this subpart, and you use a fuel other than natural gas or equivalent to fire the affected kiln, you must submit a report of alternative fuel use within 10 working days after terminating the use of the alternative fuel. The report must include the information in paragraphs (g)(1) through (6) of this section.</P>
            <P>(1) Company name and address.</P>
            <P>(2) Identification of the affected kiln.<PRTPAGE P="109"/>
            </P>
            <P>(3) Reason for using the alternative fuel.</P>
            <P>(4) Type of alternative fuel used to fire the affected kiln.</P>
            <P>(5) Dates that the use of the alternative fuel started and ended.</P>
            <P>(6) Amount of alternative fuel used.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9816</SECTNO>
            <SUBJECT>What records must I keep?</SUBJECT>
            <P>(a) You must keep the records listed in paragraphs (a)(1) through (3) of this section.</P>
            <P>(1) A copy of each notification and report that you submitted to comply with this subpart, including all documentation supporting any Initial Notification or Notification of Compliance Status that you submitted, according to the requirements in § 63.10(b)(2)(xiv).</P>
            <P>(2) The records in § 63.6(e)(3)(iii) through (v) related to startup, shutdown, and malfunction.</P>
            <P>(3) Records of performance tests as required in § 63.10(b)(2)(viii).</P>
            <P>(b) You must keep the records required in Tables 7 through 9 to this subpart to show continuous compliance with each emission limitation that applies to you.</P>
            <P>(c) You must also maintain the records listed in paragraphs (c)(1) through (10) of this section.</P>
            <P>(1) Records of emission data used to develop an emissions profile, as indicated in items 8(a)(i)(4) and 17(b)(i)(4) of Table 4 to this subpart.</P>
            <P>(2) Records that document how you comply with any applicable work practice standard.</P>
            <P>(3) For each bag leak detection system, records of each alarm, the time of the alarm, the time corrective action was initiated and completed, and a brief description of the cause of the alarm and the corrective action taken.</P>
            <P>(4) For each kiln controlled with a DLA, records that document the source of limestone used.</P>
            <P>(5) For each deviation of an operating limit parameter value, the date, time, and duration of the deviation, a brief explanation of the cause of the deviation and the corrective action taken, and whether the deviation occurred during a period of startup, shutdown, or malfunction.</P>
            <P>(6) For each affected source, records of production rate on a process throughput basis (either feed rate to the process unit or discharge rate from the process unit).</P>
            <P>(7) Records of any approved alternative monitoring method(s) or test procedure(s).</P>
            <P>(8) Records of maintenance activities and inspections performed on control devices, including all records associated with the scheduled maintenance of continuous kiln control devices, as specified in § 63.9792(e).</P>
            <P>(9) If you operate a source that is subject to the THC emission limits specified in item 2, 3, 6, or 7 of Table 1 to this subpart and is controlled with a catalytic oxidizer, records of annual checks of catalyst activity levels and subsequent corrective actions.</P>
            <P>(10) Current copies of the SSMP and the OM&amp;M plan, including any revisions and records documenting conformance with those revisions.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9818</SECTNO>
            <SUBJECT>In what form and how long must I keep my records?</SUBJECT>
            <P>(a) Your records must be in a form suitable and readily available for expeditious review, according to § 63.10(b)(1).</P>
            <P>(b) As specified in § 63.10(b)(1), you must keep each record for 5 years following the date of each occurrence, measurement, maintenance, corrective action, report, or record.</P>
            <P>(c) You must keep each record onsite for at least 2 years after the date of each occurrence, measurement, maintenance, corrective action, report, or record, according to § 63.10(b)(1). You may keep the records offsite for the remaining 3 years.</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Other Requirements and Information</HD>
          <SECTION>
            <SECTNO>§ 63.9820</SECTNO>
            <SUBJECT>What parts of the General Provisions apply to me?</SUBJECT>
            <P>Table 11 to this subpart shows which parts of the General Provisions specified in §§ 63.1 through 63.15 apply to you.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9822</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>

            <P>(a) This subpart can be implemented and enforced by us, the U.S. Environmental Protection Agency (U.S. EPA), or a delegated authority such as your State, local, or tribal agency. If the U.S. EPA Administrator has delegated <PRTPAGE P="110"/>authority to your State, local, or tribal agency, then that agency, in addition to the U.S. EPA, has the authority to implement and enforce this subpart. You should contact your U.S. EPA Regional Office to find out if implementation and enforcement to this subpart is delegated to your State, local, or tribal agency.</P>
            <P>(b) In delegating implementation and enforcement authority to this subpart to a State, local, or tribal agency under 40 CFR part 63, subpart E, the authorities contained in paragraph (c) of this section are retained by the Administrator of the U.S. EPA and are not transferred to the State, local, or tribal agency.</P>
            <P>(c) The authorities that cannot be delegated to State, local, or tribal agencies are as specified in paragraphs (c)(1) through (4) of this section.</P>
            <P>(1) Approval of alternatives to the applicability requirements in §§ 63.9782 and 63.9784, the compliance date requirements in § 63.9786, and the emission limitations in § 63.9788.</P>
            <P>(2) Approval of major changes to test methods under § 63.7(e)(2)(ii) and (f) and as defined in § 63.90.</P>
            <P>(3) Approval of major changes to monitoring under § 63.8(f) and as defined in § 63.90.</P>
            <P>(4) Approval of major changes to recordkeeping and reporting under § 63.10(f) and as defined in § 63.90.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9824</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <P>Terms used in this subpart are defined in the Clean Air Act, in 40 CFR 63.2, the General Provisions of this part, and in this section as follows:</P>
            <P>
              <E T="03">Additive</E> means a minor addition of a chemical, mineral, or metallic substance that is added to a refractory mixture to facilitate processing or impart specific properties to the final refractory product.</P>
            <P>
              <E T="03">Add-on air pollution control device (APCD)</E> means equipment installed on a process vent that reduces the quantity of a pollutant that is emitted to the air.</P>
            <P>
              <E T="03">Autoclave</E> means a vessel that is used to impregnate fired and/or unfired refractory shapes with pitch to form pitch-impregnated refractory products. Autoclaves also can be used as defumers following the impregnation process.</P>
            <P>
              <E T="03">Bag leak detection system</E> means an instrument that is capable of monitoring particulate matter loadings in the exhaust of a fabric filter in order to detect bag failures. A bag leak detection system includes, but is not limited to, an instrument that operates on triboelectric, light-scattering, light-transmittance, or other effects to monitor relative PM loadings.</P>
            <P>
              <E T="03">Basket</E> means the metal container used to hold refractory shapes for pitch impregnation during the shape preheating, impregnation, defuming, and, if applicable, coking processes.</P>
            <P>
              <E T="03">Batch process</E> means a process in which a set of refractory shapes is acted upon as a single unit according to a predetermined schedule, during which none of the refractory shapes being processed are added or removed. A batch process does not operate continuously.</P>
            <P>
              <E T="03">Binder</E> means a substance added to a granular material to give it workability and green or dry strength.</P>
            <P>
              <E T="03">Catalytic oxidizer</E> means an add-on air pollution control device that is designed specifically to destroy organic compounds in a process exhaust gas stream by catalytic incineration. A catalytic oxidizer includes a bed of catalyst media through which the process exhaust stream passes to promote combustion and incineration at a lower temperature than would be possible without the catalyst.</P>
            <P>
              <E T="03">Chromium refractory product</E> means a refractory product that contains at least 1 percent chromium by weight.</P>
            <P>
              <E T="03">Clay refractory product</E> means a refractory product that contains at least 10 percent uncalcined clay by weight prior to firing in a kiln. In this definition, the term “clay” means any of the following six classifications of clay defined by the U.S. Geologic Survey: ball clay, bentonite, common clay and shale, fire clay, fuller's earth, and kaolin.</P>
            <P>
              <E T="03">Coking oven</E> means a thermal process unit that operates at a peak temperature typically between 540° and 870 °C (1000° and 1600 °F) and is used to drive off the volatile constituents of pitch-impregnated refractory shapes under a <PRTPAGE P="111"/>reducing or oxygen-deprived atmosphere.</P>
            <P>
              <E T="03">Continuous parameter monitoring system (CPMS)</E> means the total equipment that is used to measure and record temperature, pressure, liquid flow rate, gas flow rate, or pH on a continuous basis in one or more locations. “Total equipment” includes the sensor, mechanical components, electronic components, data acquisition system, data recording system, electrical wiring, and other components of a CPMS.</P>
            <P>
              <E T="03">Continuous process</E> means a process that operates continuously. In a continuous process unit, the materials or shapes that are processed are either continuously charged (fed) to and discharged from the process unit, or are charged and discharged at regular time intervals without the process unit being shut down. Continuous thermal process units, such as tunnel kilns, generally include temperature zones that are maintained at relatively constant temperature and through which the materials or shapes being processed are conveyed continuously or at regular time intervals.</P>
            <P>
              <E T="03">Curing oven</E> means a thermal process unit that operates at a peak temperature typically between 90° and 340 °C (200° and 650 °F) and is used to activate a thermosetting resin, pitch, or other binder in refractory shapes. Curing ovens also perform the same function as shape dryers in removing the free moisture from refractory shapes.</P>
            <P>
              <E T="03">Defumer</E> means a process unit that is used for holding pitch-impregnated refractory shapes as the shapes defume or cool immediately following the impregnation process. This definition includes autoclaves that are opened and exhausted to the atmosphere following an impregnation cycle and used for holding pitch-impregnated refractory shapes while the shapes defume or cool.</P>
            <P>
              <E T="03">Deviation</E> means any instance in which an affected source subject to this subpart, or an owner or operator of such a source:</P>
            <P>(1) Fails to meet any requirement or obligation established by this subpart including, but not limited to, any emission limitation (emission limit, operating limit, or work practice standard);</P>
            <P>(2) Fails to meet any term or condition that is adopted to implement an applicable requirement in this subpart for any affected source required to obtain such a permit; or</P>
            <P>(3) Fails to meet any emission limitation (emission limit, operating limit, or work practice standard) in this subpart during startup, shutdown, or malfunction, regardless of whether or not such failure is permitted by this subpart.</P>
            <P>
              <E T="03">Dry injection fabric filter (DIFF)</E> means an add-on air pollution control device that includes continuous injection of hydrated lime or other sorbent into a duct or reaction chamber followed by a fabric filter.</P>
            <P>
              <E T="03">Dry lime scrubber/fabric filter (DLS/FF)</E> means an add-on air pollution control device that includes continuous injection of humidified hydrated lime or other sorbent into a reaction chamber followed by a fabric filter. These systems may include recirculation of some of the sorbent.</P>
            <P>
              <E T="03">Dry limestone adsorber (DLA)</E> means an air pollution control device that includes a limestone storage bin, a reaction chamber that is essentially a packed-tower filled with limestone, and may or may not include a peeling drum that mechanically scrapes reacted limestone to regenerate the stone for reuse.</P>
            <P>
              <E T="03">Emission limitation</E> means any restriction on the emissions a process unit may discharge.</P>
            <P>
              <E T="03">Fabric filter</E> means an add-on air pollution control device used to capture particulate matter by filtering a process exhaust stream through a filter or filter media; a fabric filter is also known as a baghouse.</P>
            <P>
              <E T="03">Fired refractory shape</E> means a refractory shape that has been fired in a kiln.</P>
            <P>
              <E T="03">HAP</E> means any hazardous air pollutant that appears in section 112(b) of the Clean Air Act.</P>
            <P>
              <E T="03">Kiln</E> means a thermal process unit that operates at a peak temperature greater than 820 °C (1500 °F) and is used for firing or sintering refractory, ceramic, or other shapes.</P>
            <P>
              <E T="03">Kiln furniture</E> means any refractory shape that is used to hold, support, or position ceramic or refractory products in a kiln during the firing process.</P>
            <P>
              <E T="03">Maximum organic HAP processing rate</E> means the combination of process and <PRTPAGE P="112"/>refractory product formulation that has the greatest potential to emit organic HAP. The maximum organic HAP processing rate is a function of the organic HAP processing rate, process operating temperature, and other process operating parameters that affect emissions of organic HAP. (See also the definition of <E T="03">organic HAP processing rate.</E>)</P>
            <P>
              <E T="03">Organic HAP processing rate</E> means the rate at which the mass of organic HAP materials contained in refractory shapes are processed in an affected thermal process unit. The organic HAP processing rate is a function of the amount of organic HAP contained in the resins, binders, and additives used in a refractory mix; the amounts of those resins, binders, and additives in the refractory mix; and the rate at which the refractory shapes formed from the refractory mix are processed in an affected thermal process unit. For continuous process units, the organic HAP processing rate is expressed in units of mass of organic HAP per unit of time (e.g., pounds per hour). For batch process units, the organic HAP processing rate is expressed in units of mass of organic HAP per unit mass of refractory shapes processed during the batch process cycle (e.g., pounds per ton).</P>
            <P>
              <E T="03">Particulate matter (PM)</E> means, for the purposes of this subpart, emissions of particulate matter that serve as a measure of total particulate emissions as measured by EPA Method 5 of 40 CFR part 60, appendix A.</P>
            <P>
              <E T="03">Peak emissions period</E> means the period of consecutive hourly mass emissions of the applicable pollutant that is greater than any other period of consecutive hourly mass emissions for the same pollutant over the course of a specified batch process cycle, as defined in paragraphs (1) and (2) of this definition. The peak emissions period is a function of the rate at which the temperature of the refractory shapes is increased, the mass and loading configuration of the shapes in the process unit, the constituents of the refractory mix, and the type of pollutants emitted.</P>
            <P>(1) The 3-hour peak THC emissions period is the period of 3 consecutive hours over which the sum of the hourly THC mass emissions rates is greater than the sum of the hourly THC mass emissions rates for any other period of 3 consecutive hours during the same batch process cycle.</P>
            <P>(2) The 3-hour peak HF emissions period is the period of 3 consecutive hours over which the sum of the hourly HF mass emissions rates is greater than the sum of the hourly HF mass emissions rates for any other period of 3 consecutive hours during the same batch process cycle.</P>
            <P>
              <E T="03">Period of natural gas curtailment or supply interruption</E> means a period of time during which the supply of natural gas to an affected facility is halted for reasons beyond the control of the facility. An increase in the cost or unit price of natural gas does not constitute a period of natural gas curtailment or supply interruption.</P>
            <P>
              <E T="03">Pitch</E> means the residue from the distillation of petroleum or coal tar.</P>
            <P>
              <E T="03">Pitch-bonded refractory product</E> means a formed refractory product that is manufactured using pitch as a bonding agent. Pitch-bonded refractory products are manufactured by mixing pitch with magnesium oxide, graphite, alumina, silicon carbide, silica, or other refractory raw materials, and forming the mix into shapes. After forming, pitch-bonded refractory products are cured in a curing oven and may be subsequently fired in a kiln.</P>
            <P>
              <E T="03">Pitch-impregnated refractory product</E> means a refractory shape that has been fired in a kiln, then impregnated with heated coal tar or petroleum pitch under pressure. After impregnation, pitch-impregnated refractory shapes may undergo the coking process in a coking oven. The total carbon content of a pitch-impregnated refractory product is less than 50 percent.</P>
            <P>
              <E T="03">Pitch working tank</E> means a tank that is used for heating pitch to the impregnation temperature, typically between 150° and 260 °C (300° and 500 °F); temporarily storing heated pitch between impregnation cycles; and transferring pitch to and from the autoclave during the impregnation step in manufacturing pitch-impregnated refractory products.</P>
            <P>
              <E T="03">Plant site</E> means all contiguous or adjoining property that is under common control, including properties that are <PRTPAGE P="113"/>separated only by a road or other public right-of-way. Common control includes properties that are owned, leased, or operated by the same entity, parent entity, subsidiary, or any combination thereof.</P>
            <P>
              <E T="03">Redundant sensor</E> means a second sensor or a back-up sensor that is integrated into a CPMS and is used to check the parameter value (e.g., temperature, pressure) measured by the primary sensor of the CPMS.</P>
            <P>
              <E T="03">Refractory product</E> means nonmetallic materials containing less than 50 percent carbon by weight and having those chemical and physical properties that make them applicable for structures, or as components of systems, that are exposed to environments above 538 °C (1000 °F). This definition includes, but is not limited to: refractory bricks, kiln furniture, crucibles, refractory ceramic fiber, and other materials used as linings for boilers, kilns, and other processing units and equipment where extremes of temperature, corrosion, and abrasion would destroy other materials.</P>
            <P>
              <E T="03">Refractory products that use organic HAP</E> means resin-bonded refractory products, pitch-bonded refractory products, and other refractory products that are produced using a substance that is an organic HAP, that releases an organic HAP during production of the refractory product, or that contains an organic HAP, such as methanol or ethylene glycol.</P>
            <P>
              <E T="03">Refractory shape</E> means any refractory piece forming a stable mass with specific dimensions.</P>
            <P>
              <E T="03">Research and development process unit</E> means any process unit whose purpose is to conduct research and development for new processes and products and is not engaged in the manufacture of products for commercial sale, except in a de minimis manner.</P>
            <P>
              <E T="03">Resin-bonded refractory product</E> means a formed refractory product that is manufactured using a phenolic resin or other type of thermosetting resin as a bonding agent. Resin-bonded refractory products are manufactured by mixing resin with alumina, magnesium oxide, graphite, silica, zirconia, or other refractory raw materials, and forming the mix into shapes. After forming, resin-bonded refractory products are cured in a curing oven and may be subsequently fired in a kiln.</P>
            <P>
              <E T="03">Responsible official</E> means one of the following:</P>
            <P>(1) For a corporation: a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy or decisionmaking functions for the corporation, or a duly authorized representative of such person if the representative is responsible for the overall operation of one or more manufacturing, production, or operating facilities applying for or subject to a permit and either:</P>
            <P>(i) The facilities employ more than 250 persons or have gross annual sales or expenditures exceeding $25 million (in second quarter 1980 dollars); or</P>
            <P>(ii) The delegation of authority to such representatives is approved in advance by the Administrator;</P>
            <P>(2) For a partnership or sole proprietorship: a general partner or the proprietor, respectively;</P>
            <P>(3) For a municipality, State, Federal, or other public agency: either a principal executive officer or ranking elected official. For the purposes of this part, a principal executive officer of a Federal agency includes the chief executive officer having responsibility for the overall operations of a principal geographic unit of the agency (e.g., a Regional Administrator of EPA); or</P>
            <P>(4) For affected sources (as defined in this subpart) applying for or subject to a title V permit: “responsible official” shall have the same meaning as defined in part 70 or Federal title V regulations in this chapter (42 U.S.C. 7661), whichever is applicable.</P>
            <P>
              <E T="03">Shape dryer</E> means a thermal process unit that operates at a peak temperature typically between 40° and 700 °C (100° and 1300 °F) and is used exclusively to reduce the free moisture content of a refractory shape. Shape dryers generally are the initial thermal process step following the forming step in refractory products manufacturing. (See also the definition of a <E T="03">curing oven.</E>)</P>
            <P>
              <E T="03">Shape preheater</E> means a thermal process unit that operates at a peak temperature typically between 180° and 320 °C (350° and 600 °F) and is used to <PRTPAGE P="114"/>heat fired refractory shapes prior to the impregnation step in manufacturing pitch-impregnated refractory products.</P>
            <P>
              <E T="03">Thermal oxidizer</E> means an add-on air pollution control device that includes one or more combustion chambers and is designed specifically to destroy organic compounds in a process exhaust gas stream by incineration.</P>
            <P>
              <E T="03">Uncalcined clay</E> means clay that has not undergone thermal processing in a calciner.</P>
            <P>
              <E T="03">Wet scrubber</E> means an add-on air pollution control device that removes pollutants from a gas stream by bringing them into contact with a liquid, typically water.</P>
            <P>
              <E T="03">Work practice standard</E> means any design, equipment, work practice, or operational standard, or combination thereof, that is promulgated pursuant to section 112(h) of the Clean Air Act.</P>
          </SECTION>
        </SUBJGRP>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. SSSSS, Table 1</EAR>
          <HD SOURCE="HED">Table 1 to Subpart SSSSS of Part 63—Emission Limits</HD>
          <P>As stated in § 63.9788, you must comply with the emission limits for affected sources in the following table:</P>
          <GPOTABLE CDEF="s100,r100" COLS="2" OPTS="L2">
            <BOXHD>
              <CHED H="1" O="L">For . . .</CHED>
              <CHED H="1" O="L">You must meet the following emission limits . . .</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">1. Each new or existing curing oven, shape dryer, and kiln that is used to process refractory products that use organic HAP; each new or existing coking oven and defumer that is used to produce pitch-impregnated refractory products; each new shape preheater that is used to produce pitch-impregnated refractory products; AND each new or existing process unit that is exhausted to a thermal or catalytic oxidizer that also controls emissions from an affected shape preheater or pitch working tank</ENT>
              <ENT>As specified in items 2 through 9 of this table.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">2. Continuous process units that are controlled with a thermal or catalytic oxidizer</ENT>
              <ENT>a. The 3-hour block average THC concentration must not exceed 20 parts per million by volume, dry basis (ppmvd), corrected to 18 percent oxygen, at the outlet of the control device; or</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. The 3-hour block average THC mass emissions rate must be reduced by at least 95 percent.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">3. Continuous process units that are equipped with a control device other than a thermal or catalytic oxidizer</ENT>
              <ENT>a. The 3-hour block average THC concentration must not exceed 20 ppmvd, corrected to 18 percent oxygen, at the outlet of the control device; or</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. The 3-hour block average THC mass emissions rate must be reduced by at least 95 percent.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">4. Continuous process units that use process changes to reduce organic HAP emissions</ENT>
              <ENT>The 3-hour block average THC concentration must not exceed 20 ppmvd, corrected to 18 percent oxygen, at the outlet of the process gas stream.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">5. Continuous kilns that are not equipped with a control device</ENT>
              <ENT>The 3-hour block average THC concentration must not exceed 20 ppmvd, corrected to 18 percent oxygen, at the outlet of the process gas stream.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">6. Batch process units that are controlled with a thermal or catalytic oxidizer</ENT>
              <ENT>a. The 2-run block average THC concentration for the 3-hour peak emissions period must not exceed 20 ppmvd, corrected to 18 percent oxygen, at the outlet of the control device; or</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. The 2-run block average THC mass emissions rate for the 3-hour peak emissions period must be reduced by at least 95 percent.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">7. Batch process units that are equipped with a control device other than a thermal or catalytic oxidizer</ENT>
              <ENT>a. The 2-run block average THC concentration for the 3-hour peak emissions period must not exceed 20 ppmvd, corrected to 18 percent oxygen, at the outlet of the control device; or</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. The 2-run block average THC mass emissions rate for the 3-hour peak emissions period must be reduced by at least 95 percent.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">8. Batch process units that use process changes to reduce organic HAP emissions</ENT>
              <ENT>The 2-run block average THC concentration for the 3-hour peak emissions period must not exceed 20 ppmvd, corrected to 18 percent oxygen, at the outlet of the process gas stream.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">9. Batch process kilns that are not equipped with a control device</ENT>
              <ENT>The 2-run block average THC concentration for the 3-hour peak emissions period must not exceed 20 ppmvd, corrected to 18 percent oxygen, at the outlet of the process gas stream.</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="115"/>
              <ENT I="01">10. Each new continuous kiln that is used to produce clay refractory products</ENT>
              <ENT>a. The 3-hour block average HF emissions must not exceed 0.019 kilograms per megagram (kg/Mg) (0.038 pounds per ton (lb/ton)) of uncalcined clay processed, OR the 3-hour block average HF mass emissions rate must be reduced by at least 90 percent; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. The 3-hour block average HCl emissions must not exceed 0.091 kg/Mg (0.18 lb/ton) of uncalcined clay processed, OR the 3-hour block average HCl mass emissions rate must be reduced by at least 30 percent.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">11. Each new batch process kiln that is used to produce clay refractory products</ENT>
              <ENT>a. The 2-run block average HF mass emissions rate for the 3-hour peak emissions period must be reduced by at least 90 percent; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. The 2-run block average HCl mass emissions rate for the 3-hour peak emissions period must be reduced by at least 30 percent.</ENT>
            </ROW>
          </GPOTABLE>
        </APPENDIX>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. SSSSS, Table 2</EAR>
          <HD SOURCE="HED">Table 2 to Subpart SSSSS of Part 63—Operating Limits</HD>
          <P>As stated in § 63.9788, you must comply with the operating limits for affected sources in the following table:]</P>
          <GPOTABLE CDEF="s100,r100" COLS="2" OPTS="L2">
            <BOXHD>
              <CHED H="1" O="L">For . . .</CHED>
              <CHED H="1" O="L">You must . . .</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">1. Each affected source listed in Table 1 to this subpart</ENT>
              <ENT>a. Operate all affected sources according to the requirements to this subpart on and after the date on which the initial performance test is conducted or required to be conducted, whichever date is earlier; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. Capture emissions and vent them through a closed system; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>c. Operate each control device that is required to comply with this subpart on each affected source during all periods that the source is operating, except where specified in § 63.9792(e), item 2 of this table, and item 13 of Table 4 to this subpart; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>d. Record all operating parameters specified in Table 8 to this subpart for the affected source; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>e. Prepare and implement a written OM&amp;M plan as specified in § 63.9792(d).</ENT>
            </ROW>
            <ROW>
              <ENT I="01">2. Each affected continuous kiln that is equipped with an emission control device</ENT>
              <ENT>a. Receive approval from the Administrator before taking the control device on the affected kiln out of service for scheduled maintenance, as specified in § 63.9792(e); and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. Minimize HAP emissions from the affected kiln during all periods of scheduled maintenance of the kiln control device when the kiln is operating and the control device is out of service; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>c. Minimize the duration of all periods of scheduled maintenance of the kiln control device when the kiln is operating and the control device is out of service.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">3. Each new or existing curing oven, shape dryer, and kiln that is used to process refractory products that use organic HAP; each new or existing coking oven and defumer that is used to produce pitch-impregnated refractory products; each new shape preheater that is used to produce pitch-impregnated refractory products; AND each new or existing process unit that is exhausted to a thermal or catalytic oxidizer that also controls emissions from an affected shape preheater or pitch working tank</ENT>
              <ENT>Satisfy the applicable operating limits specified in items 4 through 9 of this table.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">4. Each affected continuous process unit</ENT>
              <ENT>Maintain the 3-hour block average organic HAP processing rate (pounds per hour) at or below the maximum organic HAP processing rate established during the most recent performance test.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">5. Continuous process units that are equipped with a thermal oxidizer</ENT>
              <ENT>Maintain the 3-hour block average operating temperature in the thermal oxidizer combustion chamber at or above the minimum allowable operating temperature for the oxidizer established during the most recent performance test.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">6. Continuous process units that are equipped with a catalytic oxidizer</ENT>
              <ENT>a. Maintain the 3-hour block average operating temperature at the inlet of the catalyst bed of the oxidizer at or above the minimum allowable operating temperature for the oxidizer established during the most recent performance test; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. Check the activity level of the catalyst at least every 12 months.</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="116"/>
              <ENT I="01">7. Each affected batch process unit</ENT>
              <ENT>For each batch cycle, maintain the organic HAP processing rate (pounds per batch) at or below the maximum organic HAP processing rate established during the most recent performance test.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">8. Batch process units that are equipped with a thermal oxidizer</ENT>
              <ENT>a. From the start of each batch cycle until 3 hours have passed since the process unit reached maximum temperature, maintain the hourly average operating temperature in the thermal oxidizer combustion chamber at or above the minimum allowable operating temperature established for the corresponding period during the most recent performance test, as determined according to item 11 of Table 4 to this subpart; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. For each subsequent hour of the batch cycle, maintain the hourly average operating temperature in the thermal oxidizer combustion chamber at or above the minimum allowable operating temperature established for the corresponding hour during the most recent performance test, as specified in item 13 of Table 4 to this subpart.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">9. Batch process units that are equipped with a catalytic oxidizer</ENT>
              <ENT>a. From the start of each batch cycle until 3 hours have passed since the process unit reached maximum temperature, maintain the hourly average operating temperature at the inlet of the catalyst bed at or above the minimum allowable operating temperature established for the corresponding period during the most recent performance test, as determined according to item 12 of Table 4 to this subpart; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. For each subsequent hour of the batch cycle, maintain the hourly average operating temperature at the inlet of the catalyst bed at or above the minimum allowable operating temperature established for the corresponding hour during the most recent performance test, as specified in item 13 of Table 4 to this subpart; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>c. Check the activity level of the catalyst at least every 12 months.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">10. Each new kiln that is used to process clay refractory products</ENT>
              <ENT>Satisfy the applicable operating limits specified in items 11 through 13 of this table.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">11. Each affected kiln that is equipped with a DLA</ENT>
              <ENT>a. Maintain the 3-hour block average pressure drop across the DLA at or above the minimum levels established during the most recent performance test; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. Maintain free-flowing limestone in the feed hopper, silo, and DLA at all times; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>c. Maintain the limestone feeder at or above the level established during the most recent performance test; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>d. Use the same grade of limestone from the same source as was used during the most recent performance test and maintain records of the source and type of limestone used.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">12. Each affected kiln that is equipped with a DIFF or DLS/FF</ENT>
              <ENT>a. Initiate corrective action within 1 hour of a bag leak detection system alarm and complete corrective actions in accordance with the OM&amp;M plan; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. Verify at least once each 8-hour shift that lime is free-flowing by means of a visual check, checking the output of a load cell, carrier gas/lime flow indicator, or carrier gas pressure drop measurement system; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>c. Record the lime feeder setting daily to verify that the feeder setting is at or above the level established during the most recent performance test.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">13. Each affected kiln that is equipped with a wet scrubber</ENT>
              <ENT>a. Maintain the 3-hour block average pressure drop across the scrubber, liquid pH, and liquid flow rate at or above the minimum levels established during the most recent performance test; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. If chemicals are added to the scrubber liquid, maintain the 3-hour block average chemical feed rate at or above the minimum chemical feed rate established during the most recent performance test.</ENT>
            </ROW>
          </GPOTABLE>
        </APPENDIX>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. SSSSS, Table 3</EAR>
          <HD SOURCE="HED">Table 3 to Subpart SSSSS of Part 63—Work Practice Standards</HD>

