<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="cfr.xsl"?>
<CFRDOC xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:noNamespaceSchemaLocation="CFRMergedXML.xsd">
  <AMDDATE>March 15, 2012</AMDDATE>
  <FMTR>
    <TITLEPG>
      <CODE/>
      <PRTPAGE P="1"/>
      <TITLENUM>Title 23</TITLENUM>
      <SUBJECT>Highways</SUBJECT>
      <REVISED>Revised as of April 1, 2012</REVISED>
      <CONTAINS>Containing a codification of documents of general applicability and future effect</CONTAINS>
      <DATE>As of April 1, 2012</DATE>
      <PUB>
        <P>Published by the Office of the Federal Register National Archives and Records Administration as a Special Edition of the Federal Register</P>
      </PUB>
    </TITLEPG>
    <BTITLE>
      <PRTPAGE P="?ii"/>
      <HD SOURCE="HED">U.S. GOVERNMENT OFFICIAL EDITION NOTICE</HD>
      <HD SOURCE="HED">Legal Status and Use of Seals and Logos</HD>
      <GPH DEEP="54" HTYPE="LEFT" SPAN="1">
        <GID>e:\seals\archives.ai</GID>
      </GPH>
      <P>The seal of the National Archives and Records Administration (NARA) authenticates the Code of Federal Regulations (CFR) as the official codification of Federal regulations established under the Federal Register Act. Under the provisions of 44 U.S.C. 1507, the contents of the CFR, a special edition of the Federal Register, shall be judicially noticed. The CFR is prima facie evidence of the original documents published in the Federal Register (44 U.S.C. 1510).</P>
      <P>It is prohibited to use NARA's official seal and the stylized Code of Federal Regulations logo on any republication of this material without the express, written permission of the Archivist of the United States or the Archivist's designee. Any person using NARA's official seals and logos in a manner inconsistent with the provisions of 36 CFR part 1200 is subject to the penalties specified in 18 U.S.C. 506, 701, and 1017.</P>
      <HD SOURCE="HED">Use of ISBN Prefix</HD>
      <P>This is the Official U.S. Government edition of this publication and is herein identified to certify its authenticity. Use of the 0-16 ISBN prefix is for U.S. Government Printing Office Official Editions only. The Superintendent of Documents of the U.S. Government Printing Office requests that any reprinted edition clearly be labeled as a copy of the authentic work with a new ISBN.</P>
      <GPO/>
      <GPH DEEP="18" HTYPE="LEFT" SPAN="1">
        <GID>e:\seals\gpologo.eps</GID>
      </GPH>
      <P>U . S . G O V E R N M E N T P R I N T I N G O F F I C E</P>
      <P>U.S. Superintendent of Documents • Washington, DC 20402-0001</P>
      <P>http://bookstore.gpo.gov</P>
      <P>Phone: toll-free (866) 512-1800; DC area (202) 512-1800</P>
    </BTITLE>
    <TOC>
      <PRTPAGE P="iii"/>
      <HD SOURCE="HED">Table of Contents</HD>
      <PGHD>Page</PGHD>
      <EXPL>
        <SUBJECT>Explanation</SUBJECT>
        <PG>v</PG>
      </EXPL>
      <TITLENO>
        <HD SOURCE="HED">Title 23:</HD>
        <CHAPTI>
          <SUBJECT>Chapter I—Federal Highway Administration, Department of Transportation</SUBJECT>
          <PG>3</PG>
        </CHAPTI>
        <CHAPTI>
          <SUBJECT>Chapter II—National Highway Traffic Safety Administration and Federal Highway Administration, Department of Transportation</SUBJECT>
          <PG>501</PG>
        </CHAPTI>
        <CHAPTI>
          <SUBJECT>Chapter III—National Highway Traffic Safety Administration, Department of Transportation</SUBJECT>
          <PG>545</PG>
        </CHAPTI>
      </TITLENO>
      <FAIDS>
        <HD SOURCE="HED">Finding Aids:</HD>
        <SUBJECT>Table of CFR Titles and Chapters</SUBJECT>
        <PG>593</PG>
        <SUBJECT>Alphabetical List of Agencies Appearing in the CFR</SUBJECT>
        <PG>613</PG>
        <SUBJECT>List of CFR Sections Affected</SUBJECT>
        <PG>623</PG>
      </FAIDS>
    </TOC>
    <CITE>
      <PRTPAGE P="iv"/>
      <P>Cite this Code:<E T="01">CFR</E>
      </P>

      <CITEP>To cite the regulations in this volume use title, part and section number. Thus, <E T="01">23 CFR 1.1</E> refers to title 23, part 1, section 1.</CITEP>
    </CITE>
    <EXPLA>
      <PRTPAGE P="v"/>
      <HD SOURCE="HED">Explanation</HD>
      <P>The Code of Federal Regulations is a codification of the general and permanent rules published in the Federal Register by the Executive departments and agencies of the Federal Government. The Code is divided into 50 titles which represent broad areas subject to Federal regulation. Each title is divided into chapters which usually bear the name of the issuing agency. Each chapter is further subdivided into parts covering specific regulatory areas.</P>
      <P>Each volume of the Code is revised at least once each calendar year and issued on a quarterly basis approximately as follows:</P>
      <IPAR>
        <P SOURCE="P1">Title 1 through Title 16 </P>
        <STUB>as of January 1</STUB>
        <P SOURCE="P1">Title 17 through Title 27 </P>
        <STUB>as of April 1</STUB>
        <P SOURCE="P1">Title 28 through Title 41 </P>
        <STUB>as of July 1</STUB>
        <P SOURCE="P1">Title 42 through Title 50 </P>
        <STUB>as of October 1</STUB>
      </IPAR>
      <P>The appropriate revision date is printed on the cover of each volume.</P>
      <SIDEHED>
        <HD SOURCE="HED">LEGAL STATUS</HD>
        <P>The contents of the Federal Register are required to be judicially noticed (44 U.S.C. 1507). The Code of Federal Regulations is prima facie evidence of the text of the original documents (44 U.S.C. 1510).</P>
      </SIDEHED>
      <SIDEHED>
        <HD SOURCE="HED">HOW TO USE THE CODE OF FEDERAL REGULATIONS</HD>
        <P>The Code of Federal Regulations is kept up to date by the individual issues of the Federal Register. These two publications must be used together to determine the latest version of any given rule.</P>
        <P>To determine whether a Code volume has been amended since its revision date (in this case, April  1, 2012), consult the “List of CFR Sections Affected (LSA),” which is issued monthly, and the “Cumulative List of Parts Affected,” which appears in the Reader Aids section of the daily Federal Register. These two lists will identify the Federal Register page number of the latest amendment of any given rule.</P>
      </SIDEHED>
      <SIDEHED>
        <HD SOURCE="HED">EFFECTIVE AND EXPIRATION DATES</HD>
        <P>Each volume of the Code contains amendments published in the Federal Register since the last revision of that volume of the Code. Source citations for the regulations are referred to by volume number and page number of the Federal Register and date of publication. Publication dates and effective dates are usually not the same and care must be exercised by the user in determining the actual effective date. In instances where the effective date is beyond the cut-off date for the Code a note has been inserted to reflect the future effective date. In those instances where a regulation published in the Federal Register states a date certain for expiration, an appropriate note will be inserted following the text.</P>
      </SIDEHED>
      <SIDEHED>
        <HD SOURCE="HED">OMB CONTROL NUMBERS</HD>

        <P>The Paperwork Reduction Act of 1980 (Pub. L. 96-511) requires Federal agencies to display an OMB control number with their information collection request. <PRTPAGE P="vi"/>Many agencies have begun publishing numerous OMB control numbers as amendments to existing regulations in the CFR. These OMB numbers are placed as close as possible to the applicable recordkeeping or reporting requirements.</P>
      </SIDEHED>
      <SIDEHED>
        <HD SOURCE="HED">OBSOLETE PROVISIONS</HD>
        <P>Provisions that become obsolete before the revision date stated on the cover of each volume are not carried. Code users may find the text of provisions in effect on a given date in the past by using the appropriate numerical list of sections affected. For the period before January 1, 2001, consult either the List of CFR Sections Affected, 1949-1963, 1964-1972, 1973-1985, or 1986-2000, published in eleven separate volumes. For the period beginning January 1, 2001, a “List of CFR Sections Affected” is published at the end of each CFR volume.</P>
      </SIDEHED>
      <SIDEHED>
        <HD SOURCE="HED">“[RESERVED]” TERMINOLOGY</HD>
        <P>The term “[Reserved]” is used as a place holder within the Code of Federal Regulations. An agency may add regulatory information at a “[Reserved]” location at any time. Occasionally “[Reserved]” is used editorially to indicate that a portion of the CFR was left vacant and not accidentally dropped due to a printing or computer error.</P>
      </SIDEHED>
      <SIDEHED>
        <HD SOURCE="HED">INCORPORATION BY REFERENCE</HD>
        <P>
          <E T="03">What is incorporation by reference?</E> Incorporation by reference was established by statute and allows Federal agencies to meet the requirement to publish regulations in the Federal Register by referring to materials already published elsewhere. For an incorporation to be valid, the Director of the Federal Register must approve it. The legal effect of incorporation by reference is that the material is treated as if it were published in full in the Federal Register (5 U.S.C. 552(a)). This material, like any other properly issued regulation, has the force of law.</P>
        <P>
          <E T="03">What is a proper incorporation by reference?</E> The Director of the Federal Register will approve an incorporation by reference only when the requirements of 1 CFR part 51 are met. Some of the elements on which approval is based are:</P>
        <P>(a) The incorporation will substantially reduce the volume of material published in the Federal Register.</P>
        <P>(b) The matter incorporated is in fact available to the extent necessary to afford fairness and uniformity in the administrative process.</P>
        <P>(c) The incorporating document is drafted and submitted for publication in accordance with 1 CFR part 51.</P>
        <P>
          <E T="03">What if the material incorporated by reference cannot be found?</E> If you have any problem locating or obtaining a copy of material listed as an approved incorporation by reference, please contact the agency that issued the regulation containing that incorporation. If, after contacting the agency, you find the material is not available, please notify the Director of the Federal Register, National Archives and Records Administration, 8601 Adelphi Road, College Park, MD 20740-6001, or call 202-741-6010.</P>
      </SIDEHED>
      <SIDEHED>
        <HD SOURCE="HED">CFR INDEXES AND TABULAR GUIDES</HD>

        <P>A subject index to the Code of Federal Regulations is contained in a separate volume, revised annually as of January 1, entitled CFR <E T="04">Index and Finding Aids.</E> This volume contains the Parallel Table of Authorities and Rules. A list of CFR titles, chapters, subchapters, and parts and an alphabetical list of agencies publishing in the CFR are also included in this volume.</P>

        <P>An index to the text of “Title 3—The President” is carried within that volume.<PRTPAGE P="vii"/>
        </P>
        <P>The Federal Register Index is issued monthly in cumulative form. This index is based on a consolidation of the “Contents” entries in the daily Federal Register.</P>
        <P>A List of CFR Sections Affected (LSA) is published monthly, keyed to the revision dates of the 50 CFR titles.</P>
      </SIDEHED>
      <SIDEHED>
        <HD SOURCE="HED">REPUBLICATION OF MATERIAL</HD>
        <P>There are no restrictions on the republication of material appearing in the Code of Federal Regulations.</P>
      </SIDEHED>
      <SIDEHED>
        <HD SOURCE="HED">INQUIRIES</HD>
        <P>For a legal interpretation or explanation of any regulation in this volume, contact the issuing agency. The issuing agency's name appears at the top of odd-numbered pages.</P>
        <P>For inquiries concerning CFR reference assistance, call 202-741-6000 or write to the Director, Office of the Federal Register, National Archives and Records Administration, 8601 Adelphi Road, College Park, MD 20740-6001 or e-mail fedreg.info@nara.gov.</P>
      </SIDEHED>
      <SIDEHED>
        <HD SOURCE="HED">SALES</HD>
        <P>The Government Printing Office (GPO) processes all sales and distribution of the CFR. For payment by credit card, call toll-free, 866-512-1800, or DC area, 202-512-1800, M-F 8 a.m. to 4 p.m. e.s.t. or fax your order to 202-512-2104, 24 hours a day. For payment by check, write to: US Government Printing Office - New Orders, P.O. Box 979050, St. Louis, MO 63197-9000.</P>
      </SIDEHED>
      <SIDEHED>
        <HD SOURCE="HED">ELECTRONIC SERVICES</HD>

        <P>The full text of the Code of Federal Regulations, the LSA (List of CFR Sections Affected), The United States Government Manual, the Federal Register, Public Laws, Public Papers of the Presidents of the United States, Compilation of Presidential Documents and the Privacy Act Compilation are available in electronic format via <E T="03">www.ofr.gov</E>. For more information, contact the GPO Customer Contact Center, U.S. Government Printing Office. Phone 202-512-1800, or 866-512-1800 (toll-free). E-mail, <E T="03">gpo@custhelp.com.</E>
        </P>

        <P>The Office of the Federal Register also offers a free service on the National Archives and Records Administration's (NARA) World Wide Web site for public law numbers, Federal Register finding aids, and related information. Connect to NARA's web site at <E T="03">www.archives.gov/federal-register.</E>
          
        </P>
        <P>
          <E T="04">Michael L. White,</E>
        </P>
        <P>
          <E T="03">Acting Director,</E>
        </P>
        <P>
          <E T="03">Office of the Federal Register.</E>
        </P>
        <P>
          <E T="03">April  1, 2012.</E>
        </P>
      </SIDEHED>
      <SIG>
        <NAME/>
        <POSITION/>
        <OFFICE/>
      </SIG>
      <DATE/>
    </EXPLA>
    <THISTITL>
      <PRTPAGE P="ix"/>
      <HD SOURCE="HED">THIS TITLE</HD>
      <P>Title 23—<E T="04">Highways</E> is composed of one volume. The contents of this volume represent the current regulations of the National Highway Traffic Safety Administration and the Federal Highway Administration, Department of Transportation, issued under this title of the CFR as of April 1, 2012.</P>
      <P>For this volume, Cheryl E. Sirofchuck was Chief Editor. The Code of Federal Regulations publication program is under the direction of Michael L. White, assisted by Ann Worley.</P>
    </THISTITL>
  </FMTR>
  <TITLE>
    <LRH>23 CFR Ch. I (4-1-12 Edition)</LRH>
    <RRH>Federal Highway Administration, DOT</RRH>
    <CFRTITLE>
      <TITLEHD>
        <PRTPAGE P="1"/>
        <HD SOURCE="HED">Title 23—Highways</HD>
      </TITLEHD>
      <CFRTOC>
        <PTHD>Part</PTHD>
        <CHAPTI>
          <SUBJECT>
            <E T="04">chapter i</E>—Federal Highway Administration, Department of Transportation</SUBJECT>
          <PG>1</PG>
        </CHAPTI>
        <CHAPTI>
          <SUBJECT>
            <E T="04">chapter ii</E>—National Highway Traffic Safety Administration and Federal Highway Administration, Department of Transportation</SUBJECT>
          <PG>1200</PG>
        </CHAPTI>
        <CHAPTI>
          <SUBJECT>
            <E T="04">chapter iii</E>—National Highway Traffic Safety Administration, Department of Transportation</SUBJECT>
          <PG>1313</PG>
        </CHAPTI>
      </CFRTOC>
    </CFRTITLE>
    <CHAPTER>
      <TOC>
        <TOCHD>
          <PRTPAGE P="3"/>
          <HD SOURCE="HED">CHAPTER I—FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION</HD>
        </TOCHD>
        <SUBCHAP>
          <HD SOURCE="HED">SUBCHAPTER A—GENERAL MANAGEMENT AND ADMINISTRATION</HD>
        </SUBCHAP>
        <PTHD>Part</PTHD>
        <PGHD>Page</PGHD>
        <CHAPTI>
          <PT>1</PT>
          <SUBJECT>General</SUBJECT>
          <PG>7</PG>
        </CHAPTI>
        <SUBCHAP>
          <HD SOURCE="HED">SUBCHAPTER B—PAYMENT PROCEDURES</HD>
        </SUBCHAP>
        <CHAPTI>
          <PT>140</PT>
          <SUBJECT>Reimbursement</SUBJECT>
          <PG>12</PG>
          <PT>172</PT>
          <SUBJECT>Administration of engineering and design related service contracts</SUBJECT>
          <PG>19</PG>
          <PT>180</PT>
          <SUBJECT>Credit assistance for surface transportation projects</SUBJECT>
          <PG>22</PG>
          <PT>190</PT>
          <SUBJECT>Incentive payments for controlling outdoor advertising on the interstate system</SUBJECT>
          <PG>22</PG>
          <PT>192</PT>
          <SUBJECT>Drug offender's driver's license suspension</SUBJECT>
          <PG>23</PG>
        </CHAPTI>
        <SUBCHAP>
          <HD SOURCE="HED">SUBCHAPTER C—CIVIL RIGHTS</HD>
        </SUBCHAP>
        <CHAPTI>
          <PT>200</PT>
          <SUBJECT>Title VI program and related statutes—implementation and review procedures</SUBJECT>
          <PG>27</PG>
          <PT>230</PT>
          <SUBJECT>External programs</SUBJECT>
          <PG>30</PG>
        </CHAPTI>
        <SUBCHAP>
          <HD SOURCE="HED">SUBCHAPTER D—NATIONAL HIGHWAY INSTITUTE</HD>
        </SUBCHAP>
        <CHAPTI>
          <PT>260</PT>
          <SUBJECT>Education and training programs</SUBJECT>
          <PG>72</PG>
        </CHAPTI>
        <SUBCHAP>
          <HD SOURCE="HED">SUBCHAPTER E—PLANNING AND RESEARCH</HD>
        </SUBCHAP>
        <CHAPTI>
          <PT>420</PT>
          <SUBJECT>Planning and research program administration</SUBJECT>
          <PG>78</PG>
          <PT>450</PT>
          <SUBJECT>Planning assistance and standards</SUBJECT>
          <PG>89</PG>
          <PT>460</PT>
          <SUBJECT>Public road mileage for apportionment of highway safety funds</SUBJECT>
          <PG>131</PG>
          <PT>470</PT>
          <SUBJECT>Highway systems</SUBJECT>
          <PG>133</PG>
        </CHAPTI>
        <SUBCHAP>
          <HD SOURCE="HED">SUBCHAPTER F—TRANSPORTATION INFRASTRUCTURE MANAGEMENT</HD>
        </SUBCHAP>
        <CHAPTI>
          <PT>500</PT>
          <SUBJECT>Management and monitoring systems</SUBJECT>
          <PG>139<PRTPAGE P="4"/>
          </PG>
          <PT>505</PT>
          <SUBJECT>Projects of national and regional significance evaluation and rating</SUBJECT>
          <PG>145</PG>
          <PT>511</PT>
          <SUBJECT>Real-Time System Management Information Program</SUBJECT>
          <PG>148</PG>
        </CHAPTI>
        <SUBCHAP>
          <HD SOURCE="HED">SUBCHAPTER G—ENGINEERING AND TRAFFIC OPERATIONS</HD>
        </SUBCHAP>
        <CHAPTI>
          <PT>620</PT>
          <SUBJECT>Engineering</SUBJECT>
          <PG>152</PG>
          <PT>625</PT>
          <SUBJECT>Design standards for highways</SUBJECT>
          <PG>154</PG>
          <PT>626</PT>
          <SUBJECT>Pavement policy</SUBJECT>
          <PG>157</PG>
          <PT>627</PT>
          <SUBJECT>Value engineering</SUBJECT>
          <PG>157</PG>
          <PT>630</PT>
          <SUBJECT>Preconstruction procedures</SUBJECT>
          <PG>161</PG>
          <PT>633</PT>
          <SUBJECT>Required contract provisions</SUBJECT>
          <PG>176</PG>
          <PT>635</PT>
          <SUBJECT>Construction and maintenance</SUBJECT>
          <PG>190</PG>
          <PT>636</PT>
          <SUBJECT>Design-build contracting</SUBJECT>
          <PG>219</PG>
          <PT>637</PT>
          <SUBJECT>Construction inspection and approval</SUBJECT>
          <PG>230</PG>
          <PT>645</PT>
          <SUBJECT>Utilities</SUBJECT>
          <PG>232</PG>
          <PT>646</PT>
          <SUBJECT>Railroads</SUBJECT>
          <PG>250</PG>
          <PT>650</PT>
          <SUBJECT>Bridges, structures, and hydraulics</SUBJECT>
          <PG>259</PG>
          <PT>652</PT>
          <SUBJECT>Pedestrian and bicycle accommodations and projects</SUBJECT>
          <PG>275</PG>
          <PT>655</PT>
          <SUBJECT>Traffic operations</SUBJECT>
          <PG>278</PG>
          <PT>656</PT>
          <SUBJECT>Carpool and vanpool projects</SUBJECT>
          <PG>284</PG>
          <PT>657</PT>
          <SUBJECT>Certification of size and weight enforcement</SUBJECT>
          <PG>286</PG>
          <PT>658</PT>
          <SUBJECT>Truck size and weight, route designations—length, width and weight limitations</SUBJECT>
          <PG>291</PG>
          <PT>660</PT>
          <SUBJECT>Special programs (Direct Federal)</SUBJECT>
          <PG>351</PG>
          <PT>661</PT>
          <SUBJECT>Indian Reservation Road Bridge Program</SUBJECT>
          <PG>358</PG>
          <PT>667</PT>
          <RESERVED>[Reserved]</RESERVED>
          <PT>668</PT>
          <SUBJECT>Emergency relief program</SUBJECT>
          <PG>363</PG>
          <PT>669</PT>
          <SUBJECT>Enforcement of heavy vehicle use tax</SUBJECT>
          <PG>371</PG>
        </CHAPTI>
        <SUBCHAP>
          <HD SOURCE="HED">SUBCHAPTER H—RIGHT-OF-WAY AND ENVIRONMENT</HD>
        </SUBCHAP>
        <CHAPTI>
          <PT>710</PT>
          <SUBJECT>Right-of-way and real estate</SUBJECT>
          <PG>374</PG>
          <PT>750</PT>
          <SUBJECT>Highway beautification</SUBJECT>
          <PG>390</PG>
          <PT>751</PT>
          <SUBJECT>Junkyard control and acquisition</SUBJECT>
          <PG>409</PG>
          <PT>752</PT>
          <SUBJECT>Landscape and roadside development</SUBJECT>
          <PG>413</PG>
          <PT>771</PT>
          <SUBJECT>Environmental impact and related procedures</SUBJECT>
          <PG>417</PG>
          <PT>772</PT>
          <SUBJECT>Procedures for abatement of highway traffic noise and construction noise</SUBJECT>
          <PG>431</PG>
          <PT>773</PT>
          <SUBJECT>Surface Transportation Project Delivery Pilot Program</SUBJECT>
          <PG>439</PG>
          <PT>774</PT>
          <SUBJECT>Parks, recreation areas, wildlife and waterfowl refuges, and historic sites (Section 4(f))</SUBJECT>
          <PG>443<PRTPAGE P="5"/>
          </PG>
          <PT>777</PT>
          <SUBJECT>Mitigation of impacts to wetlands and natural habitat</SUBJECT>
          <PG>452</PG>
        </CHAPTI>
        <SUBCHAP>
          <HD SOURCE="HED">SUBCHAPTER I—PUBLIC TRANSPORTATION</HD>
        </SUBCHAP>
        <CHAPTI>
          <PT>810</PT>
          <SUBJECT>Mass transit and special use highway projects</SUBJECT>
          <PG>458</PG>
        </CHAPTI>
        <SUBCHAP>
          <HD SOURCE="HED">SUBCHAPTER J—HIGHWAY SAFETY</HD>
        </SUBCHAP>
        <CHAPTI>
          <PT>924</PT>
          <SUBJECT>Highway safety improvement program</SUBJECT>
          <PG>464</PG>
        </CHAPTI>
        <SUBCHAP>
          <HD SOURCE="HED">SUBCHAPTER K—INTELLIGENT TRANSPORTATION SYSTEMS</HD>
        </SUBCHAP>
        <CHAPTI>
          <PT>940</PT>
          <SUBJECT>Intelligent transportation system architecture and standards</SUBJECT>
          <PG>471</PG>
          <PT>950</PT>
          <SUBJECT>Electronic toll collection</SUBJECT>
          <PG>473</PG>
        </CHAPTI>
        <SUBCHAP>
          <HD SOURCE="HED">SUBCHAPTER L—FEDERAL LANDS HIGHWAYS</HD>
        </SUBCHAP>
        <CHAPTI>
          <PT>970</PT>
          <SUBJECT>National Park Service management systems</SUBJECT>
          <PG>476</PG>
          <PT>971</PT>
          <SUBJECT>Forest Service management systems</SUBJECT>
          <PG>481</PG>
          <PT>972</PT>
          <SUBJECT>Fish and Wildlife Service management systems</SUBJECT>
          <PG>487</PG>
          <PT>973</PT>
          <SUBJECT>Management systems pertaining to the Bureau of Indian Affairs and the Indian Reservation Roads Program</SUBJECT>
          <PG>493</PG>
        </CHAPTI>
      </TOC>
      <SUBCHAP TYPE="N">
        <PRTPAGE P="7"/>
        <HD SOURCE="HED">SUBCHAPTER A—GENERAL MANAGEMENT AND ADMINISTRATION</HD>
        <PART>
          <EAR>Pt. 1</EAR>
          <HD SOURCE="HED">PART 1—GENERAL</HD>
          <CONTENTS>
            <SECHD>Sec.</SECHD>
            <SECTNO>1.1</SECTNO>
            <SUBJECT>Purpose.</SUBJECT>
            <SECTNO>1.2</SECTNO>
            <SUBJECT>Definitions.</SUBJECT>
            <SECTNO>1.3</SECTNO>
            <SUBJECT>Federal-State cooperation; authority of State highway departments.</SUBJECT>
            <SECTNO>1.5</SECTNO>
            <SUBJECT>Information furnished by State highway departments.</SUBJECT>
            <SECTNO>1.7</SECTNO>
            <SUBJECT>Urban area boundaries.</SUBJECT>
            <SECTNO>1.8</SECTNO>
            <SUBJECT>[Reserved]</SUBJECT>
            <SECTNO>1.9</SECTNO>
            <SUBJECT>Limitation on Federal participation.</SUBJECT>
            <SECTNO>1.11</SECTNO>
            <SUBJECT>Engineering services.</SUBJECT>
            <SECTNO>1.23</SECTNO>
            <SUBJECT>Rights-of-way.</SUBJECT>
            <SECTNO>1.27</SECTNO>
            <SUBJECT>Maintenance.</SUBJECT>
            <SECTNO>1.28</SECTNO>
            <SUBJECT>Diversion of highway revenues.</SUBJECT>
            <SECTNO>1.32</SECTNO>
            <SUBJECT>Issuance of directives.</SUBJECT>
            <SECTNO>1.33</SECTNO>
            <SUBJECT>Conflicts of interest.</SUBJECT>
            <SECTNO>1.35</SECTNO>
            <SUBJECT>Bonus program.</SUBJECT>
            <SECTNO>1.36</SECTNO>
            <SUBJECT>Compliance with Federal laws and regulations.</SUBJECT>
          </CONTENTS>
          <AUTH>
            <HD SOURCE="HED">Authority:</HD>
            <P>23 U.S.C. 315; 49 CFR 1.48(b).</P>
          </AUTH>
          <SOURCE>
            <HD SOURCE="HED">Source:</HD>
            <P>25 FR 4162, May 11, 1960, unless otherwise noted.</P>
          </SOURCE>
          <SECTION>
            <SECTNO>§ 1.1</SECTNO>
            <SUBJECT>Purpose.</SUBJECT>
            <P>The purpose of the regulations in this part is to implement and carry out the provisions of Federal law relating to the administration of Federal aid for highways.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 1.2</SECTNO>
            <SUBJECT>Definitions.</SUBJECT>
            <P>(a) Terms defined in 23 U.S.C. 101(a), shall have the same meaning where used in the regulations in this part, except as modified herein.</P>
            <P>(b) The following terms where used in the regulations in this part shall have the following meaning:</P>
            <P>
              <E T="03">Administrator.</E> The Federal Highway Administrator.</P>
            <P>
              <E T="03">Advertising policy.</E> The national policy relating to the regulation of outdoor advertising declared in title 23 U.S.C. 131.</P>
            <P>
              <E T="03">Advertising standards.</E> The “National Standards for Regulation by States of Outdoor Advertising Signs, Displays and Devices Adjacent to the National System of Interstate and Defense Highways” promulgated by the Secretary (part 20 of this chapter).</P>
            <P>
              <E T="03">Federal laws.</E> The provisions of title 23 U.S.C., and all other Federal laws, heretofore or hereafter enacted, relating to Federal aid for highways.</P>
            <P>
              <E T="03">Latest available Federal census.</E> The latest available Federal decennial census, except for the establishment of urban area.</P>
            <P>
              <E T="03">Project.</E> An undertaking by a State highway department for highway construction, including preliminary engineering, acquisition of rights-of-way and actual construction, or for highway planning and research, or for any other work or activity to carry out the provisions of the Federal laws for the administration of Federal aid for highways.</P>
            <P>
              <E T="03">Secondary road plan.</E> A plan for administration of Federal aid for highways on the Federal-aid secondary highway system pursuant to 23 U.S.C. 117.</P>
            <P>
              <E T="03">Secretary.</E> The Secretary of Transportation.</P>
            <P>
              <E T="03">State.</E> Any State of the United States, the District of Columbia and Puerto Rico.</P>
            <P>
              <E T="03">Urban area.</E> An area including and adjacent to a municipality or other urban place having a population of five thousand or more, as determined by the latest available published official Federal census, decennial or special, within boundaries to be fixed by a State highway department, subject to the approval of the Administrator.</P>
            <CITA>[25 FR 4162, May 11, 1960, as amended at 35 FR 18719, Dec. 10, 1970]</CITA>
          </SECTION>
          <SECTION>
            <SECTNO>§ 1.3</SECTNO>
            <SUBJECT>Federal-State cooperation; authority of State highway departments.</SUBJECT>

            <P>The Administrator shall cooperate with the States, through their respective State highway departments, in the construction of Federal-aid highways. Each State highway department, maintained in conformity with 23 U.S.C. 302, shall be authorized, by the laws of the State, to make final decisions for the State in all matters relating to, and to enter into, on behalf of the State, all contracts and agreements for projects and to take such other actions on behalf of the State as may be necessary <PRTPAGE P="8"/>to comply with the Federal laws and the regulations in this part.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 1.5</SECTNO>
            <SUBJECT>Information furnished by State highway departments.</SUBJECT>
            <P>At the request of the Administrator the State highway department shall furnish to him such information as the Administrator shall deem desirable in administering the Federal-aid highway program.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 1.7</SECTNO>
            <SUBJECT>Urban area boundaries.</SUBJECT>
            <P>Boundaries of an urban area shall be submitted by the State highway department and be approved by the Administrator prior to the inclusion in a program of any project wholly or partly in such area involving funds authorized for and limited to urban areas.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 1.8</SECTNO>
            <RESERVED>[Reserved]</RESERVED>
          </SECTION>
          <SECTION>
            <SECTNO>§ 1.9</SECTNO>
            <SUBJECT>Limitation on Federal participation.</SUBJECT>
            <P>(a) Federal-aid funds shall not participate in any cost which is not incurred in conformity with applicable Federal and State law, the regulations in this title, and policies and procedures prescribed by the Administrator. Federal funds shall not be paid on account of any cost incurred prior to authorization by the Administrator to the State highway department to proceed with the project or part thereof involving such cost.</P>
            <P>(b) Notwithstanding the provisions of paragraph (a) of this section the Administrator may, upon the request of a State highway department, approve the participation of Federal-aid funds in a previously incurred cost if he finds:</P>
            <P>(1) That his approval will not adversely affect the public,</P>
            <P>(2) That the State highway department has acted in good faith, and that there has been no willful violation of Federal requirements,</P>
            <P>(3) That there has been substantial compliance with all other requirements prescribed by the Administrator, and full compliance with requirements mandated by Federal statute,</P>
            <P>(4) That the cost to the United States will not be in excess of the cost which it would have incurred had there been full compliance, and</P>
            <P>(5) That the quality of work undertaken has not been impaired.</P>
            <P>(c) Any request submitted under paragraph (b) of this section shall be accompanied by a detailed description of the relevant circumstances and facts, and shall explain the necessity for incurring the costs in question.</P>
            <CITA>[38 FR 18368, July 10, 1973]</CITA>
          </SECTION>
          <SECTION>
            <SECTNO>§ 1.11</SECTNO>
            <SUBJECT>Engineering services.</SUBJECT>
            <P>(a) <E T="03">Federal participation.</E> Costs of engineering services performed by the State highway department or any instrumentality or entity referred to in paragraph (b) of this section may be eligible for Federal participation only to the extent that such costs are directly attributable and properly allocable to specific projects.</P>
            <P>(b) <E T="03">Governmental engineering organizations.</E> The State highway department may utilize, under its supervision, the services of well-qualified and suitably equipped engineering organizations of other governmental instrumentalities for making surveys, preparing plans, specifications and estimates, and for supervising the construction of any project.</P>
            <P>(c) <E T="03">Railroad and utility engineering organizations.</E> The State highway department may utilize, under its supervision, the services of well-qualified and suitably equipped engineering organizations of the affected railroad companies for railway-highway crossing projects and of the affected utility companies for projects involving utility installations.</P>
            <P>(d) [Reserved]</P>
            <P>(e) <E T="03">Responsibility of the State highway department.</E> The State highway department is not relieved of its responsibilities under Federal law and the regulations in this part in the event it utilizes the services of any engineering organization under paragraphs (b), (c) or (d) of this section.</P>
            <CITA>[25 FR 4162, May 11, 1960, as amended at 53 FR 18276, May 23, 1988; 57 FR 60728, Dec. 22, 1992; 66 FR 58666, Nov. 23, 2001]</CITA>
          </SECTION>
          <SECTION>
            <SECTNO>§ 1.23</SECTNO>
            <SUBJECT>Rights-of-way.</SUBJECT>
            <P>(a) <E T="03">Interest to be acquired.</E> The State shall acquire rights-of-way of such nature and extent as are adequate for the <PRTPAGE P="9"/>construction, operation and maintenance of a project.</P>
            <P>(b) <E T="03">Use for highway purposes.</E> Except as provided under paragraph (c) of this section, all real property, including air space, within the right-of-way boundaries of a project shall be devoted exclusively to public highway purposes. No project shall be accepted as complete until this requirement has been satisfied. The State highway department shall be responsible for preserving such right-of-way free of all public and private installations, facilities or encroachments, except (1) those approved under paragraph (c) of this section; (2) those which the Administrator approves as constituting a part of a highway or as necessary for its operation, use or maintenance for public highway purposes and (3) informational sites established and maintained in accordance with § 1.35 of the regulations in this part.</P>
            <P>(c) <E T="03">Other use or occupancy.</E> Subject to 23 U.S.C. 111, the temporary or permanent occupancy or use of right-of-way, including air space, for nonhighway purposes and the reservation of subsurface mineral rights within the boundaries of the rights-of-way of Federal-aid highways, may be approved by the Administrator, if he determines that such occupancy, use or reservation is in the public interest and will not impair the highway or interfere with the free and safe flow of traffic thereon.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 1.27</SECTNO>
            <SUBJECT>Maintenance.</SUBJECT>
            <P>The responsibility imposed upon the State highway department, pursuant to 23 U.S.C. 116, for the maintenance of projects shall be carried out in accordance with policies and procedures issued by the Administrator. The State highway department may provide for such maintenance by formal agreement with any adequately equipped county, municipality or other governmental instrumentality, but such an agreement shall not relieve the State highway department of its responsibility for such maintenance.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 1.28</SECTNO>
            <SUBJECT>Diversion of highway revenues.</SUBJECT>
            <P>(a) <E T="03">Reduction in apportionment.</E> If the Secretary shall find that any State has diverted funds contrary to 23 U.S.C. 126, he shall take such action as he may deem necessary to comply with said provision of law by reducing the first Federal-aid apportionment of primary, secondary and urban funds made to the State after the date of such finding. In any such reduction, each of these funds shall be reduced in the same proportion.</P>
            <P>(b) <E T="03">Furnishing of information.</E> The Administrator may require any State to submit to him such information as he may deem necessary to assist the Secretary in carrying out the provisions of 23 U.S.C. 126 and paragraph (a) of this section.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 1.32</SECTNO>
            <SUBJECT>Issuance of directives.</SUBJECT>
            <P>(a) The Administrator shall promulgate and require the observance of policies and procedures, and may take other action as he deems appropriate or necessary for carrying out the provisions and purposes of Federal laws, the policies of the Federal Highway Administration, and the regulations of this part.</P>
            <P>(b) The Administrator or his delegated representative, as appropriate, is authorized to issue the following type of directives:</P>
            <P>(1) Federal Highway Administration Regulations are issued by the Administrator or his delegate, as necessary, to implement and carry out the provisions of title 23 U.S.C., relating to the administration of Federal aid for highways, direct Federal programs and State and community safety programs; and title 49 U.S.C., relating to motor carrier safety; and other applicable laws and programs under his jurisdiction.</P>
            <P>(2) Notices are temporary issuances transmitting one-time or short-term instructions or information which is expected to remain in effect for less than 90 days or for a predetermined period of time normally not to exceed one year.</P>

