<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="cfr.xsl"?>
<CFRGRANULE xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:noNamespaceSchemaLocation="CFRMergedXML.xsd">
  <FDSYS>
    <CFRTITLE>49</CFRTITLE>
    <CFRTITLETEXT>Transportation</CFRTITLETEXT>
    <VOL>3</VOL>
    <DATE>2011-10-01</DATE>
    <ORIGINALDATE>2011-10-01</ORIGINALDATE>
    <COVERONLY>false</COVERONLY>
    <TITLE>Valve maintenance: Distribution systems.</TITLE>
    <GRANULENUM>192.747</GRANULENUM>
    <HEADING>Section 192.747</HEADING>
    <ANCESTORS>
      <PARENT HEADING="Title 49" SEQ="5">Transportation</PARENT>
      <PARENT HEADING="Subtitle B" SEQ="4">Other Regulations Relating to Transportation (Continued)</PARENT>
      <PARENT HEADING="CHAPTER I" SEQ="3">PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED)</PARENT>
      <PARENT HEADING="SUBCHAPTER D" SEQ="2">PIPELINE SAFETY</PARENT>
      <PARENT HEADING="PART 192" SEQ="1">TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS</PARENT>
      <PARENT HEADING="Subpart M" SEQ="0">Maintenance</PARENT>
    </ANCESTORS>
  </FDSYS>
  <SECTION>
    <SECTNO>§ 192.747</SECTNO>
    <SUBJECT>Valve maintenance: Distribution systems.</SUBJECT>
    <P>(a) Each valve, the use of which may be necessary for the safe operation of a distribution system, must be checked and serviced at intervals not exceeding 15 months, but at least once each calendar year.</P>
    <P>(b) Each operator must take prompt remedial action to correct any valve found inoperable, unless the operator designates an alternative valve.</P>
    <CITA>[Amdt. 192-43, 47 FR 46851, Oct. 21, 1982, as amended by Amdt. 192-93, 68 FR 53901, Sept. 15, 2003]</CITA>
  </SECTION>
</CFRGRANULE>