          <P>As stated in § 63.9788, you must comply with the work practice standards for affected sources in the following table:<PRTPAGE P="117"/>
          </P>
          <GPOTABLE CDEF="s75,r75,r75" COLS="3" OPTS="L2">
            <BOXHD>
              <CHED H="1" O="L">For . . .</CHED>
              <CHED H="1" O="L">You must . . .</CHED>
              <CHED H="1" O="L">According to one of the following requirements . . .</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">1. Each basket or container that is used for holding fired refractory shapes in an existing shape preheater and autoclave during the pitch impregnation process</ENT>
              <ENT>a. Control POM emissions from any affected shape preheater</ENT>
              <ENT>i. At least every 10 preheating cycles, clean the residual pitch from the surfaces of the basket or container by abrasive blasting prior to placing the basket or container in the affected shape preheater; or<LI>ii. At least every 10 preheating cycles, subject the basket or container to a thermal process cycle that meets or exceeds the operating temperature and cycle time of the affected preheater, AND is conducted in a process unit that is exhausted to a thermal or catalytic oxidizer that is comparable to the control device used on an affected defumer or coking oven; or</LI>
                <LI>iii. Capture emissions from the affected shape preheater and vent them to the control device that is used to control emissions from an affected defumer or coking oven, or to a comparable thermal or catalytic oxidizer.</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="01">2. Each new or existing pitch working tank</ENT>
              <ENT>Control POM emissions</ENT>
              <ENT>Capture emissions from the affected pitch working tank and vent them to the control device that is used to control emissions from an affected defumer or coking oven, OR to a comparable thermal or catalytic oxidizer.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">3. Each new or existing chromium refractory products kiln</ENT>
              <ENT>Minimize fuel-based HAP emissions</ENT>
              <ENT>Use natural gas, or equivalent, as the kiln fuel, except during periods of natural gas curtailment or supply interruption, as defined in § 63.9824.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">4. Each existing clay refractory products kiln</ENT>
              <ENT>Minimize fuel-based HAP emissions</ENT>
              <ENT>Use natural gas, or equivalent, as the kiln fuel, except during periods of natural gas curtailment or supply interruption, as defined in § 63.9824.</ENT>
            </ROW>
          </GPOTABLE>
        </APPENDIX>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. SSSSS, Table 4</EAR>
          <HD SOURCE="HED">Table 4 to Subpart SSSSS to Part 63—Requirements for Performance Tests</HD>
          <P>As stated in § 63.9800, you must comply with the requirements for performance tests for affected sources in the following table:</P>
          <GPOTABLE CDEF="s40,r80,r80,r80" COLS="4" OPTS="L2">
            <BOXHD>
              <CHED H="1" O="L">For . . .</CHED>
              <CHED H="1" O="L">You must . . .</CHED>
              <CHED H="1" O="L">Using . . .</CHED>
              <CHED H="1" O="L">According to the following requirements . . .</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">1. Each affected source listed in Table 1 to this subpart</ENT>
              <ENT>a. Conduct performance tests</ENT>
              <ENT>i. The requirements of the general provisions in subpart A of this part and the requirements to this subpart</ENT>
              <ENT>(1) Record the date of the test; and<LI>(2) Identify the emission source that is tested; and</LI>
                <LI>(3) Collect and record the corresponding operating parameter and emission test data listed in this table for each run of the performance test; and</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(4) Repeat the performance test at least every 5 years; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(5) Repeat the performance test before changing the parameter value for any operating limit specified in your OM&amp;M plan; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(6) If complying with the THC concentration or THC percentage reduction limits specified in items 2 through 9 of Table 1 to this subpart, repeat the performance test under the conditions specified in items 2.a.2. and 2.a.3. of this table; and</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="118"/>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(7) If complying with the emission limits for new clay refractory products kilns specified in items 10 and 11 of Table 1 to this subpart, repeat the performance test under the conditions specified in items 14.a.i.4. and 17.a.i.4. of this table.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. Select the locations of sampling ports and the number of traverse points</ENT>
              <ENT>i. Method 1 or 1A of 40 CFR part 60, appendix A</ENT>
              <ENT>(1) To demonstrate compliance with the percentage reduction limits specified in items 2.b., 3.b., 6.b., 7.b., 10, and 11 of Table 1 to this subpart, locate sampling sites at the inlet of the control device and at either the outlet of the control device or at the stack prior to any releases to the atmosphere; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(2) To demonstrate compliance with any other emission limit specified in Table 1 to this subpart, locate all sampling sites at the outlet of the control device or at the stack prior to any releases to the atmosphere.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>c. Determine gas velocity and volumetric flow rate</ENT>
              <ENT>Method 2, 2A, 2C, 2D, 2F, or 2G of 40 CFR part 60, appendix A</ENT>
              <ENT>Measure gas velocities and volumetric flow rates at 1-hour intervals throughout each test run.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>d. Conduct gas molecular weight analysis</ENT>
              <ENT O="xl">(i) Method 3, 3A, or 3B of 40 CFR part 60, appendix A; or</ENT>
              <ENT>As specified in the applicable test method.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>(ii) ASME PTC 19.10-1981-Part 10</ENT>
              <ENT>You may use ASME PTC 19.10-1981-Part 10 (available for purchase from Three Park Avenue, New York, NY 10016-5990) as an alternative to EPA Method 3B.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>e. Measure gas moisture content</ENT>
              <ENT>Method 4 of 40 CFR part 60, appendix A</ENT>
              <ENT>As specified in the applicable test method.</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="119"/>
              <ENT I="01">2. Each new or existing curing oven, shape dryer, and kiln that is used to process refractory products that use organic HAP; each new or existing coking oven and defumer that is used to produce pitch-impregnated refractory products; each new shape preheater that is used to produce pitch-impregnated refractory products; AND each new or existing process unit that is exhausted to a thermal or catalytic oxidizer that also controls emissions from an affected shape preheater or pitch working tank</ENT>
              <ENT>a. Conduct performance tests</ENT>
              <ENT/>
              <ENT>(1) Conduct the performance test while the source is operating at the maximum organic HAP processing rate, as defined in § 63.9824, reasonably expected to occur; and<LI>(2) Repeat the performance test before starting production of any product for which the organic HAP processing rate is likely to exceed the maximum organic HAP processing rate established during the most recent performance test by more than 10 percent, as specified in § 63.9798(c); and</LI>
                <LI>(3) Repeat the performance test on any affected uncontrolled kiln following process changes (e.g., shorter curing oven cycle time) that could increase organic HAP emissions from the affected kiln, as specified in § 63.9798(d).</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. Satisfy the applicable requirements listed in items 3 through 13 of this table</ENT>
            </ROW>
            <ROW>
              <ENT I="01">3. Each affected continuous process unit</ENT>
              <ENT>a. Perform a minimum of 3 test runs</ENT>
              <ENT>The appropriate test methods specified in items 1, 4, and 5 of this table</ENT>
              <ENT>Each test run must be at least 1 hour in duration.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. Establish the operating limit for the maximum organic HAP processing rate</ENT>
              <ENT O="xl">i. Method 311 of 40 CFR part 63, appendix A, OR material safety data sheets (MSDS), OR product labels to determine the mass fraction of organic HAP in each resin, binder, or additive; and</ENT>
              <ENT>(1) Calculate and record the organic HAP content of all refractory shapes that are processed during the performance test, based on the mass fraction of organic HAP in the resins, binders, or additives; the mass fraction of each resin, binder, or additive, in the product; and the process feed rate; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl">ii. Product formulation data that specify the mass fraction of each resin, binder, and additive in the products that are processed during the performance test; and</ENT>
              <ENT>(2) Calculate and record the organic HAP processing rate (pounds per hour) for each test run; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>iii. Process feed rate data (tons per hour)</ENT>
              <ENT>(3) Calculate and record the maximum organic HAP processing rate as the average of the organic HAP processing rates for the three test runs.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>c. Record the operating temperature of the affected source</ENT>
              <ENT>Process data</ENT>
              <ENT>During each test run and at least once per hour, record the operating temperature in the highest temperature zone of the affected source.</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="120"/>
              <ENT I="01">4. Each continuous process unit that is subject to the THC emission limit listed in item 2.a., 3.a., 4, or 5 of Table 1 to this subpart</ENT>
              <ENT>a. Measure THC concentrations at the outlet of the control device or in the stack</ENT>
              <ENT>i. Method 25A of 40 CFR part 60, appendix A</ENT>
              <ENT>(1) Each minute, measure and record the concentrations of THC in the exhaust stream; and<LI>(2) Provide at least 50 1-minute measurements for each valid hourly average THC concentration.</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. Measure oxygen concentrations at the outlet of the control device or in the stack</ENT>
              <ENT>i. Method 3A of 40 CFR part 60, appendix A</ENT>
              <ENT>(1) Each minute, measure and record the concentrations of oxygen in the exhaust stream; and<LI>(2) Provide at least 50 1-minute measurements for each valid hourly average THC concentration.</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>c. Determine the hourly average THC concentration, corrected to 18 percent oxygen</ENT>
              <ENT>i. Equation 1 of § 63.9800(g)(1); and<LI>ii. The 1-minute THC and oxygen concentration data</LI>
              </ENT>
              <ENT>(1) Calculate the hourly average THC concentration for each hour of the performance test as the average of the 1-minute THC measurements; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(2) Calculate the hourly average oxygen concentration for each hour of the performance test as the average of the 1-minute oxygen measurements; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(3) Correct the hourly average THC concentrations to 18 percent oxygen using Equation 1 of § 63.9800(g)(1).</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>d. Determine the 3-hour block average THC emission concentration, corrected to 18 percent oxygen</ENT>
              <ENT>The hourly average concentration of THC, corrected to 18 percent oxygen, for each test run</ENT>
              <ENT>Calculate the 3-hour block average THC emission concentration, corrected to 18 percent oxygen, as the average of the hourly average THC emission concentrations, corrected to 18 percent oxygen.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">5. Each continuous process unit that is subject to the THC percentage reduction limit listed in item 2.b. or 3.b. of Table 1 to this subpart</ENT>
              <ENT>a. Measure THC concentrations at the inlet and outlet of the control device</ENT>
              <ENT>i. Method 25A of 40 CFR part 60, appendix A</ENT>
              <ENT>(1) Each minute, measure and record the concentrations of THC at the inlet and outlet of the control device; and<LI>(2) Provide at least 50 1-minute measurements for each valid hourly average THC concentration at the control device inlet and outlet.</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. Determine the hourly THC mass emissions rates at the inlet and outlet of the control device</ENT>
              <ENT O="xl">i. The 1-minute THC concentration data at the control device inlet and outlet; and<LI>ii. The volumetric flow rates at the control device inlet and outlet</LI>
              </ENT>
              <ENT>Calculate the hourly THC mass emissions rates at the control device inlet and outlet for each hour of the performance test.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>c. Determine the 3-hour block average THC percentage reduction</ENT>
              <ENT>i. The hourly THC mass emissions rates at the inlet and outlet of the control device</ENT>
              <ENT>(1) Calculate the hourly THC percentage reduction for each hour of the performance test using Equation 2 of § 63.9800(g)(1); and<LI>(2) Calculate the 3-hour block average THC percentage reduction.</LI>
              </ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="121"/>
              <ENT I="01">6. Each continous process unit that is equipped with a thermal oxidizer</ENT>
              <ENT>a. Establish the operating limit for the minimum allowable thermal oxidizer combustion chamber temperature</ENT>
              <ENT>i. Continuous recording of the output of the combustion chamber temperature measurement device</ENT>
              <ENT>(1) At least every 15 minutes, measure and record the thermal oxidizer combustion chamber temperature; and<LI>(2) Provide at least one measurement during at least three 15-minute periods per hour of testing; and</LI>
                <LI>(3) Calculate the hourly average thermal oxidizer combustion chamber temperature for each hour of the performance test; and</LI>
                <LI>(4) Calculate the minimum allowable combustion chamber temperature as the average of the combustion chamber temperatures for the three test runs, minus 14 °C (25 °F).</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="01">7. Each continuous process unit that is equipped with a catalytic oxidizer</ENT>
              <ENT>a. Establish the operating limit for the minimum allowable temperature at the inlet of the catalyst bed</ENT>
              <ENT>i. Continuous recording of the output of the temperature measurement device</ENT>
              <ENT>(1) At least every 15 minutes, measure and record the temperature at the inlet of the catalyst bed; and<LI>(2) Provide at least one catalyst bed inlet temperature measurement during at least three 15-minute periods per hour of testing; and</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(3) Calculate the hourly average catalyst bed inlet temperature for each hour of the performance test; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(4) Calculate the minimum allowable catalyst bed inlet temperature as the average of the catalyst bed inlet temperatures for the three test runs, minus 14 °C (25 °F).</ENT>
            </ROW>
            <ROW>
              <ENT I="01">8. Each affected batch process unit</ENT>
              <ENT>a. Perform a minimum of two test runs</ENT>
              <ENT>i. The appropriate test methods specified in items 1, 9, and 10 of this table</ENT>
              <ENT>(1) Each test run must be conducted over a separate batch cycle unless you satisfy the requirements of § 63.9800(f)(3) and (4); and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(2) Each test run must begin with the start of a batch cycle, except as specified in item 8.a.i.4. of this table; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(3) Each test run must continue until the end of the batch cycle, except as specified in items 8.a.i.4. and 8.a.i.5. of this table; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(4) If you develop an emissions profile, as described in § 63.9802(a), AND for sources equipped with a thermal or catalytic oxidizer, you do not reduce the oxidizer operating temperature, as specified in item 13 of this table, you can limit each test run to the 3-hour peak THC emissions period; and</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="122"/>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(5) If you do not develop an emissions profile, a test run can be stopped, and the results of that run considered complete, if you measure emissions continuously until at least 3 hours after the affected process unit has reached maximum temperature, AND the hourly average THC mass emissions rate has not increased during the 3-hour period since maximum process temperature was reached, and the hourly average concentrations of THC at the inlet of the control device have not exceeded 20 ppmvd, corrected to 18 percent oxygen, during the 3-hour period since maximum process temperature was reached or the hourly average THC percentage reduction has been at least 95 percent during the 3-hour period since maximum process temperature was reached, AND, for sources equipped with a thermal or catalytic oxidizer, at least 1 hour has passed since any reduction in the operating temperature of the oxidizer, as specified in item 13 of this table.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. Establish the operating limit for the maximum organic HAP processing rate</ENT>
              <ENT O="xl">i. Method 311 of 40 CFR part 63, appendix A, OR MSDS, OR product labels to determine the mass fraction of organic HAP in each resin, binder, or additive; and</ENT>
              <ENT>(1) Calculate and record the organic HAP content of all refractory shapes that are processed during the performance test, based on the mass fraction of HAP in the resins, binders, or additives; the mass fraction of each resin, binder, or additive, in the product, and the batch weight prior to processing; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl">ii. Product formulation data that specify the mass fraction of each resin, binder, and additive in the products that are processed during the performance test; and<LI>iii. Batch weight (tons)</LI>
              </ENT>
              <ENT>(2) Calculate and record the organic HAP processing rate (pounds per batch) for each test run; and<LI>(3) Calculate and record the maximum organic HAP processing rate as the average of the organic HAP processing rates for the two test runs.</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>c. Record the batch cycle time</ENT>
              <ENT>Process data</ENT>
              <ENT>Record the total elapsed time from the start to the completion of the batch cycle.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>d. Record the operating temperature of the affected source</ENT>
              <ENT>Process data</ENT>
              <ENT>Record the operating temperature of the affected source at least once every hour from the start to the completion of the batch cycle.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">9. Each batch process unit that is subject to the THC emission limit listed in item 6.a., 7.a., 8, or 9 of Table 1 to this subpart</ENT>
              <ENT>a. Measure THC concentrations at the outlet of the control device or in the stack</ENT>
              <ENT>i. Method 25A of 40 CFR part 60, appendix A</ENT>
              <ENT>(1) Each minute, measure and record the concentrations of THC in the exhaust stream; and<LI>(2) Provide at least 50 1-minute measurements for each valid hourly average THC concentration.</LI>
              </ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="123"/>
              <ENT I="22"/>
              <ENT>b. Measure oxygen concentrations at the outlet of the control device or in the stack</ENT>
              <ENT>i. Method 3A of 40 CFR part 60, appendix A</ENT>
              <ENT>(1) Each minute, measure and record the concentrations of oxygen in the exhaust stream; and<LI>(2) Provide at least 50 1-minute measurements for each valid hourly average oxygen concentration.</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>c. Determine the hourly average THC concentration, corrected to 18 percent oxygen</ENT>
              <ENT>i. Equation 1 of § 63.9800(g)(1); and<LI>ii. The 1-minute THC and oxygen concentration data</LI>
              </ENT>
              <ENT>(1) Calculate the hourly average THC concentration for each hour of the performance test as the average of the 1-minute THC measurements; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(2) Calculate the hourly average oxygen concentration for each hour of the performance test as the average of the 1-minute oxygen measurements; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(3) Correct the hourly average THC concentrations to 18 percent oxygen using Equation 1 of § 63.9800(g)(1).</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>d. Determine the 3-hour peak THC emissions period for each test run</ENT>
              <ENT>The hourly average THC concentrations, corrected to 18 percent oxygen</ENT>
              <ENT>Select the period of 3 consecutive hours over which the sum of the hourly average THC concentrations, corrected to 18 percent oxygen, is greater than the sum of the hourly average THC emission concentrations, corrected to 18 percent oxygen, for any other period of 3 consecutive hours during the test run.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>e. Determine the average THC concentration, corrected to 18 percent oxygen, for each test run</ENT>
              <ENT>The hourly average THC emission concentrations, corrected to 18 percent oxygen, for the 3-hour peak THC emissions period</ENT>
              <ENT>Calculate the average of the hourly average THC concentrations, corrected to 18 percent oxygen, for the 3 hours of the peak emissions period for each test run.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>f. Determine the 2-run block average THC concentration, corrected to 18 percent oxygen, for the emission test</ENT>
              <ENT>The average THC concentration, corrected to 18 percent oxygen, for each test run</ENT>
              <ENT>Calculate the average of the average THC concentrations, corrected to 18 percent oxygen, for each run.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">10. Each batch process unit that is subject to the THC percentage reduction limit listed in item 6.b. or 7.b. of Table 1 to this subpart</ENT>
              <ENT>a. Measure THC concentrations at the inlet and outlet of the control device</ENT>
              <ENT>i. Method 25A of 40 CFR part 60, appendix A</ENT>
              <ENT>(1) Each minute, measure and record the concentrations of THC at the control device inlet and outlet; and<LI>(2) Provide at least 50 1-minute measurements for each valid hourly average THC concentration at the control device inlet and outlet.</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. Determine the hourly THC mass emissions rates at the control device inlet and outlet</ENT>
              <ENT O="xl">i. The 1-minute THC concentration data at the control device inlet and outlet; and<LI>ii. The volumetric flow rates at the control device inlet and outlet</LI>
              </ENT>
              <ENT>(1) Calculate the hourly mass emissions rates at the control device inlet and outlet for each hour of the performance test.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>c. Determine the 3-hour peak THC emissions period for each test run</ENT>
              <ENT>The hourly THC mass emissions rates at the control device inlet</ENT>
              <ENT>Select the period of 3 consecutive hours over which the sum of the hourly THC mass emissions rates at the control device inlet is greater than the sum of the hourly THC mass emissions rates at the control device inlet for any other period of 3 consecutive hours during the test run.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>d. Determine the average THC percentage reduction for each test run</ENT>
              <ENT>i. Equation 2 of § 63.9800(g)(2); and<LI>ii. The hourly THC mass emissions rates at the control device inlet and outlet for the 3-hour peak THC emissions period</LI>
              </ENT>
              <ENT>Calculate the average THC percentage reduction for each test run using Equation 2 of § 63.9800(g)(2).</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="124"/>
              <ENT I="22"/>
              <ENT>e. Determine the 2-run block average THC percentage reduction for the emission test</ENT>
              <ENT>The average THC percentage reduction for each test run</ENT>
              <ENT>Calculate the average of the average THC percentage reductions for each test run.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">11. Each batch process unit that is equipped with a thermal oxidizer</ENT>
              <ENT>a. Establish the operating limit for the minimum thermal oxidizer combustion chamber temperature</ENT>
              <ENT>i. Continuous recording of the output of the combustion chamber temperature measurement device</ENT>
              <ENT>(1) At least every 15 minutes, measure and record the thermal oxidizer combustion chamber temperature; and<LI>(2) Provide at least one temperature measurement during at least three 15-minute periods per hour of testing; and</LI>
                <LI>(3) Calculate the hourly average combustion chamber temperature for each hour of the 3-hour peak emissions period, as defined in item 9.d. or 10.c. of this table, whichever applies; and</LI>
                <LI>(4) Calculate the minimum allowable thermal oxidizer combustion chamber operating temperature as the average of the hourly combustion chamber temperatures for the 3-hour peak emissions period, minus 14 °C (25 °F).</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="01">12. Each batch process unit that is equipped with a catalytic oxidizer</ENT>
              <ENT>a. Establish the operating limit for the minimum temperature at the inlet of the catalyst bed</ENT>
              <ENT>i. Continuous recording of the output of the temperature measurement device</ENT>
              <ENT>(1) At least every 15 minutes, measure and record the temperature at the inlet of the catalyst bed; and<LI>(2) Provide at least one catalyst bed inlet temperature measurement during at least three 15-minute periods per hour of testing; and</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(3) Calculate the hourly average catalyst bed inlet temperature for each hour of the 3-hour peak emissions period, as defined in item 9.d. or 10.c. of this table, whichever applies; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(4) Calculate the minimum allowable catalytic oxidizer catalyst bed inlet temperature as the average of the hourly catalyst bed inlet temperatures for the 3-hour peak emissions period, minus 14 °C (25 °F).</ENT>
            </ROW>
            <ROW>
              <ENT I="01">13. Each batch process unit that is equipped with a thermal or catalytic oxidizer</ENT>
              <ENT>a. During each test run, maintain the applicable operating temperature of the oxidizer until emission levels allow the oxidizer to be shut off or the operating temperature of the oxidizer to be reduced</ENT>
              <ENT O="xl"/>
              <ENT>(1) The oxidizer can be shut off or the oxidizer operating temperature can be reduced if you do not use an emission profile to limit testing to the 3-hour peak emissions period, as specified in item 8.a.i.4. of this table; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(2) At least 3 hours have passed since the affected process unit reached maximum temperature; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(3) The applicable emission limit specified in item 6.a. or 6.b. of Table 1 to this subpart was met during each of the previous three 1-hour periods; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(4) The hourly average THC mass emissions rate did not increase during the 3-hour period since maximum process temperature was reached; and</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="125"/>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(5) The applicable emission limit specified in item 6.a. and 6.b. of Table 1 to this subpart was met during each of the four 15-minute periods immediately following the oxidizer temperature reduction; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(6) If the applicable emission limit specified in item 6.a. or 6.b. of Table 1 to this subpart was not met during any of the four 15-minute periods immediately following the oxidizer temperature reduction, you must return the oxidizer to its normal operating temperature as soon as possible and maintain that temperature for at least 1 hour; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(7) Continue the test run until the applicable emission limit specified in items 6.a. and 6.b. of Table 1 to this subpart is met for at least four consecutive 15-minute periods that immediately follow the temperature reduction; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(8) Calculate the hourly average oxidizer operating temperature for each hour of the performance test since the affected process unit reached maximum temperature.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">14. Each new continuous kiln that is used to process clay refractory products</ENT>
              <ENT>a. Measure emissions of HF and HCl</ENT>
              <ENT O="xl">i. Method 26A of 40 CFR part 60, appendix A; or<LI O="xl">ii. Method 26 of 40 CFR part 60, appendix A; or</LI>
                <LI>iii. Method 320 of 40 CFR part 63, appendix A</LI>
              </ENT>
              <ENT>(1) Conduct the test while the kiln is operating at the maximum production level; and<LI>(2) You may use Method 26 of 40 CFR part 60, appendix A, only if no acid PM (e.g., HF or HCl dissolved in water droplets emitted by sources controlled by a wet scrubber) is present; and</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(3) If you use Method 320 of 40 CFR part 63, appendix A, you must follow the analyte spiking procedures of Section 13 of Method 320 unless you can demonstrate that the complete spiking procedure has been conducted at a similar source; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(4) Repeat the performance test if the affected source is controlled with a DLA and you change the source of the limestone used in the DLA.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. Perform a minimum of 3 test runs</ENT>
              <ENT>The appropriate test methods specified in items 1 and 14.a. of this table</ENT>
              <ENT>Each test run must be at least 1 hour in duration.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">15. Each new continuous kiln that is subject to the production-based HF and HCl emission limits specified in items 10.a. and 10.b. of Table 1 to this subpart</ENT>
              <ENT>a. Record the uncalcined clay processing rate</ENT>
              <ENT>i. Production data; and<LI>ii. Product formulation data that specify the mass fraction of uncalcined clay in the products that are processed during the performance test</LI>
              </ENT>
              <ENT>(1) Record the production rate (tons per hour of fired product); and<LI>(2) Calculate and record the average rate at which uncalcined clay is processed (tons per hour) for each test run; and</LI>
                <LI>(3) Calculate and record the 3-run average uncalcined clay processing rate as the average of the average uncalcined clay processing rates for each test run.</LI>
              </ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="126"/>
              <ENT I="22"/>
              <ENT>b. Determine the HF mass emissions rate at the outlet of the control device or in the stack</ENT>
              <ENT O="xl">i. Method 26A of 40 CFR part 60, appendix A; or<LI O="xl">ii. Method 26 of 40 CFR part 60, appendix A; or</LI>
                <LI>iii. Method 320 of 40 CFR part 63, appendix A</LI>
              </ENT>
              <ENT>Calculate the HF mass emissions rate for each test.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>c. Determine the 3-hour block average production-based HF emissions rate</ENT>
              <ENT O="xl">i. The HF mass emissions rate for each test run; and<LI>ii. The average uncalcined clay processing rate</LI>
              </ENT>
              <ENT>(1) Calculate the hourly production-based HF emissions rate for each test run using Equation 3 of § 63.9800(g)(3); and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(2) Calculate the 3-hour block average production-based HF emissions rate as the average of the hourly production-based HF emissions rates for each test run.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>d. Determine the HCl mass emissions rate at the outlet of the control device or in the stack</ENT>
              <ENT O="xl">i. Method 26A of 40 CFR part 60, appendix A; or<LI O="xl">ii. Method 26 of 40 CFR part 60, appendix A; or</LI>
                <LI>iii. Method 320 of 40 CFR part 63, appendix A</LI>
              </ENT>
              <ENT>Calculate the HCl mass emissions rate for each test run.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>e. Determine the 3-hour block average production-based HCl emissions rate</ENT>
              <ENT O="xl">i. The HCl mass emissions rate for each test run; and<LI>ii. The average uncalcined clay processing rate</LI>
              </ENT>
              <ENT>(1) Calculate the hourly production-based HCl emissions rate for each test run using Equation 3 of § 63.9800(g)(3); and<LI>(2) Calculate the 3-hour block average production-based HCl emissions rate as the average of the production-based HCl emissions rates for each test run.</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="01">16. Each new continuous kiln that is subject to the HF and HCl percentage reduction limits specified in items 10.a. and 10.b. of Table 1 to this subpart</ENT>
              <ENT>a. Measure the HF mass emissions rates at the inlet and outlet of the control device</ENT>
              <ENT O="xl">i. Method 26A of 40 CFR part 60, appendix A; or<LI O="xl">ii. Method 26 of 40 CFR part 60, appendix A; or</LI>
                <LI>iii. Method 320 of 40 CFR part 63, appendix A</LI>
              </ENT>
              <ENT>Calculate the HF mass emissions rates at the control device inlet and outlet for each test run.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. Determine the 3-hour block average HF percentage reduction</ENT>
              <ENT O="xl">i. The HF mass emissions rates at the inlet and outlet of the control device for each test run</ENT>
              <ENT>(1) Calculate the hourly HF percentage reduction using Equation 2 of § 63.9800(g)(2); and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(2) Calculate the 3-hour block average HF percentage reduction as the average of the HF percentage reductions for each test run.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>c. Measure the HCl mass emissions rates at the inlet and outlet of the control device</ENT>
              <ENT O="xl">i. Method 26A of 40 CFR part 60, appendix A; or<LI O="xl">ii. Method 26 of 40 CFR part 60, appendix A; or</LI>
                <LI>iii. Method 320 of 40 CFR part 63, appendix A</LI>
              </ENT>
              <ENT>Calculate the HCl mass emissions rates at the control device inlet and outlet for each test run.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl">d. Determine the 3-hour block average HCl percentage reduction.</ENT>
              <ENT>i. The HCl mass emissions rates at the inlet and outlet of the control device for each test run</ENT>
              <ENT>(1) Calculate the hourly HCl percentage reduction using Equation 2 of § 63.9800(g)(2); and<LI>(2) Calculate the 3-hour block average HCl percentage reduction as the average of HCl percentage reductions for each test run.</LI>
              </ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="127"/>
              <ENT I="01">17. Each new batch process kiln that is used to process clay refractory products</ENT>
              <ENT>a. Measure emissions of HF and HCl at the inlet and outlet of the control device</ENT>
              <ENT O="xl">i. Method 26A of 40 CFR part 60, appendix A; or<LI O="xl">ii. Method 26 of 40 CFR part 60, appendix A; or</LI>
                <LI>iii. Method 320 of 40 CFR part 63, appendix A</LI>
              </ENT>
              <ENT>(1) Conduct the test while the kiln is operating at the maximum production level; and<LI>(2) You may use Method 26 of 40 CFR part 60, appendix A, only if no acid PM (e.g., HF or HCl dissolved in water droplets emitted by sources controlled by a wet scrubber) is present; and</LI>
                <LI>(3) If you use Method 320 of 40 CFR part 63, you must follow the analyte spiking procedures of Section 13 of Method 320 unless you can demonstrate that the complete spiking procedure has been conducted at a similar source; and</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(4) Repeat the performance test if the affected source is controlled with a DLA and you change the source of the limestone used in the DLA.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. Perform a minimum of 2 test runs</ENT>
              <ENT>i. The appropriate test methods specified in items 1 and 17.a. of this table</ENT>
              <ENT>(1) Each test run must be conducted over a separate batch cycle unless you satisfy the requirements of § 63.9800(f)(3) and (4); and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(2) Each test run must consist of a series of 1-hour runs at the inlet and outlet of the control device, beginning with the start of a batch cycle, except as specified in item 17.b.i.4. of this table; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(3) Each test run must continue until the end of the batch cycle, except as specified in item 17.b.i.4. of this table; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(4) If you develop an emissions profile, as described in § 63.9802(b), you can limit each test run to the 3-hour peak HF emissions period.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>c. Determine the hourly HF and HCl mass emissions rates at the inlet and outlet of the control device</ENT>
              <ENT>i. The appropriate test methods specified in items 1 and 17.a. of this table</ENT>
              <ENT>Determine the hourly mass HF and HCl emissions rates at the inlet and outlet of the control device for each hour of each test run.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>d. Determine the 3-hour peak HF emissions period</ENT>
              <ENT>The hourly HF mass emissions rates at the inlet of the control device</ENT>
              <ENT>Select the period of 3 consecutive hours over which the sum of the hourly HF mass emissions rates at the control device inlet is greater than the sum of the hourly HF mass emissions rates at the control device inlet for any other period of 3 consecutive hours during the test run.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>e. Determine the 2-run block average HF percentage reduction for the emissions test</ENT>
              <ENT>i. The hourly average HF emissions rates at the inlet and outlet of the control device</ENT>
              <ENT>(1) Calculate the HF percentage reduction for each hour of the 3-hour peak HF emissions period using Equation 2 of § 63.9800(g)(2); and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(2) Calculate the average HF percentage reduction for each test run as the average of the hourly HF percentage reductions for the 3-hour peak HF emissions period for that run; and</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="128"/>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(3) Calculate the 2-run block average HF percentage reduction for the emission test as the average of the average HF percentage reductions for the two test runs.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>f. Determine the 2-run block average HCl percentage reduction for the emission test</ENT>
              <ENT>i. The hourly average HCl emissions rates at the inlet and outlet of the control device</ENT>
              <ENT>(1) Calculate the HCl percentage reduction for each hour of the 3-hour peak HF emissions period using Equation 2 § 63.9800(g)(2); and<LI>(2) Calculate the average HCl percentage reduction for each test run as the average of the hourly HCl percentage reductions for the 3-hour peak HF emissions period for that run; and</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(3) Calculate the 2-run block average HCl percentage reduction for the emission test as the average of the average HCl percentage reductions for the two test runs.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">18. Each new kiln that is used to process clay refractory products and is equipped with a DLA</ENT>
              <ENT>a. Establish the operating limit for the minimum pressure drop across the DLA</ENT>
              <ENT>Data from the pressure drop measurement device during the performance test</ENT>
              <ENT>(1) At least every 15 minutes, measure the pressure drop across the DLA; and<LI>(2) Provide at least one pressure drop measurement during at least three 15-minute periods per hour of testing; and</LI>
                <LI>(3) Calculate the hourly average pressure drop across the DLA for each hour of the performance test; and</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(4) Calculate and record the minimum pressure drop as the average of the hourly average pressure drops across the DLA for the two or three test runs, whichever applies.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. Establish the operating limit for the limestone feeder setting</ENT>
              <ENT>Data from the limestone feeder during the performance test</ENT>
              <ENT>(1) Ensure that limestone in the feed hopper, silo, and DLA is free-flowing at all times during the performance test; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(2) Establish the limestone feeder setting 1 week prior to the performance test; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(3) Record and maintain the feeder setting for the 1-week period that precedes the performance test and during the performance test.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">19. Each new kiln that is used to process clay refractory products and is equipped with a DIFF or DLS/FF</ENT>
              <ENT>a. Document conformance with specifications and requirements of the bag leak detection system</ENT>
              <ENT>Data from the installation and calibration of the bag leak detection system</ENT>
              <ENT>Submit analyses and supporting documentation demonstrating conformance with EPA guidance and specifications for bag leak detection systems as part of the Notification of Compliance Status.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. Establish the operating limit for the lime feeder setting</ENT>
              <ENT>i. Data from the lime feeder during the performance test</ENT>
              <ENT>(1) For continuous lime injection systems, ensure that lime in the feed hopper or silo is free-flowing at all times during the performance test; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(2) Record the feeder setting for the three test runs; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(3) If the feed rate setting varies during the three test runs, calculate and record the average feed rate for the two or three test runs, whichever applies.</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="129"/>
              <ENT I="01">20. Each new kiln that is used to process clay refractory products and is equipped with a wet scrubber</ENT>
              <ENT>a. Establish the operating limit for the minimum scrubber pressure drop</ENT>
              <ENT>i. Data from the pressure drop measurement device during the performance test</ENT>
              <ENT>(1) At least every 15 minutes, measure the pressure drop across the scrubber; and<LI>(2) Provide at least one pressure drop measurement during at least three 15-minute periods per hour of testing; and</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(3) Calculate the hourly average pressure drop across the scrubber for each hour of the performance test; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(4) Calculate and record the minimum pressure drop as the average of the hourly average pressure drops across the scrubber for the two or three test runs, whichever applies.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. Establish the operating limit for the minimum scrubber liquid pH</ENT>
              <ENT>i. Data from the pH measurement device during the performance test</ENT>
              <ENT>(1) At least every 15 minutes, measure scrubber liquid pH; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(2) Provide at least one pH measurement during at least three 15-minute periods per hour of testing; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(3) Calculate the hourly average pH values for each hour of the performance test; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(4) Calculate and record the minimum liquid pH as the average of the hourly average pH measurements for the two or three test runs, whichever applies.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>c. Establish the operating limit for the minimum scrubber liquid flow rate</ENT>
              <ENT>i. Data from the flow rate measurement device during the performance test</ENT>
              <ENT>(1) At least every 15 minutes, measure the scrubber liquid flow rate; and<LI>(2) Provide at least one flow rate measurement during at least three 15-minute periods per hour of testing; and</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(3) Calculate the hourly average liquid flow rate for each hour of the performance test; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(4) Calculate and record the minimum liquid flow rate as the average of the hourly average liquid flow rates for the two or three test runs, whichever applies.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>d. If chemicals are added to the scrubber liquid, establish the operating limit for the minimum scrubber chemical feed rate</ENT>
              <ENT>i. Data from the chemical feed rate measurement device during the performance test</ENT>
              <ENT>(1) At least every 15 minutes, measure the scrubber chemical feed rate; and<LI>(2) Provide at least one chemical feed rate measurement during at least three 15-minute periods per hour of testing; and</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(3) Calculate the hourly average chemical feed rate for each hour of the performance test; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl"/>
              <ENT>(4) Calculate and record the minimum chemical feed rate as the average of the hourly average chemical feed rates for the two or three test runs, whichever applies.</ENT>
            </ROW>
          </GPOTABLE>
        </APPENDIX>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. SSSSS, Table 5</EAR>
          <HD SOURCE="HED">Table 5 to Subpart SSSSS of Part 63—Initial Compliance With Emission Limits</HD>

          <P>As stated in § 63.9806, you must show initial compliance with the emission limits for affected sources according to the following table:<PRTPAGE P="130"/>
          </P>
          <GPOTABLE CDEF="s100,r100,r100" COLS="3" OPTS="L2">
            <BOXHD>
              <CHED H="1" O="L">For . . .</CHED>
              <CHED H="1" O="L">For the following emission limit . . .</CHED>
              <CHED H="1" O="L">You have demonstrated compliance if . . .</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">1. Each affected source listed in Table 1 to this subpart</ENT>
              <ENT>a. Each applicable emission limit listed in Table 1 to this subpart</ENT>
              <ENT>i. Emissions measured using the test methods specified in Table 4 to this subpart satisfy the applicable emission limits specified in Table 1 to this subpart; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>ii. You establish and have a record of the operating limits listed in Table 2 to this subpart over the performance test period; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>iii. You report the results of the performance test in the Notification of Compliance Status, as specified by § 63.9812(e)(1) and (2).</ENT>
            </ROW>
            <ROW>
              <ENT I="01">2. Each new or existing curing oven, shape dryer, and kiln that is used to process refractory products that use organic HAP; each new or existing coking oven and defumer that is used to produce pitch-impregnated refractory products; each new shape preheater that is used to produce pitch-impregnated refractory products; AND each new or existing process unit that is exhausted to a thermal or catalytic oxidizer that also controls emissions from an affected shape preheater or pitch working tank</ENT>
              <ENT>As specified in items 3 through 8 of this table</ENT>
              <ENT>You have satisfied the applicable requirements specified in items 3 through 8 of this table.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">3. Each affected continuous process unit that is subject to the THC emission concentration limit listed in item 2.a., 3.a., 4, or 5 of Table 1 to this subpart</ENT>
              <ENT>The average THC concentration must not exceed 20 ppmvd, corrected to 18 percent oxygen</ENT>
              <ENT>The 3-hour block average THC emission concentration measured during the performance test using Methods 25A and 3A is equal to or less than 20 ppmvd, corrected to 18 percent oxygen.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">4. Each affected continuous process unit that is subject to the THC percentage reduction limit listed in item 2.b. or 3.b. of Table 1 to this subpart</ENT>
              <ENT>The average THC percentage reduction must equal or exceed 95 percent</ENT>
              <ENT>The 3-hour block average THC percentage reduction measured during the performance test using Method 25A is equal to or greater than 95 percent.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">5. Each affected batch process unit that is subject to the THC emission concentration limit listed in item 6.a., 7.a., 8, or 9 of Table 1 to this subpart</ENT>
              <ENT>The average THC concentration must not exceed 20 ppmvd, corrected to 18 percent oxygen</ENT>
              <ENT>The 2-run block average THC emission concentration for the 3-hour peak emissions period measured during the performance test using Methods 25A and 3A is equal to or less than 20 ppmvd, corrected to 18 percent oxygen.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">6. Each affected batch process unit that is subject to the THC percentage reduction limit listed in item 6.b. or 7.b. of Table 1 to this subpart</ENT>
              <ENT>The average THC percentage reduction must equal or exceed 95 percent</ENT>
              <ENT>The 2-run block average THC percentage reduction for the 3-hour peak emissions period measured during the performance test using Method 25A is equal to or exceeds 95 percent.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">7. Each affected continuous or batch process unit that is equipped with a control device other than a thermal or catalytic oxidizer and is subject to the emission limit listed in item 3 or 7 of Table 1 to this subpart</ENT>
              <ENT O="xl">a. The average THC concentration must not exceed 20 ppmvd, corrected to 18 percent oxygen; or</ENT>
              <ENT O="xl">i. You have installed a THC CEMS at the outlet of the control device or in the stack of the affected source; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. The average THC percentage reduction must equal or exceed 95 percent</ENT>
              <ENT>ii. You have satisfied the requirements of PS-8 of 40 CFR part 60, appendix B.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">8. Each affected continuous or batch process unit that uses process changes to reduce organic HAP emissions and is subject to the emission limit listed in item 4 or 8 of Table 1 to this subpart</ENT>
              <ENT>The average THC concentration must not exceed 20 ppmvd, corrected to 18 percent oxygen</ENT>
              <ENT>i. You have installed a THC CEMS at the outlet of the control device or in the stack of the affected source; and<LI>ii. You have satisfied the requirements of PS-8 of 40 CFR part 60, appendix B.</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="01">9. Each new continuous kiln that is used to process clay refractory products</ENT>
              <ENT>a. The average HF emissions must not exceed 0.019 kg/Mg (0.038 lb/ton) of uncalcined clay processed; OR the average uncontrolled HF emissions must be reduced by at least 90 percent</ENT>
              <ENT>i. The 3-hour block average production-based HF emissions rate measured during the performance test using one of the methods specified in item 14.a.i. of Table 4 to this subpart is equal to or less than 0.019 kg/Mg (0.038 lb/ton) of uncalcined clay processed; or</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>ii. The 3-hour block average HF emissions reduction measured during the performance test is equal to or greater than 90 percent.</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="131"/>
              <ENT I="22"/>
              <ENT>b. The average HCl emissions must not exceed 0.091 kg/Mg (0.18 lb/ton) of uncalcined clay processed; OR the average uncontrolled HCl emissions must be reduced by at least 30 percent</ENT>
              <ENT>i. The 3-hour block average production-based HCl emissions rate measured during the performance test using one of the methods specified in item 14.a.i. of Table 4 to this subpart is equal to or less than 0.091 kg/Mg (0.18 lb/ton) of uncalcined clay processed; or</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>ii. The 3-hour block average HCl emissions reduction measured during the performance test is equal to or greater than 30 percent.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">10. Each new batch process kiln that is used to process clay refractory products</ENT>
              <ENT>a. The average uncontrolled HF emissions must be reduced by at least 90 percent</ENT>
              <ENT>The 2-run block average HF emission reduction measured during the performance test is equal to or greater than 90 percent.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. The average uncontrolled HCl emissions must be reduced by at least 30 percent</ENT>
              <ENT>The 2-run block average HCl emissions reduction measured during the performance test is equal to or greater than 30 percent.</ENT>
            </ROW>
          </GPOTABLE>
        </APPENDIX>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. SSSSS, Table 6</EAR>
          <HD SOURCE="HED">Table 6 to Subpart SSSSS of Part 63—Initial Compliance With Work Practice Standards</HD>
          <P>As stated in § 63.9806, you must show initial compliance with the work practice standards for affected sources according to the following table:</P>
          <GPOTABLE CDEF="s100,r100,r100" COLS="3" OPTS="L2">
            <BOXHD>
              <CHED H="1" O="L">For each . . .</CHED>
              <CHED H="1" O="L">For the following standard . . .</CHED>
              <CHED H="1" O="L">You have demonstrated initial compliance if . . .</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">1. Each affected source listed in Table 3 to this subpart</ENT>
              <ENT>a. Each applicable work practice standard listed in Table 3 to this subpart</ENT>
              <ENT>i. You have selected a method for performing each of the applicable work practice standards listed in Table 3 to this subpart; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>ii. You have included in your Initial Notification a description of the method selected for complying with each applicable work practice standard, as required by § 63.9(b); and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>iii. You submit a signed statement with the Notification of Compliance Status that you have implemented the applicable work practice standard listed in Table 3 to this subpart; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>iv. You have described in your OM&amp;M plan the method for complying with each applicable work practice standard specified in Table 3 to this subpart.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">2. Each basket or container that is used for holding fired refractory shapes in an existing shape preheater and autoclave during the pitch impregnation process</ENT>
              <ENT>a. Control POM emissions from any affected shape preheater</ENT>
              <ENT>i. You have implemented at least one of the work practice standards listed in item 1 of Table 3 to this subpart; and<LI>ii. You have established a system for recording the date and cleaning method for each time you clean an affected basket or container.</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="01">3. Each affected new or existing pitch working tank</ENT>
              <ENT>Control POM emissions</ENT>
              <ENT>You have captured and vented emissions from the affected pitch working tank to the device that is used to control emissions from an affected defumer or coking oven, or to a thermal or catalytic oxidizer that is comparable to the control device used on an affected defumer or coking oven.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">4. Each new or existing chromium refractory products kiln</ENT>
              <ENT>Minimize fuel-based HAP emissions</ENT>
              <ENT>You use natural gas, or equivalent, as the kiln fuel.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">5. Each existing clay refractory products kiln</ENT>
              <ENT>Minimize fuel-based HAP emissions</ENT>
              <ENT>You use natural gas, or equivalent, as the kiln fuel.</ENT>
            </ROW>
          </GPOTABLE>
        </APPENDIX>
        <APPENDIX>
          <PRTPAGE P="132"/>
          <EAR>Pt. 63, Subpt. SSSSS, Table 7</EAR>
          <HD SOURCE="HED">Table 7 to Subpart SSSSS of Part 63—Continuous Compliance with Emission Limits</HD>
          <P>As stated in § 63.9810, you must show continuous compliance with the emission limits for affected sources according to the following table:</P>
          <GPOTABLE CDEF="s100,r100,r100" COLS="3" OPTS="L2">
            <BOXHD>
              <CHED H="1" O="L">For . . .</CHED>
              <CHED H="1" O="L">For the following emission limit . . .</CHED>
              <CHED H="1" O="L">You must demonstrate continuous compliance by . . .</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">1. Each affected source listed in Table 1 to this subpart</ENT>
              <ENT>a. Each applicable emission limit listed in Table 1 to this subpart</ENT>
              <ENT>i. Collecting and recording the monitoring and process data listed in Table 2 (operating limits) to this subpart; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>ii. Reducing the monitoring and process data associated with the operating limits specified in Table 2 to this subpart; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>iii. Recording the results of any control device inspections; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>iv. Reporting, in accordance with § 63.9814(e), any deviation from the applicable operating limits specified in Table 2 to this subpart.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">2. Each new or existing curing oven, shape dryer, and kiln that is used to process refractory products that use organic HAP; each new or existing coking oven and defumer that is used to produce pitch-impregnated refractory products; each new shape preheater that is used to produce pitch-impregnated refractory products; AND each new or existing process unit that is exhausted to a thermal or catalytic oxidizer that also controls emissions from an affected shape preheater or pitch working tank</ENT>
              <ENT>As specified in items 3 though 7 of this table</ENT>
              <ENT>Satisfying the applicable requirements specified in items 3 through 7 of this table.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">3. Each affected process unit that is equipped with a thermal or catalytic oxidizer</ENT>
              <ENT>a. The average THC concentration must not exceed 20 ppmvd, corrected to 18 percent oxygen; OR the average THC percentage reduction must equal or exceed 95 percent</ENT>
              <ENT>i. Collecting the applicable data measured by the control device temperature monitoring system, as specified in items 5, 6, 8, and 9 of Table 8 to this subpart; and<LI>ii. Reducing the applicable data measured by the control device temperature monitoring system, as specified in items 5, 6, 8, and 9 of Table 8 to this subpart; and</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>iii. Maintaining the average control device operating temperature for the applicable averaging period specified in items 5, 6, 8, and 9 of Table 2 to this subpart at or above the minimum allowable operating temperature established during the most recent performance test.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">4. Each affected process unit that is equipped with a control device other than a thermal or catalytic oxidizer</ENT>
              <ENT>The average THC concentration must not exceed 20 ppmvd, corrected to 18 percent oxygen; OR the average THC performance reduction must equal or exceed 95 percent</ENT>
              <ENT>Operating and maintaining a THC CEMS at the outlet of the control device or in the stack of the affected source, according to the requirements of Procedure 1 of 40 CFR part 60, appendix F.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">5. Each affected process unit that uses process changes to meet the applicable emission limit</ENT>
              <ENT>The average THC concentration must not exceed 20 ppmvd, corrected to 18 percent oxygen</ENT>
              <ENT>Operating and maintaining a THC CEMS at the outlet of the control device or in the stack of the affected source, according to the requirements of Procedure 1 of 40 CFR part 60, appendix F.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">6. Each affected continuous process unit</ENT>
              <ENT>The average THC concentration must not exceed 20 ppmvd, corrected to 18 percent oxygen; OR the average THC percentage reduction must equal or exceed 95 percent</ENT>
              <ENT>Recording the organic HAP processing rate (pounds per hour) and the operating temperature of the affected source, as specified in items 3.b. and 3.c. of Table 4 to this subpart.</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="133"/>
              <ENT I="01">7. Each affected batch process unit</ENT>
              <ENT>The average THC concentration must not exceed 20 ppmvd, corrected to 18 percent oxygen; OR the average THC percentage reduction must equal or exceed 95 percent</ENT>
              <ENT>Recording the organic HAP processing rate (pounds per batch); and process cycle time for each batch cycle; and hourly average operating temperature of the affected source, as specified in items 8.b. through 8.d. of Table 4 to this subpart.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">8. Each kiln that is used to process clay refractory products</ENT>
              <ENT>As specified in items 9 through 11 of this table</ENT>
              <ENT>Satisfying the applicable requirements specified in items 9 through 11 of this table.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">9. Each affected kiln that is equipped with a DLA</ENT>
              <ENT O="xl">a. The average HF emissions must not exceed 0.019 kg/Mg (0.038 lb/ton) of uncalcined clay processed, OR the average uncontrolled HF emissions must be reduced by at least 90 percent; and<LI>b. The average HCl emissions must not exceed 0.091 kg/Mg (0.18 lb/ton) of uncalcined clay processed, or the average uncontrolled HCl emissions must be reduced by at least 30 percent</LI>
              </ENT>
              <ENT>i. Maintaining the pressure drop across the DLA at or above the minimum levels established during the most recent performance test; and<LI>ii. Verifying that the limestone hopper contains an adequate amount of free-flowing limestone by performing a daily visual check of the limestone in the feed hopper; and</LI>
                <LI>iii. Recording the limestone feeder setting daily to verify that the feeder setting is at or above the level established during the most recent performance test; and</LI>
                <LI>iv. Using the same grade of limestone as was used during the most recent performance test and maintaining records of the source and grade of limestone.</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="01">10. Each affected kiln that is equipped with a DIFF or DLS/FF</ENT>
              <ENT O="xl">a. The average HF emissions must not exceed 0.019 kg/Mg (0.038 lb/ton) of uncalcined clay processed; OR the average uncontrolled HF emissions must be reduced by at least 90 percent; and</ENT>
              <ENT>i. Verifying at least once each 8-hour shift that lime is free-flowing by means of a visual check, checking the output of a load cell, carrier gas/lime flow indicator, or carrier gas pressure drop measurement system; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. The average HCl emissions must not exceed 0.091 kg/Mg (0.18 lb/ton) of uncalcined clay processed; OR the average uncontrolled HCl emissions must be reduced by at least 30 percent</ENT>
              <ENT>ii. Recording feeder setting daily to verify that the feeder setting is at or above the level established during the most recent performance test; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>iii. Initiating corrective action within 1 hour of a bag leak detection system alarm AND completing corrective actions in accordance with the OM&amp;M plan, AND operating and maintaining the fabric filter such that the alarm does not engage for more than 5 percent of the total operating time in a 6-month block reporting period.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">11. Each affected kiln that is equipped with a wet scrubber</ENT>
              <ENT O="xl">a. The average HF emissions must not exceed 0.019 kg/Mg (0.038 lb/ton) of uncalcined clay processed; OR the average uncontrolled HF emissions must be reduced by at least 90 percent; and</ENT>
              <ENT>i. Maintaining the pressure drop across the scrubber, liquid pH, and liquid flow rate at or above the minimum levels established during the most recent performance test; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. The average HCl emissions must not exceed 0.091 kg/Mg (0.18 lb/ton) of uncalcined clay processed; OR the average uncontrolled HCl emissions must be reduced by at least 30 percent</ENT>
              <ENT>ii. If chemicals are added to the scrubber liquid, maintaining the average chemical feed rate at or above the minimum chemical feed rate established during the most recent performance test.</ENT>
            </ROW>
          </GPOTABLE>
        </APPENDIX>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. SSSSS, Table 8</EAR>
          <HD SOURCE="HED">Table 8 to Subpart SSSSS of Part 63—Continuous Compliance with Operating Limits</HD>