            <P>(3) Orders are directives limited in volume and contain permanent or longlasting policy, instructions, and procedures. FHWA Orders are to be used primarily as internal FHWA directives.<PRTPAGE P="10"/>
            </P>
            <P>(4) Joint Interagency Orders and Notices are used by FHWA and the National Highway Traffic Safety Administration (NHTSA) to issue joint policies, procedures, and information pertaining to the joint administration of the State and Community Highway Safety Program. Where necessary, other joint directives may be issued with other modal administrations within the Department of Transportation.</P>
            <P>(5) Manuals are generally designed for use in issuing permanent or long-lasting detailed policy and procedure. Some of the major manuals recognized by the FHWA Directives System follow:</P>
            <P>(i) The Federal-Aid Highway Program Manual has been established to assemble and organize program material of the type previously contained in the Policy and Procedure and Instructional Memoranda which will continue in effect until specifically revoked or published in the new manual. Regulatory material is printed in italics in the manual and also appears in this code. Nonregulatory material is printed in delegate type.</P>
            <P>(ii) The Administrative Manual covers all internal FHWA administrative support functions.</P>
            <P>(iii) The Highway Planning Program Manual covers the methods and procedures necessary to conduct the highway planning functions.</P>
            <P>(iv) The Research and Development Manual series entitled, “The Federally Coordinated Program of Research and Development in Highway Transportation” describes the FHWA research and development program.</P>
            <P>(v) The External Audit Manual provides guidance to FHWA auditors in their review of State programs and processes.</P>
            <P>(vi) The Civil Rights and Equal Opportunity Manual provides guidance to FHWA and State Civil Rights and Equal Employment Opportunity Officers.</P>
            <P>(vii) The BMCS Operations Manual provides program guidance for all field employees assigned to the motor carrier safety program.</P>
            <P>(viii) The Highway Safety Program Manual, issued jointly by FHWA and NHTSA, contains volumes relating to the joint administration of the program.</P>
            <P>(6) Handbooks are internal operating instructions published in book form where, because of the program area covered, it is desirable to provide greater detail of administrative and technical instructions.</P>
            <P>(7) Transmittals identify and explain the original issuance or page change, provide background information, and provide filing instructions for insertion of new pages and removal of changed pages, or both.</P>
            <SECAUTH>(49 U.S.C. 1655)</SECAUTH>
            <CITA>[39 FR 1512, Jan. 10, 1974]</CITA>
          </SECTION>
          <SECTION>
            <SECTNO>§ 1.33</SECTNO>
            <SUBJECT>Conflicts of interest.</SUBJECT>
            <P>No official or employee of a State or any other governmental instrumentality who is authorized in his official capacity to negotiate, make, accept or approve, or to take part in negotiating, making, accepting or approving any contract or subcontract in connection with a project shall have, directly or indirectly, any financial or other personal interest in any such contract or subcontract. No engineer, attorney, appraiser, inspector or other person performing services for a State or a governmental instrumentality in connection with a project shall have, directly or indirectly, a financial or other personal interest, other than his employment or retention by a State or other governmental instrumentality, in any contract or subcontract in connection with such project. No officer or employee of such person retained by a State or other governmental instrumentality shall have, directly or indirectly, any financial or other personal interest in any real property acquired for a project unless such interest is openly disclosed upon the public records of the State highway department and of such other governmental instrumentality, and such officer, employee or person has not participated in such acquisition for and in behalf of the State. It shall be the responsibility of the State to enforce the requirements of this section.</P>
          </SECTION>
          <SECTION>
            <PRTPAGE P="11"/>
            <SECTNO>§ 1.35</SECTNO>
            <SUBJECT>Bonus program.</SUBJECT>
            <P>(a) Any agreement entered into by a State pursuant to the provisions of section 12 of the Federal-Aid Highway Act of 1958, Pub. L. 85-381, 72 Stat. 95, as amended, shall provide for the control or regulation of outdoor advertising, consistent with the advertising policy and standards promulgated by the Administrator, in areas adjacent to the entire mileage of the Interstate System within that State, except such segments as may be excluded from the application of such policy and standards by section 12.</P>
            <P>(b) Any such agreement for the control of advertising may provide for establishing publicly owned informational sites, whether publicly or privately operated, within the limits of or adjacent to the right-of-way of the Interstate System on condition that no such site shall be established or maintained except at locations and in accordance with plans, in furtherance of the advertising policy and standards, submitted to and approved by the Administrator.</P>
            <P>(c) No advertising right in the acquisition of which Federal funds participated shall be disposed of without the prior approval of the Administrator.</P>
            <CITA>[39 FR 28628, Aug. 9, 1974]</CITA>
          </SECTION>
          <SECTION>
            <SECTNO>§ 1.36</SECTNO>
            <SUBJECT>Compliance with Federal laws and regulations.</SUBJECT>
            <P>If the Administrator determines that a State has violated or failed to comply with the Federal laws or the regulations in this part with respect to a project, he may withhold payment to the State of Federal funds on account of such project, withhold approval of further projects in the State, and take such other action that he deems appropriate under the circumstances, until compliance or remedial action has been accomplished by the State to the satisfaction of the Administrator.</P>
          </SECTION>
        </PART>
      </SUBCHAP>
      <SUBCHAP TYPE="P">
        <PRTPAGE P="12"/>
        <HD SOURCE="HED">SUBCHAPTER B—PAYMENT PROCEDURES</HD>
        <PART>
          <EAR>Pt. 140</EAR>
          <HD SOURCE="HED">PART 140—REIMBURSEMENT</HD>
          <CONTENTS>
            <SUBPART>
              <RESERVED>Subparts A-D [Reserved]</RESERVED>
            </SUBPART>
            <SUBPART>
              <HD SOURCE="HED">Subpart E—Administrative Settlement Costs—Contract Claims</HD>
              <SECHD>Sec.</SECHD>
              <SECTNO>140.501</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <SECTNO>140.503</SECTNO>
              <SUBJECT>Definition.</SUBJECT>
              <SECTNO>140.505</SECTNO>
              <SUBJECT>Reimbursable costs.</SUBJECT>
            </SUBPART>
            <SUBPART>
              <HD SOURCE="HED">Subpart F—Reimbursement for Bond Issue Projects</HD>
              <SECTNO>140.601</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <SECTNO>140.602</SECTNO>
              <SUBJECT>Requirements and conditions.</SUBJECT>
              <SECTNO>140.603</SECTNO>
              <SUBJECT>Programs.</SUBJECT>
              <SECTNO>140.604</SECTNO>
              <SUBJECT>Reimbursable schedule.</SUBJECT>
              <SECTNO>140.605</SECTNO>
              <SUBJECT>Approval actions.</SUBJECT>
              <SECTNO>140.606</SECTNO>
              <SUBJECT>Project agreements.</SUBJECT>
              <SECTNO>140.607</SECTNO>
              <SUBJECT>Construction.</SUBJECT>
              <SECTNO>140.608</SECTNO>
              <SUBJECT>Reimbursable bond interest costs of Interstate projects.</SUBJECT>
              <SECTNO>140.609</SECTNO>
              <SUBJECT>Progress and final vouchers.</SUBJECT>
              <SECTNO>140.610</SECTNO>
              <SUBJECT>Conversion from bond issue to funded project status.</SUBJECT>
              <SECTNO>140.611</SECTNO>
              <SUBJECT>Determination of bond retirement.</SUBJECT>
              <SECTNO>140.612</SECTNO>
              <SUBJECT>Cash management.</SUBJECT>
              <APP>Appendix to Subpart F—Reimbursable Schedule for Converted “E” (Bond Issue) Projects (Other Than Interstate Projects)</APP>
            </SUBPART>
            <SUBPART>
              <RESERVED>Subpart G [Reserved]</RESERVED>
            </SUBPART>
            <SUBPART>
              <HD SOURCE="HED">Subpart H—State Highway Agency Audit Expense</HD>
              <SECTNO>140.801</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <SECTNO>140.803</SECTNO>
              <SUBJECT>Policy.</SUBJECT>
              <SECTNO>140.805</SECTNO>
              <SUBJECT>Definitions.</SUBJECT>
              <SECTNO>140.807</SECTNO>
              <SUBJECT>Reimbursable costs.</SUBJECT>
            </SUBPART>
            <SUBPART>
              <HD SOURCE="HED">Subpart I—Reimbursement for Railroad Work</HD>
              <SECTNO>140.900</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <SECTNO>140.902</SECTNO>
              <SUBJECT>Applicability.</SUBJECT>
              <SECTNO>140.904</SECTNO>
              <SUBJECT>Reimbursement basis.</SUBJECT>
              <SECTNO>140.906</SECTNO>
              <SUBJECT>Labor costs.</SUBJECT>
              <SECTNO>140.907</SECTNO>
              <SUBJECT>Overhead and indirect construction costs.</SUBJECT>
              <SECTNO>140.908</SECTNO>
              <SUBJECT>Materials and supplies.</SUBJECT>
              <SECTNO>140.910</SECTNO>
              <SUBJECT>Equipment.</SUBJECT>
              <SECTNO>140.912</SECTNO>
              <SUBJECT>Transportation.</SUBJECT>
              <SECTNO>140.914</SECTNO>
              <SUBJECT>Credits for improvements.</SUBJECT>
              <SECTNO>140.916</SECTNO>
              <SUBJECT>Protection.</SUBJECT>
              <SECTNO>140.918</SECTNO>
              <SUBJECT>Maintenance and extended construction.</SUBJECT>
              <SECTNO>140.920</SECTNO>
              <SUBJECT>Lump sum payments.</SUBJECT>
              <SECTNO>140.922</SECTNO>
              <SUBJECT>Billings.</SUBJECT>
            </SUBPART>
          </CONTENTS>
          <AUTH>
            <HD SOURCE="HED">Authority:</HD>
            <P>23 U.S.C. 101(e), 106, 109(e), 114(a), 120(g), 121, 122, 130, and 315; and 49 CFR 1.48(b).</P>
          </AUTH>
          <SUBPART>
            <RESERVED>Subparts A-D [Reserved]</RESERVED>
          </SUBPART>
          <SUBPART>
            <HD SOURCE="HED">Subpart E—Administrative Settlement Costs—Contract Claims</HD>
            <SOURCE>
              <HD SOURCE="HED">Source:</HD>
              <P>44 FR 59233, Oct. 15, 1979, unless otherwise noted.</P>
            </SOURCE>
            <SECTION>
              <SECTNO>§ 140.501</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <P>This regulation establishes the criteria for eligibility for reimbursement of administrative settlement costs in defense of contract claims on projects performed by a State under Federal-aid procedures.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 140.503</SECTNO>
              <SUBJECT>Definition.</SUBJECT>
              <P>Administrative settlement costs are costs related to the defense and settlement of contract claims including, but not limited to, salaries of a contracting officer or his/her authorized representative, attorneys, and/or members of State boards of arbitration, appeals boards, or similar tribunals, which are allocable to the findings and determinations of contract claims, but not including administrative or overhead costs.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 140.505</SECTNO>
              <SUBJECT>Reimbursable costs.</SUBJECT>
              <P>(a) Federal funds may participate in administrative settlement costs which are:</P>
              <P>(1) Incurred after notice of claim,</P>
              <P>(2) Properly supported,</P>
              <P>(3) Directly allocable to a specific Federal-aid or Federal project,</P>
              <P>(4) For employment of special counsel for review and defense of contract claims, when</P>
              <P>(i) Recommended by the State Attorney General or State Highway Agency (SHA) legal counsel and</P>
              <P>(ii) Approved in advance by the FHWA Division Administrator, with advice of FHWA Regional Counsel, and</P>

              <P>(5) For travel and transportation expenses, if in accord with established policy and practices.<PRTPAGE P="13"/>
              </P>
              <P>(b) No reimbursement shall be made if it is determined by FHWA that there was negligence or wrongdoing of any kind by SHA officials with respect to the claim.</P>
            </SECTION>
          </SUBPART>
          <SUBPART>
            <HD SOURCE="HED">Subpart F—Reimbursement for Bond Issue Projects</HD>
            <SOURCE>
              <HD SOURCE="HED">Source:</HD>
              <P>48 FR 54971, Dec. 8, 1983, unless otherwise noted.</P>
            </SOURCE>
            <SECTION>
              <SECTNO>§ 140.601</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <P>To prescribe policies and procedures for the use of Federal funds by State highway agencies (SHAs) to aid in the retirement of the principal and interest of bonds, pursuant to 23 U.S.C. 122 and the payment of interest on bonds of eligible Interstate projects.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 140.602</SECTNO>
              <SUBJECT>Requirements and conditions.</SUBJECT>
              <P>(a) An SHA that uses the proceeds of bonds issued by the State, a county, city or other political subdivision of the State, for the construction of projects on the Federal-aid primary or Interstate system, or extensions of any of the Federal-aid highway systems in urban areas, or for substitute highway projects approved under 23 U.S.C. 103(e)(4), may claim payment of any portion of such sums apportioned to it for expenditures on such system to aid in the retirement of the principal of bonds at their maturities, to the extent that the proceeds of bonds have actually been expended in the construction of projects.</P>
              <P>(b) Any interest earned and payable on bonds, the proceeds of which were expended on Interstate projects after November 6, 1978, is an eligible cost of construction. The amount of interest eligible for participation will be based on (1) the date the proceeds were expended on the project, (2) amount expended, and (3) the date of conversion to a regularly funded project. As provided for in section 115(c), Pub. L. 95-599, November 6, 1978, interest on bonds issued in any fiscal year by a State after November 6, 1978, may be paid under the authority of 23 U.S.C. 122 only if such SHA was eligible to obligate Interstate Discretionary funds under the provisions of 23 U.S.C. 118(b) during such fiscal year, and the Administrator certifies that such eligible SHA has utilized, or will utilize to the fullest extent possible during such fiscal year, its authority to obligate funds under 23 U.S.C. 118(b).</P>
              <P>(c) The Federal share payable at the time of conversion, as provided for in § 140.610 shall be the legal pro rata in effect at the time of execution of the project agreement for the bond issue project.</P>
              <P>(d) The authorization of a bond issue project does not constitute a commitment of Federal funds until the project is converted to a regular Federal-aid project as provided for in § 140.610.</P>
              <P>(e) Reimbursements for the redemption of bonds may not precede, by more than 60 days, the scheduled date of the retirement of the bonds.</P>
              <P>(f) Federal funds are not eligible for payment into sinking funds created and maintained for the subsequent retirement of bonds.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 140.603</SECTNO>
              <SUBJECT>Programs.</SUBJECT>
              <P>Programs covering projects to be financed from the proceeds of bonds shall be prepared and submitted to FHWA. Project designations shall be the same as for regular Federal-aid projects except that the prefix letter “B” for bond issue shall be used as the first letter of each project designation, e.g., “BI” for Bond Issue Projects—Interstate.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 140.604</SECTNO>
              <SUBJECT>Reimbursable schedule.</SUBJECT>
              <P>Projects to be financed from other than Interstate funds shall be subject to a 36-month reimbursable schedule upon conversion to regular Federal-aid financing (See appendix). FHWA will consider requests for waiver of this provision at the time of conversion action. Waivers are subject to the availability of liquidating cash.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 140.605</SECTNO>
              <SUBJECT>Approval actions.</SUBJECT>
              <P>(a) Authorization to proceed with preliminary engineering and acquisition of rights-of-way shall be issued in the same manner as for regularly financed Federal-aid projects.</P>

              <P>(b) Authorization of physical construction shall be given in the same manner as for regularly financed Federal-aid projects. The total cost and <PRTPAGE P="14"/>Federal funds required, including interest, shall be indicated in the plans, specifications, and estimates.</P>
              <P>(c) Projects subject to the reimbursable schedule shall be identified as an “E” project when the SHA is authorized to proceed with all or any phase of the work.</P>
              <P>(d) Concurrence in the award of contracts shall be given.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 140.606</SECTNO>
              <SUBJECT>Project agreements.</SUBJECT>
              <P>Project Agreements, Form PR-2, shall be prepared and executed. Agreement provision 8 on the reverse side of Form PR-2 <SU>1</SU>
                <FTREF/> shall apply for bond issue projects.</P>
              <FTNT>
                <P>
                  <SU>1</SU> The text of FHWA Form PR-2 is found in 23 CFR part 630, subpart C, appendix A.</P>
              </FTNT>
            </SECTION>
            <SECTION>
              <SECTNO>§ 140.607</SECTNO>
              <SUBJECT>Construction.</SUBJECT>
              <P>Construction shall be supervised by the SHA in the same manner as for regularly financed Federal-aid projects. The FHWA will make construction inspections and reports.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 140.608</SECTNO>
              <SUBJECT>Reimbursable bond interest costs of Interstate projects.</SUBJECT>
              <P>(a) Bond interest earned on bonds actually retired may be reimbursed on the Federal pro rata basis applicable to such projects in accordance with § 140.602(b) and (c).</P>
              <P>(b) No interest will be reimbursed for bonds issued after November 6, 1978, used to retire or otherwise refinance bonds issued prior to that date.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 140.609</SECTNO>
              <SUBJECT>Progress and final vouchers.</SUBJECT>
              <P>(a) Progress vouchers may be submitted for the Federal share of bonds retired or about to be retired, including eligible interest on Interstate Bond Issue Projects, the proceeds of which have actually been expended for the construction of the project.</P>
              <P>(b) Upon completion of a bond issue project, a final voucher shall be submitted by the SHA. After final review, the SHA will be advised as to the total cost and Federal fund participation for the project.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 140.610</SECTNO>
              <SUBJECT>Conversion from bond issue to funded project status.</SUBJECT>

              <P>(a) At such time as the SHA elects to apply available apportioned Federal-aid funds to the retirement of bonds, including eligible interest earned and payable on Interstate Bond Projects, subject to available obligational authority, its claim shall be supported by appropriate certifications as follows:
              </P>
              <EXTRACT>
                <P>I hereby certify that the following bonds, (list), the proceeds of which have been actually expended in the construction of bond issue projects authorized by title 23 U.S.C., section 122, (1) have been retired on ___, or (2) mature and are scheduled for retirement on ___, which is __ days in advance of the maturity date of ___.</P>
              </EXTRACT>
              

              <P>Eligible interest claimed on Interstate Bond Projects shall be shown for each bond and the certification shall include the statement:
              </P>
              <EXTRACT>
                <P>I also certify that interest earned and paid or payable for each bond listed has been determined from the date on and after which the respective bond proceeds were actually expended on the project.</P>
              </EXTRACT>
              
              <P>(b) The SHA's request for full conversion of a completed projects), or partial conversion of an active or completed project(s), may be made by letter, inclusive of the appropriate certification as described in § 140.610(a) making reference to any progress payments received or the final voucher(s) previously submitted and approved in accordance with § 140.609.</P>
              <P>(c) Approval of the conversion action shall be by the Division Administrator.</P>
              <P>(d) The SHA's request for partial conversion of an active or completed bond issue project shall provide for: (1) Conversion to funded project status of the portion to be financed out of the balance of currently available apportioned funds, and (2) retention of the unfunded portion of the project in the bond program.</P>
              <P>(e) Where the SHA's request involves the partial conversion of a completed bond issue project, payment of the Federal funds made available under the conversion action shall be accomplished through use of Form PR-20, Voucher for Work Performed under Provisions of the Federal-aid and Federal Highway Acts, prepared in the division office and appropriately cross-referenced to the Bond Issue Project final voucher previously submitted and approved. The final voucher will be reduced by the amount of the approved reimbursement.</P>
            </SECTION>
            <SECTION>
              <PRTPAGE P="15"/>
              <SECTNO>§ 140.611</SECTNO>
              <SUBJECT>Determination of bond retirement.</SUBJECT>
              <P>Division Administrators shall be responsible for the prompt review of the SHA's records to determine that bonds issued to finance the projects and for which reimbursement has been made, including eligible bond interest expense, have been retired pursuant to the State's certification required by § 140.610(a), and that such action is documented in the project file.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 140.612</SECTNO>
              <SUBJECT>Cash management.</SUBJECT>
              <P>By July 1 of each year the SHA will provide FHWA with a schedule, including the anticipated claims for reimbursement, of bond projects to be converted during the next two fiscal years. The data will be used by FHWA in determining liquidating cash required to finance such conversions.</P>
            </SECTION>
            <APPENDIX>
              <EAR>Pt. 140, Subpt. F, App.</EAR>
              <HD SOURCE="HED">Appendix to Subpart F of Part 140—Reimbursable Schedule for Converted “E” (Bond Issue) Projects (other than Interstate Projects)</HD>
              <GPOTABLE CDEF="s30,10" COLS="2" OPTS="L2">
                <BOXHD>
                  <CHED H="1">Time in months following conversion from “E” (bond issue) project to regular project</CHED>
                  <CHED H="1">Cumulative amount reimbursable (percent of Federal funds obligated)</CHED>
                </BOXHD>
                <ROW>
                  <ENT I="01">1</ENT>
                  <ENT>1</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">2</ENT>
                  <ENT>2</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">3</ENT>
                  <ENT>5</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">4</ENT>
                  <ENT>9</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">5</ENT>
                  <ENT>13</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">6</ENT>
                  <ENT>18</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">7</ENT>
                  <ENT>23</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">8</ENT>
                  <ENT>29</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">9</ENT>
                  <ENT>34</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">10</ENT>
                  <ENT>39</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">11</ENT>
                  <ENT>44</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">12</ENT>
                  <ENT>49</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">13</ENT>
                  <ENT>54</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">14</ENT>
                  <ENT>58</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">15</ENT>
                  <ENT>61</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">16</ENT>
                  <ENT>64</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">17</ENT>
                  <ENT>67</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">18</ENT>
                  <ENT>70</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">19</ENT>
                  <ENT>73</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">20</ENT>
                  <ENT>75</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">21</ENT>
                  <ENT>77</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">22</ENT>
                  <ENT>79</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">23</ENT>
                  <ENT>81</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">24</ENT>
                  <ENT>83</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">25</ENT>
                  <ENT>85</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">26</ENT>
                  <ENT>87</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">27</ENT>
                  <ENT>89</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">28</ENT>
                  <ENT>91</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">29</ENT>
                  <ENT>93</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">30</ENT>
                  <ENT>94</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">31</ENT>
                  <ENT>95</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">32</ENT>
                  <ENT>96</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">34</ENT>
                  <ENT>97</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">35</ENT>
                  <ENT>99</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">36</ENT>
                  <ENT>100</ENT>
                </ROW>
              </GPOTABLE>
            </APPENDIX>
          </SUBPART>
          <SUBPART>
            <RESERVED>Subpart G [Reserved]</RESERVED>
          </SUBPART>
          <SUBPART>
            <HD SOURCE="HED">Subpart H—State Highway Agency Audit Expense</HD>
            <SOURCE>
              <HD SOURCE="HED">Source:</HD>
              <P>49 FR 45578, Nov. 19, 1984, unless otherwise noted.</P>
            </SOURCE>
            <SECTION>
              <SECTNO>§ 140.801</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <P>To establish the reimbursement criteria for Federal participation in project related audit expenses.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 140.803</SECTNO>
              <SUBJECT>Policy.</SUBJECT>
              <P>Project related audits performed in accordance with generally accepted auditing standards (as modified by the Comptroller General of the United States) and applicable Federal laws and regulations are eligible for Federal participation. The State highway agency (SHA) may use other State, local public agency, and Federal audit organizations as well as licensed or certified public accounting firms to augment its audit force.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 140.805</SECTNO>
              <SUBJECT>Definitions.</SUBJECT>
              <P>(a) <E T="03">Project related audits.</E> Audits which directly benefit Federal-aid highway projects. Audits performed in accordance with the requirements of 23 CFR part 12, audits of third party contract costs, and other audits providing assurance that a recipient has complied with FHWA regulations are all considered project related audits. Audits benefiting only nonfederal projects, those performed for SHA management use only, or those serving similar nonfederal purposes are not considered project related.</P>
              <P>(b) <E T="03">Third party contract costs.</E> Project related costs incurred by railroads, utilities, consultants, governmental instrumentalities, universities, nonprofit <PRTPAGE P="16"/>organizations, construction contractors (force account work), and organizations engaged in right-of-way studies, planning, research, or related activities where the terms of a proposal or contract (including lump sum) necessitate an audit. Construction contracts (except force account work) are not included in this group.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 140.807</SECTNO>
              <SUBJECT>Reimbursable costs.</SUBJECT>
              <P>(a) Federal funds may be used to reimburse an SHA for the following types of project related audit costs:</P>
              <P>(1) Salaries, wages, and related costs paid to public employees in accordance with subpart G of this part,</P>
              <P>(2) Payments by the SHA to any Federal, State, or local public agency audit organization, and</P>
              <P>(3) Payments by the SHA to licensed or certified public accounting firms.</P>
              <P>(b) Audit costs incurred by an SHA shall be equitably distributed to all benefiting parties. The portion of these costs allocated to the Federal-Aid Highway Program which are not directly related to a specific project or projects shall be equitably distributed, as a minimum, to the major FHWA funding categories in that State.</P>
            </SECTION>
          </SUBPART>
          <SUBPART>
            <HD SOURCE="HED">Subpart I—Reimbursement for Railroad Work</HD>
            <SOURCE>
              <HD SOURCE="HED">Source:</HD>
              <P>40 FR 16057, Apr. 9, 1975, unless otherwise noted.</P>
            </SOURCE>
            <SECTION>
              <SECTNO>§ 140.900</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <P>The purpose of this subpart is to prescribe policies and procedures on reimbursement to the States for railroad work done on projects undertaken pursuant to the provisions of 23 CFR part 646, subpart B.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 140.902</SECTNO>
              <SUBJECT>Applicability.</SUBJECT>
              <P>This subpart, and all references hereinafter made to “projects,” applies to Federal-aid projects involving railroad facilities, including projects for the elimination of hazards of railroad-highway crossings, and other projects which use railroad properties or which involve adjustments required by highway construction to either railroad facilities or facilities that are jointly owned or used by railroad and utility companies.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 140.904</SECTNO>
              <SUBJECT>Reimbursement basis.</SUBJECT>
              <P>(a) <E T="03">General.</E> On projects involving the elimination of hazards of railroad-highway crossings, and on other projects where a railroad company is not obligated to move or to change its facilities at its own expense, reimbursement will be made for the costs incurred by the State in making changes to railroad facilities as required in connection with a Federal-aid highway project, in accordance with the provisions of this subpart.</P>
              <P>(b) <E T="03">Eligibility.</E> To be eligible, the costs must be:</P>
              <P>(1) For work which is included in an approved statewide transportation improvement program.</P>
              <P>(2) Incurred subsequent to the date of authorization by the Federal Highway Administration (FHWA),</P>
              <P>(3) Incurred in accordance with the provisions of 23 CFR, part 646, subpart B, and</P>
              <P>(4) Properly attributable to the project.</P>
              <CITA>[40 FR 16057, Apr. 9, 1975, as amended at 53 FR 18276, May 23, 1988; 62 FR 45328, Aug. 27, 1997]</CITA>
            </SECTION>
            <SECTION>
              <SECTNO>§ 140.906</SECTNO>
              <SUBJECT>Labor costs.</SUBJECT>
              <P>(a) <E T="03">General.</E> (1) Salaries and wages, at actual or average rates, and related expenses paid by a company to individuals, for the time they are working on the project, are reimbursable when supported by adequate records. This shall include labor costs associated with preliminary engineering, construction engineering, right-of-way, and force account construction.</P>
              <P>(2) Salaries and expenses paid to individuals who are normally part of the overhead organization of the company may be reimbursed for the time they are working directly on the project, such as for accounting and bill preparation, when supported by adequate records and when the work performed by such individuals is essential to the project and could not have been accomplished as economically by employees outside the overhead organization.</P>

              <P>(3) Amounts paid to engineers, architects and others for services directly related to projects may be reimbursed.<PRTPAGE P="17"/>
              </P>
              <P>(b) <E T="03">Labor surcharges.</E> (1) Labor surcharges include worker compensation insurance, public liability and property damage insurance, and such fringe benefits as the company has established for the benefit of its employees. The cost of labor surcharges will be reimbursed at actual cost to the company or a company may, at its option, use an additive rate or other similar technique in lieu of actual costs provided that (i) the rate is based on historical cost data of the company, (ii) such rate is representative of actual costs incurred, (iii) the rate is adjusted at least annually taking into consideration known anticipated changes and correcting for any over or under applied costs for the preceding period, and (iv) the rate is approved by the SHA and FHWA.</P>
              <P>(2) Where the company is a self-insurer there may be reimbursement:</P>
              <P>(i) At experience rates properly developed from actual costs, not to exceed the rates of a regular insurance company for the class of employment covered, or</P>
              <P>(ii) At the option of the company, a fixed rate of 8 percent of direct labor costs for worker compensation and public liability and property damage insurance together.</P>
              <CITA>[40 FR 16057, Apr. 9, 1975, as amended at 47 FR 33955, Aug. 5, 1982; 56 FR 56578, Nov. 6, 1991]</CITA>
            </SECTION>
            <SECTION>
              <SECTNO>§ 140.907</SECTNO>
              <SUBJECT>Overhead and indirect construction costs.</SUBJECT>
              <P>(a) A State may elect to reimburse the railroad company for its overhead and indirect construction costs.</P>
              <P>(b) The FHWA will participate in these costs provided that:</P>
              <P>(1) The costs are distributed to all applicable work orders and other functions on an equitable and uniform basis in accordance with generally accepted accounting principles;</P>
              <P>(2) The costs included in the distribution are limited to costs actually incurred by the railroad;</P>
              <P>(3) The costs are eligible in accordance with the Federal Acquisition Regulation (48 CFR), part 31, Contract Cost Principles and Procedures, relating to contracts with commercial organizations;</P>
              <P>(4) The costs are considered reasonable;</P>
              <P>(5) Records are readily available at a single location which adequately support the costs included in the distribution, the method used for distributing the costs, and the basis for determining additive rates;</P>
              <P>(6) The rates are adjusted at least annually taking into consideration any overrecovery or underrecovery of costs; and</P>
              <P>(7) The railroad maintains written procedures which assure proper control and distribution of the overhead and indirect construction costs.</P>
              <CITA>[53 FR 18276, May 23, 1988]</CITA>
            </SECTION>
            <SECTION>
              <SECTNO>§ 140.908</SECTNO>
              <SUBJECT>Materials and supplies.</SUBJECT>
              <P>(a) <E T="03">Procurement.</E> Materials and supplies, if available, are to be furnished from company stock, except they may be obtained from other sources near the project site when available at less cost. Where not available from company stock, they may be purchased either under competitive bids or existing continuing contracts, under which the lowest available prices are developed. Minor quantities and proprietary products are excluded from these requirements. The company shall not be required to change its existing standards for materials used in permanent changes to its facilities.</P>
              <P>(b) <E T="03">Costs.</E> (1) Materials and supplies furnished from company stock shall be billed at current stock price of such new or used material at time of issue.</P>
              <P>(2) Materials and supplies not furnished from company stock shall be billed at actual costs to the company delivered to the point of entry on the railroad company's line nearest the source of procurement.</P>
              <P>(3) A reasonable cost of plant inspection and testing may be included in the costs of materials and supplies where such expense has been incurred. The computation of actual costs of materials and supplies shall include the deduction of all offered discounts, rebates and allowances.</P>
              <P>(c) <E T="03">Materials recovered.</E> (1) Materials recovered from temporary use and accepted for reuse by the company shall be credited to the project at prices charged to the job, less a consideration for loss in service life at 10 percent for <PRTPAGE P="18"/>rails, angle bars, tie plates and metal turnout materials and 15 percent for all other materials. Materials recovered from the permanent facility of the company that are accepted by the company for return to stock shall be credited to the project at current stock prices of such used material.</P>
              <P>(2) Materials recovered and not accepted for reuse by the company, if determined to have a net sale value, shall be sold by the State or railroad following an opportunity for State inspection and appropriate solicitation for bids, to the highest bidder; or if the company practices a system of periodic disposal by sale, credit to the project shall be at the going prices supported by the records of the company. Where applicable, credit for materials recovered from the permanent facility in length or quantities in excess of that being placed should be reduced to reflect any increased cost of railroad operation resulting from the adjustment.</P>
              <P>(d) <E T="03">Removal costs.</E> Federal participation in the costs of removing, salvaging, transporting, and handling recovered materials will be limited to the value of materials recovered, except where FHWA approves additional measures for restoration of affected areas as required by the physical construction or by reason of safety or aesthetics.</P>
              <P>(e) <E T="03">Handling costs.</E> The actual and direct costs of handling and loading out of materials and supplies at and from company stores or material yards and of unloading and handling of recovered materials accepted by the company at its stores or material yards, are reimbursable. At the option of the company, 5 percent of the amounts billed for the materials and supplies which are issued from company stores and material yards will be reimbursable in lieu of actual costs.</P>
              <P>(f) <E T="03">Credit losses.</E> On projects where a company actually suffers loss by application of credits, the company shall have the opportunity of submitting a detailed statement of such loss as a basis for further adjustment.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 140.910</SECTNO>
              <SUBJECT>Equipment.</SUBJECT>
              <P>(a) <E T="03">Company owned equipment.</E> Cost of company-owned equipment may be reimbursed for the average or actual cost of operation, light and running repairs, and depreciation, or at industry rates representative of actual costs as agreed to by the railroad, SHA, and FHWA. Reimbursement for company-owned vehicles may be made at average or actual costs or at rates of recorded use per mile which are representative of actual costs and agreed to by the company, SHA, and FHWA.</P>
              <P>(b) <E T="03">Other equipment.</E> Where company owned equipment is not available, reimbursement will be limited to the amount of rental paid (1) to the lowest qualified bidder, (2) under existing continuing contracts at reasonable cost, or (3) as an exception, by negotiation where (b) (1) and (2) are impractical due to project location or schedule.</P>
              <CITA>[40 FR 16057, Apr. 9, 1975, as amended at 47 FR 33955, Aug. 5, 1982]</CITA>
            </SECTION>
            <SECTION>
              <SECTNO>§ 140.912</SECTNO>
              <SUBJECT>Transportation.</SUBJECT>
              <P>(a) <E T="03">Employees.</E> The company's cost of necessary employee transportation and subsistence directly attributable to the project, which is consistent with overall policy of the company, is reimbursable.</P>
              <P>(b) <E T="03">Materials, supplies, and equipment.</E> The most economical movement of materials, supplies and equipment to the project and necessary return to storage, including the associated costs of loading and unloading equipment, is reimbursable. Transportation by a railroad company over its own lines in a revenue train is reimbursable at average or actual costs, at rates which are representative of actual costs, or at rates which the company charges its customers for similar shipments provided the rate structure is documented and available to the public. These rates are to be agreed to by the company, SHA, and FHWA. No charge will be made for transportation by work train other than the operating expenses of the work train. When it is more practicable or more economical to move equipment on its own wheels, reimbursement may be made at average or actual costs or at rates which are representative of actual costs and are agreed to by the railroad, SHA, and FHWA.</P>
              <CITA>[40 FR 16057, Apr. 9, 1975, as amended at 47 FR 33955, Aug. 5, 1982]</CITA>
            </SECTION>
            <SECTION>
              <PRTPAGE P="19"/>
              <SECTNO>§ 140.914</SECTNO>
              <SUBJECT>Credits for improvements.</SUBJECT>
              <P>(a) Credit shall be made to the project for additions or improvements which provide for higher quality or increased service capability of the operating facility and which are provided solely for the benefit of the company.</P>
              <P>(b) Where buildings and other depreciable structures of a company which are integral to operation of rail traffic must be replaced, credit shall be made to the project as set forth in 23 CFR 646.216(c)(2).</P>
              <P>(c) No credit is required for additions or improvements which are:</P>
              <P>(1) Necessitated by the requirements of the highway project.</P>
              <P>(2) Replacements which, although not identical, are of equivalent standard.</P>
              <P>(3) Replacements of devices or materials no longer regularly manufactured and the next highest grade or size is used.</P>
              <P>(4) Required by governmental and appropriate regulatory commission requirements.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 140.916</SECTNO>
              <SUBJECT>Protection.</SUBJECT>
              <P>The cost of essential protective services which, in the opinion of a railroad company, are required to ensure safety to railroad operations during certain periods of the construction of a project, is reimbursable provided an item for such services is incorporated in the State-railroad agreement or in a work order issued by the State and approved by FHWA.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 140.918</SECTNO>
              <SUBJECT>Maintenance and extended construction.</SUBJECT>
              <P>The cost of maintenance and extended construction is reimbursable to the extent provided for in 23 CFR 646.216(f)(4), and where included in the State-Railroad Agreement or otherwise approved by the State and FHWA.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 140.920</SECTNO>
              <SUBJECT>Lump sum payments.</SUBJECT>
              <P>Where approved by FHWA, pursuant to 23 CFR 646.216(d)(3), reimbursement may be made as a lump sum payment, in lieu of actual costs.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 140.922</SECTNO>
              <SUBJECT>Billings.</SUBJECT>
              <P>(a) After the executed State-Railroad Agreement has been approved by FHWA, the company may be reimbursed on progress billings of incurred costs. Costs for materials stockpiled at the project site or specifically purchased and delivered to the company for use on the project may be reimbursed on progress billings following approval of the executed State-Railroad Agreement or the written agreement under 23 CFR 646.218(c).</P>
              <P>(b) The company shall provide one final and complete billing of all incurred costs, or of the agreed-to lump sum, within one year following completion of the reimbursable railroad work. Otherwise, previous payments to the company may be considered final, except as agreed to between the SHA and the railroad.</P>
              <P>(c) All company cost records and accounts relating to the project are subject to audit by representatives of the State and/or the Federal Government for a period of three years from the date final payment has been received by the company.</P>
              <P>(d) A railroad company must advise the State promptly of any outstanding obligation of the State's contractor for services furnished by the company such as protective services.</P>
              <CITA>[40 FR 16057, Apr. 9, 1975, as amended at 40 FR 29712, July 15, 1975; 62 FR 45328, Aug. 27, 1997]</CITA>
            </SECTION>
          </SUBPART>
        </PART>
        <PART>
          <EAR>Pt. 172</EAR>
          <HD SOURCE="HED">PART 172—ADMINISTRATION OF ENGINEERING AND DESIGN RELATED SERVICE CONTRACTS</HD>
          <CONTENTS>
            <SECHD>Sec.</SECHD>
            <SECTNO>172.1</SECTNO>
            <SUBJECT>Purpose and applicability.</SUBJECT>
            <SECTNO>172.3</SECTNO>
            <SUBJECT>Definitions.</SUBJECT>
            <SECTNO>172.5</SECTNO>
            <SUBJECT>Methods of procurement.</SUBJECT>
            <SECTNO>172.7</SECTNO>
            <SUBJECT>Audits.</SUBJECT>
            <SECTNO>172.9</SECTNO>
            <SUBJECT>Approvals.</SUBJECT>
          </CONTENTS>
          <AUTH>
            <HD SOURCE="HED">Authority:</HD>

            <P>23 U.S.C. 112, 114(a), 302, 315, and 402; 40 U.S.C. 541 <E T="03">et seq.</E>; sec.1205(a), Pub. L. 105-178, 112 Stat. 107 (1998); sec. 307, Pub. L. 104-59, 109 Stat. 568 (1995); sec. 1060, Pub. L. 102-240, 105 Stat. 1914, 2003 (1991); 48 CFR 12 and 31; 49 CFR 1.48(b) and 18.</P>
          </AUTH>
          <SOURCE>
            <HD SOURCE="HED">Source:</HD>
            <P>67 FR 40155, June 12, 2002, unless otherwise noted.</P>
          </SOURCE>
          <SECTION>
            <SECTNO>§ 172.1</SECTNO>
            <SUBJECT>Purpose and applicability.</SUBJECT>

            <P>This part prescribes policies and procedures for the administration of engineering and design related service contracts under 23 U.S.C. 112 as supplemented by the common grant rule, 49 <PRTPAGE P="20"/>CFR part 18. It is not the intent of this part to release the grantee from the requirements of the common grant rule. The policies and procedures involve federally funded contracts for engineering and design related services for projects subject to the provisions of 23 U.S.C. 112(a) and are issued to ensure that a qualified consultant is obtained through an equitable selection process, that prescribed work is properly accomplished in a timely manner, and at fair and reasonable cost. Recipients of Federal funds shall ensure that their subrecipients comply with this part.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 172.3</SECTNO>
            <SUBJECT>Definitions.</SUBJECT>
            <P>As used in this part:</P>
            <P>
              <E T="03">Audit</E> means a review to test the contractor's compliance with the requirements of the cost principles contained in 48 CFR part 31.</P>
            <P>
              <E T="03">Cognizant agency</E> means any Federal or State agency that has conducted and issued an audit report of the consultant's indirect cost rate that has been developed in accordance with the requirements of the cost principles contained in 48 CFR part 31.</P>
            <P>
              <E T="03">Competitive negotiation</E> means any form of negotiation that utilizes the following:</P>
            <P>(1) Qualifications-based procedures complying with title IX of the Federal Property and Administrative Services Act of 1949 (Public Law 92-582, 86 Stat. 1278 (1972));</P>
            <P>(2) Equivalent State qualifications-based procedures; or</P>
            <P>(3) A formal procedure permitted by State statute that was enacted into State law prior to the enactment of Public Law 105-178 (TEA-21) on June 9, 1998.</P>
            <P>
              <E T="03">Consultant</E> means the individual or firm providing engineering and design related services as a party to the contract.</P>
            <P>
              <E T="03">Contracting agencies</E> means State Departments of Transportation (State DOTs) or local governmental agencies that are responsible for the procurement of engineering and design related services.</P>
            <P>
              <E T="03">Engineering and design related services</E> means program management, construction management, feasibility studies, preliminary engineering, design, engineering, surveying, mapping, or architectural related services with respect to a construction project subject to 23 U.S.C. 112(a).</P>
            <P>
              <E T="03">One-year applicable accounting period</E> means the annual accounting period for which financial statements are regularly prepared for the consultant.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 172.5</SECTNO>
            <SUBJECT>Methods of procurement.</SUBJECT>
            <P>(a) <E T="03">Procurement.</E> The procurement of Federal-aid highway contracts for engineering and design related services shall be evaluated and ranked by the contracting agency using one of the following procedures:</P>
            <P>(1) <E T="03">Competitive negotiation.</E> Contracting agencies shall use competitive negotiation for the procurement of engineering and design related services when Federal-aid highway funds are involved in the contract. These contracts shall use qualifications-based selection procedures in the same manner as a contract for architectural and engineering services is negotiated under title IX of the Federal Property and Administrative Services Act of 1949 (40 U.S.C. 541-544) or equivalent State qualifications-based requirements. The proposal solicitation (project, task, or service) process shall be by public announcement, advertisement, or any other method that assures qualified in-State and out-of-State consultants are given a fair opportunity to be considered for award of the contract. Price shall not be used as a factor in the analysis and selection phase. Alternatively, a formal procedure adopted by State Statute enacted into law prior to June 9, 1998 is also permitted under paragraph (a)(4) of this section.</P>
            <P>(2) <E T="03">Small purchases.</E> Small purchase procedures are those relatively simple and informal procurement methods where an adequate number of qualified sources are reviewed and the total contract costs do not exceed the simplified acquisition threshold fixed in 41 U.S.C. 403(11). Contract requirements should not be broken down into smaller components merely to permit the use of small purchase requirements. States and subrecipients of States may use the State's small purchase procedures for the procurement of engineering and design related services provided the total contract costs do not exceed the <PRTPAGE P="21"/>simplified acquisition threshold fixed in 41 U.S.C. 403(11).</P>
            <P>(3) <E T="03">Noncompetitive negotiation.</E> Noncompetitive negotiation may be used to procure engineering and design related services on Federal-aid participating contracts when it is not feasible to award the contract using competitive negotiation, equivalent State qualifications-based procedures, or small purchase procedures. Contracting agencies shall submit justification and receive approval from the FHWA before using this form of contracting. Circumstances under which a contract may be awarded by noncompetitive negotiation are limited to the following:</P>
            <P>(i) The service is available only from a single source;</P>
            <P>(ii) There is an emergency which will not permit the time necessary to conduct competitive negotiations; or</P>
            <P>(iii) After solicitation of a number of sources, competition is determined to be inadequate.</P>
            <P>(4) <E T="03">State statutory procedures.</E> Contracting agencies may procure engineering and design related services using an alternate selection procedure established in State statute enacted into law before June 9, 1998.</P>
            <P>(b) <E T="03">Disadvantaged Business Enterprise (DBE) program.</E> The contracting agency shall give consideration to DBE consultants in the procurement of engineering and design related service contracts subject to 23 U.S.C. 112(b)(2) in accordance with 49 CFR part 26.</P>
            <P>(c) <E T="03">Compensation.</E> The cost plus a percentage of cost and percentage of construction cost methods of compensation shall not be used.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 172.7</SECTNO>
            <SUBJECT>Audits.</SUBJECT>
            <P>(a) <E T="03">Performance of audits.</E> When State procedures call for audits of contracts or subcontracts for engineering design services, the audit shall be performed to test compliance with the requirements of the cost principles contained in 48 CFR part 31. Other procedures may be used if permitted by State statutes that were enacted into law prior to June 9, 1998.</P>
            <P>(b) <E T="03">Audits for indirect cost rate.</E> Contracting agencies shall use the indirect cost rate established by a cognizant agency audit for the cost principles contained in 48 CFR part 31 for the consultant, if such rates are not under dispute. A lower indirect cost rate may be used if submitted by the consultant firm, however the consultant's offer of a lower indirect cost rate shall not be a condition of contract award. The contracting agencies shall apply these indirect cost rates for the purposes of contract estimation, negotiation, administration, reporting, and contract payment and the indirect cost rates shall not be limited by any administrative or de facto ceilings. The consultant's indirect cost rates for its one-year applicable accounting period shall be applied to the contract, however once an indirect cost rate is established for a contract it may be extended beyond the one year applicable accounting period provided all concerned parties agree. Agreement to the extension of the one-year applicable period shall not be a condition of contract award. Other procedures may be used if permitted by State statutes that were enacted into law prior to June 9, 1998.</P>
            <P>(c) <E T="03">Disputed audits.</E> If the indirect cost rate(s) as established by the cognizant audit in paragraph (b) of this section are in dispute, the parties of any proposed new contract must negotiate a provisional indirect cost rate or perform an independent audit to establish a rate for the specific contract. Only the consultant and the parties involved in performing the indirect cost audit may dispute the established indirect cost rate. If an error is discovered in the established indirect cost rate, the rate may be disputed by any prospective user.</P>
            <P>(d) <E T="03">Prenotification; confidentiality of data.</E> The FHWA and recipients and subrecipients of Federal-aid highway funds may share the audit information in complying with the State or subrecpient's acceptance of a consultant's overhead rates pursuant to 23 U.S.C. 112 and this part provided that the consultant is given notice of each use and transfer. Audit information shall not be provided to other consultants or any other government agency not sharing the cost data, or to any firm or government agency for purposes other than complying with the State or subrecpient's acceptance of a consultant's overhead rates pursuant <PRTPAGE P="22"/>to 23 U.S.C. 112 and this part without the written permission of the affected consultants. If prohibited by law, such cost and rate data shall not be disclosed under any circumstance, however should a release be required by law or court order, such release shall make note of the confidential nature of the data.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 172.9</SECTNO>
            <SUBJECT>Approvals.</SUBJECT>
            <P>(a) <E T="03">Written procedures.</E> The contracting agency shall prepare written procedures for each method of procurement it proposes to utilize. These written procedures and all revisions shall be approved by the FHWA for recipients of federal funds. Recipients shall approve the written procedures and all revisions for their subrecipients. These procedures shall, as appropriate to the particular method of procurement, cover the following steps:</P>
            <P>(1) In preparing a scope of work, evaluation factors and cost estimate for selecting a consultant;</P>
            <P>(2) In soliciting proposals from prospective consultants;</P>
            <P>(3) In the evaluation of proposals and the ranking/selection of a consultant;</P>
            <P>(4) In negotiation of the reimbursement to be paid to the selected consultant;</P>
            <P>(5) In monitoring the consultant's work and in preparing a consultant's performance evaluation when completed; and</P>
            <P>(6) In determining the extent to which the consultant, who is responsible for the professional quality, technical accuracy, and coordination of services, may be reasonably liable for costs resulting from errors or deficiencies in design furnished under its contract.</P>
            <P>(b) <E T="03">Contracts.</E> Contracts and contract settlements involving design services for projects that have not been delegated to the State under 23 U.S.C. 106(c), that do not fall under the small purchase procedures in § 172.5(a)(2), shall be subject to the prior approval by FHWA, unless an alternate approval procedure has been approved by FHWA.</P>
            <P>(c) <E T="03">Major projects.</E> Any contract, revision of a contract or settlement of a contract for design services for a project that is expected to fall under 23 U.S.C. 106(h) shall be submitted to the FHWA for approval.</P>
            <P>(d) <E T="03">Consultant services in management roles.</E> When Federal-aid highway funds participate in the contract, the contracting agency shall receive approval from the FHWA before hiring a consultant to act in a management role for the contracting agency.</P>
          </SECTION>
        </PART>
        <PART>
          <EAR>Pt. 180</EAR>
          <HD SOURCE="HED">PART 180—CREDIT ASSISTANCE FOR SURFACE TRANSPORTATION PROJECTS</HD>
          <AUTH>
            <HD SOURCE="HED">Authority:</HD>
            <P>Secs. 1501 <E T="03">et seq.,</E> Pub. L. 105-178, 112 Stat. 107, 241, as amended; 23 U.S.C. 181-189 and 315; 49 CFR 1.48.</P>
          </AUTH>
          <SOURCE>
            <HD SOURCE="HED">Source:</HD>
            <P>64 FR 29750, June 2, 1999, unless otherwise noted.</P>
          </SOURCE>
          <SECTION>
            <SECTNO>§ 180.1</SECTNO>
            <SUBJECT>Cross-reference to credit assistance.</SUBJECT>