          <P>As stated in § 63.9810, you must show continuous compliance with the operating limits for affected sources according to the following table:<PRTPAGE P="134"/>
          </P>
          <GPOTABLE CDEF="s100,r100,r100" COLS="3" OPTS="L2">
            <BOXHD>
              <CHED H="1" O="L">For . . .</CHED>
              <CHED H="1" O="L">For the following operating limit . . .</CHED>
              <CHED H="1" O="L">You must demonstrate continuous compliance by . . .</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">1. Each affected source listed in Table 2 to this subpart</ENT>
              <ENT O="xl">a. Each applicable operating limit listed in Table 2 to this subpart.</ENT>
              <ENT>i. Maintaining all applicable process and control device operating parameters within the limits established during the most recent performance test; and<LI>ii. Conducting annually an inspection of all duct work, vents, and capture devices to verify that no leaks exist and that the capture device is operating such that all emissions are properly vented to the control device in accordance with the OM&amp;M plan.</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="01">2. Each affected continuous kiln that is equipped with a control device</ENT>
              <ENT>a. The operating limits specified in items 2.a. through 2.c. of Table 2 to this subpart</ENT>
              <ENT>i. Operating the control device on the affected kiln during all times except during periods of approved scheduled maintenance, as specified in § 63.9792(e); and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>ii. Minimizing HAP emissions from the affected kiln during all periods of scheduled maintenance of the kiln control device when the kiln is operating and the control device is out of service; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>iii. Minimizing the duration of all periods of scheduled maintenance of the kiln control device when the kiln is operating and the control device is out of service.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">3. Each new or existing curing oven, shape dryer, and kiln that is used to process refractory products that use organic HAP; each new or existing coking oven and defumer that is used to produce pitch-impregnated refractory products; each new shape preheater that is used to produce pitch-impregnated refractory products; AND each new or existing process unit that is exhausted to a thermal or catalytic oxidizer that also controls emissions from an affected shape preheater or pitch working tank</ENT>
              <ENT O="xl">As specified in items 4 through 9 of this table.</ENT>
              <ENT>Satisfying the applicable requirements specified in items 4 through 9 of this table.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">4. Each affected continuous process unit</ENT>
              <ENT>Maintain process operating parameters within the limits established during the most recent performance test</ENT>
              <ENT>i. Recording the organic HAP processing rate (pounds per hour); and<LI>ii. Recording the operating temperature of the affected source at least hourly; and</LI>
                <LI>iii. Maintaining the 3-hour block average organic HAP processing rate at or below the maximum organic HAP processing rate established during the most recent performance test.</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="01">5. Continuous process units that are equipped with a thermal oxidizer</ENT>
              <ENT>Maintain the 3-hour block average operating temperature in the thermal oxidizer combustion chamber at or above the minimum allowable operating temperature established during the most recent performance test</ENT>
              <ENT>i. Measuring and recording the thermal oxidizer combustion chamber temperature at least every 15 minutes; and<LI>ii. Calculating the hourly average thermal oxidizer combustion chamber temperature; and</LI>
                <LI>iii. Maintaining the 3-hour block average thermal oxidizer combustion chamber temperature at or above the minimum allowable operating temperature established during the most recent performance test; and</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>iv. Reporting, in accordance with § 63.9814(e), any 3-hour block average operating temperature measurements below the minimum allowable thermal oxidizer combustion chamber operating temperature established during the most recent performance test.</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="135"/>
              <ENT I="01">6. Continuous process units that are equipped with a catalytic oxidizer</ENT>
              <ENT>a. Maintain the 3-hour block average temperature at the inlet of the catalyst bed at or above the minimum allowable catalyst bed inlet temperature established during the most recent performance test</ENT>
              <ENT>i. Measuring and recording the temperature at the inlet of the catalyst bed at least every 15 minutes; and<LI>ii. Calculating the hourly average temperature at the inlet of the catalyst bed; and</LI>
                <LI>iii. Maintaining the 3-hour block average temperature at the inlet of the catalyst bed at or above the minimum allowable catalyst bed inlet temperature established during the most recent performance test; and</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>iv. Reporting, in accordance with § 63.9814(e), any 3-hour block average catalyst bed inlet temperature measurements below the minimum allowable catalyst bed inlet temperature established during the most recent performance; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>v. Checking the activity level of the catalyst at least every 12 months and taking any necessary corrective action, such as replacing the catalyst, to ensure that the catalyst is performing as designed.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">7. Each affected batch process unit</ENT>
              <ENT>Maintain process operating parameters within the limits established during the most recent performance test</ENT>
              <ENT>i. Recording the organic HAP processing rate (pounds per batch); and<LI>ii. Recording the hourly average operating temperature of the affected source; and</LI>
                <LI>iii. Recording the process cycle time for each batch cycle; and</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>iv. Maintaining the organic HAP processing rate at or below the maximum organic HAP processing rate established during the most recent performance test.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">8. Batch process units that are equipped with a thermal oxidizer</ENT>
              <ENT>Maintain the hourly average temperature in the thermal oxidizer combustion chamber at or above the hourly average temperature established for the corresponding 1-hour period of the cycle during the most recent performance test</ENT>
              <ENT>i. Measuring and recording the thermal oxidizer combustion chamber temperature at least every 15 minutes; and<LI>ii. Calculating the hourly average thermal oxidizer combustion chamber temperature; and</LI>
                <LI>iii. From the start of each batch cycle until 3 hours have passed since the process unit reached maximum temperature, maintaining the hourly average operating temperature in the thermal oxidizer combustion chamber at or above the minimum allowable operating temperature established for the corresponding period during the most recent performance test, as determined according to item 11 of Table 4 to this subpart; and</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>iv. For each subsequent hour of the batch cycle, maintaining the hourly average operating temperature in the thermal oxidizer combustion chamber at or above the minimum allowable operating temperature established for the corresponding hour during the most recent performance test, as specified in item 13 of Table 4 to this subpart; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>v. Reporting, in accordance with § 63.9814(e), any temperature measurements below the minimum allowable thermal oxidizer combustion chamber temperature measured during the most recent performance test.</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="136"/>
              <ENT I="01">9. Batch process units that are equipped with a catalytic oxidizer</ENT>
              <ENT>Maintain the hourly average temperature at the inlet of the catalyst bed at or above the corresponding hourly average temperature established for the corresponding 1-hour period of the cycle during the most recent performance test</ENT>
              <ENT>i. Measuring and recording temperatures at the inlet of the catalyst bed at least every 15 minutes; and<LI>ii. Calculating the hourly average temperature at the inlet of the catalyst bed; and</LI>
                <LI>iii. From the start of each batch cycle until 3 hours have passed since the process unit reached maximum temperature, maintaining the hourly average operating temperature at the inlet of the catalyst bed at or above the minimum allowable bed inlet temperature established for the corresponding period during the most recent performance test, as determined according to item 12 of Table 4 to this subpart; and</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>iv. For each subsequent hour of the batch cycle, maintaining the hourly average operating temperature at the inlet of the catalyst bed at or above the minimum allowable bed inlet temperature established for the corresponding hour during the most recent performance test, as specified in item 13 of Table 4 to this subpart; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>v. Reporting, in accordance with § 63.9814(e), any catalyst bed inlet temperature measurements below the minimum allowable bed inlet temperature measured during the most recent performance test; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>vi. Checking the activity level of the catalyst at least every 12 months and taking any necessary corrective action, such as replacing the catalyst, to ensure that the catalyst is performing as designed.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">10. Each new kiln that is used to process clay refractory products</ENT>
              <ENT>As specified in items 11 through 13 of this table</ENT>
              <ENT>Satisfying the applicable requirements specified in items 11 through 13 of this table.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">11. Each new kiln that is equipped a DLA</ENT>
              <ENT>a. Maintain the average pressure drop across the DLA for each 3-hour block period at or above the minimum pressure drop established during the most recent performance test</ENT>
              <ENT>i. Collecting the DLA pressure drop data, as specified in item 18.a. of Table 4 to this subpart; and<LI>ii. Reducing the DLA pressure drop data to 1-hour and 3-hour block averages; and</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>iii. Maintaining the 3-hour block average pressure drop across the DLA at or above the minimum pressure drop established during the most recent performance test.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. Maintain free-flowing limestone in the feed hopper, silo, and DLA</ENT>
              <ENT>Verifying that the limestone hopper has an adequate amount of free-flowing limestone by performing a daily visual check of the limestone hopper.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>c. Maintain the limestone feeder setting at or above the level established during the most recent performance test</ENT>
              <ENT>Recording the limestone feeder setting at least daily to verify that the feeder setting is being maintained at or above the level established during the most recent performance test.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>d. Use the same grade of limestone from the same source as was used during the most recent performance test</ENT>
              <ENT>Using the same grade of limestone as was used during the most recent performance test and maintaining records of the source and grade of limestone.</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="137"/>
              <ENT I="01">12. Each new kiln that is equipped with a DIFF or DLS/FF</ENT>
              <ENT>a. Initiate corrective action within 1 hour of a bag leak detection system alarm and complete corrective actions in accordance with the OM&amp;M plan; AND operate and maintain the fabric filter such that the alarm does not engage for more than 5 percent of the total operating time in a 6-month block reporting period</ENT>
              <ENT>i. Initiating corrective action within 1 hour of a bag leak detection system alarm and completing corrective actions in accordance with the OM&amp;M plan; and<LI>ii. Operating and maintaining the fabric filter such that the alarm does not engage for more than 5 percent of the total operating time in a 6-month block reporting period; in calculating this operating time fraction, if inspection of the fabric filter demonstrates that no corrective action is required, no alarm time is counted; if corrective action is required, each alarm shall be counted as a minimum of 1 hour; if you take longer than 1 hour to initiate corrective action, the alarm time shall be counted as the actual amount of time taken by you to initiate corrective action.</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. Maintain free-flowing lime in the feed hopper or silo at all times for continuous injection systems; AND maintain feeder setting at or above the level established during the most recent performance test for continuous injection systems</ENT>
              <ENT>i. Verifying at least once each 8-hour shift that lime is free-flowing via a load cell, carrier gas/lime flow indicator, carrier gas pressure drop measurement system, or other system; recording all monitor or sensor output, and if lime is found not to be free flowing, promptly initiating and completing corrective actions; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>ii. Recording the feeder setting once each day of operation to verify that the feeder setting is being maintained at or above the level established during the most recent performance test.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">13. Each new kiln that is used to process clay refractory products and is equipped with a wet scrubber</ENT>
              <ENT>a. Maintain the average pressure drop across the scrubber for each 3-hour block period at or above the minimum pressure drop established during the most recent performance test</ENT>
              <ENT>i. Collecting the scrubber pressure drop data, as specified in item 20.a. of Table 4 to this subpart; and<LI>ii. Reducing the scrubber pressure drop data to 1-hour and 3-hour block averages; and</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>iii. Maintaining the 3-hour block average scrubber pressure drop at or above the minimum pressure drop established during the most recent performance test.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. Maintain the average scrubber liquid pH for each 3-hour block period at or above the minimum scrubber liquid pH established during the most recent performance test</ENT>
              <ENT>i. Collecting the scrubber liquid pH data, as specified in item 20.b. of Table 4 to this subpart; and<LI>ii. Reducing the scrubber liquid pH data to 1-hour and 3-hour block averages; and</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>iii. Maintaining the 3-hour block average scrubber liquid pH at or above the minimum scrubber liquid pH established during the most recent performance test.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>c. Maintain the average scrubber liquid flow rate for each 3-hour block period at or above the minimum scrubber liquid flow rate established during the most recent performance test</ENT>
              <ENT>i. Collecting the scrubber liquid flow rate data, as specified in item 20.c. of Table 4 to this subpart; and<LI>ii. Reducing the scrubber liquid flow rate data to 1-hour and 3-hour block averages; and</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>iii. Maintaining the 3-hour block average scrubber liquid flow rate at or above the minimum scrubber liquid flow rate established during the most recent performance test.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>d. If chemicals are added to the scrubber liquid, maintain the average scrubber chemical feed rate for each 3-hour block period at or above the minimum scrubber chemical feed rate established during the most recent performance test</ENT>
              <ENT>i. Collecting the scrubber chemical feed rate data, as specified in item 20.d. of Table 4 to this subpart; and<LI>ii. Reducing the scrubber chemical feed rate data to 1-hour and 3-hour block averages; and</LI>
              </ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="138"/>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>iii. Maintaining the 3-hour block average scrubber chemical feed rate at or above the minimum scrubber chemical feed rate established during the most recent performance test.</ENT>
            </ROW>
          </GPOTABLE>
        </APPENDIX>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. SSSSS, Table 9</EAR>
          <HD SOURCE="HED">Table 9 to Subpart SSSSS of Part 63—Continuous Compliance With Work Practice Standards</HD>
          <P>As stated in § 63.9810, you must show continuous compliance with the work practice standards for affected sources according to the following table:</P>
          <GPOTABLE CDEF="s100,r100,r100" COLS="3" OPTS="L2">
            <BOXHD>
              <CHED H="1" O="L">For . . .</CHED>
              <CHED H="1" O="L">For the following work practice standard . . .</CHED>
              <CHED H="1" O="L">You must demonstrate continuous compliance by . . .</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">1. Each affected source listed in Table 3 to this subpart</ENT>
              <ENT>Each applicable work practice requirement listed in Table 3 to this subpart</ENT>
              <ENT>i. Performing each applicable work practice standard listed in Table 3 to this subpart; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>ii. Maintaining records that document the method and frequency for complying with each applicable work practice standard listed in Table 3 to this subpart, as required by §§ 63.10(b) and 63.9816(c)(2).</ENT>
            </ROW>
            <ROW>
              <ENT I="01">2. Each basket or container that is used for holding fired refractory shapes in an existing shape preheater and autoclave during the pitch impregnation process</ENT>
              <ENT>Control POM emissions from any affected shape preheater</ENT>
              <ENT>i. Controlling emissions from the volatilization of residual pitch by implementing one of the work practice standards listed in item 1 of Table 3 to this subpart; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>ii. Recording the date and cleaning method each time you clean an affected basket or container.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">3. Each new or existing pitch working tank</ENT>
              <ENT>Control POM emissions</ENT>
              <ENT>Capturing and venting emissions from the affected pitch working tank to the control device that is used to control emissions from an affected defumer or coking oven, or to a thermal or catalytic oxidizer that is comparable to the control device used on an affected defumer or coking oven.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">4. Each new or existing chromium refractory products kiln</ENT>
              <ENT>Minimize fuel-based HAP emissions</ENT>
              <ENT>i. Using natural gas, or equivalent, as the kiln fuel at all times except during periods of natural gas curtailment or supply interruption; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>ii. If you intend to use an alternative fuel, submitting a notification of alternative fuel use within 48 hours of the declaration of a per-iod of natural gas curtailment or supply interruption, as defined in § 63.9824; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>iii. Submitting a report of alternative fuel use within 10 working days after terminating the use of the alternative fuel, as specified in § 63.9814(g).</ENT>
            </ROW>
            <ROW>
              <ENT I="01">5. Each existing clay refractory products kiln</ENT>
              <ENT>Minimize fuel-based HAP emissions</ENT>
              <ENT>i. Using natural gas, or equivalent, as the kiln fuel at all times except during periods of natural gas curtailment or supply interruption; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>ii. If you intend to use an alternative fuel, submitting a notification of alternative fuel use within 48 hours of the declaration of a per-iod of natural gas curtailment or supply interruption, as defined in § 63.9824; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT>iii. Submitting a report of alternative fuel use within 10 working days after terminating the use of the alternative fuel, as specified in § 63.9814(g).</ENT>
            </ROW>
          </GPOTABLE>
        </APPENDIX>
        <APPENDIX>
          <PRTPAGE P="139"/>
          <EAR>Pt. 63, Subpt. SSSSS, Table 10</EAR>
          <HD SOURCE="HED">Table 10 to Subpart SSSSS of Part 63—Requirements for Reports</HD>
          <P>As stated in § 63.9814, you must comply with the requirements for reports in the following table:</P>
          <GPOTABLE CDEF="s100,r100,r100" COLS="3" OPTS="L2">
            <BOXHD>
              <CHED H="1" O="L">You must submit a(n) . . .</CHED>
              <CHED H="1" O="L">The report must contain . . .</CHED>
              <CHED H="1" O="L">You must submit the report . . .</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">1. Compliance report</ENT>
              <ENT>The information in § 63.9814(c) through (f)</ENT>
              <ENT>Semiannually according to the requirements in § 63.9814(a) through (f).</ENT>
            </ROW>
            <ROW>
              <ENT I="01">2. Immediate startup, shutdown, and malfunction report if you had a startup, shutdown, or malfunction during the reporting period that is not consistent with your SSMP</ENT>
              <ENT>a. Actions taken for the event</ENT>
              <ENT>By fax or telephone within 2 working days after starting actions inconsistent with the plan.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. The information in § 63.10(d)(5)(ii)</ENT>
              <ENT>By letter within 7 working days after the end of the event unless you have made alternative arrangements with the permitting authority.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">3. Report of alternative fuel use</ENT>
              <ENT>The information in § 63.9814(g) and items 4 and 5 of Table 9 to this subpart</ENT>
              <ENT>If you are subject to the work practice standard specified in item 3 or 4 of Table 3 to this subpart, and you use an alternative fuel in the affected kiln, by letter within 10 working days after terminating the use of the alternative fuel.</ENT>
            </ROW>
          </GPOTABLE>
        </APPENDIX>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. SSSSS, Table 11</EAR>
          <HD SOURCE="HED">Table 11 to Subpart SSSSS of Part 63—Applicability of General Provisions to Subpart SSSSS</HD>
          <P>As stated in § 63.9820, you must comply with the applicable General Provisions requirements according to the following table:</P>
          <GPOTABLE CDEF="s40,r100,r100,r50" COLS="4" OPTS="L2">
            <BOXHD>
              <CHED H="1">Citation</CHED>
              <CHED H="1">Subject</CHED>
              <CHED H="1">Brief description</CHED>
              <CHED H="1">Applies to subpart SSSSS</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">§ 63.1</ENT>
              <ENT>Applicability</ENT>
              <ENT/>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.2</ENT>
              <ENT>Definitions</ENT>
              <ENT/>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.3</ENT>
              <ENT>Units and Abbreviations</ENT>
              <ENT/>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.4</ENT>
              <ENT>Prohibited Activities</ENT>
              <ENT>Compliance date; circumvention, severability</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.5</ENT>
              <ENT>Construction/Reconstruction</ENT>
              <ENT>Applicability; applications; approvals</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(a)</ENT>
              <ENT>Applicability</ENT>
              <ENT>General Provisions (GP) apply unless compliance extension; GP apply to area sources that become major</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(b)(1)-(4)</ENT>
              <ENT>Compliance Dates for New and Reconstructed Sources</ENT>
              <ENT>Standards apply at effective date; 3 years after effective date; upon startup; 10 years after construction or reconstruction commences for section 112(f)</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(b)(5)</ENT>
              <ENT>Notification</ENT>
              <ENT/>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(b)(6)</ENT>
              <ENT O="xl">[Reserved]</ENT>
              <ENT O="xl"/>
              <ENT/>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(b)(7)</ENT>
              <ENT>Compliance Dates for New and Reconstructed Area Sources That Become Major</ENT>
              <ENT>Area sources that become major must comply with major source standards immediately upon becoming major, regardless of whether required to comply when they were area sources</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(c)(1)-(2)</ENT>
              <ENT>Compliance Dates for Existing Sources</ENT>
              <ENT>Comply according to date in subpart, which must be no later than 3 years after effective date; for section 112(f) standards, comply within 90 days of effective date unless compliance extension</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(c)(3)-(4)</ENT>
              <ENT O="xl">[Reserved]</ENT>
              <ENT O="xl"/>
              <ENT/>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(c)(5)</ENT>
              <ENT>Compliance Dates for Existing Area Sources That Become Major</ENT>
              <ENT>Area sources that become major must comply with major source standards by date indicated in subpart or by equivalent time period (for example, 3 years)</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(d)</ENT>
              <ENT O="xl">[Reserved]</ENT>
              <ENT O="xl"/>
              <ENT/>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(e)(1)-(2)</ENT>
              <ENT>Operation &amp; Maintenance</ENT>
              <ENT>Operate to minimize emissions at all times; correct malfunctions as soon as practicable; requirements independently enforceable; information Administrator will use to determine if operation and maintenance requirements were met</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="140"/>
              <ENT I="01">§ 63.6(e)(3)</ENT>
              <ENT>Startup, Shutdown, and Malfunction Plan (SSMP)</ENT>
              <ENT/>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(f)(1)</ENT>
              <ENT>Compliance Except During SSM</ENT>
              <ENT>You must comply with emission standards at all times except during SSM</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(f)(2)-(3)</ENT>
              <ENT>Methods for Determining Compliance</ENT>
              <ENT>Compliance based on performance test, operation and maintenance plans, records, inspection</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(g)(1)-(3)</ENT>
              <ENT>Alternative Standard</ENT>
              <ENT O="xl">Procedures for getting an alternative standard.</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(h)(1)-(9)</ENT>
              <ENT>Opacity/Visible Emission (VE) Standards</ENT>
              <ENT/>
              <ENT>Not applicable.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(i)(1)-(14)</ENT>
              <ENT>Compliance Extension</ENT>
              <ENT>Procedures and criteria for Administrator to grant compliance extension</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(j)</ENT>
              <ENT>Presidential Compliance Exemption</ENT>
              <ENT>President may exempt source category</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(a)(1)-(2)</ENT>
              <ENT>Performance Test Dates</ENT>
              <ENT>Dates for conducting initial performance testing and other compliance demonstrations; must conduct 180 days after first subject to rule</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(a)(3)</ENT>
              <ENT>Section 114 Authority</ENT>
              <ENT>Administrator may require a performance test under CAA section 114 at any time</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(b)(1)</ENT>
              <ENT>Notification of Performance Test</ENT>
              <ENT>Must notify Administrator 60 days before the test</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(b)(2)</ENT>
              <ENT>Notification of Rescheduling</ENT>
              <ENT>Must notify Administrator 5 days before scheduled date and provide rescheduled date</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(c)</ENT>
              <ENT>Quality Assurance/Test Plan</ENT>
              <ENT>Requirements; test plan approval procedures; performance audit requirements; internal and external QA procedures for testing</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(d)</ENT>
              <ENT>Testing Facilities</ENT>
              <ENT/>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(e)(1)</ENT>
              <ENT>Conditions for Conducting Performance Tests</ENT>
              <ENT>Performance tests must be conducted under representative conditions; cannot conduct performance tests during SSM; not a violation to exceed standard during SSM</ENT>
              <ENT>No, § 63.9800 specifies requirements; Yes; Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(e)(2)</ENT>
              <ENT>Conditions for Conducting Performance Tests</ENT>
              <ENT>Must conduct according to subpart and EPA test methods unless Administrator approves alternative</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(e)(3)</ENT>
              <ENT>Test Run Duration</ENT>
              <ENT>Must have three test runs of at least 1 hour each; compliance is based on arithmetic mean of three runs; conditions when data from an additional test run can be used</ENT>
              <ENT>Yes; Yes, except where specified in § 63.9800 for batch process sources; Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(f)</ENT>
              <ENT>Alternative Test Method</ENT>
              <ENT/>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(g)</ENT>
              <ENT>Performance Test Data Analysis</ENT>
              <ENT/>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(h)</ENT>
              <ENT>Waiver of Test</ENT>
              <ENT/>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(a)(1)</ENT>
              <ENT>Applicability of Monitoring Requirements</ENT>
              <ENT/>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(a)(2)</ENT>
              <ENT>Performance Specifications</ENT>
              <ENT>Performance Specifications in appendix B of 40 CFR part 60 apply</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(a)(3)</ENT>
              <ENT O="xl">[Reserved]</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(a)(4)</ENT>
              <ENT>Monitoring with Flares</ENT>
              <ENT/>
              <ENT>Not applicable.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(b)(1)</ENT>
              <ENT>Monitoring</ENT>
              <ENT>Must conduct monitoring according to standard unless Administrator approves alternative</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(b)(2)-(3)</ENT>
              <ENT>Multiple Effluents and Multiple Monitoring Systems</ENT>
              <ENT>Specific requirements for installing and reporting on monitoring systems</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c)(1)</ENT>
              <ENT>Monitoring System Operation and Maintenance</ENT>
              <ENT>Maintenance consistent with good air pollution control practices</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c)(1)(i)</ENT>
              <ENT>Routine and Predictable SSM</ENT>
              <ENT>Reporting requirements for SSM when action is described in SSMP</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c)(1)(ii)</ENT>
              <ENT>SSM not in SSMP</ENT>
              <ENT>Reporting requirements for SSM when action is not described in SSMP</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c)(1)(iii)</ENT>
              <ENT>Compliance with Operation and Maintenance Requirements</ENT>
              <ENT>How Administrator determines if source is complying with operation and maintenance requirements</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c)(2)-(3)</ENT>
              <ENT>Monitoring System Installation</ENT>
              <ENT>Must install to get representative emission and parameter measurements</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c)(4)</ENT>
              <ENT>CMS Requirements</ENT>
              <ENT/>
              <ENT>No, § 63.9808 specifies requirements.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c)(5)</ENT>
              <ENT>COMS Minimum Procedures</ENT>
              <ENT/>
              <ENT>Not applicable.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c)(6)</ENT>
              <ENT>CMS Requirements</ENT>
              <ENT/>
              <ENT>Applies only to sources required to install and operate a THC CEMS.</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="141"/>
              <ENT I="01">§ 63.8(c)(7)(i)(A)</ENT>
              <ENT>CMS Requirements</ENT>
              <ENT/>
              <ENT>Applies only to sources required to install and operate a THC CEMS.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c)(7)(i)(B)</ENT>
              <ENT>CMS Requirements</ENT>
              <ENT/>
              <ENT>Applies only to sources required to install and operate a THC CEMS.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c)(7)(i)(C)</ENT>
              <ENT>CMS Requirements</ENT>
              <ENT/>
              <ENT>Not applicable.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c)(7)(ii)</ENT>
              <ENT>CMS Requirements</ENT>
              <ENT>Corrective action required when CMS is out of control</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c)(8)</ENT>
              <ENT>CMS Requirements</ENT>
              <ENT/>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(d)</ENT>
              <ENT>CMS Quality Control</ENT>
              <ENT/>
              <ENT>Applies only to sources required to install and operate a THC CEMS.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(e)</ENT>
              <ENT>CMS Performance Evaluation</ENT>
              <ENT/>
              <ENT>Applies only to sources required to install and operate a THC CEMS.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(f)(1)-(5)</ENT>
              <ENT>Alternative Monitoring Method</ENT>
              <ENT/>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(f)(6)</ENT>
              <ENT>Alternative to Relative Accuracy Test</ENT>
              <ENT/>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(g)</ENT>
              <ENT>Data Reduction</ENT>
              <ENT/>
              <ENT>Applies only to sources required to install and operate a THC CEMS.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(a)</ENT>
              <ENT>Notification Requirements</ENT>
              <ENT/>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(b)(1)-(5)</ENT>
              <ENT>Initial Notifications</ENT>
              <ENT/>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(c)</ENT>
              <ENT>Request for Compliance Extension</ENT>
              <ENT/>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(d)</ENT>
              <ENT>Notification of Special Compliance Requirements for New Source</ENT>
              <ENT/>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(e)</ENT>
              <ENT>Notification of Performance Test</ENT>
              <ENT>Notify Administrator 60 days prior</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(f)</ENT>
              <ENT>Notification of VE/Opacity Test</ENT>
              <ENT/>
              <ENT>Not applicable.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(g)</ENT>
              <ENT>Additional Notifications When Using CMS</ENT>
              <ENT/>
              <ENT>Applies only to sources required to install and operate a THC CEMS.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(h)</ENT>
              <ENT>Notification of Compliance Status</ENT>
              <ENT/>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(i)</ENT>
              <ENT>Adjustment of Submittal Deadlines</ENT>
              <ENT/>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(j)</ENT>
              <ENT>Change in Previous Information</ENT>
              <ENT/>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(a)</ENT>
              <ENT>Recordkeeping/Reporting</ENT>
              <ENT/>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(1)</ENT>
              <ENT>Recordkeeping/Reporting</ENT>
              <ENT/>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(2)(i)-(v)</ENT>
              <ENT>Records Related to Startup, Shutdown, and Malfunction</ENT>
              <ENT/>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(2)(vi) and (x-xi)</ENT>
              <ENT>CMS Records</ENT>
              <ENT/>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(2)(vii)-(ix)</ENT>
              <ENT>Records</ENT>
              <ENT>Measurements to demonstrate compliance with emission limitations; performance test, performance evaluation, and visible emission observation results; measurements to determine conditions of performance tests and performance evaluations</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(2)(xii)</ENT>
              <ENT>Records</ENT>
              <ENT>Records when under waiver</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(2)(xiii)</ENT>
              <ENT>Records</ENT>
              <ENT>Records when using alternative to relative accuracy test</ENT>
              <ENT>Not applicable.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(2)(xiv)</ENT>
              <ENT>Records</ENT>
              <ENT>All documentation supporting Initial Notification and Notification of Compliance Status</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(3)</ENT>
              <ENT>Records</ENT>
              <ENT>Applicability Determinations</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(c)(1)-(6), (9)-(15)</ENT>
              <ENT>Records</ENT>
              <ENT>Additional Records for CMS</ENT>
              <ENT>Not applicable.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(c)(7)-(8)</ENT>
              <ENT>Records</ENT>
              <ENT>Records of excess emissions and parameter monitoring exceedances for CMS</ENT>
              <ENT>No, § 63.9816 specifies requirements.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(d)(1)</ENT>
              <ENT>General Reporting Requirements</ENT>
              <ENT>Requirements for reporting</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(d)(2)</ENT>
              <ENT>Report of Performance Test Results</ENT>
              <ENT>When to submit to Federal or State authority</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(d)(3)</ENT>
              <ENT>Reporting Opacity or VE Observations</ENT>
              <ENT/>
              <ENT>Not applicable.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(d)(4)</ENT>
              <ENT>Progress Reports</ENT>
              <ENT>Must submit progress reports on schedule if under compliance extension</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(d)(5)</ENT>
              <ENT>Startup, Shutdown, and Malfunction Reports</ENT>
              <ENT>Contents and submission</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="142"/>
              <ENT I="01">§ 63.10(e)(1)-(2)</ENT>
              <ENT>Additional CMS Reports</ENT>
              <ENT/>
              <ENT>Applies only to sources required to install and operate a THC CEMS.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(e)(3)</ENT>
              <ENT>Reports</ENT>
              <ENT/>
              <ENT>No, § 63.9814 specifies requirements.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(e)(4)</ENT>
              <ENT>Reporting COMS data</ENT>
              <ENT/>
              <ENT>Not applicable.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(f)</ENT>
              <ENT>Waiver for Recordkeeping/Reporting</ENT>
              <ENT/>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.11</ENT>
              <ENT>Flares</ENT>
              <ENT/>
              <ENT>Not applicable.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.12</ENT>
              <ENT>Delegation</ENT>
              <ENT/>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.13</ENT>
              <ENT>Addresses</ENT>
              <ENT/>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.14</ENT>
              <ENT>Incorporation by Reference</ENT>
              <ENT/>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.15</ENT>
              <ENT>Availability of Information</ENT>
              <ENT/>
              <ENT>Yes.</ENT>
            </ROW>
          </GPOTABLE>
        </APPENDIX>
      </SUBPART>
      <SUBPART>
        <HD SOURCE="HED">Subpart TTTTT—National Emissions Standards for Hazardous Air Pollutants for Primary Magnesium Refining</HD>
        <SOURCE>
          <HD SOURCE="HED">Source:</HD>
          <P>68 FR 58620, Oct. 10, 2003, unless otherwise noted.</P>
        </SOURCE>
        <SUBJGRP>
          <HD SOURCE="HED">What This Subpart Covers</HD>
          <SECTION>
            <SECTNO>§ 63.9880</SECTNO>
            <SUBJECT>What is the purpose of this subpart?</SUBJECT>
            <P>This subpart establishes national emission standards for hazardous air pollutants (NESHAP) for primary magnesium refineries. This subpart also establishes requirements to demonstrate initial and continuous compliance with all applicable emission limitations, work practice standards, and operation and maintenance requirements.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9881</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <P>You are subject to this subpart if you own or operate a primary magnesium refinery that is (or is part of) a major source of hazardous air pollutant (HAP) emissions. Your primary magnesium refinery is a major source of HAP if it emits or has the potential to emit any single HAP at a rate of 10 tons or more per year or any combination of HAP at a rate of 25 tons or more per year.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9882</SECTNO>
            <SUBJECT>What parts of my plant does this subpart cover?</SUBJECT>
            <P>(a) The affected sources are each new and existing primary magnesium refining facility.</P>
            <P>(b) This subpart covers emissions from each spray dryer stack, magnesium chloride storage bins scrubber stack, melt/reactor system stack, and launder off-gas system stack at your primary magnesium refining facility. This subpart also covers fugitive dust emissions.</P>
            <P>(c) Each primary magnesium refining facility is existing if you commenced construction or reconstruction of the affected source before January 22, 2003.</P>
            <P>(d) Each primary magnesium refining facility is new if you commence construction or reconstruction of the affected source on or after January 22, 2003. An affected source is reconstructed if it meets the definition of reconstruction in § 63.2.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9883</SECTNO>
            <SUBJECT>When do I have to comply with this subpart?</SUBJECT>
            <P>(a) If you have an existing source, you must comply with each emission limitation, work practice standard, and operation and maintenance requirement in this subpart that applies to you no later than October 11, 2004.</P>
            <P>(b) If you have a new affected source and its initial startup date is on or before October 11, 2003, you must comply with each emission limitation, work practice standard, and operation and maintenance requirement in this subpart that applies to you by October 10, 2003.</P>
            <P>(c) If you have a new affected source and its initial startup date is after October 10, 2003, you must comply with each emission limitation, work practice standard, and operation and maintenance requirement in this subpart that applies to you upon initial startup.</P>

            <P>(d) If your primary magnesium refinery is an area source that becomes a major source of HAP, the compliance <PRTPAGE P="143"/>dates in paragraphs (d)(1) and (2) of this section apply to you:</P>
            <P>(1) Any portion of the existing primary magnesium refinery that is a new affected source or a new reconstructed source must be in compliance with this subpart upon startup.</P>
            <P>(2) All other parts of the primary magnesium refinery must be in compliance with this subpart no later than 2 years after it becomes a major source.</P>
            <P>(e) You must meet the notification and schedule requirements in § 63.9930. Several of these notifications must be submitted before the compliance date for your affected source.</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Emission Limitations and Work Practice Standards</HD>
          <SECTION>
            <SECTNO>§ 63.9890</SECTNO>
            <SUBJECT>What emission limitations must I meet?</SUBJECT>
            <P>(a) You must meet each emission limit in Table 1 to this subpart that applies to you.</P>

            <P>(b) For each wet scrubber applied to meet any particulate matter, particulate matter less than 10 microns (PM<E T="52">10</E>), chlorine, hydrochloric acid, or dioxins/furans emission limit in Table 1 to this subpart, you must maintain the hourly average pressure drop and scrubber liquid flow rate at or above the minimum level established during the initial or subsequent performance test.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9891</SECTNO>
            <SUBJECT>What work practice standards must I meet for my fugitive dust sources?</SUBJECT>
            <P>(a) You must prepare and at all times operate according to a fugitive dust emissions control plan that describes in detail the measures that will be put in place to control fugitive dust emissions from all unpaved roads and other unpaved operational areas.</P>
            <P>(b) You must submit a copy of your fugitive dust emissions control plan for approval to the Administrator on or before the applicable compliance date for the affected source as specified in § 63.9883. The requirement to operate according to the fugitive dust emissions control plan must be incorporated by reference in the source's operating permit issued by the permitting authority under 40 CFR part 70 or 40 CFR part 71.</P>
            <P>(c) You can use an existing fugitive dust emissions control plan provided it meets the requirements in paragraphs (c)(1) through (3) of this section.</P>
            <P>(1) The plan satisfies the requirements of paragraph (a) of this section.</P>
            <P>(2) The plan describes the current measures to control fugitive dust emission sources.</P>
            <P>(3) The plan has been approved as part of a State implementation plan or title V permit.</P>
            <P>(d) You must maintain a current copy of the fugitive dust emissions control plan on-site and available for inspection upon request. You must keep the plan for the life of the affected source or until the affected source is no longer subject to the requirements of this subpart.</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Operation and Maintenance Requirements</HD>
          <SECTION>
            <SECTNO>§ 63.9900</SECTNO>
            <SUBJECT>What are my operation and maintenance requirements?</SUBJECT>
            <P>(a) As required by § 63.6(e)(1)(i), you must always operate and maintain your affected source, including air pollution control and monitoring equipment, in a manner consistent with good air pollution control practices for minimizing emissions at least to the levels required by this subpart.</P>
            <P>(b) You must prepare and operate at all times according to a written operation and maintenance plan for each control device subject to an operating limit in § 63.9890(b). Each plan must address preventative maintenance for each control device, including a preventative maintenance schedule that is consistent with the manufacturer's instructions for routine and long-term maintenance.</P>
            <P>(c) You must maintain a current copy of the operation and maintenance plan required in paragraph (b) of this section on-site and available for inspection upon request. You must keep the plan for the life of the affected source or until the affected source is no longer subject to the requirements of this subpart.</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <PRTPAGE P="144"/>
          <HD SOURCE="HED">General Compliance Requirements</HD>
          <SECTION>
            <SECTNO>§ 63.9910</SECTNO>
            <SUBJECT>What are my general requirements for complying with this subpart?</SUBJECT>
            <P>(a) You must be in compliance with the emission limitations, work practice standards, and operation and maintenance requirements in this subpart at all times, except during periods of startup, shutdown, and malfunction as defined in § 63.2.</P>
            <P>(b) You must develop a written startup, shutdown, and malfunction plan according to the provisions in § 63.6(e)(3).</P>
            <CITA>[68 FR 58620, Oct. 10, 2003, as amended at 71 FR 20471, Apr. 20, 2006]</CITA>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Initial Compliance Requirements</HD>
          <SECTION>
            <SECTNO>§ 63.9911</SECTNO>
            <SUBJECT>By what date must I conduct performance tests or other initial compliance demonstrations?</SUBJECT>
            <P>(a) As required in § 63.7(a)(2), you must conduct a performance test to demonstrate initial compliance with each emission limit in Table 1 to this subpart that applies to you as indicated in paragraphs (a)(1) through (3) of this section:</P>
            <P>(1) Within 180 calendar days after the compliance date that is specified in § 63.9883 for your existing affected source;</P>
            <P>(2) By April 7, 2004 for a new source that has an initial startup date before October 10, 2003; or</P>
            <P>(3) Within 180 days after initial startup for a new source that has an initial startup date after October 10, 2003.</P>
            <P>(b) For each operation and maintenance requirement that applies to you where initial compliance is not demonstrated using a performance test, you must demonstrate initial compliance within 30 calendar days after the compliance date that is specified for your affected source in § 63.9883.</P>
            <P>(c) If you commenced construction or reconstruction between January 22, 2003 and October 10, 2003, you must demonstrate initial compliance with either the proposed emission limitation or the promulgated emission limitation no later than April 7, 2004 or no later than 180 calendar days after startup of the source, whichever is later, according to § 63.7(a)(2)(ix).</P>
            <P>(d) If you commenced construction or reconstruction between January 22, 2003 and October 10, 2003, and you chose to comply with the proposed emission limit when demonstrating initial compliance, you must conduct a second performance test to demonstrate compliance with the promulgated emission limit by April 11, 2005, or after startup of the source, whichever is later, according to § 63.7(a)(2)(ix).</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9912</SECTNO>
            <SUBJECT>When must I conduct subsequent performance tests?</SUBJECT>
            <P>You must conduct subsequent performance tests to demonstrate continuous compliance with all applicable emission limits in Table 1 to this subpart no less frequently than twice (at mid-term and renewal) during each term of your title V operating permit.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9913</SECTNO>
            <SUBJECT>What test methods and other procedures must I use to demonstrate initial compliance with the emission limits for particulate matter and PM10?</SUBJECT>
            <P>(a) You must conduct each performance test that applies to your affected source according to the requirements in § 63.7(e)(1).</P>
            <P>(b) To determine compliance with the applicable emission limits for particulate matter in Table 1 to this subpart, you must follow the test methods and procedures in paragraphs (b)(1) and (2) of this section.</P>
            <P>(1) Determine the concentration of particulate matter according to the following test methods in appendix A to 40 CFR part 60:</P>
            <P>(i) Method 1 to select sampling port locations and the number of traverse points. Sampling ports must be located at the outlet of the control device and prior to any releases to the atmosphere.</P>
            <P>(ii) Method 2, 2F, or 2G to determine the volumetric flow rate of the stack gas.</P>
            <P>(iii) Method 3, 3A, or 3B to determine the dry molecular weight of the stack gas.</P>
            <P>(iv) Method 4 to determine the moisture content of the stack gas.</P>

            <P>(v) Method 5 or 5D, as applicable, to determine the concentration of particulate matter.<PRTPAGE P="145"/>
            </P>

            <P>(vi) Method 201 or 201A, as applicable, to determine the concentration of PM<E T="52">10</E>.</P>

            <P>(2) Collect a minimum sample volume of 60 dry standard cubic feet (dscf) during each particulate matter or PM<E T="52">10</E> test run. Three valid test runs are needed to comprise a performance test.</P>
            <P>(c) Compute the mass emissions rate in pounds per hour (lbs/hr) for each test run using Equation 1 of this section:</P>
            <MATH DEEP="26" SPAN="1">
              <MID>ER10OC03.000</MID>
            </MATH>
            <EXTRACT>
              <FP>Where:</FP>
              
              <FP SOURCE="FP-1">E<E T="52">lbs/hr</E> = Mass emissions rate of particulate matter or PM<E T="52">10</E> (lbs/hr);</FP>
              <FP SOURCE="FP-1">C<E T="52">s</E> = Concentration of particulate matter or PM<E T="52">10</E> in the gas stream, grains per dry standard cubic feet (gr/dscf);</FP>
              <FP SOURCE="FP-1">Q<E T="52">std</E> = Volumetric flow rate of stack gas, dry standard cubic feet per minute (dscfm);</FP>
              <FP SOURCE="FP-1">60 = Conversion factor, minutes per hour (min/hr); and</FP>
              <FP SOURCE="FP-1">7,000 = Conversion factor, grains per pound (gr/lb).</FP>
            </EXTRACT>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9914</SECTNO>
            <SUBJECT>What test methods and other procedures must I use to demonstrate initial compliance with chlorine and hydrochloric acid emission limits?</SUBJECT>
            <P>(a) You must conduct each performance test that applies to your affected source according to the requirements in § 63.7(e)(1).</P>
            <P>(b) To determine compliance with the applicable emission limits for chlorine and hydrochloric acid in Table 1 to this subpart, you must follow the test methods and procedures specified in paragraphs (b)(1) and (2) of this section.</P>
            <P>(1) Determine the concentration of chlorine and hydrochloric acid according to the following test methods in appendix A to 40 CFR part 60:</P>
            <P>(i) Method 1 to select sampling port locations and the number of traverse points. Sampling ports must be located at the outlet of the control device and prior to any releases to the atmosphere.</P>
            <P>(ii) Method 2, 2F, or 2G to determine the volumetric flow of the stack gas.</P>
            <P>(iii) Method 3, 3A, or 3B to determine the dry molecular weight of the stack gas.</P>
            <P>(iv) Method 4 to determine the moisture content of the stack gas.</P>
            <P>(v) Method 26 or 26A, as applicable, to determine the concentration of hydrochloric acid and chlorine.</P>
            <P>(2) Collect a minimum sample of 60 dscf during each test run for chlorine and hydrochloric acid. Three valid test runs are needed to comprise a performance test.</P>
            <P>(c) Compute the mass emissions rate (lbs/hr) for each test run using Equation 1 of this section:</P>
            <MATH DEEP="26" SPAN="1">
              <MID>ER10OC03.001</MID>
            </MATH>
            <EXTRACT>
              <FP>Where:</FP>
              
              <FP SOURCE="FP-1">E<E T="52">lbs/hr</E> = Mass emissions rate of chlorine or hydrochloric acid (lbs/hr);</FP>
              <FP SOURCE="FP-1">C<E T="52">s</E> = Concentration of chlorine or hydrochloric acid in the gas stream, milligrams per dry standard cubic meter (mg/dscm);</FP>
              <FP SOURCE="FP-1">Q<E T="52">std</E> = Volumetric flow rate of stack gas (dscfm);</FP>
              <FP SOURCE="FP-1">60 = Conversion factor (min/hr);</FP>
              <FP SOURCE="FP-1">35.31 = Conversion factor (dscf/dscm); and</FP>
              <FP SOURCE="FP-1">454,000 = Conversion factor (mg/lb).</FP>
            </EXTRACT>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9915</SECTNO>
            <SUBJECT>What test methods and other procedures must I use to demonstrate initial compliance with dioxin/furan emission limits?</SUBJECT>
            <P>(a) You must conduct each performance test that applies to your affected source according to the requirements in § 63.7(e)(1).</P>
            <P>(b) To determine compliance with the applicable emission limit for dioxins/furans in Table 1 to this subpart, you must follow the test methods and procedures specified in paragraphs (b)(1) and (2) of this section.</P>
            <P>(1) Determine the concentration of dioxin and furan according to the following test methods in appendix A to 40 CFR part 60:</P>
            <P>(i) Method 1 to select sampling port locations and the number of traverse points. Sampling ports must be located at the outlet of the control device and prior to any releases to the atmosphere.</P>
            <P>(ii) Method 2, 2F, or 2G to determine the volumetric flow of the stack gas.</P>
            <P>(iii) Method 3, 3A, or 3B to determine the dry molecular weight of the stack gas.</P>
            <P>(iv) Method 4 to determine the moisture content of the stack gas.</P>

            <P>(v) Method 23 to determine the concentration of dioxins/furans. For each <PRTPAGE P="146"/>dioxin/furan congener measured in accordance with this paragraph (b)(v), multiply the congener concentration by its corresponding toxic equivalency factor specified in Table 2 of this subpart.</P>
            <P>(2) Collect a minimum sample of 100 dscf during each test run. Three valid test runs are needed to comprise a performance test.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9916</SECTNO>
            <SUBJECT>What test methods and other procedures must I use to establish and demonstrate initial compliance with the operating limits?</SUBJECT>
            <P>For a wet scrubber subject to operating limits for pressure drop and scrubber water flow rate in § 63.9890(b), you must establish site-specific operating limits according to the procedures in paragraphs (a) and (b) of this section.</P>
            <P>(a) Using the continuous parameter monitoring system (CPMS) required in § 63.9920, measure and record the pressure drop and scrubber water flow rate at least every 15 minutes during each run of the particulate matter performance test.</P>
            <P>(b) Compute and record the average pressure drop and scrubber water flow rate for each individual test run. Your operating limits are the lowest average individual pressure drop and scrubber water flow rate values in any of the three runs that meet the applicable emission limit.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9917</SECTNO>
            <SUBJECT>How do I demonstrate initial compliance with the emission limitations and work practice standards that apply to me?</SUBJECT>
            <P>(a) For each affected source subject to an emission limit in Table 1 to this subpart, you have demonstrated initial compliance if:</P>
            <P>(1) You have met the conditions in Table 3 to this subpart; and</P>
            <P>(2) For each wet scrubber subject to the operating limits for pressure drop and scrubber water flow rate in § 63.9890(b), you have established appropriate site-specific operating limits and have a record of the pressure drop and scrubber water flow rate measured during the performance test in accordance with § 63.9916.</P>
            <P>(b) You have demonstrated initial compliance with the work practice standards in § 63.9891 if you have certified in your notification of compliance status that:</P>
            <P>(1) You have prepared a fugitive dust emissions control plan according to the requirements in § 63.9891 and submitted the plan for approval; and</P>
            <P>(2) You will operate according to the requirements in the plan.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9918</SECTNO>
            <SUBJECT>How do I demonstrate initial compliance with the operation and maintenance requirements that apply to me?</SUBJECT>
            <P>You must demonstrate initial compliance by certifying in your notification of compliance status that you have met the requirements in paragraphs (a) and (b) of this section.</P>
            <P>(a) You have prepared the operation and maintenance plan according to the requirements in § 63.9910; and</P>
            <P>(b) You will operate each control device according to the procedures in the plan.</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Continuous Compliance Requirements</HD>
          <SECTION>
            <SECTNO>§ 63.9920</SECTNO>
            <SUBJECT>What are my continuous monitoring requirements?</SUBJECT>
            <P>For each wet scrubber subject to the operating limits for pressure drop and scrubber water flow rates in § 63.9890(b), you must at all times monitor the hourly average pressure drop and liquid flow rate using a CPMS according to the requirements in § 63.9921(a).</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9921</SECTNO>
            <SUBJECT>What are the installation, operation and maintenance requirements for my monitors?</SUBJECT>
            <P>(a) For each wet scrubber subject to the operating limits in § 63.9890(b) for pressure drop and scrubber water flow rate, you must install, operate, and maintain each CPMS according to the requirements in paragraphs (a)(1) and (2) of this section.</P>
            <P>(1) For the pressure drop CPMS, you must:</P>
            <P>(i) Locate the pressure sensor(s) in or as close to a position that provides a representative measurement of the pressure and that minimizes or eliminates pulsating pressure, vibration, and internal and external corrosion.</P>

            <P>(ii) Use a gauge with a minimum measurement sensitivity of 0.5 inch of water or a transducer with a minimum measurement sensitivity of 1 percent of the pressure range.<PRTPAGE P="147"/>
            </P>
            <P>(iii) Check the pressure tap for pluggage daily.</P>
            <P>(iv) Using a manometer, check gauge calibration quarterly and transducer calibration monthly.</P>
            <P>(v) Conduct calibration checks any time the sensor exceeds the manufacturer's specified maximum operating pressure range, or install a new pressure sensor.</P>
            <P>(vi) At least monthly, inspect all components for integrity, all electrical connections for continuity, and all mechanical connections for leakage.</P>
            <P>(2) For the scrubber water flow rate CPMS, you must:</P>
            <P>(i) Locate the flow sensor and other necessary equipment in a position that provides a representative flow and that reduces swirling flow or abnormal velocity distributions due to upstream and downstream disturbances.</P>
            <P>(ii) Use a flow sensor with a minimum measurement sensitivity of 2 percent of the flow rate.</P>
            <P>(iii) Conduct a flow sensor calibration check at least semiannually according to the manufacturer's instructions.</P>
            <P>(iv) At least monthly, inspect all components for integrity, all electrical connections for continuity, and all mechanical connections for leakage.</P>
            <P>(b) You must install, operate, and maintain each CPMS for a wet scrubber according to the requirements in paragraphs (b)(1) through (3) of this section.</P>
            <P>(1) Each CPMS must complete a minimum of one cycle of operation for each successive 15-minute period.</P>
            <P>(2) Each CPMS must have valid data for at least 95 percent of every averaging period.</P>
            <P>(3) Each CPMS must determine and record the hourly average of all recorded readings.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9922</SECTNO>
            <SUBJECT>How do I monitor and collect data to demonstrate continuous compliance?</SUBJECT>
            <P>(a) Except for monitoring malfunctions, associated repairs, and required quality assurance or control activities (including, as applicable, calibration checks and required zero and span adjustments), you must monitor continuously (or collect data at all required intervals) at all times an affected source is operating.</P>
            <P>(b) You may not use data recorded during monitoring malfunctions, associated repairs, and required quality assurance or control activities in data averages and calculations used to report emission or operating levels or to fulfill a minimum data availability requirement, if applicable. You must use all the data collected during all other periods in assessing compliance.</P>
            <P>(c) A monitoring malfunction is any sudden, infrequent, not reasonably preventable failure of the monitoring to provide valid data. Monitoring failures that are caused in part by poor maintenance or careless operation are not malfunctions.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9923</SECTNO>
            <SUBJECT>How do I demonstrate continuous compliance with the emission limitations and work practice standards that apply to me?</SUBJECT>
            <P>(a) For each affected source subject to an emission limit in Table 1 to this subpart, you must demonstrate continuous compliance according to the requirements in Table 4 to this subpart.</P>
            <P>(b) For each wet scrubber subject to the operating limits for pressure drop and scrubber water flow rate in § 63.9890(b), you must demonstrate continuous compliance according to the requirements in paragraphs (b)(1) and (2) of this section.</P>
            <P>(1) Collecting and reducing the monitoring data according to § 63.9921(b); and</P>
            <P>(2) Maintaining the hourly average pressure drop and scrubber water flow rate at or above the minimum level established during the initial or subsequent performance.</P>
            <P>(c) You must demonstrate continuous compliance with the work practice standards in § 63.9891 by operating according to the requirements in your fugitive dust emissions control plan and recording information needed to document conformance with the requirements.</P>
          </SECTION>
          <SECTION>
            <PRTPAGE P="148"/>
            <SECTNO>§ 63.9924</SECTNO>
            <SUBJECT>How do I demonstrate continuous compliance with the operation and maintenance requirements that apply to me?</SUBJECT>
            <P>For each emission point subject to an emission limit in Table 1 to this subpart, you must demonstrate continuous compliance with the operation and maintenance requirements in § 63.9900 by performing preventive maintenance for each control device according to § 63.9900(b) and recording all information needed to document conformance with these requirements.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9925</SECTNO>
            <SUBJECT>What other requirements must I meet to demonstrate continuous compliance?</SUBJECT>
            <P>(a) <E T="03">Deviations.</E> You must report each instance in which you did not meet each emission limitation in § 63.9890 or work practice standard in § 63.9891 that applies to you. This includes periods of startup, shutdown, and malfunction. You must also report each instance in which you did not meet each operation and maintenance requirement required in § 63.9900 that applies to you. These instances are deviations from the emission limitations, work practice standards, and operation and maintenance requirements in this subpart. These deviations must be reported according to the requirements in § 63.9931.</P>
            <P>(b) <E T="03">Startups, shutdowns, and malfunctions.</E> (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you demonstrate to the Administrator's satisfaction that you were operating in accordance with § 63.6(e)(1).</P>
            <P>(2) The Administrator will determine whether deviations that occur during a period of startup, shutdown, or malfunction are violations, according to the provisions in § 63.6(e).</P>
            <CITA>[68 FR 58620, Oct. 10, 2003, as amended at 71 FR 20471, Apr. 20, 2006]</CITA>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Notifications, Reports, and Records</HD>
          <SECTION>
            <SECTNO>§ 63.9930</SECTNO>
            <SUBJECT>What notifications must I submit and when?</SUBJECT>
            <P>(a) You must submit all of the notifications in §§ 63.7(b) and (c), 63.8(f)(4), 63.9(b), and 63.9(h) that apply to you by the specified dates.</P>
            <P>(b) As specified in § 63.9(b)(2), if you startup your affected source before October 10, 2003, you must submit your initial notification no later than February 9, 2004.</P>
            <P>(c) As specified in § 63.9(b)(3), if you start your new affected source on or after October 10, 2003, you must submit your initial notification no later that 120 calendar days after you become subject to this subpart.</P>
            <P>(d) If you are required to conduct a performance test, you must submit a notification of intent to conduct a performance test at least 60 calendar days before the performance test is scheduled to begin as required in § 63.7(b)(1).</P>
            <P>(e) If you are required to conduct a performance test or other initial compliance demonstration, you must submit a notification of compliance status according to § 63.9(h)(2)(ii), and the requirements in paragraphs (e)(1) and (2) of this section:</P>
            <P>(1) For each initial compliance demonstration that does not include a performance test, you must submit the notification of compliance status before the close of business on the 30th calendar day following completion of the initial compliance demonstration.</P>
            <P>(2) For each initial compliance demonstration that does include a performance test, you must submit the notification of compliance status, including the performance test results, before the close of business on the 60th calendar day following the completion of the performance test according to § 63.10(d)(2).</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9931</SECTNO>
            <SUBJECT>What reports must I submit and when?</SUBJECT>
            <P>(a) <E T="03">Compliance report due dates.</E> Unless the Administrator has approved a different schedule, you must submit a semiannual compliance report to your permitting authority according to the requirements in paragraphs (a) (1) through (5) of this section.</P>

            <P>(1) The first compliance report must cover the period beginning on the compliance date that is specified for your affected source in § 63.9883 and ending on June 30 or December 31, whichever date comes after the compliance date that is specified for your source in § 63.9883.<PRTPAGE P="149"/>
            </P>
            <P>(2) The first compliance report must be postmarked or delivered no later than July 31 or January 31, whichever date comes first after your compliance report is due.</P>
            <P>(3) Each subsequent compliance report must cover the semiannual reporting period from January 1 through June 30 or the semiannual reporting period from July 1 through December 31.</P>
            <P>(4) Each subsequent compliance report must be postmarked or delivered no later than July 31 or January 31, whichever date comes first after the end of the semiannual reporting period.</P>
            <P>(5) For each affected source that is subject to permitting regulations pursuant to 40 CFR part 70 or 40 CFR part 71, and if the permitting authority has established dates for submitting semiannual reports pursuant to 40 CFR 70.6(a)(3)(iii)(A) or 40 CFR 71.6(a)(3)(iii)(A), you may submit the first and subsequent compliance reports according to the dates the permitting authority has established instead of according to the dates in paragraphs (a)(1) through (4) of this section.</P>
            <P>(b) <E T="03">Compliance report contents.</E> Each compliance report must include the information in paragraphs (b)(1) through (3) of this section and, as applicable, paragraphs (b)(4) through (8) of this section.</P>
            <P>(1) Company name and address.</P>
            <P>(2) Statement by a responsible official, with that official's name, title, and signature, certifying the truth, accuracy, and completeness of the content of the report.</P>
            <P>(3) Date of report and beginning and ending dates of the reporting period.</P>
            <P>(4) If you had a startup, shutdown, or malfunction during the reporting period and you took actions consistent with your startup, shutdown, and malfunction plan, the compliance report must include the information in § 63.10(d)(5)(i).</P>
            <P>(5) If there were no deviations from the continuous compliance requirements in §§ 63.9923 and 63.9924 that apply to you, a statement that there were no deviations from the emission limitations, work practice standards, or operation and maintenance requirements during the reporting period.</P>
            <P>(6) If there were no periods during which a CPMS was out-of-control as specified in § 63.8(c)(7), a statement that there were no periods during which the CPMS was out-of-control during the reporting period.</P>
            <P>(7) For each deviation from an emission limitation in § 63.9890 that occurs at an affected source where you are not using a CPMS to comply with an emission limitation in this subpart, the compliance report must contain the information in paragraphs (b)(1) through (4) of this section and the information in paragraphs (b)(7)(i) and (ii) of this section. This includes periods of startup, shutdown, and malfunction.</P>
            <P>(i) The total operating time of each affected source during the reporting period.</P>
            <P>(ii) Information on the number, duration, and cause of deviations (including unknown cause, if applicable) as applicable and the corrective action taken.</P>
            <P>(8) For each deviation from an emission limitation occurring at an affected source where you are using a CPMS to comply with the emission limitation in this subpart, you must include the information in paragraphs (b)(1) through (4) of this section and the information in paragraphs (b)(8)(i) through (xi) of this section. This includes periods of startup, shutdown, and malfunction.</P>
            <P>(i) The date and time that each malfunction started and stopped.</P>
            <P>(ii) The date and time that each continuous monitoring was inoperative, except for zero (low-level) and high-level checks.</P>
            <P>(iii) The date, time, and duration that each continuous monitoring system was out-of-control, including the information in § 63.8(c)(8).</P>
            <P>(iv) The date and time that each deviation started and stopped, and whether each deviation occurred during a period of startup, shutdown, or malfunction or during another period.</P>
            <P>(v) A summary of the total duration of the deviation during the reporting period and the total duration as a percent of the total source operating time during that reporting period.</P>

            <P>(vi) A breakdown of the total duration of the deviations during the reporting period including those that are due to startup, shutdown, control <PRTPAGE P="150"/>equipment problems, process problems, other known causes, and other unknown causes.</P>
            <P>(vii) A summary of the total duration of continuous monitoring system downtime during the reporting period and the total duration of continuous monitoring system downtime as a percent of the total source operating time during the reporting period.</P>
            <P>(viii) A brief description of the process units.</P>
            <P>(ix) A brief description of the continuous monitoring system.</P>
            <P>(x) The date of the latest continuous monitoring system certification or audit.</P>
            <P>(xi) A description of any changes in continuous monitoring systems, processes, or controls since the last reporting period.</P>
            <P>(c) <E T="03">Immediate startup, shutdown, and malfunction report.</E> If you had a startup, shutdown, or malfunction during the semiannual reporting period that was not consistent with your startup, shutdown, and malfunction plan, you must submit an immediate startup, shutdown, and malfunction report according to the requirements in § 63.10(d)(5)(ii).</P>
            <P>(d) <E T="03">Part 70 monitoring report.</E> If you have obtained a title V operating permit for an affected source pursuant to 40 CFR part 70 or 40 CFR part 71, you must report all deviations as defined in this subpart in the semiannual monitoring report required by 40 CFR 70.6(a)(3)(iii)(A) or 40 CFR 71.6(a)(3)(iii)(A). If you submit a compliance report for an affected source along with, or as part of, the semiannual monitoring report required by 40 CFR 70.6(a)(3)(iii)(A) or 40 CFR 71.6(a)(3)(iii)(A), and the compliance report includes all the required information concerning deviations from any emissions limitation, work practice standards, or operation and maintenance requirement in this subpart, submission of the compliance report satisfies any obligation to report the same deviations in the semiannual monitoring report. However, submission of the compliance report does not otherwise affect any obligation you may have to report deviations from permit requirements for an affected source to your permitting authority.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9932</SECTNO>
            <SUBJECT>What records must I keep?</SUBJECT>
            <P>(a) You must keep the records as indicated in paragraphs (a)(1) through (3) of this section:</P>
            <P>(1) A copy of each notification and report that you submitted to comply with this subpart, including all documentation supporting any initial notification or notification of compliance status that you submitted, according to the requirements in § 63.10(b)(2)(xiv).</P>
            <P>(2) The records in § 63.6(e)(3)(iii) through (v) related to startup, shutdown, and malfunction.</P>
            <P>(3) Records of performance tests and performance evaluations as required in § 63.10(b)(2)(viii).</P>
            <P>(b) You must keep the records required in §§ 63.9932 and 63.9933 to show continuous compliance with each emission limitation, work practice standard, and operating and maintenance requirement that applies to you.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9933</SECTNO>
            <SUBJECT>In what form and how long must I keep my records?</SUBJECT>
            <P>(a) Your records must be in a form suitable and readily available for expeditious review, according to § 63.10(b)(1).</P>
            <P>(b) As specified in § 63.10(b)(1), you must keep each record for 5 years following the date of each occurrence, measurement, maintenance, corrective action, report, or record.</P>
            <P>(c) You must keep each record on site for at least 2 years after the date of each occurrence, measurement, maintenance, corrective action, report, or record according to § 63.10(b)(1). You can keep the records off site for the remaining 3 years.</P>
            <P>(d) You must keep your fugitive dust emissions control plan and your operation and maintenance plan on-site according to the requirements in §§ 63.9891(d) and 63.9900(c).</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Other Requirements and Information</HD>
          <SECTION>
            <SECTNO>§ 63.9940</SECTNO>
            <SUBJECT>What parts of the General Provisions apply to me?</SUBJECT>
            <P>Table 4 to this subpart shows which parts of the General Provisions in §§ 63.1 through 63.15 apply to you.</P>
          </SECTION>
          <SECTION>
            <PRTPAGE P="151"/>
            <SECTNO>§ 63.9941</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <P>(a) This subpart can be implemented and enforced by us, the United States Environmental Protection Agency (U.S. EPA) or a delegated authority such as your State, local, or tribal agency. If the EPA Administrator has delegated authority to your State, local, or tribal agency, then that agency has the authority to implement and enforce this subpart. You should contact your EPA Regional Office to find out if this subpart is delegated to your State, local, or tribal agency.</P>
            <P>(b) In delegating implementation and enforcement authority of this subpart to a State, local, or tribal agency under subpart E of this part, the authorities contained in paragraph (c) of this section are retained by the Administrator of the EPA and are not transferred to the State, local, or tribal agency.</P>
            <P>(c) The authorities that will not be delegated to State, local, or tribal agencies are specified in paragraphs (c)(1) through (4) of this section.</P>
            <P>(1) Approval of alternatives to the non-opacity emission limitations in § 63.9890 and work practice standards in § 63.9891 under § 63.6(g).</P>
            <P>(2) Approval of major alternatives to test methods under § 63.7(e)(2)(ii) and (f) and as defined in § 63.90.</P>
            <P>(3) Approval of major alternatives to monitoring under § 63.8(f) and as defined in § 63.90.</P>
            <P>(4) Approval of major alternatives to recordkeeping and reporting under § 63.10(f) and as defined in § 63.90.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.9942</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <P>Terms used in this subpart are defined in the Clean Air Act, in § 63.2, and in this section as follows:</P>
            <P>
              <E T="03">Chlorine plant bypass scrubber</E> means the wet scrubber that captures chlorine gas during a chlorine plant shut down or failure.</P>
            <P>
              <E T="03">Deviation</E> means any instance in which an affected source subject to this subpart, or an owner or operator of such a source:</P>
            <P>(1) Fails to meet any requirement or obligation established by this subpart, including but not limited to any emission limitation (including operating limits) or operation and maintenance requirement;</P>
            <P>(2) Fails to meet any term or condition that is adopted to implement an applicable requirement in this subpart and that is included in the operating permit for any affected source required to obtain such a permit; or</P>
            <P>(3) Fails to meet any emission limitation in this subpart during startup, shutdown, or malfunction, regardless of whether or not such failure is permitted by this subpart.</P>
            <P>
              <E T="03">Emission limitation</E> means any emission limit, opacity limit, or operating limit.</P>
            <P>
              <E T="03">Launder off-gas system</E> means a system that collects chlorine and hydrochloric acid fumes from collection points within the melt/reactor system building. The system then removes particulate matter and hydrochloric acid from the collected gases prior to discharge to the atmosphere.</P>
            <P>
              <E T="03">Magnesium chloride storage bins</E> means vessels that store dried magnesium chloride powder produced from the spray drying operation.</P>
            <P>
              <E T="03">Melt/reactor system</E> means a system that melts and chlorinates dehydrated brine to produce high purity molten magnesium chloride feed for electrolysis.</P>
            <P>
              <E T="03">Primary magnesium refining</E> means the production of magnesium metal and magnesium metal alloys from natural sources of magnesium chloride such as sea water or water from the Great Salt Lake and magnesium bearing ores.</P>
            <P>
              <E T="03">Responsible official</E> means responsible official as defined in § 63.2.</P>
            <P>
              <E T="03">Spray dryer</E> means dryers that evaporate brine to form magnesium powder by contact with high temperature gases exhausted from gas turbines.</P>
            <P>
              <E T="03">Wet scrubber</E> means a device that contacts an exhaust gas with a liquid to remove particulate matter and acid gases from the exhaust. Examples are packed-bed wet scrubbers and venturi scrubbers.</P>
            <P>
              <E T="03">Work practice standard</E> means any design, equipment, work practice, or operational standard, or combination thereof, that is promulgated pursuant to section 112(h) of the Clean Air Act.</P>
          </SECTION>
        </SUBJGRP>
        <APPENDIX>
          <PRTPAGE P="152"/>
          <EAR>Pt. 63, Subpt. TTTTT, Table 1</EAR>
          <HD SOURCE="HED">Table 1 to Subpart TTTTT of Part 63—Emission Limits</HD>
          <P>As required in § 63.9890(a), you must comply with each applicable emission limit in the following table:</P>
          <GPOTABLE CDEF="s100,r200" COLS="2" OPTS="L2">
            <BOXHD>
              <CHED H="1" O="L">For . . .</CHED>
              <CHED H="1" O="L">You must comply with each of the following . . .</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">1. Each spray dryer stack</ENT>
              <ENT>a. You must not cause to be discharged to the atmosphere any gases that contain particulate matter in excess of 100 lbs/hr; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. You must not cause to be discharged to the atmosphere any gases that contain hydrochloric acid in excess of 200 lbs/hr.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">2. Each magnesium chloride storage bins scrubber stack</ENT>
              <ENT>a. You must not cause to be discharged to the atmosphere any gases that contain hydrochloric acid in excess of 47.5 lbs/hr and 0.35 gr/dscf; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>

              <ENT>b. You must not cause to be discharged to the atmosphere any gases that contain PM<E T="52">10</E> in excess of 2.7 lbs/hr and 0.016 gr/dscf.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">3. Each melt/reactor system stack</ENT>

              <ENT>a. You must not cause to be discharged to the atmosphere any gases that contain PM<E T="52">10</E> in excess of 13.1 lbs/hr; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. You must not cause to be discharged to the atmosphere any gases that contain hydrochloric acid in excess of 7.2 lbs/hr; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>c. You must not cause to be discharged to the atmosphere any gases that contain chlorine in excess of 100 lbs/hr; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>d. You must not cause to be discharged to the atmosphere any gases that contain 36 ng TEQ/dscm corrected to 7% oxygen.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">4. Each launder off-gas system stack</ENT>
              <ENT>a. You must not cause to be discharged to the atmosphere any gases that contain particulate matter in excess of 37.5 lbs/hr; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. You must not cause to be discharged to the atmosphere any gases that contain hydrochloric acid in excess of 46.0 lbs/hr; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>c. You must not cause to be discharged to the atmosphere any gases that contain chlorine in excess of 26.0 lbs/hr.</ENT>
            </ROW>
          </GPOTABLE>
        </APPENDIX>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. TTTTT, Table 2</EAR>
          <HD SOURCE="HED">Table 2 to Subpart TTTTT of Part 63—Toxic Equivalency Factors</HD>
          <GPOTABLE CDEF="s200,9.4" COLS="2" OPTS="L2">
            <BOXHD>
              <CHED H="1">Dioxin/furan congener</CHED>
              <CHED H="1">Toxic equivalency factor</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">2,3,7,8-tetrachlorinated dibenzo-p-dioxin</ENT>
              <ENT>1</ENT>
            </ROW>
            <ROW>
              <ENT I="01">1,2,3,7,8-pentachlorinated dibenzo-p-dioxin</ENT>
              <ENT>1</ENT>
            </ROW>
            <ROW>
              <ENT I="01">1,2,3,4,7,8-hexachlorinated dibenzo-p-dioxin</ENT>
              <ENT>0.1</ENT>
            </ROW>
            <ROW>
              <ENT I="01">1,2,3,7,8,9-hexachlorinated dibenzo-p-dioxin</ENT>
              <ENT>0.1</ENT>
            </ROW>
            <ROW>
              <ENT I="01">1,2,3,6,7,8-hexachlorinated dibenzo-p-dioxin</ENT>
              <ENT>0.1</ENT>
            </ROW>
            <ROW>
              <ENT I="01">1,2,3,4,6,7,8-heptachlorinated dibenzo-p-dioxin</ENT>
              <ENT>0.01</ENT>
            </ROW>
            <ROW>
              <ENT I="01">octachlorinated dibenzo-p-dioxin</ENT>
              <ENT>0.0001</ENT>
            </ROW>
            <ROW>
              <ENT I="01">2,3,7,8-tetrachlorinated dibenzofuran</ENT>
              <ENT>0.1</ENT>
            </ROW>
            <ROW>
              <ENT I="01">2,3,4,7,8-pentachlorinated dibenzofuran</ENT>
              <ENT>0.5</ENT>
            </ROW>
            <ROW>
              <ENT I="01">1,2,3,7,8-pentachlorinated dibenzofuran</ENT>
              <ENT>0.05</ENT>
            </ROW>
            <ROW>
              <ENT I="01">1,2,3,4,7,8-hexachlorinated dibenzofuran</ENT>
              <ENT>0.1</ENT>
            </ROW>
            <ROW>
              <ENT I="01">1,2,3,6,7,8-hexachlorinated dibenzofuran</ENT>
              <ENT>0.1</ENT>
            </ROW>
            <ROW>
              <ENT I="01">1,2,3,7,8,9-hexachlorinated dibenzofuran</ENT>
              <ENT>0.1</ENT>
            </ROW>
            <ROW>
              <ENT I="01">2,3,4,6,7,8-hexachlorinated dibenzofuran</ENT>
              <ENT>0.1</ENT>
            </ROW>
            <ROW>
              <ENT I="01">1,2,3,4,6,7,8-heptachlorinated dibenzofuran</ENT>
              <ENT>0.01</ENT>
            </ROW>
            <ROW>
              <ENT I="01">1,2,3,4,7,8,9-heptachlorinated dibenzofuran</ENT>
              <ENT>0.01</ENT>
            </ROW>
            <ROW>
              <ENT I="01">octachlorinated dibenzofuran</ENT>
              <ENT>0.0001</ENT>
            </ROW>
          </GPOTABLE>
        </APPENDIX>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. TTTTT, Table 3</EAR>
          <HD SOURCE="HED">Table 3 to Subpart TTTTT of Part 63—Initial Compliance With Emission Limits</HD>
          <P>As required in 63.9916, you must demonstrate initial compliance with the emission limits according to the following table:</P>
          <GPOTABLE CDEF="s100,r200" COLS="2" OPTS="L2">
            <BOXHD>
              <CHED H="1" O="L">For . . .</CHED>
              <CHED H="1" O="L">You have demonstrated initial compliance if . . .</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">1. Each spray dryer stack</ENT>
              <ENT>a. The average mass flow of particulate matter from the control system applied to emissions from each spray dryer, measured according to the performance test procedures in § 63.9913(c), did not exceed 100 lbs/hr; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. The average mass flow of hydrochloric acid from the control system applied to emissions from each spray dryer, determined according to the performance test procedures in § 63.9914(c), did not exceed 200 lbs/hr.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">2. Each magnesium chloride storage bin scrubber stack</ENT>
              <ENT>a. The average mass flow of hydrochloric acid from the control system applied to the magnesium chloride storage bins scrubber exhaust, measured according to the performance test procedure in § 63.9914, did not exceed 47.5 lbs/hr and 0.35 gr/dscf; and</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="153"/>
              <ENT I="22"/>
              <ENT>b. The average mass flow of PM<E T="52">10</E> from the control system applied to the magnesium chloride storage bins scrubber exhaust, determined according to the performance test procedures in § 63.9913, did not exceed 2.7 lbs/hr and 0.016 gr/dscf.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">3. Each melt/reactor system stack</ENT>
              <ENT>a. The average mass flow of PM<E T="52">10</E> from the control system applied to the melt/reactor system exhaust, measured according to the performance test procedures in § 63.9913, did not exceed 13.1 lbs/hr; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. The average mass flow of hydrochloric acid from the control system applied to the melt/reactor system exhaust, measured according to the performance test procedures in § 63.9914, did not exceed 7.2 lbs/hr; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>c. The average mass flow of chlorine from the control system applied to the melt/reactor system exhaust, measured according to the performance test procedures in § 63.9914, did not exceed 100 lbs/hr.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>d. The average concentration of dioxins/furans from the control system applied to the melt/reactor system exhaust, measured according to the performance test procedures in § 63.9915, did not exceed 36 ng TEQ/dscm corrected to 7% oxygen.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">4. Each launder off-gas system stack</ENT>
              <ENT>a. The average mass flow of particulate matter from the control system applied to the launder off-gas system collection system exhaust, measured according to the performance test procedures in § 63.9913, did not exceed 37.5 lbs/hr; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. The average mass flow of hydrochloric acid from the control system applied to the launder off-gas system collection system exhaust, measured according to the performance test procedures in § 63.9914, did not exceed 46.0 lbs/hr; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>c. The average mass flow of chlorine from the control system applied to the launder off-gas system collection system exhaust, measured according to the performance test procedures in § 63.9914, did not exceed 26.0 lbs/hr.</ENT>
            </ROW>
          </GPOTABLE>
        </APPENDIX>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. TTTTT, Table 4</EAR>
          <HD SOURCE="HED">Table 4 to Subpart TTTTT of Part 63—Continuous Compliance With Emission Limits</HD>
          <P>As required in § 63.9923, you must demonstrate continuous compliance with the emission limits according to the following table:</P>
          <GPOTABLE CDEF="s100,r200" COLS="2" OPTS="L2">
            <BOXHD>
              <CHED H="1" O="L">For . . .</CHED>
              <CHED H="1" O="L">You must demonstrate continuous compliance by . . .</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">1. Each spray dryer stack</ENT>
              <ENT>a. Maintaining emissions of PM<E T="52">10</E> at or below 100 lbs/hr; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. Maintaining emissions of hydrochloric acid at or below 200 lbs/hr; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>c. Conducting subsequent performance tests at least twice during each term of your title V operating permit (at mid-term and renewal).</ENT>
            </ROW>
            <ROW>
              <ENT I="01">2. Magnesium chloride storage bins scrubber stack</ENT>
              <ENT>a. Maintaining emissions of hydrochloric acid at or below 47.5 lbs/hr and 0.35 gr/dscf; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. Maintaining emissions of PM<E T="52">10</E> at or below 2.7 lbs/hr and 0.016 gr/dscf; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>c. Conducting subsequent performance tests at least twice during each term of your title V operating permit (at mid-term and renewal).</ENT>
            </ROW>
            <ROW>
              <ENT I="01">3. Each melt/reactor system stack</ENT>
              <ENT>a. Maintaining emissions of PM<E T="52">10</E> at or below 13.1 lbs/hr; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. Maintaining emissions of hydrochloric acid at or below 7.2 lbs/hr; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>c. Maintaining emissions of chlorine at or below 100 lbs/hr; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>d. Maintaining emissions of dioxins/furans at or below 36 ng TEQ/dscm corrected to 7% oxygen.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>e. Conducting subsequent performance test at least twice during each term of your title V operating permit (at mid-term and renewal).</ENT>
            </ROW>
            <ROW>
              <ENT I="01">4. Each launder off-gas system stack</ENT>
              <ENT>a. Maintaining emissions of particulate matter at or below 37.5 lbs/hr; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. Maintaining emissions of hydrochloric acid at or below 46.0 lbs/hr; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>c. Maintaining emissions of chlorine at or below 26.0 lbs/hr; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>d. Conducting subsequent performance tests at least twice during each term of your title V operating permit (at mid-term and renewal).</ENT>
            </ROW>
          </GPOTABLE>
        </APPENDIX>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. TTTTT, Table 5</EAR>
          <HD SOURCE="HED">Table 5 to Subpart TTTTT of Part 63—Applicability of General Provisions to Subpart TTTTT of Part 63</HD>
          <P>As required in § 63.9950, you must comply with the requirements of the NESHAP General Provisions (40 CFR part 63, subpart A) shown in the following table:</P>
          <GPOTABLE CDEF="s50,r50,xs60,r50" COLS="4" OPTS="L2">
            <BOXHD>
              <CHED H="1">Citation</CHED>
              <CHED H="1">Subject</CHED>
              <CHED H="1">Applies to Subpart<LI>TTTTT</LI>
              </CHED>
              <CHED H="1">Explanation</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">63.1</ENT>
              <ENT>Applicability</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.2</ENT>
              <ENT>Definitions</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.3</ENT>
              <ENT>Units and Abbreviations</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.4</ENT>
              <ENT>Prohibited Activities</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.5</ENT>
              <ENT>Construction and Reconstruction</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="154"/>
              <ENT I="01">63.6(a)-(g)</ENT>
              <ENT>Compliance with Standards and Maintenance Requirements</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.6(h)</ENT>
              <ENT>Determining Compliance with Opacity and Visible Emission Standards</ENT>
              <ENT O="xl">No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.6(i)-(j)</ENT>
              <ENT>Extension of Compliance and Presidential Compliance Exemption</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.7(a)(1)-(2)</ENT>
              <ENT>Applicability and Performance Test Dates</ENT>
              <ENT O="xl">No</ENT>
              <ENT>Subpart TTTTT specifies performance test applicability and dates.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.7(a)(3), (b)-(h)</ENT>
              <ENT>Performance Testing Requirements</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.8 except for (a)(4),(c)(4), and (f)(6)</ENT>
              <ENT>Monitoring Requirements</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.8(a)(4)</ENT>
              <ENT>Additional Monitoring Requirements for Control Devices in § 63.11</ENT>
              <ENT>No</ENT>
              <ENT>Subpart TTTTT does not require flares.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.8(c)(4)</ENT>
              <ENT>Continuous Monitoring System Requirements</ENT>
              <ENT>No</ENT>
              <ENT>Subpart TTTTT specifies requirements for operation of CMS.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.8(f)(6)</ENT>
              <ENT>Relative Accuracy Test Alternative (RATA)</ENT>
              <ENT>No</ENT>
              <ENT>Subpart TTTTT does not require continuous emission monitoring systems.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.9</ENT>
              <ENT>Notification Requirements</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.9(g)(5)</ENT>
              <ENT>Data Reduction</ENT>
              <ENT>No</ENT>
              <ENT>Subpart TTTTT specifies data reduction requirements.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.10 except for (b)(2)(xiii) and (c)(7)-(8)</ENT>
              <ENT>Recordkeeping and Reporting Requirements</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.10(b)(2)(xiii)</ENT>
              <ENT>Continuous Monitoring System (CMS) Records for RATA Alternative</ENT>
              <ENT>No</ENT>
              <ENT>Subpart TTTTT does not require continuous emission monitoring systems.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.10(c)(7)-(8)</ENT>
              <ENT>Records of Excess Emissions and Parameter Monitoring Accedences for CMS</ENT>
              <ENT>No</ENT>
              <ENT>Subpart TTTTT specifies recordkeeping requirements.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.11</ENT>
              <ENT>Control Device Requirements</ENT>
              <ENT>No</ENT>
              <ENT>Subpart TTTTT does not require flares.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.12</ENT>
              <ENT>State Authority and Delegations</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.13-63.15</ENT>
              <ENT>Addresses, Incorporation by Reference, Availability of Information</ENT>
              <ENT O="xl">Yes.</ENT>
            </ROW>
          </GPOTABLE>
        </APPENDIX>
      </SUBPART>
      <SUBPART>
        <RESERVED>Subparts UUUUU—VVVVV [Reserved]</RESERVED>
      </SUBPART>
      <SUBPART>
        <HD SOURCE="HED">Subpart WWWWW—National Emission Standards for Hospital Ethylene Oxide Sterilizers</HD>
        <SOURCE>
          <HD SOURCE="HED">Source:</HD>
          <P>72 FR 73623, Dec. 28, 2007, unless otherwise noted.</P>
        </SOURCE>
        <SUBJGRP>
          <HD SOURCE="HED">Applicability and Compliance Dates</HD>
          <SECTION>
            <SECTNO>§ 63.10382</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <P>(a) You are subject to this subpart if you own or operate an ethylene oxide sterilization facility at a hospital that is an area source of hazardous air pollutant (HAP) emissions.</P>
            <P>(b) The affected source subject to this subpart is each new or existing sterilization facility.</P>
            <P>(1) An affected source is existing if you commenced construction or reconstruction of the affected source before November 6, 2006.</P>
            <P>(2) An affected source is new if you commenced construction or reconstruction of the affected source on or after November 6, 2006.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.10384</SECTNO>
            <SUBJECT>What are my compliance dates?</SUBJECT>
            <P>(a) <E T="03">Existing source.</E> If you have an existing affected source, you must comply with applicable requirements in this subpart no later than December 29, 2008.</P>
            <P>(b) <E T="03">New source.</E> If you start up a new affected source on or before December <PRTPAGE P="155"/>28, 2007, you must comply with applicable requirements in this subpart by December 28, 2007.</P>
            <P>(c) <E T="03">New source.</E> If you start up a new affected source after December 28, 2007, you must comply with applicable requirements in this subpart upon startup of your affected source.</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Standards</HD>
          <SECTION>
            <SECTNO>§ 63.10390</SECTNO>
            <SUBJECT>What management practice standard must I meet?</SUBJECT>
            <P>You must sterilize full loads of items having a common aeration time, except under medically necessary circumstances, as that term is defined in § 63.10448.</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Initial Compliance Requirements</HD>
          <SECTION>
            <SECTNO>§ 63.10400</SECTNO>
            <SUBJECT>How do I demonstrate initial compliance?</SUBJECT>
            <P>(a) Except as provided in paragraphs (b) and (c) of this section, you must demonstrate initial compliance with the management practice standard in § 63.10390 by submitting an Initial Notification of Compliance Status certifying that you are sterilizing full loads of items having a common aeration time except under medically necessary circumstances.</P>
            <P>(b) If you operate your sterilization unit(s) with an air pollution control device pursuant to a State or local regulation, you may demonstrate initial compliance with § 63.10390 by submitting an Initial Notification of Compliance Status certifying that you are operating the sterilization unit in accordance with your State or local regulation and following control device manufacturer's recommended procedures.</P>
            <P>(c) If you operate your sterilization unit(s) with an air pollution control device but are not subject to any State or local regulation, you may demonstrate initial compliance with § 63.10390 by submitting an Initial Notification of Compliance Status certifying that you are venting the ethylene oxide emissions from each sterilization unit to an add-on air pollution control device. You must certify that you are operating the control device during all sterilization processes and in accordance with manufacturer's recommended procedures.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.10402</SECTNO>
            <SUBJECT>By what date must I demonstrate initial compliance?</SUBJECT>
            <P>You must demonstrate initial compliance with § 63.10390 upon startup or no later than 180 calendar days after your compliance date, whichever is later.</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Monitoring—Continuous Compliance Requirements</HD>
          <SECTION>
            <SECTNO>§ 63.10420</SECTNO>
            <SUBJECT>How do I demonstrate continuous compliance with the management practice requirements?</SUBJECT>
            <P>For each sterilization unit not equipped with an air pollution control device, you must demonstrate continuous compliance with the management practice standard in § 63.10390 by recording the date and time of each sterilization cycle, whether each sterilization cycle contains a full load of items, and if not, a statement from a hospital central services staff, a hospital administrator, or a physician that it was medically necessary.</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Notifications, Reports, and Records</HD>
          <SECTION>
            <SECTNO>§ 63.10430</SECTNO>
            <SUBJECT>What notifications must I submit and by when?</SUBJECT>
            <P>(a) You must submit an Initial Notification of Compliance Status that includes the information required in paragraphs (a)(1) through (5) of this section and the applicable certification in § 63.10400.</P>
            <P>(1) The name and address of the owner or operator.</P>
            <P>(2) The address (i.e., physical location) of the affected source.</P>
            <P>(3) An identification of the standard and other applicable requirements in this subpart that serve as the basis of the notification and the source's compliance date.</P>
            <P>(4) A brief description of the sterilization facility, including the number of ethylene oxide sterilizers, the size (volume) of each, the number of aeration units, if any, the amount of annual ethylene oxide usage at the facility, the control technique used for each sterilizer, and typical number of sterilization cycles per year.</P>
            <P>(5) A statement that the affected source is an area source.</P>

            <P>(b) You must submit the Initial Notification of Compliance Status to the <PRTPAGE P="156"/>appropriate authority(ies) specified in § 63.9(a)(4). In addition, you must submit a copy of the Initial Notification of Compliance Status to EPA's Office of Air Quality Planning and Standards. Send your notification via e-mail to <E T="03">CCG-ONG@EPA.GOV</E> or via U.S. mail or other mail delivery service to U.S. EPA, Sector Policies and Programs Division, Coatings and Chemicals Group (E143-01), Attn: Hospital Sterilizers Project Leader, Research Triangle Park, NC 27711.</P>
            <P>(c) You must submit the Initial Notification of Compliance Status no later than 180 calendar days after your compliance date, consistent with § 63.10402.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.10432</SECTNO>
            <SUBJECT>What records must I keep?</SUBJECT>
            <P>You must keep the records specified in paragraphs (a) and (b) of this section.</P>
            <P>(a) A copy of the Initial Notification of Compliance Status that you submitted to comply with this subpart.</P>
            <P>(b) Records required by § 63.10420 for each sterilization unit not equipped with an air pollution control device.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.10434</SECTNO>
            <SUBJECT>In what form and for how long must I keep my records?</SUBJECT>
            <P>(a) Your records must be in a form suitable and readily available for expeditious review.</P>
            <P>(b) You must keep each record for 5 years following the date of each record.</P>
            <P>(c) You must keep each record onsite for at least 2 years after the date of each record. You may keep the records offsite for the remaining 3 years.</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Other Requirements and Information</HD>
          <SECTION>
            <SECTNO>§ 63.10440</SECTNO>
            <SUBJECT>What parts of the General Provisions apply to me?</SUBJECT>
            <P>Table 1 to this subpart shows which parts of the General Provisions in 40 CFR 63.1 through 63.16 apply to you.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.10442</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <P>(a) This subpart can be implemented and enforced by us, the U.S. EPA, or a delegated authority such as your State, local, or tribal agency. If the U.S. EPA Administrator has delegated authority to your State, local, or tribal agency, then that agency has the authority to implement and enforce this subpart. You should contact your U.S. EPA Regional Office to find out if this subpart is delegated to your State, local, or tribal agency.</P>
            <P>(b) In delegating implementation and enforcement authority of this subpart to a State, local, or tribal agency under 40 CFR part 63, subpart E, the authorities contained in paragraph (c) of this section are retained by the Administrator of the U.S. EPA and are not transferred to the State, local, or tribal agency.</P>
            <P>(c) The authorities that will not be delegated to State, local, or tribal agencies include approval of alternatives to the applicability requirements under 40 CFR 63.10382, the compliance date requirements in 40 CFR 63.10384, and the management practice standards as defined in 40 CFR 63.10390.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.10446</SECTNO>
            <SUBJECT>Do title V permitting requirements apply to area sources subject to this subpart?</SUBJECT>
            <P>You are exempt from the obligation to obtain a permit under 40 CFR part 70 or 40 CFR part 71, provided you are not otherwise required by law to obtain a permit under 40 CFR 70.3(a) or 40 CFR 71.3(a). Notwithstanding the previous sentence, you must continue to comply with the provisions of this subpart.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.10448</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <P>Terms used in this subpart are defined in the Clean Air Act (CAA), in 40 CFR 63.2, and in this section as follows:</P>
            <P>
              <E T="03">Aeration process</E> means any time when ethylene oxide is removed from the aeration unit through the aeration unit vent or from the combination sterilization unit through the sterilization unit vent, while aeration or off-gassing is occurring.</P>
            <P>
              <E T="03">Aeration unit</E> means any vessel that is used to facilitate off-gassing of ethylene oxide.</P>
            <P>
              <E T="03">Air pollution control device</E> means a catalytic oxidizer, acid-water scrubber, or any other air pollution control equipment that reduces the quantity of ethylene oxide in the effluent gas stream from sterilization and aeration processes.</P>
            <P>
              <E T="03">Combination sterilization unit</E> means any enclosed vessel in which both the sterilization process and the aeration <PRTPAGE P="157"/>process occur within the same vessel, i.e., the vessel is filled with ethylene oxide gas or an ethylene oxide/inert gas mixture for the purpose of sterilizing and is followed by off-gassing of ethylene oxide.</P>
            <P>
              <E T="03">Common aeration time</E> means that items require the same length of time to off-gas ethylene oxide.</P>
            <P>
              <E T="03">Full load</E> means the maximum number of items that does not impede proper air removal, humidification of the load, or sterilant penetration and evacuation in the sterilization unit.</P>
            <P>
              <E T="03">Hospital</E> means a facility that provides medical care and treatment for patients who are acutely ill or chronically ill on an inpatient basis under supervision of licensed physicians and under nursing care offered 24 hours per day. Hospitals include diagnostic and major surgery facilities but exclude doctor's offices, clinics, or other facilities whose primary purpose is to provide medical services to humans or animals on an outpatient basis.</P>
            <P>
              <E T="03">Hospital central services staff</E> means a healthcare professional, including manager and technician, who is either directly involved in or responsible for sterile processing at a hospital.</P>
            <P>
              <E T="03">Medically necessary</E> means circumstances that a hospital central services staff, a hospital administrator, or a physician concludes, based on generally accepted medical practices, necessitate sterilizing without a full load in order to protect human health.</P>
            <P>
              <E T="03">State or local regulation</E> means a regulation at the State or local level that requires a hospital to reduce the quantity of ethylene oxide emissions from ethylene oxide sterilization units.</P>
            <P>
              <E T="03">Sterilization facility</E> means the group of ethylene oxide sterilization units at a hospital using ethylene oxide gas or an ethylene oxide/inert gas mixture for the purpose of sterilizing.</P>
            <P>
              <E T="03">Sterilization process</E> means any time when ethylene oxide is removed from the sterilization unit or combination sterilization unit through the sterilization unit vent.</P>
            <P>
              <E T="03">Sterilization unit</E> means any enclosed vessel that is filled with ethylene oxide gas or an ethylene oxide/inert gas mixture for the purpose of sterilizing. As used in this subpart, the term includes combination sterilization units.</P>
          </SECTION>
        </SUBJGRP>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. WWWWW, Table 1</EAR>
          <HD SOURCE="HED">Table 1 to Subpart WWWWW of Part 63—Applicability of General Provisions to Subpart WWWWW</HD>
          <P>As required in § 63.10440, you must comply with the requirements of the General Provisions (40 CFR part 63, subpart A) shown in the following table:</P>
          <GPOTABLE CDEF="s50,r50,xs60,r50" COLS="4" OPTS="L2">
            <BOXHD>
              <CHED H="1">Citation</CHED>
              <CHED H="1">Subject</CHED>
              <CHED H="1">Applies to subpart WWWWW</CHED>
              <CHED H="1">Explanation</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">§ 63.1(a)(1)-(4), (6), (10)-(12), (b)(1), (3)</ENT>
              <ENT>Applicability</ENT>
              <ENT>Yes</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.1(a)(5), (7)-(9)</ENT>
              <ENT>[Reserved]</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.1(b)(2)</ENT>
              <ENT>[Reserved]</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.1(c)(1)-(2)</ENT>
              <ENT>Applicability of this part after a relevant standard has been set</ENT>
              <ENT>Yes</ENT>
              <ENT>§ 63.10446 of this subpart exempts affected sources from the obligation to obtain title V operating permits for purposes of being subject to this subpart.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.1(c)(3)-(4)</ENT>
              <ENT>[Reserved]</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.1(c)(5)</ENT>
              <ENT>Subject to notification requirements</ENT>
              <ENT>No</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.1(d)</ENT>
              <ENT>[Reserved]</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.1(e)</ENT>
              <ENT>Emission limitation by permit</ENT>
              <ENT>Yes</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.2</ENT>
              <ENT>Definitions</ENT>
              <ENT>Yes</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.3</ENT>
              <ENT>Units and abbreviations</ENT>
              <ENT>Yes</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.4</ENT>
              <ENT>Prohibited activities</ENT>
              <ENT>Yes</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.5</ENT>
              <ENT>Construction/reconstruction</ENT>
              <ENT>No</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(a), (b)(1)-(5), (7)</ENT>
              <ENT>Compliance with standards and maintenance requirements</ENT>
              <ENT>Yes</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(b)(6)</ENT>
              <ENT>[Reserved]</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(c)(1)</ENT>
              <ENT>Compliance dates for existing sources</ENT>
              <ENT>Yes</ENT>
              <ENT>Subpart WWWWW requires compliance 1 year after the effective date.</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="158"/>
              <ENT I="01">§ 63.6(c)(2), (5)</ENT>
              <ENT>Compliance dates for CAA section 112(f) standards and for area sources that become major</ENT>
              <ENT>No</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(c)(3)-(4)</ENT>
              <ENT>[Reserved]</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(d)</ENT>
              <ENT>[Reserved]</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(e)-(h)</ENT>
              <ENT>Alternative nonopacity emission standard</ENT>
              <ENT>No</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(i)-(j)</ENT>
              <ENT>Compliance extension</ENT>
              <ENT>Yes</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7</ENT>
              <ENT>Performance testing requirements</ENT>
              <ENT>No</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8</ENT>
              <ENT>Monitoring requirements</ENT>
              <ENT>No</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(a)</ENT>
              <ENT>Applicability and initial notifications addressees</ENT>
              <ENT>Yes</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(b)</ENT>
              <ENT>Initial notifications</ENT>
              <ENT>No</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(c)</ENT>
              <ENT>Request for extension of compliance</ENT>
              <ENT>Yes</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(d)-(j)</ENT>
              <ENT>Other notifications</ENT>
              <ENT>No</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(a)(1)-(2)</ENT>
              <ENT>Recordkeeping and reporting requirements, applicability</ENT>
              <ENT>Yes</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(a)(3)-(4)</ENT>
              <ENT>General information</ENT>
              <ENT>Yes</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(a)(5)-(7)</ENT>
              <ENT>Recordkeeping and reporting requirements, reporting schedules</ENT>
              <ENT>No</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(1)</ENT>
              <ENT>Retention time</ENT>
              <ENT>Yes</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(2)-(f)</ENT>
              <ENT>Recordkeeping and reporting requirements</ENT>
              <ENT>No</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.11</ENT>
              <ENT>Control device requirements</ENT>
              <ENT>No</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.12</ENT>
              <ENT>State authority and delegations</ENT>
              <ENT>Yes</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§§ 63.13-63.16</ENT>
              <ENT>Addresses, Incorporations by Reference, availability of information, performance track provisions</ENT>
              <ENT>Yes</ENT>
            </ROW>
          </GPOTABLE>
        </APPENDIX>
      </SUBPART>
      <SUBPART>
        <RESERVED>Subpart XXXXX [Reserved]</RESERVED>
      </SUBPART>
      <SUBPART>
        <HD SOURCE="HED">Subpart YYYYY—National Emission Standards for Hazardous Air Pollutants for Area Sources: Electric Arc Furnace Steelmaking Facilities</HD>
        <SOURCE>
          <HD SOURCE="HED">Source:</HD>
          <P>72 FR 74111, Dec. 28, 2007, unless otherwise noted.</P>
        </SOURCE>
        <SUBJGRP>
          <HD SOURCE="HED">Applicability and Compliance Dates</HD>
          <SECTION>
            <SECTNO>§ 63.10680</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <P>(a) You are subject to this subpart if you own or operate an electric arc furnace (EAF) steelmaking facility that is an area source of hazardous air pollutant (HAP) emissions.</P>
            <P>(b) This subpart applies to each new or existing affected source. The affected source is each EAF steelmaking facility.</P>
            <P>(1) An affected source is existing if you commenced construction or reconstruction of the affected source on or before September 20, 2007.</P>
            <P>(2) An affected source is new if you commenced construction or reconstruction of the affected source after September 20, 2007.</P>
            <P>(c) This subpart does not apply to research and development facilities, as defined in section 112(c)(7) of the Clean Air Act (CAA).</P>
            <P>(d) If you own or operate an area source subject to this subpart, you must have or obtain a permit under 40 CFR part 70 or 40 CFR part 71.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.10681</SECTNO>
            <SUBJECT>What are my compliance dates?</SUBJECT>
            <P>(a) Except as provided in paragraph (b) of this section, if you own or operate an existing affected source, you must achieve compliance with the applicable provisions of this subpart by no later than June 30, 2008.</P>

            <P>(b) If you own or operate an existing affected source, you must achieve compliance with opacity limit in § 63.10686(b)(2) or (c)(2) by no later than December 28, 2010 if you demonstrate to the satisfaction of the permitting <PRTPAGE P="159"/>authority that additional time is needed to install or modify emission control equipment.</P>
            <P>(c) If you start up a new affected source on or before December 28, 2007, you must achieve compliance with the applicable provisions of this subpart by no later than December 28, 2007.</P>
            <P>(d) If you start up a new affected source after December 28, 2007, you must achieve compliance with the applicable provisions of this subpart upon startup of your affected source.</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Standards and Compliance Requirements</HD>
          <SECTION>
            <SECTNO>§ 63.10685</SECTNO>
            <SUBJECT>What are the requirements for the control of contaminants from scrap?</SUBJECT>
            <P>(a) <E T="03">Chlorinated plastics, lead, and free organic liquids</E>. For metallic scrap utilized in the EAF at your facility, you must comply with the requirements in either paragraph (a)(1) or (2) of this section. You may have certain scrap at your facility subject to paragraph (a)(1) of this section and other scrap subject to paragraph (a)(2) of this section provided the scrap remains segregated until charge make-up.</P>
            <P>(1) <E T="03">Pollution prevention plan</E>. For the production of steel other than leaded steel, you must prepare and implement a pollution prevention plan for metallic scrap selection and inspection to minimize the amount of chlorinated plastics, lead, and free organic liquids that is charged to the furnace. For the production of leaded steel, you must prepare and implement a pollution prevention plan for scrap selection and inspection to minimize the amount of chlorinated plastics and free organic liquids in the scrap that is charged to the furnace. You must submit the scrap pollution prevention plan to the permitting authority for approval. You must operate according to the plan as submitted during the review and approval process, operate according to the approved plan at all times after approval, and address any deficiency identified by the permitting authority within 60 days following disapproval of a plan. You may request approval to revise the plan and may operate according to the revised plan unless and until the revision is disapproved by the permitting authority. You must keep a copy of the plan onsite, and you must provide training on the plan's requirements to all plant personnel with materials acquisition or inspection duties. Each plan must include the information in paragraphs (a)(1)(i) through (iii) of this section:</P>
            <P>(i) Specifications that scrap materials must be depleted (to the extent practicable) of undrained used oil filters, chlorinated plastics, and free organic liquids at the time of charging to the furnace.</P>
            <P>(ii) A requirement in your scrap specifications for removal (to the extent practicable) of lead-containing components (such as batteries, battery cables, and wheel weights) from the scrap, except for scrap used to produce leaded steel.</P>
            <P>(iii) Procedures for determining if the requirements and specifications in paragraph (a)(1) of this section are met (such as visual inspection or periodic audits of scrap providers) and procedures for taking corrective actions with vendors whose shipments are not within specifications.</P>
            <P>(iv) The requirements of paragraph (a)(1) of this section do not apply to the routine recycling of baghouse bags or other internal process or maintenance materials in the furnace. These exempted materials must be identified in the pollution prevention plan.</P>
            <P>(2) <E T="03">Restricted metallic scrap</E>. For the production of steel other than leaded steel, you must not charge to a furnace metallic scrap that contains scrap from motor vehicle bodies, engine blocks, oil filters, oily turnings, machine shop borings, transformers or capacitors containing polychlorinated biphenyls, lead-containing components, chlorinated plastics, or free organic liquids. For the production of leaded steel, you must not charge to the furnace metallic scrap that contains scrap from motor vehicle bodies, engine blocks, oil filters, oily turnings, machine shop borings, transformers or capacitors containing polychlorinated biphenyls, chlorinated plastics, or free organic liquids. This restriction does not apply to any post-consumer engine blocks, post-consumer oil filters, or oily turnings that are processed or cleaned to the extent practicable such that the materials do not include lead <PRTPAGE P="160"/>components, chlorinated plastics, or free organic liquids. This restriction does not apply to motor vehicle scrap that is charged to recover the chromium or nickel content if you meet the requirements in paragraph (b)(3) of this section.</P>
            <P>(b) <E T="03">Mercury requirements</E>. For scrap containing motor vehicle scrap, you must procure the scrap pursuant to one of the compliance options in paragraphs (b)(1), (2), or (3) of this section for each scrap provider, contract, or shipment. For scrap that does not contain motor vehicle scrap, you must procure the scrap pursuant to the requirements in paragraph (b)(4) of this section for each scrap provider, contract, or shipment. You may have one scrap provider, contract, or shipment subject to one compliance provision and others subject to another compliance provision.</P>
            <P>(1) <E T="03">Site-specific plan for mercury switches</E>. You must comply with the requirements in paragraphs (b)(1)(i) through (v) of this section.</P>
            <P>(i) You must include a requirement in your scrap specifications for removal of mercury switches from vehicle bodies used to make the scrap.</P>
            <P>(ii) You must prepare and operate according to a plan demonstrating how your facility will implement the scrap specification in paragraph (b)(1)(i) of this section for removal of mercury switches. You must submit the plan to the permitting authority for approval. You must operate according to this plan as submitted during the review and approval process, operate according to the approved plan at all times after approval, and address any deficiency identified by the permitting authority within 60 days following disapproval of a plan. You may request approval to revise the plan and may operate according to the revised plan unless and until the revision is disapproved by the permitting authority. The permitting authority may change the approval status of the plan upon 90-days written notice based upon the semiannual compliance report or other information. The plan must include:</P>
            <P>(A) A means of communicating to scrap purchasers and scrap providers the need to obtain or provide motor vehicle scrap from which mercury switches have been removed and the need to ensure the proper management of the mercury switches removed from that scrap as required under the rules implementing subtitle C of the Resource Conservation and Recovery Act (RCRA) (40 CFR parts 261 through 265 and 268). The plan must include documentation of direction to appropriate staff to communicate to suppliers throughout the scrap supply chain the need to promote the removal of mercury switches from end-of-life vehicles. Upon the request of the permitting authority, you must provide examples of materials that are used for outreach to suppliers, such as letters, contract language, policies for purchasing agents, and scrap inspection protocols;</P>
            <P>(B) Provisions for obtaining assurance from scrap providers that motor vehicle scrap provided to the facility meet the scrap specification;</P>
            <P>(C) Provisions for periodic inspections or other means of corroboration to ensure that scrap providers and dismantlers are implementing appropriate steps to minimize the presence of mercury switches in motor vehicle scrap and that the mercury switches removed are being properly managed, including the minimum frequency such means of corroboration will be implemented; and</P>
            <P>(D) Provisions for taking corrective actions (i.e., actions resulting in scrap providers removing a higher percentage of mercury switches or other mercury-containing components) if needed, based on the results of procedures implemented in paragraph (b)(1)(ii)(C) of this section).</P>
            <P>(iii) You must require each motor vehicle scrap provider to provide an estimate of the number of mercury switches removed from motor vehicle scrap sent to your facility during the previous year and the basis for the estimate. The permitting authority may request documentation or additional information at any time.</P>

            <P>(iv) You must establish a goal for each scrap provider to remove at least 80 percent of the mercury switches. Although a site-specific plan approved under paragraph (b)(1) of this section may require only the removal of convenience light switch mechanisms, the permitting authority will credit all <PRTPAGE P="161"/>documented and verifiable mercury-containing components removed from motor vehicle scrap (such as sensors in anti-locking brake systems, security systems, active ride control, and other applications) when evaluating progress towards the 80 percent goal.</P>
            <P>(v) For each scrap provider, you must submit semiannual progress reports to the permitting authority that provide the number of mercury switches removed or the weight of mercury recovered from the switches, the estimated number of vehicles processed, an estimate of the percent of mercury switches removed, and certification that the removed mercury switches were recycled at RCRA-permitted facilities or otherwise properly managed pursuant to RCRA subtitle C regulations referenced in paragraph (b)(1)(ii)(A) of this section. This information can be submitted in aggregated form and does not have to be submitted for each scrap provider, contract, or shipment. The permitting authority may change the approval status of a site-specific plan following 90-days notice based on the progress reports or other information.</P>
            <P>(2) <E T="03">Option for approved mercury programs.</E> You must certify in your notification of compliance status that you participate in and purchase motor vehicle scrap only from scrap providers who participate in a program for removal of mercury switches that has been approved by the Administrator based on the criteria in paragraphs (b)(2)(i) through (iii) of this section. If you purchase motor vehicle scrap from a broker, you must certify that all scrap received from that broker was obtained from other scrap providers who participate in a program for the removal of mercury switches that has been approved by the Administrator based on the criteria in paragraphs (b)(2)(i) through (iii) of this section. The National Vehicle Mercury Switch Recovery Program and the Vehicle Switch Recovery Program mandated by Maine State law are EPA-approved programs under paragraph (b)(2) of this section unless and until the Administrator disapproves the program (in part or in whole) under paragraph (b)(2)(iii) of this section.</P>
            <P>(i) The program includes outreach that informs the dismantlers of the need for removal of mercury switches and provides training and guidance for removing mercury switches;</P>
            <P>(ii) The program has a goal to remove at least 80 percent of mercury switches from the motor vehicle scrap the scrap provider processes. Although a program approved under paragraph (b)(2) of this section may require only the removal of convenience light switch mechanisms, the Administrator will credit all documented and verifiable mercury-containing components removed from motor vehicle scrap (such as sensors in anti-locking brake systems, security systems, active ride control, and other applications) when evaluating progress towards the 80 percent goal; and</P>
            <P>(iii) The program sponsor agrees to submit progress reports to the Administrator no less frequently than once every year that provide the number of mercury switches removed or the weight of mercury recovered from the switches, the estimated number of vehicles processed, an estimate of the percent of mercury switches recovered, and certification that the recovered mercury switches were recycled at facilities with permits as required under the rules implementing subtitle C of RCRA (40 CFR parts 261 through 265 and 268). The progress reports must be based on a database that includes data for each program participant; however, data may be aggregated at the State level for progress reports that will be publicly available. The Administrator may change the approval status of a program or portion of a program (e.g., at the State level) following 90-days notice based on the progress reports or on other information.</P>
            <P>(iv) You must develop and maintain onsite a plan demonstrating the manner through which your facility is participating in the EPA-approved program.</P>
            <P>(A) The plan must include facility-specific implementation elements, corporate-wide policies, and/or efforts coordinated by a trade association as appropriate for each facility.</P>