            <P>The regulations in 49 CFR part 80 shall be followed in complying with the requirements of this part. Title 49 CFR part 80 implements the Transportation Infrastructure Finance and Innovation Act of 1998, secs. 1501 <E T="03">et seq.,</E> Pub. L. 105-178, 112 Stat. 107, 241.</P>
          </SECTION>
        </PART>
        <PART>
          <EAR>Pt. 190</EAR>
          <HD SOURCE="HED">PART 190—INCENTIVE PAYMENTS FOR CONTROLLING OUTDOOR ADVERTISING ON THE INTERSTATE SYSTEM</HD>
          <CONTENTS>
            <SECHD>Sec.</SECHD>
            <SECTNO>190.1</SECTNO>
            <SUBJECT>Purpose.</SUBJECT>
            <SECTNO>190.3</SECTNO>
            <SUBJECT>Agreement to control advertising.</SUBJECT>
            <SECTNO>190.5</SECTNO>
            <SUBJECT>Bonus project claims.</SUBJECT>
            <SECTNO>190.7</SECTNO>
            <SUBJECT>Processing of claims.</SUBJECT>
          </CONTENTS>
          <AUTH>
            <HD SOURCE="HED">Authority:</HD>
            <P>23 U.S.C. 131(j) and 315; 49 CFR 1.48(b).</P>
          </AUTH>
          <SOURCE>
            <HD SOURCE="HED">Source:</HD>
            <P>43 FR 42742, Sept. 21, 1978, unless otherwise noted.</P>
          </SOURCE>
          <SECTION>
            <SECTNO>§ 190.1</SECTNO>
            <SUBJECT>Purpose.</SUBJECT>
            <P>The purpose of this regulation is to prescribe project procedures for making the incentive payments authorized by 23 U.S.C. 131(j).</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 190.3</SECTNO>
            <SUBJECT>Agreement to control advertising.</SUBJECT>

            <P>To qualify for the bonus payment, a State must have entered into an agreement with the Secretary to control outdoor advertising. It must fulfill, and must continue to fulfill its obligations <PRTPAGE P="23"/>under such agreement consistent with 23 CFR 750.101.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 190.5</SECTNO>
            <SUBJECT>Bonus project claims.</SUBJECT>
            <P>(a) The State may claim payment by submitting a form PR-20 voucher, supported by strip maps which identify advertising control limits and areas excluded from the claim and form FHWA-1175, for the one-half percent bonus claim.</P>
            <P>(b) The bonus payment computation is based on projects or portions thereof for which (1) the section of highway on which the project is located has been opened to traffic, and (2) final payment has been made. A bonus project may cover an individual project, a part thereof, or a combination of projects, on a section of an Interstate route.</P>
            <P>(c) The eligible system mileage to be shown for a bonus project is that on which advertising controls are in effect. The eligible system mileage reported in subsequent projects on the same Interstate route section should cover only the additional system mileage not previously reported. Eligible project cost is the total participating cost (State and Federal share of approved preliminary engineering (PE), right-of-way (R-O-W), and construction) exclusive of any ineligible costs. The amount of the bonus payment is to be based on the eligible total costs of the supporting projects included in each claim.</P>
            <P>(d) Progress vouchers for route sections on which additional one-half percent bonus payments are to be claimed are to be so identified, and the final claim for each route section is to be identified as the final voucher.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 190.7</SECTNO>
            <SUBJECT>Processing of claims.</SUBJECT>
            <P>Audited and approved PR-20 vouchers with form FHWA-1175 shall be forwarded to the regional office for submission to the Finance Division, Washington Headquarters, for payment. The associated strip maps shall be retained with the division office copies of the PR-20 vouchers.</P>
          </SECTION>
        </PART>
        <PART>
          <EAR>Pt. 192</EAR>
          <HD SOURCE="HED">PART 192—DRUG OFFENDER'S DRIVER'S LICENSE SUSPENSION</HD>
          <CONTENTS>
            <SECHD>Sec.</SECHD>
            <SECTNO>192.1</SECTNO>
            <SUBJECT>Scope.</SUBJECT>
            <SECTNO>192.2</SECTNO>
            <SUBJECT>Purpose.</SUBJECT>
            <SECTNO>192.3</SECTNO>
            <SUBJECT>Definitions.</SUBJECT>
            <SECTNO>192.4</SECTNO>
            <SUBJECT>Adoption of drug offender's driver's license suspension.</SUBJECT>
            <SECTNO>192.5</SECTNO>
            <SUBJECT>Certification requirements.</SUBJECT>
            <SECTNO>192.6</SECTNO>
            <SUBJECT>Period of availability of withheld funds.</SUBJECT>
            <SECTNO>192.7</SECTNO>
            <SUBJECT>Apportionment of withheld funds after compliance.</SUBJECT>
            <SECTNO>192.8</SECTNO>
            <SUBJECT>Period of availability of subsequently apportioned funds.</SUBJECT>
            <SECTNO>192.9</SECTNO>
            <SUBJECT>Effect of noncompliance.</SUBJECT>
            <SECTNO>192.10</SECTNO>
            <SUBJECT>Procedures affecting States in noncompliance.</SUBJECT>
          </CONTENTS>
          <AUTH>
            <HD SOURCE="HED">Authority:</HD>
            <P>23 U.S.C. 159 and 315.</P>
          </AUTH>
          <SOURCE>
            <HD SOURCE="HED">Source:</HD>
            <P>57 FR 35999, Aug. 12, 1992, unless otherwise noted. Redesignated at 60 FR 50100, Sept. 28, 1995.</P>
          </SOURCE>
          <SECTION>
            <SECTNO>§ 192.1</SECTNO>
            <SUBJECT>Scope.</SUBJECT>
            <P>This part prescribes the requirements necessary to implement 23 U.S.C. § 159, which encourages States to enact and enforce drug offender's driver's license suspensions.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 192.2</SECTNO>
            <SUBJECT>Purpose.</SUBJECT>
            <P>The purpose of this part is to specify the steps that States must take in order to avoid the withholding of Federal-aid highway funds for noncompliance with 23 U.S.C. 159.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 192.3</SECTNO>
            <SUBJECT>Definitions.</SUBJECT>
            <P>As used in this part:</P>
            <P>(a) <E T="03">Convicted</E> includes adjudicated under juvenile proceedings.</P>
            <P>(b) <E T="03">Driver's license</E> means a license issued by a State to any individual that authorizes the individual to operate a motor vehicle on highways.</P>
            <P>(c) <E T="03">Drug offense</E> means:</P>
            <P>(1) The possession, distribution, manufacture, cultivation, sale, transfer, or the attempt or conspiracy to possess, distribute, manufacture, cultivate, sell, or transfer any substance the possession of which is prohibited under the Controlled Substances Act, or</P>
            <P>(2) The operation of a motor vehicle under the influence of such a substance.</P>
            <P>(d) <E T="03">Substance the possession of which is prohibited under the Controlled Substances Act</E> or <E T="03">substance</E> means a controlled or counterfeit chemical, as those terms are defined in subsections 102 (6) and (7) of the Comprehensive Drug Abuse Prevention and Control <PRTPAGE P="24"/>Act of 1970 (21 U.S.C. 802 (6) and (7) and listed in 21 CFR 1308.11-.15.</P>
            <CITA>[57 FR 35999, Aug. 12, 1992; 58 FR 62415, Nov. 26, 1993; 59 FR 39256, Aug. 2, 1994]</CITA>
          </SECTION>
          <SECTION>
            <SECTNO>§ 192.4</SECTNO>
            <SUBJECT>Adoption of drug offender's driver's license suspension.</SUBJECT>
            <P>(a) The Secretary shall withhold five percent of the amount required to be apportioned to any State under each of sections 104(b)(1), 104(b)(3), and 104(b)(5) of title 23 of the United States Code on the first day of fiscal years 1994 and 1995 if the States does not meet the requirements of this section on that date.</P>
            <P>(b) The Secretary shall withhold ten percent of the amount required to be apportioned to any State under each of sections 104(b)(1), 104(b)(3), and 104(b)(5) of title 23 of the United States Code on the first day of fiscal year 1996 and any subsequent fiscal year if the State does not meet the requirements of this section on that date.</P>
            <P>(c) A State meets the requirements of this section if:</P>
            <P>(1) The State has enacted and is enforcing a law that requires in all circumstances, or requires in the absence of compelling circumstances warranting an exception:</P>
            <P>(i) The revocation, or suspension for at least 6 months, of the driver's license of any individual who is convicted, after the enactment of such law, of</P>
            <P>(A) Any violation of the Controlled Substances Act, or</P>
            <P>(B) Any drug offense, and</P>
            <P>(ii) A delay in the issuance or reinstatement of a driver's license to such an individual for at least 6 months after the individual otherwise would have been eligible to have a driver's license issued or reinstated if the individual does not have a driver's license, or the driver's license of the individual is suspended, at the time the individual is so convicted, or</P>
            <P>(2) The Governor of the State:</P>
            <P>(i) Submits to the Secretary no earlier than the adjournment sine die of the first regularly scheduled session of the State's legislature which begins after November 5, 1990, a written certification stating that he or she is opposed to the enactment or enforcement in the State of a law described in paragraph (c)(1) of this section relating to the revocation, suspension, issuance, or reinstatement of driver's licenses to convicted drug offenders; and</P>
            <P>(ii) Submits to the Secretary a written certification that the legislature (including both Houses where applicable) has adopted a resolution expressing its opposition to a law described in paragraph (c)(1) of this section.</P>
            <P>(d) A State that makes exceptions for compelling circumstances must do so in accordance with a State law, regulation, binding policy directive or Statewide published guidelines establishing the conditions for making such exceptions and in exceptional circumstances specific to the offender.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 192.5</SECTNO>
            <SUBJECT>Certification requirements.</SUBJECT>
            <P>(a) Each State shall certify to the Secretary of Transportation by April 1, 1993 and by January 1 of each subsequent year that it meets the requirements of 23 U.S.C. 159 and this regulation.</P>
            <P>(b) If the State believes it meets the requirements of 23 U.S.C. 159 and this regulation on the basis that it has enacted and is enforcing a law that suspends or revokes the driver's license of drug offenders, the certification shall contain:</P>
            <P>(1) A statement by the Governor of the State that the State has enacted and is enforcing a Drug Offender's Driver's License Suspension law that conforms to 23 U.S.C. 159(a)(3)(A). The certifying statement may be worded as follows: I, (Name of Governor), Governor of the (State or Commonwealth) of ______, do hereby certify that the (State or Commonwealth) of ______, has enacted is enforcing a Drug Offender's Driver's License Suspension law that conforms to section 23 U.S. C. 159(a)(3)(A).</P>
            <P>(2) Until a State has been determined to be in compliance with the requirements of 23 U.S.C. 159 and this regulation, the certification shall include also:</P>

            <P>(i) A copy of the State law, regulation, or binding policy directive implementing or interpreting such law or regulation relating to the suspension, revocation, issuance or reinstatement or driver's licenses of drug offenders, and<PRTPAGE P="25"/>
            </P>
            <P>(ii) A statement describing the steps the State is taking to enforce its law with regard to within State convictions, out-of-State convictions, Federal convictions and juvenile adjudications. The statement shall demonstrate that, upon receiving notification that a State driver has been convicted of a within State, out-of-State or Federal conviction or juvenile adjudication, the State is revoking, suspending or delaying the issuance of that drug offender's driver's license; and that, when the State convicts an individual of a drug offense, it is notifying the appropriate State office or, if the offender is a non-resident driver, the appropriate office in the driver's home State. If the State is not yet making these notifications, the State may satisfy this element by submitting a plan describing the steps it is taking to establish notification procedures.</P>
            <P>(c) If the State believes it meets the requirements of 23 U.S.C. 159(a)(3)(B) on the basis that it opposes a law that requires the suspension, revocation or delay in issuance or reinstatement of the driver's license of drug offenders that conforms to 23 U.S.C. 159(a)(3)(A), the certification shall contain:</P>
            <P>(1) A statement by the Governor of the State that he or she is opposed to the enactment or enforcement of a law that conforms to 23 U.S.C. 159(a)(3)(A) and that the State legislature has adopted a resolution expressing its opposition to such a law. The certifying statement may be worded as follows: I, (Name of Governor), Governor of the (State or Commonwealth of ______, do hereby certify that I am opposed to the enactment or enforcement of a law that conforms to 23 U.S.C. 159(a)(3)(A) and that the legislature of the (State or Commonwealth) of ______, has adopted a resolution expressing its opposition to such a law.</P>
            <P>(2) Until a State has been determined to be in compliance with the requirements of 23 U.S.C. 159(a)(3)(B) and this regulation, the certification shall include a copy of the resolution.</P>
            <P>(d) The Governor each year shall submit the original and three copies of the certification to the local FHWA Division Administrator. The FHWA Division Administrator shall retain the original and forward one copy each to the FHWA Regional Administrator, FHWA Chief Counsel, and the Director of the Office of Highway Safety.</P>
            <P>(e) Any changes to the original certification or supplemental information necessitated by the review of the certifications as they are forwarded, State legislative changes or changes in State enforcement activity (including failure to make progress in a plan previously submitted) shall be submitted in the same manner as the original.</P>
            <CITA>[57 FR 35999, Aug. 12, 1992. Redesignated and amended at 60 FR 50100, Sept. 28, 1995]</CITA>
          </SECTION>
          <SECTION>
            <SECTNO>§ 192.6</SECTNO>
            <SUBJECT>Period of availability of withheld funds.</SUBJECT>
            <P>(a) Funds withheld under § 1212.4 from apportionment to any State on or before September 30, 1995, will remain available for apportionment as follows:</P>
            <P>(1) If the funds would have been apportioned under 23 U.S.C. 104(b)(5)(A) but for this section, the funds will remain available until the end of the fiscal year for which the funds are authorized to be appropriated.</P>
            <P>(2) If the funds would have been apportioned under 23 U.S.C. 104(b)(5)(B) but for this section, the funds will remain available until the end of the second fiscal year following the fiscal year for which the funds are authorized to be appropriated.</P>
            <P>(3) If the funds would have been apportioned under 23 U.S.C. 104(b)(1) or 104(b)(3) but for this section, the funds will remain available until the end of the third fiscal year following the fiscal year for which the funds are authorized to be appropriated.</P>
            <P>(b) Funds withheld under § 1212.4 from apportionment to any State after September 30, 1995 will not be available for apportionment to the State.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 192.7</SECTNO>
            <SUBJECT>Apportionment of withheld funds after compliance.</SUBJECT>
            <P>Funds withheld under § 1212.4 from apportionment, which remain available for apportionment under § 1212.6(a), will be made available to any State that conforms to the requirements of § 1212.4 before the last day of the period of availability as defined in § 1212.6(a).</P>
            <CITA>[57 FR 35999, Aug. 12, 1992, as amended at 59 FR 39256, Aug. 2, 1994]</CITA>
          </SECTION>
          <SECTION>
            <PRTPAGE P="26"/>
            <SECTNO>§ 192.8</SECTNO>
            <SUBJECT>Period of availability of subsequently apportioned funds.</SUBJECT>
            <P>(a) Funds apportioned pursuant to § 1212.7 will remain available for expenditure as follows:</P>
            <P>(1) Funds originally apportioned under 23 U.S.C. 104(b)(5)(A) will remain available until the end of the fiscal year succeeding the fiscal year in which the funds are apportioned.</P>
            <P>(2) Funds originally apportioned under 23 U.S.C. 104(b)(1), 104(b)(2), 104(b)(5)(B), or 104(b)(6) will remain available until the end of the third fiscal year succeeding the fiscal year in which the funds are apportioned.</P>
            <P>(b) Sums apportioned to a State pursuant to § 1212.7 and not obligated at the end of the periods defined in § 1212.8(a), shall lapse or, in the case of funds apportioned under 23 U.S.C. 104(b)(5), shall lapse and be made available by the Secretary for projects in accordance with 23 U.S.C. 118(b).</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 192.9</SECTNO>
            <SUBJECT>Effect of noncompliance.</SUBJECT>
            <P>If a State has not met the requirements of 23 U.S.C. 159(a)(3) at the end of the period for which funds withheld under § 1212.4 are available for apportionment to a State under § 1212.6, then such funds shall lapse or, in the case of funds withheld from apportionment under 23 U.S.C. 104(b)(5), shall lapse and be made available by the Secretary for projects in accordance with 23 U.S.C. 118(b).</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 192.10</SECTNO>
            <SUBJECT>Procedures affecting States in noncompliance.</SUBJECT>
            <P>(a) Each fiscal year, each State determined to be in noncompliance with 23 U.S.C. 159, based on FHWA's preliminary review of its statutes, will be advised of the funds expected to be withheld under § 1212.4 from apportionment, as part of the advance notice of apportionments required under 23 U.S.C. 104(e), normally not later than ninety days prior to final apportionment.</P>
            <P>(b) If FHWA determines that the State is not in compliance with 23 U.S.C. 159 based on the agencies' preliminary review, the State may, within 30 days of its receipt of the advance notice of apportionments, submit documentation showing why it is in compliance. Documentation shall be submitted to the Federal Highway Administration, 1200 New Jersey Avenue, SE., Washington, DC 20590.</P>
            <P>(c) Each fiscal year, each State determined not to be in compliance with 23 U.S.C. 159(a)(3), based on FHWA's final determination, will receive notice of the funds being withheld under § 1212.4 from apportionment, as part of the certification of apportionments required under 23 U.S.C. 104(e), which normally occurs on October 1 of each fiscal year.</P>
            <CITA>[57 FR 35999, Aug. 12, 1992. Redesignated and amended at 60 FR 50100, Sept. 28, 1995; 74 FR 28442, June 16, 2009]</CITA>
          </SECTION>
        </PART>
      </SUBCHAP>
      <SUBCHAP TYPE="P">
        <PRTPAGE P="27"/>
        <HD SOURCE="HED">SUBCHAPTER C—CIVIL RIGHTS</HD>
        <PART>
          <EAR>Pt. 200</EAR>
          <HD SOURCE="HED">PART 200—TITLE VI PROGRAM AND RELATED STATUTES—IMPLEMENTATION AND REVIEW PROCEDURES</HD>
          <CONTENTS>
            <SECHD>Sec.</SECHD>
            <SECTNO>200.1</SECTNO>
            <SUBJECT>Purpose.</SUBJECT>
            <SECTNO>200.3</SECTNO>
            <SUBJECT>Application of this part.</SUBJECT>
            <SECTNO>200.5</SECTNO>
            <SUBJECT>Definitions.</SUBJECT>
            <SECTNO>200.7</SECTNO>
            <SUBJECT>FHWA Title VI policy.</SUBJECT>
            <SECTNO>200.9</SECTNO>
            <SUBJECT>State highway agency responsibilities.</SUBJECT>
            <SECTNO>200.11</SECTNO>
            <SUBJECT>Procedures for processing Title VI reviews.</SUBJECT>
          </CONTENTS>
          <AUTH>
            <HD SOURCE="HED">Authority:</HD>
            <P>Title VI of the Civil Rights Act of 1964, 42 U.S.C. 2000d to 2000d-4; Title VIII of the Civil Rights Act of 1968, 42 U.S.C. 3601-3619; 42 U.S.C. 4601 to 4655; 23 U.S.C. 109(h); 23 U.S.C. 324.</P>
          </AUTH>
          <SOURCE>
            <HD SOURCE="HED">Source:</HD>
            <P>41 FR 53982, Dec. 10, 1976, unless otherwise noted.</P>
          </SOURCE>
          <SECTION>
            <SECTNO>§ 200.1</SECTNO>
            <SUBJECT>Purpose.</SUBJECT>
            <P>To provide guidelines for: (a) Implementing the Federal Highway Administration (FHWA) Title VI compliance program under Title VI of the Civil Rights Act of 1964 and related civil rights laws and regulations, and (b) Conducting Title VI program compliance reviews relative to the Federal-aid highway program.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 200.3</SECTNO>
            <SUBJECT>Application of this part.</SUBJECT>
            <P>The provisions of this part are applicable to all elements of FHWA and provide requirements and guidelines for State highway agencies to implement the Title VI Program requirements. The related civil rights laws and regulations are listed under § 200.5(p) of this part. Title VI requirements for 23 U.S.C. 402 will be covered under a joint FHWA/NHTSA agreement.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 200.5</SECTNO>
            <SUBJECT>Definitions.</SUBJECT>
            <P>The following definitions shall apply for the purpose of this part:</P>
            <P>(a) <E T="03">Affirmative action.</E> A good faith effort to eliminate past and present discrimination in all federally assisted programs, and to ensure future nondiscriminatory practices.</P>
            <P>(b) <E T="03">Beneficiary.</E> Any person or group of persons (other than States) entitled to receive benefits, directly or indirectly, from any federally assisted program, <E T="03">i.e.</E>, relocatees, impacted citizens, communities, etc.</P>
            <P>(c) <E T="03">Citizen participation.</E> An open process in which the rights of the community to be informed, to provide comments to the Government and to receive a response from the Government are met through a full opportunity to be involved and to express needs and goals.</P>
            <P>(d) <E T="03">Compliance.</E> That satisfactory condition existing when a recipient has effectively implemented all of the Title VI requirements or can demonstrate that every good faith effort toward achieving this end has been made.</P>
            <P>(e) <E T="03">Deficiency status.</E> The interim period during which the recipient State has been notified of deficiencies, has not voluntarily complied with Title VI Program guidelines, but has not been declared in noncompliance by the Secretary of Transportation.</P>
            <P>(f) <E T="03">Discrimination.</E> That act (or action) whether intentional or unintentional, through which a person in the United States, solely because of race, color, religion, sex, or national origin, has been otherwise subjected to unequal treatment under any program or activity receiving financial assistance from the Federal Highway Administration under title 23 U.S.C.</P>
            <P>(g) <E T="03">Facility.</E> Includes all, or any part of, structures, equipment or other real or personal property, or interests therein, and <E T="03">the provision of facilities</E> includes the construction, expansion, renovation, remodeling, alternation or acquisition of facilities.</P>
            <P>(h) <E T="03">Federal assistance.</E> Includes:</P>
            <P>(1) Grants and loans of Federal funds,</P>
            <P>(2) The grant or donation of Federal property and interests in property,</P>
            <P>(3) The detail of Federal personnel,</P>

            <P>(4) The sale and lease of, and the permission to use (on other than a casual or transient basis), Federal property or any interest in such property without consideration or at a nominal consideration, or at a consideration which is reduced for the purpose of assisting the recipient, or in recognition of the public interest to be served by such sale or lease to the recipient, and<PRTPAGE P="28"/>
            </P>
            <P>(5) Any Federal agreement, arrangement, or other contract which has, as one of its purposes, the provision of assistance.</P>
            <P>(i) <E T="03">Noncompliance.</E> A recipient has failed to meet prescribed requirements and has shown an apparent lack of good faith effort in implementing all of the Title VI requirements.</P>
            <P>(j) <E T="03">Persons.</E> Where designation of persons by race, color, or national origin is required, the following designations ordinarily may be used: “White not of Hispanic origin”, “Black not of Hispanic origin”, “Hispanic”, “Asian or Pacific Islander”, “American Indian or Alaskan Native.” Additional subcategories based on national origin or primary language spoken may be used, where appropriate, on either a national or a regional basis.</P>
            <P>(k) <E T="03">Program.</E> Includes any highway, project, or activity for the provision of services, financial aid, or other benefits to individuals. This includes education or training, work opportunities, health, welfare, rehabilitation, housing, or other services, whether provided directly by the recipient of Federal financial assistance or provided by others through contracts or other arrangements with the recipient.</P>
            <P>(l) <E T="03">State highway agency.</E> That department, commission, board, or official of any State charged by its laws with the responsibility for highway construction. The term <E T="03">State</E> would be considered equivalent to <E T="03">State highway agency</E> if the context so implies.</P>
            <P>(m) <E T="03">Program area officials.</E> The officials in FHWA who are responsible for carrying out technical program responsibilities.</P>
            <P>(n) <E T="03">Recipient.</E> Any State, territory, possession, the District of Columbia, Puerto Rico, or any political subdivision, or instrumentality thereof, or any public or private agency, institution, or organization, or other entity, or any individual, in any State, territory, possession, the District of Columbia, or Puerto Rico, to whom Federal assistance is extended, either directly or through another recipient, for any program. Recipient includes any successor, assignee, or transferee thereof. The term <E T="03">recipient</E> does not include any ultimate beneficiary under any such program.</P>
            <P>(o) <E T="03">Secretary.</E> The Secretary of Transportation as set forth in 49 CFR 21.17(g)(3) or the Federal Highway Administrator to whom the Secretary has delegated his authority in specific cases.</P>
            <P>(p) <E T="03">Title VI Program.</E> The system of requirements developed to implement Title VI of the Civil Rights Act of 1964. References in this part to Title VI requirements and regulations shall not be limited to only Title VI of the Civil Rights Act of 1964. Where appropriate, this term also refers to the civil rights provisions of other Federal statutes to the extent that they prohibit discrimination on the grounds of race, color, sex, or national origin in programs receiving Federal financial assistance of the type subject to Title VI itself. These Federal statutes are:</P>
            <P>(1) Title VI of the Civil Rights Act of 1964, 42 U.S.C. 2000d-d4 (49 CFR part 21; the standard DOT Title VI assurances signed by each State pursuant to DOT Order 1050.2; Executive Order 11764; 28 CFR 50.3);</P>
            <P>(2) Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 (42 U.S.C. 4601-4655) (49 CFR part 25; Pub. L. 91-646);</P>
            <P>(3) Title VIII of the Civil Rights Act of 1968, amended 1974 (42 U.S.C. 3601- 3619);</P>
            <P>(4) 23 U.S.C. 109(h);</P>
            <P>(5) 23 U.S.C. 324;</P>
            <P>(6) Subsequent Federal-Aid Highway Acts and related statutes.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 200.7</SECTNO>
            <SUBJECT>FHWA Title VI policy.</SUBJECT>
            <P>It is the policy of the FHWA to ensure compliance with Title VI of the Civil Rights Act of 1964; 49 CFR part 21; and related statutes and regulations.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 200.9</SECTNO>
            <SUBJECT>State highway agency responsibilities.</SUBJECT>
            <P>(a) State assurances in accordance with Title VI of the Civil Rights Act of 1964.</P>

            <P>(1) Title 49, CFR part 21 (Department of Transportation Regulations for the implementation of Title VI of the Civil Rights Act of 1964) requires assurances from States that no person in the United States shall, on the grounds of race, color, or national origin, be excluded from participation in, be denied <PRTPAGE P="29"/>the benefits of, or be otherwise subjected to discrimination under any program or activity for which the recipient receives Federal assistance from the Department of Transportation, including the Federal Highway Administration.</P>
            <P>(2) Section 162a of the Federal-Aid Highway Act of 1973 (section 324, title 23 U.S.C.) requires that there be no discrimination on the ground of sex. The FHWA considers all assurances heretofore received to have been amended to include a prohibition against discrimination on the ground of sex. These assurances were signed by the 50 States, the District of Columbia, Puerto Rico, the Virgin Islands, Guam, and American Samoa. The State highway agency shall submit a certification to the FHWA indicating that the requirements of section 162a of the Federal-Aid Highway Act of 1973 have been added to its assurances.</P>
            <P>(3) The State highway agency shall take affirmative action to correct any deficiencies found by the FHWA within a reasonable time period, not to exceed 90 days, in order to implement Title VI compliance in accordance with State-signed assurances and required guidelines. The head of the State highway agency shall be held responsible for implementing Title VI requirements.</P>
            <P>(4) The State program area officials and Title VI Specialist shall conduct annual reviews of all pertinent program areas to determine the effectiveness of program area activities at all levels.</P>
            <P>(b) <E T="03">State actions.</E> (1) Establish a civil rights unit and designate a coordinator who has a responsible position in the organization and easy access to the head of the State highway agency. This unit shall contain a Title VI Equal Employment Opportunity Coordinator or a Title VI Specialist, who shall be responsible for initiating and monitoring Title VI activities and preparing required reports.</P>
            <P>(2) Adequately staff the civil rights unit to effectively implement the State civil rights requirements.</P>
            <P>(3) Develop procedures for prompt processing and disposition of Title VI and Title VIII complaints received directly by the State and not by FHWA. Complaints shall be investigated by State civil rights personnel trained in compliance investigations. Identify each complainant by race, color, sex, or national origin; the recipient; the nature of the complaint; the dates the complaint was filed and the investigation completed; the disposition; the date of the disposition; and other pertinent information. Each recipient (State) processing Title VI complaints shall be required to maintain a similar log. A copy of the complaint, together with a copy of the State's report of investigation, shall be forwarded to the FHWA division office within 60 days of the date the complaint was received by the State.</P>

            <P>(4) Develop procedures for the collection of statistical data (race, color, religion, sex, and national origin) of participants in, and beneficiaries of State highway programs, <E T="03">i.e.</E>, relocatees, impacted citizens and affected communities.</P>
            <P>(5) Develop a program to conduct Title VI reviews of program areas.</P>
            <P>(6) Conduct annual reviews of special emphasis program areas to determine the effectiveness or program area activities at all levels.</P>
            <P>(7) Conduct Title VI reviews of cities, counties, consultant contractors, suppliers, universities, colleges, planning agencies, and other recipients of Federal-aid highway funds.</P>
            <P>(8) Review State program directives in coordination with State program officials and, where applicable, include Title VI and related requirements.</P>
            <P>(9) The State highway agency Title VI designee shall be responsible for conducting training programs on Title VI and related statutes for State program and civil rights officials.</P>
            <P>(10) Prepare a yearly report of Title VI accomplishments for the past year and goals for the next year.</P>
            <P>(11) Beginning October 1, 1976, each State highway agency shall annually submit an updated Title VI implementing plan to the Regional Federal Highway Administrator for approval or disapproval.</P>

            <P>(12) Develop Title VI information for dissemination to the general public and, where appropriate, in languages other than English.<PRTPAGE P="30"/>
            </P>

            <P>(13) Establishing procedures for pregrant and postgrant approval reviews of State programs and applicants for compliance with Title VI requirements; <E T="03">i.e.</E>, highway location, design and relocation, and persons seeking contracts with the State.</P>
            <P>(14) Establish procedures to identify and eliminate discrimination when found to exist.</P>
            <P>(15) Establishing procedures for promptly resolving deficiency status and reducing to writing the remedial action agreed to be necessary, all within a period not to exceed 90 days.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 200.11</SECTNO>
            <SUBJECT>Procedures for processing Title VI reviews.</SUBJECT>
            <P>(a) If the regional Title VI review report contains deficiencies and recommended actions, the report shall be forwarded by the Regional Federal Highway Administrator to the Division Administrator, who will forward it with a cover letter to the State highway agency for corrective action.</P>
            <P>(b) The division office, in coordination with the Regional Civil Rights Officer, shall schedule a meeting with the recipient, to be held not later than 30 days from receipt of the deficiency report.</P>
            <P>(c) Recipients placed in a deficiency status shall be given a reasonable time, not to exceed 90 days after receipt of the deficiency letter, to voluntarily correct deficiencies.</P>
            <P>(d) The Division Administrator shall seek the cooperation of the recipient in correcting deficiencies found during the review. The FHWA officials shall also provide the technical assistance and guidance needed to aid the recipient to comply voluntarily.</P>
            <P>(e) When a recipient fails or refuses to voluntarily comply with requirements within the time frame allotted, the Division Administrator shall submit to the Regional Administrator two copies of the case file and a recommendation that the State be found in noncompliance.</P>
            <P>(f) The Office of Civil Rights shall review the case file for a determination of concurrence or noncurrence with a recommendation to the Federal Highway Administrator. Should the Federal Highway Administrator concur with the recommendation, the file is referred to the Department of Transportation, Office of the Secretary, for appropriate action in accordance with 49 CFR.</P>
          </SECTION>
        </PART>
        <PART>
          <EAR>Pt. 230</EAR>
          <HD SOURCE="HED">PART 230—EXTERNAL PROGRAMS</HD>
          <CONTENTS>
            <SUBPART>
              <HD SOURCE="HED">Subpart A—Equal Employment Opportunity on Federal and Federal-Aid Construction Contracts (Including Supportive Services)</HD>
              <SECHD>Sec.</SECHD>
              <SECTNO>230.101</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <SECTNO>230.103</SECTNO>
              <SUBJECT>Definitions.</SUBJECT>
              <SECTNO>230.105</SECTNO>
              <SUBJECT>Applicability.</SUBJECT>
              <SECTNO>230.107</SECTNO>
              <SUBJECT>Policy.</SUBJECT>
              <SECTNO>230.109</SECTNO>
              <SUBJECT>Implementation of specific Equal Employment Opportunity requirements.</SUBJECT>
              <SECTNO>230.111</SECTNO>
              <SUBJECT>Implementation of special requirements for the provision of on-the-job training.</SUBJECT>
              <SECTNO>230.113</SECTNO>
              <SUBJECT>Implementation of supportive services.</SUBJECT>
              <SECTNO>230.115</SECTNO>
              <SUBJECT>Special contract requirements for “Hometown” or “Imposed” Plan areas.</SUBJECT>
              <SECTNO>230.117</SECTNO>
              <SUBJECT>Reimbursement procedures (Federal-aid highway construction projects only).</SUBJECT>
              <SECTNO>230.119</SECTNO>
              <SUBJECT>Monitoring of supportive services.</SUBJECT>
              <SECTNO>230.121</SECTNO>
              <SUBJECT>Reports.</SUBJECT>
              <APP>Appendix A to Subpart A of Part 230—Special Provisions</APP>
              <APP>Appendix B to Subpart A of Part 230—Training Special Provisions</APP>
              <APP>Appendix C to Subpart A of Part 230—Federal-Aid Highway Contractors Annual EEO Report (Form PR-1391)</APP>
              <APP>Appendix D to Subpart A of Part 230—Federal-Aid Highway Construction Summary of Employment Data (Form PR-1392)</APP>
              <APP>Appendixes E-F to Subpart A of Part 230 [Reserved]</APP>
              <APP>Appendix G to Subpart A of Part 230—Special Reporting Requirements for “Hometown” or “Imposed” Plan Areas</APP>
            </SUBPART>
            <SUBPART>
              <HD SOURCE="HED">Subpart B—Supportive Services for Minority, Disadvantaged, and Women Business Enterprises</HD>
              <SECTNO>230.201</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <SECTNO>230.202</SECTNO>
              <SUBJECT>Definitions.</SUBJECT>
              <SECTNO>230.203</SECTNO>
              <SUBJECT>Policy.</SUBJECT>
              <SECTNO>230.204</SECTNO>
              <SUBJECT>Implementation of supportive services.</SUBJECT>
              <SECTNO>230.205</SECTNO>
              <SUBJECT>Supportive services funds obligation.</SUBJECT>
              <SECTNO>230.206</SECTNO>
              <SUBJECT>Monitoring supportive services.</SUBJECT>
              <SECTNO>230.207</SECTNO>
              <SUBJECT>Sources of assistance.</SUBJECT>
            </SUBPART>
            <SUBPART>
              <HD SOURCE="HED">Subpart C—State Highway Agency Equal Employment Opportunity Programs</HD>
              <SECTNO>230.301</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <SECTNO>230.303</SECTNO>
              <SUBJECT>Applicability.<PRTPAGE P="31"/>
              </SUBJECT>
              <SECTNO>230.305</SECTNO>
              <SUBJECT>Definitions.</SUBJECT>
              <SECTNO>230.307</SECTNO>
              <SUBJECT>Policy.</SUBJECT>
              <SECTNO>230.309</SECTNO>
              <SUBJECT>Program format.</SUBJECT>
              <SECTNO>230.311</SECTNO>
              <SUBJECT>State responsibilities.</SUBJECT>
              <SECTNO>230.313</SECTNO>
              <SUBJECT>Approval procedure.</SUBJECT>
              <APP>Appendix A to Subpart C of Part 230—State Highway Agency Equal Employment Opportunity Programs</APP>
            </SUBPART>
            <SUBPART>
              <HD SOURCE="HED">Subpart D—Construction Contract Equal Opportunity Compliance Procedures</HD>
              <SECTNO>230.401</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <SECTNO>230.403</SECTNO>
              <SUBJECT>Applicability.</SUBJECT>
              <SECTNO>230.405</SECTNO>
              <SUBJECT>Administrative responsibilities.</SUBJECT>
              <SECTNO>230.407</SECTNO>
              <SUBJECT>Definitions.</SUBJECT>
              <SECTNO>230.409</SECTNO>
              <SUBJECT>Contract compliance review procedures.</SUBJECT>
              <SECTNO>230.411</SECTNO>
              <SUBJECT>Guidance for conducting reviews.</SUBJECT>
              <SECTNO>230.413</SECTNO>
              <SUBJECT>Review reports.</SUBJECT>
              <SECTNO>230.415</SECTNO>
              <SUBJECT>Consolidated compliance reviews.</SUBJECT>
              <APP>Appendix A to Subpart D of Part 230—Sample Show Cause Notice</APP>
              <APP>Appendix B to Subpart D of Part 230—Sample Corrective Action Plan</APP>
              <APP>Appendix C to Subpart D of Part 230—Sample Show Cause Rescission</APP>
              <APP>Appendix D to Subpart D of Part 230—Equal Opportunity Compliance Review Process Flow Chart</APP>
            </SUBPART>
          </CONTENTS>
          <AUTH>
            <HD SOURCE="HED">Authority:</HD>
            <P>23 U.S.C. 101, 140, and 315; 42 U.S.C. 2000d <E T="03">et seq.</E>; 49 CFR 1.48 and 60-1.</P>
          </AUTH>
          <SOURCE>
            <HD SOURCE="HED">Source:</HD>
            <P>40 FR 28053, July 3, 1975, unless otherwise noted.</P>
          </SOURCE>
          <SUBPART>
            <HD SOURCE="HED">Subpart A—Equal Employment Opportunity on Federal and Federal-Aid Construction Contracts (Including Supportive Services)</HD>
            <SECTION>
              <SECTNO>§ 230.101</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <P>The purpose of the regulations in this subpart is to prescribe the policies, procedures, and guides relative to the implementation of an equal employment opportunity program on Federal and Federal-aid highway construction contracts, except for those contracts awarded under 23 U.S.C. 117, and to the preparation and submission of reports pursuant thereto.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 230.103</SECTNO>
              <SUBJECT>Definitions.</SUBJECT>
              <P>For purposes of this subpart—</P>
              <P>
                <E T="03">Administrator</E> means the Federal Highway Administrator.</P>
              <P>
                <E T="03">Areawide Plan</E> means an affirmative action plan to increase minority utilization of crafts in a specified geographical area pursuant to Executive Order 11246, and taking the form of either a “Hometown” or an “Imposed” plan.</P>
              <P>
                <E T="03">Bid conditions</E> means contract requirements which have been issued by OFCC for purposes of implementing a Hometown Plan.</P>
              <P>
                <E T="03">Division Administrator</E> means the chief Federal Highway Administration (FHWA) official assigned to conduct FHWA business in a particular State, the District of Columbia, or the Commonwealth of Puerto Rico.</P>
              <P>
                <E T="03">Division Equal Opportunity Officer</E> means an individual with staff level responsibilities and necessary authority by which to operate as an Equal Opportunity Officer in a Division office. Normally the Equal Opportunity Officer will be a full-time civil rights specialist serving as staff assistant to the Division Administrator.</P>
              <P>
                <E T="03">Hometown Plan</E> means a voluntary areawide plan which was developed by representatives of affected groups (usually labor unions, minority organizations, and contractors), and subsequently approved by the Office of Federal Contract Compliance (OFCC), for purposes of implementing the equal employment opportunity requirements pursuant to Executive Order 11246, as amended.</P>
              <P>
                <E T="03">Imposed Plan</E> means an affirmative action requirement for a specified geographical area made mandatory by OFCC and, in some areas, by the courts.</P>
              <P>
                <E T="03">Journeyman</E> means a person who is capable of performing all the duties within a given job classification or craft.</P>
              <P>
                <E T="03">State highway agency</E> means that department, commission, board, or official of any State charged by its laws with the responsibility for highway construction. The term <E T="03">State</E> should be considered equivalent to <E T="03">State highway agency.</E>
              </P>
              <P>
                <E T="03">Suggested minimum annual training goals</E> means goals which have been assigned to each State highway agency annually for the purpose of specifying training positions on selected Federal-aid highway construction projects.</P>
              <P>
                <E T="03">Supportive services</E> means those services provided in connection with approved on-the-job training programs for highway construction workers and <PRTPAGE P="32"/>highway contractors which are designed to increase the overall effectiveness of training programs through the performance of functions determined to be necessary in connection with such programs, but which are not generally considered as comprising part of actual on-the-job craft training.</P>
              <P>
                <E T="03">Trainee</E> means a person who received on-the-job training, whether through an apprenticeship program or other programs approved or accepted by the FHWA.</P>
              <CITA>[40 FR 28053, July 3, 1975, as amended at 41 FR 3080, Jan. 21, 1976]</CITA>
            </SECTION>
            <SECTION>
              <SECTNO>§ 230.105</SECTNO>
              <SUBJECT>Applicability.</SUBJECT>
              <P>(a) <E T="03">Federal-aid highway construction projects.</E> This subpart applies to all Federal-aid highway construction projects and to Appalachian highway construction projects and other State supervised cooperative highway construction projects except:</P>
              <P>(1) Federal-aided highway construction projects being constructed pursuant to 23 U.S.C. 117; and</P>
              <P>(2) Those projects located in areas where the Office of Federal Contract Compliance has implemented an “Imposed” or a “Hometown” Plan, except for those requirements pertaining to specific provisions involving on-the-job training and those provisions pertaining to supportive services and reporting requirements.</P>
              <P>(b) <E T="03">Direct Federal highway construction projects.</E> This subpart applies to all direct Federal highway construction projects except:</P>
              <P>(1) For those provisions relating to the special requirements for the provision of supportive services; and</P>
              <P>(2) For those provisions relating to implementation of specific equal employment opportunity requirements in areas where the Office of Federal Contract Compliance has implemented an “Imposed” or “Hometown” plan.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 230.107</SECTNO>
              <SUBJECT>Policy.</SUBJECT>
              <P>(a) <E T="03">Direct Federal and Federal-aid highway construction projects.</E> It is the policy of the FHWA to require that all direct Federal and Federal-aid highway construction contracts include the same specific equal employment opportunity requirements. It is also the policy to require that all direct Federal and Federal-aid highway construction subcontracts of $10,000 or more (not including contracts for supplying materials) include these same requirements.</P>
              <P>(b) <E T="03">Federal-aid highway construction projects.</E> It is the policy of the FHWA to require full utilization of all available training and skill-improvement opportunities to assure the increased participation of minority groups and disadvantaged persons and women in all phases of the highway construction industry. Moreover, it is the policy of the Federal Highway Administration to encourage the provision of supportive services which will increase the effectiveness of approved on-the-job training programs conducted in connection with Federal-aid highway construction projects.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 230.109</SECTNO>
              <SUBJECT>Implementation of specific Equal Employment Opportunity requirements.</SUBJECT>
              <P>(a) <E T="03">Federal-aid highway construction projects.</E> The special provisions set forth in appendix A shall be included in the advertised bidding proposal and made part of the contract for each contract and each covered Federal-aid highway construction subcontract.</P>
              <P>(b) <E T="03">Direct Federal highway construction projects.</E> Advertising, award and contract administration procedures for direct Federal highway construction contracts shall be as set forth in Federal Acquisition Regulations (48 CFR, chapter 1, section 22.803(c)). In order to obtain information required by 48 CFR, chapter 1, § 22.804-2(c), the following requirement shall be included at the end of the bid schedule in the proposal and contract assembly:
              </P>
              <EXTRACT>

                <P>I expect to employ the following firms as subcontractors on this project: (Naming subcontractors at this time does not constitute a binding commitment on the bidder to retain such subcontractors, nor will failure to enter names affect the contract award):
                </P>
                <FP SOURCE="FP-DASH">Name</FP>
                <FP SOURCE="FP-DASH">Address</FP>
                <FP SOURCE="FP-DASH">Name</FP>
                <FP SOURCE="FP-DASH">Address</FP>
              </EXTRACT>
              <CITA>[40 FR 28053, July 3, 1975, as amended at 51 FR 22800, June 23, 1986]</CITA>
            </SECTION>
            <SECTION>
              <PRTPAGE P="33"/>
              <SECTNO>§ 230.111</SECTNO>
              <SUBJECT>Implementation of special requirements for the provision of on-the-job training.</SUBJECT>
              <P>(a) The State highway agency shall determine which Federal-aid highway construction contracts shall include the “Training Special Provisions” (appendix B) and the minimum number of trainees to be specified therein after giving appropriate consideration to the guidelines set forth in § 230.111(c). The “Training Special Provisions” shall supersede section 7(b) of the Special Provisions (appendix A) entitled “Specific Equal Employment Opportunity Responsibilities.” Minor wording revisions will be required to the “Training Special Provisions” in areas having “Hometown” or “Imposed Plan” requirements.</P>
              <P>(b) The Washington Headquarters shall establish and publish annually suggested minimum training goals. These goals will be based on the Federal-aid apportioned amounts and the minority population. A State will have achieved its goal if the total number of training slots on selected federally aided highway construction contracts which have been awarded during each 12-month period equals or exceeds the State's suggested minimum annual goal. In the event a State highway agency does not attain its goal during a calendar year, the State highway agency at the end of the calendar year shall inform the Administrator of the reasons for its inability to meet the suggested minimum number of training slots and the steps to be taken to achieve the goal during the next calendar year. The information is to be submitted not later than 30 days from the end of the calendar year and should be factual, and should not only indicate the situations occurring during the year but show the project conditions at least through the coming year. The final determination will be made on what training goals are considered to be realistic based on the information submitted by a State.</P>
              <P>(c) The following guidelines shall be utilized by the State highway agency in selecting projects and determining the number of trainees to be provided training therein:</P>
              <P>(1) Availability of minorities, women, and disadvantaged for training.</P>
              <P>(2) The potential for effective training.</P>
              <P>(3) Duration of the contract.</P>
              <P>(4) Dollar value of the contract.</P>
              <P>(5) Total normal work force that the average bidder could be expected to use.</P>
              <P>(6) Geographic location.</P>
              <P>(7) Type of work.</P>
              <P>(8) The need for additional journeymen in the area.</P>
              <P>(9) Recognition of the suggested minimum goal for the State.</P>
              <P>(10) A satisfactory ratio of trainees to journeymen expected to be on the contractor's work force during normal operations (considered to fall between 1:10 and 1:4).</P>
              <P>(d) Training programs which are established shall be approved only if they meet the standards set forth in appendix B with regard to:</P>
              <P>(1) The primary objectives of training and upgrading minority group workers, women and disadvantaged persons.</P>
              <P>(2) The development of full journeymen.</P>
              <P>(3) The minimum length and type of training.</P>
              <P>(4) The minimum wages of trainees.</P>
              <P>(5) Trainees certifications.</P>
              <P>(6) Keeping records and furnishing reports.</P>
              <P>(e)(1) Training programs considered by a State highway agency to meet the standards under this directive shall be submitted to the FHWA division Administrator with a recommendation for approval.</P>
              <P>(2) Employment pursuant to training programs approved by the FHWA division Administrator will be exempt from the minimum wage rate provisions of section 113 of title 23 U.S.C. Approval, however, shall not be given to training programs which provide for employment of trainees at wages less than those required by the Special Training Provisions. (Appendix B.)</P>

              <P>(f)(1) Apprenticeship programs approved by the U.S. Department of Labor as of the date of proposed use by a Federal-aid highway contractor or subcontractor need not be formally approved by the State highway agency or the FHWA division Administrator. Such programs, including their minimum wage provisions, are acceptable for use, provided they are administered <PRTPAGE P="34"/>in a manner reasonably calculated to meet the equal employment opportunity obligations of the contractor.</P>
              <P>(2) Other training programs approved by the U.S. Department of Labor as of the date of proposed use by a Federal-aid highway contractor or subcontractor are also acceptable for use without the formal approval of the State highway agency or the division Administrator provided:</P>
              <P>(i) The U.S. Department of Labor has clearly approved the program aspects relating to equal employment opportunity and the payment of trainee wage rates in lieu of prevailing wage rates.</P>
              <P>(ii) They are reasonably calculated to qualify the average trainees for journeyman status in the classification concerned by the end of the training period.</P>
              <P>(iii) They are administered in a manner calculated to meet the equal employment obligations of the contractors.</P>
              <P>(g) The State highway agencies have the option of permitting Federal-aid highway construction contractors to bid on training to be given under this directive. The following procedures are to be utilized by those State highway agencies that elect to provide a bid item for training:</P>
              <P>(1) The number of training positions shall continue to be specified in the Special Training Provisions. Furthermore, this number should be converted into an estimated number of hours of training which is to be used in arriving at the total bid price for the training item. Increases and decreases from the estimated amounts would be handled as overruns or underruns;</P>
              <P>(2) A section concerning the method of payment should be included in the Special Training Provisions. Some offsite training is permissible as long as the training is an integral part of an approved training program and does not comprise a substantial part of the overall training. Furthermore, the trainee must be concurrently employed on a federally aided highway construction project subject to the Special Training Provisions attached to this directive. Reimbursement for offsite training may only be made to the contractor where he does one or more of the following: Contributes to the cost of the training, provides the instruction to the trainee, or pays the trainee's wages during the offsite training period;</P>
              <P>(3) A State highway agency may modify the special provisions to specify the numbers to be trained in specific job classifications;</P>
              <P>(4) A State highway agency can specify training standards provided any prospective bidder can use them, the training standards are made known in the advertised specifications, and such standards are found acceptable by FHWA.</P>
              <CITA>[40 FR 28053, July 3, 1975; 40 FR 57358, Dec. 9, 1975, as amended at 41 FR 3080, Jan. 21, 1976]</CITA>
            </SECTION>
            <SECTION>
              <SECTNO>§ 230.113</SECTNO>
              <SUBJECT>Implementation of supportive services.</SUBJECT>
              <P>(a) The State highway agency shall establish procedures, subject to the availability of funds under 23 U.S.C. 140(b), for the provision of supportive services in support of training programs approved under this directive. Funds made available to implement this paragraph shall not be used to finance the training of State highway agency employees or to provide services in support of such training. State highway agencies are not required to match funds allocated to them under this section.</P>
              <P>(b) In determining the types of supportive services to be provided which will increase the effectiveness of approved training programs. State highway agencies shall give preference to the following types of services in the order listed:</P>
              <P>(1) Services related to recruiting, counseling, transportation, physical examinations, remedial training, with special emphasis upon increasing training opportunities for members of minority groups and women;</P>
              <P>(2) Services in connection with the administration of on-the-job training programs being sponsored by individual or groups of contractors and/or minority groups and women's groups;</P>
              <P>(3) Services designed to develop the capabilities of prospective trainees for undertaking on-the-job training;</P>

              <P>(4) Services in connection with providing a continuation of training during periods of seasonal shutdown;<PRTPAGE P="35"/>
              </P>
              <P>(5) Followup services to ascertain outcome of training being provided.</P>
              <P>(c) State highway agencies which desire to provide or obtain supportive services other than those listed above shall submit their proposals to the Federal Highway Administration for approval. The proposal, together with recommendations of the division and regional offices shall be submitted to the Administrator for appropriate action.</P>
              <P>(d) When the State highway agency provides supportive services by contract, formal advertising is not required by the FHWA, however, the State highway agency shall solicit proposals from such qualified sources as will assure the competitive nature of the procurement. The evaluation of proposals by the State highway agency must include consideration of the proposer's ability to effect a productive relationship with contractors, unions (if appropriate), minority and women groups, minority and women trainees, and other persons or organizations whose cooperation and assistance will contribute to the successful performance of the contract work.</P>
              <P>(e) In the selection of contractors to provide supportive services, State highway agencies shall make conscientious efforts to search out and utilize the services of qualified minority or women organizations, or minority or women business enterprises.</P>
              <P>(f) As a minimum, State highway agency contracts to obtain supportive services shall include the following provisions:</P>
              <P>(1) A statement that a primary purpose of the supportive services is to increase the effectiveness of approved on-the-job training programs, particularly their effectiveness in providing meaningful training opportunities for minorities, women, and the disadvantaged on Federal-aid highway projects;</P>
              <P>(2) A clear and complete statement of the services to be provided under the contract, such as services to construction contractors, subcontractors, and trainees, for recruiting, counseling, remedial educational training, assistance in the acquisition of tools, special equipment and transportation, followup procedures, etc.;</P>
              <P>(3) The nondiscrimination provisions required by Title VI of the Civil Rights Act of 1964 as set forth in FHWA Form PR-1273, and a statement of nondiscrimination in employment because of race, color, religion, national origin or sex;</P>
              <P>(4) The establishment of a definite perriod of contract performance together with, if appropriate, a schedule stating when specific supportive services are to be provided;</P>
              <P>(5) Reporting requirements pursuant to which the State highway agency will receive monthly or quarterly reports containing sufficient statistical data and narrative content to enable evaluation of both progress and problems;</P>
              <P>(6) A requirement that the contractor keep track of trainees receiving training on Federal-aid highway construction projects for up to 6 months during periods when their training is interrupted. Such contracts shall also require the contractor to conduct a 6 month followup review of the employment status of each graduate who completes an on-the-job training program on a Federal-aid highway construction project subsequent to the effective date of the contract for supportive services.</P>
              <P>(7) The basis of payment;</P>
              <P>(8) An estimated schedule for expenditures;</P>
              <P>(9) The right of access to contractor and subcontractor records and the right to audit shall be granted to authorize State highway agency and FHWA officials;</P>
              <P>(10) Noncollusion certification;</P>
              <P>(11) A requirement that the contractor provide all information necessary to support progress payments if such are provided for in the contract;</P>
              <P>(12) A termination clause.</P>
              <P>(g) The State highway agency is to furnish copies of the reports received under paragraph (b)(5) of this section, to the division office.</P>
              <CITA>[40 FR 28053, July 3, 1975, as amended at 41 FR 3080, Jan. 21, 1976]</CITA>
            </SECTION>
            <SECTION>
              <SECTNO>§ 230.115</SECTNO>
              <SUBJECT>Special contract requirements for “Hometown” or “Imposed” Plan areas.</SUBJECT>

              <P>Direct Federal and Federal-aid contracts to be performed in “Hometown” <PRTPAGE P="36"/>or “Imposed” Plan areas will incorporate the special provision set forth in appendix G.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 230.117</SECTNO>
              <SUBJECT>Reimbursement procedures (Federal-aid highway construction projects only).</SUBJECT>
              <P>(a) <E T="03">On-the-job special training provisions.</E> State highway agencies will be reimbursed on the same pro-rata basis as the construction costs of the Federal-aid project.</P>
              <P>(b) <E T="03">Supportive services.</E> (1) The State highway agency must keep a separate account of supportive services funds since they cannot be interchanged with regular Federal-aid funds. In addition, these funds may not be expended in a manner that would provide for duplicate payment of Federal or Federal-aid funds for the same service.</P>
              <P>(2) Where a State highway agency does not obligate all its funds within the time specified in the particular year's allocation directive, the funds shall revert to the FHWA Headquarters Office to be made available for use by other State highway agencies, taking into consideration each State's need for and ability to use such funds.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 230.119</SECTNO>
              <SUBJECT>Monitoring of supportive services.</SUBJECT>
              <P>Supportive services procured by a State highway agency shall be monitored by both the State highway agency and the division office.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 230.121</SECTNO>
              <SUBJECT>Reports.</SUBJECT>
              <P>(a) Employment reports on Federal-aid highway construction contracts not subject to “Hometown” or “Imposed” plan requirements.</P>
              <P>(1) Paragraph 10c of the special provisions (appendix A) sets forth specific reporting requirements. FHWA Form PR-1391, Federal-Aid Highway Construction Contractors Annual EEO Report, (appendix C) and FHWA Form PR 1392, Federal-Aid Highway Construction Summary of Employment Data (including minority breakdown) for all Federal-Aid Highway Projects for month ending July 31st, 19—, (appendix D) are to be used to fulfill these reporting requirements.</P>
              <P>(2) Form PR 1391 is to be completed by each contractor and each subcontractor subject to this part for every month of July during which work is performed, and submitted to the State highway agency. A separate report is to be completed for each covered contract or subcontract. The employment data entered should reflect the work force on board during all or any part of the last payroll period preceding the end of the month. The State highway agency is to forward a single copy of each report to the FHWA division office.</P>
              <P>(3) Form PR 1392 is to be completed by the State highway agencies, summarizing the reports on PR 1391 for the month of July received from all active contractors and subcontractors. Three (3) copies of completed Forms PR 1392 are to be forwarded to the division office.</P>
              <P>(b) Employment reports on direct Federal highway construction contracts not subject to “Hometown” or “Imposed” plan requirements. Forms PR 1391 (appendix C) and PR 1392 (appendix D) shall be used for reporting purposes as prescribed in § 230.121(a).</P>
              <P>(c) Employment reports on direct Federal and Federal-aid highway construction contracts subject to “Hometown” or “Imposed” plan requirements.</P>
              <P>(1) Reporting requirements for direct Federal and Federal-aid highway construction projects located in areas where “Hometown” or “Imposed” plans are in effect shall be in accordance with those issued by the U.S. Department of Labor, Office of Federal Contract Compliance.</P>
              <P>(2) In order that we may comply with the U.S. Senate Committee on Public Works' request that the Federal Highway Administration submit a report annually on the status of the equal employment opportunity program, Form PR 1391 is to be completed annually by each contractor and each subcontractor holding contracts or subcontracts exceeding $10,000 except as otherwise provided for under 23 U.S.C. 117. The employment data entered should reflect the work force on board during all or any part of the last payroll period preceding the end of the month of July.</P>
              <P>(d) [Reserved]</P>

              <P>(e) Reports on supportive services contracts. The State highway agency is <PRTPAGE P="37"/>to furnish copies of the reports received from supportive services contractors to the FHWA division office which will furnish a copy to the regional office.</P>
              <CITA>[40 FR 28053, July 3, 1975, as amended at 43 FR 19386, May 5, 1978; 61 FR 14616, Apr. 3, 1996]</CITA>
            </SECTION>
            <APPENDIX>
              <EAR>Pt. 230, Subpt. A, App. A</EAR>
              <HD SOURCE="HED">Appendix A to Subpart A of Part 230—Special Provisions</HD>
              <HD SOURCE="HD1">specific equal employment opportunity responsibilities</HD>
              <P>1. <E T="03">General.</E> a. Equal employment opportunity requirements not to discriminate and to take affirmative action to assure equal employment opportunity as required by Executive Order 11246 and Executive Order 11375 are set forth in Required Contract, Provisions (Form PR-1273 or 1316, as appropriate) and these Special Provisions which are imposed pursuant to section 140 of title 23 U.S.C., as established by section 22 of the Federal-Aid Highway Act of 1968. The requirements set forth in these Special Provisions shall constitute the specific affirmative action requirements for project activities under this contract and supplement the equal employment opportunity requirements set forth in the Required Contract Provisions.</P>
              <P>b. The contractor will work with the State highway agencies and the Federal Government in carrying out equal employment opportunity obligations and in their review of his/her activities under the contract.</P>
              <P>c. The contractor and all his/her subcontractors holding subcontracts not including material suppliers, of $10,000 or more, will comply with the following minimum specific requirement activities of equal employment opportunity: (The equal employment opportunity requirements of Executive Order 11246, as set forth in volume 6, chapter 4, section 1, subsection 1 of the Federal-Aid Highway Program Manual, are applicable to material suppliers as well as contractors and subcontractors.) The contractor will include these requirements in every subcontract of $10,000 or more with such modification of language as is necessary to make them binding on the subcontractor.</P>
              <P>2. <E T="03">Equal Employment Opportunity Policy.</E> The contractor will accept as his operating policy the following statement which is designed to further the provision of equal employment opportunity to all persons without regard to their race, color, religion, sex, or national origin, and to promote the full realization of equal employment opportunity through a positive continuing program:</P>
              <P>It is the policy of this Company to assure that applicants are employed, and that employees are treated during employment, without regard to their race, religion, sex, color, or national origin. Such action shall include: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship, preapprenticeship, and/or on-the-job training.</P>
              <P>3. <E T="03">Equal Employment Opportunity Officer.</E> The contractor will designate and make known to the State highway agency contracting officers and equal employment opportunity officer (hereinafter referred to as the EEO Officer) who will have the responsibility for and must be capable of effectively administering and promoting an active contractor program of equal employment opportunity and who must be assigned adequate authority and responsibility to do so.</P>
              <P>4. <E T="03">Dissemination of Policy.</E> a. All members of the contractor's staff who are authorized to hire, supervise, promote, and discharge employees, or who recommend such action, or who are substantially involved in such action, will be made fully cognizant of, and will implement, the contractor's equal employment opportunity policy and contractual responsibilities to provide equal employment opportunity in each grade and classification of employment. To ensure that the above agreement will be met, the following actions will be taken as a minimum:</P>
              <P>(1) Periodic meetings of supervisory and personnel office employees will be conducted before the start of work and then not less often than once every six months, at which time the contractor's equal employment opportunity policy and its implementation will be reviewed and explained. The meetings will be conducted by the EEO Officer or other knowledgeable company official.</P>
              <P>(2) All new supervisory or personnel office employees will be given a thorough indoctrination by the EEO Officer or other knowledgeable company official, covering all major aspects of the contractor's equal employment opportunity obligations within thirty days following their reporting for duty with the contractor.</P>
              <P>(3) All personnel who are engaged in direct recruitment for the project will be instructed by the EEO Officer or appropriate company official in the contractor's procedures for locating and hiring minority group employees.</P>

              <P>b. In order to make the contractor's equal employment opportunity policy known to all employees, prospective employees and potential sources of employees, <E T="03">i.e.</E>, schools, employment agencies, labor unions (where appropriate), college placement officers, etc., the contractor will take the following actions:</P>

              <P>(1) Notices and posters setting forth the contractor's equal employment opportunity <PRTPAGE P="38"/>policy will be placed in areas readily accessible to employees, applicants for employment and potential employees.</P>
              <P>(2) The contractor's equal employment opportunity policy and the procedures to implement such policy will be brought to the attention of employees by means of meetings, employee handbooks, or other appropriate means.</P>
              <P>5. Recruitment. a. When advertising for employees, the contractor will include in all advertisements for employees the notation: “An Equal Opportunity Employer.” All such advertisements will be published in newspapers or other publications having a large circulation among minority groups in the area from which the project work force would normally be derived.</P>
              <P>b. The contractor will, unless precluded by a valid bargaining agreement, conduct systematic and direct recruitment through public and private employee referral sources likely to yield qualified minority group applicants, including, but not limited to, State employment agencies, schools, colleges and minority group organizations. To meet this requirement, the contractor will, through his EEO Officer, identify sources of potential minority group employees, and establish with such identified sources procedures whereby minority group applicants may be referred to the contractor for employment consideration.</P>
              <P>In the event the contractor has a valid bargaining agreement providing for exclusive hiring hall referrals, he is expected to observe the provisions of that agreement to the extent that the system permits the contractor's compliance with equal employment opportunity contract provisions. (The U.S. Department of Labor has held that where implementation of such agreements have the effect of discriminating against minorities or women, or obligates the contractor to do the same, such implementation violates Executive Order 11246, as amended.)</P>
              <P>c. The contractor will encourage his present employees to refer minority group applicants for employment by posting appropriate notices or bulletins in areas accessible to all such employees. In addition, information and procedures with regard to referring minority group applicants will be discussed with employees.</P>
              <P>6. <E T="03">Personnel Actions.</E> Wages, working conditions, and employee benefits shall be established and administered, and personnel actions of every type, including hiring, upgrading, promotion, transfer, demotion, layoff, and termination, shall be taken without regard to race, color, religion, sex, or national origin. The following procedures shall be followed:</P>
              <P>a. The contractor will conduct periodic inspections of project sites to insure that working conditions and employee facilities do not indicate discriminatory treatment of project site personnel.</P>
              <P>b. The contractor will periodically evaluate the spread of wages paid within each classification to determine any evidence of discriminatory wage practices.</P>
              <P>c. The contractor will periodically review selected personnel actions in depth to determine whether there is evidence of discrimination. Where evidence is found, the contractor will promptly take corrective action. If the review indicates that the discrimination may extend beyond the actions reviewed, such corrective action shall include all affected persons.</P>
              <P>d. The contractor will promptly investigate all complaints of alleged discrimination made to the contractor in connection with his obligations under this contract, will attempt to resolve such complaints, and will take appropriate corrective action within a reasonable time. If the investigation indicates that the discrimination may affect persons other than the complainant, such corrective action shall include such other persons. Upon completion of each investigation, the contractor will inform every complainant of all of his avenues of appeal.</P>
              <P>7. <E T="03">Training and Promotion.</E> a. The contractor will assist in locating, qualifying, and increasing the skills of minority group and women employees, and applicants for employment.</P>

              <P>b. Consistent with the contractor's work force requirements and as permissible under Federal and State regulations, the contractor shall make full use of training programs, <E T="03">i.e.</E>, apprenticeship, and on-the-job training programs for the geographical area of contract performance. Where feasible, 25 percent of apprentices or trainees in each occupation shall be in their first year of apprenticeship or training. In the event the Training Special Provision is provided under this contract, this subparagraph will be superseded as indicated in Attachment 2.</P>
              <P>c. The contractor will advise employees and applicants for employment of available training programs and entrance requirements for each.</P>
              <P>d. The contractor will periodically review the training and promotion potential of minority group and women employees and will encourage eligible employees to apply for such training and promotion.</P>
              <P>8. <E T="03">Unions.</E> If the contractor relies in whole or in part upon unions as a source of employees, the contractor will use his/her best efforts to obtain the cooperation of such unions to increase opportunities for minority groups and women within the unions, and to effect referrals by such unions of minority and female employees. Actions by the contractor either directly or through a contractor's association acting as agent will include the procedures set forth below:<PRTPAGE P="39"/>
              </P>
              <P>a. The contractor will use best efforts to develop, in cooperation with the unions, joint training programs aimed toward qualifying more minority group members and women for membership in the unions and increasing the skills of minority group employees and women so that they may qualify for higher paying employment.</P>
              <P>b. The contractor will use best efforts to incorporate an equal employment opportunity clause into each union agreement to the end that such union will be contractually bound to refer applicants without regard to their race, color, religion, sex, or national origin.</P>
              <P>c. The contractor is to obtain information as to the referral practices and policies of the labor union except that to the extent such information is within the exclusive possession of the labor union and such labor union refuses to furnish such information to the contractor, the contractor shall so certify to the State highway department and shall set forth what efforts have been made to obtain such information.</P>
              <P>d. In the event the union is unable to provide the contractor with a reasonable flow of minority and women referrals within the time limit set forth in the collective bargaining agreement, the contractor will, through independent recruitment efforts, fill the employment vacancies without regard to race, color, religion, sex, or national origin; making full efforts to obtain qualified and/or qualifiable minority group persons and women. (The U.S. Department of Labor has held that it shall be no excuse that the union with which the contractor has a collective bargaining agreement providing for exclusive referral failed to refer minority employees.) In the event the union referral practice prevents the contractor from meeting the obligations pursuant to Executive Order 11246, as amended, and these special provisions, such contractor shall immediately notify the State highway agency.</P>
              <P>9. <E T="03">Subcontracting.</E> a. The contractor will use his best efforts to solicit bids from and to utilize minority group subcontractors or subcontractors with meaningful minority group and female representation among their employees. Contractors shall obtain lists of minority-owned construction firms from State highway agency personnel.</P>
              <P>b. The contractor will use his best efforts to ensure subcontractor compliance with their equal employment opportunity obligations.</P>
              <P>10. <E T="03">Records and Reports.</E> a. The contractor will keep such records as are necessary to determine compliance with the contractor's equal employment opportunity obligations. The records kept by the contractor will be designed to indicate:</P>
              <P>(1) The number of minority and nonminority group members and women employed in each work classification on the project.</P>
              <P>(2) The progress and efforts being made in cooperation with unions to increase employment opportunities for minorities and women (applicable only to contractors who rely in whole or in part on unions as a source of their work force),</P>
              <P>(3) The progress and efforts being made in locating, hiring, training, qualifying, and upgrading minority and female employees, and</P>
              <P>(4) The progress and efforts being made in securing the services of minority group subcontractors or subcontractors with meaningful minority and female representation among their employees.</P>
              <P>b. All such records must be retained for a period of three years following completion of the contract work and shall be available at reasonable times and places for inspection by authorized representatives of the State highway agency and the Federal Highway Administration.</P>
              <P>c. The contractors will submit an annual report to the State highway agency each July for the duration of the project, indicating the number of minority, women, and non-minority group employees currently engaged in each work classification required by the contract work. This information is to be reported on Form PR 1391. If on-the-job training is being required by “Training Special Provision”, the contractor will be required to furnish Form FHWA 1409.</P>
              <CITA>[40 FR 28053, July 3, 1975, as amended at 43 FR 19386, May 5, 1978. Correctly redesignated at 46 FR 21156, Apr. 9, 1981]</CITA>
            </APPENDIX>
            <APPENDIX>
              <EAR>Pt. 230, Subpt. A, App. B</EAR>
              <HD SOURCE="HED">Appendix B to Subpart A of Part 230—Training Special Provisions</HD>
              <P>This Training Special Provision supersedes subparagraph 7b of the Special Provision entitled “Specific Equal Employment Opportunity Responsibilities,” (Attachment 1), and is in implementation of 23 U.S.C. 140(a).</P>
              <P>As part of the contractor's equal employment opportunity affirmative action program training shall be provided as follows:</P>
              <P>The contractor shall provide on-the-job training aimed at developing full journeymen in the type of trade or job classification involved.</P>
              <P>The number of trainees to be trained under the special provisions will be ____ (amount to be filled in by State highway department).</P>

              <P>In the event that a contractor subcontracts a portion of the contract work, he shall determine how many, if any, of the trainees are to be trained by the subcontractor, provided, however, that the contractor shall retain the primary responsibility for meeting the training requirements imposed by this special provision. The contractor shall also insure that this training <PRTPAGE P="40"/>special provision is made applicable to such subcontract. Where feasible, 25 percent of apprentices or trainees in each occupation shall be in their first year of apprenticeship or training.</P>
              <P>The number of trainees shall be distributed among the work classifications on the basis of the contractor's needs and the availability of journeymen in the various classifications within a reasonable area of recruitment. Prior to commencing construction, the contractor shall submit to the State highway agency for approval the number of trainees to be trained in each selected classification and training program to be used. Furthermore, the contractor shall specify the starting time for training in each of the classifications. The contractor will be credited for each trainee employed by him on the contract work who is currently enrolled or becomes enrolled in an approved program and will be reimbursed for such trainees as provided hereinafter.</P>
              <P>Training and upgrading of minorities and women toward journeymen status is a primary objective of this Training Special Provision. Accordingly, the contractor shall make every effort to enroll minority trainees and women (e.g., by conducting systematic and direct recruitment through public and private sources likely to yield minority and women trainees) to the extent that such persons are available within a reasonable area of recruitment. The contractor will be responsible for demonstrating the steps that he has taken in pursuance thereof, prior to a determination as to whether the contractor is in compliance with this Training Special Provision. This training commitment is not intended, and shall not be used, to discriminate against any applicant for training, whether a member of a minority group or not.</P>
              <P>No employee shall be employed as a trainee in any classification in which he has successfully completed a training course leading to journeyman status or in which he has been employed as a journeyman. The contractor should satisfy this requirement by including appropriate questions in the employee application or by other suitable means. Regardless of the method used the contractor's records should document the findings in each case.</P>
              <P>The minimum length and type of training for each classification will be as established in the training program selected by the contractor and approved by the State highway agency and the Federal Highway Administration. The State highway agency and the Federal Highway Administration shall approve a program if it is reasonably calculated to meet the equal employment opportunity obligations of the contractor and to qualify the average trainee for journeyman status in the classification concerned by the end of the training period. Furthermore, apprenticeship programs registered with the U.S. Department of Labor, Bureau of Apprenticeship and Training, or with a State apprenticeship agency recognized by the Bureau and training programs approved but not necessarily sponsored by the U.S. Department of Labor, Manpower Administration, Bureau of Apprenticeship and Training shall also be considered acceptable provided it is being administered in a manner consistent with the equal employment obligations of Federal-aid highway construction contracts. Approval or acceptance of a training program shall be obtained from the State prior to commencing work on the classification covered by the program. It is the intention of these provisions that training is to be provided in the construction crafts rather than clerk-typists or secretarial-type positions. Training is permissible in lower level management positions such as office engineers, estimators, timekeepers, etc., where the training is oriented toward construction applications. Training in the laborer classification may be permitted provided that significant and meaningful training is provided and approved by the division office. Some offsite training is permissible as long as the training is an integral part of an approved training program and does not comprise a significant part of the overall training.</P>
              <P>Except as otherwise noted below, the contractor will be reimbursed 80 cents per hour of training given an employee on this contract in accordance with an approved training program. As approved by the engineer, reimbursement will be made for training persons in excess of the number specified herein. This reimbursement will be made even though the contractor receives additional training program funds from other sources, provided such other does not specifically prohibit the contractor from receiving other reimbursement. Reimbursement for offsite training indicated above may only be made to the contractor where he does one or more of the following and the trainees are concurrently employed on a Federal-aid project; contributes to the cost of the training, provides the instruction to the trainee or pays the trainee's wages during the offsite training period.</P>

              <P>No payment shall be made to the contractor if either the failure to provide the required training, or the failure to hire the trainee as a journeyman, is caused by the contractor and evidences a lack of good faith on the part of the contractor in meeting the requirements of this Training Special Provision. It is normally expected that a trainee will begin his training on the project as soon as feasible after start of work utilizing the skill involved and remain on the project as long as training opportunities exist in his work classification or until he has completed his training program. It is not required that all trainees be on board for the entire length <PRTPAGE P="41"/>of the contract. A contractor will have fulfilled his responsibilities under this Training Special Provision if he has provided acceptable training to the number of trainees specified. The number trained shall be determined on the basis of the total number enrolled on the contract for a significant period.</P>
              <P>Trainees will be paid at least 60 percent of the appropriate minimum journeyman's rate specified in the contract for the first half of the training period, 75 percent for the third quarter of the training period, and 90 percent for the last quarter of the training period, unless apprentices or trainees in an approved existing program are enrolled as trainees on this project. In that case, the appropriate rates approved by the Departments of Labor or Transportation in connection with the existing program shall apply to all trainees being trained for the same classification who are covered by this Training Special Provision.</P>
              <P>The contractor shall furnish the trainee a copy of the program he will follow in providing the training. The contractor shall provide each trainee with a certification showing the type and length of training satisfactorily completed.</P>
              <P>The contractor will provide for the maintenance of records and furnish periodic reports documenting his performance under this Training Special Provision.</P>
              <CITA>[40 FR 28053, July 3, 1975. Correctly redesignated at 46 FR 21156, Apr. 9, 1981]</CITA>
            </APPENDIX>
            <APPENDIX>
              <PRTPAGE P="42"/>
              <EAR>Pt. 230, Subpt. A, App. C</EAR>
              <HD SOURCE="HED">Appendix C to Subpart A of Part 230—Federal-Aid Highway Contractors Annual EEO Report (Form PR-1391)</HD>
              <GPH DEEP="433" SPAN="2">
                <GID>EC14OC91.000</GID>
              </GPH>
            </APPENDIX>
            <APPENDIX>
              <PRTPAGE P="43"/>
              <EAR>Pt. 230, Subpt. A, App. D</EAR>
              <HD SOURCE="HED">Appendix D to Subpart A of Part 230—Federal-Aid Highway Construction Summary of Employment Data (Form PR-1392)</HD>
              <GPH DEEP="445" SPAN="2">
                <GID>EC14OC91.001</GID>
              </GPH>
              <HD SOURCE="HD1">General Information and Instructions</HD>