            <P>(B) You must provide in the plan documentation of direction to appropriate staff to communicate to suppliers throughout the scrap supply chain the <PRTPAGE P="162"/>need to promote the removal of mercury switches from end-of-life vehicles. Upon the request of the permitting authority, you must provide examples of materials that are used for outreach to suppliers, such as letters, contract language, policies for purchasing agents, and scrap inspection protocols.</P>
            <P>(C) You must conduct periodic inspections or provide other means of corroboration to ensure that scrap providers are aware of the need for and are implementing appropriate steps to minimize the presence of mercury in scrap from end-of-life vehicles.</P>
            <P>(3) <E T="03">Option for specialty metal scrap.</E> You must certify in your notification of compliance status that the only materials from motor vehicles in the scrap are materials recovered for their specialty alloy (including, but not limited to, chromium, nickel, molybdenum, or other alloys) content (such as certain exhaust systems) and, based on the nature of the scrap and purchase specifications, that the type of scrap is not reasonably expected to contain mercury switches.</P>
            <P>(4) <E T="03">Scrap that does not contain motor vehicle scrap.</E> For scrap not subject to the requirements in paragraphs (b)(1) through (3) of this section, you must certify in your notification of compliance status and maintain records of documentation that this scrap does not contain motor vehicle scrap.</P>
            <P>(c) <E T="03">Recordkeeping and reporting requirements.</E> In addition to the records required by § 63.10, you must keep records to demonstrate compliance with the requirements for your pollution prevention plan in paragraph (a)(1) of this section and/or for the use of only restricted scrap in paragraph (a)(2) of this section and for mercury in paragraphs (b)(1) through (3) of this section as applicable. You must keep records documenting compliance with paragraph (b)(4) of this section for scrap that does not contain motor vehicle scrap.</P>
            <P>(1) If you are subject to the requirements for a site-specific plan for mercury under paragraph (b)(1) of this section, you must:</P>
            <P>(i) Maintain records of the number of mercury switches removed or the weight of mercury recovered from the switches and properly managed, the estimated number of vehicles processed, and an estimate of the percent of mercury switches recovered; and</P>
            <P>(ii) Submit semiannual reports of the number of mercury switches removed or the weight of mercury recovered from the switches and properly managed, the estimated number of vehicles processed, an estimate of the percent of mercury switches recovered, and a certification that the recovered mercury switches were recycled at RCRA-permitted facilities. The semiannual reports must include a certification that you have conducted inspections or taken other means of corroboration as required under paragraph (b)(1)(ii)(C) of this section. You may include this information in the semiannual compliance reports required under paragraph (c)(3) of this section.</P>
            <P>(2) If you are subject to the option for approved mercury programs under paragraph (b)(2) of this section, you must maintain records identifying each scrap provider and documenting the scrap provider's participation in an approved mercury switch removal program. If you purchase motor vehicle scrap from a broker, you must maintain records identifying each broker and documentation that all scrap provided by the broker was obtained from other scrap providers who participate in an approved mercury switch removal program.</P>
            <P>(3) You must submit semiannual compliance reports to the Administrator for the control of contaminants from scrap according to the requirements in § 63.10(e). The report must clearly identify any deviation from the requirements in paragraphs (a) and (b) of this section and the corrective action taken. You must identify which compliance option in paragraph (b) of this section applies to each scrap provider, contract, or shipment.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.10686</SECTNO>
            <SUBJECT>What are the requirements for electric arc furnaces and argon-oxygen decarburization vessels?</SUBJECT>

            <P>(a) You must install, operate, and maintain a capture system that collects the emissions from each EAF (including charging, melting, and tapping operations) and argon-oxygen <PRTPAGE P="163"/>decarburization (AOD) vessel and conveys the collected emissions to a control device for the removal of particulate matter (PM).</P>
            <P>(b) Except as provided in paragraph (c) of this section, you must not discharge or cause the discharge into the atmosphere from an EAF or AOD vessel any gases which:</P>
            <P>(1) Exit from a control device and contain in excess of 0.0052 grains of PM per dry standard cubic foot (gr/dscf); and</P>
            <P>(2) Exit from a melt shop and, due solely to the operations of any affected EAF(s) or AOD vessel(s), exhibit 6 percent opacity or greater.</P>
            <P>(c) If you own or operate a new or existing affected source that has a production capacity of less than 150,000 tons per year (tpy) of stainless or specialty steel (as determined by the maximum production if specified in the source's operating permit or EAF capacity and maximum number of operating hours per year), you must not discharge or cause the discharge into the atmosphere from an EAF or AOD vessel any gases which:</P>
            <P>(1) Exit from a control device and contain particulate matter (PM) in excess of 0.8 pounds per ton (lb/ton) of steel. Alternatively, the owner or operator may elect to comply with a PM limit of 0.0052 grains per dry standard cubic foot (gr/dscf); and</P>
            <P>(2) Exit from a melt shop and, due solely to the operations of any affected EAF(s) or AOD vessel(s), exhibit 6 percent opacity or greater.</P>
            <P>(d) Except as provided in paragraph (d)(6) of this section, you must conduct performance tests to demonstrate initial compliance with the applicable emissions limit for each emissions source subject to an emissions limit in paragraph (b) or (c) of this section.</P>
            <P>(1) You must conduct each PM performance test for an EAF or AOD vessel according to the procedures in § 63.7 and 40 CFR 60.275a using the following test methods in 40 CFR part 60, appendices A-1, A-2, A-3, and A-4:</P>
            <P>(i) Method 1 or 1A of appendix A-1 of 40 CFR part 60 to select sampling port locations and the number of traverse points in each stack or duct. Sampling sites must be located at the outlet of the control device (or at the outlet of the emissions source if no control device is present) prior to any releases to the atmosphere.</P>
            <P>(ii) Method 2, 2A, 2C, 2D, 2F, or 2G of appendix A-1 of 40 CFR part 60 to determine the volumetric flow rate of the stack gas.</P>
            <P>(iii) Method 3, 3A, or 3B of appendix A-3 of 40 CFR part 60 to determine the dry molecular weight of the stack gas. You may use ANSI/ASME PTC 19.10-1981, “Flue and Exhaust Gas Analyses” (incorporated by reference—see § 63.14) as an alternative to EPA Method 3B.</P>
            <P>(iv) Method 4 of appendix A-3 of 40 CFR part 60 to determine the moisture content of the stack gas.</P>
            <P>(v) Method 5 or 5D of appendix A-3 of 40 CFR part 60 to determine the PM concentration. Three valid test runs are needed to comprise a PM performance test. For EAF, sample only when metal is being melted and refined. For AOD vessels, sample only when the operation(s) are being conducted.</P>
            <P>(2) You must conduct each opacity test for a melt shop according to the procedures in § 63.6(h) and Method 9 of appendix A-4 of 40 CFR part 60. When emissions from any EAF or AOD vessel are combined with emissions from emission sources not subject to this subpart, you must demonstrate compliance with the melt shop opacity limit based on emissions from only the emission sources subject to this subpart.</P>
            <P>(3) During any performance test, you must monitor and record the information specified in 40 CFR 60.274a(h) for all heats covered by the test.</P>
            <P>(4) You must notify and receive approval from the Administrator for procedures that will be used to determine compliance for an EAF or AOD vessel when emissions are combined with those from facilities not subject to this subpart.</P>

            <P>(5) To determine compliance with the PM emissions limit in paragraph (c) of this section for an EAF or AOD vessel in a lb/ton of steel format, compute the process-weighted mass emissions (E<E T="52">p</E>) for each test run using Equation 1 of this section:</P>
            <GPH DEEP="27" SPAN="1">
              <GID>ER28DE07.004</GID>
            </GPH>
            <EXTRACT>
              <FP>Where:</FP>
              
              <PRTPAGE P="164"/>
              <FP SOURCE="FP-1">E<E T="52">p</E> = Process-weighted mass emissions of PM, lb/ton;</FP>
              <FP SOURCE="FP-1">C = Concentration of PM or total metal HAP, gr/dscf;</FP>
              <FP SOURCE="FP-1">Q = Volumetric flow rate of stack gas, dscf/hr;</FP>
              <FP SOURCE="FP-1">T = Total time during a test run that a sample is withdrawn from the stack during steel production cycle, hr;</FP>
              <FP SOURCE="FP-1">P = Total amount of metal produced during the test run, tons; and</FP>
              <FP SOURCE="FP-1">K = Conversion factor, 7,000 grains per pound.</FP>
            </EXTRACT>
            
            <P>(6) If you own or operate an existing affected source that is subject to the emissions limits in paragraph (b) or (c) of this section, you may certify initial compliance with the applicable emission limit for one or more emissions sources based on the results of a previous performance test for that emissions source in lieu of the requirement for an initial performance test provided that the test(s) were conducted within 5 years of the compliance date using the methods and procedures specified in paragraph (d)(1) or (2) of this section; the test(s) were for the affected facility; and the test(s) were representative of current or anticipated operating processes and conditions. Should the permitting authority deem the prior test data unacceptable to demonstrate compliance with an applicable emissions limit, the owner or operator must conduct an initial performance test within 180 days of the compliance date or within 90 days of receipt of the notification of disapproval of the prior test, whichever is later.</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Other Information and Requirements</HD>
          <SECTION>
            <SECTNO>§ 63.10690</SECTNO>
            <SUBJECT>What parts of the General Provisions apply to this subpart?</SUBJECT>
            <P>(a) You must comply with the requirements of the NESHAP General Provisions (40 CFR part 63, subpart A) as provided in Table 1 of this subpart.</P>
            <P>(b) The notification of compliance status required by § 63.9(h) must include each applicable certification of compliance, signed by a responsible official, in paragraphs (b)(1) through (6) of this section.</P>
            <P>(1) For the pollution prevention plan requirements in § 63.10685(a)(1): “This facility has submitted a pollution prevention plan for metallic scrap selection and inspection in accordance with § 63.10685(a)(1)”;</P>
            <P>(2) For the restrictions on metallic scrap in § 63.10685(a)(2): “This facility complies with the requirements for restricted metallic scrap in accordance with § 63.10685(a)(2)”;</P>
            <P>(3) For the mercury requirements in § 63.10685(b):</P>
            <P>(i) “This facility has prepared a site-specific plan for mercury switches in accordance with § 63.10685(b)(1)”;</P>
            <P>(ii) “This facility participates in and purchases motor vehicle scrap only from scrap providers who participate in a program for removal of mercury switches that has been approved by the EPA Administrator in accordance with § 63.10685(b)(2)” and has prepared a plan demonstrating how the facility participates in the EPA-approved program in accordance with § 63.10685(b)(2)(iv);</P>
            <P>(iii) “The only materials from motor vehicles in the scrap charged to an electric arc furnace at this facility are materials recovered for their specialty alloy content in accordance with § 63.10685(b)(3) which are not reasonably expected to contain mercury switches”; or</P>
            <P>(iv) “This facility complies with the requirements for scrap that does not contain motor vehicle scrap in accordance with § 63.10685(b)(4).”</P>
            <P>(4) This certification of compliance for the capture system requirements in § 63.10686(a), signed by a responsible official: “This facility operates a capture system for each electric arc furnace and argon-oxygen decarburization vessel that conveys the collected emissions to a PM control device in accordance with § 63.10686(a)”.</P>
            <P>(5) If applicable, this certification of compliance for the performance test requirements in § 63.10686(d)(6): “This facility certifies initial compliance with the applicable emissions limit in § 63.10686(a) or (b) based on the results of a previous performance test in accordance with § 63.10686(d)(6)”.</P>
            <P>(6) This certification of compliance for the monitoring requirements in § 63.10686(e), signed by a responsible official: “This facility has developed and submitted proposed monitoring information in accordance with 40 CFR part 64”.</P>
          </SECTION>
          <SECTION>
            <PRTPAGE P="165"/>
            <SECTNO>§ 63.10691</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <P>(a) This subpart can be implemented and enforced by the EPA or a delegated authority such as a State, local, or tribal agency. If the EPA Administrator has delegated authority to a State, local, or tribal agency, then that Agency has the authority to implement and enforce this subpart. You should contact your EPA Regional Office to find out if this subpart is delegated to your State, local, or tribal agency.</P>
            <P>(b) In delegating implementation and enforcement authority of this subpart to a State, local, or tribal agency under 40 CFR part 63, subpart E, the authorities contained in paragraph (c) of this section are retained by the Administrator and are not transferred to the State, local, or tribal agency.</P>
            <P>(c) The authorities that will not be delegated to State, local, or tribal agencies are listed in paragraphs (c)(1) through (6) of this section.</P>
            <P>(1) Approval of an alternative non-opacity emissions standard under 40 CFR 63.6(g).</P>
            <P>(2) Approval of an alternative opacity emissions standard under § 63.6(h)(9).</P>
            <P>(3) Approval of a major change to test methods under § 63.7(e)(2)(ii) and (f). A “major change to test method” is defined in 40 CFR 63.90.</P>
            <P>(4) Approval of major change to monitoring under 40 CFR 63.8(f). A “major change to monitoring” is defined in 40 CFR 63.90.</P>
            <P>(5) Approval of a major change to recordkeeping/reporting under 40 CFR 63.10(f). A “major change to recordkeeping/reporting” is defined in 40 CFR 63.90.</P>
            <P>(6) Approval of a program for the removal of mercury switches under § 63.10685(b)(2).</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.10692</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <P>Terms used in this subpart are defined in the Clean Air Act, in § 63.2, and in this section as follows:</P>
            <P>
              <E T="03">Argon-oxygen decarburization (AOD) vessel</E> means any closed-bottom, refractory-lined converter vessel with submerged tuyeres through which gaseous mixtures containing argon and oxygen or nitrogen may be blown into molten steel for further refining.</P>
            <P>
              <E T="03">Capture system</E> means the equipment (including ducts, hoods, fans, dampers, etc.) used to capture or transport emissions generated by an electric arc furnace or argon-oxygen decarburization vessel to the air pollution control device.</P>
            <P>
              <E T="03">Chlorinated plastics</E> means solid polymeric materials that contain chlorine in the polymer chain, such as polyvinyl chloride (PVC) and PVC copolymers.</P>
            <P>
              <E T="03">Control device</E> means the air pollution control equipment used to remove particulate matter from the effluent gas stream generated by an electric arc furnace or argon-oxygen decarburization vessel.</P>
            <P>
              <E T="03">Deviation</E> means any instance where an affected source subject to this subpart, or an owner or operator of such a source:</P>
            <P>(1) Fails to meet any requirement or obligation established by this subpart, including but not limited to any emissions limitation or work practice standard;</P>
            <P>(2) Fails to meet any term or condition that is adopted to implement an applicable requirement in this subpart and that is included in the operating permit for any affected source required to obtain such a permit; or</P>
            <P>(3) Fails to meet any emissions limitation in this subpart during startup, shutdown, or malfunction, regardless of whether or not such failure is permitted by this subpart.</P>
            <P>
              <E T="03">Electric arc furnace (EAF)</E> means a furnace that produces molten steel and heats the charge materials with electric arcs from carbon electrodes. An electric arc furnace consists of the furnace shell, roof, and the transformer.</P>
            <P>
              <E T="03">Electric arc furnace (EAF) steelmaking facility</E> means a steel plant that produces carbon, alloy, or specialty steels using an EAF. This definition excludes EAF steelmaking facilities at steel foundries and EAF facilities used to produce nonferrous metals.</P>
            <P>
              <E T="03">Free organic liquids</E> means material that fails the paint filter test by EPA Method 9095B, (revision 2, dated November 1994) (incorporated by reference—see § 63.14) after accounting for water using a moisture determination <PRTPAGE P="166"/>test by ASTM Method D2216-05 (incorporated by reference—see § 63.14). If, after conducting a moisture determination test, if any portion of the material passes through and drops from the filter within the 5-minute test period, the material contains <E T="03">free organic liquids</E>.</P>
            <P>
              <E T="03">Leaded steel</E> means steel that must meet a minimum specification for lead content (typically 0.25 percent or more) and for which lead is a necessary alloy for that grade of steel.</P>
            <P>
              <E T="03">Mercury switch</E> means each mercury-containing capsule or switch assembly that is part of a convenience light switch mechanism installed in a vehicle.</P>
            <P>
              <E T="03">Motor vehicle</E> means an automotive vehicle not operated on rails and usually operated with rubber tires for use on highways.</P>
            <P>
              <E T="03">Motor vehicle scrap</E> means vehicle or automobile bodies, including automobile body hulks, that have been processed through a shredder. <E T="03">Motor vehicle scrap</E> does not include automobile manufacturing bundles, or miscellaneous vehicle parts, such as wheels, bumpers or other components that do not contain mercury switches.</P>
            <P>
              <E T="03">Nonferrous metals</E> means any pure metal other than iron or any metal alloy for which an element other than iron is its major constituent by percent in weight.</P>
            <P>
              <E T="03">Scrap provider</E> means the person (including a broker) who contracts directly with a steel mill to provide scrap that contains motor vehicle scrap. Scrap processors such as shredder operators or vehicle dismantlers that do not sell scrap directly to a steel mill are not <E T="03">scrap providers</E>.</P>
            <P>
              <E T="03">Specialty steel</E> means low carbon and high alloy steel other than stainless steel that is processed in an argon-oxygen decarburization vessel.</P>
            <P>
              <E T="03">Stainless steel</E> means low carbon steel that contains at least 10.5 percent chromium.</P>
          </SECTION>
        </SUBJGRP>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. YYYYY, Table 1</EAR>
          <HD SOURCE="HED">Table 1 to Subpart YYYYY of Part 63—Applicability of General Provisions to Subpart YYYYY</HD>
          <P>As required in § 63.10691(a), you must comply with the requirements of the NESHAP General Provisions (40 CFR part 63, subpart A) shown in the following table.</P>
          <GPOTABLE CDEF="s50,r50,xs60,r50" COLS="4" OPTS="L2">
            <BOXHD>
              <CHED H="1">Citation</CHED>
              <CHED H="1">Subject</CHED>
              <CHED H="1">Applies to subpart YYYYY?</CHED>
              <CHED H="1">Explanation</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">§ 63.1(a)(1), (a)(2), (a)(3), (a)(4), (a)(6), (a)(10)-(a)(12), (b)(1), (b)(3), (c)(1), (c)(2), (c)(5), (e)</ENT>
              <ENT>Applicability</ENT>
              <ENT>Yes</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.1(a)(5), (a)(7)-(a)(9), (b)(2), (c)(3), (c)(4), (d)</ENT>
              <ENT>Reserved</ENT>
              <ENT>No</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.2</ENT>
              <ENT>Definitions</ENT>
              <ENT>Yes</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.3</ENT>
              <ENT>Units and Abbreviations</ENT>
              <ENT>Yes</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.4</ENT>
              <ENT>Prohibited Activities and Circumvention</ENT>
              <ENT>Yes</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.5</ENT>
              <ENT>Preconstruction Review and Notification Requirements</ENT>
              <ENT>Yes</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(a), (b)(1)-(b)(5), (b)(7), (c)(1), (c)(2), (c)(5), (e)(1), (e)(3)(i), (e)(3)(iii)-(e)(3)(ix), (f), (g), (h)(1), (h)(2), (h)(5)-(h)(9), (i), (j)</ENT>
              <ENT>Compliance with Standards and Maintenance Requirements</ENT>
              <ENT>Yes</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(b)(6), (c)(3), (c)(4), (d), (e)(2), (e)(3)(ii), (h)(3), (h)(5)(iv)</ENT>
              <ENT>Reserved</ENT>
              <ENT>No</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7</ENT>
              <ENT>Applicability and Performance Test Dates</ENT>
              <ENT>Yes</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(a)(1), (a)(2), (b), (c), (d), (e), (f)(1)-(5), (g)</ENT>
              <ENT>Monitoring Requirements</ENT>
              <ENT>Yes</ENT>
              <ENT>Requirements apply if a COMS or CEMS is used.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(a)(3)</ENT>
              <ENT>[Reserved]</ENT>
              <ENT>No</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(a)(4)</ENT>
              <ENT>Additional Monitoring Requirements for Control Devices in § 63.11</ENT>
              <ENT>No</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c)(4)</ENT>
              <ENT>Continuous Monitoring System Requirements</ENT>
              <ENT>Yes</ENT>
              <ENT>Requirements apply if a COMS or CEMS is used.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(f)(6)</ENT>
              <ENT>RATA Alternative</ENT>
              <ENT>Yes</ENT>
              <ENT>Requirements apply if a CEMS is used.</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="167"/>
              <ENT I="01">§ 63.9(a), (b)(1), (b)(2), (b)(5), (c), (d), (f), (g), (h)(1)-(h)(3), (h)(5), (h)(6), (i), (j)</ENT>
              <ENT>Notification Requirements</ENT>
              <ENT>Yes</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(b)(3), (h)(4)</ENT>
              <ENT>Reserved</ENT>
              <ENT>No</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(b)(4)</ENT>
              <ENT/>
              <ENT>No</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(a), (b)(1), (b)(2)(i)-(v), (b)(2)(xiv), (b)(3), (c)(1), (c)(5)-(c)(8), (c)(10)-(c)(15), (d), (e)(1)-(e)(4), (f)</ENT>
              <ENT>Recordkeeping and Reporting Requirements</ENT>
              <ENT>Yes</ENT>
              <ENT>Additional records for CMS in § 63.10(c) (1)-(6), (9)-(15), and reports in § 63.10(d)(1)-(2) apply if a COMS or CEMS is used.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(2)(xiii)</ENT>
              <ENT>CMS Records for RATA Alternative</ENT>
              <ENT>Yes</ENT>
              <ENT>Requirements apply if a CEMS is used.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(c)(2)-(c)(4), (c)(9)</ENT>
              <ENT>Reserved</ENT>
              <ENT>No</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.11</ENT>
              <ENT>Control Device Requirements</ENT>
              <ENT>No</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.12</ENT>
              <ENT>State Authority and Delegations</ENT>
              <ENT>Yes</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§§ 63.13-63.16</ENT>
              <ENT>Addresses, Incorporations by Reference, Availability of Information, Performance Track Provisions</ENT>
              <ENT>Yes</ENT>
            </ROW>
          </GPOTABLE>
        </APPENDIX>
      </SUBPART>
      <SUBPART>
        <HD SOURCE="HED">Subpart ZZZZZ—National Emission Standards for Hazardous Air Pollutants for Iron and Steel Foundries Area Sources</HD>
        <SOURCE>
          <HD SOURCE="HED">Source:</HD>
          <P>73 FR 252, Jan. 2, 2008, unless otherwise noted.</P>
        </SOURCE>
        <SUBJGRP>
          <HD SOURCE="HED">Applicability and Compliance Dates</HD>
          <SECTION>
            <SECTNO>§ 63.10880</SECTNO>
            <SUBJECT>Am I subject to this subpart?</SUBJECT>
            <P>(a) You are subject to this subpart if you own or operate an iron and steel foundry that is an area source of hazardous air pollutant (HAP) emissions.</P>
            <P>(b) This subpart applies to each new or existing affected source. The affected source is each iron and steel foundry.</P>
            <P>(1) An affected source is existing if you commenced construction or reconstruction of the affected source before September 17, 2007.</P>
            <P>(2) An affected source is new if you commenced construction or reconstruction of the affected source on or after September 17, 2007. If an affected source is not new pursuant to the preceding sentence, it is not new as a result of a change in its compliance obligations pursuant to § 63.10881(d).</P>
            <P>(c) On and after January 2, 2008, if your iron and steel foundry becomes a major source as defined in § 63.2, you must meet the requirements of 40 CFR part 63, subpart EEEEE.</P>
            <P>(d) This subpart does not apply to research and development facilities, as defined in section 112(c)(7) of the Clean Air Act.</P>
            <P>(e) You are exempt from the obligation to obtain a permit under 40 CFR part 70 or 40 CFR part 71, provided you are not otherwise required by law to obtain a permit under 40 CFR 70.3(a) or 40 CFR 71.3(a). Notwithstanding the previous sentence, you must continue to comply with the provisions of this subpart.</P>
            <P>(f) If you own or operate an existing affected source, you must determine the initial applicability of the requirements of this subpart to a small foundry or a large foundry based on your facility's metal melt production for calendar year 2008. If the metal melt production for calendar year 2008 is 20,000 tons or less, your area source is a small foundry. If your metal melt production for calendar year 2008 is greater than 20,000 tons, your area source is a large foundry. You must submit a written notification to the Administrator that identifies your area source as a small foundry or a large foundry no later than January 2, 2009.</P>

            <P>(g) If you own or operate a new affected source, you must determine the initial applicability of the requirements of this subpart to a small foundry or a large foundry based on your facility's annual metal melting capacity at startup. If the annual metal melting capacity is 10,000 tons or less, your area source is a small foundry. If the annual metal melting capacity is greater than 10,000 tons, your area source is a large <PRTPAGE P="168"/>foundry. You must submit a written notification to the Administrator that identifies your area source as a small foundry or a large foundry no later than 120 days after startup.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.10881</SECTNO>
            <SUBJECT>What are my compliance dates?</SUBJECT>
            <P>(a) If you own or operate an existing affected source, you must achieve compliance with the applicable provisions of this subpart by the dates in paragraphs (a)(1) through (3) of this section.</P>
            <P>(1) Not later than January 2, 2009 for the pollution prevention management practices for metallic scrap in § 63.10885(a) and binder formulations in § 63.10886.</P>
            <P>(2) Not later than January 4, 2010 for the pollution prevention management practices for mercury in § 63.10885(b).</P>
            <P>(3) Except as provided in paragraph (d) of this section, not later than 2 years after the date of your large foundry's notification of the initial determination required in § 63.10880(f) for the standards and management practices in § 63.10895.</P>
            <P>(b) If you have a new affected source for which the initial startup date is on or before January 2, 2008, you must achieve compliance with the provisions of this subpart not later than January 2, 2008.</P>
            <P>(c) If you own or operate a new affected source for which the initial startup date is after January 2, 2008, you must achieve compliance with the provisions of this subpart upon startup of your affected source.</P>
            <P>(d) Following the initial determination for an existing affected source required in § 63.10880(f),</P>
            <P>(1) Beginning January 1, 2010, if the annual metal melt production of your small foundry exceeds 20,000 tons during the preceding calendar year, you must submit a notification of foundry reclassification to the Administrator within 30 days and comply with the requirements in paragraphs (d)(1)(i) or (ii) of this section, as applicable.</P>
            <P>(i) If your small foundry has never been classified as a large foundry, you must comply with the requirements for a large foundry no later than 2 years after the date of your foundry's notification that the annual metal melt production exceeded 20,000 tons.</P>
            <P>(ii) If your small foundry had previously been classified as a large foundry, you must comply with the requirements for a large foundry no later than the date of your foundry's most recent notification that the annual metal melt production exceeded 20,000 tons.</P>
            <P>(2) If your facility is initially classified as a large foundry (or your small foundry subsequently becomes a large foundry), you must comply with the requirements for a large foundry for at least 3 years before reclassifying your facility as a small foundry, even if your annual metal melt production falls below 20,000 tons. After 3 years, you may reclassify your facility as a small foundry provided your annual metal melt production for the preceding calendar year was 20,000 tons or less. If you reclassify your large foundry as a small foundry, you must submit a notification of reclassification to the Administrator within 30 days and comply with the requirements for a small foundry no later than the date you notify the Administrator of the reclassification. If the annual metal melt production exceeds 20,000 tons during a subsequent year, you must submit a notification of reclassification to the Administrator within 30 days and comply with the requirements for a large foundry no later than the date you notify the Administrator of the reclassification.</P>
            <P>(e) Following the initial determination for a new affected source required in § 63.10880(g),</P>
            <P>(1) If you increase the annual metal melt capacity of your small foundry to exceed 10,000 tons, you must submit a notification of reclassification to the Administrator within 30 days and comply with the requirements for a large foundry no later than the startup date for the new equipment, if applicable, or the date of issuance for your revised State or Federal operating permit.</P>

            <P>(2) If your facility is initially classified as a large foundry (or your small foundry subsequently becomes a large foundry), you must comply with the requirements for a large foundry for at least 3 years before reclassifying your facility as a small foundry. After 3 years, you may reclassify your facility as a small foundry provided your most recent annual metal melt capacity is <PRTPAGE P="169"/>10,000 tons or less. If you reclassify your large foundry as a small foundry, you must notify the Administrator within 30 days and comply with the requirements for a small foundry no later than the date your melting equipment was removed or taken out of service, if applicable, or the date of issuance for your revised State or Federal operating permit.</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Pollution Prevention Management Practices for New and Existing Affected Sources</HD>
          <SECTION>
            <SECTNO>§ 63.10885</SECTNO>
            <SUBJECT>What are my management practices for metallic scrap and mercury switches?</SUBJECT>
            <P>(a) <E T="03">Metallic scrap management program.</E> For each segregated metallic scrap storage area, bin or pile, you must comply with the materials acquisition requirements in paragraph (a)(1) or (2) of this section. You must keep a copy of the material specifications onsite and readily available to all personnel with material acquisition duties, and provide a copy to each of your scrap providers. You may have certain scrap subject to paragraph (a)(1) of this section and other scrap subject to paragraph (a)(2) of this section at your facility provided the metallic scrap remains segregated until charge make-up.</P>
            <P>(1) <E T="03">Restricted metallic scrap.</E> You must prepare and operate at all times according to written material specifications for the purchase and use of only metal ingots, pig iron, slitter, or other materials that do not include post-consumer automotive body scrap, post-consumer engine blocks, post-consumer oil filters, oily turnings, lead components, chlorinated plastics, or free liquids. For the purpose of this subpart, “free liquids” is defined as material that fails the paint filter test by EPA Method 9095B, “Paint Filter Liquids Test” (revision 2), November 2004 (incorporated by reference—see § 63.14). The requirements for no free liquids do not apply if the owner or operator can demonstrate that the free liquid is water that resulted from scrap exposure to rain.</P>
            <P>(2) <E T="03">General iron and steel scrap.</E> You must prepare and operate at all times according to written material specifications for the purchase and use of only iron and steel scrap that has been depleted (to the extent practicable) of organics and HAP metals in the charge materials used by the iron and steel foundry. The materials specifications must include at minimum the information specified in paragraph (a)(2)(i) or (ii) of this section.</P>
            <P>(i) Except as provided in paragraph (a)(2)(ii) of this section, specifications for metallic scrap materials charged to a scrap preheater or metal melting furnace to be depleted (to the extent practicable) of the presence of used oil filters, chlorinated plastic parts, accessible lead-containing components (such as batteries and wheel weights), and a program to ensure the scrap materials are drained of free liquids.</P>
            <P>(ii) For scrap charged to a cupola metal melting furnace that is equipped with an afterburner, specifications for metallic scrap materials to be depleted (to the extent practicable) of the presence of chlorinated plastics, accessible lead-containing components (such as batteries and wheel weights), and a program to ensure the scrap materials are drained of free liquids.</P>
            <P>(b) <E T="03">Mercury requirements.</E> For scrap containing motor vehicle scrap, you must procure the scrap pursuant to one of the compliance options in paragraphs (b)(1), (2), or (3) of this section for each scrap provider, contract, or shipment. For scrap that does not contain motor vehicle scrap, you must procure the scrap pursuant to the requirements in paragraph (b)(4) of this section for each scrap provider, contract, or shipment. You may have one scrap provider, contract, or shipment subject to one compliance provision and others subject to another compliance provision.</P>
            <P>(1) <E T="03">Site-specific plan for mercury switches.</E> You must comply with the requirements in paragraphs (b)(1)(i) through (v) of this section.</P>
            <P>(i) You must include a requirement in your scrap specifications for removal of mercury switches from vehicle bodies used to make the scrap.</P>

            <P>(ii) You must prepare and operate according to a plan demonstrating how your facility will implement the scrap specification in paragraph (b)(1)(i) of this section for removal of mercury switches. You must submit the plan to <PRTPAGE P="170"/>the Administrator for approval. You must operate according to the plan as submitted during the review and approval process, operate according to the approved plan at all times after approval, and address any deficiency identified by the Administrator or delegated authority within 60 days following disapproval of a plan. You may request approval to revise the plan and may operate according to the revised plan unless and until the revision is disapproved by the Administrator or delegated authority. The Administrator or delegated authority may change the approval status of the plan upon 90-days written notice based upon the semiannual report or other information. The plan must include:</P>
            <P>(A) A means of communicating to scrap purchasers and scrap providers the need to obtain or provide motor vehicle scrap from which mercury switches have been removed and the need to ensure the proper management of the mercury switches removed from the scrap as required under the rules implementing subtitle C of the Resource Conservation and Recovery Act (RCRA) (40 CFR parts 261 through 265 and 268). The plan must include documentation of direction to appropriate staff to communicate to suppliers throughout the scrap supply chain the need to promote the removal of mercury switches from end-of-life vehicles. Upon the request of the Administrator or delegated authority, you must provide examples of materials that are used for outreach to suppliers, such as letters, contract language, policies for purchasing agents, and scrap inspection protocols;</P>
            <P>(B) Provisions for obtaining assurance from scrap providers motor vehicle scrap provided to the facility meet the scrap specification;</P>
            <P>(C) Provisions for periodic inspections or other means of corroboration to ensure that scrap providers and dismantlers are implementing appropriate steps to minimize the presence of mercury switches in motor vehicle scrap and that the mercury switches removed are being properly managed, including the minimum frequency such means of corroboration will be implemented; and</P>
            <P>(D) Provisions for taking corrective actions (i.e., actions resulting in scrap providers removing a higher percentage of mercury switches or other mercury-containing components) if needed, based on the results of procedures implemented in paragraph (b)(1)(ii)(C) of this section).</P>
            <P>(iii) You must require each motor vehicle scrap provider to provide an estimate of the number of mercury switches removed from motor vehicle scrap sent to the facility during the previous year and the basis for the estimate. The Administrator may request documentation or additional information at any time.</P>
            <P>(iv) You must establish a goal for each scrap supplier to remove at least 80 percent of the mercury switches. Although a site-specific plan approved under paragraph (b)(1) of this section may require only the removal of convenience light switch mechanisms, the Administrator will credit all documented and verifiable mercury-containing components removed from motor vehicle scrap (such as sensors in anti-locking brake systems, security systems, active ride control, and other applications) when evaluating progress towards the 80 percent goal.</P>
            <P>(v) For each scrap provider, you must submit semiannual progress reports to the Administrator that provide the number of mercury switches removed or the weight of mercury recovered from the switches, the estimated number of vehicles processed, an estimate of the percent of mercury switches removed, and certification that the removed mercury switches were recycled at RCRA-permitted facilities or otherwise properly managed pursuant to RCRA subtitle C regulations referenced in paragraph (b)(1)(ii)(A) of this section. This information can be submitted in aggregate form and does not have to be submitted for each shipment. The Administrator may change the approval status of a site-specific plan following 90-days notice based on the progress reports or other information.</P>
            <P>(2) <E T="03">Option for approved mercury programs.</E> You must certify in your notification of compliance status that you participate in and purchase motor vehicle scrap only from scrap providers <PRTPAGE P="171"/>who participate in a program for removal of mercury switches that has been approved by the Administrator based on the criteria in paragraphs (b)(2)(i) through (iii) of this section. If you purchase motor vehicle scrap from a broker, you must certify that all scrap received from that broker was obtained from other scrap providers who participate in a program for the removal of mercury switches that has been approved by the Administrator based on the criteria in paragraphs (b)(2)(i) through (iii) of this section. The National Mercury Switch Recovery Program and the State of Maine Mercury Switch Removal Program are EPA-approved programs under paragraph (b)(2) of this section unless and until the Administrator disapproves the program (in part or in whole) under paragraph (b)(2)(iii) of this section.</P>
            <P>(i) The program includes outreach that informs the dismantlers of the need for removal of mercury switches and provides training and guidance for removing mercury switches;</P>
            <P>(ii) The program has a goal to remove at least 80 percent of mercury switches from motor vehicle scrap the scrap provider processes. Although a program approved under paragraph (b)(2) of this section may require only the removal of convenience light switch mechanisms, the Administrator will credit all documented and verifiable mercury-containing components removed from motor vehicle scrap (such as sensors in anti-locking brake systems, security systems, active ride control, and other applications) when evaluating progress towards the 80 percent goal; and</P>
            <P>(iii) The program sponsor agrees to submit progress reports to the Administrator no less frequently than once every year that provide the number of mercury switches removed or the weight of mercury recovered from the switches, the estimated number of vehicles processed, an estimate of the percent of mercury switches recovered, and certification that the recovered mercury switches were recycled at facilities with permits as required under the rules implementing subtitle C of RCRA (40 CFR parts 261 through 265 and 268). The progress reports must be based on a database that includes data for each program participant; however, data may be aggregated at the State level for progress reports that will be publicly available. The Administrator may change the approval status of a program or portion of a program (e.g., at the State level) following 90-days notice based on the progress reports or on other information.</P>
            <P>(iv) You must develop and maintain onsite a plan demonstrating the manner through which your facility is participating in the EPA-approved program.</P>
            <P>(A) The plan must include facility-specific implementation elements, corporate-wide policies, and/or efforts coordinated by a trade association as appropriate for each facility.</P>
            <P>(B) You must provide in the plan documentation of direction to appropriate staff to communicate to suppliers throughout the scrap supply chain the need to promote the removal or mercury switches from end-of-life vehicles. Upon the request of the Administrator or delegated authority, you must provide examples of materials that are used for outreach to suppliers, such as letters, contract language, policies for purchasing agents, and scrap inspection protocols.</P>
            <P>(C) You must conduct periodic inspections or other means of corroboration to ensure that scrap providers are aware of the need for and are implementing appropriate steps to minimize the presence of mercury in scrap from end-of-life vehicles.</P>
            <P>(3) <E T="03">Option for specialty metal scrap.</E> You must certify in your notification of compliance status and maintain records of documentation that the only materials from motor vehicles in the scrap are materials recovered for their specialty alloy (including, but not limited to, chromium, nickel, molybdenum, or other alloys) content (such as certain exhaust systems) and, based on the nature of the scrap and purchase specifications, that the type of scrap is not reasonably expected to contain mercury switches.</P>
            <P>(4) <E T="03">Scrap that does not contain motor vehicle scrap.</E> For scrap not subject to the requirements in paragraphs (b)(1) through (3) of this section, you must certify in your notification of compliance status and maintain records of <PRTPAGE P="172"/>documentation that this scrap does not contain motor vehicle scrap.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.10886</SECTNO>
            <SUBJECT>What are my management practices for binder formulations?</SUBJECT>
            <P>For each furfuryl alcohol warm box mold or core making line at a new or existing iron and steel foundry, you must use a binder chemical formulation that does not use methanol as a specific ingredient of the catalyst formulation. This requirement does not apply to the resin portion of the binder system.</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Requirements for New and Existing Affected Sources Classified as Small Foundries</HD>
          <SECTION>
            <SECTNO>§ 63.10890</SECTNO>
            <SUBJECT>What are my management practices and compliance requirements?</SUBJECT>
            <P>(a) You must comply with the pollution prevention management practices for metallic scrap and mercury switches in § 63.10885 and binder formulations in § 63.10886.</P>
            <P>(b) You must submit an initial notification of applicability according to § 63.9(b)(2).</P>
            <P>(c) You must submit a notification of compliance status according to § 63.9(h)(1)(i). You must send the notification of compliance status before the close of business on the 30th day after the applicable compliance date specified in § 63.10881. The notification must include the following compliance certifications, as applicable:</P>
            <P>(1) “This facility has prepared, and will operate by, written material specifications for metallic scrap according to § 63.10885(a)(1)” and/or “This facility has prepared, and will operate by, written material specifications for general iron and steel scrap according to § 63.10885(a)(2).”</P>
            <P>(2) “This facility has prepared, and will operate by, written material specifications for the removal of mercury switches and a site-specific plan implementing the material specifications according to § 63.10885(b)(1) and/or “This facility participates in and purchases motor vehicle scrap only from scrap providers who participate in a program for removal of mercury switches that has been approved by the Administrator according to § 63.10885(b)(2) and has prepared a plan for participation in the EPA-approved program according to § 63.10885(b)(2)(iv)” and/or “The only materials from motor vehicles in the scrap charged to a metal melting furnace at this facility are materials recovered for their specialty alloy content in accordance with § 63.10885(b)(3) which are not reasonably expected to contain mercury switches” and/or “This facility complies with the requirements for scrap that does not contain motor vehicle scrap in accordance with § 63.10885(b)(4).”</P>
            <P>(3) “This facility complies with the no methanol requirement for the catalyst portion of each binder chemical formulation for a furfuryl alcohol warm box mold or core making line according to § 63.10886.”</P>
            <P>(d) As required by § 63.10(b)(1), you must maintain files of all information (including all reports and notifications) for at least 5 years following the date of each occurrence, measurement, maintenance, corrective action, report, or record. At a minimum, the most recent 2 years of data shall be retained on site. The remaining 3 years of data may be retained off site. Such files may be maintained on microfilm, on a computer, on computer floppy disks, on magnetic tape disks, or on microfiche.</P>
            <P>(e) You must maintain records of the information specified in paragraphs (e)(1) through (7) of this section according to the requirements in § 63.10(b)(1).</P>
            <P>(1) Records supporting your initial notification of applicability and your notification of compliance status according to § 63.10(b)(2)(xiv).</P>
            <P>(2) Records of your written materials specifications according to § 63.10885(a) and records that demonstrate compliance with the requirements for restricted metallic scrap in § 63.10885(a)(1) and/or for the use of general scrap in § 63.10885(a)(2) and for mercury in § 63.10885(b)(1) through (3), as applicable. You must keep records documenting compliance with § 63.10885(b)(4) for scrap that does not contain motor vehicle scrap.</P>
            <P>(3) If you are subject to the requirements for a site-specific plan for mercury switch removal under § 63.10885(b)(1), you must:</P>

            <P>(i) Maintain records of the number of mercury switches removed or the weight of mercury recovered from the <PRTPAGE P="173"/>switches and properly managed, the estimated number of vehicles processed, and an estimate of the percent of mercury switches recovered; and</P>
            <P>(ii) Submit semiannual reports of the number of mercury switches removed or the weight of mercury recovered from the switches and properly managed, the estimated number of vehicles processed, an estimate of the percent of mercury switches recovered, and a certification that the recovered mercury switches were recycled at RCRA-permitted facilities. The semiannual reports must include a certification that you have conducted periodic inspections or taken other means of corroboration as required under § 63.10885(b)(1)(ii)(C). You must identify which option in paragraph § 63.10885(b) applies to each scrap provider, contract, or shipment. You may include this information in the semiannual compliance reports required under paragraph (f) of this section.</P>
            <P>(4) If you are subject to the option for approved mercury programs under § 63.10885(b)(2), you must maintain records identifying each scrap provider and documenting the scrap provider's participation in an approved mercury switch removal program. If you purchase motor vehicle scrap from a broker, you must maintain records identifying each broker and documentation that all scrap provided by the broker was obtained from other scrap providers who participate in an approved mercury switch removal program.</P>
            <P>(5) Records to document use of binder chemical formulation that does not contain methanol as a specific ingredient of the catalyst formulation for each furfuryl alcohol warm box mold or core making line as required by § 63.10886. These records must be the Material Safety Data Sheet (provided that it contains appropriate information), a certified product data sheet, or a manufacturer's hazardous air pollutant data sheet.</P>
            <P>(6) Records of the annual quantity and composition of each HAP-containing chemical binder or coating material used to make molds and cores. These records must be copies of purchasing records, Material Safety Data Sheets, or other documentation that provides information on the binder or coating materials used.</P>
            <P>(7) Records of metal melt production for each calendar year.</P>
            <P>(f) You must submit semiannual compliance reports to the Administrator according to the requirements in § 63.10(e). The report must clearly identify any deviation from the pollution prevention management practices in § 63.10885 or § 63.10886 and the corrective action taken.</P>
            <P>(g) You must submit a written notification to the Administrator of the initial classification of your facility as a small foundry as required in § 63.10880(f) and (g), as applicable, and for any subsequent reclassification as required in § 63.10881(d)(1) or (e), as applicable.</P>
            <P>(h) Following the initial determination for an existing affected source as a small foundry, if the annual metal melt production exceeds 20,000 tons during the preceding year, you must comply with the requirements for large foundries by the applicable dates in § 63.10881(d)(1)(i) or (d)(1)(ii). Following the initial determination for a new affected source as a small foundry, if you increase the annual metal melt capacity to exceed 10,000 tons, you must comply with the requirements for a large foundry by the applicable dates in § 63.10881(e)(1).</P>
            <P>(i) You must comply with the following requirements of the General Provisions (40 CFR part 63, subpart A): §§ 63.1 through 63.5; § 63.6(a), (b), (c), and (e)(1); § 63.9; § 63.10(a), (b)(1), (b)(2)(xiv), (b)(3), (d)(1), (d)(4), and (f); and §§ 63.13 through 63.16. Requirements of the General Provisions not cited in the preceding sentence do not apply to the owner or operator of a new or existing affected source that is classified as a small foundry.</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Requirements for New and Existing Affected Sources Classified as Large Iron and Steel Foundries</HD>
          <SECTION>
            <SECTNO>§ 63.10895</SECTNO>
            <SUBJECT>What are my standards and management practices?</SUBJECT>

            <P>(a) If you own or operate an affected source that is a large foundry as defined in § 63.10906, you must comply with the pollution prevention management practices in §§ 63.10885 and <PRTPAGE P="174"/>63.10886, the requirements in paragraphs (b) through (e) of this section, and the requirements in §§ 63.10896 through 63.10900.</P>
            <P>(b) You must operate a capture and collection system for each metal melting furnace at a new or existing iron and steel foundry unless that furnace is specifically uncontrolled as part of an emissions averaging group. Each capture and collection system must meet accepted engineering standards, such as those published by the American Conference of Governmental Industrial Hygienists.</P>
            <P>(c) You must not discharge to the atmosphere emissions from any metal melting furnace or group of all metal melting furnaces that exceed the applicable limit in paragraph (c)(1) or (2) of this section. When an alternative emissions limit is provided for a given emissions source, you are not restricted in the selection of which applicable alternative emissions limit is used to demonstrate compliance.</P>
            <P>(1) For an existing iron and steel foundry, 0.8 pounds of particulate matter (PM) per ton of metal charged or 0.06 pounds of total metal HAP per ton of metal charged.</P>
            <P>(2) For a new iron and steel foundry, 0.1 pounds of PM per ton of metal charged or 0.008 pounds of total metal HAP per ton of metal charged.</P>
            <P>(d) If you own or operate a new affected source, you must comply with each control device parameter operating limit in paragraphs (d)(1) and (2) of this section that applies to you.</P>
            <P>(1) For each wet scrubber applied to emissions from a metal melting furnace, you must maintain the 3-hour average pressure drop and scrubber water flow rate at or above the minimum levels established during the initial or subsequent performance test.</P>
            <P>(2) For each electrostatic precipitator applied to emissions from a metal melting furnace, you must maintain the voltage and secondary current (or total power input) to the control device at or above the level established during the initial or subsequent performance test.</P>
            <P>(e) If you own or operate a new or existing iron and steel foundry, you must not discharge to the atmosphere fugitive emissions from foundry operations that exhibit opacity greater than 20 percent (6-minute average), except for one 6-minute average per hour that does not exceed 30 percent.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.10896</SECTNO>
            <SUBJECT>What are my operation and maintenance requirements?</SUBJECT>
            <P>(a) You must prepare and operate at all times according to a written operation and maintenance (O&amp;M) plan for each control device for an emissions source subject to a PM, metal HAP, or opacity emissions limit in § 63.10895. You must maintain a copy of the O&amp;M plan at the facility and make it available for review upon request. At a minimum, each plan must contain the following information:</P>
            <P>(1) General facility and contact information;</P>
            <P>(2) Positions responsible for inspecting, maintaining, and repairing emissions control devices which are used to comply with this subpart;</P>
            <P>(3) Description of items, equipment, and conditions that will be inspected, including an inspection schedule for the items, equipment, and conditions. For baghouses that are equipped with bag leak detection systems, the O&amp;M plan must include the site-specific monitoring plan required in § 63.10897(d)(2).</P>
            <P>(4) Identity and estimated quantity of the replacement parts that will be maintained in inventory; and</P>
            <P>(5) For a new affected source, procedures for operating and maintaining a CPMS in accordance with manufacturer's specifications.</P>
            <P>(b) You may use any other O&amp;M, preventative maintenance, or similar plan which addresses the requirements in paragraph (a)(1) through (5) of this section to demonstrate compliance with the requirements for an O&amp;M plan.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.10897</SECTNO>
            <SUBJECT>What are my monitoring requirements?</SUBJECT>