              <P>This form is to be developed from the “Contractor's Annual EEO Report.” This data is to be compiled by the State and submitted annually. It should reflect the total employment on all Federal-Aid Highway Projects in the State as of July 31st. The <PRTPAGE P="44"/>staffing figures to be reported should represent the project work force on board in all or any part of the last payroll period preceding the end of July. The staffing figures to be reported in Table A should include journey-level men and women, apprentices, and on-the-job trainees. Staffing figures to be reported in Table B should include only apprentices and on-the-job trainees as indicated.</P>
              <P>Entries made for “Job Categories” are to be confined to the listing shown. Miscellaneous job classifications are to be incorporated in the most appropriate category listed on the form. All employees on projects should thus be accounted for.</P>
              <P>This information will be useful in complying with the U.S. Senate Committee on Public Works request that the Federal Highway Administration submit a report annually on the status of the Equal Employment Opportunity Program, its effectiveness, and progress made by the States and the Administration in carrying out section 22(A) of the Federal-Aid Highway Act of 1968. In addition, the form should be used as a valuable tool for States to evaluate their own programs for ensuring equal opportunity.</P>
              <P>It is requested that States submit this information annually to the FHWA Divisions no later than September 25.</P>
              <P>
                <E T="03">Line 01</E>—State &amp; Region Code. Enter the 4-digit code from the list below.</P>
              <GPOTABLE CDEF="s110,7,r110,7" COLS="4" OPTS="L0">
                <ROW>
                  <ENT I="01">Alabama</ENT>
                  <ENT>01-04</ENT>
                  <ENT>Montana</ENT>
                  <ENT>30-08</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">Alaska</ENT>
                  <ENT>02-10</ENT>
                  <ENT>Nebraska</ENT>
                  <ENT>31-07</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">Arizona</ENT>
                  <ENT>04-09</ENT>
                  <ENT>Nevada</ENT>
                  <ENT>32-09</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">Arkansas</ENT>
                  <ENT>05-06</ENT>
                  <ENT>New Hampshire</ENT>
                  <ENT>33-01</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">California</ENT>
                  <ENT>06-09</ENT>
                  <ENT>New Jersey</ENT>
                  <ENT>34-01</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">Colorado</ENT>
                  <ENT>08-08</ENT>
                  <ENT>New Mexico</ENT>
                  <ENT>35-06</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">Delaware</ENT>
                  <ENT>10-03</ENT>
                  <ENT>North Carolina</ENT>
                  <ENT>37-04</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">District of Columbia</ENT>
                  <ENT>11-03</ENT>
                  <ENT>North Dakota</ENT>
                  <ENT>38-08</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">Florida</ENT>
                  <ENT>12-04</ENT>
                  <ENT>Ohio</ENT>
                  <ENT>39-05</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">Georgia</ENT>
                  <ENT>13-04</ENT>
                  <ENT>Oklahoma</ENT>
                  <ENT>40-06</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">Hawaii</ENT>
                  <ENT>15-09</ENT>
                  <ENT>Oregon</ENT>
                  <ENT>41-10</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">Idaho</ENT>
                  <ENT>16-10</ENT>
                  <ENT>Pennsylvania</ENT>
                  <ENT>42-03</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">Illinois</ENT>
                  <ENT>17-05</ENT>
                  <ENT>Puerto Rico</ENT>
                  <ENT>43-01</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">Iowa</ENT>
                  <ENT>19-07</ENT>
                  <ENT>South Carolina</ENT>
                  <ENT>45-04</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">Kansas</ENT>
                  <ENT>20-07</ENT>
                  <ENT>South Dakota</ENT>
                  <ENT>46-08</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">Kentucky</ENT>
                  <ENT>21-04</ENT>
                  <ENT>Tennessee</ENT>
                  <ENT>47-04</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">Louisiana</ENT>
                  <ENT>22-06</ENT>
                  <ENT>Texas</ENT>
                  <ENT>48-06</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">Maine</ENT>
                  <ENT>23-01</ENT>
                  <ENT>Utah</ENT>
                  <ENT>49-08</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">Maryland</ENT>
                  <ENT>24-03</ENT>
                  <ENT>Vermont</ENT>
                  <ENT>50-01</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">Massachusetts</ENT>
                  <ENT>25-01</ENT>
                  <ENT>Virginia</ENT>
                  <ENT>51-03</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">Michigan</ENT>
                  <ENT>26-05</ENT>
                  <ENT>Washington</ENT>
                  <ENT>53-10</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">Minnesota</ENT>
                  <ENT>27-05</ENT>
                  <ENT>West Virginia</ENT>
                  <ENT>54-03</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">Mississippi</ENT>
                  <ENT>28-04</ENT>
                  <ENT>Wisconsin</ENT>
                  <ENT>55-05</ENT>
                </ROW>
                <ROW>
                  <ENT I="01">Missouri</ENT>
                  <ENT>29-07</ENT>
                  <ENT>Wyoming</ENT>
                  <ENT>56-08</ENT>
                </ROW>
              </GPOTABLE>
              <SECAUTH>(23 U.S.C. sec. 140(a), 315, 49 CFR 1.48(b))</SECAUTH>
              <CITA>[44 FR 46832, Aug. 8, 1979. Correctly redesignated at 46 FR 21156, Apr. 9, 1981, and amended at 56 FR 4721, Feb. 6, 1991]</CITA>
            </APPENDIX>
            <APPENDIX>
              <RESERVED>Appendixes E-F to Subpart A of Part 230 [Reserved]</RESERVED>
            </APPENDIX>
            <APPENDIX>
              <EAR>Pt. 230, Subpt. A, App. G</EAR>
              <HD SOURCE="HED">Appendix G to Subpart A of Part 230—Special Reporting Requirements for “Hometown” or “Imposed” Plan Areas</HD>
              <P>In addition to the reporting requirements set forth elsewhere in this contract the contractor and the subcontractors holding subcontracts, not including material suppliers, of $10,000 or more, shall submit for every month of July during which work is performed, employment data as contained under Form PR-1391 (appendix C to 23 CFR part 230) and in accordance with the instructions included thereon.</P>
              <CITA>[40 FR 28053, July 3, 1975. Correctly redesignated at 46 FR 21156, Apr. 9, 1981]</CITA>
            </APPENDIX>
          </SUBPART>
          <SUBPART>
            <HD SOURCE="HED">Subpart B—Supportive Services for Minority, Disadvantaged, and Women Business Enterprises</HD>
            <SOURCE>
              <HD SOURCE="HED">Source:</HD>
              <P>50 FR 51243, Dec. 16, 1985, unless otherwise noted.</P>
            </SOURCE>
            <SECTION>
              <SECTNO>§ 230.201</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <P>To prescribe the policies, procedures, and guidance to develop, conduct, and administer supportive services assistance programs for minority, disadvantaged, and women business enterprises.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 230.202</SECTNO>
              <SUBJECT>Definitions.</SUBJECT>
              <P>(a) <E T="03">Minority Business Enterprise,</E> as used in this subpart, refers to all small <PRTPAGE P="45"/>businesses which participate in the Federal-aid highway program as a minority business enterprise (MBE), women business enterprise (WBE), or disadvantaged business enterprise (DBE), all defined under 49 CFR part 23. This expanded definition is used only in this subpart as a simplified way of defining the firms eligible to benefit from this supportive services program.</P>
              <P>(b) <E T="03">Supportive Services</E> means those services and activities provided in connection with minority business enterprise programs which are designed to increase the total number of minority businesses active in the highway program and contribute to the growth and eventual self-sufficiency of individual minority businesses so that such businesses may achieve proficiency to compete, on an equal basis, for contracts and subcontracts.</P>
              <P>(c) <E T="03">State highway agency</E> means that department, commission, board, or official of any State charged by its laws with the responsibility for highway construction. The term <E T="03">State</E> is considered equivalent to <E T="03">State highway agency</E> if the context so implies.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 230.203</SECTNO>
              <SUBJECT>Policy.</SUBJECT>
              <P>Based on the provisions of Pub. L. 97-424, dated January 6, 1983, it is the policy of the Federal Highway Administration (FHWA) to promote increased participation of minority business enterprises in Federal-aid highway contracts in part through the development and implementation of cost effective supportive services programs through the State highway agencies.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 230.204</SECTNO>
              <SUBJECT>Implementation of supportive services.</SUBJECT>
              <P>(a) Subject to the availability of funds under 23 U.S.C. 140(c), the State highway agency shall establish procedures to develop, conduct, and administer minority business enterprise training and assistance programs specifically for the benefit of women and minority businesses. Supportive services funds allocated to the States shall not be used to finance the training of State highway agency employees or to provide services in support of such training. State highway agencies are not required to match funds allocated to them under this section. Individual States are encouraged to be actively involved in the provision of supportive services. Such involvement can take the form of staff, funding, and/or direct assistance to augment the supportive services efforts financed by Federal-aid funds.</P>
              <P>(b) State highway agencies shall give preference to the following types of services:</P>
              <P>(1) Services relating to identification, prequalification, and certification assistance, with emphasis on increasing the total number of legitimate minority business enterprises participating in the Federal-aid highway program;</P>
              <P>(2) Services in connection with estimating, bidding, and technical assistance designed to develop and improve the capabilities of minority businesses and assist them in achieving proficiency in the technical skills involved in highway construction;</P>
              <P>(3) Services designed to develop and improve the immediate and long-term business management, recordkeeping, and financial accounting capabilities;</P>
              <P>(4) Services to assist minority business enterprises to become eligible for and to obtain bonding and financial assistance;</P>

              <P>(5) Services relating to verification procedures to ensure that only <E T="03">bona fide</E> minority business enterprises are certified as eligible for participation in the Federal-aid highway program;</P>
              <P>(6) Follow-up services to ascertain the outcome of training and assistance being provided; and</P>
              <P>(7) Other services which contribute to long-term development, increased opportunities, and eventual self-sufficiency of minority business enterprises.</P>
              <P>(c) A detailed work statement of the supportive services which the State highway agency considers to meet the guidance under this regulation and a program plan for meeting the requirements of paragraph (b) of this section and accomplishing other objectives shall be submitted to the FHWA for approval.</P>

              <P>(d) State highway agencies which desire to provide or obtain services other than those listed in paragraph (b) of this section shall submit their proposals to the FHWA for approval.<PRTPAGE P="46"/>
              </P>
              <P>(e) When the State highway agency provides supportive services by contract, formal advertising is not required by FHWA; however, the State highway agency shall solicit proposals from such qualified sources as will assure the competitive nature of the procurement. The evaluation of proposals by the State highway agency must include consideration of the proposer's ability to effect a productive relationship with majority and minority contractors, contractors' associations, minority groups, and other persons or organizations whose cooperation and assistance will increase the opportunities for minority business enterprises to compete for and perform contracts and subcontracts.</P>
              <P>(f) In the selection of contractors to perform supportive services, State highway agencies shall make conscientious efforts to search out, and utilize the services of qualified minority or women organizations, or minority or women enterprises.</P>
              <P>(g) As a minimum, State highway agency contracts to obtain supportive services shall include the following provisions:</P>
              <P>(1) A statement that a primary purpose of the supportive services is to increase the total number of minority firms participating in the Federal-aid highway program and to contribute to the growth and eventual self-sufficiency of minority firms;</P>
              <P>(2) A statement that supportive services shall be provided only to those minority business enterprises determined to be eligible for participation in the Federal-aid highway program in accordance with 49 CFR part 23 and have a work specialty related to the highway construction industry;</P>
              <P>(3) A clear and complete statement of the services to be provided under the contract, such as technical assistance, managerial assistance, counseling, certification assistance, and follow-up procedures as set forth in § 230.204(b) of this part;</P>
              <P>(4) The nondiscrimination provisions required by Title VI of the Civil Rights Act of 1964 as set forth in Form FHWA-1273, Required Contract Provisions, Federal-Aid Construction Contracts, <SU>1</SU>
                <FTREF/> and a statement of nondiscrimination in employment because of race, color, religion, sex, or national origin;</P>
              <FTNT>
                <P>
                  <SU>1</SU> Form FHWA-1273 is available for inspection and copying at the locations given in 49 CFR part 7, appendix D, under Document Inspection Facilities, and at all State highway agencies.</P>
              </FTNT>
              <P>(5) The establishment of a definite period of contract performance together with, if appropriate, a schedule stating when specific supportive services are to be provided;</P>
              <P>(6) Monthly or quarterly reports to the State highway agency containing sufficient data and narrative content to enable evaluation of both progress and problems;</P>
              <P>(7) The basis of payment;</P>
              <P>(8) An estimated schedule for expenditures;</P>
              <P>(9) The right of access to records and the right to audit shall be granted to authorize State highway agency and FHWA officials;</P>
              <P>(10) Noncollusion certification;</P>
              <P>(11) A requirement that the contractor provide all information necessary to support progress payments if such are provided for in the contract; and</P>
              <P>(12) A termination clause.</P>
              <P>(h) The State highway agency is to furnish copies of the reports received under paragraph (g)(6) of this section to the FHWA division office.</P>
              <CITA>[50 FR 51243, Dec. 16, 1985, as amended at 52 FR 36922, Oct. 2, 1987]</CITA>
            </SECTION>
            <SECTION>
              <SECTNO>§ 230.205</SECTNO>
              <SUBJECT>Supportive services funds obligation.</SUBJECT>
              <P>Supportive services funds shall be obligated in accordance with the procedures set forth in § 230.117(b) of this part. The point of obligation is defined as that time when the FHWA has approved a detailed work statement for the supportive services.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 230.206</SECTNO>
              <SUBJECT>Monitoring supportive services.</SUBJECT>

              <P>Supportive services programs shall be continually monitored and evaluated by the State highway agency so that needed improvements can be identified and instituted. This requires the documentation of valid effectiveness <PRTPAGE P="47"/>measures by which the results of program efforts may be accurately assessed.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 230.207</SECTNO>
              <SUBJECT>Sources of assistance.</SUBJECT>
              <P>It is the policy of the FHWA that all potential sources of assistance to minority business enterprises be utilized. The State highway agency shall take actions to ensure that supportive services contracts reflect the availability of all sources of assistance in order to maximize resource utilization and avoid unnecessary duplication.</P>
            </SECTION>
          </SUBPART>
          <SUBPART>
            <HD SOURCE="HED">Subpart C—State Highway Agency Equal Employment Opportunity Programs</HD>
            <SOURCE>
              <HD SOURCE="HED">Source:</HD>
              <P>41 FR 28270, July 9, 1976, unless otherwise noted.</P>
            </SOURCE>
            <SECTION>
              <SECTNO>§ 230.301</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <P>The purpose of the regulations in this subpart is to set forth Federal Highway Administration (FHWA) Federal-aid policy and FHWA and State responsibilities relative to a State highway agency's internal equal employment opportunity program and for assuring compliance with the equal employment opportunity requirements of federally-assisted highway construction contracts.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 230.303</SECTNO>
              <SUBJECT>Applicability.</SUBJECT>
              <P>The provisions of this subpart are applicable to all States that receive Federal financial assistance in connection with the Federal-aid highway program.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 230.305</SECTNO>
              <SUBJECT>Definitions.</SUBJECT>
              <P>As used in this subpart, the following definitions apply:</P>
              <P>(a) <E T="03">Affirmative Action Plan</E> means:</P>
              <P>(1) With regard to State highway agency work forces, a written document detailing the positive action steps the State highway agency will take to assure internal equal employment opportunity (internal plan).</P>
              <P>(2) With regard to Federal-aid construction contract work forces, the Federal equal employment opportunity bid conditions, to be enforced by a State highway agency in the plan areas established by the Secretary of Labor and FHWA special provisions in nonplan areas (external plan).</P>
              <P>(b) <E T="03">Equal employment opportunity program</E> means the total State highway agency program, including the affirmative action plans, for ensuring compliance with Federal requirements both in State highway agency internal employment and in employment on Federal-aid construction projects.</P>
              <P>(c) <E T="03">Minority groups.</E> An employee may be included in the minority group to which he or she appears to belong, or is regarded in the community as belonging. As defined by U.S. Federal agencies for employment purposes, minority group persons in the U.S. are identified as Blacks (not of Hispanic origin), Hispanics, Asian or Pacific Islanders, and American Indians or Alaskan Natives.</P>
              <P>(d) <E T="03">Racial/ethnic identification.</E> For the purpose of this regulation and any accompanying report requirements, an employee may be included in the group to which he or she appears to belong, identifies with, or is regarded in the community as belonging. However, no person should be counted in more than one racial/ethnic category. The following group categories will be used:</P>
              <P>(1) The category <E T="03">White (not of Hispanic origin):</E> All persons having origins in any of the original peoples of Europe, North Africa, the Middle East, or the Indian Subcontinent.</P>
              <P>(2) The category <E T="03">Black (not of Hispanic origin):</E> All persons having origins in any of the Black racial groups.</P>
              <P>(3) The category <E T="03">Hispanic:</E> All persons of Mexican, Puerto Rican, Cuban, Central or South American, or other Spanish culture or origin, regardless of race.</P>
              <P>(4) The category <E T="03">Asian or Pacific Islanders:</E> All persons having origins in any of the original peoples of the Far East, Southeast Asia, or the Pacific Islands. This area includes, for example, China, Japan, Korea, the Philippine Islands, and Samoa.</P>
              <P>(5) The category <E T="03">American Indian or Alaskan Native:</E> All persons having origins in any of the original peoples of North America.</P>
              <P>(e) <E T="03">State</E> means any of the 50 States of the United States, the District of Columbia, the Commonwealth of Puerto Rico, Guam, American Samoa, and the Virgin Islands.<PRTPAGE P="48"/>
              </P>
              <P>(f) <E T="03">State highway agency</E> means that department, commission, board, or official of any State charged by its laws with the responsibility for highway construction. The term <E T="03">State</E> should be considered equivalent to <E T="03">State highway agency</E> if the context so implies.</P>
              <CITA>[41 FR 28270, July 9, 1976, as amended at 41 FR 46293, Oct. 20, 1976]</CITA>
            </SECTION>
            <SECTION>
              <SECTNO>§ 230.307</SECTNO>
              <SUBJECT>Policy.</SUBJECT>
              <P>Every employee and representative of State highway agencies shall perform all official equal employment opportunity actions in an affirmative manner, and in full accord with applicable statutes, executive orders, regulations, and policies enunciated thereunder, to assure the equality of employment opportunity, without regard to race, color, religion, sex, or national origin both in its own work force and in the work forces of contractors, subcontractors, and material suppliers engaged in the performance of Federal-aid highway construction contracts.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 230.309</SECTNO>
              <SUBJECT>Program format.</SUBJECT>
              <P>It is essential that a standardized Federal approach be taken in assisting the States in development and implementation of EEO programs. The format set forth in appendix A provides that standardized approach. State equal employment opportunity programs that meet or exceed the prescribed standards will comply with basic FHWA requirements.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 230.311</SECTNO>
              <SUBJECT>State responsibilities.</SUBJECT>
              <P>(a) Each State highway agency shall prepare and submit an updated equal employment opportunity program, one year from the date of approval of the preceding program by the Federal Highway Administrator, over the signature of the head of the State highway agency, to the Federal Highway Administrator through the FHWA Division Administrator. The program shall consist of the following elements:</P>
              <P>(1) The collection and analysis of internal employment data for its entire work force in the manner prescribed in part II, paragraph III of appendix A; and</P>
              <P>(2) The equal employment opportunity program, including the internal affirmative action plan, in the format and manner set forth in appendix A.</P>
              <P>(b) In preparation of the program required by § 230.311(a), the State highway agency shall consider and respond to written comments from FHWA regarding the preceding program.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 230.313</SECTNO>
              <SUBJECT>Approval procedure.</SUBJECT>
              <P>After reviewing the State highway agency equal employment opportunity program and the summary analysis and recommendations from the FHWA regional office, the Washington Headquarters Office of Civil Rights staff will recommend approval or disapproval of the program to the Federal Highway Administrator. The State highway agency will be advised of the Administrator's decision. Each program approval is effective for a period of one year from date of approval.</P>
            </SECTION>
            <APPENDIX>
              <EAR>Pt. 230, Subpt. C, App. A</EAR>
              <HD SOURCE="HED">Appendix A to Subpart C of Part 230—State Highway Agency Equal Employment Opportunity Programs</HD>
              <P>Each State highway agency's (SHA) equal employment opportunity (EEO) program shall be in the format set forth herein and shall address Contractor Compliance (part I) and SHA Internal Employment (part II), including the organizational structure of the SHA total EEO Program (internal and external).</P>
              <HD SOURCE="HD1">part i—contractor compliance</HD>
              <P>I. <E T="03">Organization and structure.</E> A. <E T="03">Statehighway agency EEO Coordinator (External) and staff support.</E> 1. Describe the organizational location and responsibilities of the State highway agency EEO Coordinator. (Provided organization charts of the State highway agency and of the EEO staff.)</P>
              <P>2. Indicate whether full or part-time; if part-time, indicate percentage of time devoted to EEO.</P>
              <P>3. Indicate length of time in position, civil rights experience and training, and supervision.</P>
              <P>4. Indicate whether compliance program is centralized or decentralized.</P>
              <P>5. Identify EEO Coordinator's staff support (full- and part-time) by job title and indicate areas of their responsibilities.</P>
              <P>6. Identify any other individuals in the central office having a responsibility for the implementation of this program and describe their respective roles and training received in program area.</P>
              <P>B. <E T="03">District or division personnel.</E> 1. Describe the responsibilities and duties of any district <PRTPAGE P="49"/>EEO personnel. Identify to whom they report.</P>
              <P>2. Explain whether district EEO personnel are full-time or have other responsibilities such as labor compliance or engineering.</P>
              <P>3. Describe training provided for personnel having EEO compliance responsibility.</P>
              <P>C. <E T="03">Project personnel.</E> Describe the EEO role of project personnel.</P>
              <P>II. <E T="03">Compliance procedures.</E> A. <E T="03">Applicable directives.</E> 1. FHWA Contract Compliance Procedures.</P>
              <P>2. EEO Special Provisions (FHWA Federal-Aid Highway Program Manual, vol. 6, chap. 4, sec. 1, subsec. 2, Attachment 1) <SU>1</SU>
                <FTREF/>
              </P>
              <FTNT>
                <P>
                  <SU>1</SU> The Federal-Aid Highway Program Manual is available for inspection and copying at the Federal Highway Administration (FHWA), 1200 New Jersey Avenue, SE., Washington, DC 20590, or at FHWA offices listed in 49 CFR part 7, appendix D.</P>
              </FTNT>
              <P>3. Training Special Provisions (FHWA Federal-Aid Highway Program Manual, vol. 6, chap. 4, sec. 1, subsec. 2, Attachment 2) <SU>1</SU>
              </P>
              <P>4. FHWA Federal-Aid Highway Program Manual, vol. 6, chap. 4, sec. 1, subsec. 6 (Contract Procedures), and subsec. 8 (Minority Business Enterprise). <SU>1</SU>
              </P>
              <P>B. <E T="03">Implementation.</E> 1. Describe process (methods) of incorporating the above FHWA directives into the SHA compliance program.</P>
              <P>2. Describe the methods used by the State to familiarize State compliance personnel with all FHWA contract compliance directives. Indicate frequency of work shops, training sessions, etc.</P>
              <P>3. Describe the procedure for advising the contractor of the EEO contract requirements at any preconstruction conference held in connection with a Federal-aid contract.</P>
              <P>III. <E T="03">Accomplishments.</E> Describe accomplishments in the construction EEO compliance program during the past fiscal year.</P>
              <P>A. <E T="03">Regular project compliance review program.</E> This number should include at least all of the following items:</P>
              <P>1. Number of compliance reviews conducted.</P>
              <P>2. Number of contractors reviewed.</P>
              <P>3. Number of contractors found in compliance.</P>
              <P>4. Number of contractors found in noncompliance.</P>
              <P>5. Number of show cause notices issued.</P>
              <P>6. Number of show cause notices rescinded.</P>
              <P>7. Number of show cause actions still under conciliation and unresolved.</P>
              <P>8. Number of followup reviews conducted.
              </P>
              <NOTE>
                <HD SOURCE="HED">(Note:</HD>
                <P>In addition to information requested in items 4-8 above, include a brief summary of total show cause and followup activities—findings and achievements.)</P>
              </NOTE>
              
              <P>B. <E T="03">Consolidated compliance reviews.</E> 1. Identify the target areas that have been reviewed since the inception of the consolidated compliance program. Briefly summarize total findings.</P>
              <P>2. Identify any significant impact or effect of this program on contractor compliance.</P>
              <P>C. <E T="03">Home office reviews.</E> If the State conducts home office reviews, describe briefly the procedures followed by State.</P>
              <P>D. <E T="03">Major problems encountered.</E> Describe major problems encountered in connection with any review activities during the past fiscal year.</P>
              <P>E. <E T="03">Major breakthroughs.</E> Comment briefly on any major breakthrough or other accomplishment significant to the compliance review program.</P>
              <P>IV. <E T="03">Areawide plans/Hometown and Imposed (if applicable).</E> A. Provide overall analysis of the effectiveness of each areawide plan in the State.</P>
              <P>B. Indicate by job titles the number of State personnel involved in the collection, consolidation, preparation, copying, reviewing, analysis, and transmittal of area plan reports (Contracting Activity and Post Contract Implementation). Estimate the amount of time (number of hours) spent collectively on this activity each month. How does the State use the plan report data?</P>
              <P>C. Identify Office of Federal Contract Compliance Programs (OFCCP) area plan audits or compliance checks in which State personnel participated during the last fiscal year. On the average, how many hours have been spent on these audits and/or checks during the past fiscal year?</P>
              <P>D. Describe the working relationship of State EEO compliance personnel with representatives of plan administrative committee(s).</P>
              <P>E. Provide recommendations for improving the areawide plan program and the reporting system.</P>
              <P>V. <E T="03">Contract sanctions.</E> A. Describe the procedures used by the State to impose contract sanctions or institute legal proceedings.</P>
              <P>B. Indicate the State or Federal laws which are applicable.</P>
              <P>C. Does the State withhold a contractor's progress payments for failure to comply with EEO requirements? If so, identify contractors involved in such actions during the past fiscal year. If not, identify other actions taken.</P>
              <P>VI. <E T="03">Complaints.</E> A. Describe the State's procedures for handling discrimination complaints against contractors.</P>
              <P>B. If complaints are referred to a State fair employment agency or similar agency, describe the referral procedure.</P>
              <P>C. Identify the Federal-aid highway contractors that have had discrimination complaints filed against them during the past fiscal year and provide current status.</P>
              <P>VII. <E T="03">External training programs, including supportive services.</E> A. Describe the State's process for reviewing the work classifications of trainees to determine that there is a <PRTPAGE P="50"/>proper and reasonable distribution among appropriate craft.</P>
              <P>B. Describe the State's procedures for identifying the number of minorities and women who have completed training programs.</P>
              <P>C. Describe the extent of participation by women in construction training programs.</P>
              <P>D. Describe the efforts made by the State to locate and use the services of qualified minority and female supportive service consultants. Indicate if the State's supportive service contractor is a minority or female owned enterprise.</P>
              <P>E. Describe the extent to which reports from the supportive service contractors provide sufficient data to evaluate the status of training programs, with particular reference to minorities and women.</P>
              <P>VIII. <E T="03">Minority business enterprise program.</E> FHPM 6-4-1-8 sets forth the FHWA policy regarding the minority business enterprise program. The implementation of this program should be explained by responding to the following:</P>
              <P>A. Describe the method used for listing of minority contractors capable of, or interested in, highway construction contracting or subcontracting. Describe the process used to circulate names of appropriate minority firms and associations to contractors obtaining contract proposals.</P>
              <P>B. Describe the State's procedure for insuring that contractors take action to affirmatively solicit the interest, capability, and prices of potential minority subcontractors.</P>
              <P>C. Describe the State's procedure for insuring that contractors have designated liaison officers to administer the minority business enterprise program in an effective manner. Specify resource material, including contracts, which the State provides to liaison officers.</P>
              <P>D. Describe the action the State has taken to meet its goals for prequalification or licensing of minority business. Include dollar goals established for the year, and describe what criteria or formula the State has adopted for setting such goals. If it is different from the previous year, describe in detail.</P>
              <P>E. Outline the State's procedure for evaluating its prequalification/licensing requirements.</P>
              <P>F. Identify instances where the State has waived prequalification for subcontractors on Federal-aid construction work or for prime contractors on Federal-aid contracts with an estimated dollar value lower than $100,000.</P>
              <P>G. Describe the State's methods of monitoring the progress and results of its minority business enterprise efforts.</P>
              <P>IX. <E T="03">Liaison.</E> Describe the liaison established by the State between public (State, county, and municpal) agencies and private organizations involved in EEO programs. How is the liaison maintained on a continuing basis?</P>
              <P>X. <E T="03">Innovative programs.</E> Identify any innovative EEO programs or management procedures initiated by the State and not previously covered.</P>
              <HD SOURCE="HD1">part ii—state highway agency employment</HD>
              <P>I. <E T="03">General.</E> The State highway agency's (SHA) internal program is an integral part of the agency's total activities. It should include the involvement, commitment and support of executives, managers, supervisors and all other employees. For effective administration and implementation of the EEO Program, an affirmative action plan (AAP) is required. The scope of an EEO program and an AAP must be comprehensive, covering all elements of the agency's personnel management policies and practices. The major part of an AAP must be recognition and removal of any barriers to equal employment opportunity, identification of problem areas and of persons unfairly excluded or held back and action enabling them to compete for jobs on an equal basis. An effective AAP not only benefits those who have been denied equal employment opportunity but will also greatly benefit the organization which often has overlooked, screened out or underutilized the great reservoir of untapped human resources and skills, especially among women and minority groups.</P>
              <P>Set forth are general guidelines designed to assist the State highway agencies in implementing internal programs, including the development and implementation of AAP's to ensure fair and equal treatment for all persons, regardless of race, color, religion, sex or national origin in all employment practices.</P>
              <P>II. <E T="03">Administration and implementation.</E> The head of each State highway agency is responsible for the overall administration of the internal EEO program, including the total integration of equal opportunity into all facets of personnel management. However, specific program responsibilities should be assigned for carrying out the program at all management levels.</P>
              <P>To ensure effectiveness in the implementation of the internal EEO program, a specific and realistic AAP should be developed. It should include both short and long-range objectives, with priorities and target dates for achieving goals and measuring progress, according to the agency's individual need to overcome existing problems.</P>
              <P>A. <E T="03">State Highway Agency Affirmative Action Officer (internal).</E> 1. <E T="03">Appointment of Affirmative Action Officer.</E> The head of the SHA should appoint a qualified Affirmative Action (AA) Officer (Internal EEO Officer) with responsibility and authority to implement the internal EEO program. In making the selection, the following factors should be considered:<PRTPAGE P="51"/>
              </P>
              <P>a. The person appointed should have proven ability to accomplish major program goals.</P>
              <P>b. Managing the internal EEO program requires a major time commitment; it cannot be added on to an existing full-time job.</P>
              <P>c. Appointing qualified minority and/or female employees to head or staff the program may offer good role models for present and potential employees and add credibility to the programs involved. However, the most essential requirements for such position(s) are sensitivity to varied ways in which discrimination limits job opportunities, commitment to program goals and sufficient status and ability to work with others in the agency to achieve them.</P>
              <P>2. <E T="03">Responsibilities of the Affirmative Action Officer.</E> The responsibilities of the AA Officer should include, but not necessarily be limited to:</P>
              <P>a. Developing the written AAP.</P>
              <P>b. Publicizing its content internally and externally.</P>
              <P>c. Assisting managers and supervisors in collecting and analyzing employment data, identifying problem areas, setting goals and timetables and developing programs to achieve goals. Programs should include specific remedies to eliminate any discriminatory practices discovered in the employment system.</P>
              <P>d. Handling and processing formal discrimination complaints.</P>
              <P>e. Designing, implementing and monitoring internal audit and reporting systems to measure program effectiveness and to determine where progress has been made and where further action is needed.</P>
              <P>f. Reporting, at least quarterly, to the head of the SHA on progress and deficiencies of each unit in relation to agency goals.</P>
              <P>g. In addition, consider the creation of:</P>
              <P>(1) An EEO Advisory Committee, whose membership would include top management officials,</P>
              <P>(2) An EEO Employee Committee, whose membership would include rank and file employees, with minority and female representatives from various job levels and departments to meet regularly with the AA officer, and</P>
              <P>(3) An EEO Counseling Program to attempt informal resolution of discrimination complaints.</P>
              <P>B. <E T="03">Contents of an affirmative action plan.</E> The Affirmative Action Plan (AAP) is an integral part of the SHA's EEO program. Although the style and format of AAP's may vary from one SHA to another, the basic substance will generally be the same. The essence of the AAP should include, but not necessarily be limited to:</P>
              <P>1. Inclusion of a strong agency policy statement of commitment to EEO.</P>
              <P>2. Assignment of responsibility and authority for program to a qualified individual.</P>
              <P>3. A survey of the labor market area in terms of population makeup, skills, and availability for employment.</P>
              <P>4. Analyzing the present work force to identify jobs, departments and units where minorities and females are underutilized.</P>
              <P>5. Setting specific, measurable, attainable hiring and promotion goals, with target dates, in each area of underutilization.</P>
              <P>6. Making every manager and supervisor responsible and accountable for meeting these goals.</P>
              <P>7. Reevaluating job descriptions and hiring criteria to assure that they reflect actual job needs.</P>
              <P>8. Finding minorities and females who are qualified or qualifiable to fill jobs.</P>
              <P>9. Getting minorities and females into upward mobility and relevant training programs where they have not had previous access.</P>
              <P>10. Developing systems to monitor and measure progress regularly. If results are not satisfactory to meet goals, determine the reasons and make necessary changes.</P>
              <P>11. Developing a procedure whereby employees and applicants may process allegations of discrimination to an impartial body without fear of reprisal.</P>
              <P>C. <E T="03">Implementation of an affirmative action plan.</E> The written AAP is the framework and management tool to be used at all organizational levels to actively implement, measure and evaluate program progress on the specific action items which represent EEO program problems or deficiencies. The presence of a written plan alone does not constitute an EEO program, nor is it, in itself, evidence of an ongoing program. As a minimum, the following specific actions should be taken.</P>
              <P>1. <E T="03">Issue written equal employment opportunity policy statement and affirmative action commitment.</E> To be effective, EEO policy provisions must be enforced by top management, and all employees must be made aware that EEO is basic agency policy. The head of the SHA (1) should issue a firm statement of personal commitment, legal obligation and the importance of EEO as an agency goal, and (2) assign specific responsibility and accountability to each executive, manager and supervisor.</P>
              <P>The statement should include, but not necessarily be limited to, the following elements:</P>
              <P>a. EEO for all persons, regardless of race, color, religion, sex or national origin as a fundamental agency policy.</P>
              <P>b. Personal commitment to and support of EEO by the head of the SHA.</P>
              <P>c. The requirement that special affirmative action be taken throughout the agency to overcome the effects of past discrimination.</P>

              <P>d. The requirement that the EEO program be a goal setting program with measurement <PRTPAGE P="52"/>and evaluation factors similar to other major agency programs.</P>
              <P>e. Equal opportunity in all employment practices, including (but not limited to) recruiting, hiring, transfers, promotions, training, compensation, benefits, recognition (awards), layoffs, and other terminations.</P>
              <P>f. Responsibility for positive affirmative action in the discharge of EEO programs, including performance evaluations of managers and supervisors in such functions, will be expected of and shared by all management personnel.</P>
              <P>g. Accountability for action or inaction in the area of EEO by management personnel.</P>
              <P>2. <E T="03">Publicize the affirmative action plan.</E> a. <E T="03">Internally:</E> (1) Distribute written communications from the head of the SHA.</P>
              <P>(2) Include the AAP and the EEO policy statement in agency operations manual.</P>
              <P>(3) Hold individual meetings with managers and supervisors to discuss the program, their individual responsibilities and to review progress.</P>
              <P>(4) Place Federal and State EEO posters on bulletin boards, near time clocks and in personnel offices.</P>
              <P>(5) Publicize the AAP in the agency newsletters and other publications.</P>
              <P>(6) Present and discuss the AAP as a part of employee orientation and all training programs.</P>
              <P>(7) Invite employee organization representatives to cooperate and assist in developing and implementing the AAP.</P>
              <P>b. <E T="03">Externally:</E> Distribute the AAP to minority groups and women's organizations, community action groups, appropriate State agencies, professional organizations, etc.</P>
              <P>3. <E T="03">Develop and implement specific programs to eliminate discriminatory barriers and achieve goals.</E> a. <E T="03">Job structuring and upward mobility:</E> The AAP should include specific provisions for:</P>
              <P>(1) Periodic classification plan reviews to correct inaccurate position descriptions and to ensure that positions are allocated to the appropriate classification.</P>
              <P>(2) Plans to ensure that all qualification requirements are closely job related.</P>
              <P>(3) Efforts to restructure jobs and establish entry level and trainee positions to facilitate progression within occupational areas.</P>
              <P>(4) Career counseling and guidance to employees.</P>
              <P>(5) Creating career development plans for lower grade employees who are underutilized or who demonstrate potential for advancement.</P>
              <P>(6) Widely publicizing upward mobility programs and opportunities within each work unit and within the total organizational structure.</P>
              <P>b. <E T="03">Recruitment and placement.</E> The AAP should include specific provisions for, but not necessarily limited to:</P>
              <P>(1) Active recruitment efforts to support and supplement those of the central personnel agency or department, reaching all appropriate sources to obtain qualified employees on a nondiscriminatory basis.</P>
              <P>(2) Maintaining contracts with organizations representing minority groups, women, professional societies, and other sources of candidates for technical, professional and management level positions.</P>
              <P>(3) Ensuring that recruitment literature is relevant to all employees, including minority groups and women.</P>
              <P>(4) Reviewing and monitoring recruitment and placement procedures so as to assure that no discriminatory practices exist.</P>
              <P>(5) Cooperating with management and the central personnel agency on the review and validation of written tests and other selection devices.</P>
              <P>(6) Analyzing the flow of applicants through the selection and appointment process, including an analytical review of reasons for rejections.</P>
              <P>(7) Monitoring the placement of employees to ensure the assignment of work and workplace on a nondiscriminatory basis.</P>
              <P>c. <E T="03">Promotions.</E> The AAP should include specific provisions for, but not necessarily limited to:</P>
              <P>1. Establishing an agency-wide merit promotion program, including a merit promotion plan, to provide equal opportunity for all persons based on merit and without regard to race, color, religion, sex or national origin.</P>
              <P>2. Monitoring the operation of the merit promotion program, including a review of promotion actions, to assure that requirements procedures and practices support EEO program objectives and do not have a discriminatory impact in actual operation.</P>
              <P>3. Establishing skills banks to match employee skills with available job advancement opportunities.</P>
              <P>4. Evaluating promotion criteria (supervisory evaluations, oral interviews, written tests, qualification standards, etc.) and their use by selecting officials to identify and eliminate factors which may lead to improper “selection out” of employees or applicants, particularly minorities and women, who traditionally have not had access to better jobs. It may be appropriate to require selecting officials to submit a written justification when well qualified persons are passed over for upgrading or promotion.</P>
              <P>5. Assuring that all job vacancies are posted conspicuously and that all employees are encouraged to bid on all jobs for which they feel they are qualified.</P>

              <P>6. Publicizing the agency merit promotion program by highlighting breakthrough promotions, <E T="03">i.e.</E>, advancement of minorities and women to key jobs, new career heights, etc.<PRTPAGE P="53"/>
              </P>
              <P>d. <E T="03">Training.</E> The AAP should include specific provisions for, but not necessarily limited to:</P>
              <P>(1) Requiring managers and supervisors to participate in EEO seminars covering the AAP, the overall EEO program and the administration of the policies and procedures incorporated therein, and on Federal, State and local laws relating to EEO.</P>
              <P>(2) Training in proper interviewing techniques of employees who conduct employment selection interviews.</P>
              <P>(3) Training and education programs designed to provide opportunities for employees to advance in relation to the present and projected manpower needs of the agency and the employees' career goals.</P>
              <P>(4) The review of profiles of training course participants to ensure that training opportunities are being offered to all eligible employees on an equal basis and to correct any inequities discovered.</P>
              <P>e. <E T="03">Layoffs, recalls, discharges, demotions, and disciplinary actions.</E> The standards for deciding when a person shall be terminated, demoted, disciplined, laid off or recalled should be the same for all employees, including minorities and females. Seemingly neutral practices should be reexamined to see if they have a disparate effect on such groups. For example, if more minorities and females are being laid off because they were the last hired, then, adjustments should be made to assure that the minority and female ratios do not decrease because of these actions.</P>
              <P>(1) When employees, particularly minorities and females, are disciplined, laid off, discharged or downgraded, it is advisable that the actions be reviewed by the AA Officer before they become final.</P>
              <P>(2) Any punitive action (<E T="03">i.e.</E>, harassment, terminations, demotions), taken as a result of employees filing discrimination complaints, is illegal.</P>
              <P>(3) The following records should be kept to monitor this area of the internal EEO program:</P>
              <P>On all terminations, including layoffs and discharges: indicate total number, name, (home address and phone number), employment date, termination date, recall rights, sex, racial/ethnic identification (by job category), type of termination and reason for termination.</P>
              <P>On all demotions: indicate total number, name, (home address and phone number), demotion date, sex, racial/ethnic identification (by job category), and reason for demotion.</P>
              <P>On all recalls: indicate total number, name, (home address and phone number) recall date, sex, and racial/ethnic identification (by job category).</P>
              <P>Exit interviews should be conducted with employees who leave the employment of the SHA.</P>
              <P>f. <E T="03">Other personnel actions.</E> The AAP should include specific provisions for, but not necessarily limited to:</P>
              <P>(1) Assuring that information on EEO counseling and grievance procedures is easily available to all employees.</P>
              <P>(2) A system for processing complaints alleging discrimination because of race, color, religion, sex or national origin to an impartial body.</P>
              <P>(3) A system for processing grievances and appeals (<E T="03">i.e.</E>, disciplinary actions, adverse actions, adverse action appeals, etc).</P>
              <P>(4) Including in the performance appraisal system a factor to rate manager's and supervisors' performance in discharging the EEO program responsibilities assigned to them.</P>
              <P>(5) Reviewing and monitoring the performance appraisal program periodically to determine its objectivity and effectiveness.</P>
              <P>(6) Ensuring the equal availability of employee benefits to all employees.</P>
              <P>4. <E T="03">Program evaluation.</E> An internal reporting system to continually audit, monitor and evaluate programs is essential for a successful AAP. Therefore, a system providing for EEO goals, timetables, and periodic evaluations needs to be established and implemented. Consideration should be given to the following actions:</P>
              <P>a. Defining the major objectives of EEO program evaluation.</P>
              <P>b. The evaluation should be directed toward results accomplished, not only at efforts made.</P>
              <P>c. The evaluation should focus attention on assessing the adequacy of problem identification in the AAP and the extent to which the specific action steps in the plan provide solutions.</P>
              <P>d. The AAP should be reviewed and evaluated at least annually. The review and evaluation procedures should include, but not be limited to, the following:</P>
              <P>(1) Each bureau, division or other major component of the agency should make annual and such other periodic reports as are needed to provide an accurate review of the operations of the AAP in that component.</P>
              <P>(2) The AA Officer should make an annual report to the head of the SHA, containing the overall status of the program, results achieved toward established objectives, identity of any particular problems encountered and recommendations for corrective actions needed.</P>
              <P>e. Specific, numerical goals and objectives should be established for the ensuing year. Goals should be developed for the SHA as a whole, as well as for each unit and each job category.</P>
              <P>III. <E T="03">Employment statistical data.</E> A. As a minimum, furnish the most recent data on the following:</P>
              <P>1. The total population in the State,<PRTPAGE P="54"/>
              </P>
              <P>2. The total labor market in State, with a breakdown by racial/ethnic identification and sex, and</P>
              <P>3. An analysis of (1) and (2) above, in connection with the availability of personnel and jobs within SHA's.</P>
              <P>B. State highway agencies shall use the EEO-4 Form in providing current work force data. This data shall reflect only State department of transportation/State highway department employment.</P>
              <GPH DEEP="470" SPAN="2">
                <PRTPAGE P="55"/>
                <GID>EC14OC91.002</GID>
              </GPH>
              <GPH DEEP="470" SPAN="2">
                <PRTPAGE P="56"/>
                <GID>EC14OC91.003</GID>
              </GPH>
              <CITA>[41 FR 28270, July 9, 1976, as amended at 41 FR 46294, Oct. 20, 1976; 74 FR 28442, June 16, 2009]</CITA>
            </APPENDIX>
          </SUBPART>
          <SUBPART>
            <PRTPAGE P="57"/>
            <HD SOURCE="HED">Subpart D—Construction Contract Equal Opportunity Compliance Procedures</HD>
            <SOURCE>
              <HD SOURCE="HED">Source:</HD>
              <P>41 FR 34239, Aug. 13, 1976, unless otherwise noted.</P>
            </SOURCE>
            <SECTION>
              <SECTNO>§ 230.401</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <P>The purpose of the regulations in this subpart is to prescribe policies and procedures to standardize the implementation of the equal opportunity contract compliance program, including compliance reviews, consolidated compliance reviews, and the administration of areawide plans.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 230.403</SECTNO>
              <SUBJECT>Applicability.</SUBJECT>
              <P>The procedures set forth hereinafter apply to all nonexempt direct Federal and Federal-aid highway construction contracts and subcontracts, unless otherwise specified.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 230.405</SECTNO>
              <SUBJECT>Administrative responsibilities.</SUBJECT>
              <P>(a) <E T="03">Federal Highway Administration</E> (<E T="03">FHWA</E>) <E T="03">responsibilities.</E> (1) The FHWA has the responsibility to ensure that contractors meet contractural equal opportunity requirements under E.O. 11246, as amended, and title 23 U.S.C., and to provide guidance and direction to States in the development and implementation of a program to assure compliance with equal opportunity requirements.</P>
              <P>(2) The Federal Highway Administrator or a designee may inquire into the status of any matter affecting the FHWA equal opportunity program and, when considered necessary, assume jurisdiction over the matter, proceeding in coordination with the State concerned. This is without derogation of the authority of the Secretary of Transportation, Department of Transportation (DOT), the Director, DOT Departmental Office of Civil Rights (OCR) or the Director, Office of Federal Contract Compliance Programs (OFCCP), Department of Labor.</P>
              <P>(3) Failure of the State highway agency (SHA) to discharge the responsibilities stated in § 230.405(b)(1) may result in DOT's taking any or all of the following actions (see appendix A to 23 CFR part 630, subpart C “Federal-aid project agreement”):</P>
              <P>(i) Cancel, terminate, or suspend the Federal-aid project agreement in whole or in part;</P>
              <P>(ii) Refrain from extending any further assistance to the SHA under the program with respect to which the failure or refusal occurred until satisfactory assurance of future compliance has been received from the SHA; and</P>
              <P>(iii) Refer the case to an appropriate Federal agency for legal proceedings.</P>
              <P>(4) Action by the DOT, with respect to noncompliant contractors, shall not relieve a SHA of its responsibilities in connection with these same matters; nor is such action by DOT a substitute for corrective action utilized by a State under applicable State laws or regulations.</P>
              <P>(b) <E T="03">State responsibilities.</E> (1) The SHA's, as contracting agencies, have a responsibility to assure compliance by contractors with the requirements of Federal-aid construction contracts, including the equal opportunity requirements, and to assist in and cooperate with FHWA programs to assure equal opportunity.</P>
              <P>(2) The corrective action procedures outlined herein do not preclude normal contract administration procedures by the States to ensure the contractor's completion of specific contract equal opportunity requirements, as long as such procedures support, and sustain the objectives of E.O. 11246, as amended. The State shall inform FHWA of any actions taken against a contractor under normal State contract administration procedures, if that action is precipitated in whole or in part by noncompliance with equal opportunity contract requirements.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 230.407</SECTNO>
              <SUBJECT>Definitions.</SUBJECT>
              <P>For the purpose of this subpart, the following definitions shall apply, unless the context requires otherwise:</P>
              <P>(a) <E T="03">Actions,</E> identified by letter and number, shall refer to those items identified in the process flow chart. (Appendix D);</P>
              <P>(b) <E T="03">Affirmative Action Plan</E> means a written positive management tool of a total equal opportunity program indicating the action steps for all organizational levels of a contractor to initiate <PRTPAGE P="58"/>and measure equal opportunity program progress and effectiveness. (The Special Provisions [23 CFR part 230 A, appendix A] and areawide plans are Affirmative Action Plans.);</P>
              <P>(c) <E T="03">Affirmative Actions</E> means the efforts exerted towards achieving equal opportunity through positive, aggressive, and continuous result-oriented measures to correct past and present discriminatory practices and their effects on the conditions and privileges of employment. These measures include, but are not limited to, recruitment, hiring, promotion, upgrading, demotion, transfer, termination, compensation, and training;</P>
              <P>(d) <E T="03">Areawide Plan</E> means an Affirmative Action Plan approved by the Department of Labor to increase minority and female utilization in crafts of the construction industry in a specified geographical area pursuant to E.O. 11246, as amended, and taking the form of either a “Hometown” or an “Imposed” Plan.</P>
              <P>(1) <E T="03">Hometown Plan</E> means a voluntary areawide agreement usually developed by representatives of labor unions, minority organizations, and contractors, and approved by the OFCCP for the purpose of implementing the equal employment opportunity requirements pursuant to E.O. 11246, as amended;</P>
              <P>(2) <E T="03">Imposed Plan</E> means mandatory affirmative action requirements for a specified geographical area issued by OFCCP and, in some areas, by the courts;</P>
              <P>(e) <E T="03">Compliance Specialist</E> means a Federal or State employee regularly employed and experienced in civil rights policies, practices, procedures, and equal opportunity compliance review and evaluation functions;</P>
              <P>(f) <E T="03">Consolidated Compliance Review</E> means a review and evaluation of all significant construction employment in a specific geographical (target) area;</P>
              <P>(g) <E T="03">Construction</E> shall have the meanings set forth in 41 CFR 60-1.3(e) and 23 U.S.C. 101(a). References in both definitions to expenses or functions incidental to construction shall include preliminary engineering work in project development or engineering services performed by or for a SHA;</P>
              <P>(h) <E T="03">Corrective Action Plan</E> means a contractor's unequivocal written and signed commitment outlining actions taken or proposed, with time limits and goals, where appropriate to correct, compensate for, and remedy each violation of the equal opportunity requirements as specified in a list of deficiencies. (Sometimes called a conciliation agreement or a letter of commitment.);</P>
              <P>(i) <E T="03">Contractor</E> means, any person, corporation, partnership, or unincorporated association that holds a FHWA direct or federally assisted construction contract or subcontract regardless of tier;</P>
              <P>(j) <E T="03">Days</E> shall mean calendar days;</P>
              <P>(k) <E T="03">Discrimination</E> means a distinction in treatment based on race, color, religion, sex, or national origin;</P>
              <P>(l) <E T="03">Equal Employment Opportunity</E> means the absence of partiality or distinction in employment treatment, so that the right of all persons to work and advance on the basis of merit, ability, and potential is maintained;</P>
              <P>(m) <E T="03">Equal Opportunity Compliance Review</E> means an evaluation and determination of a nonexempt direct Federal or Federal-aid contractor's or subcontractor's compliance with equal opportunity requirements based on:</P>
              <P>(1) <E T="03">Project work force</E>—employees at the physical location of the construction activity;</P>
              <P>(2) <E T="03">Area work force</E>—employees at all Federal-aid, Federal, and non-Federal projects in a specific geographical area as determined under § 230.409 (b)(9); or</P>
              <P>(3) <E T="03">Home office work force</E>—employees at the physical location of the corporate, company, or other ownership headquarters or regional managerial, offices, including “white collar” personnel (managers, professionals, technicians, and clericals) and any maintenance or service personnel connected thereto;</P>
              <P>(n) <E T="03">Equal Opportunity Requirements</E> is a general term used throughout this document to mean all contract provisions relative to equal employment opportunity (EEO), subcontracting, and training;</P>
              <P>(o) <E T="03">Good Faith Effort</E> means affirmative action measures designed to implement the established objectives of an Affirmative Action Plan;</P>
              <P>(p) <E T="03">Show Cause Notice</E> means a written notification to a contractor based <PRTPAGE P="59"/>on the determination of the reviewer (or in appropriate cases by higher level authority) to be in noncompliance with the equal opportunity requirements. The notice informs the contractor of the specific basis for the determination and provides the opportunity, within 30 days from receipt, to present an explanation why sanctions should not be imposed;</P>
              <P>(q) <E T="03">State highway agency</E> (SHA) means that department, commission, board, or official of any State charged by its laws with the responsibility for highway construction. The term <E T="03">State</E> should be considered equivalent to <E T="03">State highway agency.</E> With regard to direct Federal contracts, references herein to SHA's shall be considered to refer to FHWA regional offices, as appropriate.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 230.409</SECTNO>
              <SUBJECT>Contract compliance review procedures.</SUBJECT>
              <P>(a) <E T="03">General.</E> A compliance review consists of the following elements:</P>
              <P>(1) Review Scheduling (Actions R-1 and R-2).</P>
              <P>(2) Contractor Notification (Action R-3).</P>
              <P>(3) Preliminary Analysis (Phase I) (Action R-4).</P>
              <P>(4) Onsite Verification and Interviews (Phase II) (Action R-5).</P>
              <P>(5) Exit Conference (Action R-6).</P>
              <P>(6) Compliance Determination and Formal Notification (Actions R-8, R-9, R-10, R-11, R-12).</P>
              <FP>The compliance review procedure, as described herein and in appendix D provides for continual monitoring of the employment process. Monitoring officials at all levels shall analyze submissions from field offices to ensure proper completion of procedural requirements and to ascertain the effectiveness of program implementation.</FP>
              <P>(b) <E T="03">Review scheduling.</E> (<E T="03">Actions R-1 and R-2</E>). Because construction work forces are not constant, particular attention should be paid to the proper scheduling of equal opportunity compliance reviews. Priority in scheduling equal opportunity compliance reviews shall be given to reviewing those contractor's work forces:</P>
              <P>(1) Which hold the greatest potential for employment and promotion of minorities and women (particularly in higher skilled crafts or occupations);</P>
              <P>(2) Working in areas which have significant minority and female labor forces within a reasonable recruitment area;</P>
              <P>(3) Working on projects that include special training provisions; and</P>
              <P>(4) Where compliance with equal opportunity requirements is questionable. (Based on previous PR-1391's (23 CFR part 230, subpart A, appendix C) Review Reports and Hometown Plan Reports).</P>
              <FP>In addition, the following considerations shall apply:</FP>
              <P>(5) Reviews specifically requested by the Washington Headquarters shall receive priority scheduling;</P>
              <P>(6) Compliance Reviews in geographical areas covered by areawide plans would normally be reviewed under the Consolidated Compliance Review Procedures set forth in § 230.415.</P>
              <P>(7) Reviews shall be conducted prior to or during peak employment periods.</P>
              <P>(8) No compliance review shall be conducted that is based on a home office work force of less than 15 employees unless requested or approved by Washington Headquarters; and</P>
              <P>(9) For compliance reviews based on an area work force (outside of areawide plan coverage), the Compliance Specialist shall define the applicable geographical area by considering:</P>
              <P>(i) Union geographical boundaries;</P>

              <P>(ii) The geographical area from which the contractor recruits employees, <E T="03">i.e.</E>, reasonable recruitment area;</P>
              <P>(iii) Standard Metropolitan Statistical Area (SMSA) or census tracts; and</P>
              <P>(iv) The county in which the Federal or Federal-aid project(s) is located and adjacent counties.</P>
              <P>(c) <E T="03">Contractor notification</E> (<E T="03">Action R-3</E>). (1) The Compliance Specialist should usually provide written notification to the contractor of the pending compliance review at least 2 weeks prior to the onsite verification and interviews. This notification shall include the scheduled date(s), an outline of the mechanics and basis of the review, requisite interviews, and documents required.</P>

              <P>(2) The contractor shall be requested to provide a meeting place on the day <PRTPAGE P="60"/>of the visit either at the local office of the contractor or at the jobsite.</P>
              <P>(3) The contractor shall be requested to supply all of the following information to the Compliance Specialist prior to the onsite verification and interviews.</P>
              <P>(i) Current Form PR-1391 developed from the most recent payroll;</P>
              <P>(ii) Copies of all current bargaining agreements;</P>
              <P>(iii) Copies of purchase orders and subcontracts containing the EEO clause;</P>
              <P>(iv) A list of recruitment sources available and utilized;</P>
              <P>(v) A statement of the status of any action pertaining to employment practices taken by the Equal Employment Opportunity Commission (EEOC) or other Federal, State, or local agency regarding the contractor or any source of employees;</P>
              <P>(vi) A list of promotions made during the past 6 months, to include race, national origin, and sex of employee, previous job held, job promoted into; and corresponding wage rates;</P>
              <P>(vii) An annotated payroll to show job classification, race, national origin and sex;</P>
              <P>(viii) A list of minority- or female-owned companies contacted as possible subcontractors, vendors, material suppliers, etc.; and</P>
              <P>(ix) Any other necessary documents or statements requested by the Compliance Specialist for review prior to the actual onsite visit.</P>
              <P>(4) For a project review, the prime contractor shall be held responsible for ensuring that all active subcontractors are present at the meeting and have supplied the documentation listed in § 230.409(c)(3).</P>
              <P>(d) <E T="03">Preliminary analysis</E> (<E T="03">Phase I</E>) (<E T="03">Action R-4</E>). Before the onsite verification and interviews, the Compliance Specialist shall analyze the employment patterns, policies, practices, and programs of the contractor to determine whether or not problems exist by reviewing information relative to:</P>
              <P>(1) The contractor's current work force;</P>
              <P>(2) The contractor's relationship with referral sources, e.g., unions, employment agencies, community action agencies, minority and female organizations, etc.;</P>
              <P>(3) The minority and female representation of sources;</P>
              <P>(4) The availability of minorities and females with requisite skills in a reasonable recruitment area;</P>
              <P>(5) Any pending EEOC or Department of Justice cases or local or State Fair Employment Agency cases which are relevant to the contractor and/or the referral sources; and</P>
              <P>(6) The related projects (and/or contractor) files of FHWA regional or division and State Coordinator's offices to obtain current information relating to the status of the contractor's project(s), value, scheduled duration, written corrective action plans, PR-1391 or Manpower Utilization Reports, training requirements, previous compliance reviews, and other pertinent correspondence and/or reports.</P>
              <P>(e) <E T="03">Onsite verification and interviews</E> (<E T="03">Phase II</E>) (<E T="03">Action R-5</E>). (1) Phase II of the review consists of the construction or home office site visit(s). During the initial meeting with the contractor, the following topics shall be discussed:</P>
              <P>(i) Objectives of the visit;</P>
              <P>(ii) The material submitted by the contractor, including the actual implementation of the employee referral source system and any discrepancies found in the material; and</P>
              <P>(iii) Arrangements for the site tour(s) and employee interviews.</P>
              <P>(2) The Compliance Specialist shall make a physical tour of the employment site(s) to determine that:</P>
              <P>(i) EEO posters are displayed in conspicuous places in a legible fashion;</P>
              <P>(ii) Facilities are provided on a nonsegregated basis (e.g. work areas, washroom, timeclocks, locker rooms, storage areas, parking lots, and drinking fountains);</P>
              <P>(iii) Supervisory personnel have been oriented to the contractor's EEO commitments;</P>
              <P>(iv) The employee referral source system is being implemented;</P>
              <P>(v) Reported employment data is accurate;</P>

              <P>(vi) Meetings have been held with employees to discuss EEO policy, particularly new employees; and<PRTPAGE P="61"/>
              </P>
              <P>(vii) Employees are aware of their right to file complaints of discrimination.</P>
              <P>(3) The Compliance Specialist should interview at least one minority, one nonminority, and one woman in each trade, classification, or occupation. The contractor's superintendent or home office manager should also be interviewed.</P>
              <P>(4) The Compliance Specialist shall, on a sample basis, determine the union membership status of union employees on the site (e.g. whether they have permits, membership cards, or books, and in what category they are classified [e.g., A, B, or C]).</P>
              <P>(5) The Compliance Specialist shall also determine the method utilized to place employees on the job and whether equal opportunity requirements have been followed.</P>
              <P>(6) The Compliance Specialist shall determine, and the report shall indicate the following:</P>
              <P>(i) Is there reasonable representation and utilization of minorities and women in each craft, classification or occupation? If not, what has the contractor done to increase recruitment, hiring, upgrading, and training of minorities and women?</P>
              <P>(ii) What action is the contractor taking to meet the contractual requirement to provide equal employment opportunity?</P>
              <P>(iii) Are the actions taken by the contractor acceptable? Could they reasonably be expected to result in increased utilization of minorities and women?</P>
              <P>(iv) Is there impartiality in treatment of minorities and women?</P>
              <P>(v) Are affirmative action measures of an isolated nature or are they continuing?</P>
              <P>(vi) Have the contractor's efforts produced results?</P>
              <P>(f) <E T="03">Exit conference</E> (<E T="03">Action R-6</E>). (1) During the exit conference with the contractor, the following topics shall be discussed:</P>
              <P>(i) Any preliminary findings that, if not corrected immediately or not corrected by the adoption of an acceptable voluntary corrective action plan, would necessitate a determination of noncompliance;</P>
              <P>(ii) The process and time in which the contractor shall be informed of the final determination (15 days following the onsite verification and interviews); and</P>
              <P>(iii) Any other matters that would best be resolved before concluding the onsite portion of the review.</P>
              <P>(2) Voluntary corrective action plans may be negotiated at the exit conference, so that within 15 days following the exit portion of the review, the Compliance Specialist shall prepare the review report and make a determination of either:</P>
              <P>(i) Compliance, and so notify the contractor; or</P>
              <P>(ii) Noncompliance, and issue a 30-day show cause notice.</P>
              <FP>The acceptance of a voluntary corrective action plan at the exit conference does not preclude a determination of noncompliance, particularly if deficiencies not addressed by the plan are uncovered during the final analysis and report writing. (Action R-7) A voluntary corrective action plan should be accepted with the understanding that it only address those problems uncovered prior to the exit conference.</FP>
              <P>(g) <E T="03">Compliance determinations</E> (<E T="03">Action R-8</E>). (1) The evidence obtained at the compliance review shall constitute a sufficient basis for an objective determination by the Compliance Specialist conducting the review of the contractor's compliance or noncompliance with contractual provisions pursuant to E.O. 11246, as amended, and FHWA EEO Special Provisions implementing the Federal-Aid Highway Act of 1968, where applicable.</P>
              <P>(2) Compliance determinations on contractors working in a Hometown Plan Area shall reflect the status of those crafts covered by part II of the plan bid conditions. Findings regarding part I crafts shall be transmitted through channels to the Washington Headquarters, Office of Civil Rights.</P>
              <P>(3) The compliance status of the contractor will usually be reflected by positive efforts in the following areas:</P>
              <P>(i) The contractor's equal employment opportunity (EEO) policy;</P>

              <P>(ii) Dissemination of the policy and education of supervisory employees concerning their responsibilities in implementing the EEO policy;<PRTPAGE P="62"/>
              </P>
              <P>(iii) The authority and responsibilities of the EEO officer;</P>
              <P>(iv) The contractor's recruitment activities, especially establishing minority and female recruitment and referral procedures;</P>
              <P>(v) The extent of participation and minority and female utilization in FHWA training programs;</P>
              <P>(vi) The contractor's review of personnel actions to ensure equal opportunities;</P>
              <P>(vii) The contractor's participation in apprenticeship or other training;</P>
              <P>(viii) The contractor's relationship (if any) with unions and minority and female union membership;</P>
              <P>(ix) Effective measures to assure nonsegregated facilities, as required by contract provisions;</P>
              <P>(x) The contractor's procedures for monitoring subcontractors and utilization of minority and female subcontractors and/or subcontractors with substantial minority and female employment; and</P>
              <P>(xi) The adequacy of the contractor's records and reports.</P>
              <P>(4) A contractor shall be considered to be in compliance (Action R-9) when the equal opportunity requirements have been effectively implemented, or there is evidence that every good faith effort has been made toward achieving this end. Efforts to acheive this goal shall be result-oriented, initiated and maintained in good faith, and emphasized as any other vital management function.</P>
              <P>(5) A contractor shall be considered to be in noncompliance (Action R-10) when:</P>
              <P>(i) The contractor has discriminated against applicants or employees with respect to the conditions or privileges of employment; or</P>
              <P>(ii) The contractor fails to provide evidence of every good faith effort to provide equal opportunity.</P>
              <P>(h) <E T="03">Show cause procedures</E>—(1) <E T="03">General.</E> Once the onsite verification and exit conference (Action R-5) have been completed and a compliance determination made, (Action R-8), the contractor shall be notified in writing of the compliance determination. (Action R-11 or R-12) This written notification shall be sent to the contractor within 15 days following the completion of the onsite verification and exit conference. If a contractor is found in noncompliance (Action R-10), action efforts to bring the contractor into compliance shall be initiated through the issuance of a show cause notice (Action R-12). The notice shall advise the contractor to show cause within 30 days why sanctions should not be imposed.</P>
              <P>(2) <E T="03">When a show cause notice is required.</E> A show cause notice shall be issued when a determination of noncompliance is made based upon:</P>
              <P>(i) The findings of a compliance review;</P>
              <P>(ii) The results of an investigation which verifies the existence of discrimination; or</P>
              <P>(iii) Areawide plan reports that show an underutilization of minorities (based on criteria of U.S. Department of Labor's Optional Form 66 “Manpower Utilization Report”) throughout the contractor's work force covered by part II of the plan bid conditions.</P>
              <P>(3) <E T="03">Responsibility for issuance.</E> (i) Show cause notices will normally be issued by SHA's to federally assisted contractors when the State has made a determination of noncompliance, or when FHWA has made such a determination and has requested the State to issue the notice.</P>
              <P>(ii) When circumstances warrant, the Regional Federal Highway Administrator or a designee may exercise primary compliance responsibility by issuing the notice directly to the contractor.</P>
              <P>(iii) The Regional Federal Highway Administrators in Regions 8, 10, and the Regional Engineer in Region 15, shall issue show cause notices to direct Federal contractors found in noncompliance.</P>
              <P>(4) <E T="03">Content of show cause notice.</E> The show cause notice must: (See sample—appendix A of this subpart)</P>
              <P>(i) Notify the contractor of the determination of noncompliance;</P>
              <P>(ii) Provide the basis for the determination of noncompliance;</P>

              <P>(iii) Notify the contractor of the obligation to show cause within 30 days why formal proceedings should not be instituted;<PRTPAGE P="63"/>
              </P>
              <P>(iv) Schedule (date, time, and place) a compliance conference to be held approximately 15 days from the contractor's receipt of the notice;</P>
              <P>(v) Advise the contractor that the conference will be held to receive and discuss the acceptability of any proposed corrective action plan and/or correction of deficiencies; and</P>
              <P>(vi) Advise the contractor of the availability and willingness of the Compliance Specialist to conciliate within the time limits of the show cause notice.</P>
              <P>(5) <E T="03">Preparing and processing the show cause notice.</E> (i) The State or FHWA official who conducted the investigation or review shall develop complete background data for the issuance of the show cause notice and submit the recommendation to the head of the SHA or the Regional Federal Highway Administrator, as appropriate.</P>
              <P>(ii) The recommendation, background data, and final draft notice shall be reviewed by appropriate State or FHWA legal counsel.</P>
              <P>(iii) Show cause notices issued by the SHA shall be issued by the head of that agency or a designee.</P>
              <P>(iv) The notice shall be personally served to the contractor or delivered by certified mail, return receipt requested, with a certificate of service or the return receipt filed with the case record.</P>
              <P>(v) The date of the contractor's receipt of the show cause notice shall begin the 30-day show cause period. (Action R-13).</P>
              <P>(vi) The 30-day show cause notice shall be issued directly to the noncompliant contractor or subcontractor with an informational copy sent to any concerned prime contractors.</P>
              <P>(6) <E T="03">Conciliation efforts during show cause period.</E> (i) The Compliance Specialist is required to attempt conciliation with the contractor throughout the show cause time period. Conciliation and negotiation efforts shall be directed toward correcting contractor program deficiencies and initiating corrective action which will maintain and assure equal opportunity. Records shall be maintained in the State, FHWA division, or FHWA regional office's case files, as appropriate, indicating actions and reactions of the contractor, a brief synopsis of any meetings with the contractor, notes on verbal communication and written correspondence, requests for assistance or interpretations, and other relevant matters.</P>
              <P>(ii) In instances where a contractor is determined to be in compliance after a show cause notice has been issued, the show cause notice will be recinded and the contractor formally notified (Action R-17). The FHWA Washington Headquarters, Office of Civil Rights, shall immediately be notified of any change in status.</P>
              <P>(7) <E T="03">Corrective action plans.</E> (i) When a contractor is required to show cause and the deficiencies cannot be corrected within the 30-day show cause period, a written corrective action plan may be accepted. The written corrective action plan shall specify clear unequivocal action by the contractor with time limits for completion. Token actions to correct cited deficiencies will not be accepted. (See Sample Corrective Action Plan—appendix B of this subpart)</P>
              <P>(ii) When a contractor submits an acceptable written corrective action plan, the contractor shall be considered in compliance during the plan's effective implementation and submission of required progress reports. (Action R-15 and R-17).</P>
              <P>(iii) When an acceptable corrective action plan is not agreed upon and the contractor does not otherwise show cause as required, the formal hearing process shall be recommended through appropriate channels by the compliance specialist immediately upon expiration of the 30-day show cause period. (Action R-16, R-18, R-19)</P>
              <P>(iv) When a contractor, after having submitted an acceptable corrective action plan and being determined in compliance is subsequently determined to be in noncompliance based upon the contractor's failure to implement the corrective action plan, the formal hearing process must be recommended immediately. There are no provisions for reinstituting a show cause notice.</P>

              <P>(v) When, however, a contractor operating under an acceptable corrective action plan carries out the provisions of the corrective action plan but the actions do not result in the necessary <PRTPAGE P="64"/>changes, the corrective action plan shall be immediately amended through negotiations. If, at this point, the contractor refuses to appropriately amend the corrective action plan, the formal hearing process shall be recommended immediately.</P>

              <P>(vi) A contractor operating under an approved voluntary corrective action plan (<E T="03">i.e.</E>, plan entered into prior to the issuance of a show cause) must be issued a 30-day show cause notice in the situations referred to in paragraphs (h) (7) (iv) and (v) of this section, <E T="03">i.e.</E>, failure to implement an approved corrective action plan or failure of corrective actions to result in necessary changes.</P>
              <P>(i) <E T="03">Followup reviews.</E> (1) A followup review is an extension of the initial review process to verify the contractors performance of corrective action and to validate progress report information. Therefore, followup reviews shall only be conducted of those contractors where the initial review resulted in a finding of noncompliance and a show cause notice was issued.</P>
              <P>(2) Followup reviews shall be reported as a narrative summary referencing the initial review report.</P>
              <P>(j) <E T="03">Hearing process.</E> (1) When such procedures as show cause issuance and conciliation conferences have been unsuccessful in bringing contractors into compliance within the prescribed 30 days, the reviewer (or other appropriate level) shall immediately recommend, through channels, that the Department of Transportation obtain approval from the Office of Federal Contract Compliance Programs for a formal hearing (Action R-19). The Contractor should be notified of this action.</P>
              <P>(2) Recommendations to the Federal Highway Administrator for hearing approval shall be accompanied by full reports of findings and case files containing any related correspondence. The following items shall be included with the recommendation:</P>
              <P>(i) Copies of all Federal and Federal-aid contracts and/or subcontracts to which the contractor is party;</P>
              <P>(ii) Copies of any contractor or subcontractor certifications;</P>
              <P>(iii) Copy of show cause notice;</P>
              <P>(iv) Copies of any corrective action plans; and</P>
              <P>(v) Copies of all pertinent Manpower Utilization Reports, if applicable.</P>
              <P>(3) SHA's through FHWA regional and division offices, will be advised of decisions and directions affecting contractors by the FHWA Washington Headquarters, Office of Civil Rights, for the Department of Transportation.</P>
              <P>(k) <E T="03">Responsibility determinations.</E> (1) In instances where requests for formal hearings are pending OFCCP approval, the contractor may be declared a nonresponsible contractor for inability to comply with the equal opportunity requirements.</P>
              <P>(2) SHA's shall refrain from entering into any contract or contract modification subject to E.O. 11246, as amended, with a contractor who has not demonstrated eligibility for Government contracts and federally assisted construction contracts pursuant to E.O. 11246, as amended.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 230.411</SECTNO>
              <SUBJECT>Guidance for conducting reviews.</SUBJECT>
              <P>(a) <E T="03">Extensions of time.</E> Reasonable extensions of time limits set forth in these instructions may be authorized by the SHA's or the FHWA regional office, as appropriate. However, all extensions are subject to Washington Headquarters approval and should only be granted with this understanding. The Federal Highway Administrator shall be notified of all time extensions granted and the justification therefor. In sensitive or special interest cases, simultaneous transmittal of reports and other pertinent documents is authorized.</P>
              <P>(b) <E T="03">Contract completion.</E> Completion of a contract or seasonal shutdown shall not preclude completion of the administrative procedures outlined herein or the possible imposition of sanctions or debarment.</P>
              <P>(c) <E T="03">Home office reviews outside regions.</E> When contractor's home offices are located outside the FHWA region in which the particular contract is being performed, and it is determined that the contractors' home offices should be reviewed, requests for such reviews with accompanying justification shall be forwarded through appropriate <PRTPAGE P="65"/>channels to the Washington Headquarters, Office of Civil Rights. After approval, the Washington Headquarters, Office of Civil Rights, (OCR) shall request the appropriate region to conduct the home office review.</P>
              <P>(d) <E T="03">Employment of women.</E> Executive Order 11246, as amended, implementing rules and regulations regarding sex discrimination are outlined in 41 CFR part 60-20. It is the responsibility of the Compliance Specialist to ensure that contractors provide women full participation in their work forces.</P>
              <P>(e) <E T="03">Effect of exclusive referral agreements.</E> (1) The OFCCP has established the following criteria for determining compliance when an exclusive referral agreement is involved;</P>
              <P>(i) It shall be no excuse that the union, with which the contractor has a collective bargaining agreement providing for exclusive referral, failed to refer minority or female employees.</P>
              <P>(ii) Discrimination in referral for employment, even if pursuant to provisions of a collective bargaining agreement, is prohibited by the National Labor Relations Act and Title VII of the Civil Rights Act of 1964, as amended.</P>
              <P>(iii) Contractors and subcontractors have a responsibility to provide equal opportunity if they want to participate in federally involved contracts. To the extent they have delegated the responsibility for some of their employment practices to some other organization or agency which prevents them from meeting their obligations, these contractors must be found in noncompliance.</P>
              <P>(2) If the contractor indicates that union action or inaction is a proximate cause of the contractor's failure to provide equal opportunity, a finding of noncompliance will be made and a show cause notice issued, and:</P>
              <P>(i) The contractor will be formally directed to comply with the equal opportunity requirements.</P>
              <P>(ii) Reviews of other contractors with projects within the jurisdiction of the applicable union locals shall be scheduled.</P>
              <P>(iii) If the reviews indicate a pattern and/or practice of discrimination on the part of specific union locals, each contractor in the area shall be informed of the criteria outlined in § 230.411(e)(1) of this section. Furthermore, the FHWA Washington Headquarters, OCR, shall be provided with full documentary evidence to support the discriminatory pattern indicated.</P>
              <P>(iv) In the event the union referral practices prevent the contractor from meeting the equal opportunity requirements pursuant to the E.O. 11246, as amended, such contractor shall immediately notify the SHA.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 230.413</SECTNO>
              <SUBJECT>Review reports.</SUBJECT>
              <P>(a) <E T="03">General.</E> (1) The Compliance Specialist shall maintain detailed notes from the beginning of the review from which a comprehensive compliance review report can be developed.</P>
              <P>(2) The completed compliance review report shall contain documentary evidence to support the determination of a contractor's or subcontractor's compliance status.</P>
              <P>(3) Findings, conclusions, and recommendations shall be explicitly stated and, when necessary, supported by documentary evidence.</P>
              <P>(4) The compliance review report shall contain at least the following information. <SU>1</SU>
                <FTREF/> (Action R-20)</P>
              <FTNT>
                <P>
                  <SU>1</SU> The Federal Highway Administration will accept completed Form FHWA-86 for the purpose. The form is available at the offices listed in 49 CFR part 7, appendix D.</P>
              </FTNT>
              <P>(i) Complete name and address of contractor.</P>
              <P>(ii) Project(s) identification.</P>
              <P>(iii) Basis for the review, <E T="03">i.e.</E>, area work force, project work force, home office work force, and target area work force.</P>
              <P>(iv) Identification of Federal or Federal-aid contract(s).</P>
              <P>(v) Date of review.</P>
              <P>(vi) Employment data by job craft, classification, or occupation by race and sex in accordance with (iii) above. This shall be the data verified during the onsite.</P>
              <P>(vii) Identification of local unions involved with contractor, when applicable.</P>
              <P>(viii) Determination of compliance status: compliance or noncompliance.</P>

              <P>(ix) Copy of show cause notice or compliance notification sent to contractor.<PRTPAGE P="66"/>
              </P>
              <P>(x) Name of the Compliance Specialist who conducted the review and whether that person is a State, division or regional Compliance Specialist.</P>
              <P>(xi) Concurrences at appropriate levels.</P>
              <P>(5) Each contractor (joint venture is one contractor) will be reported separately. When a project review is conducted, the reports should be attached, with the initial report being that of the prime contractor followed by the reports of each subcontractor.</P>
              <P>(6) Each review level is responsible for ensuring that required information is contained in the report.</P>
              <P>(7) When a project review is conducted, the project work force shall be reported. When an areawide review is conducted (all Federal-aid, Federal, and non-Federal projects in an area), then areawide work force shall be reported. When a home office review is conducted, only home office work force shall be reported. Other information required by regional offices shall be detached before forwarding the reports to the Washington Headquarters, OCR.</P>
              <P>(8) The Washington Headquarters, OCR, shall be provided all of the following:</P>
              <P>(i) The compliance review report required by § 230.413(a)(4).</P>
              <P>(ii) Corrective action plans.</P>
              <P>(iii) Show cause notices or compliance notifications.</P>
              <P>(iv) Show cause recissions.</P>
              <FP>While other data and information should be kept by regional offices (including progress reports, correspondence, and similar review backup material), it should not be routinely forwarded to the Washington Headquarters, OCR.</FP>
              <P>(b) <E T="03">Administrative requirements</E>—(1) <E T="03">State conducted reviews.</E> (i) Within 15 days from the completion of the onsite verification and exit conference, the State Compliance Specialist will:</P>
              <P>(A) Prepare the compliance review report, based on information obtained;</P>
              <P>(B) Determine the contractor's compliance status;</P>

              <P>(C) Notify the contractor of the compliance determination, <E T="03">i.e.</E>, send the contractor either notification of compliance or show cause notice; and</P>
              <P>(D) Forward three copies of the compliance review report, and the compliance notification or show cause notice to the FHWA division EEO Specialist.</P>
              <P>(ii) Within 10 days of receipt, the FHWA division EEO Specialist shall:</P>
              <P>(A) Analyze the State's report, ensure that it is complete and accurate;</P>
              <P>(B) Resolve nonconcurrence, if any;</P>
              <P>(C) Indicate concurrence, and, where appropriate, prepare comments; and</P>
              <P>(D) Forward two copies of the compliance review report, and the compliance notification or show cause notice to the Regional Civil Rights Director.</P>
              <P>(iii) Within 15 days of receipt, the FHWA Regional Civil Rights Director shall:</P>
              <P>(A) Analyze the report, ensure that it is complete and accurate;</P>
              <P>(B) Resolve nonconcurrence, if any;</P>
              <P>(C) Indicate concurrence, and, where appropriate, prepare comments; and</P>
              <P>(D) Forward one copy of the compliance review report, and the compliance notification or show cause notice to the Washington Headquarters, OCR.</P>
              <P>(2) <E T="03">FHWA division conducted reviews.</E> (i) Within 15 days from the completion of the onsite verification and exit conference, the division EEO Specialist shall:</P>
              <P>(A) Prepare compliance review report, based on information obtained;</P>
              <P>(B) Determine the contractor's compliance status;</P>

              <P>(C) Notify the State to send the contractor the compliance determination, <E T="03">i.e.</E>, either notification of compliance or show cause notice; and</P>
              <P>(D) Forward two copies of the compliance review report and the compliance notification or show cause notice to the Regional Civil Rights Director.</P>
              <P>(ii) Within 15 days of receipt, the FHWA Regional Civil Rights Director will take the steps outlined in § 230.413(b)(1)(iii).</P>
              <P>(3) <E T="03">FHWA region conducted reviews.</E> (i) Within 15 days from the completion of the onsite verification and exit conference the regional EEO Specialist shall:</P>
              <P>(A) Prepare the compliance review report, based on information obtained;</P>
              <P>(B) Determine the contractor's compliance status;</P>

              <P>(C) Inform the appropriate division to notify the State to send the contractor <PRTPAGE P="67"/>the compliance determination <E T="03">i.e.</E>, either notification of compliance or show cause notice; and</P>
              <P>(D) Forward one copy of the compliance review report, and the compliance notification or show cause notice to the Washington Headquarters, OCR.</P>
              <P>(4) Upon receipt of compliance review reports, the Washington Headquarters, OCR, shall review, resolve any nonconcurrences, and record them for the purpose of:</P>
              <P>(i) Providing ongoing technical assistance to FHWA regional and division offices and SHA's;</P>
              <P>(ii) Gathering a sufficient data base for program evaluation;</P>
              <P>(iii) Ensuring uniform standards are being applied in the compliance review process;</P>
              <P>(iv) Initiating appropriate changes in FHWA policy and implementing regulations; and</P>
              <P>(v) Responding to requests from the General Accounting Office, Office of Management and Budget, Senate Subcommittee on Public Roads, and other agencies and organizations.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 230.415</SECTNO>
              <SUBJECT>Consolidated compliance reviews.</SUBJECT>
              <P>(a) <E T="03">General.</E> Consolidated compliance reviews shall be implemented to determine employment opportunities on an areawide rather than an individual project basis. The consolidated compliance review approach shall be adopted and directed by either Headquarters, region, division, or SHA, however, consolidated reviews shall at all times remain a cooperative effort.</P>
              <P>(b) OFCCP policy requires contracting agencies to ensure compliance, in hometown an imposed plan areas, on an areawide rather than a project basis. The consolidated compliance review approach facilitates implementation of this policy.</P>
              <P>(c) <E T="03">Methodology</E>—(1) <E T="03">Selection of a target area.</E> In identifying the target area of a consolidated compliance review (e.g. SMSA, hometown or imposed plan area, a multicounty area, or an entire State), consideration shall at least be given to the following facts:</P>
              <P>(i) Minority and female work force concentrations;</P>
              <P>(ii) Suspected or alleged discrimination in union membership or referral practices by local unions involved in highway construction;</P>
              <P>(iii) Present or potential problem areas;</P>
              <P>(iv) The number of highway projects in the target area; and</P>
              <P>(v) Hometown or imposed plan reports that indicate underutilization of minorities or females.</P>
              <P>(2) <E T="03">Determine the review period.</E> After the target area has been selected, the dates for the actual onsite reviews shall be established.</P>
              <P>(3) <E T="03">Obtain background information.</E> EEO-3's Local Union Reports, should be obtained from regional offices of the EEOC. Target area civilian labor force statistics providing percent minorities and percent females in the target area shall be obtained from State employment security agencies or similar State agencies.</P>
              <P>(4) <E T="03">Identify contractors.</E> Every nonexempt federally assisted or direct Federal contractor and subcontractor in the target area shall be identified. In order to establish areawide employment patterns in the target area, employment data is needed for all contractors and subcontractors in the area. However, only those contractors with significant work forces (working prior to peak and not recently reviewed) may need to be actually reviwed onsite. Accordingly, once all contractors are identified, those contractors which will actually be reviewed onsite shall be determined. Compliance determinations shall only reflect the status of crafts covered by part II of plan bid conditions. Employment data of crafts covered by part I of plan bid conditions shall be gathered and identified as such in the composite report, however, OFCCP has reserved the responsibility for compliance determinations on crafts covered by part I of the plan bid conditions.</P>
              <P>(5) <E T="03">Contractor notification.</E> Those contractors selected for onsite review shall be sent a notification letter as outlined in § 230.409(c) along with a request for current workforce data <SU>2</SU>
                <FTREF/> for completion <PRTPAGE P="68"/>and submission at the onsite review. Those contractors in the target area not selected for onsite review shall also be requested to supply current workforce data as of the onsite review period, and shall return the data within 15 days following the onsite review period.</P>
              <FTNT>
                <P>
                  <SU>2</SU> The Consolidated Workforce Questionnaire is convenient for the purpose and appears as attachment 4 to volume 2, chapter 2, <PRTPAGE/>section 3 of the Federal-Aid Highway Program Manual, which is available at the offices listed in 49 CFR part 7, appendix D.</P>
              </FTNT>
              <P>(6) <E T="03">Onsite reviews.</E> Compliance reviews shall then be conducted in accordance with the requirements set forth in § 230.409. Reviewers may use Form FHWA-86, Compliance Data Report, if appropriate. It is of particular importance during the onsite reviews that the review team provide for adequate coordination of activities at every stage of the review process.</P>
              <P>(7) <E T="03">Compliance determinations.</E> Upon completion of the consolidated reviews, compliance determinations shall be made on each review by the reviewer. Individual show cause notices or compliance notifications shall be sent (as appropriate) to each reviewed contractor.</P>
              <FP>The compliance determination shall be based on the contractor's target area work force (Federal, Federal-aid and non-Federal), except when the target area is coincidental with hometown plan area, compliance determinations must not be based on that part of a contractor's work force covered by part I of the plan bid conditions, as previously set forth in this regulation. For example: ABC Contracting, Inc. employs carpenters, operating engineers, and cement masons. Carpenters and operating engineers are covered by part II of the plan bid conditions, however, cement masons are covered by part I of the plan bid conditions. The compliance determination must be based only on the contractor's utilization of carpenters and operating engineers.</FP>
              <P>(d) <E T="03">Reporting</E>—(1) <E T="03">Composite report.</E> A final composite report shall be submitted as a complete package to the Washington Headquarters, OCR, within 45 days after the review period and shall consist of the following:</P>
              <P>(i) Compliance review report, for each contractor and subcontractor with accompanying show cause notice or compliance notification.</P>
              <P>(ii) Work force data to show the aggregate employment of all contractors in the target area.</P>
              <P>(iii) A narrative summary of findings and recommendations to include the following:</P>
              <P>(A) A summary of highway construction employment in the target area by craft, race, and sex. This summary should explore possible patterns of discrimination or underutilization and possible causes, and should compare the utilization of minorities and females on contractor's work forces to the civilian labor force percent for minorities and females in the target area.</P>
              <P>(B) If the target area is a plan area, a narrative summary of the plan's effectiveness with an identification of part I and part II crafts. This summary shall discuss possible differences in minority and female utilization between part I and part II crafts, documenting any inferences drawn from such comparisons.</P>
              <P>(C) If applicable, discuss local labor unions' membership and/or referral practices that impact on the utilization of minorities and females in the target area. Complete and current copies of all collective bargaining agreements and copies of EEO-3, Local Union Reports, for all appropriate unions shall accompany the composite report.</P>
              <P>(D) Any other appropriate data, analyses, or information deemed necessary for a complete picture of the areawide employment.</P>
              <P>(E) Considering the information compiled from the summaries listed above, make concrete recommendations on possible avenues for correcting problems uncovered by the analyses.</P>
              <P>(2) <E T="03">Annual planning report.</E> The proper execution of consolidated compliance reviews necessitates scheduling, along with other fiscal program planning. The Washington Headquarters, OCR, shall be notified of all planned consolidated reviews by August 10 of each year and of any changes in the target area or review periods, as they become known. The annual consolidated planning report shall indicate:</P>
              <P>(i) Selected target areas:<PRTPAGE P="69"/>
              </P>
              <P>(ii) The basis for selection of each area; and</P>
              <P>(iii) The anticipated review period (dates) for each target area.</P>
            </SECTION>
            <APPENDIX>
              <EAR>Pt. 230, Subpt. D, App. A</EAR>
              <HD SOURCE="HED">Appendix A to Subpart D of Part 230—Sample Show Cause Notice</HD>
              <FP SOURCE="FP-1">Certified Mail, Return Receipt Requested</FP>
              <FP SOURCE="FP-1">Date</FP>
              <FP SOURCE="FP-1">Contractor's Name</FP>
              <FP SOURCE="FP-1">Address</FP>
              <FP SOURCE="FP-1">City, State, and Zip Code.</FP>
              