            <P>(a) You must conduct an initial inspection of each PM control device for a metal melting furnace at an existing affected source. You must conduct each initial inspection no later than 60 days after your applicable compliance date for each installed control device which has been operated within 60 days of the compliance date. For an installed control device which has not operated <PRTPAGE P="175"/>within 60 days of the compliance date, you must conduct an initial inspection prior to startup of the control device. Following the initial inspections, you must perform periodic inspections and maintenance of each PM control device for a metal melting furnace at an existing affected source. You must perform the initial and periodic inspections according to the requirements in paragraphs (a)(1) through (4) of this section. You must record the results of each initial and periodic inspection and any maintenance action in the logbook required in § 63.10899(b)(13).</P>
            <P>(1) For the initial inspection of each baghouse, you must visually inspect the system ductwork and baghouse units for leaks. You must also inspect the inside of each baghouse for structural integrity and fabric filter condition. Following the initial inspections, you must inspect and maintain each baghouse according to the requirements in paragraphs (a)(1)(i) and (ii) of this section.</P>
            <P>(i) You must conduct monthly visual inspections of the system ductwork for leaks.</P>
            <P>(ii) You must conduct inspections of the interior of the baghouse for structural integrity and to determine the condition of the fabric filter every 6 months.</P>
            <P>(2) For the initial inspection of each dry electrostatic precipitator, you must verify the proper functioning of the electronic controls for corona power and rapper operation, that the corona wires are energized, and that adequate air pressure is present on the rapper manifold. You must also visually inspect the system ductwork and electrostatic housing unit and hopper for leaks and inspect the interior of the electrostatic precipitator to determine the condition and integrity of corona wires, collection plates, hopper, and air diffuser plates. Following the initial inspection, you must inspect and maintain each dry electrostatic precipitator according to the requirements in paragraphs (a)(2)(i) through (iii) of this section.</P>
            <P>(i) You must conduct a daily inspection to verify the proper functioning of the electronic controls for corona power and rapper operation, that the corona wires are energized, and that adequate air pressure is present on the rapper manifold.</P>
            <P>(ii) You must conduct monthly visual inspections of the system ductwork, housing unit, and hopper for leaks.</P>
            <P>(iii) You must conduct inspections of the interior of the electrostatic precipitator to determine the condition and integrity of corona wires, collection plates, plate rappers, hopper, and air diffuser plates every 24 months.</P>
            <P>(3) For the initial inspection of each wet electrostatic precipitator, you must verify the proper functioning of the electronic controls for corona power, that the corona wires are energized, and that water flow is present. You must also visually inspect the system ductwork and electrostatic precipitator housing unit and hopper for leaks and inspect the interior of the electrostatic precipitator to determine the condition and integrity of corona wires, collection plates, plate wash spray heads, hopper, and air diffuser plates. Following the initial inspection, you must inspect and maintain each wet electrostatic precipitator according to the requirements in paragraphs (a)(3)(i) through (iii) of this section.</P>
            <P>(i) You must conduct a daily inspection to verify the proper functioning of the electronic controls for corona power, that the corona wires are energized, and that water flow is present.</P>
            <P>(ii) You must conduct monthly visual inspections of the system ductwork, electrostatic precipitator housing unit, and hopper for leaks.</P>
            <P>(iii) You must conduct inspections of the interior of the electrostatic precipitator to determine the condition and integrity of corona wires, collection plates, plate wash spray heads, hopper, and air diffuser plates every 24 months.</P>

            <P>(4) For the initial inspection of each wet scrubber, you must verify the presence of water flow to the scrubber. You must also visually inspect the system ductwork and scrubber unit for leaks and inspect the interior of the scrubber for structural integrity and the condition of the demister and spray nozzle. Following the initial inspection, you must inspect and maintain each wet scrubber according to the requirements <PRTPAGE P="176"/>in paragraphs (a)(4)(i) through (iii) of this section.</P>
            <P>(i) You must conduct a daily inspection to verify the presence of water flow to the scrubber.</P>
            <P>(ii) You must conduct monthly visual inspections of the system ductwork and scrubber unit for leaks.</P>
            <P>(iii) You must conduct inspections of the interior of the scrubber to determine the structural integrity and condition of the demister and spray nozzle every 12 months.</P>
            <P>(b) For each wet scrubber applied to emissions from a metal melting furnace at a new affected source, you must use a continuous parameter monitoring system (CPMS) to measure and record the 3-hour average pressure drop and scrubber water flow rate.</P>
            <P>(c) For each electrostatic precipitator applied to emissions from a metal melting furnace at a new affected source, you must measure and record the hourly average voltage and secondary current (or total power input) using a CPMS.</P>
            <P>(d) If you own or operate an existing affected source, you may install, operate, and maintain a bag leak detection system for each negative pressure baghouse or positive pressure baghouse as an alternative to the baghouse inspection requirements in paragraph (a)(1) of this section. If you own or operate a new affected source, you must install, operate, and maintain a bag leak detection system for each negative pressure baghouse or positive pressure baghouse. You must install, operate, and maintain each bag leak detection system according to the requirements in paragraphs (d)(1) through (3) of this section.</P>
            <P>(1) Each bag leak detection system must meet the requirements in paragraphs (d)(1)(i) through (vii) of this section.</P>
            <P>(i) The system must be certified by the manufacturer to be capable of detecting emissions of particulate matter at concentrations of 10 milligrams per actual cubic meter (0.00044 grains per actual cubic foot) or less.</P>
            <P>(ii) The bag leak detection system sensor must provide output of relative particulate matter loadings and the owner or operator shall continuously record the output from the bag leak detection system using a strip chart recorder, data logger, or other means.</P>
            <P>(iii) The system must be equipped with an alarm that will sound when an increase in relative particulate loadings is detected over the alarm set point established in the operation and maintenance plan, and the alarm must be located such that it can be heard by the appropriate plant personnel.</P>
            <P>(iv) The initial adjustment of the system must, at minimum, consist of establishing the baseline output by adjusting the sensitivity (range) and the averaging period of the device, and establishing the alarm set points. If the system is equipped with an alarm delay time feature, you also must adjust the alarm delay time.</P>
            <P>(v) Following the initial adjustment, do not adjust the sensitivity or range, averaging period, alarm set point, or alarm delay time. Except, once per quarter, you may adjust the sensitivity of the bag leak detection system to account for seasonable effects including temperature and humidity according to the procedures in the monitoring plan required by paragraph (d)(2) of this section.</P>
            <P>(vi) For negative pressure baghouses, induced air baghouses, and positive pressure baghouses that are discharged to the atmosphere through a stack, the bag leak detector sensor must be installed downstream of the baghouse and upstream of any wet scrubber.</P>
            <P>(vii) Where multiple detectors are required, the system's instrumentation and alarm may be shared among detectors.</P>
            <P>(2) You must prepare a site-specific monitoring plan for each bag leak detection system to be incorporated in your O&amp;M plan. You must operate and maintain each bag leak detection system according to the plan at all times. Each plan must address all of the items identified in paragraphs (d)(2)(i) through (vi) of this section.</P>
            <P>(i) Installation of the bag leak detection system.</P>
            <P>(ii) Initial and periodic adjustment of the bag leak detection system including how the alarm set-point will be established.</P>

            <P>(iii) Operation of the bag leak detection system including quality assurance procedures.<PRTPAGE P="177"/>
            </P>
            <P>(iv) Maintenance of the bag leak detection system including a routine maintenance schedule and spare parts inventory list.</P>
            <P>(v) How the bag leak detection system output will be recorded and stored.</P>
            <P>(vi) Procedures for determining what corrective actions are necessary in the event of a bag leak detection alarm as required in paragraph (d)(3) of this section.</P>
            <P>(3) In the event that a bag leak detection system alarm is triggered, you must initiate corrective action to determine the cause of the alarm within 1 hour of the alarm, initiate corrective action to correct the cause of the problem within 24 hours of the alarm, and complete corrective action as soon as practicable, but no later than 10 calendar days from the date of the alarm. You must record the date and time of each valid alarm, the time you initiated corrective action, the correction action taken, and the date on which corrective action was completed. Corrective actions may include, but are not limited to:</P>
            <P>(i) Inspecting the bag house for air leaks, torn or broken bags or filter media, or any other condition that may cause an increase in emissions.</P>
            <P>(ii) Sealing off defective bags or filter media.</P>
            <P>(iii) Replacing defective bags or filter media or otherwise repairing the control device.</P>
            <P>(iv) Sealing off a defective baghouse department.</P>
            <P>(v) Cleaning the bag leak detection system probe, or otherwise repairing the bag leak detection system.</P>
            <P>(vi) Shutting down the process producing the particulate emissions.</P>
            <P>(e) You must make monthly inspections of the equipment that is important to the performance of the total capture system (i.e., pressure sensors, dampers, and damper switches). This inspection must include observations of the physical appearance of the equipment (e.g., presence of holes in the ductwork or hoods, flow constrictions caused by dents or accumulated dust in the ductwork, and fan erosion). You must repair any defect or deficiency in the capture system as soon as practicable, but no later than 90 days. You must record the date and results of each inspection and the date of repair of any defect or deficiency.</P>
            <P>(f) You must install, operate, and maintain each CPMS or other measurement device according to your O&amp;M plan. You must record all information needed to document conformance with these requirements.</P>
            <P>(g) In the event of an exceedance of an established emissions limitation (including an operating limit), you must restore operation of the emissions source (including the control device and associated capture system) to its normal or usual manner or operation as expeditiously as practicable in accordance with good air pollution control practices for minimizing emissions. The response shall include minimizing the period of any startup, shutdown or malfunction and taking any necessary corrective actions to restore normal operation and prevent the likely recurrence of the exceedance. You must record the date and time correction action was initiated, the correction action taken, and the date corrective action was completed.</P>
            <P>(h) If you choose to comply with an emissions limit in § 63.10895(c) using emissions averaging, you must calculate and record for each calendar month the pounds of PM or total metal HAP per ton of metal melted from the group of all metal melting furnaces at your foundry. You must calculate and record the weighted average pounds per ton emissions rate for the group of all metal melting furnaces at the foundry determined from the performance test procedures in § 63.10898(d) and (e).</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.10898</SECTNO>
            <SUBJECT>What are my performance test requirements?</SUBJECT>

            <P>(a) You must conduct a performance test to demonstrate initial compliance with the applicable emissions limits for each metal melting furnace or group of all metal melting furnaces that is subject to an emissions limit in § 63.10895(c) and for each building or structure housing foundry operations that is subject to the opacity limit for fugitive emissions in § 63.10895(e). You must conduct the test within 180 days of your compliance date and report the results in your notification of compliance status.<PRTPAGE P="178"/>
            </P>
            <P>(1) If you own or operate an existing iron and steel foundry, you may choose to submit the results of a prior performance test for PM or total metal HAP that demonstrates compliance with the applicable emissions limit for a metal melting furnace or group of all metal melting furnaces provided the test was conducted within the last 5 years using the methods and procedures specified in this subpart and either no process changes have been made since the test, or you can demonstrate that the results of the performance test, with or without adjustments, reliably demonstrate compliance with the applicable emissions limit despite such process changes.</P>
            <P>(2) If you own or operate an existing iron and steel foundry and you choose to submit the results of a prior performance test according to paragraph (a)(1) of this section, you must submit a written notification to the Administrator of your intent to use the previous test data no later than 60 days after your compliance date. The notification must contain a full copy of the performance test and contain information to demonstrate, if applicable, that either no process changes have been made since the test, or that the results of the performance test, with or without adjustments, reliably demonstrate compliance despite such process changes.</P>
            <P>(3) If you have an electric induction furnace equipped with an emissions control device at an existing foundry, you may use the test results from another electric induction furnace to demonstrate compliance with the applicable PM or total metal HAP emissions limit in § 63.10895(c) provided the furnaces are similar with respect to the type of emission control device that is used, the composition of the scrap charged, furnace size, and furnace melting temperature.</P>
            <P>(4) If you have an uncontrolled electric induction furnace at an existing foundry, you may use the test results from another electric induction furnace to demonstrate compliance with the applicable PM or total metal HAP emissions limit in § 63.10895(c) provided the test results are prior to any control device and the electric induction furnaces are similar with respect to the composition of the scrap charged, furnace size, and furnace melting temperature.</P>
            <P>(5) For electric induction furnaces that do not have emission capture systems, you may install a temporary enclosure for the purpose of representative sampling of emissions. A permanent enclosure and capture system is not required for the purpose of the performance test.</P>
            <P>(b) You must conduct subsequent performance tests to demonstrate compliance with all applicable PM or total metal HAP emissions limits in § 63.10895(c) for a metal melting furnace or group of all metal melting furnaces no less frequently than every 5 years and each time you elect to change an operating limit or make a process change likely to increase HAP emissions.</P>
            <P>(c) You must conduct each performance test according to the requirements in § 63.7(e)(1), Table 1 to this subpart, and paragraphs (d) through (g) of this section.</P>
            <P>(d) To determine compliance with the applicable PM or total metal HAP emissions limit in § 63.10895(c) for a metal melting furnace in a lb/ton of metal charged format, compute the process-weighted mass emissions (E<SU>p</SU>) for each test run using Equation 1 of this section:</P>
            <MATH DEEP="27" SPAN="1">
              <MID>ER02JA08.000</MID>
            </MATH>
            <EXTRACT>
              <FP>Where:</FP>
              
              <FP SOURCE="FP-1">E<E T="52">p</E> = Process-weighted mass emissions rate of PM or total metal HAP, pounds of PM or total metal HAP per ton (lb/ton) of metal charged;</FP>
              <FP SOURCE="FP-1">C = Concentration of PM or total metal HAP measured during performance test run, grains per dry standard cubic foot (gr/dscf);</FP>
              <FP SOURCE="FP-1">Q = Volumetric flow rate of exhaust gas, dry standard cubic feet per hour (dscf/hr);</FP>
              <FP SOURCE="FP-1">T = Total time during a test run that a sample is withdrawn from the stack during melt production cycle, hr;</FP>
              <FP SOURCE="FP-1">P = Total amount of metal charged during the test run, tons; and</FP>
              <FP SOURCE="FP-1">K = Conversion factor, 7,000 grains per pound.</FP>
            </EXTRACT>
            

            <P>(e) To determine compliance with the applicable emissions limit in § 63.10895(c) for a group of all metal melting furnaces using emissions averaging,<PRTPAGE P="179"/>
            </P>
            <P>(1) Determine and record the monthly average charge rate for each metal melting furnace at your iron and steel foundry for the previous calendar month; and</P>
            <P>(2) Compute the mass-weighted PM or total metal HAP using Equation 2 of this section.</P>
            <MATH DEEP="57" SPAN="1">
              <MID>ER02JA08.001</MID>
            </MATH>
            <EXTRACT>
              <FP>Where:</FP>
              
              <FP SOURCE="FP-1">E<E T="52">C</E> = The mass-weighted PM or total metal HAP emissions for the group of all metal melting furnaces at the foundry, pounds of PM or total metal HAP per ton of metal charged;</FP>
              <FP SOURCE="FP-1">E<E T="52">pi</E> = Process-weighted mass emissions of PM or total metal HAP for individual emission unit i as determined from the performance test and calculated using Equation 1 of this section, pounds of PM or total metal HAP per ton of metal charged;</FP>
              <FP SOURCE="FP-1">T<E T="52">ti</E> = Total tons of metal charged for individual emission unit i for the calendar month prior to the performance test, tons; and</FP>
              <FP SOURCE="FP-1">n = The total number of metal melting furnaces at the iron and steel foundry.</FP>
            </EXTRACT>
            
            <P>(3) For an uncontrolled electric induction furnace that is not equipped with a capture system and has not been previously tested for PM or total metal HAP, you may assume an emissions factor of 2 pounds per ton of PM or 0.13 pounds of total metal HAP per ton of metal melted in Equation 2 of this section instead of a measured test value. If the uncontrolled electric induction furnace is equipped with a capture system, you must use a measured test value.</P>
            <P>(f) To determine compliance with the applicable PM or total metal HAP emissions limit for a metal melting furnace in § 63.10895(c) when emissions from one or more regulated furnaces are combined with other non-regulated emissions sources, you may demonstrate compliance using the procedures in paragraphs (f)(1) through (3) of this section.</P>
            <P>(1) Determine the PM or total metal HAP process-weighted mass emissions for each of the regulated streams prior to the combination with other exhaust streams or control device.</P>
            <P>(2) Measure the flow rate and PM or total metal HAP concentration of the combined exhaust stream both before and after the control device and calculate the mass removal efficiency of the control device using Equation 3 of this section.</P>
            <MATH DEEP="30" SPAN="2">
              <MID>ER02JA08.002</MID>
            </MATH>
            <EXTRACT>
              <FP>Where:</FP>
              
              <FP SOURCE="FP-1">E<E T="52">i</E> = Mass emissions rate of PM or total metal HAP at the control device inlet, lb/hr;</FP>
              <FP SOURCE="FP-1">E<E T="52">o</E> = Mass emissions rate of PM or total metal HAP at the control device outlet, lb/hr.</FP>
            </EXTRACT>
            
            <P>(3) Meet the applicable emissions limit based on the calculated PM or total metal HAP process-weighted mass emissions for the regulated emissions source using Equation 4 of this section:</P>
            <MATH DEEP="29" SPAN="2">
              <MID>ER02JA08.003</MID>
            </MATH>
            <EXTRACT>
              <FP>Where:</FP>
              
              <FP SOURCE="FP-1">E<E T="52">p1released</E> = Calculated process-weighted mass emissions of PM (or total metal HAP) predicted to be released to the atmosphere from the regulated emissions source, <PRTPAGE P="180"/>pounds of PM or total metal HAP per ton of metal charged; and</FP>
              <FP SOURCE="FP-1">E<E T="52">p1i</E> = Process-weighted mass emissions of PM (or total metal HAP) in the uncontrolled regulated exhaust stream, pounds of PM or total metal HAP per ton of metal charged.</FP>
            </EXTRACT>
            
            <P>(g) To determine compliance with an emissions limit for situations when multiple sources are controlled by a single control device, but only one source operates at a time or other situations that are not expressly considered in paragraphs (d) through (f) of this section, you must submit a site-specific test plan to the Administrator for approval according to the requirements in § 63.7(c)(2) and (3).</P>
            <P>(h) You must conduct each opacity test for fugitive emissions according to the requirements in § 63.6(h)(5) and Table 1 to this subpart.</P>
            <P>(i) You must conduct subsequent performance tests to demonstrate compliance with the opacity limit in § 63.10895(e) no less frequently than every 6 months and each time you make a process change likely to increase fugitive emissions.</P>
            <P>(j) In your performance test report, you must certify that the capture system operated normally during the performance test.</P>
            <P>(k) You must establish operating limits for a new affected source during the initial performance test according to the requirements in Table 2 of this subpart.</P>
            <P>(l) You may change the operating limits for a wet scrubber, electrostatic precipitator, or baghouse if you meet the requirements in paragraphs (l)(1) through (3) of this section.</P>
            <P>(1) Submit a written notification to the Administrator of your plan to conduct a new performance test to revise the operating limit.</P>
            <P>(2) Conduct a performance test to demonstrate compliance with the applicable emissions limitation in § 63.10895(c).</P>
            <P>(3) Establish revised operating limits according to the applicable procedures in Table 2 to this subpart.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.10899</SECTNO>
            <SUBJECT>What are my recordkeeping and reporting requirements?</SUBJECT>
            <P>(a) As required by § 63.10(b)(1), you must maintain files of all information (including all reports and notifications) for at least 5 years following the date of each occurrence, measurement, maintenance, corrective action, report, or record. At a minimum, the most recent 2 years of data shall be retained on site. The remaining 3 years of data may be retained off site. Such files may be maintained on microfilm, on a computer, on computer floppy disks, on magnetic tape disks, or on microfiche.</P>
            <P>(b) In addition to the records required by 40 CFR 63.10, you must keep records of the information specified in paragraphs (b)(1) through (13) of this section.</P>
            <P>(1) You must keep records of your written materials specifications according to § 63.10885(a) and records that demonstrate compliance with the requirements for restricted metallic scrap in § 63.10885(a)(1) and/or for the use of general scrap in § 63.10885(a)(2) and for mercury in § 63.10885(b)(1) through (3), as applicable. You must keep records documenting compliance with § 63.10885(b)(4) for scrap that does not contain motor vehicle scrap.</P>
            <P>(2) If you are subject to the requirements for a site-specific plan for mercury under § 63.10885(b)(1), you must:</P>
            <P>(i) Maintain records of the number of mercury switches removed or the weight of mercury recovered from the switches and properly managed, the estimated number of vehicles processed, and an estimate of the percent of mercury switches recovered; and</P>

            <P>(ii) Submit semiannual reports of the number of mercury switches removed or the weight of mercury recovered from the switches and properly managed, the estimated number of vehicles processed, an estimate of the percent of mercury switches recovered, and a certification that the recovered mercury switches were recycled at RCRA-permitted facilities. The semiannual reports must include a certification that you have conducted periodic inspections or taken other means of corroboration as required under § 63.10885(b)(1)(ii)(C). You must identify which option in § 63.10885(b) applies to each scrap provider, contract, or shipment. You may include this information in the semiannual compliance reports required under paragraph (c) of this section.<PRTPAGE P="181"/>
            </P>
            <P>(3) If you are subject to the option for approved mercury programs under § 63.10885(b)(2), you must maintain records identifying each scrap provider and documenting the scrap provider's participation in an approved mercury switch removal program. If your scrap provider is a broker, you must maintain records identifying each of the broker's scrap suppliers and documenting the scrap supplier's participation in an approved mercury switch removal program.</P>
            <P>(4) You must keep records to document use of any binder chemical formulation that does not contain methanol as a specific ingredient of the catalyst formulation for each furfuryl alcohol warm box mold or core making line as required by § 63.10886. These records must be the Material Safety Data Sheet (provided that it contains appropriate information), a certified product data sheet, or a manufacturer's hazardous air pollutant data sheet.</P>
            <P>(5) You must keep records of the annual quantity and composition of each HAP-containing chemical binder or coating material used to make molds and cores. These records must be copies of purchasing records, Material Safety Data Sheets, or other documentation that provide information on the binder or coating materials used.</P>
            <P>(6) You must keep records of monthly metal melt production for each calendar year.</P>
            <P>(7) You must keep a copy of the operation and maintenance plan as required by § 63.10896(a) and records that demonstrate compliance with plan requirements.</P>
            <P>(8) If you use emissions averaging, you must keep records of the monthly metal melting rate for each furnace at your iron and steel foundry, and records of the calculated pounds of PM or total metal HAP per ton of metal melted for the group of all metal melting furnaces required by § 63.10897(h).</P>
            <P>(9) If applicable, you must keep records for bag leak detection systems as follows:</P>
            <P>(i) Records of the bag leak detection system output;</P>
            <P>(ii) Records of bag leak detection system adjustments, including the date and time of the adjustment, the initial bag leak detection system settings, and the final bag leak detection system settings; and</P>
            <P>(iii) The date and time of all bag leak detection system alarms, and for each valid alarm, the time you initiated corrective action, the corrective action taken, and the date on which corrective action was completed.</P>
            <P>(10) You must keep records of capture system inspections and repairs as required by § 63.10897(e).</P>
            <P>(11) You must keep records demonstrating conformance with your specifications for the operation of CPMS as required by § 63.10897(f).</P>
            <P>(12) You must keep records of corrective action(s) for exceedances and excursions as required by § 63.10897(g).</P>
            <P>(13) You must record the results of each inspection and maintenance required by § 63.10897(a) for PM control devices in a logbook (written or electronic format). You must keep the logbook onsite and make the logbook available to the Administrator upon request. You must keep records of the information specified in paragraphs (b)(13)(i) through (iii) of this section.</P>
            <P>(i) The date and time of each recorded action for a fabric filter, the results of each inspection, and the results of any maintenance performed on the bag filters.</P>
            <P>(ii) The date and time of each recorded action for a wet or dry electrostatic precipitator (including ductwork), the results of each inspection, and the results of any maintenance performed for the electrostatic precipitator.</P>
            <P>(iii) The date and time of each recorded action for a wet scrubber (including ductwork), the results of each inspection, and the results of any maintenance performed on the wet scrubber.</P>
            <P>(c) You must submit semiannual compliance reports to the Administrator according to the requirements in § 63.10(e). The reports must include, at a minimum, the following information as applicable:</P>
            <P>(1) Summary information on the number, duration, and cause (including unknown cause, if applicable) of excursions or exceedances, as applicable, and the corrective action taken;</P>

            <P>(2) Summary information on the number, duration, and cause (including <PRTPAGE P="182"/>unknown cause, if applicable) for monitor downtime incidents (other than downtime associated with zero and span or other calibration checks, if applicable); and</P>
            <P>(3) Summary information on any deviation from the pollution prevention management practices in §§ 63.10885 and 63.10886 and the operation and maintenance requirements § 63.10896 and the corrective action taken.</P>
            <P>(d) You must submit written notification to the Administrator of the initial classification of your new or existing affected source as a large iron and steel facility as required in § 63.10880(f) and (g), as applicable, and for any subsequent reclassification as required in § 63.10881(d) or (e), as applicable.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.10900</SECTNO>
            <SUBJECT>What parts of the General Provisions apply to my large foundry?</SUBJECT>
            <P>(a) If you own or operate a new or existing affected source that is classified as a large foundry, you must comply with the requirements of the General Provisions (40 CFR part 63, subpart A) according to Table 3 of this subpart.</P>
            <P>(b) If you own or operator a new or existing affected source that is classified as a large foundry, your notification of compliance status required by § 63.9(h) must include each applicable certification of compliance, signed by a responsible official, in Table 4 of this subpart.</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Other Requirements and Information</HD>
          <SECTION>
            <SECTNO>§ 63.10905</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <P>(a) This subpart can be implemented and enforced by EPA or a delegated authority such as your State, local, or tribal agency. If the EPA Administrator has delegated authority to your State, local, or tribal agency, then that agency has the authority to implement and enforce this subpart. You should contact your EPA Regional Office to find out if implementation and enforcement of this subpart is delegated to your State, local, or tribal agency.</P>
            <P>(b) In delegating implementation and enforcement authority of this subpart to a State, local, or tribal agency under 40 CFR part 63, subpart E, the authorities contained in paragraph (c) of this section are retained by the EPA Administrator and are not transferred to the State, local, or tribal agency.</P>
            <P>(c) The authorities that cannot be delegated to State, local, or tribal agencies are specified in paragraphs (c)(1) through (6) of this section.</P>
            <P>(1) Approval of an alternative non-opacity emissions standard under 40 CFR 63.6(g).</P>
            <P>(2) Approval of an alternative opacity emissions standard under § 63.6(h)(9).</P>
            <P>(3) Approval of a major change to test methods under § 63.7(e)(2)(ii) and (f). A “major change to test method” is defined in § 63.90.</P>
            <P>(4) Approval of a major change to monitoring under § 63.8(f). A “major change to monitoring” under is defined in § 63.90.</P>
            <P>(5) Approval of a major change to recordkeeping and reporting under § 63.10(f). A “major change to recordkeeping/reporting” is defined in § 63.90.</P>
            <P>(6) Approval of a local, State, or national mercury switch removal program under § 63.10885(b)(2).</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.10906</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>
            <P>Terms used in this subpart are defined in the Clean Air Act, in § 63.2, and in this section.</P>
            <P>
              <E T="03">Annual metal melt capacity</E> means the lower of the total metal melting furnace equipment melt rate capacity assuming 8,760 operating hours per year summed for all metal melting furnaces at the foundry or, if applicable, the maximum permitted metal melt production rate for the iron and steel foundry calculated on an annual basis. Unless otherwise specified in the permit, permitted metal melt production rates that are not specified on an annual basis must be annualized assuming 24 hours per day, 365 days per year of operation. If the permit limits the operating hours of the furnace(s) or foundry, then the permitted operating hours are used to annualize the maximum permitted metal melt production rate.</P>
            <P>
              <E T="03">Annual metal melt production</E> means the quantity of metal melted in a metal melting furnace or group of all metal melting furnaces at the iron and steel foundry in a given calendar year. For the purposes of this subpart, metal melt production is determined on the <PRTPAGE P="183"/>basis on the quantity of metal charged to each metal melting furnace; the sum of the metal melt production for each furnace in a given calendar year is the annual metal melt production of the foundry.</P>
            <P>
              <E T="03">Bag leak detection system</E> means a system that is capable of continuously monitoring relative particulate matter (dust) loadings in the exhaust of a baghouse to detect bag leaks and other upset conditions. A bag leak detection system includes, but is not limited to, an instrument that operates on triboelectric, electrodynamic, light scattering, light transmittance, or other effect to continuously monitor relative particulate matter loadings.</P>
            <P>
              <E T="03">Binder chemical</E> means a component of a system of chemicals used to bind sand together into molds, mold sections, and cores through chemical reaction as opposed to pressure.</P>
            <P>
              <E T="03">Capture system</E> means the collection of components used to capture gases and fumes released from one or more emissions points and then convey the captured gas stream to a control device or to the atmosphere. A capture system may include, but is not limited to, the following components as applicable to a given capture system design: Duct intake devices, hoods, enclosures, ductwork, dampers, manifolds, plenums, and fans.</P>
            <P>
              <E T="03">Chlorinated plastics</E> means solid polymeric materials that contain chlorine in the polymer chain, such as polyvinyl chloride (PVC) and PVC copolymers.</P>
            <P>
              <E T="03">Control device</E> means the air pollution control equipment used to remove particulate matter from the effluent gas stream generated by a metal melting furnace.</P>
            <P>
              <E T="03">Cupola</E> means a vertical cylindrical shaft furnace that uses coke and forms of iron and steel such as scrap and foundry returns as the primary charge components and melts the iron and steel through combustion of the coke by a forced upward flow of heated air.</P>
            <P>
              <E T="03">Deviation</E> means any instance in which an affected source or an owner or operator of such an affected source:</P>
            <P>(1) Fails to meet any requirement or obligation established by this subpart including, but not limited to, any emissions limitation (including operating limits), management practice, or operation and maintenance requirement;</P>
            <P>(2) Fails to meet any term or condition that is adopted to implement an applicable requirement in this subpart and that is included in the operating permit for any iron and steel foundry required to obtain such a permit; or</P>
            <P>(3) Fails to meet any emissions limitation (including operating limits) or management standard in this subpart during startup, shutdown, or malfunction, regardless of whether or not such failure is permitted by this subpart.</P>
            <P>
              <E T="03">Electric arc furnace</E> means a vessel in which forms of iron and steel such as scrap and foundry returns are melted through resistance heating by an electric current flowing through the arcs formed between the electrodes and the surface of the metal and also flowing through the metal between the arc paths.</P>
            <P>
              <E T="03">Electric induction furnace</E> means a vessel in which forms of iron and steel such as scrap and foundry returns are melted though resistance heating by an electric current that is induced in the metal by passing an alternating current through a coil surrounding the metal charge or surrounding a pool of molten metal at the bottom of the vessel.</P>
            <P>
              <E T="03">Exhaust stream</E> means gases emitted from a process through a conveyance as defined in this subpart.</P>
            <P>
              <E T="03">Foundry operations</E> mean all process equipment and practices used to produce metal castings for shipment. <E T="03">Foundry operations</E> include: Mold or core making and coating; scrap handling and preheating; metal melting and inoculation; pouring, cooling, and shakeout; shotblasting, grinding, and other metal finishing operations; and sand handling.</P>
            <P>
              <E T="03">Free liquids</E> means material that fails the paint filter liquids test by EPA Method 9095B, Revision 2, November 1994 (incorporated by reference—see § 63.14). That is, if any portion of the material passes through and drops from the filter within the 5-minute test period, the material contains <E T="03">free liquids</E>.</P>
            <P>
              <E T="03">Fugitive emissions</E> means any pollutant released to the atmosphere that is not discharged through a system of equipment that is specifically designed <PRTPAGE P="184"/>to capture pollutants at the source, convey them through ductwork, and exhaust them using forced ventilation. <E T="03">Fugitive emissions</E> include pollutants released to the atmosphere through windows, doors, vents, or other building openings. <E T="03">Fugitive emissions</E> also include pollutants released to the atmosphere through other general building ventilation or exhaust systems not specifically designed to capture pollutants at the source.</P>
            <P>
              <E T="03">Furfuryl alcohol warm box mold or core making line</E> means a mold or core making line in which the binder chemical system used is that system commonly designated as a furfuryl alcohol warm box system by the foundry industry.</P>
            <P>
              <E T="03">Iron and steel foundry</E> means a facility or portion of a facility that melts scrap, ingot, and/or other forms of iron and/or steel and pours the resulting molten metal into molds to produce final or near final shape products for introduction into commerce. Research and development facilities, operations that only produce non-commercial castings, and operations associated with nonferrous metal production are not included in this definition.</P>
            <P>
              <E T="03">Large foundry</E> means, for an existing affected source, an iron and steel foundry with an annual metal melt production greater than 20,000 tons. For a new affected source, <E T="03">large foundry</E> means an iron and steel foundry with an annual metal melt capacity greater than 10,000 tons.</P>
            <P>
              <E T="03">Mercury switch</E> means each mercury-containing capsule or switch assembly that is part of a convenience light switch mechanism installed in a vehicle.</P>
            <P>
              <E T="03">Metal charged</E> means the quantity of scrap metal, pig iron, metal returns, alloy materials, and other solid forms of iron and steel placed into a metal melting furnace. Metal charged does not include the quantity of fluxing agents or, in the case of a cupola, the quantity of coke that is placed into the metal melting furnace.</P>
            <P>
              <E T="03">Metal melting furnace</E> means a cupola, electric arc furnace, electric induction furnace, or similar device that converts scrap, foundry returns, and/or other solid forms of iron and/or steel to a liquid state. This definition does not include a holding furnace, an argon oxygen decarburization vessel, or ladle that receives molten metal from a metal melting furnace, to which metal ingots or other material may be added to adjust the metal chemistry.</P>
            <P>
              <E T="03">Mold or core making line</E> means the collection of equipment that is used to mix an aggregate of sand and binder chemicals, form the aggregate into final shape, and harden the formed aggregate. This definition does not include a line for making greensand molds or cores.</P>
            <P>
              <E T="03">Motor vehicle</E> means an automotive vehicle not operated on rails and usually is operated with rubber tires for use on highways.</P>
            <P>
              <E T="03">Motor vehicle scrap</E> means vehicle or automobile bodies, including automobile body hulks, that have been processed through a shredder. <E T="03">Motor vehicle scrap</E> does not include automobile manufacturing bundles, or miscellaneous vehicle parts, such as wheels, bumpers, or other components that do not contain mercury switches.</P>
            <P>
              <E T="03">Nonferrous metal</E> means any pure metal other than iron or any metal alloy for which an element other than iron is its major constituent in percent by weight.</P>
            <P>
              <E T="03">On blast</E> means those periods of cupola operation when combustion (blast) air is introduced to the cupola furnace and the furnace is capable of producing molten metal. On blast conditions are characterized by both blast air introduction and molten metal production.</P>
            <P>
              <E T="03">Responsible official</E> means responsible official as defined in § 63.2.</P>
            <P>
              <E T="03">Scrap preheater</E> means a vessel or other piece of equipment in which metal scrap that is to be used as melting furnace feed is heated to a temperature high enough to eliminate volatile impurities or other tramp materials by direct flame heating or similar means of heating. Scrap dryers, which solely remove moisture from metal scrap, are not considered to be scrap preheaters for purposes of this subpart.</P>
            <P>
              <E T="03">Scrap provider</E> means the person (including a broker) who contracts directly with an iron and steel foundry to provide motor vehicle scrap. Scrap processors such as shredder operators or vehicle dismantlers that do not sell scrap directly to a foundry are not <E T="03">scrap providers</E>.<PRTPAGE P="185"/>
            </P>
            <P>
              <E T="03">Scrubber blowdown</E> means liquor or slurry discharged from a wet scrubber that is either removed as a waste stream or processed to remove impurities or adjust its composition or pH.</P>
            <P>
              <E T="03">Small foundry</E> means, for an existing affected source, an iron and steel foundry that has an annual metal melt production of 20,000 tons or less. For a new affected source, <E T="03">small foundry</E> means an iron and steel foundry that has an annual metal melt capacity of 10,000 tons or less.</P>
            <P>
              <E T="03">Total metal HAP</E> means, for the purposes of this subpart, the sum of the concentrations of compounds of antimony, arsenic, beryllium, cadmium, chromium, cobalt, lead, manganese, mercury, nickel, and selenium as measured by EPA Method 29 (40 CFR part 60, appendix A-8). Only the measured concentration of the listed analytes that are present at concentrations exceeding one-half the quantitation limit of the analytical method are to be used in the sum. If any of the analytes are not detected or are detected at concentrations less than one-half the quantitation limit of the analytical method, the concentration of those analytes will be assumed to be zero for the purposes of calculating the total metal HAP for this subpart.</P>
          </SECTION>
        </SUBJGRP>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. ZZZZZ, Table 1</EAR>
          <HD SOURCE="HED">Table 1 to Subpart ZZZZZ of Part 63—Performance Test Requirements for New and Existing Affected Sources Classified as Large Foundries</HD>
          <P>As required in § 63.10898(c) and (h), you must conduct performance tests according to the test methods and procedures in the following table:</P>
          <GPOTABLE CDEF="s100,r100,r100" COLS="3" OPTS="L2">
            <BOXHD>
              <CHED H="1">For. . .</CHED>
              <CHED H="1">You must. . .</CHED>
              <CHED H="1">According to the following<LI>requirements. . .</LI>
              </CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">1. Each metal melting furnace subject to a PM or total metal HAP limit in § 63.10895(c)</ENT>
              <ENT>a. Select sampling port locations and the number of traverse points in each stack or duct using EPA Method 1 or 1A (40 CFR part 60, appendix A)<LI>b. Determine volumetric flow rate of the stack gas using Method 2, 2A, 2C, 2D, 2F, or 2G (40 CFR part 60, appendix A)</LI>
                <LI>c. Determine dry molecular weight of the stack gas using EPA Method 3, 3A, or 3B (40 CFR part 60, appendix A).<SU>1</SU>
                </LI>
                <LI>d. Measure moisture content of the stack gas using EPA Method 4 (40 CFR part 60, A)</LI>
                <LI>e. Determine PM concentration using EPA Method 5, 5B, 5D, 5F, or 5I, as applicable or total metal HAP concentration using EPA Method 29 (40 CFR part 60, appendix A)</LI>
              </ENT>
              <ENT>Sampling sites must be located at the outlet of the control device (or at the outlet of the emissions source if no control device is present) prior to any releases to the atmosphere.<LI>i. Collect a minimum sample volume of 60 dscf of gas during each PM sampling run. The PM concentration is determined using only the front-half (probe rinse and filter) of the PM catch.</LI>
                <LI>ii. For Method 29, only the measured concentration of the listed metal HAP analytes that are present at concentrations exceeding one-half the quantification limit of the analytical method are to be used in the sum. If any of the analytes are not detected or are detected at concentrations less than one-half the quantification limit of the analytical method, the concentration of those analytes is assumed to be zero for the purposes of calculating the total metal HAP.</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl">iii. A minimum of three valid test runs are needed to comprise a PM or total metal HAP performance test.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl">iv. For cupola metal melting furnaces, sample PM or total metal HAP only during times when the cupola is on blast.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl">v. For electric arc and electric induction metal melting furnaces, sample PM or total metal HAP only during normal melt production conditions, which may include, but are not limited to the following operations: Charging, melting, alloying, refining, slagging, and tapping.</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="186"/>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl">vi. Determine and record the total combined weight of tons of metal charged during the duration of each test run. You must compute the process-weighted mass emissions of PM according to Equation 1 of § 63.10898(d) for an individual furnace or Equation 2 of § 63.10898(e) for the group of all metal melting furnaces at the foundry.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">2. Fugitive emissions from buildings or structures housing any iron and steel foundry emissions sources subject to opacity limit in § 63.10895(e)</ENT>
              <ENT>a. Using a certified observer, conduct each opacity test according to EPA Method 9 (40 CFR part 60, appendix A-4) and 40 CFR 63.6(h)(5)</ENT>
              <ENT>i. The certified observer may identify a limited number of openings or vents that appear to have the highest opacities and perform opacity observations on the identified openings or vents in lieu of performing observations for each opening or vent from the building or structure. Alternatively, a single opacity observation for the entire building or structure may be performed, if the fugitive release points afford such an observation.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="xl"/>
              <ENT O="xl">ii. During testing intervals when PM or total metal HAP performance tests, if applicable, are being conducted, conduct the opacity test such that the opacity observations are recorded during the PM or total metal HAP performance tests.</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT>b. As alternative to Method 9 performance test, conduct visible emissions test by Method 22 (40 CFR part 60, appendix A-7). The test is successful if no visible emissions are observed for 90 percent of the readings over 1 hour. If VE is observed greater than 10 percent of the time over 1 hour, then the facility must conduct another performance test as soon as possible, but no later than 15 calendar days after the Method 22 test, using Method 9 (40 CFR part 60, appendix A-4)</ENT>
              <ENT>i. The observer may identify a limited number of openings or vents that appear to have the highest visible emissions and perform observations on the identified openings or vents in lieu of performing observations for each opening or vent from the building or structure. Alternatively, a single observation for the entire building or structure may be performed, if the fugitive release points afford such an observation.<LI>ii. During testing intervals when PM or total metal HAP performance tests, if applicable, are being conducted, conduct the visible emissions test such that the observations are recorded during the PM or total metal HAP performance tests.</LI>
              </ENT>
            </ROW>
            <TNOTE>
              <SU>1</SU> You may also use as an alternative to EPA Method 3B (40 CFR part 60, appendix A), the manual method for measuring the oxygen, carbon dioxide, and carbon monoxide content of exhaust gas, ANSI/ASME PTC 19.10-1981, “Flue and Exhaust Gas Analyses” (incorporated by reference—see § 63.14).</TNOTE>
          </GPOTABLE>
        </APPENDIX>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. ZZZZZ, Table 2</EAR>
          <HD SOURCE="HED">Table 2 to Subpart ZZZZZ of Part 63—Procedures for Establishing Operating Limits for New Affected Sources Classified as Large Foundries</HD>
          <P>As required in § 63.10898(k), you must establish operating limits using the procedures in the following table:</P>
          <GPOTABLE CDEF="s100,r200" COLS="2" OPTS="L2">
            <BOXHD>
              <CHED H="1">For . . .</CHED>
              <CHED H="1">You must . . .</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01" O="xl">1. Each wet scrubber subject to the operating limits in § 63.10895(d)(1) for pressure drop and scrubber water flow rate.</ENT>
              <ENT>Using the CPMS required in § 63.10897(b), measure and record the pressure drop and scrubber water flow rate in intervals of no more than 15 minutes during each PM or total metal HAP test run. Compute and record the average pressure drop and average scrubber water flow rate for all the valid sampling runs in which the applicable emissions limit is met.</ENT>
            </ROW>
            <ROW>
              <ENT I="01" O="xl">2. Each electrostatic precipitator subject to operating limits in § 63.10895(d)(2) for voltage and secondary current (or total power input).</ENT>
              <ENT>Using the CPMS required in § 63.10897(c), measure and record voltage and secondary current (or total power input) in intervals of no more than 15 minutes during each PM or total metal HAP test run. Compute and record the minimum hourly average voltage and secondary current (or total power input) from all the readings for each valid sampling run in which the applicable emissions limit is met.</ENT>
            </ROW>
          </GPOTABLE>
        </APPENDIX>
        <APPENDIX>
          <PRTPAGE P="187"/>
          <EAR>Pt. 63, Subpt. ZZZZZ, Table 3</EAR>
          <HD SOURCE="HED">Table 3 to Subpart ZZZZZ of Part 63—Applicability of General Provisions to New and Existing Affected Sources Classified as Large Foundries</HD>
          <P>As required in § 63.10900(a), you must meet each requirement in the following table that applies to you:</P>
          <GPOTABLE CDEF="s75,r75,xls48,r75" COLS="4" OPTS="L2">
            <BOXHD>
              <CHED H="1">Citation</CHED>
              <CHED H="1">Subject</CHED>
              <CHED H="1">Applies to large<LI>foundry?</LI>
              </CHED>
              <CHED H="1">Explanation</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">63.1</ENT>
              <ENT>Applicability</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.2</ENT>
              <ENT>Definitions</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.3</ENT>
              <ENT>Units and abbreviations</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.4</ENT>
              <ENT>Prohibited activities</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.5</ENT>
              <ENT>Construction/reconstruction</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.6(a)-(g)</ENT>
              <ENT>Compliance with standards and maintenance requirements</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.6(h)</ENT>
              <ENT>Opacity and visible emissions standards</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.6(i)(i)-(j)</ENT>
              <ENT>Compliance extension and Presidential compliance exemption</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.7(a)(3), (b)-(h)</ENT>
              <ENT>Performance testing requirements</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.7(a)(1)-(a)(2)</ENT>
              <ENT>Applicability and performance test dates</ENT>
              <ENT O=".">No</ENT>
              <ENT>Subpart ZZZZZ specifies applicability and performance test dates.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.8(a)(1)-(a)(3), (b), (c)(1)-(c)(3), (c)(6)-(c)(8), (d), (e), (f)(1)-(f)(6), (g)(1)-(g)(4)</ENT>
              <ENT>Monitoring requirements</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.8(a)(4)</ENT>
              <ENT>Additional monitoring requirements for control devices in § 63.11</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.8(c)(4)</ENT>
              <ENT>Continuous monitoring system (CMS) requirements</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.8(c)(5)</ENT>
              <ENT>Continuous opacity monitoring system (COMS) minimum procedures</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.8(g)(5)</ENT>
              <ENT>Data reduction</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.9</ENT>
              <ENT>Notification requirements</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.10(a), (b)(1)-(b)(2)(xii) -(b)(2)(xiv), (b)(3), (d)(1)-(2), (e)(1)-(2), (f)</ENT>
              <ENT>Recordkeeping and reporting requirements</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.10(c)(1)-(6), (c)(9)-(15)</ENT>
              <ENT>Additional records for continuous monitoring systems</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.10(c)(7)-(8)</ENT>
              <ENT>Records of excess emissions and parameter monitoring exceedances for CMS</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.10(d)(3)</ENT>
              <ENT>Reporting opacity or visible emissions observations</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.10(e)(3)</ENT>
              <ENT>Excess emissions reports</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.10(e)(4)</ENT>
              <ENT>Reporting COMS data</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.11</ENT>
              <ENT>Control device requirements</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.12</ENT>
              <ENT>State authority and delegations</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.13-63.16</ENT>
              <ENT>Addresses of State air pollution control agencies and EPA regional offices. Incorporation by reference. Availability of information and confidentiality. Performance track provisions</ENT>
              <ENT>Yes.</ENT>
            </ROW>
          </GPOTABLE>
        </APPENDIX>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. ZZZZZ, Table 4</EAR>
          <HD SOURCE="HED">Table 4 to Subpart ZZZZZ of Part 63—Compliance Certifications for New and Existing Affected Sources Classified as Large Iron and Steel Foundries</HD>
          <P>As required by § 63.10900(b), your notification of compliance status must include certifications of compliance according to the following table:</P>
          <GPOTABLE CDEF="s100,r200" COLS="2" OPTS="L2">
            <BOXHD>
              <CHED H="1">For. . .</CHED>
              <CHED H="1">Your notification of compliance status required by § 63.9(h) must include this certification of compliance, signed by a responsible official:</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">Each new or existing affected source classified as a large foundry and subject to scrap management requirements in § 63.10885(a)(1) and/or (2)</ENT>
              <ENT>“This facility has prepared, and will operate by, written material specifications for metallic scrap according to § 63.10885(a)(1)” and/or “This facility has prepared, and will operate by, written material specifications for general iron and steel scrap according to § 63.10885(a)(2).”</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="188"/>
              <ENT I="01">Each new or existing affected source classified as a large foundry and subject to mercury switch removal requirements in § 63.10885(b)</ENT>
              <ENT>“This facility has prepared, and will operate by, written material specifications for the removal of mercury switches and a site-specific plan implementing the material specifications according to § 63.10885(b)(1)” and/or “This facility participates in and purchases motor vehicles scrap only from scrap providers who participate in a program for removal of mercury switches that has been approved by the EPA Administrator according to § 63.10885(b)(2) and have prepared a plan for participation in the EPA approved program according to § 63.10885(b)(2)(iv)” and/or “The only materials from motor vehicles in the scrap charged to a metal melting furnace at this facility are materials recovered for their specialty alloy content in accordance with § 63.10885(b)(3) which are not reasonably expected to contain mercury switches” and/or “This facility complies with the requirements for scrap that does not contain motor vehicle scrap in accordance with § 63.10885(b)(4).”</ENT>
            </ROW>
            <ROW>
              <ENT I="01">Each new or existing affected source classified as a large foundry and subject to § 63.10886</ENT>
              <ENT>“This facility complies with the no methanol requirement for the catalyst portion of each binder chemical formulation for a furfuryl alcohol warm box mold or core making line according to § 63.10886.”</ENT>
            </ROW>
            <ROW>
              <ENT I="01">Each new or existing affected source classified as a large foundry and subject to § 63.10895(b)</ENT>
              <ENT>“This facility operates a capture and collection system for each emissions source subject to this subpart according to § 63.10895(b).”</ENT>
            </ROW>
            <ROW>
              <ENT I="01">Each existing affected source classified as a large foundry and subject to § 63.10895(c)(1)</ENT>
              <ENT>“This facility complies with the PM or total metal HAP emissions limit in § 63.10895(c) for each metal melting furnace or group of all metal melting furnaces based on a previous performance test in accordance with § 63.10898(a)(1).”</ENT>
            </ROW>
            <ROW>
              <ENT I="01">Each new or existing affected source classified as a large foundry and subject to § 63.10896(a)</ENT>
              <ENT>“This facility has prepared and will operate by an operation and maintenance plan according to § 63.10896(a).”</ENT>
            </ROW>
            <ROW>
              <ENT I="01">Each new or existing (if applicable) affected source classified as a large foundry and subject to § 63.10897(d)</ENT>
              <ENT>“This facility has prepared and will operate by a site-specific monitoring plan for each bag leak detection system and submitted the plan to the Administrator for approval according to § 63.10897(d)(2).”</ENT>
            </ROW>
          </GPOTABLE>
        </APPENDIX>
      </SUBPART>
      <SUBPART>
        <RESERVED>Subpart AAAAAA [Reserved]</RESERVED>
      </SUBPART>
      <SUBPART>
        <HD SOURCE="HED">Subpart BBBBBB—National Emission Standards for Hazardous Air Pollutants for Source Category: Gasoline Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities</HD>
        <SOURCE>
          <HD SOURCE="HED">Source:</HD>
          <P>73 FR 1933, Jan. 10, 2008, unless otherwise noted.</P>
        </SOURCE>
        <SUBJGRP>
          <HD SOURCE="HED">What This Subpart Covers</HD>
          <SECTION>
            <SECTNO>§ 63.11080</SECTNO>
            <SUBJECT>What is the purpose of this subpart?</SUBJECT>
            <P>This subpart establishes national emission limitations and management practices for hazardous air pollutants (HAP) emitted from area source gasoline distribution bulk terminals, bulk plants, and pipeline facilities. This subpart also establishes requirements to demonstrate compliance with the emission limitations and management practices.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.11081</SECTNO>
            <SUBJECT>Am I subject to the requirements in this subpart?</SUBJECT>
            <P>(a) The affected source to which this subpart applies is each area source bulk gasoline terminal, pipeline breakout station, pipeline pumping station, and bulk gasoline plant identified in paragraphs (a)(1) through (4) of this section. You are subject to the requirements in this subpart if you own or operate one or more of the affected area sources identified in paragraphs (a)(1) through (4) of this section.</P>
            <P>(1) A bulk gasoline terminal that is not subject to the control requirements of 40 CFR part 63, subpart R (§§ 63.422, 63.423, and 63.424) or 40 CFR part 63, subpart CC (§§ 63.646, 63.648, 63.649, and 63.650).</P>
            <P>(2) A pipeline breakout station that is not subject to the control requirements of 40 CFR part 63, subpart R (§§ 63.423 and 63.424).</P>
            <P>(3) A pipeline pumping station.</P>
            <P>(4) A bulk gasoline plant.</P>