              <P>
                <E T="04">Dear Contractor:</E> As a result of the review of your (Project Number) project located at (Project Location) conducted on (Date) by (Reviewing Agency), it is our determination that you are not in compliance with your equal opportunity requirements and that good faith efforts have not been made to meet your equal opportunity requirements in the following areas:</P>
              <P>List of Deficiencies</P>
              <P>1.</P>
              <P>2.</P>
              <P>3.
              </P>
              <P>Your failure to take the contractually required affirmative action has contributed to the unacceptable level of minority and female employment in your operations, particularly in the semiskilled and skilled categories of employees.</P>
              <P>The Department of Labor regulations (41 CFR 60) implementing Executive Order 11246, as amended, are applicable to your Federal-aid highway construction contract and are controlling in this matter (see Required Contract Provisions, Form PR-1273, Clause II). Section 60-1.20(b) of these regulations provides that when equal opportunity deficiencies exist, it is necessary that you make a commitment in writing to correct such deficiencies before you may be found in compliance. The commitment must include the specific action which you propose to take to correct each deficiency and the date of completion of such action. The time period allotted shall be no longer than the minimum period necessary to effect the necessary correction. In accordance with instructions issued by the Office of Federal Contract Compliance Programs (OFCCP), U.S. Department of Labor, your written commitment must also provide for the submission of monthly progress reports which shall include a head count of minority and female representation at each level of each trade and a list of minority employees.</P>
              <P>You are specifically advised that making the commitment discussed above will not preclude a further determination of noncompliance upon a finding that the commitment is not sufficient to achieve compliance.</P>
              <P>We will hold a compliance conference at ________(Address) at ________ (Time) on ________(Date) for you to submit and discuss your written commitment. If your written commitment is acceptable and if the commitment is sufficient to achieve compliance, you will be found in compliance during the effective implementation of that commitment. You are cautioned, however, that our determination is subject to review by the Federal Highway Administration, the Department of Transportation, and OFCCP and may be disapproved if your written commitment is not considered sufficient to achieve compliance.</P>
              <P>If you indicate either directly or by inaction that you do not wish to participate in the scheduled conference and do not otherwise show cause within 30 days from receipt of this notice why enforcement proceedings should not be instituted, this agency will commence enforcement proceedings under Executive Order 11246, as amended.</P>
              <P>If your written commitment is accepted and it is subsequently found that you have failed to comply with its provisions, you will be advised of this determination and formal sanction proceedings will be instituted immediately.</P>
              <P>In the event formal sanction proceedings are instituted and the final determination is that a violation of your equal opportunity contract requirements has taken place, any Federal-aid highway construction contracts or subcontracts which you hold may be canceled, terminated, or suspended, and you may be debarred from further such contracts or subcontracts. Such other sanctions as are authorized by Executive Order 11246, as amended, may also be imposed.</P>
              <P>We encourage you to take whatever action is necessary to resolve this matter and are anxious to assist you in achieving compliance. Any questions concerning this notice should be addressed to (Name, Address, and Phone).</P>
              <P SOURCE="P2">Sincerely yours,</P>
              <CITA>[41 FR 34245, Aug. 13, 1976]</CITA>
            </APPENDIX>
            <APPENDIX>
              <EAR>Pt. 230, Subpt. D, App. B</EAR>
              <HD SOURCE="HED">Appendix B to Subpart D of Part 230—Sample Corrective Action Plan</HD>
              <P>Deficiency 1: Sources likely to yield minority employees have not been contacted for recruitment purposes.</P>

              <P>Commitment: We have developed a system of written job applications at our home office which readily identifies minority applicants. In addition to this, as a minimum, we will contact the National Association for the Advancement of Colored People (NAACP), League of Latin American Citizens (LULAC), Urban League, and the Employment Security Office within 20 days to establish a referral system for minority group applicants and expand our recruitment base. We are in the process of identifying other community organizations and associations that may be able to provide minority applicants and will <PRTPAGE P="70"/>submit an updated listing of recruitment sources and evidence of contact by ________(Date).</P>
              <P>Deficiency 2: There have been inadequate efforts to locate, qualify, and increase skills of minority and female employees and applicants for employment.</P>
              <P>Commitment: We will set up an individual file for each apprentice or trainee by ______(Date) in order to carefully screen the progress, ensure that they are receiving the necessary training, and being promoted promptly upon completion of training requirements. We have established a goal of at least 50 percent of our apprentices and trainees will be minorities and 15 percent will be female. In addition to the commitment made to deficiency number 1, we will conduct a similar identification of organizations able to supply female applicants. Based on our projected personnel needs, we expect to have reached our 50 percent goal for apprentices and trainees by _______(Date).</P>
              <P>Deficiency 3: Very little effort to assure subcontractors have meaningful minority group representation among their employees.</P>
              <P>
                <E T="03">Commitment:</E> In cooperation with the Regional Office of Minority Business Enterprise, Department of Commerce, and the local NAACP, we have identified seven minority-owned contractors that may be able to work on future contracts we may receive. These contractors (identified in the attached list) will be contacted prior to our bidding on all future contracts. In addition, we have scheduled a meeting with all subcontractors currently working on our contracts. This meeting will be held to inform the subcontractors of our intention to monitor their reports and require meaningful minority representation. This meeting will be held on __________(Date) and we will summarize the discussions and current posture of each subcontractor for your review by __________(Date) Additionally, as requested, we will submit a PR-1391 on __________(Date), ____________________(Date), __________(Date). Finally, we have committed ourselves to maintaining at least 20 percent minority and female representation in each trade during the time we are carrying out the above commitments. We plan to have completely implemented all the provisions of these commitments by __________(Date).</P>
              <CITA>[41 FR 34245, Aug. 13, 1976]</CITA>
            </APPENDIX>
            <APPENDIX>
              <EAR>Pt. 230, Subpt. D, App. C</EAR>
              <HD SOURCE="HED">Appendix C to Subpart D of Part 230—Sample Show Cause Rescission</HD>
              <FP SOURCE="FP-1">Certified Mail, Return Receipt Requested</FP>
              <FP SOURCE="FP-1">Date</FP>
              <FP SOURCE="FP-1">Contractor</FP>
              <FP SOURCE="FP-1">Address</FP>
              <FP SOURCE="FP-1">City, State, and Zip Code</FP>
              
              <P>
                <E T="04">Dear Contractor:</E> On _______, (Date) you received a 30-day show cause notice from this office for failing to implement the required contract requirements pertaining to equal employment opportunity.</P>
              <P>Your corrective action plan, discussed and submitted at the compliance conference held on __________(Date), has been reviewed and determined to be acceptable. Your implementation of your corrective action plan shows that you are now taking the required affirmative action and can be considered in compliance with Executive Order 11246, as amended. If it should later be determined that your corrective action plan is not sufficient to achieve compliance, this Rescission shall not preclude a subsequent finding of noncompliance.</P>
              <P>In view of the above, this letter is to inform you that the 30-day show cause notice of __________(Date) is hereby rescinded. You are further advised that if it is found that you have failed to comply with the provisions of your corrective action plan, formal sanction proceedings will be instituted immediately.</P>
              <P SOURCE="P2">Sincerely,</P>
            </APPENDIX>
            <APPENDIX>
              <PRTPAGE P="71"/>
              <EAR>Pt. 230, Subpt. D, App. D</EAR>
              <HD SOURCE="HED">Appendix D to Subpart D of Part 230—Equal Opportunity Compliance Review Process Flow Chart</HD>
              <GPH DEEP="435" SPAN="2">
                <GID>EC14OC91.004</GID>
              </GPH>
              <CITA>[41 FR 34245, Aug. 13, 1976]</CITA>
            </APPENDIX>
          </SUBPART>
        </PART>
      </SUBCHAP>
      <SUBCHAP TYPE="P">
        <PRTPAGE P="72"/>
        <HD SOURCE="HED">SUBCHAPTER D—NATIONAL HIGHWAY INSTITUTE</HD>
        <PART>
          <EAR>Pt. 260</EAR>
          <HD SOURCE="HED">PART 260—EDUCATION AND TRAINING PROGRAMS</HD>
          <CONTENTS>
            <SUBPART>
              <HD SOURCE="HED">Subpart A—Fellowship and Scholarship Grants</HD>
              <SECHD>Sec.</SECHD>
              <SECTNO>260.101</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <SECTNO>260.103</SECTNO>
              <SUBJECT>Definitions.</SUBJECT>
              <SECTNO>260.105</SECTNO>
              <SUBJECT>Policy.</SUBJECT>
              <SECTNO>260.107</SECTNO>
              <SUBJECT>Eligibility.</SUBJECT>
              <SECTNO>260.109</SECTNO>
              <SUBJECT>Selection.</SUBJECT>
              <SECTNO>260.111</SECTNO>
              <SUBJECT>Responsibilities of educational institutions.</SUBJECT>
              <SECTNO>260.113</SECTNO>
              <SUBJECT>Responsibilities of employing agencies.</SUBJECT>
              <SECTNO>260.115</SECTNO>
              <SUBJECT>Equal opportunity.</SUBJECT>
              <SECTNO>260.117</SECTNO>
              <SUBJECT>Application procedures.</SUBJECT>
            </SUBPART>
            <SUBPART>
              <RESERVED>Subparts B-C [Reserved]</RESERVED>
            </SUBPART>
            <SUBPART>
              <HD SOURCE="HED">Subpart D—State Education and Training Programs</HD>
              <SECTNO>260.401</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <SECTNO>260.403</SECTNO>
              <SUBJECT>Policy.</SUBJECT>
              <SECTNO>260.405</SECTNO>
              <SUBJECT>Application and approval procedures.</SUBJECT>
              <SECTNO>260.407</SECTNO>
              <SUBJECT>Implementation and reimbursement.</SUBJECT>
              <APP>Appendix A to Part 260—Request for Use of Federal-Aid Highway Funds for Education or Training (Form FHWA-1422)</APP>
            </SUBPART>
          </CONTENTS>
          <SUBPART>
            <HD SOURCE="HED">Subpart A—Fellowship and Scholarship Grants</HD>
            <AUTH>
              <HD SOURCE="HED">Authority:</HD>
              <P>23 U.S.C. 307(a), 315, 321 and 403; and 49 CFR 1.48(b).</P>
            </AUTH>
            <SOURCE>
              <HD SOURCE="HED">Source:</HD>
              <P>43 FR 3558, Jan. 26, 1978, unless otherwise noted.</P>
            </SOURCE>
            <SECTION>
              <SECTNO>§ 260.101</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <P>To establish policy for the Federal Highway Administration (FHWA) Fellowship and Scholarship Programs as administered by the National Highway Institute (NHI).</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 260.103</SECTNO>
              <SUBJECT>Definitions.</SUBJECT>
              <P>As used in this regulation, the following definitions apply:</P>
              <P>(a) <E T="03">Candidate.</E> One who meets the eligibility criteria set forth in § 260.107, and who has completed and submitted the necessary forms and documents in order to be considered for selection for a fellowship or scholarship.</P>
              <P>(b) <E T="03">Direct educational expenses.</E> Those expenses directly related to attending school including tuition, student fees, books, and expendable supplies but excluding travel expenses to and from the school.</P>
              <P>(c) <E T="03">Employing agency.</E> The agency for which the candidate works. This may be either a State or local highway/transportation agency or the FHWA.</P>
              <P>(d) <E T="03">Fellowship.</E> The grant presented to the recipient's school and administered by the school to assist the candidate financially during the period of graduate study.</P>
              <P>(e) <E T="03">Living stipend.</E> The portion of the fellowship or scholarship grant remaining after the direct educational expenses have been deducted.</P>
              <P>(f) <E T="03">Local highway/transportation agency.</E> The agency or metropolitan planning organization with the responsibility for initiating and carrying forward a highway program or public transportation program utilizing highways at the local level, usually the city or county level.</P>
              <P>(g) <E T="03">National Highway Institute (NHI).</E> The organization located within the FHWA responsible for the administration of the FHWA fellowship and scholarship grant programs.</P>
              <P>(h) <E T="03">Recipient.</E> The successful candidate receiving a fellowship or scholarship.</P>
              <P>(i) <E T="03">Scholarship.</E> The grant presented to the recipient's school and administered by the school to assist the candidate financially during the period of post-secondary study.</P>
              <P>(j) <E T="03">State highway/transportation agency.</E> The agency with the responsibility for initiating and carrying forward a highway program or public transportation program utilizing highways at the State level.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 260.105</SECTNO>
              <SUBJECT>Policy.</SUBJECT>

              <P>It is the policy of the FHWA to administer, through the NHI, fellowship and scholarship grant programs to assist State and local agencies and the FHWA in developing the expertise needed for the implementation of their highway programs and to assist in the <PRTPAGE P="73"/>development of more effective transportation programs at all levels of government. These programs shall provide financial support for up to 24 months of either full-time or part-time study in the field of highway transportation. The programs for each year shall be announced by FHWA notices. <SU>1</SU>
                <FTREF/> These notices shall contain an application form and shall announce the number of grants to be awarded and their value.</P>
              <FTNT>
                <P>
                  <SU>1</SU> The Federal Highway Administration notices are available for inspection and copying as prescribed in 49 CFR part 7, appendix D.</P>
              </FTNT>
              <CITA>[43 FR 3558, Jan. 26, 1978, as amended at 45 FR 67091, Oct. 9, 1980]</CITA>
            </SECTION>
            <SECTION>
              <SECTNO>§ 260.107</SECTNO>
              <SUBJECT>Eligibility.</SUBJECT>
              <P>(a) Prior recipients of FHWA scholarships or fellowships are eligible if they will have completed all specific work commitments before beginining study under the programs for which applications are made.</P>
              <P>(b) Candidates for the fellowship program shall have earned bachelor's or comparable college-level degrees prior to beginining advanced studies under the program.</P>
              <P>(c) Candidates shall submit evidence of acceptance, or probable acceptance, for study in programs that will enhance their contributions to their employers. Evidence of probable acceptance may be a letter from the department chairman or other school official.</P>
              <P>(d) Candidates shall agree to pursue certain minimum study loads as determined by the FHWA and designated in the FHWA notices announcing the programs each year.</P>
              <P>(e) FHWA employees who receive awards will be required to execute continued service agreements, consistent with the Government Employees Training Act requirements, which obligate the employees to continue to work for the agency for three times the duration of the training received.</P>
              <P>(f) Candidates who are students or employees of State or local highway/transportation agencies shall agree in writing to work on a full-time basis in public service with State or local highway/transportation agencies for a specified period of time after completing study under the program. The FHWA notices announcing the programs each year shall specify the time period of the work commitment.</P>
              <P>(g) Candidates shall agree to respond to brief questionnaires designed to assist the NHI in program evaluation both during and following the study period.</P>
              <P>(h) Recipients of awards for full-time shall agree to limit their part-time employment as stipulated in the FHWA notice announcing the programs.</P>
              <P>(i) Candidates shall not profit financially from FHWA grants. Where acceptance of the living stipend portion of the grant would result in a profit to the candidate, as determined by comparing the candidate's regular full-time salary with the candidate's part-time salary and employer salary support plus living stipend, the grant amount will be reduced accordingly. In cases where a candidate must relocate and maintain two households, exceptions to this condition will be considered.</P>
              <P>(j) Candidates shall be citizens, or shall declare their intent to become citizens of the United States.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 260.109</SECTNO>
              <SUBJECT>Selection.</SUBJECT>
              <P>(a) Candidates shall be rated by a selection panel appointed by the Director of the NHI. Members of the panel shall represent the highway transportation interests of government, industry, and the academic community. The factors considered by the selection panel are weighed in accordance with specific program objectives.</P>
              <P>(b) The major factors to be considered by the panel are:</P>
              <P>(1) Candidate's potential to contribute to a public agency's highway transportation program,</P>
              <P>(2) Relevance of a candidate's study program to the objectives of the fellowship or scholarship program,</P>
              <P>(3) Relevant experience, and</P>
              <P>(4) Academic and professional achievements.</P>
              <P>(c) Using ratings given by the selection panel, the Director of the NHI shall select candidates for awards and designate alternates.</P>

              <P>(d) The FHWA may designate in the FHWA notices announcing the programs the maximum number of awards <PRTPAGE P="74"/>that will be made to employees of any one agency.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 260.111</SECTNO>
              <SUBJECT>Responsibilities of educational institutions.</SUBJECT>
              <P>(a) The college or university chosen by the grant recipient shall enter into an appropriate agreement with the FHWA providing for the administration of the grant by the college or university.</P>
              <P>(b) The college or university chosen by the recipient shall designate a faculty advisor prior to the commitment of funds by the FHWA. The faculty advisor will be requested to submit reports of the recipient's study progress following completion of each study period. These reports are oriented toward total program evaluation. To assure the recipient's rights to privacy, the FHWA will obtain appropriate advance concurrences from the recipient.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 260.113</SECTNO>
              <SUBJECT>Responsibilities of employing agencies.</SUBJECT>
              <P>(a) A candidate's employing agency is responsible for furnishing a statement of endorsement and information concerning the relevancy of the candidate's study to agency requirements. The agency is encouraged to identify educational and training priorities and to provide backup to support its priority candidates for these programs.</P>
              <P>(b) Employing agencies are encouraged to give favorable consideration to the requests of candidates for educational leave and salary support for the study period to facilitate the candidates' applications. Agency decisions involving salary support and educational leave that will affect the acceptance of awards by recipients should be made at the earliest possible date to provide adequate time for the FHWA to select alternates to replace candidates that decline their awards.</P>
              <P>(c) Agencies are responsible for negotiations with their candidates concerning conditions of reinstatement and the candidates' commitments to return to work.</P>
              <P>(d) Employing agencies are encouraged to publicize the availability of these grants throughout the agencies, to implement procedures for internal evaluation of applications, and to forward the applications to the FHWA division office in their State.</P>
              <P>(e) Employing agencies that choose to process their employees' applications are responsible for observing the cutoff date for the FHWA to receive applications. This date will be stipulated in the Notices announcing the program for each academic year.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 260.115</SECTNO>
              <SUBJECT>Equal opportunity.</SUBJECT>
              <P>(a) Consistent with the provisions of the Civil Rights Act of 1964 and Title VI, assurances executed by each State, 23 U.S.C. 324, and 29 U.S.C. 794, no applicant, including otherwise qualified handicapped individuals, shall on the grounds of race, color, religion, sex, national origin, or handicap, be excluded from participation in, be denied benefits of, or be otherwise subjected to discrimination under this program.</P>
              <P>(b) In accordance with Executive Order 11141, no individual shall be denied benefits of this program because of age.</P>
              <P>(c) Agencies should make information on this program available to all eligible employees, including otherwise qualified handicapped individuals, so as to assure nondiscrimination on the grounds of race, color, religion, sex, national origin, age, or handicap.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 260.117</SECTNO>
              <SUBJECT>Application procedures.</SUBJECT>
              <P>(a) The FHWA notices announcing each year's programs and containing the application form may be obtained from FHWA regional and division offices, State highway agencies, metropolitan planning organizations, Governors' highway safety representatives, Urban Mass Transportation Administration regional directors, major transit authorities and from colleges and universities. Forms may also be obtained from the NHI, HHI-3, FHWA, Washington, DC 20590.</P>
              <P>(b) In order to become a candidate, the applicant shall complete and forward the application form according to the instructions in the FHWA notice announcing the programs. The cutoff date for submitting the application stipulated in the notices should be observed.</P>
            </SECTION>
          </SUBPART>
          <SUBPART>
            <RESERVED>Subparts B-C [Reserved]</RESERVED>
          </SUBPART>
          <SUBPART>
            <PRTPAGE P="75"/>
            <HD SOURCE="HED">Subpart D—State Education and Training Programs</HD>
            <AUTH>
              <HD SOURCE="HED">Authority:</HD>
              <P>23 U.S.C. 315, 321 (b) and (c); 49 CFR 1.48(b).</P>
            </AUTH>
            <SOURCE>
              <HD SOURCE="HED">Source:</HD>
              <P>43 FR 35477, Aug. 10, 1978, unless otherwise noted.</P>
            </SOURCE>
            <SECTION>
              <SECTNO>§ 260.401</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <P>To prescribe policy and implement procedures for the administration of Federal-aid funds for education and training of State and local highway department employees.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 260.403</SECTNO>
              <SUBJECT>Policy.</SUBJECT>
              <P>It is the policy of the Federal Highway Administration (FHWA) to provide continuing education of State and local highway agency employees engaged or to be engaged in Federal-aid highway work. To carry out this policy, States are encouraged to fully utilize the authority contained in 23 U.S.C. 321(b) and 321(c).</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 260.405</SECTNO>
              <SUBJECT>Application and approval procedures.</SUBJECT>
              <P>The State may apply for education and training funds by submitting a signed agreement designating the desired Federal-aid funds, not to exceed the limits in 23 U.S.C. 321(b). The FHWA's approval of the agreement will constitute obligation of funds and authorization for work to proceed.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 260.407</SECTNO>
              <SUBJECT>Implementation and reimbursement.</SUBJECT>
              <P>(a) After execution of the fiscal agreement, the State may make grants and contracts with public and private agencies, institutions, individuals, and the National Highway Institute to provide highway-related training and education. The principal recipients of this training shall be employees who are engaged or likely to be engaged, in Federal-aid highway work.</P>
              <P>(b) Claims for Federal-aid reimbursement of costs incurred may be submitted following established procedures to cover 75 percent of the cost of tuition and direct educational expenses (including incidental training, equipment, and program materials) exclusive of travel, subsistence, or salary of trainees.</P>
              <P>(c) As provided in 23 U.S.C. 321(c), education and training for subject areas that are identified by the FHWA as Federal program responsibilities, shall be provided at no cost to State and local governments.</P>
              <CITA>[43 FR 35477, Aug. 10, 1978, as amended at 45 FR 6378, Jan. 28, 1980; 53 FR 3745, Feb. 9, 1988]</CITA>
            </SECTION>
            <APPENDIX>
              <PRTPAGE P="76"/>
              <EAR>Pt. 260, App. A</EAR>
              <HD SOURCE="HED">Appendix A to Part 260—Request for Use of Federal-Aid Highway Funds for Education or Training (Form FHWA-1422)</HD>
              <GPH DEEP="470" SPAN="2">
                <GID>EC14OC91.005</GID>
              </GPH>
              <GPH DEEP="467" SPAN="2">
                <PRTPAGE P="77"/>
                <GID>EC14OC91.006</GID>
              </GPH>
            </APPENDIX>
          </SUBPART>
        </PART>
      </SUBCHAP>
      <SUBCHAP TYPE="P">
        <PRTPAGE P="78"/>
        <HD SOURCE="HED">SUBCHAPTER E—PLANNING AND RESEARCH</HD>
        <PART>
          <EAR>Pt. 420</EAR>
          <HD SOURCE="HED">PART 420—PLANNING AND RESEARCH PROGRAM ADMINISTRATION</HD>
          <CONTENTS>
            <SUBPART>
              <HD SOURCE="HED">Subpart A—Administration of FHWA Planning and Research Funds</HD>
              <SECHD>Sec.</SECHD>
              <SECTNO>420.101</SECTNO>
              <SUBJECT>What is the purpose of this part?</SUBJECT>
              <SECTNO>420.103</SECTNO>
              <SUBJECT>How does the FHWA define the terms used in this part?</SUBJECT>
              <SECTNO>420.105</SECTNO>
              <SUBJECT>What is the FHWA's policy on use of FHWA planning and research funds?</SUBJECT>
              <SECTNO>420.107</SECTNO>
              <SUBJECT>What is the minimum required expenditure of State planning and research funds for research development and technology transfer?</SUBJECT>
              <SECTNO>420.109</SECTNO>
              <SUBJECT>What are the requirements for distribution of metropolitan planning funds?</SUBJECT>
              <SECTNO>420.111</SECTNO>
              <SUBJECT>What are the documentation requirements for use of FHWA planning and research funds?</SUBJECT>
              <SECTNO>420.113</SECTNO>
              <SUBJECT>What costs are eligible?</SUBJECT>
              <SECTNO>420.115</SECTNO>
              <SUBJECT>What are the FHWA approval and authorization requirements?</SUBJECT>
              <SECTNO>420.117</SECTNO>
              <SUBJECT>What are the program monitoring and reporting requirements?</SUBJECT>
              <SECTNO>420.119</SECTNO>
              <SUBJECT>What are the fiscal requirements?</SUBJECT>
              <SECTNO>420.121</SECTNO>
              <SUBJECT>What other requirements apply to the administration of FHWA planning and research funds?</SUBJECT>
            </SUBPART>
            <SUBPART>
              <HD SOURCE="HED">Subpart B—Research, Development, and Technology Transfer Program Management</HD>
              <SECTNO>420.201</SECTNO>
              <SUBJECT>What is the purpose of this subpart?</SUBJECT>
              <SECTNO>420.203</SECTNO>
              <SUBJECT>How does the FHWA define the terms used in this subpart?</SUBJECT>
              <SECTNO>420.205</SECTNO>
              <SUBJECT>What is the FHWA's policy for research, development, and technology transfer funding?</SUBJECT>
              <SECTNO>420.207</SECTNO>
              <SUBJECT>What are the requirements for research, development, and technology transfer work programs?</SUBJECT>
              <SECTNO>420.209</SECTNO>
              <SUBJECT>What are the conditions for approval?</SUBJECT>
            </SUBPART>
          </CONTENTS>
          <AUTH>
            <HD SOURCE="HED">Authority:</HD>
            <P>23 U.S.C. 103(b)(6), 104(f), 115, 120, 133(b), 134(n), 303(g), 505, and 315; and 49 CFR 1.48(b).</P>
          </AUTH>
          <SOURCE>
            <HD SOURCE="HED">Source:</HD>
            <P>67 FR 47271, July 18, 2002, unless otherwise noted.</P>
          </SOURCE>
          <SUBPART>
            <HD SOURCE="HED">Subpart A—Administration of FHWA Planning and Research Funds</HD>
            <SECTION>
              <SECTNO>§ 420.101</SECTNO>
              <SUBJECT>What is the purpose of this part?</SUBJECT>
              <P>This part prescribes the Federal Highway Administration (FHWA) policies and procedures for the administration of activities undertaken by State departments of transportation (State DOTs) and their subrecipients, including metropolitan planning organizations (MPOs), with FHWA planning and research funds. Subpart A identifies the administrative requirements that apply to use of FHWA planning and research funds both for planning and for research, development, and technology transfer (RD&amp;T) activities. Subpart B describes the policies and procedures that relate to the approval and authorization of RD&amp;T work programs. The requirements in this part supplement those in 49 CFR part 18, Uniform Administrative Requirements for Grants and Cooperative Agreements to State and Local Governments and 49 CFR part 19, Uniform Administrative Requirements for Grants and Cooperative Agreements with Institutions of Higher Education, Hospitals and Other Non-Profit Organizations.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 420.103</SECTNO>
              <SUBJECT>How does the FHWA define the terms used in this part?</SUBJECT>
              <P>Unless otherwise specified in this part, the definitions in 23 U.S.C. 101(a) are applicable to this part. As used in this part:</P>
              <P>
                <E T="03">FHWA planning and research funds</E> include:</P>
              <P>(1) State planning and research (SPR) funds (the two percent set aside of funds apportioned or allocated to a State DOT for activities authorized under 23 U.S.C. 505);</P>
              <P>(2) Metropolitan planning (PL) funds (the one percent of funds authorized under 23 U.S.C. 104(f) to carry out the provisions of 23 U.S.C. 134);</P>

              <P>(3) National highway system (NHS) funds authorized under 23 U.S.C. 104(b)(1) used for transportation planning in accordance with 23 U.S.C. 134 <PRTPAGE P="79"/>and 135, highway research and planning in accordance with 23 U.S.C. 505, highway-related technology transfer activities, or development and establishment of management systems under 23 U.S.C. 303;</P>
              <P>(4) Surface transportation program (STP) funds authorized under 23 U.S.C. 104(b)(3) used for highway and transit research and development and technology transfer programs, surface transportation planning programs, or development and establishment of management systems under 23 U.S.C. 303; and</P>
              <P>(5) Minimum guarantee (MG) funds authorized under 23 U.S.C. 505 used for transportation planning and research, development and technology transfer activities that are eligible under title 23, U.S.C.</P>
              <P>
                <E T="03">Grant agreement</E> means a legal instrument reflecting a relationship between an awarding agency and a recipient or subrecipient when the principal purpose of the relationship is to transfer a thing of value to the recipient or subrecipient to carry out a public purpose of support or stimulation authorized by a law instead of acquiring (by purchase, lease, or barter) property or services for the direct benefit or use of the awarding agency.</P>
              <P>
                <E T="03">Metropolitan planning area</E> means the geographic area in which the metropolitan transportation planning process required by 23 U.S.C. 134 and 49 U.S.C. 5303-5305 must be carried out.</P>
              <P>
                <E T="03">Metropolitan planning organization (MPO)</E> means the forum for cooperative transportation decisionmaking for a metropolitan planning area.</P>
              <P>
                <E T="03">National Cooperative Highway Research Program (NCHRP)</E> means the cooperative RD&amp;T program directed toward solving problems of national or regional significance identified by State DOTs and the FHWA, and administered by the Transportation Research Board, National Academy of Sciences.</P>
              <P>
                <E T="03">Procurement contract</E> means a legal instrument reflecting a relationship between an awarding agency and a recipient or subrecipient when the principal purpose of the instrument is to acquire (by purchase, lease, or barter) property or services for the direct benefit or use of the awarding agency.</P>
              <P>
                <E T="03">State Department of Transportation (State DOT)</E> means that department, commission, board, or official of any State charged by its laws with the responsibility for highway construction.</P>
              <P>
                <E T="03">Transportation management area (TMA)</E> means an urbanized area with a population over 200,000 (as determined by the latest decennial census) and designated by the Secretary of Transportation or other area when TMA designation is requested by the Governor and the MPO (or affected local officials), and officially designated by the Secretary of Transportation.</P>
              <P>
                <E T="03">Transportation pooled fund study</E> means a planning, research, development, or technology transfer activity administered by the FHWA, a lead State DOT, or other organization that is supported by two or more participants and that addresses an issue of significant or widespread interest related to highway, public, or intermodal transportation. A transportation pooled fund study is intended to address a new area or provide information that will complement or advance previous investigations of the subject matter.</P>
              <P>
                <E T="03">Work program</E> means a periodic statement of proposed work, covering no less than one year, and estimated costs that documents eligible activities to be undertaken by State DOTs and/or their subrecipients with FHWA planning and research funds.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 420.105</SECTNO>
              <SUBJECT>What is the FHWA's policy on use of FHWA planning and research funds?</SUBJECT>
              <P>(a) If the FHWA determines that planning activities of national significance, identified in paragraph (b) of this section, and the requirements of 23 U.S.C. 134, 135, 303, and 505 are being adequately addressed, the FHWA will allow State DOTs and MPOs:</P>
              <P>(1) Maximum possible flexibility in the use of FHWA planning and research funds to meet highway and local public transportation planning and RD&amp;T needs at the national, State, and local levels while ensuring legal use of such funds and avoiding unnecessary duplication of efforts; and</P>

              <P>(2) To determine which eligible planning and RD&amp;T activities they desire <PRTPAGE P="80"/>to support with FHWA planning and research funds and at what funding level.</P>
              <P>(b) The State DOTs must provide data that support the FHWA's responsibilities to the Congress and to the public. These data include, but are not limited to, information required for: preparing proposed legislation and reports to the Congress; evaluating the extent, performance, condition, and use of the Nation's transportation systems; analyzing existing and proposed Federal-aid funding methods and levels and the assignment of user cost responsibility; maintaining a critical information base on fuel availability, use, and revenues generated; and calculating apportionment factors.</P>
              <P>(c) The policy in paragraph (a) of this section does not remove the FHWA's responsibility and authority to determine which activities are eligible for funding. Activities proposed to be funded with FHWA planning and research funds by the State DOTs and their subrecipients shall be documented and submitted for FHWA approval and authorization as prescribed in §§ 420.111 and 420.113. (The information collection requirements in paragraph (b) of § 420.105 have been approved by the Office of Management and Budget (OMB) under control numbers 2125-0028 and 2125-0032.)</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 420.107</SECTNO>
              <SUBJECT>What is the minimum required expenditure of State planning and research funds for research development and technology transfer?</SUBJECT>
              <P>(a) A State DOT must expend no less than 25 percent of its annual SPR funds on RD&amp;T activities relating to highway, public transportation, and intermodal transportation systems in accordance with the provisions of 23 U.S.C. 505(b), unless a State DOT certifies, and the FHWA accepts the State DOT's certification, that total expenditures by the State DOT during the fiscal year for transportation planning under 23 U.S.C. 134 and 135 will exceed 75 percent of the amount apportioned for the fiscal year.</P>
              <P>(b) Prior to submitting a request for an exception to the 25 percent requirement, the State DOT must ensure that:</P>
              <P>(1) The additional planning activities are essential, and there are no other reasonable options available for funding these planning activities (including the use of NHS, STP, MG, or FTA State planning and research funds (49 U.S.C. 5313(b)) or by deferment of lower priority planning activities);</P>
              <P>(2) The planning activities have a higher priority than RD&amp;T activities in the overall needs of the State DOT for a given fiscal year; and</P>
              <P>(3) The total level of effort by the State DOT in RD&amp;T (using both Federal and State funds) is adequate.</P>
              <P>(c) If the State DOT chooses to pursue an exception, it must send the request, along with supporting justification, to the FHWA Division Administrator for action by the FHWA Associate Administrator for Research, Development, and Technology. The Associate Administrator's decision will be based upon the following considerations:</P>
              <P>(1) Whether the State DOT has a process for identifying RD&amp;T needs and for implementing a viable RD&amp;T program.</P>
              <P>(2) Whether the State DOT is contributing to cooperative RD&amp;T programs or activities, such as the National Cooperative Highway Research Program, the Transportation Research Board, and transportation pooled fund studies.</P>
              <P>(3) Whether the State DOT is using SPR funds for technology transfer and for transit or intermodal research and development to help meet the 25 percent minimum requirement.</P>
              <P>(4) Whether the State DOT can demonstrate that it will meet the requirement or substantially increase its RD&amp;T expenditures over a multi-year period, if an exception is granted for the fiscal year.</P>
              <P>(5) Whether Federal funds needed for planning exceed the 75 percent limit for the fiscal year and whether any unused planning funds are available from previous fiscal years.</P>
              <P>(d) If the FHWA Associate Administrator for Research, Development, and Technology approves the State DOT's request for an exception, the exception is valid only for that fiscal year's funds. A new request must be submitted and approved for subsequent fiscal year funds.</P>
            </SECTION>
            <SECTION>
              <PRTPAGE P="81"/>
              <SECTNO>§ 420.109</SECTNO>
              <SUBJECT>What are the requirements for distribution of metropolitan planning funds?</SUBJECT>
              <P>(a) The State DOTs shall make all PL funds authorized by 23 U.S.C. 104(f) available to the MPOs in accordance with a formula developed by the State DOT, in consultation with the MPOs, and approved by the FHWA Division Administrator. The formula may allow for a portion of the PL funds to be used by the State DOT, or other agency agreed to by the State DOT and the MPOs, for activities that benefit all MPOs in the State, but State DOTs shall not use any PL funds for grant or subgrant administration. The formula may also provide for a portion of the funds to be made available for discretionary grants to MPOs to supplement their annual amount received under the distribution formula.</P>
              <P>(b) In developing the formula for distributing PL funds, the State DOT shall consider population, status of planning, attainment of air quality standards, metropolitan area transportation needs, and other factors necessary to provide for an appropriate distribution of funds to carry out the requirements of 23 U.S.C. 134 and other applicable requirements of Federal law.</P>
              <P>(c) The State DOTs shall inform the MPOs and the FHWA Division Office of the amounts allocated to each MPO as soon as possible after PL funds have been apportioned by the FHWA to the State DOTs.</P>
              <P>(d) If the State DOT, in a State receiving the minimum apportionment of PL funds under the provisions of 23 U.S.C. 104(f)(2), determines that the share of funds to be allocated to any MPO results in the MPO receiving more funds than necessary to carry out the provisions of 23 U.S.C. 134, the State DOT may, after considering the views of the affected MPO(s) and with the approval of the FHWA Division Administrator, use those funds for transportation planning outside of metropolitan planning areas.</P>
              <P>(e) In accordance with the provisions of 23 U.S.C. 134(n), any PL funds not needed for carrying out the metropolitan planning provisions of 23 U.S.C. 134 in any State may be made available by the MPO(s) to the State DOT for funding statewide planning activities under 23 U.S.C. 135, subject to approval by the FHWA Division Administrator.</P>
              <P>(f) Any State PL fund distribution formula that does not meet the requirements of paragraphs (a) and (b) of this section shall be brought into conformance with those requirements before distribution on any new apportionment of PL funds.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 420.111</SECTNO>
              <SUBJECT>What are the documentation requirements for use of FHWA planning and research funds?</SUBJECT>
              <P>(a) Proposed use of FHWA planning and research funds must be documented by the State DOTs and subrecipients in a work program, or other document that describes the work to be accomplished, that is acceptable to the FHWA Division Administrator. Statewide, metropolitan, other transportation planning activities, and transportation RD&amp;T activities may be documented in separate programs, paired in various combinations, or brought together as a single work program. The expenditure of PL funds for transportation planning outside of metropolitan planning areas under § 420.109(d) may be included in the work program for statewide transportation planning activities or in a separate work program submitted by the State DOT.</P>
              <P>(b)(1) A work program(s) for transportation planning activities must include a description of work to be accomplished and cost estimates by activity or task. In addition, each work program must include a summary that shows:</P>
              <P>(i) Federal share by type of fund;</P>
              <P>(ii) Matching rate by type of fund;</P>
              <P>(iii) State and/or local matching share; and</P>
              <P>(iv) Other State or local funds.</P>
              <P>(2) Additional information on metropolitan planning area work programs is contained in 23 CFR part 450. Additional information on RD&amp;T work program content and format is contained in subpart B of this part.</P>