            <P>(b) If you are an owner or operator of affected sources, as defined in (a)(1) through (4) of this section, you are not required to meet the obligation to obtain a permit under 40 CFR part 70 or 40 CFR part 71 as a result of being subject to this subpart. However, you are still subject to the requirement to apply for and obtain a permit under 40 CFR part 70 or 40 CFR part 71 if you meet one or more of the applicability <PRTPAGE P="189"/>criteria found in 40 CFR 70.3(a) and (b) or 40 CFR part 71.3(a) and (b).</P>
            <P>(c) Gasoline storage tanks that are located at affected sources identified in paragraphs (a)(1) through (a)(4) of this section, and that are used only for dispensing gasoline in a manner consistent with tanks located at a gasoline dispensing facility as defined in § 63.11132, are not subject to any of the requirements in this subpart. These tanks must comply with subpart CCCCCC of this part.</P>
            <P>(d) The loading of aviation gasoline into storage tanks at airports, and the subsequent transfer of aviation gasoline within the airport, is not subject to this subpart.</P>
            <P>(e) The loading of gasoline into marine tank vessels at bulk facilities is not subject to this subpart.</P>
            <P>(f) If your affected source's throughput ever exceeds an applicable throughput threshold in the definition of “bulk gasoline terminal” or in item 1 in Table 2 to this subpart, the affected source will remain subject to the requirements for sources above the threshold, even if the affected source throughput later falls below the applicable throughput threshold.</P>
            <P>(g) For the purpose of determining gasoline throughput, as used in the definition of bulk gasoline plant and bulk gasoline terminal, the 20,000 gallons per day threshold throughput is the maximum calculated design throughout for any day, and is not an average. An enforceable State, local, or Tribal permit limitation on throughput, established prior to the applicable compliance date, may be used in lieu of the 20,000 gallons per day design capacity throughput threshold to determine whether the facility is a bulk gasoline plant or a bulk gasoline terminal.</P>
            <P>(h) Storage tanks that are used to load gasoline into a cargo tank for the on-site redistribution of gasoline to another storage tank are subject to this subpart.</P>
            <P>(i) For any affected source subject to the provisions of this subpart and another Federal rule, you may elect to comply only with the more stringent provisions of the applicable subparts. You must consider all provisions of the rules, including monitoring, recordkeeping, and reporting. You must identify the affected source and provisions with which you will comply in your Notification of Compliance Status required under § 63.11093. You also must demonstrate in your Notification of Compliance Status that each provision with which you will comply is at least as stringent as the otherwise applicable requirements in this subpart. You are responsible for making accurate determinations concerning the more stringent provisions; noncompliance with this rule is not excused if it is later determined that your determination was in error, and, as a result, you are violating this subpart. Compliance with this rule is your responsibility, and the Notification of Compliance Status does not alter or affect that responsibility.</P>
            <P>(j) For new or reconstructed affected sources, as specified in § 63.11082(b) and (c), recordkeeping to document applicable throughput must begin upon startup of the affected source. For existing sources, as specified in § 63.11082(d), recordkeeping to document applicable throughput must begin on January 10, 2008. Records required under this paragraph shall be kept for a period of 5 years.</P>
            <CITA>[73 FR 1933, Jan. 10, 2008, as amended at 76 FR 4176, Jan. 24, 2011]</CITA>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.11082</SECTNO>
            <SUBJECT>What parts of my affected source does this subpart cover?</SUBJECT>
            <P>(a) The emission sources to which this subpart applies are gasoline storage tanks, gasoline loading racks, vapor collection-equipped gasoline cargo tanks, and equipment components in vapor or liquid gasoline service that meet the criteria specified in Tables 1 through 3 to this subpart.</P>
            <P>(b) An affected source is a new affected source if you commenced construction on the affected source after November 9, 2006, and you meet the applicability criteria in § 63.11081 at the time you commenced operation.</P>
            <P>(c) An affected source is reconstructed if you meet the criteria for reconstruction as defined in § 63.2.</P>
            <P>(d) An affected source is an existing affected source if it is not new or reconstructed.</P>
          </SECTION>
          <SECTION>
            <PRTPAGE P="190"/>
            <SECTNO>§ 63.11083</SECTNO>
            <SUBJECT>When do I have to comply with this subpart?</SUBJECT>
            <P>(a) If you have a new or reconstructed affected source, you must comply with this subpart according to paragraphs (a)(1) and (2) of this section.</P>
            <P>(1) If you start up your affected source before January 10, 2008, you must comply with the standards in this subpart no later than January 10, 2008.</P>
            <P>(2) If you start up your affected source after January 10, 2008, you must comply with the standards in this subpart upon startup of your affected source.</P>
            <P>(b) If you have an existing affected source, you must comply with the standards in this subpart no later than January 10, 2011.</P>
            <P>(c) If you have an existing affected source that becomes subject to the control requirements in this subpart because of an increase in the daily throughput, as specified in option 1 of Table 2 to this subpart, you must comply with the standards in this subpart no later than 3 years after the affected source becomes subject to the control requirements in this subpart.</P>
            <CITA>[73 FR 1933, Jan. 10, 2008, as amended at 76 FR 4177, Jan. 24, 2011]</CITA>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Emission Limitations and Management Practices</HD>
          <SECTION>
            <SECTNO>§ 63.11085</SECTNO>
            <SUBJECT>What are my general duties to minimize emissions?</SUBJECT>
            <P>Each owner or operator of an affected source under this subpart must comply with the requirements of paragraphs (a) and (b) of this section.</P>
            <P>(a) You must, at all times, operate and maintain any affected source, including associated air pollution control equipment and monitoring equipment, in a manner consistent with safety and good air pollution control practices for minimizing emissions. Determination of whether such operation and maintenance procedures are being used will be based on information available to the Administrator, which may include, but is not limited to, monitoring results, review of operation and maintenance procedures, review of operation and maintenance records, and inspection of the source.</P>
            <P>(b) You must keep applicable records and submit reports as specified in § 63.11094(g) and § 63.11095(d).</P>
            <CITA>[76 FR 4177, Jan. 24, 2011]</CITA>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.11086</SECTNO>
            <SUBJECT>What requirements must I meet if my facility is a bulk gasoline plant?</SUBJECT>
            <P>Each owner or operator of an affected bulk gasoline plant, as defined in § 63.11100, must comply with the requirements of paragraphs (a) through (i) of this section.</P>
            <P>(a) Except as specified in paragraph (b) of this section, you must only load gasoline into storage tanks and cargo tanks at your facility by utilizing submerged filling, as defined in § 63.11100, and as specified in paragraphs (a)(1), (a)(2), or (a)(3) of this section. The applicable distances in paragraphs (a)(1) and (2) of this section shall be measured from the point in the opening of the submerged fill pipe that is the greatest distance from the bottom of the storage tank.</P>
            <P>(1) Submerged fill pipes installed on or before November 9, 2006, must be no more than 12 inches from the bottom of the tank.</P>
            <P>(2) Submerged fill pipes installed after November 9, 2006, must be no more than 6 inches from the bottom of the tank.</P>
            <P>(3) Submerged fill pipes not meeting the specifications of paragraphs (a)(1) or (a)(2) of this section are allowed if the owner or operator can demonstrate that the liquid level in the gasoline storage tank is always above the entire opening of the fill pipe. Documentation providing such demonstration must be made available for inspection by the Administrator's delegated representative during the course of a site visit.</P>
            <P>(b) Gasoline storage tanks with a capacity of less than 250 gallons are not required to comply with the control requirements in paragraph (a) of this section, but must comply only with the requirements in paragraph (d) of this section.</P>
            <P>(c) You must perform a monthly leak inspection of all equipment in gasoline service according to the requirements specified in § 63.11089(a) through (d).</P>

            <P>(d) You must not allow gasoline to be handled in a manner that would result in vapor releases to the atmosphere for <PRTPAGE P="191"/>extended periods of time. Measures to be taken include, but are not limited to, the following:</P>
            <P>(1) Minimize gasoline spills;</P>
            <P>(2) Clean up spills as expeditiously as practicable;</P>
            <P>(3) Cover all open gasoline containers and all gasoline storage tank fill-pipes with a gasketed seal when not in use;</P>
            <P>(4) Minimize gasoline sent to open waste collection systems that collect and transport gasoline to reclamation and recycling devices, such as oil/water separators.</P>
            <P>(e) You must submit an Initial Notification that you are subject to this subpart by May 9, 2008 unless you meet the requirements in paragraph (g) of this section. The Initial Notification must contain the information specified in paragraphs (e)(1) through (4) of this section. The notification must be submitted to the applicable EPA Regional Office and the delegated State authority, as specified in § 63.13.</P>
            <P>(1) The name and address of the owner and the operator.</P>
            <P>(2) The address (i.e., physical location) of the bulk plant.</P>
            <P>(3) A statement that the notification is being submitted in response to this subpart and identifying the requirements in paragraphs (a), (b), (c), and (d) of this section that apply to you.</P>
            <P>(4) A brief description of the bulk plant, including the number of storage tanks in gasoline service, the capacity of each storage tank in gasoline service, and the average monthly gasoline throughput at the affected source.</P>
            <P>(f) You must submit a Notification of Compliance Status to the applicable EPA Regional Office and the delegated State authority, as specified in § 63.13, by the compliance date specified in § 63.11083 unless you meet the requirements in paragraph (g) of this section. The Notification of Compliance Status must be signed by a responsible official who must certify its accuracy and must indicate whether the source has complied with the requirements of this subpart. If your facility is in compliance with the requirements of this subpart at the time the Initial Notification required under paragraph (e) of this section is due, the Notification of Compliance Status may be submitted in lieu of the Initial Notification provided it contains the information required under paragraph (e) of this section.</P>
            <P>(g) If, prior to January 10, 2008, you are operating in compliance with an enforceable State, local, or tribal rule or permit that requires submerged fill as specified in § 63.11086(a), you are not required to submit an Initial Notification or a Notification of Compliance Status under paragraph (e) or paragraph (f) of this section.</P>
            <P>(h) You must comply with the requirements of this subpart by the applicable dates specified in § 63.11083.</P>
            <P>(i) You must keep applicable records and submit reports as specified in § 63.11094(d) and (e) and § 63.11095(c).</P>
            <CITA>[73 FR 1933, Jan. 10, 2008, as amended at 76 FR 4177, Jan. 24, 2011]</CITA>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.11087</SECTNO>
            <SUBJECT>What requirements must I meet for gasoline storage tanks if my facility is a bulk gasoline terminal, pipeline breakout station, or pipeline pumping station?</SUBJECT>
            <P>(a) You must meet each emission limit and management practice in Table 1 to this subpart that applies to your gasoline storage tank.</P>
            <P>(b) You must comply with the requirements of this subpart by the applicable dates specified in § 63.11083, except that storage vessels equipped with floating roofs and not meeting the requirements of paragraph (a) of this section must be in compliance at the first degassing and cleaning activity after January 10, 2011 or by January 10, 2018, whichever is first.</P>
            <P>(c) You must comply with the applicable testing and monitoring requirements specified in § 63.11092(e).</P>
            <P>(d) You must submit the applicable notifications as required under § 63.11093.</P>
            <P>(e) You must keep records and submit reports as specified in §§ 63.11094 and 63.11095.</P>
            <P>(f) If your gasoline storage tank is subject to, and complies with, the control requirements of 40 CFR part 60, subpart Kb of this chapter, your storage tank will be deemed in compliance with this section. You must report this determination in the Notification of Compliance Status report under § 63.11093(b).</P>
          </SECTION>
          <SECTION>
            <PRTPAGE P="192"/>
            <SECTNO>§ 63.11088</SECTNO>
            <SUBJECT>What requirements must I meet for gasoline loading racks if my facility is a bulk gasoline terminal, pipeline breakout station, or pipeline pumping station?</SUBJECT>
            <P>(a) You must meet each emission limit and management practice in Table 2 to this subpart that applies to you.</P>
            <P>(b) As an alternative for railcar cargo tanks to the requirements specified in Table 2 to this subpart, you may comply with the requirements specified in § 63.422(e).</P>
            <P>(c) You must comply with the requirements of this subpart by the applicable dates specified in § 63.11083.</P>
            <P>(d) You must comply with the applicable testing and monitoring requirements specified in § 63.11092.</P>
            <P>(e) You must submit the applicable notifications as required under § 63.11093.</P>
            <P>(f) You must keep records and submit reports as specified in §§ 63.11094 and 63.11095.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.11089</SECTNO>
            <SUBJECT>What requirements must I meet for equipment leak inspections if my facility is a bulk gasoline terminal, bulk plant, pipeline breakout station, or pipeline pumping station?</SUBJECT>
            <P>(a) Each owner or operator of a bulk gasoline terminal, bulk plant, pipeline breakout station, or pipeline pumping station subject to the provisions of this subpart shall perform a monthly leak inspection of all equipment in gasoline service, as defined in § 63.11100. For this inspection, detection methods incorporating sight, sound, and smell are acceptable.</P>
            <P>(b) A log book shall be used and shall be signed by the owner or operator at the completion of each inspection. A section of the log book shall contain a list, summary description, or diagram(s) showing the location of all equipment in gasoline service at the facility.</P>
            <P>(c) Each detection of a liquid or vapor leak shall be recorded in the log book. When a leak is detected, an initial attempt at repair shall be made as soon as practicable, but no later than 5 calendar days after the leak is detected. Repair or replacement of leaking equipment shall be completed within 15 calendar days after detection of each leak, except as provided in paragraph (d) of this section.</P>
            <P>(d) Delay of repair of leaking equipment will be allowed if the repair is not feasible within 15 days. The owner or operator shall provide in the semiannual report specified in § 63.11095(b), the reason(s) why the repair was not feasible and the date each repair was completed.</P>
            <P>(e) You must comply with the requirements of this subpart by the applicable dates specified in § 63.11083.</P>
            <P>(f) You must submit the applicable notifications as required under § 63.11093.</P>
            <P>(g) You must keep records and submit reports as specified in §§ 63.11094 and 63.11095.</P>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Testing and Monitoring Requirements</HD>
          <SECTION>
            <SECTNO>§ 63.11092</SECTNO>
            <SUBJECT>What testing and monitoring requirements must I meet?</SUBJECT>
            <P>(a) Each owner or operator of a bulk gasoline terminal subject to the emission standard in item 1(b) of Table 2 to this subpart must comply with the requirements in paragraphs (a) through (d) of this section.</P>
            <P>(1) Conduct a performance test on the vapor processing and collection systems according to either paragraph (a)(1)(i) or paragraph (a)(1)(ii) of this section.</P>
            <P>(i) Use the test methods and procedures in § 60.503 of this chapter, except a reading of 500 parts per million shall be used to determine the level of leaks to be repaired under § 60.503(b) of this chapter.</P>
            <P>(ii) Use alternative test methods and procedures in accordance with the alternative test method requirements in § 63.7(f).</P>

            <P>(2) If you are operating your gasoline loading rack in compliance with an enforceable State, local, or tribal rule or permit that requires your loading rack to meet an emission limit of 80 milligrams (mg), or less, per liter of gasoline loaded (mg/l), you may submit a statement by a responsible official of your facility certifying the compliance status of your loading rack in lieu of the test required under paragraph (a)(1) of this section.<PRTPAGE P="193"/>
            </P>
            <P>(3) If you have conducted performance testing on the vapor processing and collection systems within 5 years prior to January 10, 2008, and the test is for the affected facility and is representative of current or anticipated operating processes and conditions, you may submit the results of such testing in lieu of the test required under paragraph (a)(1) of this section, provided the testing was conducted using the test methods and procedures in § 60.503 of this chapter. Should the Administrator deem the prior test data unacceptable, the facility is still required to meet the requirement to conduct an initial performance test within 180 days of the compliance date specified in § 63.11083; thus, previous test reports should be submitted as soon as possible after January 10, 2008.</P>
            <P>(4) The performance test requirements of § 63.11092(a) do not apply to flares defined in § 63.11100 and meeting the flare requirements in § 63.11(b). The owner or operator shall demonstrate that the flare and associated vapor collection system is in compliance with the requirements in § 63.11(b) and 40 CFR 60.503(a), (b), and (d).</P>
            <P>(b) Each owner or operator of a bulk gasoline terminal subject to the provisions of this subpart shall install, calibrate, certify, operate, and maintain, according to the manufacturer's specifications, a continuous monitoring system (CMS) while gasoline vapors are displaced to the vapor processor systems, as specified in paragraphs (b)(1) through (5) of this section. For each facility conducting a performance test under paragraph (a)(1) of this section, and for each facility utilizing the provisions of paragraphs (a)(2) or (a)(3) of this section, the CMS must be installed by January 10, 2011.</P>
            <P>(1) For each performance test conducted under paragraph (a)(1) of this section, the owner or operator shall determine a monitored operating parameter value for the vapor processing system using the procedures specified in paragraphs (b)(1)(i) through (iv) of this section. During the performance test, continuously record the operating parameter as specified under paragraphs (b)(1)(i) through (iv) of this section.</P>
            <P>(i) Where a carbon adsorption system is used, the owner or operator shall monitor the operation of the system as specified in paragraphs (b)(1)(i)(A) or (B) of this section.</P>
            <P>(A) A continuous emissions monitoring system (CEMS) capable of measuring organic compound concentration shall be installed in the exhaust air stream.</P>

            <P>(B) As an alternative to paragraph (b)(1)(i)(A) of this section, you may choose to meet the requirements listed in paragraph (b)(1)(i)(B)(<E T="03">1</E>) and (<E T="03">2</E>) of this section.</P>
            <P>(<E T="03">1</E>) Carbon adsorption devices shall be monitored as specified in paragraphs (b)(1)(i)(B)(<E T="03">1</E>)(<E T="03">i</E>),(<E T="03">ii</E>), and (<E T="03">iii</E>) of this section.</P>
            <P>(<E T="03">i</E>) Vacuum level shall be monitored using a pressure transmitter installed in the vacuum pump suction line, with the measurements displayed on a gauge that can be visually observed. Each carbon bed shall be observed during one complete regeneration cycle on each day of operation of the loading rack to determine the maximum vacuum level achieved.</P>
            <P>(<E T="03">ii</E>) Conduct annual testing of the carbon activity for the carbon in each carbon bed. Carbon activity shall be tested in accordance with the butane working capacity test of the American Society for Testing and Materials (ASTM) Method D 5228-92 (incorporated by reference, see § 63.14), or by another suitable procedure as recommended by the manufacturer.</P>
            <P>(<E T="03">iii</E>) Conduct monthly measurements of the carbon bed outlet volatile organic compounds (VOC) concentration over the last 5 minutes of an adsorption cycle for each carbon bed, documenting the highest measured VOC concentration. Measurements shall be made using a portable analyzer, or a permanently mounted analyzer, in accordance with 40 CFR part 60, Appendix A-7, EPA Method 21 for open-ended lines.</P>
            <P>(<E T="03">2</E>) Develop and submit to the Administrator a monitoring and inspection plan that describes the owner or operator's approach for meeting the requirements in paragraphs (b)(1)(i)(B)(<E T="03">2</E>)(<E T="03">i</E>) through (<E T="03">v</E>) of this section.</P>
            <P>(<E T="03">i</E>) The lowest maximum required vacuum level and duration needed to assure regeneration of the carbon beds shall be determined by an engineering <PRTPAGE P="194"/>analysis or from the manufacturer's recommendation and shall be documented in the monitoring and inspection plan.</P>
            <P>(<E T="03">ii</E>) The owner or operator shall verify, during each day of operation of the loading rack, the proper valve sequencing, cycle time, gasoline flow, purge air flow, and operating temperatures. Verification shall be through visual observation, or through an automated alarm or shutdown system that monitors system operation. A manual or electronic record of the start and end of a shutdown event may be used.</P>
            <P>(<E T="03">iii</E>) The owner or operator shall perform semi-annual preventive maintenance inspections of the carbon adsorption system, including the automated alarm or shutdown system for those units so equipped, according to the recommendations of the manufacturer of the system.</P>
            <P>(<E T="03">iv</E>) The monitoring plan developed under paragraph (<E T="03">2</E>) of this section shall specify conditions that would be considered malfunctions of the carbon adsorption system during the inspections or automated monitoring performed under paragraphs (b)(1)(i)(B)(<E T="03">2</E>)(<E T="03">i</E>) through (<E T="03">iii</E>) of this section, describe specific corrective actions that will be taken to correct any malfunction, and define what the owner or operator would consider to be a timely repair for each potential malfunction.</P>
            <P>(<E T="03">v</E>) The owner or operator shall document the maximum vacuum level observed on each carbon bed from each daily inspection and the maximum VOC concentration observed from each carbon bed on each monthly inspection as well as any system malfunction, as defined in the monitoring and inspection plan, and any activation of the automated alarm or shutdown system with a written entry into a log book or other permanent form of record. Such record shall also include a description of the corrective action taken and whether such corrective actions were taken in a timely manner, as defined in the monitoring and inspection plan, as well as an estimate of the amount of gasoline loaded during the period of the malfunction.</P>
            <P>(ii) Where a refrigeration condenser system is used, a continuous parameter monitoring system (CPMS) capable of measuring temperature shall be installed immediately downstream from the outlet to the condenser section. Alternatively, a CEMS capable of measuring organic compound concentration may be installed in the exhaust air stream.</P>
            <P>(iii) Where a thermal oxidation system other than a flare is used, the owner or operator shall monitor the operation of the system as specified in paragraphs (b)(1)(iii)(A) or (B) of this section.</P>
            <P>(A) A CPMS capable of measuring temperature shall be installed in the firebox or in the ductwork immediately downstream from the firebox in a position before any substantial heat exchange occurs.</P>

            <P>(B) As an alternative to paragraph (b)(1)(iii)(A) of this section, you may choose to meet the requirements listed in paragraphs (b)(1)(iii)(B)(<E T="03">1</E>) and (<E T="03">2</E>) of this section.</P>
            <P>(<E T="03">1</E>) The presence of a thermal oxidation system pilot flame shall be monitored using a heat-sensing device, such as an ultraviolet beam sensor or a thermocouple, installed in proximity of the pilot light, to indicate the presence of a flame. The heat-sensing device shall send a positive parameter value to indicate that the pilot flame is on, or a negative parameter value to indicate that the pilot flame is off.</P>
            <P>(<E T="03">2</E>) Develop and submit to the Administrator a monitoring and inspection plan that describes the owner or operator's approach for meeting the requirements in paragraphs (b)(1)(iii)(B)(<E T="03">2</E>)(<E T="03">i</E>) through (<E T="03">v</E>) of this section.</P>
            <P>(<E T="03">i</E>) The thermal oxidation system shall be equipped to automatically prevent gasoline loading operations from beginning at any time that the pilot flame is absent.</P>
            <P>(<E T="03">ii</E>) The owner or operator shall verify, during each day of operation of the loading rack, the proper operation of the assist-air blower and the vapor line valve. Verification shall be through visual observation, or through an automated alarm or shutdown system that monitors system operation. A manual or electronic record of the start and end of a shutdown event may be used.<PRTPAGE P="195"/>
            </P>
            <P>(<E T="03">iii</E>) The owner or operator shall perform semi-annual preventive maintenance inspections of the thermal oxidation system, including the automated alarm or shutdown system for those units so equipped, according to the recommendations of the manufacturer of the system.</P>
            <P>(<E T="03">iv</E>) The monitoring plan developed under paragraph (<E T="03">2</E>) of this section shall specify conditions that would be considered malfunctions of the thermal oxidation system during the inspections or automated monitoring performed under paragraphs (b)(1)(iii)(B)(<E T="03">2</E>)(<E T="03">ii</E>) and (<E T="03">iii</E>) of this section, describe specific corrective actions that will be taken to correct any malfunction, and define what the owner or operator would consider to be a timely repair for each potential malfunction.</P>
            <P>(<E T="03">v</E>) The owner or operator shall document any system malfunction, as defined in the monitoring and inspection plan, and any activation of the automated alarm or shutdown system with a written entry into a log book or other permanent form of record. Such record shall also include a description of the corrective action taken and whether such corrective actions were taken in a timely manner, as defined in the monitoring and inspection plan, as well as an estimate of the amount of gasoline loaded during the period of the malfunction.</P>
            <P>(iv) Monitoring an alternative operating parameter or a parameter of a vapor processing system other than those listed in paragraphs (b)(1)(i) through (iii) of this section will be allowed upon demonstrating to the Administrator's satisfaction that the alternative parameter demonstrates continuous compliance with the emission standard in § 63.11088(a).</P>
            <P>(2) Where a flare meeting the requirements in § 63.11(b) is used, a heat-sensing device, such as an ultraviolet beam sensor or a thermocouple, must be installed in proximity to the pilot light to indicate the presence of a flame.</P>
            <P>(3) Determine an operating parameter value based on the parameter data monitored during the performance test, supplemented by engineering assessments and the manufacturer's recommendations.</P>
            <P>(4) Provide for the Administrator's approval the rationale for the selected operating parameter value, monitoring frequency, and averaging time, including data and calculations used to develop the value and a description of why the value, monitoring frequency, and averaging time demonstrate continuous compliance with the emission standard in § 63.11088(a).</P>
            <P>(5) If you have chosen to comply with the performance testing alternatives provided under paragraph (a)(2) or paragraph (a)(3) of this section, the monitored operating parameter value may be determined according to the provisions in paragraph (b)(5)(i) or paragraph (b)(5)(ii) of this section.</P>
            <P>(i) Monitor an operating parameter that has been approved by the Administrator and is specified in your facility's current enforceable operating permit. At the time that the Administrator requires a new performance test, you must determine the monitored operating parameter value according to the requirements specified in paragraph (b) of this section.</P>
            <P>(ii) Determine an operating parameter value based on engineering assessment and the manufacturer's recommendation and submit the information specified in paragraph (b)(4) of this section for approval by the Administrator. At the time that the Administrator requires a new performance test, you must determine the monitored operating parameter value according to the requirements specified in paragraph (b) of this section.</P>
            <P>(c) For performance tests performed after the initial test required under paragraph (a) of this section, the owner or operator shall document the reasons for any change in the operating parameter value since the previous performance test.</P>
            <P>(d) Each owner or operator of a bulk gasoline terminal subject to the provisions of this subpart shall comply with the requirements in paragraphs (d)(1) through (4) of this section.</P>

            <P>(1) Operate the vapor processing system in a manner not to exceed or not to go below, as appropriate, the operating parameter value for the parameters described in paragraph (b)(1) of this section.<PRTPAGE P="196"/>
            </P>
            <P>(2) In cases where an alternative parameter pursuant to paragraph (b)(1)(iv) or paragraph (b)(5)(i) of this section is approved, each owner or operator shall operate the vapor processing system in a manner not to exceed or not to go below, as appropriate, the alternative operating parameter value.</P>
            <P>(3) Operation of the vapor processing system in a manner exceeding or going below the operating parameter value, as appropriate, shall constitute a violation of the emission standard in § 63.11088(a), except as specified in paragraph (d)(4) of this section.</P>

            <P>(4) For the monitoring and inspection, as required under paragraphs (b)(1)(i)(B)(<E T="03">2</E>) and (b)(1)(iii)(B)(<E T="03">2</E>) of this section, malfunctions that are discovered shall not constitute a violation of the emission standard in § 63.11088(a) if corrective actions as described in the monitoring and inspection plan are followed. The owner or operator must:</P>
            <P>(i) Initiate corrective action to determine the cause of the problem within 1 hour;</P>
            <P>(ii) Initiate corrective action to fix the problem within 24 hours;</P>
            <P>(iii) Complete all corrective actions needed to fix the problem as soon as practicable consistent with good air pollution control practices for minimizing emissions;</P>
            <P>(iv) Minimize periods of start-up, shutdown, or malfunction; and</P>
            <P>(v) Take any necessary corrective actions to restore normal operation and prevent the recurrence of the cause of the problem.</P>
            <P>(e) Each owner or operator subject to the emission standard in § 63.11087 for gasoline storage tanks shall comply with the requirements in paragraphs (e)(1) through (3) of this section.</P>
            <P>(1) If your gasoline storage tank is equipped with an internal floating roof, you must perform inspections of the floating roof system according to the requirements of § 60.113b(a) if you are complying with option 2(b) in Table 1 to this subpart, or according to the requirements of § 63.1063(c)(1) if you are complying with option 2(d) in Table 1 to this subpart.</P>
            <P>(2) If your gasoline storage tank is equipped with an external floating roof, you must perform inspections of the floating roof system according to the requirements of § 60.113b(b) if you are complying with option 2(c) in Table 1 to this subpart, or according to the requirements of § 63.1063(c)(2) if you are complying with option 2(d) in Table 1 to this subpart.</P>
            <P>(3) If your gasoline storage tank is equipped with a closed vent system and control device, you must conduct a performance test and determine a monitored operating parameter value in accordance with the requirements in paragraphs (a) through (d) of this section, except that the applicable level of control specified in paragraph (a)(2) of this section shall be a 95-percent reduction in inlet total organic compounds (TOC) levels rather than 80 mg/l of gasoline loaded.</P>
            <P>(f) The annual certification test for gasoline cargo tanks shall consist of the test methods specified in paragraphs (f)(1) or (f)(2) of this section. Affected facilities that are subject to subpart XX of 40 CFR part 60 may elect, after notification to the subpart XX delegated authority, to comply with paragraphs (f)(1) and (2) of this section.</P>
            <P>(1) <E T="03">EPA Method 27, Appendix A-8, 40 CFR part 60.</E> Conduct the test using a time period (t) for the pressure and vacuum tests of 5 minutes. The initial pressure (P<E T="52">i</E>) for the pressure test shall be 460 millimeters (mm) of water (18 inches of water), gauge. The initial vacuum (V<E T="52">i</E>) for the vacuum test shall be 150 mm of water (6 inches of water), gauge. The maximum allowable pressure and vacuum changes (Δ p, Δ v) for all affected gasoline cargo tanks is 3 inches of water, or less, in 5 minutes.</P>
            <P>(2) <E T="03">Railcar bubble leak test procedures.</E> As an alternative to the annual certification test required under paragraph (1) of this section for certification leakage testing of gasoline cargo tanks, the owner or operator may comply with paragraphs (f)(2)(i) and (ii) of this section for railcar cargo tanks, provided the railcar cargo tank meets the requirement in paragraph (f)(2)(iii) of this section.</P>
            <P>(i) Comply with the requirements of 49 CFR 173.31(d), 49 CFR 179.7, 49 CFR 180.509, and 49 CFR 180.511 for the periodic testing of railcar cargo tanks.</P>

            <P>(ii) The leakage pressure test procedure required under 49 CFR 180.509(j) <PRTPAGE P="197"/>and used to show no indication of leakage under 49 CFR 180.511(f) shall be ASTM E 515-95, BS EN 1593:1999, or another bubble leak test procedure meeting the requirements in 49 CFR 179.7, 49 CFR 180.505, and 49 CFR 180.509.</P>
            <P>(iii) The alternative requirements in this paragraph (f)(2) may not be used for any railcar cargo tank that collects gasoline vapors from a vapor balance system and the system complies with a Federal, State, local, or tribal rule or permit. A vapor balance system is a piping and collection system designed to collect gasoline vapors displaced from a storage vessel, barge, or other container being loaded, and routes the displaced gasoline vapors into the railcar cargo tank from which liquid gasoline is being unloaded.</P>
            <P>(g) <E T="03">Conduct of performance tests.</E> Performance tests conducted for this subpart shall be conducted under such conditions as the Administrator specifies to the owner or operator, based on representative performance (<E T="03">i.e.,</E> performance based on normal operating conditions) of the affected source. Upon request, the owner or operator shall make available to the Administrator such records as may be necessary to determine the conditions of performance tests.</P>
            <CITA>[73 FR 1933, Jan. 10, 2008 as amended at 73 FR 12276, Mar. 7, 2008; 76 FR 4177, Jan. 24, 2011]</CITA>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Notifications, Records, and Reports</HD>
          <SECTION>
            <SECTNO>§ 63.11093</SECTNO>
            <SUBJECT>What notifications must I submit and when?</SUBJECT>
            <P>(a) Each owner or operator of an affected source under this subpart must submit an Initial Notification as specified in § 63.9(b). If your facility is in compliance with the requirements of this subpart at the time the Initial Notification is due, the Notification of Compliance Status required under paragraph (b) of this section may be submitted in lieu of the Initial Notification.</P>
            <P>(b) Each owner or operator of an affected source under this subpart must submit a Notification of Compliance Status as specified in § 63.9(h). The Notification of Compliance Status must specify which of the compliance options included in Table 1 to this subpart is used to comply with this subpart.</P>
            <P>(c) Each owner or operator of an affected bulk gasoline terminal under this subpart must submit a Notification of Performance Test, as specified in § 63.9(e), prior to initiating testing required by § 63.11092(a) or § 63.11092(b).</P>
            <P>(d) Each owner or operator of any affected source under this subpart must submit additional notifications specified in § 63.9, as applicable.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.11094</SECTNO>
            <SUBJECT>What are my recordkeeping requirements?</SUBJECT>
            <P>(a) Each owner or operator of a bulk gasoline terminal or pipeline breakout station whose storage vessels are subject to the provisions of this subpart shall keep records as specified in § 60.115b of this chapter if you are complying with options 2(a), 2(b), or 2(c) in Table 1 to this subpart, except records shall be kept for at least 5 years. If you are complying with the requirements of option 2(d) in Table 1 to this subpart, you shall keep records as specified in § 63.1065.</P>
            <P>(b) Each owner or operator of a bulk gasoline terminal subject to the provisions of this subpart shall keep records of the test results for each gasoline cargo tank loading at the facility as specified in paragraphs (b)(1) through (3) of this section.</P>
            <P>(1) Annual certification testing performed under § 63.11092(f)(1) and periodic railcar bubble leak testing performed under § 63.11092(f)(2).</P>
            <P>(2) The documentation file shall be kept up-to-date for each gasoline cargo tank loading at the facility. The documentation for each test shall include, as a minimum, the following information:</P>
            <P>(i) <E T="03">Name of test:</E> Annual Certification Test—Method 27 or Periodic Railcar Bubble Leak Test Procedure.</P>
            <P>(ii) Cargo tank owner's name and address.</P>
            <P>(iii) Cargo tank identification number.</P>
            <P>(iv) Test location and date.</P>
            <P>(v) Tester name and signature.</P>
            <P>(vi) <E T="03">Witnessing inspector, if any:</E> Name, signature, and affiliation.</P>
            <P>(vii) <E T="03">Vapor tightness repair:</E> Nature of repair work and when performed in relation to vapor tightness testing.<PRTPAGE P="198"/>
            </P>
            <P>(viii) <E T="03">Test results:</E> Test pressure; pressure or vacuum change, mm of water; time period of test; number of leaks found with instrument; and leak definition.</P>
            <P>(3) If you are complying with the alternative requirements in § 63.11088(b), you must keep records documenting that you have verified the vapor tightness testing according to the requirements of the Administrator.</P>
            <P>(c) As an alternative to keeping records at the terminal of each gasoline cargo tank test result as required in paragraph (b) of this section, an owner or operator may comply with the requirements in either paragraph (c)(1) or paragraph (c)(2) of this section.</P>
            <P>(1) An electronic copy of each record is instantly available at the terminal.</P>
            <P>(i) The copy of each record in paragraph (c)(1) of this section is an exact duplicate image of the original paper record with certifying signatures.</P>
            <P>(ii) The Administrator is notified in writing that each terminal using this alternative is in compliance with paragraph (c)(1) of this section.</P>
            <P>(2) For facilities that use a terminal automation system to prevent gasoline cargo tanks that do not have valid cargo tank vapor tightness documentation from loading (e.g., via a card lock-out system), a copy of the documentation is made available (e.g., via facsimile) for inspection by the Administrator's delegated representatives during the course of a site visit, or within a mutually agreeable time frame.</P>
            <P>(i) The copy of each record in paragraph (c)(2) of this section is an exact duplicate image of the original paper record with certifying signatures.</P>
            <P>(ii) The Administrator is notified in writing that each terminal using this alternative is in compliance with paragraph (c)(2) of this section.</P>
            <P>(d) Each owner or operator subject to the equipment leak provisions of § 63.11089 shall prepare and maintain a record describing the types, identification numbers, and locations of all equipment in gasoline service. For facilities electing to implement an instrument program under § 63.11089, the record shall contain a full description of the program.</P>
            <P>(e) Each owner or operator of an affected source subject to equipment leak inspections under § 63.11089 shall record in the log book for each leak that is detected the information specified in paragraphs (e)(1) through (7) of this section.</P>
            <P>(1) The equipment type and identification number.</P>
            <P>(2) The nature of the leak (i.e., vapor or liquid) and the method of detection (i.e., sight, sound, or smell).</P>
            <P>(3) The date the leak was detected and the date of each attempt to repair the leak.</P>
            <P>(4) Repair methods applied in each attempt to repair the leak.</P>
            <P>(5) “Repair delayed” and the reason for the delay if the leak is not repaired within 15 calendar days after discovery of the leak.</P>
            <P>(6) The expected date of successful repair of the leak if the leak is not repaired within 15 days.</P>
            <P>(7) The date of successful repair of the leak.</P>
            <P>(f) Each owner or operator of a bulk gasoline terminal subject to the provisions of this subpart shall:</P>
            <P>(1) Keep an up-to-date, readily accessible record of the continuous monitoring data required under § 63.11092(b) or § 63.11092(e). This record shall indicate the time intervals during which loadings of gasoline cargo tanks have occurred or, alternatively, shall record the operating parameter data only during such loadings. The date and time of day shall also be indicated at reasonable intervals on this record.</P>
            <P>(2) Record and report simultaneously with the Notification of Compliance Status required under § 63.11093(b):</P>
            <P>(i) All data and calculations, engineering assessments, and manufacturer's recommendations used in determining the operating parameter value under § 63.11092(b) or § 63.11092(e); and</P>
            <P>(ii) The following information when using a flare under provisions of § 63.11(b) to comply with § 63.11087(a):</P>
            <P>(A) Flare design (i.e., steam-assisted, air-assisted, or non-assisted); and</P>

            <P>(B) All visible emissions (VE) readings, heat content determinations, flow rate measurements, and exit velocity determinations made during the compliance determination required under § 63.11092(e)(3).<PRTPAGE P="199"/>
            </P>

            <P>(3) Keep an up-to-date, readily accessible copy of the monitoring and inspection plan required under § 63.11092(b)(1)(i)(B)(<E T="03">2</E>) or § 63.11092(b)(1)(iii)(B)(<E T="03">2</E>).</P>

            <P>(4) Keep an up-to-date, readily accessible record of all system malfunctions, as specified in § 63.11092(b)(1)(i)(B)(<E T="03">2</E>)(<E T="03">v</E>) or § 63.11092(b)(1)(iii)(B)(<E T="03">2</E>)(<E T="03">v</E>).</P>
            <P>(5) If an owner or operator requests approval to use a vapor processing system or monitor an operating parameter other than those specified in § 63.11092(b), the owner or operator shall submit a description of planned reporting and recordkeeping procedures.</P>
            <P>(g) Each owner or operator of an affected source under this subpart shall keep records as specified in paragraphs (g)(1) and (2) of this section.</P>

            <P>(1) Records of the occurrence and duration of each malfunction of operation (<E T="03">i.e.,</E> process equipment) or the air pollution control and monitoring equipment.</P>
            <P>(2) Records of actions taken during periods of malfunction to minimize emissions in accordance with § 63.11085(a), including corrective actions to restore malfunctioning process and air pollution control and monitoring equipment to its normal or usual manner of operation.</P>
            <CITA>[73 FR 1933, Jan. 10, 2008, as amended at 76 FR 4178, Jan. 24, 2011]</CITA>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.11095</SECTNO>
            <SUBJECT>What are my reporting requirements?</SUBJECT>
            <P>(a) Each owner or operator of a bulk terminal or a pipeline breakout station subject to the control requirements of this subpart shall include in a semiannual compliance report to the Administrator the following information, as applicable:</P>
            <P>(1) For storage vessels, if you are complying with options 2(a), 2(b), or 2(c) in Table 1 to this subpart, the information specified in § 60.115b(a), § 60.115b(b), or § 60.115b(c) of this chapter, depending upon the control equipment installed, or, if you are complying with option 2(d) in Table 1 to this subpart, the information specified in § 63.1066.</P>
            <P>(2) For loading racks, each loading of a gasoline cargo tank for which vapor tightness documentation had not been previously obtained by the facility.</P>
            <P>(3) For equipment leak inspections, the number of equipment leaks not repaired within 15 days after detection.</P>
            <P>(4) For storage vessels complying with § 63.11087(b) after January 10, 2011, the storage vessel's Notice of Compliance Status information can be included in the next semi-annual compliance report in lieu of filing a separate Notification of Compliance Status report under § 63.11093.</P>
            <P>(b) Each owner or operator of an affected source subject to the control requirements of this subpart shall submit an excess emissions report to the Administrator at the time the semiannual compliance report is submitted. Excess emissions events under this subpart, and the information to be included in the excess emissions report, are specified in paragraphs (b)(1) through (5) of this section.</P>
            <P>(1) Each instance of a non-vapor-tight gasoline cargo tank loading at the facility in which the owner or operator failed to take steps to assure that such cargo tank would not be reloaded at the facility before vapor tightness documentation for that cargo tank was obtained.</P>
            <P>(2) Each reloading of a non-vapor-tight gasoline cargo tank at the facility before vapor tightness documentation for that cargo tank is obtained by the facility in accordance with § 63.11094(b).</P>
            <P>(3) Each exceedance or failure to maintain, as appropriate, the monitored operating parameter value determined under § 63.11092(b). The report shall include the monitoring data for the days on which exceedances or failures to maintain have occurred, and a description and timing of the steps taken to repair or perform maintenance on the vapor collection and processing systems or the CMS.</P>

            <P>(4) Each instance in which malfunctions discovered during the monitoring and inspections required under § 63.11092(b)(1)(i)(B)(<E T="03">2</E>) and (b)(1)(iii)(B)(<E T="03">2</E>) were not resolved according to the necessary corrective actions described in the monitoring and inspection plan. The report shall include a description of the malfunction and the timing of the steps taken to correct the malfunction.<PRTPAGE P="200"/>
            </P>
            <P>(5) For each occurrence of an equipment leak for which no repair attempt was made within 5 days or for which repair was not completed within 15 days after detection:</P>
            <P>(i) The date on which the leak was detected;</P>
            <P>(ii) The date of each attempt to repair the leak;</P>
            <P>(iii) The reasons for the delay of repair; and</P>
            <P>(iv) The date of successful repair.</P>
            <P>(c) Each owner or operator of a bulk gasoline plant or a pipeline pumping station shall submit a semiannual excess emissions report, including the information specified in paragraphs (a)(3) and (b)(5) of this section, only for a 6-month period during which an excess emission event has occurred. If no excess emission events have occurred during the previous 6-month period, no report is required.</P>
            <P>(d) Each owner or operator of an affected source under this subpart shall submit a semiannual report including the number, duration, and a brief description of each type of malfunction which occurred during the reporting period and which caused or may have caused any applicable emission limitation to be exceeded. The report must also include a description of actions taken by an owner or operator during a malfunction of an affected source to minimize emissions in accordance with § 63.11085(a), including actions taken to correct a malfunction. The report may be submitted as a part of the semiannual compliance report, if one is required. Owners or operators of affected bulk plants and pipeline pumping stations are not required to submit reports for periods during which no malfunctions occurred.</P>
            <CITA>[73 FR 1933, Jan. 10, 2008 as amended at 73 FR 12276, Mar. 7, 2008; 76 FR 4178, Jan. 24, 2011]</CITA>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Other Requirements and Information</HD>
          <SECTION>
            <SECTNO>§ 63.11098</SECTNO>
            <SUBJECT>What parts of the General Provisions apply to me?</SUBJECT>
            <P>Table 3 to this subpart shows which parts of the General Provisions apply to you.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.11099</SECTNO>
            <SUBJECT>Who implements and enforces this subpart?</SUBJECT>
            <P>(a) This subpart can be implemented and enforced by the U.S. EPA or a delegated authority such as the applicable State, local, or tribal agency. If the U.S. EPA Administrator has delegated authority to a State, local, or tribal agency, then that agency, in addition to the U.S. EPA, has the authority to implement and enforce this subpart. Contact the applicable U.S. EPA Regional Office to find out if implementation and enforcement of this subpart is delegated to a State, local, or tribal agency.</P>
            <P>(b) In delegating implementation and enforcement authority of this subpart to a State, local, or tribal agency under subpart E of this part, the authorities specified in paragraph (c) of this section are retained by the Administrator of U.S. EPA and cannot be transferred to the State, local, or tribal agency.</P>
            <P>(c) The authorities that cannot be delegated to State, local, or tribal agencies are as specified in paragraphs (c)(1) through (4) of this section.</P>
            <P>(1) Approval of alternatives to the requirements in §§ 63.11086 through 63.11088 and § 63.11092. Any owner or operator requesting to use an alternative means of emission limitation for storage vessels in Table 1 to this subpart must follow either the provisions in § 60.114b of this chapter if you are complying with options 2(a), 2(b), or 2(c) in Table 1 to this subpart, or the provisions in § 63.1064 if you are complying with option 2(d) in Table 1 to this subpart.</P>
            <P>(2) Approval of major alternatives to test methods under § 63.7(e)(2)(ii) and (f), as defined in § 63.90, and as required in this subpart.</P>
            <P>(3) Approval of major alternatives to monitoring under § 63.8(f), as defined in § 63.90, and as required in this subpart.</P>
            <P>(4) Approval of major alternatives to recordkeeping and reporting under § 63.10(f), as defined in § 63.90, and as required in this subpart.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.11100</SECTNO>
            <SUBJECT>What definitions apply to this subpart?</SUBJECT>

            <P>As used in this subpart, all terms not defined herein shall have the meaning given them in the Clean Air Act (CAA), <PRTPAGE P="201"/>in subparts A, K, Ka, Kb, and XX of part 60 of this chapter, or in subparts A, R, and WW of this part. All terms defined in both subpart A of part 60 of this chapter and subparts A, R, and WW of this part shall have the meaning given in subparts A, R, and WW of this part. For purposes of this subpart, definitions in this section supersede definitions in other parts or subparts.</P>
            <P>
              <E T="03">Administrator</E> means the Administrator of the United States Environmental Protection Agency or his or her authorized representative (e.g., a State that has been delegated the authority to implement the provisions of this subpart).</P>
            <P>
              <E T="03">Bulk gasoline plant</E> means any gasoline storage and distribution facility that receives gasoline by pipeline, ship or barge, or cargo tank, and subsequently loads the gasoline into gasoline cargo tanks for transport to gasoline dispensing facilities, and has a gasoline throughput of less than 20,000 gallons per day. Gasoline throughput shall be the maximum calculated design throughput as may be limited by compliance with an enforceable condition under Federal, State, or local law, and discoverable by the Administrator and any other person.</P>
            <P>
              <E T="03">Bulk gasoline terminal</E> means any gasoline storage and distribution facility that receives gasoline by pipeline, ship or barge, or cargo tank and has a gasoline throughput of 20,000 gallons per day or greater. Gasoline throughput shall be the maximum calculated design throughput as may be limited by compliance with an enforceable condition under Federal, State, or local law and discoverable by the Administrator and any other person.</P>
            <P>
              <E T="03">Equipment</E> means each valve, pump, pressure relief device, sampling connection system, open-ended valve or line, and flange or other connector in the gasoline liquid transfer and vapor collection systems. This definition also includes the entire vapor processing system except the exhaust port(s) or stack(s).</P>
            <P>
              <E T="03">Flare</E> means a thermal oxidation system using an open (without enclosure) flame.</P>
            <P>
              <E T="03">Gasoline</E> means any petroleum distillate or petroleum distillate/alcohol blend having a Reid vapor pressure of 27.6 kilopascals or greater, which is used as a fuel for internal combustion engines.</P>
            <P>
              <E T="03">Gasoline cargo tank</E> means a delivery tank truck or railcar which is loading gasoline or which has loaded gasoline on the immediately previous load.</P>
            <P>
              <E T="03">Gasoline storage tank or vessel</E> means each tank, vessel, reservoir, or container used for the storage of gasoline, but does not include:</P>
            <P>(1) Frames, housing, auxiliary supports, or other components that are not directly involved in the containment of gasoline or gasoline vapors;</P>
            <P>(2) Subsurface caverns or porous rock reservoirs;</P>
            <P>(3) Oil/water separators and sumps, including butane blending sample recovery tanks, used to collect drained material such that it can be pumped to storage or back into a process; or</P>
            <P>(4) Tanks or vessels permanently attached to mobile sources such as trucks, railcars, barges, or ships.</P>
            <P>
              <E T="03">In gasoline service</E> means that a piece of equipment is used in a system that transfers gasoline or gasoline vapors.</P>
            <P>
              <E T="03">Monthly</E> means once per calendar month at regular intervals of no less than 28 days and no more than 35 days.</P>
            <P>
              <E T="03">Operating parameter value</E> means a value for an operating or emission parameter of the vapor processing system (e.g., temperature) which, if maintained continuously by itself or in combination with one or more other operating parameter values, determines that an owner or operator has complied with the applicable emission standard. The operating parameter value is determined using the procedures specified in § 63.11092(b).</P>
            <P>
              <E T="03">Pipeline breakout station</E> means a facility along a pipeline containing storage vessels used to relieve surges or receive and store gasoline from the pipeline for re-injection and continued transportation by pipeline or to other facilities.</P>
            <P>
              <E T="03">Pipeline pumping station</E> means a facility along a pipeline containing pumps to maintain the desired pressure and flow of product through the pipeline, and not containing gasoline storage tanks other than surge control tanks.</P>
            <P>
              <E T="03">Submerged filling</E> means, for the purposes of this subpart, the filling of a <PRTPAGE P="202"/>gasoline cargo tank or a stationary storage tank through a submerged fill pipe whose discharge is no more than the applicable distance specified in § 63.11086(a) from the bottom of the tank. Bottom filling of gasoline cargo tanks or storage tanks is included in this definition.</P>
            <P>
              <E T="03">Surge control tank or vessel</E> means, for the purposes of this subpart, those tanks or vessels used only for controlling pressure in a pipeline system during surges or other variations from normal operations.</P>
            <P>
              <E T="03">Vapor collection-equipped gasoline cargo tank</E> means a gasoline cargo tank that is outfitted with the equipment necessary to transfer vapors, displaced during the loading of gasoline into the cargo tank, to a vapor processor system.</P>
            <P>
              <E T="03">Vapor-tight gasoline cargo tank</E> means a gasoline cargo tank which has demonstrated within the 12 preceding months that it meets the annual certification test requirements in § 63.11092(f).</P>
            <CITA>[73 FR 1933, Jan. 10, 2008, as amended at 76 FR 4178, Jan. 24, 2011]</CITA>
          </SECTION>
        </SUBJGRP>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. BBBBBB, Table 1</EAR>
          <HD SOURCE="HED">Table 1 to Subpart BBBBBB of Part 63—Applicability Criteria, Emission Limits, and Management Practices for Storage Tanks</HD>
          <GPOTABLE CDEF="s100,r100" COLS="2" OPTS="L2">
            <BOXHD>
              <CHED H="1" O="L">If you own or operate . . .</CHED>
              <CHED H="1" O="L">Then you must . . .</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01" O="xl">1. A gasoline storage tank meeting either of the following conditions:<LI O="oi1">(i) a capacity of less than 75 cubic meters (m<SU>3</SU>); or</LI>
                <LI O="oi1">(ii) a capacity of less than 151 m<SU>3</SU> and a gasoline throughput of 480 gallons per day or less. Gallons per day is calculated by summing the current day's throughput, plus the throughput for the previous 364 days, and then dividing that sum by 365</LI>
              </ENT>
              <ENT>Equip each gasoline storage tank with a fixed roof that is mounted to the storage tank in a stationary manner, and maintain all openings in a closed position at all times when not in use.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">2. A gasoline storage tank with a capacity of greater than or equal to 75 m<SU>3</SU> and not meeting any of the criteria specified in item 1 of this Table</ENT>
              <ENT>Do the following:<LI O="oi1">(a) Reduce emissions of total organic HAP or TOC by 95 weight-percent with a closed vent system and control device, as specified in § 60.112b(a)(3) of this chapter; or</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="oi1">(b) Equip each internal floating roof gasoline storage tank according to the requirements in § 60.112b(a)(1) of this chapter, except for the secondary seal requirements under § 60.112b(a)(1)(ii)(B) and the requirements in § 60.112b(a)(1)(iv) through (ix) of this chapter; and</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="oi1">(c) Equip each external floating roof gasoline storage tank according to the requirements in § 60.112b(a)(2) of this chapter, except that the requirements of § 60.112b(a)(2)(ii) of this chapter shall only be required if such storage tank does not currently meet the requirements of § 60.112b(a)(2)(i) of this chapter; or</ENT>
            </ROW>
            <ROW>
              <ENT I="22"/>
              <ENT O="oi1">(d) Equip and operate each internal and external floating roof gasoline storage tank according to the applicable requirements in § 63.1063(a)(1) and (b), except for the secondary seal requirements under § 63.1063(a)(1)(i)(C) and (D), and equip each external floating roof gasoline storage tank according to the requirements of § 63.1063(a)(2) if such storage tank does not currently meet the requirements of § 63.1063(a)(1).</ENT>
            </ROW>
            <ROW>
              <ENT I="01">3. A surge control tank</ENT>
              <ENT>Equip each tank with a fixed roof that is mounted to the tank in a stationary manner and with a pressure/vacuum vent with a positive cracking pressure of no less than 0.50 inches of water. Maintain all openings in a closed position at all times when not in use.</ENT>
            </ROW>
          </GPOTABLE>
          <CITA>[76 FR 4179, Jan. 24, 2011]</CITA>
        </APPENDIX>
        <APPENDIX>
          <PRTPAGE P="203"/>
          <EAR>Pt. 63, Subpt. BBBBBB, Table 2</EAR>
          <HD SOURCE="HED">Table 2 to Subpart BBBBBB of Part 63—Applicability Criteria, Emission Limits, and Management Practices for Loading Racks</HD>
          <GPOTABLE CDEF="s100,r100" COLS="2" OPTS="L2">
            <BOXHD>
              <CHED H="1" O="L">If you own or operate . . .</CHED>
              <CHED H="1" O="L">Then you must . . .</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">1. A bulk gasoline terminal loading rack(s) with a gasoline throughput (total of all racks) of 250,000 gallons per day, or greater. Gallons per day is calculated by summing the current day's throughput, plus the throughput for the previous 364 days, and then dividing that sum by 365</ENT>
              <ENT>(a) Equip your loading rack(s) with a vapor collection system designed to collect the TOC vapors displaced from cargo tanks during product loading; and<LI>(b) Reduce emissions of TOC to less than or equal to 80 mg/l of gasoline loaded into gasoline cargo tanks at the loading rack; and</LI>
                <LI>(c) Design and operate the vapor collection system to prevent any TOC vapors collected at one loading rack or lane from passing through another loading rack or lane to the atmosphere; and</LI>
                <LI>(d) Limit the loading of gasoline into gasoline cargo tanks that are vapor tight using the procedures specified in § 60.502(e) through (j) of this chapter. For the purposes of this section, the term “tank truck” as used in § 60.502(e) through (j) of this chapter means “cargo tank” as defined in § 63.11100.</LI>
              </ENT>
            </ROW>
            <ROW>
              <ENT I="22">2. A bulk gasoline terminal loading rack(s) with a gasoline throughput (total of all racks) of less than 250,000 gallons per day. Gallons per day is calculated by summing the current day's throughput, plus the throughput for the previous 364 days, and then dividing that sum by 365</ENT>
              <ENT>(a) Use submerged filling with a submerged fill pipe that is no more than 6 inches from the bottom of the cargo tank; and<LI>(b) Make records available within 24 hours of a request by the Administrator to document your gasoline throughput.</LI>
              </ENT>
            </ROW>
          </GPOTABLE>
          <CITA>[76 FR 4179, Jan. 24, 2011]</CITA>
        </APPENDIX>
        <APPENDIX>
          <EAR>Pt. 63, Subpt. BBBBBB, Table 3</EAR>
          <HD SOURCE="HED">Table 3 to Subpart BBBBBB of Part 63—Applicability of General Provisions</HD>
          <GPOTABLE CDEF="s50,r50,r100,r50" COLS="4" OPTS="L2">
            <BOXHD>
              <CHED H="1">Citation</CHED>
              <CHED H="1">Subject</CHED>
              <CHED H="1">Brief description</CHED>
              <CHED H="1">Applies to subpart BBBBBB</CHED>
            </BOXHD>
            <ROW>
              <ENT I="01">§ 63.1</ENT>
              <ENT>Applicability</ENT>
              <ENT>Initial applicability determination; applicability after standard established; permit requirements; extensions, notifications</ENT>
              <ENT>Yes, specific requirements given in § 63.11081.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.1(c)(2)</ENT>
              <ENT>Title V permit</ENT>
              <ENT>Requirements for obtaining a title V permit from the applicable permitting authority</ENT>
              <ENT>Yes, § 63.11081(b) of subpart BBBBBB exempts identified area sources from the obligation to obtain title V operating permits.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.2</ENT>
              <ENT>Definitions</ENT>
              <ENT>Definitions for part 63 standards</ENT>
              <ENT>Yes, additional definitions in § 63.11100.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.3</ENT>
              <ENT>Units and Abbreviations</ENT>
              <ENT>Units and abbreviations for part 63 standards</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.4</ENT>
              <ENT>Prohibited Activities and Circumvention</ENT>
              <ENT>Prohibited activities; circumvention, severability</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.5</ENT>
              <ENT>Construction/Reconstruction</ENT>
              <ENT>Applicability; applications; approvals</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(a)</ENT>
              <ENT>Compliance with Standards/Operation &amp; Maintenance Applicability</ENT>
              <ENT>General Provisions apply unless compliance extension; General Provisions apply to area sources that become major</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(b)(1)-(4)</ENT>
              <ENT>Compliance Dates for New and Reconstructed Sources</ENT>
              <ENT>Standards apply at effective date; 3 years after effective date; upon startup; 10 years after construction or reconstruction commences for CAA section 112(f)</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(b)(5)</ENT>
              <ENT>Notification</ENT>
              <ENT>Must notify if commenced construction or reconstruction after proposal</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(b)(6)</ENT>
              <ENT>[Reserved]</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(b)(7)</ENT>
              <ENT>Compliance Dates for New and Reconstructed Area Sources that Become Major</ENT>
              <ENT>Area sources that become major must comply with major source standards immediately upon becoming major, regardless of whether required to comply when they were an area source</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(c)(1)-(2)</ENT>
              <ENT>Compliance Dates for Existing Sources</ENT>
              <ENT>Comply according to date in this subpart, which must be no later than 3 years after effective date; for CAA section 112(f) standards, comply within 90 days of effective date unless compliance extension</ENT>
              <ENT>No, § 63.11083 specifies the compliance dates.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(c)(3)-(4)</ENT>
              <ENT>[Reserved]</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="204"/>
              <ENT I="01">§ 63.6(c)(5)</ENT>
              <ENT>Compliance Dates for Existing Area Sources that Become Major</ENT>
              <ENT>Area sources that become major must comply with major source standards by date indicated in this subpart or by equivalent time period (e.g., 3 years)</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(d)</ENT>
              <ENT>[Reserved]</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.6(e)(1)(i)</ENT>
              <ENT>General duty to minimize emissions</ENT>
              <ENT>Operate to minimize emissions at all times; information Administrator will use to determine if operation and maintenance requirements were met</ENT>
              <ENT>No. <E T="03">See</E> § 63.11085 for general duty requirement.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.6(e)(1)(ii)</ENT>
              <ENT>Requirement to correct malfunctions as soon as possible</ENT>
              <ENT>Owner or operator must correct malfunctions as soon as possible</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(e)(2)</ENT>
              <ENT>[Reserved]</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(e)(3)</ENT>
              <ENT>Startup, Shutdown, and Malfunction (SSM) plan</ENT>
              <ENT>Requirement for SSM plan; content of SSM plan; actions during SSM</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(f)(1)</ENT>
              <ENT>Compliance Except During SSM</ENT>
              <ENT>You must comply with emission standards at all times except during SSM</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(f)(2)-(3)</ENT>
              <ENT>Methods for Determining Compliance</ENT>
              <ENT>Compliance based on performance test, operation and maintenance plans, records, inspection</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(g)(1)-(3)</ENT>
              <ENT>Alternative Standard</ENT>
              <ENT>Procedures for getting an alternative standard</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(h)(1)</ENT>
              <ENT>Compliance with Opacity/VE Standards</ENT>
              <ENT>You must comply with opacity/VE standards at all times except during SSM</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(h)(2)(i)</ENT>
              <ENT>Determining Compliance with Opacity/VE Standards</ENT>
              <ENT>If standard does not State test method, use EPA Method 9 for opacity in appendix A of part 60 of this chapter and EPA Method 22 for VE in appendix A of part 60 of this chapter</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(h)(2)(ii)</ENT>
              <ENT>[Reserved]</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(h)(2)(iii)</ENT>
              <ENT>Using Previous Tests to Demonstrate Compliance with Opacity/VE Standards</ENT>
              <ENT>Criteria for when previous opacity/VE testing can be used to show compliance with this subpart</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(h)(3)</ENT>
              <ENT>[Reserved]</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(h)(4)</ENT>
              <ENT>Notification of Opacity/VE Observation Date</ENT>
              <ENT>Must notify Administrator of anticipated date of observation</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(h)(5)(i), (iii)-(v)</ENT>
              <ENT>Conducting Opacity/VE Observations</ENT>
              <ENT>Dates and schedule for conducting opacity/VE observations</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(h) (5)(ii)</ENT>
              <ENT>Opacity Test Duration and Averaging Times</ENT>
              <ENT>Must have at least 3 hours of observation with 30 6-minute averages</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(h)(6)</ENT>
              <ENT>Records of Conditions During Opacity/VE Observations</ENT>
              <ENT>Must keep records available and allow Administrator to inspect</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(h)(7)(i)</ENT>
              <ENT>Report Continuous Opacity Monitoring System (COMS) Monitoring Data from Performance Test</ENT>
              <ENT>Must submit COMS data with other performance test data</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(h)(7)(ii)</ENT>
              <ENT>Using COMS Instead of EPA Method 9</ENT>
              <ENT>Can submit COMS data instead of EPA Method 9 results even if rule requires EPA Method 9 in appendix A of part 60 of this chapter, but must notify Administrator before performance test</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(h)(7)(iii)</ENT>
              <ENT>Averaging Time for COMS During Performance Test</ENT>
              <ENT>To determine compliance, must reduce COMS data to 6-minute averages</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(h)(7)(iv)</ENT>
              <ENT>COMS Requirements</ENT>
              <ENT>Owner/operator must demonstrate that COMS performance evaluations are conducted according to § 63.8(e); COMS are properly maintained and operated according to § 63.8(c) and data quality as § 63.8(d)</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(h)(7)(v)</ENT>
              <ENT>Determining Compliance with Opacity/VE Standards</ENT>
              <ENT>COMS is probable but not conclusive evidence of compliance with opacity standard, even if EPA Method 9 observation shows otherwise. Requirements for COMS to be probable evidence-proper maintenance, meeting Performance Specification 1 in appendix B of part 60 of this chapter, and data have not been altered</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="205"/>
              <ENT I="01">§ 63.6(h)(8)</ENT>
              <ENT>Determining Compliance with Opacity/VE Standards</ENT>
              <ENT>Administrator will use all COMS, EPA Method 9 (in appendix A of part 60 of this chapter), and EPA Method 22 (in appendix A of part 60 of this chapter) results, as well as information about operation and maintenance to determine compliance</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(h)(9)</ENT>
              <ENT>Adjusted Opacity Standard</ENT>
              <ENT>Procedures for Administrator to adjust an opacity standard</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(i)(1)-(14)</ENT>
              <ENT>Compliance Extension</ENT>
              <ENT>Procedures and criteria for Administrator to grant compliance extension</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.6(j)</ENT>
              <ENT>Presidential Compliance Exemption</ENT>
              <ENT>President may exempt any source from requirement to comply with this subpart</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(a)(2)</ENT>
              <ENT>Performance Test Dates</ENT>
              <ENT>Dates for conducting initial performance testing; must conduct 180 days after compliance date</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(a)(3)</ENT>
              <ENT>Section 114 Authority</ENT>
              <ENT>Administrator may require a performance test under CAA section 114 at any time</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(b)(1)</ENT>
              <ENT>Notification of Performance Test</ENT>
              <ENT>Must notify Administrator 60 days before the test</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(b)(2)</ENT>
              <ENT>Notification of Re-scheduling</ENT>
              <ENT>If have to reschedule performance test, must notify Administrator of rescheduled date as soon as practicable and without delay</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(c)</ENT>
              <ENT>Quality Assurance (QA)/Test Plan</ENT>
              <ENT>Requirement to submit site-specific test plan 60 days before the test or on date Administrator agrees with; test plan approval procedures; performance audit requirements; internal and external QA procedures for testing</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(d)</ENT>
              <ENT>Testing Facilities</ENT>
              <ENT>Requirements for testing facilities</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">63.7(e)(1)</ENT>
              <ENT>Conditions for Conducting Performance Tests</ENT>
              <ENT>Performance test must be conducted under representative conditions</ENT>
              <ENT>No, § 63.11092(g) specifies conditions for conducting performance tests.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(e)(2)</ENT>
              <ENT>Conditions for Conducting Performance Tests</ENT>
              <ENT>Must conduct according to this subpart and EPA test methods unless Administrator approves alternative</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(e)(3)</ENT>
              <ENT>Test Run Duration</ENT>
              <ENT>Must have three test runs of at least 1 hour each; compliance is based on arithmetic mean of three runs; conditions when data from an additional test run can be used</ENT>
              <ENT>Yes, except for testing conducted under § 63.11092(a).</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(f)</ENT>
              <ENT>Alternative Test Method</ENT>
              <ENT>Procedures by which Administrator can grant approval to use an intermediate or major change, or alternative to a test method</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(g)</ENT>
              <ENT>Performance Test Data Analysis</ENT>
              <ENT>Must include raw data in performance test report; must submit performance test data 60 days after end of test with the notification of compliance status; keep data for 5 years</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.7(h)</ENT>
              <ENT>Waiver of Tests</ENT>
              <ENT>Procedures for Administrator to waive performance test</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(a)(1)</ENT>
              <ENT>Applicability of Monitoring Requirements</ENT>
              <ENT>Subject to all monitoring requirements in standard</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(a)(2)</ENT>
              <ENT>Performance Specifications</ENT>
              <ENT>Performance specifications in appendix B of 40 CFR part 60 apply</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(a)(3)</ENT>
              <ENT>[Reserved]</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(a)(4)</ENT>
              <ENT>Monitoring of Flares</ENT>
              <ENT>Monitoring requirements for flares in § 63.11 apply</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(b)(1)</ENT>
              <ENT>Monitoring</ENT>
              <ENT>Must conduct monitoring according to standard unless Administrator approves alternative</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(b)(2)-(3)</ENT>
              <ENT>Multiple Effluents and Multiple Monitoring Systems</ENT>
              <ENT>Specific requirements for installing monitoring systems; must install on each affected source or after combined with another affected source before it is released to the atmosphere provided the monitoring is sufficient to demonstrate compliance with the standard; if more than one monitoring system on an emission point, must report all monitoring system results, unless one monitoring system is a backup</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c)(1)</ENT>
              <ENT>Monitoring System Operation and Maintenance</ENT>
              <ENT>Maintain monitoring system in a manner consistent with good air pollution control practices</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c)(1)(i)</ENT>
              <ENT>Operation and Maintenance of CMS</ENT>
              <ENT>Must maintain and operate each CMS as specified in § 63.6(e)(1)</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c)(1)(ii)</ENT>
              <ENT>Operation and Maintenance of CMS</ENT>
              <ENT>Must keep parts for routine repairs readily available</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="206"/>
              <ENT I="01">§ 63.8(c)(1)(iii)</ENT>
              <ENT>Operation and Maintenance of CMS</ENT>
              <ENT>Requirement to develop SSM Plan for CMS</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(c) (2)-(8)</ENT>
              <ENT>CMS Requirements</ENT>
              <ENT>Must install to get representative emission or parameter measurements; must verify operational status before or at performance test</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(d)</ENT>
              <ENT>CMS Quality Control</ENT>
              <ENT>Requirements for CMS quality control, including calibration, etc.; must keep quality control plan on record for 5 years; keep old versions for 5 years after revisions</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(e)</ENT>
              <ENT>CMS Performance Evaluation</ENT>
              <ENT>Notification, performance evaluation test plan, reports</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(f) (1)-(5)</ENT>
              <ENT>Alternative Monitoring Method</ENT>
              <ENT>Procedures for Administrator to approve alternative monitoring</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(f)(6)</ENT>
              <ENT>Alternative to Relative Accuracy Test</ENT>
              <ENT>Procedures for Administrator to approve alternative relative accuracy tests for CEMS</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.8(g)</ENT>
              <ENT>Data Reduction</ENT>
              <ENT>COMS 6-minute averages calculated over at least 36 evenly spaced data points; CEMS 1 hour averages computed over at least 4 equally spaced data points; data that cannot be used in average</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(a)</ENT>
              <ENT>Notification Requirements</ENT>
              <ENT>Applicability and State delegation</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(b) (1)-(2), (4)-(5)</ENT>
              <ENT>Initial Notifications</ENT>
              <ENT>Submit notification within 120 days after effective date; notification of intent to construct/reconstruct, notification of commencement of construction/reconstruction, notification of startup; contents of each</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(c)</ENT>
              <ENT>Request for Compliance Extension</ENT>
              <ENT>Can request if cannot comply by date or if installed best available control technology or lowest achievable emission rate</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(d)</ENT>
              <ENT>Notification of Special Compliance Requirements for New Sources</ENT>
              <ENT>For sources that commence construction between proposal and promulgation and want to comply 3 years after effective date</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(e)</ENT>
              <ENT>Notification of Performance Test</ENT>
              <ENT>Notify Administrator 60 days prior</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(f)</ENT>
              <ENT>Notification of VE/Opacity Test</ENT>
              <ENT>Notify Administrator 30 days prior</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(g)</ENT>
              <ENT>Additional Notifications When Using CMS</ENT>
              <ENT>Notification of performance evaluation; notification about use of COMS data; notification that exceeded criterion for relative accuracy alternative</ENT>
              <ENT>Yes, however, there are no opacity standards.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(h)(1)-(6)</ENT>
              <ENT>Notification of Compliance Status</ENT>
              <ENT>Contents due 60 days after end of performance test or other compliance demonstration, except for opacity/VE, which are due 30 days after; when to submit to Federal vs. State authority</ENT>
              <ENT>Yes, except as specified in § 63.11095(a)(4); also, there are no opacity standards.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(i)</ENT>
              <ENT>Adjustment of Submittal Deadlines</ENT>
              <ENT>Procedures for Administrator to approve change when notifications must be submitted</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.9(j)</ENT>
              <ENT>Change in Previous Information</ENT>
              <ENT>Must submit within 15 days after the change</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(a)</ENT>
              <ENT>Record-keeping/Reporting</ENT>
              <ENT>Applies to all, unless compliance extension; when to submit to Federal vs. State authority; procedures for owners of more than one source</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(1)</ENT>
              <ENT>Record-keeping/Reporting</ENT>
              <ENT>General requirements; keep all records readily available; keep for 5 years</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(2)(i)</ENT>
              <ENT>Records related to SSM</ENT>
              <ENT>Recordkeeping of occurrence and duration of startups and shutdowns</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(2)(ii)</ENT>
              <ENT>Records related to SSM</ENT>
              <ENT>Recordkeeping of malfunctions</ENT>
              <ENT>No. <E T="03">See</E> § 63.11094(g) for recordkeeping of (1) occurrence and duration and (2) actions taken during malfunction.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(2)(iii)</ENT>
              <ENT>Maintenance records</ENT>
              <ENT>Recordkeeping of maintenance on air pollution control and monitoring equipment</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(2)(iv)</ENT>
              <ENT>Records Related to SSM</ENT>
              <ENT>Actions taken to minimize emissions during SSM</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(2)(v)</ENT>
              <ENT>Records Related to SSM</ENT>
              <ENT>Actions taken to minimize emissions during SSM</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(2)(vi)-(xi)</ENT>
              <ENT>CMS Records</ENT>
              <ENT>Malfunctions, inoperative, out-of-control periods</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(2)(xii)</ENT>
              <ENT>Records</ENT>
              <ENT>Records when under waiver</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <PRTPAGE P="207"/>
              <ENT I="01">§ 63.10(b)(2)(xiii)</ENT>
              <ENT>Records</ENT>
              <ENT>Records when using alternative to relative accuracy test</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(2)(xiv)</ENT>
              <ENT>Records</ENT>
              <ENT>All documentation supporting initial notification and notification of compliance status</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(b)(3)</ENT>
              <ENT>Records</ENT>
              <ENT>Applicability determinations</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(c)</ENT>
              <ENT>Records</ENT>
              <ENT>Additional records for CMS</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(d)(1)</ENT>
              <ENT>General Reporting Requirements</ENT>
              <ENT>Requirement to report</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(d)(2)</ENT>
              <ENT>Report of Performance Test Results</ENT>
              <ENT>When to submit to Federal or State authority</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(d)(3)</ENT>
              <ENT>Reporting Opacity or VE Observations</ENT>
              <ENT>What to report and when</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(d)(4)</ENT>
              <ENT>Progress Reports</ENT>
              <ENT>Must submit progress reports on schedule if under compliance extension</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(d)(5)</ENT>
              <ENT>SSM Reports</ENT>
              <ENT>Contents and submission</ENT>
              <ENT>No. <E T="03">See</E> § 63.11095(d) for malfunction reporting requirements.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(e)(1)-(2)</ENT>
              <ENT>Additional CMS Reports</ENT>
              <ENT>Must report results for each CEMS on a unit; written copy of CMS performance evaluation; 2-3 copies of COMS performance evaluation</ENT>
              <ENT>No.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(e)(3)(i)-(iii)</ENT>
              <ENT>Reports</ENT>
              <ENT>Schedule for reporting excess emissions</ENT>
              <ENT>Yes, note that § 63.11095 specifies excess emission events for this subpart.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(e)(3)(iv)-(v)</ENT>
              <ENT>Excess Emissions Reports</ENT>
              <ENT>Requirement to revert to quarterly submission if there is an excess emissions and parameter monitor exceedances (now defined as deviations); provision to request semiannual reporting after compliance for 1 year; submit report by 30th day following end of quarter or calendar half; if there has not been an exceedance or excess emissions (now defined as deviations), report contents in a statement that there have been no deviations; must submit report containing all of the information in §§ 63.8(c)(7)-(8) and 63.10(c)(5)-(13)</ENT>
              <ENT>Yes, § 63.11095 specifies excess emission events for this subpart.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(e)(3)(vi)-(viii)</ENT>
              <ENT>Excess Emissions Report and Summary Report</ENT>
              <ENT>Requirements for reporting excess emissions for CMS; requires all of the information in §§ 63.8(c)(7)-(8) and 63.10(c)(5)-(13)</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(e)(4)</ENT>
              <ENT>Reporting COMS Data</ENT>
              <ENT>Must submit COMS data with performance test data</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.10(f)</ENT>
              <ENT>Waiver for Recordkeeping/Reporting</ENT>
              <ENT>Procedures for Administrator to waive</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.11(b)</ENT>
              <ENT>Flares</ENT>
              <ENT>Requirements for flares</ENT>
              <ENT>Yes, the section references § 63.11(b).</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.12</ENT>
              <ENT>Delegation</ENT>
              <ENT>State authority to enforce standards</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.13</ENT>
              <ENT>Addresses</ENT>
              <ENT>Addresses where reports, notifications, and requests are sent</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.14</ENT>
              <ENT>Incorporations by Reference</ENT>
              <ENT>Test methods incorporated by reference</ENT>
              <ENT>Yes.</ENT>
            </ROW>
            <ROW>
              <ENT I="01">§ 63.15</ENT>
              <ENT>Availability of Information</ENT>
              <ENT>Public and confidential information</ENT>
              <ENT>Yes.</ENT>
            </ROW>
          </GPOTABLE>
          <CITA>[73 FR 1933, Jan. 10, 2008, as amended at 76 FR 4180, Jan. 24, 2011]</CITA>
        </APPENDIX>
      </SUBPART>
      <SUBPART>
        <HD SOURCE="HED">Subpart CCCCCC—National Emission Standards for Hazardous Air Pollutants for Source Category: Gasoline Dispensing Facilities</HD>
        <SOURCE>
          <HD SOURCE="HED">Source:</HD>
          <P>73 FR 1945, Jan. 10, 2008, unless otherwise noted.</P>
        </SOURCE>
        <SUBJGRP>
          <HD SOURCE="HED">What This Subpart Covers</HD>
          <SECTION>
            <SECTNO>§ 63.11110</SECTNO>
            <SUBJECT>What is the purpose of this subpart?</SUBJECT>
            <P>This subpart establishes national emission limitations and management practices for hazardous air pollutants (HAP) emitted from the loading of gasoline storage tanks at gasoline dispensing facilities (GDF). This subpart also establishes requirements to demonstrate compliance with the emission limitations and management practices.</P>
          </SECTION>
          <SECTION>
            <PRTPAGE P="208"/>
            <SECTNO>§ 63.11111</SECTNO>
            <SUBJECT>Am I subject to the requirements in this subpart?</SUBJECT>
            <P>(a) The affected source to which this subpart applies is each GDF that is located at an area source. The affected source includes each gasoline cargo tank during the delivery of product to a GDF and also includes each storage tank.</P>
            <P>(b) If your GDF has a monthly throughput of less than 10,000 gallons of gasoline, you must comply with the requirements in § 63.11116.</P>
            <P>(c) If your GDF has a monthly throughput of 10,000 gallons of gasoline or more, you must comply with the requirements in § 63.11117.</P>
            <P>(d) If your GDF has a monthly throughput of 100,000 gallons of gasoline or more, you must comply with the requirements in § 63.11118.</P>
            <P>(e) An affected source shall, upon request by the Administrator, demonstrate that their monthly throughput is less than the 10,000-gallon or the 100,000-gallon threshold level, as applicable. For new or reconstructed affected sources, as specified in § 63.11112(b) and (c), recordkeeping to document monthly throughput must begin upon startup of the affected source. For existing sources, as specified in § 63.11112(d), recordkeeping to document monthly throughput must begin on January 10, 2008. For existing sources that are subject to this subpart only because they load gasoline into fuel tanks other than those in motor vehicles, as defined in § 63.11132, recordkeeping to document monthly throughput must begin on January 24, 2011. Records required under this paragraph shall be kept for a period of 5 years.</P>
            <P>(f) If you are an owner or operator of affected sources, as defined in paragraph (a) of this section, you are not required to obtain a permit under 40 CFR part 70 or 40 CFR part 71 as a result of being subject to this subpart. However, you must still apply for and obtain a permit under 40 CFR part 70 or 40 CFR part 71 if you meet one or more of the applicability criteria found in 40 CFR 70.3(a) and (b) or 40 CFR 71.3(a) and (b).</P>
            <P>(g) The loading of aviation gasoline into storage tanks at airports, and the subsequent transfer of aviation gasoline within the airport, is not subject to this subpart.</P>
            <P>(h) Monthly throughput is the total volume of gasoline loaded into, or dispensed from, all the gasoline storage tanks located at a single affected GDF. If an area source has two or more GDF at separate locations within the area source, each GDF is treated as a separate affected source.</P>
            <P>(i) If your affected source's throughput ever exceeds an applicable throughput threshold, the affected source will remain subject to the requirements for sources above the threshold, even if the affected source throughput later falls below the applicable throughput threshold.</P>
            <P>(j) The dispensing of gasoline from a fixed gasoline storage tank at a GDF into a portable gasoline tank for the on-site delivery and subsequent dispensing of the gasoline into the fuel tank of a motor vehicle or other gasoline-fueled engine or equipment used within the area source is only subject to § 63.11116 of this subpart.</P>
            <P>(k) For any affected source subject to the provisions of this subpart and another Federal rule, you may elect to comply only with the more stringent provisions of the applicable subparts. You must consider all provisions of the rules, including monitoring, recordkeeping, and reporting. You must identify the affected source and provisions with which you will comply in your Notification of Compliance Status required under § 63.11124. You also must demonstrate in your Notification of Compliance Status that each provision with which you will comply is at least as stringent as the otherwise applicable requirements in this subpart. You are responsible for making accurate determinations concerning the more stringent provisions, and noncompliance with this rule is not excused if it is later determined that your determination was in error, and, as a result, you are violating this subpart. Compliance with this rule is your responsibility and the Notification of Compliance Status does not alter or affect that responsibility.</P>
            <CITA>[73 FR 1945, Jan. 10, 2008, as amended at 76 FR 4181, Jan. 24, 2011]</CITA>
          </SECTION>
          <SECTION>
            <PRTPAGE P="209"/>
            <SECTNO>§ 63.11112</SECTNO>
            <SUBJECT>What parts of my affected source does this subpart cover?</SUBJECT>
            <P>(a) The emission sources to which this subpart applies are gasoline storage tanks and associated equipment components in vapor or liquid gasoline service at new, reconstructed, or existing GDF that meet the criteria specified in § 63.11111. Pressure/Vacuum vents on gasoline storage tanks and the equipment necessary to unload product from cargo tanks into the storage tanks at GDF are covered emission sources. The equipment used for the refueling of motor vehicles is not covered by this subpart.</P>
            <P>(b) An affected source is a new affected source if you commenced construction on the affected source after November 9, 2006, and you meet the applicability criteria in § 63.11111 at the time you commenced operation.</P>
            <P>(c) An affected source is reconstructed if you meet the criteria for reconstruction as defined in § 63.2.</P>
            <P>(d) An affected source is an existing affected source if it is not new or reconstructed.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.11113</SECTNO>
            <SUBJECT>When do I have to comply with this subpart?</SUBJECT>
            <P>(a) If you have a new or reconstructed affected source, you must comply with this subpart according to paragraphs (a)(1) and (2) of this section, except as specified in paragraph (d) of this section.</P>
            <P>(1) If you start up your affected source before January 10, 2008, you must comply with the standards in this subpart no later than January 10, 2008.</P>
            <P>(2) If you start up your affected source after January 10, 2008, you must comply with the standards in this subpart upon startup of your affected source.</P>
            <P>(b) If you have an existing affected source, you must comply with the standards in this subpart no later than January 10, 2011.</P>
            <P>(c) If you have an existing affected source that becomes subject to the control requirements in this subpart because of an increase in the monthly throughput, as specified in § 63.11111(c) or § 63.11111(d), you must comply with the standards in this subpart no later than 3 years after the affected source becomes subject to the control requirements in this subpart.</P>
            <P>(d) If you have a new or reconstructed affected source and you are complying with Table 1 to this subpart, you must comply according to paragraphs (d)(1) and (2) of this section.</P>
            <P>(1) If you start up your affected source from November 9, 2006 to September 23, 2008, you must comply no later than September 23, 2008.</P>
            <P>(2) If you start up your affected source after September 23, 2008, you must comply upon startup of your affected source.</P>
            <P>(e) The initial compliance demonstration test required under § 63.11120(a)(1) and (2) must be conducted as specified in paragraphs (e)(1) and (2) of this section.</P>
            <P>(1) If you have a new or reconstructed affected source, you must conduct the initial compliance test upon installation of the complete vapor balance system.</P>
            <P>(2) If you have an existing affected source, you must conduct the initial compliance test as specified in paragraphs (e)(2)(i) or (e)(2)(ii) of this section.</P>
            <P>(i) For vapor balance systems installed on or before December 15, 2009, you must test no later than 180 days after the applicable compliance date specified in paragraphs (b) or (c) of this section.</P>
            <P>(ii) For vapor balance systems installed after December 15, 2009, you must test upon installation of the complete vapor balance system.</P>
            <P>(f) If your GDF is subject to the control requirements in this subpart only because it loads gasoline into fuel tanks other than those in motor vehicles, as defined in § 63.11132, you must comply with the standards in this subpart as specified in paragraphs (f)(1) or (f)(2) of this section.</P>
            <P>(1) If your GDF is an existing facility, you must comply by January 24, 2014.</P>
            <P>(2) If your GDF is a new or reconstructed facility, you must comply by the dates specified in paragraphs (f)(2)(i) and (ii) of this section.</P>

            <P>(i) If you start up your GDF after December 15, 2009, but before January 24, 2011, you must comply no later than January 24, 2011.<PRTPAGE P="210"/>
            </P>
            <P>(ii) If you start up your GDF after January 24, 2011, you must comply upon startup of your GDF.</P>
            <CITA>[73 FR 1945, Jan. 10, 2008, as amended at 73 FR 35944, June 25, 2008; 76 FR 4181, Jan. 24, 2011]</CITA>
          </SECTION>
        </SUBJGRP>
        <SUBJGRP>
          <HD SOURCE="HED">Emission Limitations and Management Practices</HD>
          <SECTION>
            <SECTNO>§ 63.11115</SECTNO>
            <SUBJECT>What are my general duties to minimize emissions?</SUBJECT>
            <P>Each owner or operator of an affected source under this subpart must comply with the requirements of paragraphs (a) and (b) of this section.</P>
            <P>(a) You must, at all times, operate and maintain any affected source, including associated air pollution control equipment and monitoring equipment, in a manner consistent with safety and good air pollution control practices for minimizing emissions. Determination of whether such operation and maintenance procedures are being used will be based on information available to the Administrator which may include, but is not limited to, monitoring results, review of operation and maintenance procedures, review of operation and maintenance records, and inspection of the source.</P>
            <P>(b) You must keep applicable records and submit reports as specified in § 63.11125(d) and § 63.11126(b).</P>
            <CITA>[76 FR 4182, Jan. 24, 2011]</CITA>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.11116</SECTNO>
            <SUBJECT>Requirements for facilities with monthly throughput of less than 10,000 gallons of gasoline.</SUBJECT>
            <P>(a) You must not allow gasoline to be handled in a manner that would result in vapor releases to the atmosphere for extended periods of time. Measures to be taken include, but are not limited to, the following:</P>
            <P>(1) Minimize gasoline spills;</P>
            <P>(2) Clean up spills as expeditiously as practicable;</P>
            <P>(3) Cover all open gasoline containers and all gasoline storage tank fill-pipes with a gasketed seal when not in use;</P>
            <P>(4) Minimize gasoline sent to open waste collection systems that collect and transport gasoline to reclamation and recycling devices, such as oil/water separators.</P>
            <P>(b) You are not required to submit notifications or reports as specified in § 63.11125, § 63.11126, or subpart A of this part, but you must have records available within 24 hours of a request by the Administrator to document your gasoline throughput.</P>
            <P>(c) You must comply with the requirements of this subpart by the applicable dates specified in § 63.11113.</P>
            <P>(d) Portable gasoline containers that meet the requirements of 40 CFR part 59, subpart F, are considered acceptable for compliance with paragraph (a)(3) of this section.</P>
            <CITA>[73 FR 1945, Jan. 10, 2008, as amended at 76 FR 4182, Jan. 24, 2011]</CITA>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.11117</SECTNO>
            <SUBJECT>Requirements for facilities with monthly throughput of 10,000 gallons of gasoline or more.</SUBJECT>
            <P>(a) You must comply with the requirements in section § 63.11116(a).</P>
            <P>(b) Except as specified in paragraph (c) of this section, you must only load gasoline into storage tanks at your facility by utilizing submerged filling, as defined in § 63.11132, and as specified in paragraphs (b)(1), (b)(2), or (b)(3) of this section. The applicable distances in paragraphs (b)(1) and (2) shall be measured from the point in the opening of the submerged fill pipe that is the greatest distance from the bottom of the storage tank.</P>
            <P>(1) Submerged fill pipes installed on or before November 9, 2006, must be no more than 12 inches from the bottom of the tank.</P>
            <P>(2) Submerged fill pipes installed after November 9, 2006, must be no more than 6 inches from the bottom of the tank.</P>
            <P>(3) Submerged fill pipes not meeting the specifications of paragraphs (b)(1) or (b)(2) of this section are allowed if the owner or operator can demonstrate that the liquid level in the tank is always above the entire opening of the fill pipe. Documentation providing such demonstration must be made available for inspection by the Administrator's delegated representative during the course of a site visit.</P>

            <P>(c) Gasoline storage tanks with a capacity of less than 250 gallons are not required to comply with the submerged fill requirements in paragraph (b) of this section, but must comply only with all of the requirements in § 63.11116.<PRTPAGE P="211"/>
            </P>
            <P>(d) You must have records available within 24 hours of a request by the Administrator to document your gasoline throughput.</P>
            <P>(e) You must submit the applicable notifications as required under § 63.11124(a).</P>
            <P>(f) You must comply with the requirements of this subpart by the applicable dates contained in § 63.11113.</P>
            <CITA>[73 FR 1945, Jan. 10, 2008, as amended at 73 FR 12276, Mar. 7, 2008; 76 FR 4182, Jan. 24, 2011]</CITA>
          </SECTION>
          <SECTION>
            <SECTNO>§ 63.11118</SECTNO>
            <SUBJECT>Requirements for facilities with monthly throughput of 100,000 gallons of gasoline or more.</SUBJECT>
            <P>(a) You must comply with the requirements in §§ 63.11116(a) and 63.11117(b).</P>
            <P>(b) Except as provided in paragraph (c) of this section, you must meet the requirements in either paragraph (b)(1) or paragraph (b)(2) of this section.</P>
            <P>(1) Each management 