              <P>(c) In areas not designated as TMAs, a simplified statement of work that describes who will perform the work and the work that will be accomplished using Federal funds may be used in lieu of a work program. If a simplified statement of work is used, it may be <PRTPAGE P="82"/>submitted separately or as part of the Statewide planning work program.</P>
              <P>(d) The State DOTs that use separate Federal-aid projects in accordance with paragraph (a) of this section must submit an overall summary that identifies the amounts and sources of FHWA planning and research funds available, matching funds, and the amounts budgeted for each activity (e.g., statewide planning, RD&amp;T, each metropolitan area, contributions to NCHRP and transportation pooled fund studies, etc.).</P>
              <P>(e) The State DOTs and MPOs also are encouraged to include cost estimates for transportation planning, research, development, and technology transfer related activities funded with other Federal or State and/or local funds; particularly for producing the FHWA-required data specified in paragraph (b) of § 420.105, for planning for other transportation modes, and for air quality planning activities in areas designated as non-attainment for transportation-related pollutants in their work programs. The MPOs in TMAs must include such information in their work programs. (The information collection requirements in §§ 420.111 have been approved by the OMB and assigned control numbers 2125-0039 for States and 2132-0529 for MPOs.)</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 420.113</SECTNO>
              <SUBJECT>What costs are eligible?</SUBJECT>
              <P>(a) Costs will be eligible for FHWA participation provided that the costs:</P>
              <P>(1) Are for work performed for activities eligible under the section of title 23, U.S.C., applicable to the class of funds used for the activities;</P>
              <P>(2) Are verifiable from the State DOT's or the subrecipient's records;</P>
              <P>(3) Are necessary and reasonable for proper and efficient accomplishment of project objectives and meet the other criteria for allowable costs in the applicable cost principles cited in 49 CFR 18.22;</P>
              <P>(4) Are included in the approved budget, or amendment thereto; and</P>
              <P>(5) Were not incurred prior to FHWA authorization.</P>
              <P>(b) Indirect costs of State DOTs and their subrecipients are allowable if supported by a cost allocation plan and indirect cost proposal prepared, submitted (if required), and approved by the cognizant or oversight agency in accordance with the OMB requirements applicable to the State DOT or subrecipient specified in 49 CFR 18.22(b).</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 420.115</SECTNO>
              <SUBJECT>What are the FHWA approval and authorization requirements?</SUBJECT>
              <P>(a) The State DOT and its subrecipients must obtain approval and authorization to proceed prior to beginning work on activities to be undertaken with FHWA planning and research funds. Such approvals and authorizations should be based on final work programs or other documents that describe the work to be performed. The State DOT and its subrecipients also must obtain prior approval for budget and programmatic changes as specified in 49 CFR 18.30 or 49 CFR 19.25 and for those items of allowable costs which require approval in accordance with the cost principles specified in 49 CFR 18.22(b) applicable to the entity expending the funds.</P>
              <P>(b) Authorization to proceed with the FHWA funded work in whole or in part is a contractual obligation of the Federal government pursuant to 23 U.S.C. 106 and requires that appropriate funds be available for the full Federal share of the cost of work authorized. Those State DOTs that do not have sufficient FHWA planning and research funds or obligation authority available to obligate the full Federal share of a work program or project may utilize the advance construction provisions of 23 U.S.C. 115(a) in accordance with the requirements of 23 CFR part 630, subpart G. The State DOTs that do not meet the advance construction provisions, or do not wish to utilize them, may request authorization to proceed with that portion of the work for which FHWA planning and research funds are available. In the latter case, authorization to proceed may be given for either selected work activities or for a portion of the program period, but such authorization does not constitute a commitment by the FHWA to fund the remaining portion of the work if additional funds do become available.</P>

              <P>(c) A project agreement must be executed by the State DOT and the FHWA Division Office for each statewide transportation planning, metropolitan <PRTPAGE P="83"/>planning area, or RD&amp;T work program, individual activity or study, or any combination administered as a single Federal-aid project. The project agreement may be executed concurrent with or after authorization has been given by the FHWA Division Administrator to proceed with the work in whole or in part. In the event that the project agreement is executed for only part of the work, the project agreement must be amended when authorization is given to proceed with additional work.</P>
              <APPRO>(The information collection requirements in § 420.115(c) have been approved by the OMB and assigned control numbers 2125-0529)</APPRO>
            </SECTION>
            <SECTION>
              <SECTNO>§ 420.117</SECTNO>
              <SUBJECT>What are the program monitoring and reporting requirements?</SUBJECT>
              <P>(a) In accordance with 49 CFR 18.40, the State DOT shall monitor all activities performed by its staff or by subrecipients with FHWA planning and research funds to assure that the work is being managed and performed satisfactorily and that time schedules are being met.</P>
              <P>(b)(1) The State DOT must submit performance and expenditure reports, including a report from each subrecipient, that contain as a minimum:</P>
              <P>(i) Comparison of actual performance with established goals;</P>
              <P>(ii) Progress in meeting schedules;</P>
              <P>(iii) Status of expenditures in a format compatible with the work program, including a comparison of budgeted (approved) amounts and actual costs incurred;</P>
              <P>(iv) Cost overruns or underruns;</P>
              <P>(v) Approved work program revisions; and</P>
              <P>(vi) Other pertinent supporting data.</P>
              <P>(2) Additional information on reporting requirements for individual RD&amp;T studies is contained in subpart B of this part.</P>
              <P>(c) Reports required by paragraph (b) of this section shall be annual unless more frequent reporting is determined to be necessary by the FHWA Division Administrator. The FHWA may not require more frequent than quarterly reporting unless the criteria in 49 CFR 18.12 or 49 CFR 19.14 are met. Reports are due 90 days after the end of the reporting period for annual and final reports and no later than 30 days after the end of the reporting period for other reports.</P>
              <P>(d) Events that have significant impact on the work must be reported as soon as they become known. The types of events or conditions that require reporting include: problems, delays, or adverse conditions that will materially affect the ability to attain program objectives. This disclosure must be accompanied by a statement of the action taken, or contemplated, and any Federal assistance needed to resolve the situation.</P>
              <P>(e) Suitable reports that document the results of activities performed with FHWA planning and research funds must be prepared by the State DOT or subrecipient and submitted for approval by the FHWA Division Administrator prior to publication. The FHWA Division Administrator may waive this requirement for prior approval. The FHWA's approval of reports constitutes acceptance of such reports as evidence of work performed but does not imply endorsement of a report's findings or recommendations. Reports prepared for FHWA-funded work must include appropriate credit references and disclaimer statements. (The information collection requirements in § 420.117 have been approved by the OMB and assigned control numbers 2125-0039 for States and 2132-0529 for MPOs.)</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 420.119</SECTNO>
              <SUBJECT>What are the fiscal requirements?</SUBJECT>

              <P>(a) The maximum rate of Federal participation for FHWA planning and research funds shall be as prescribed in title 23, U.S.C., for the specific class of funds used (<E T="03">i.e.,</E> SPR, PL, NHS, STP, or MG) except as specified in paragraph (d) of this section. The provisions of 49 CFR 18.24 or 49 CFR 19.23 are applicable to any necessary matching of FHWA planning and research funds.</P>

              <P>(b) The value of third party in-kind contributions may be accepted as the match for FHWA planning and research funds, in accordance with the provisions of 49 CFR 18.24(a)(2) or 49 CFR 19.23(a) and may be on either a total planning work program basis or for specific line items or projects. The use of third party in-kind contributions must be identified in the original work program/scope of work and the grant/<PRTPAGE P="84"/>subgrant agreement, or amendments thereto. The use of third-party in-kind contributions must be approved in advance by the FHWA Division Administrator and may not be made retroactive prior to approval of the work program/scope of work or an amendment thereto. The State DOT or subrecipient is responsible for ensuring that the following additional criteria are met:</P>
              <P>(1) The third party performing the work agrees to allow the value of the work to be used as the match;</P>
              <P>(2) The cost of the third party work is not paid for by other Federal funds or used as a match for other federally funded grants/subgrants;</P>
              <P>(3) The work performed by the third party is an eligible transportation planning or RD&amp;T related activity that benefits the federally funded work;</P>
              <P>(4) The third party costs (<E T="03">i.e.,</E> salaries, fringe benefits, etc.) are allowable under the applicable Office of Management and Budget (OMB) cost principles (<E T="03">i.e.,</E> OMB Circular A-21, A-87, or A-122);<SU>1</SU>
                <FTREF/>
              </P>
              <FTNT>
                <P>

                  <SU>1</SU> OMB Circulars are available on the Internet at <E T="03">http://www.whitehouse.gov/omb/circulars/index.html.</E>
                </P>
              </FTNT>
              <P>(5) The third party work is performed during the period to which the matching requirement applies;</P>
              <P>(6) The third party in-kind contributions are verifiable from the records of the State DOT or subrecipient and these records show how the value placed on third party in-kind contributions was derived; and</P>
              <P>(7) If the total amount of third party expenditures at the end of the program period is not sufficient to match the total expenditure of Federal funds by the recipient/subrecipient, the recipient/subrecipient will need to make up any shortfall with its own funds.</P>
              <P>(c) In accordance with the provisions of 23 U.S.C. 120(j), toll revenues that are generated and used by public, quasi-public, and private agencies to build, improve, or maintain highways, bridges, or tunnels that serve the public purpose of interstate commerce may be used as a credit for the non-Federal share of an FHWA planning and research funded project.</P>
              <P>(d) In accordance with 23 U.S.C. 505(c) or 23 U.S.C. 104(f)(3), the requirement for matching SPR or PL funds may be waived if the FHWA determines the interests of the Federal-aid highway program would be best served. Waiver of the matching requirement is intended to encourage State DOTs and/or MPOs to pool SPR and/or PL funds to address national or regional high priority planning or RD&amp;T problems that would benefit multiple States and/or MPOs. Requests for waiver of matching requirements must be submitted to the FHWA headquarters office for approval by the Associate Administrator for Planning and Environment (for planning activities) or the Associate Administrator for Research, Development, and Technology (for RD&amp;T activities). The matching requirement may not be waived for NHS, STP, or MG funds.</P>
              <P>(e) NHS, STP, or MG funds used for eligible planning and RD&amp;T purposes must be identified separately from SPR or PL funds in the work program(s) and must be administered and accounted for separately for fiscal purposes. In accordance with the statewide and metropolitan planning process requirements for fiscally constrained transportation improvement program (TIPs) planning or RD&amp;T activities funded with NHS, STP, or MG funds must be included in the Statewide and/or metropolitan TIP(s) unless the State DOT and MPO (for a metropolitan area) agree that they may be excluded from the TIP.</P>
              <P>(f) Payment shall be made in accordance with the provisions of 49 CFR 18.21 or 49 CFR 19.22.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 420.121</SECTNO>
              <SUBJECT>What other requirements apply to the administration of FHWA planning and research funds?</SUBJECT>
              <P>(a) <E T="03">Audits.</E> Audits of the State DOTs and their subrecipients shall be performed in accordance with OMB Circular A-133, Audits of States, Local Governments, and Non-Profit Organizations. <SU>2</SU>
                <FTREF/> Audits of for-profit contractors are to be performed in accordance with State DOT or subrecipient contract administration procedures.</P>
              <FTNT>
                <P>
                  <SU>2</SU> See footnote 1.</P>
              </FTNT>
              <PRTPAGE P="85"/>
              <P>(b) <E T="03">Copyrights.</E> The State DOTs and their subrecipients may copyright any books, publications, or other copyrightable materials developed in the course of the FHWA planning and research funded project. The FHWA reserves a royalty-free, nonexclusive and irrevocable right to reproduce, publish, or otherwise use, and to authorize others to use, the work for Government purposes.</P>
              <P>(c) <E T="03">Disadvantaged business enterprises.</E> The State DOTs must administer the transportation planning and RD&amp;T program(s) consistent with their overall efforts to implement section 1001(b) of the Transportation Equity Act for the 21st Century (Pub. L. 105-178) and 49 CFR part 26 regarding disadvantaged business enterprises.</P>
              <P>(d) <E T="03">Drug free workplace.</E> In accordance with the provisions of 49 CFR part 29, subpart F, State DOTs must certify to the FHWA that they will provide a drug free workplace. This requirement may be satisfied through the annual certification for the Federal-aid highway program.</P>
              <P>(e) <E T="03">Equipment.</E> Acquisition, use, and disposition of equipment purchased with FHWA planning and research funds by the State DOTs must be in accordance with 49 CFR 18.32(b). Local government subrecipients of State DOTs must follow the procedures specified by the State DOT. Universities, hospitals, and other non-profit organizations must follow the procedures in 49 CFR 19.34.</P>
              <P>(f) <E T="03">Financial management systems.</E> The financial management systems of the State DOTs and their local government subrecipients must be in accordance with the provisions of 49 CFR 18.20(a). The financial management systems of universities, hospitals, and other non-profit organizations must be in accordance with 49 CFR 19.21.</P>
              <P>(g) <E T="03">Lobbying.</E> The provisions of 49 CFR part 20 regarding restrictions on influencing certain Federal activities are applicable to all tiers of recipients of FHWA planning and research funds.</P>
              <P>(h) <E T="03">Nondiscrimination.</E> The nondiscrimination provisions of 23 CFR parts 200 and 230 and 49 CFR part 21, with respect to Title VI of the Civil Rights Act of 1964 and the Civil Rights Restoration Act of 1987, apply to all programs and activities of recipients, subrecipients, and contractors receiving FHWA planning and research funds whether or not those programs or activities are federally funded.</P>
              <P>(i) <E T="03">Patents.</E> The State DOTs and their subrecipients are subject to the provisions of 37 CFR part 401 governing patents and inventions and must include or cite the standard patent rights clause at 37 CFR 401.14, except for § 401.14(g), in all subgrants or contracts. In addition, State DOTs and their subrecipients must include the following clause, suitably modified to identify the parties, in all subgrants or contracts, regardless of tier, for experimental, developmental or research work: “The subgrantee or contractor will retain all rights provided for the State in this clause, and the State will not, as part of the consideration for awarding the subgrant or contract, obtain rights in the subgrantee's or contractor's subject inventions.”</P>
              <P>(j) <E T="03">Procurement.</E> Procedures for the procurement of property and services with FHWA planning and research funds by the State DOTs must be in accordance with 49 CFR 18.36(a) and (i) and, if applicable, 18.36(t). Local government subrecipients of State DOTs must follow the procedures specified by the State DOT. Universities, hospitals, and other non-profit organizations must follow the procedures in 49 CFR 19.40 through 19.48. The State DOTs and their subrecipients must not use FHWA funds for procurements from persons (as defined in 49 CFR 29.105) who have been debarred or suspended in accordance with the provisions of 49 CFR part 29, subparts A through E.</P>
              <P>(k) <E T="03">Program income.</E> Program income, as defined in 49 CFR 18.25(b) or 49 CFR 19.24, must be shown and deducted from total expenditures to determine the Federal share to be reimbursed, unless the FHWA Division Administrator has given prior approval to use the program income to perform additional eligible work or as the non-Federal match.</P>
              <P>(l) <E T="03">Record retention.</E> Recordkeeping and retention requirements must be in accordance with 49 CFR 18.42 or 49 CFR 19.53.</P>
              <P>(m) <E T="03">Subgrants to local governments.</E> The State DOTs and subrecipients are <PRTPAGE P="86"/>responsible for administering FHWA planning and research funds passed through to MPOs and local governments, for ensuring that such funds are expended for eligible activities, and for ensuring that the funds are administered in accordance with this part, 49 CFR part 18, Uniform Administrative Requirements for Grants and Agreements to State and Local Governments, and applicable OMB cost principles. The State DOTs shall follow State laws and procedures when awarding and administering subgrants to MPOs and local governments and must ensure that the requirements of 49 CFR 18.37(a) have been satisfied.</P>
              <P>(n) <E T="03">Subgrants to universities, hospitals, and other non-profit organizations.</E> The State DOTs and subrecipients are responsible for ensuring that FHWA planning and research funds passed through to universities, hospitals, and other non-profit organizations are expended for eligible activities and for ensuring that the funds are administered in accordance with this part, 49 CFR part 19, Uniform Administrative Requirements for Grants and Agreements with Institutions of Higher Education, Hospitals, and Other Non-Profit Organizations, and applicable OMB cost principles.</P>
              <P>(o) <E T="03">Suspension and debarment.</E> (1) The State DOTs and their subrecipients shall not award grants or cooperative agreements to entities who are debarred or suspended, or otherwise excluded from or ineligible for participation in Federal assistance programs under Executive Order 12549 of February 18, 1986 (3 CFR, 1986 Comp., p. 189); and</P>
              <P>(2) The State DOTs and their subrecipients shall comply with the provisions of 49 CFR part 29, subparts A through E, for procurements from persons (as defined in 49 CFR 29.105) who have been debarred or suspended.</P>
              <P>(p) <E T="03">Supplies.</E> Acquisition and disposition of supplies acquired by the State DOTs and their subrecipients with FHWA planning and research funds must be in accordance with 49 CFR 18.33 or 49 CFR 19.35.</P>
            </SECTION>
          </SUBPART>
          <SUBPART>
            <HD SOURCE="HED">Subpart B—Research, Development and Technology Transfer Program Management</HD>
            <SECTION>
              <SECTNO>§ 420.201</SECTNO>
              <SUBJECT>What is the purpose of this subpart?</SUBJECT>
              <P>The purpose of this subpart is to prescribe requirements for research, development, and technology transfer (RD&amp;T) activities, programs, and studies undertaken by State DOTs and their subrecipients with FHWA planning and research funds.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 420.203</SECTNO>
              <SUBJECT>How does the FHWA define the terms used in this subpart?</SUBJECT>
              <P>Unless otherwise specified in this part, the definitions in 23 U.S.C. 101(a) and subpart A of this part, are applicable to this subpart. As used in this subpart:</P>
              <P>
                <E T="03">Applied research</E> means the study of phenomena to gain knowledge or understanding necessary for determining the means by which a recognized need may be met; the primary purpose of this kind of research is to answer a question or solve a problem.</P>
              <P>
                <E T="03">Basic research</E> means the study of phenomena, and of observable facts, without specific applications towards processes or products in mind; the primary purpose of this kind of research is to increase knowledge.</P>
              <P>
                <E T="03">Development</E> means the systematic use of the knowledge or understanding gained from research, directed toward the production of useful materials, devices, systems or methods, including design and development of prototypes and processes.</P>
              <P>
                <E T="03">Final report</E> means a report documenting a completed RD&amp;T study or activity.</P>
              <P>
                <E T="03">Intermodal RD&amp;T</E> means research, development, and technology transfer activities involving more than one mode of transportation, including transfer facilities between modes.</P>
              <P>
                <E T="03">Peer exchange</E> means a periodic review of a State DOT's RD&amp;T program, or portion thereof, by representatives of other State DOT's, for the purpose of exchange of information or best practices. The State DOT may also invite the participation of the FHWA, and other Federal, State, regional or local <PRTPAGE P="87"/>transportation agencies, the Transportation Research Board, academic institutions, foundations or private firms that support transportation research, development or technology transfer activities.</P>
              <P>
                <E T="03">RD&amp;T activity</E> means a basic or applied research project or study, development or technology transfer activity.</P>
              <P>
                <E T="03">Research</E> means a systematic study directed toward fuller scientific knowledge or understanding of the subject studied. Research can be basic or applied.</P>
              <P>
                <E T="03">Technology transfer</E> means those activities that lead to the adoption of a new technique or product by users and involves dissemination, demonstration, training, and other activities that lead to eventual innovation.</P>
              <P>
                <E T="03">Transportation Research Information Services (TRIS)</E> means the database produced and maintained by the Transportation Research Board and available online through the National Transportation Library. TRIS includes bibliographic records and abstracts of on-going and completed RD&amp;T activities. TRIS Online also includes links to the full text of public-domain documents.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 420.205</SECTNO>
              <SUBJECT>What is the FHWA's policy for research, development, and technology transfer funding?</SUBJECT>
              <P>(a) It is the FHWA's policy to administer the RD&amp;T program activities utilizing FHWA planning and research funds consistent with the policy specified in § 420.105 and the following general principles in paragraphs (b) through (g) of this section.</P>
              <P>(b) The State DOTs must provide information necessary for peer exchanges.</P>
              <P>(c) The State DOTs are encouraged to develop, establish, and implement an RD&amp;T program, funded with Federal and State DOT resources that anticipates and addresses transportation concerns before they become critical problems. Further, the State DOTs are encouraged to include in this program development and technology transfer programs to share the results of their own research efforts and promote the use of new technology.</P>
              <P>(d) To promote effective use of available resources, the State DOTs are encouraged to cooperate with other State DOTs, the FHWA, and other appropriate agencies to achieve RD&amp;T objectives established at the national level and to develop a technology transfer program to promote and use those results. This includes contributing to cooperative RD&amp;T programs such as the NCHRP, the TRB, and transportation pooled fund studies as a means of addressing national and regional issues and as a means of leveraging funds.</P>
              <P>(e) The State DOTs will be allowed the authority and flexibility to manage and direct their RD&amp;T activities as presented in their work programs, and to initiate RD&amp;T activities supported by FHWA planning and research funds, subject to the limitation of Federal funds and to compliance with program conditions set forth in subpart A of this part and § 420.207.</P>
              <P>(f) The State DOTs will have primary responsibility for managing RD&amp;T activities supported with FHWA planning and research funds carried out by other State agencies and organizations and for ensuring that such funds are expended for purposes consistent with this subpart.</P>
              <P>(g) Each State DOT must develop, establish, and implement a management process that ensures effective use of available FHWA planning and research funds for RD&amp;T activities on a statewide basis. Each State DOT is permitted to tailor its management process to meet State or local needs; however, the process must comply with the minimum requirements and conditions of this subpart.</P>
              <P>(h) The State DOTs are encouraged to make effective use of the FHWA Division, Resource Center, and Headquarters office expertise in developing and carrying out their RD&amp;T activities. Participation of the FHWA on advisory panels and in program exchange meetings is encouraged.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 420.207</SECTNO>
              <SUBJECT>What are the requirements for research, development, and technology transfer work programs?</SUBJECT>

              <P>(a) The State DOT's RD&amp;T work program must, as a minimum, consist of a description of RD&amp;T activities to be accomplished during the program period, estimated costs for each eligible <PRTPAGE P="88"/>activity, and a description of any cooperative activities including the State DOT's participation in any transportation pooled fund studies and the NCHRP. The State DOT's work program should include a list of the major items with a cost estimate for each item. The work program should also include any study funded under a previous work program until a final report has been completed for the study.</P>
              <P>(b) The State DOT's RD&amp;T work program must include financial summaries showing the funding levels and share (Federal, State, and other sources) for RD&amp;T activities for the program year. State DOTs are encouraged to include any activity funded 100 percent with State or other funds for information purposes.</P>
              <P>(c) Approval and authorization procedures in § 420.115 are applicable to the State DOT's RD&amp;T work program.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 420.209</SECTNO>
              <SUBJECT>What are the conditions for approval?</SUBJECT>
              <P>(a) As a condition for approval of FHWA planning and research funds for RD&amp;T activities, a State DOT must develop, establish, and implement a management process that identifies and results in implementation of RD&amp;T activities expected to address high priority transportation issues. The management process must include:</P>
              <P>(1) An interactive process for identification and prioritization of RD&amp;T activities for inclusion in an RD&amp;T work program;</P>
              <P>(2) Use of all FHWA planning and research funds set aside for RD&amp;T activities, either internally or for participation in transportation pooled fund studies or other cooperative RD&amp;T programs, to the maximum extent possible;</P>
              <P>(3) Procedures for tracking program activities, schedules, accomplishments, and fiscal commitments;</P>
              <P>(4) Support and use of the TRIS database for program development, reporting of active RD&amp;T activities, and input of the final report information;</P>
              <P>(5) Procedures to determine the effectiveness of the State DOT's management process in implementing the RD&amp;T program, to determine the utilization of the State DOT's RD&amp;T outputs, and to facilitate peer exchanges of its RD&amp;T Program on a periodic basis;</P>
              <P>(6) Procedures for documenting RD&amp;T activities through the preparation of final reports. As a minimum, the documentation must include the data collected, analyses performed, conclusions, and recommendations. The State DOT must actively implement appropriate research findings and should document benefits; and</P>
              <P>(7) Participation in peer exchanges of its RD&amp;T management process and of other State DOTs' programs on a periodic basis. To assist peer exchange teams in conducting an effective exchange, the State DOT must provide to them the information and documentation required to be collected and maintained under this subpart. Travel and other costs associated with the State DOT's peer exchange may be identified as a line item in the State DOT's work program and will be eligible for 100 percent Federal funding. The peer exchange team must prepare a written report of the exchange.</P>
              <P>(b) Documentation that describes the State DOT's management process and the procedures for selecting and implementing RD&amp;T activities must be developed by the State DOT and submitted to the FHWA Division office for approval. Significant changes in the management process also must be submitted by the State DOT to the FHWA for approval. The State DOT must make the documentation available, as necessary, to facilitate peer exchanges.</P>

              <P>(c) The State DOT must include a certification that it is in full compliance with the requirements of this subpart in each RD&amp;T work program. If the State DOT is unable to certify full compliance, the FHWA Division Administrator may grant conditional approval of the State DOT's work program. A conditional approval must cite those areas of the State DOT's management process that are deficient and require that the deficiencies be corrected within 6 months of conditional approval. The certification must consist of a statement signed by the Administrator, or an official designated by the Administrator, of the State DOT certifying as follows: “I (name of certifying official), (position title), of the State (Commonwealth) of ____, do hereby <PRTPAGE P="89"/>certify that the State (Commonwealth) is in compliance with all requirements of 23 U.S.C. 505 and its implementing regulations with respect to the research, development, and technology transfer program, and contemplate no changes in statutes, regulations, or administrative procedures which would affect such compliance.”</P>
              <P>(d) The FHWA Division Administrator shall periodically review the State DOT's management process to determine if the State is in compliance with the requirements of this subpart. If the Division Administrator determines that a State DOT is not complying with the requirements of this subpart, or is not performing in accordance with its RD&amp;T management process, the FHWA Division Administrator shall issue a written notice of proposed determination of noncompliance to the State DOT. The notice will set forth the reasons for the proposed determination and inform the State DOT that it may reply in writing within 30 calendar days from the date of the notice. The State DOT's reply should address the deficiencies cited in the notice and provide documentation as necessary. If the State DOT and the Division Administrator cannot resolve the differences set forth in the determination of nonconformity, the State DOT may appeal to the Federal Highway Administrator whose action shall constitute the final decision of the FHWA. An adverse decision shall result in immediate withdrawal of approval of FHWA planning and research funds for the State DOT's RD&amp;T activities until the State DOT is in full compliance.</P>
              <APPRO>(The information collection requirements in § 420.209 have been approved by the OMB and assigned control number 2125-0039)</APPRO>
            </SECTION>
          </SUBPART>
        </PART>
        <PART>
          <EAR>Pt. 450</EAR>
          <HD SOURCE="HED">PART 450—PLANNING ASSISTANCE AND STANDARDS</HD>
          <CONTENTS>
            <SUBPART>
              <HD SOURCE="HED">Subpart A—Transportation Planning and Programming Definitions</HD>
              <SECHD>Sec.</SECHD>
              <SECTNO>450.100</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <SECTNO>450.102</SECTNO>
              <SUBJECT>Applicability.</SUBJECT>
              <SECTNO>450.104</SECTNO>
              <SUBJECT>Definitions.</SUBJECT>
            </SUBPART>
            <SUBPART>
              <HD SOURCE="HED">Subpart B—Statewide Transportation Planning and Programming</HD>
              <SECTNO>450.200</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <SECTNO>450.202</SECTNO>
              <SUBJECT>Applicability.</SUBJECT>
              <SECTNO>450.204</SECTNO>
              <SUBJECT>Definitions.</SUBJECT>
              <SECTNO>450.206</SECTNO>
              <SUBJECT>Scope of the statewide transportation planning process.</SUBJECT>
              <SECTNO>450.208</SECTNO>
              <SUBJECT>Coordination of planning process activities.</SUBJECT>
              <SECTNO>450.210</SECTNO>
              <SUBJECT>Interested parties, public involvement, and consultation.</SUBJECT>
              <SECTNO>450.212</SECTNO>
              <SUBJECT>Transportation planning studies and project development.</SUBJECT>
              <SECTNO>450.214</SECTNO>
              <SUBJECT>Development and content of the long-range statewide transportation plan.</SUBJECT>
              <SECTNO>450.216</SECTNO>
              <SUBJECT>Development and content of the statewide transportation improvement program (STIP).</SUBJECT>
              <SECTNO>450.218</SECTNO>
              <SUBJECT>Self-certifications, Federal findings, and Federal approvals.</SUBJECT>
              <SECTNO>450.220</SECTNO>
              <SUBJECT>Project selection from the STIP.</SUBJECT>
              <SECTNO>450.222</SECTNO>
              <SUBJECT>Applicability of NEPA to statewide transportation plans and programs.</SUBJECT>
              <SECTNO>450.224</SECTNO>
              <SUBJECT>Phase-in of new requirements.</SUBJECT>
            </SUBPART>
            <SUBPART>
              <HD SOURCE="HED">Subpart C—Metropolitan Transportation Planning and Programming</HD>
              <SECTNO>450.300</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <SECTNO>450.302</SECTNO>
              <SUBJECT>Applicability.</SUBJECT>
              <SECTNO>450.304</SECTNO>
              <SUBJECT>Definitions.</SUBJECT>
              <SECTNO>450.306</SECTNO>
              <SUBJECT>Scope of the metropolitan transportation planning process.</SUBJECT>
              <SECTNO>450.308</SECTNO>
              <SUBJECT>Funding for transportation planning and unified planning work programs.</SUBJECT>
              <SECTNO>450.310</SECTNO>
              <SUBJECT>Metropolitan planning organization designation and redesignation.</SUBJECT>
              <SECTNO>450.312</SECTNO>
              <SUBJECT>Metropolitan planning area boundaries.</SUBJECT>
              <SECTNO>450.314</SECTNO>
              <SUBJECT>Metropolitan planning agreements.</SUBJECT>
              <SECTNO>450.316</SECTNO>
              <SUBJECT>Interested parties, participation, and consultation.</SUBJECT>
              <SECTNO>450.318</SECTNO>
              <SUBJECT>Transportation planning studies and project development.</SUBJECT>
              <SECTNO>450.320</SECTNO>
              <SUBJECT>Congestion management process in transportation management areas.</SUBJECT>
              <SECTNO>450.322</SECTNO>
              <SUBJECT>Development and content of the metropolitan transportation plan.</SUBJECT>
              <SECTNO>450.324</SECTNO>
              <SUBJECT>Development and content of the transportation improvement program (TIP).</SUBJECT>
              <SECTNO>450.326</SECTNO>
              <SUBJECT>TIP revisions and relationship to the STIP.</SUBJECT>
              <SECTNO>450.328</SECTNO>
              <SUBJECT>TIP action by the FHWA and the FTA.</SUBJECT>
              <SECTNO>450.330</SECTNO>
              <SUBJECT>Project selection from the TIP.</SUBJECT>
              <SECTNO>450.332</SECTNO>
              <SUBJECT>Annual listing of obligated projects.</SUBJECT>
              <SECTNO>450.334</SECTNO>
              <SUBJECT>Self-certifications and Federal certifications.</SUBJECT>
              <SECTNO>450.336</SECTNO>
              <SUBJECT>Applicability of NEPA to metropolitan transportation plans and programs.</SUBJECT>
              <SECTNO>450.338</SECTNO>
              <SUBJECT>Phase-in of new requirements.</SUBJECT>
              <APP>Appendix A to Part 450—Linking the Transportation Planning and NEPA Processes.</APP>
            </SUBPART>
          </CONTENTS>
          <AUTH>
            <PRTPAGE P="90"/>
            <HD SOURCE="HED">Authority:</HD>
            <P>23 U.S.C. 134 and 135; 42 U.S.C. 7410 <E T="03">et seq.</E>; 49 U.S.C. 5303 and 5304; 49 CFR 1.48 and 1.51.</P>
          </AUTH>
          <SOURCE>
            <HD SOURCE="HED">Source:</HD>
            <P>72 FR 7261, Feb. 14, 2007, unless otherwise noted.</P>
          </SOURCE>
          <SUBPART>
            <HD SOURCE="HED">Subpart A—Transportation Planning and Programming Definitions</HD>
            <SECTION>
              <SECTNO>§ 450.100</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <P>The purpose of this subpart is to provide definitions for terms used in this part.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 450.102</SECTNO>
              <SUBJECT>Applicability.</SUBJECT>
              <P>The definitions in this subpart are applicable to this part, except as otherwise provided.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 450.104</SECTNO>
              <SUBJECT>Definitions.</SUBJECT>
              <P>Unless otherwise specified, the definitions in 23 U.S.C. 101(a) and 49 U.S.C. 5302 are applicable to this part.</P>
              <P>
                <E T="03">Administrative modification</E> means a minor revision to a long-range statewide or metropolitan transportation plan, Transportation Improvement Program (TIP), or Statewide Transportation Improvement Program (STIP) that includes minor changes to project/project phase costs, minor changes to funding sources of previously-included projects, and minor changes to project/project phase initiation dates. An administrative modification is a revision that does not require public review and comment, redemonstration of fiscal constraint, or a conformity determination (in nonattainment and maintenance areas).</P>
              <P>
                <E T="03">Alternatives analysis (AA)</E> means a study required for eligibility of funding under the Federal Transit Administration's (FTA's) Capital Investment Grant program (49 U.S.C. 5309), which includes an assessment of a range of alternatives designed to address a transportation problem in a corridor or subarea, resulting in sufficient information to support selection by State and local officials of a locally preferred alternative for adoption into a metropolitan transportation plan, and for the Secretary to make decisions to advance the locally preferred alternative through the project development process, as set forth in 49 CFR part 611 (Major Capital Investment Projects).</P>
              <P>
                <E T="03">Amendment</E> means a revision to a long-range statewide or metropolitan transportation plan, TIP, or STIP that involves a major change to a project included in a metropolitan transportation plan, TIP, or STIP, including the addition or deletion of a project or a major change in project cost, project/project phase initiation dates, or a major change in design concept or design scope (e.g., changing project termini or the number of through traffic lanes). Changes to projects that are included only for illustrative purposes do not require an amendment. An amendment is a revision that requires public review and comment, redemonstration of fiscal constraint, or a conformity determination (for metropolitan transportation plans and TIPs involving “non-exempt” projects in nonattainment and maintenance areas). In the context of a long-range statewide transportation plan, an amendment is a revision approved by the State in accordance with its public involvement process.</P>
              <P>
                <E T="03">Attainment area</E> means any geographic area in which levels of a given criteria air pollutant (e.g., ozone, carbon monoxide, PM10, PM2.5, and nitrogen dioxide) meet the health-based National Ambient Air Quality Standards (NAAQS) for that pollutant. An area may be an attainment area for one pollutant and a nonattainment area for others. A “maintenance area” (see definition below) is not considered an attainment area for transportation planning purposes.</P>
              <P>
                <E T="03">Available funds</E> means funds derived from an existing source dedicated to or historically used for transportation purposes. For Federal funds, authorized and/or appropriated funds and the extrapolation of formula and discretionary funds at historic rates of increase are considered “available.” A similar approach may be used for State and local funds that are dedicated to or historically used for transportation purposes.</P>
              <P>
                <E T="03">Committed funds</E> means funds that have been dedicated or obligated for transportation purposes. For State funds that are not dedicated to transportation purposes, only those funds over which the Governor has control <PRTPAGE P="91"/>may be considered “committed.” Approval of a TIP by the Governor is considered a commitment of those funds over which the Governor has control. For local or private sources of funds not dedicated to or historically used for transportation purposes (including donations of property), a commitment in writing (e.g., letter of intent) by the responsible official or body having control of the funds may be considered a commitment. For projects involving 49 U.S.C. 5309 funding, execution of a Full Funding Grant Agreement (or equivalent) or a Project Construction Grant Agreement with the USDOT shall be considered a multi-year commitment of Federal funds.</P>
              <P>
                <E T="03">Conformity</E> means a Clean Air Act (42 U.S.C. 7506(c)) requirement that ensures that Federal funding and approval are given to transportation plans, programs and projects that are consistent with the air quality goals established by a State Implementation Plan (SIP). Conformity, to the purpose of the SIP, means that transportation activities will not cause new air quality violations, worsen existing violations, or delay timely attainment of the NAAQS. The transportation conformity rule (40 CFR part 93) sets forth policy, criteria, and procedures for demonstrating and assuring conformity of transportation activities.</P>
              <P>
                <E T="03">Conformity lapse</E> means, pursuant to section 176(c) of the Clean Air Act (42 U.S.C. 7506(c)), as amended, that the conformity determination for a metropolitan transportation plan or TIP has expired and thus there is no currently conforming metropolitan transportation plan or TIP.</P>
              <P>
                <E T="03">Congestion management process</E> means a systematic approach required in transportation management areas (TMAs) that provides for effective management and operation, based on a cooperatively developed and implemented metropolitan-wide strategy, of new and existing transportation facilities eligible for funding under title 23 U.S.C., and title 49 U.S.C., through the use of operational management strategies.</P>
              <P>
                <E T="03">Consideration</E> means that one or more parties takes into account the opinions, action, and relevant information from other parties in making a decision or determining a course of action.</P>
              <P>
                <E T="03">Consultation</E> means that one or more parties confer with other identified parties in accordance with an established process and, prior to taking action(s), considers the views of the other parties and periodically informs them about action(s) taken. This definition does not apply to the “consultation” performed by the States and the MPOs in comparing the long-range statewide transportation plan and the metropolitan transportation plan, respectively, to State and Tribal conservation plans or maps or inventories of natural or historic resources (see § 450.214(i) and § 450.322(g)(1) and (g)(2)).</P>
              <P>
                <E T="03">Cooperation</E> means that the parties involved in carrying out the transportation planning and programming processes work together to achieve a common goal or objective.</P>
              <P>
                <E T="03">Coordinated public transit-human services transportation plan</E> means a locally developed, coordinated transportation plan that identifies the transportation needs of individuals with disabilities, older adults, and people with low incomes, provides strategies for meeting those local needs, and prioritizes transportation services for funding and implementation.</P>
              <P>
                <E T="03">Coordination</E> means the cooperative development of plans, programs, and schedules among agencies and entities with legal standing and adjustment of such plans, programs, and schedules to achieve general consistency, as appropriate.</P>
              <P>
                <E T="03">Design concept</E> means the type of facility identified for a transportation improvement project (e.g., freeway, expressway, arterial highway, grade-separated highway, toll road, reserved right-of-way rail transit, mixed-traffic rail transit, or busway).</P>
              <P>
                <E T="03">Design scope</E> means the aspects that will affect the proposed facility's impact on the region, usually as they relate to vehicle or person carrying capacity and control (e.g., number of lanes or tracks to be constructed or added, length of project, signalization, safety features, access control including approximate number and location of interchanges, or preferential treatment for high-occupancy vehicles).<PRTPAGE P="92"/>
              </P>
              <P>
                <E T="03">Designated recipient</E> means an entity designated, in accordance with the planning process under 49 U.S.C. 5303, 5304, and 5306, by the chief executive officer of a State, responsible local officials, and publicly-owned operators of public transportation, to receive and apportion amounts under 49 U.S.C. 5336 that are attributable to transportation management areas (TMAs) identified under 49 U.S.C. 5303, or a State regional authority if the authority is responsible under the laws of a State for a capital project and for financing and directly providing public transportation.</P>
              <P>
                <E T="03">Environmental mitigation activities</E> means strategies, policies, programs, actions, and activities that, over time, will serve to avoid, minimize, or compensate for (by replacing or providing substitute resources) the impacts to or disruption of elements of the human and natural environment associated with the implementation of a long-range statewide transportation plan or metropolitan transportation plan. The human and natural environment includes, for example, neighborhoods and communities, homes and businesses, cultural resources, parks and recreation areas, wetlands and water sources, forested and other natural areas, agricultural areas, endangered and threatened species, and the ambient air. The environmental mitigation strategies and activities are intended to be regional in scope, and may not necessarily address potential project-level impacts.</P>
              <P>
                <E T="03">Federal land management agency</E> means units of the Federal Government currently responsible for the administration of public lands (e.g., U.S. Forest Service, U.S. Fish and Wildlife Service, Bureau of Land Management, and the National Park Service).</P>
              <P>
                <E T="03">Federally funded non-emergency transportation services</E> means transportation services provided to the general public, including those with special transport needs, by public transit, private non-profit service providers, and private third-party contractors to public agencies.</P>
              <P>
                <E T="03">Financial plan</E> means documentation required to be included with a metropolitan transportation plan and TIP (and optional for the long-range statewide transportation plan and STIP) that demonstrates the consistency between reasonably available and projected sources of Federal, State, local, and private revenues and the costs of implementing proposed transportation system improvements.</P>
              <P>
                <E T="03">Financially constrained or Fiscal constraint</E> means that the metropolitan transportation plan, TIP, and STIP includes sufficient financial information for demonstrating that projects in the metropolitan transportation plan, TIP, and STIP can be implemented using committed, available, or reasonably available revenue sources, with reasonable assurance that the federally supported transportation system is being adequately operated and maintained. For the TIP and the STIP, financial constraint/fiscal constraint applies to each program year. Additionally, projects in air quality nonattainment and maintenance areas can be included in the first two years of the TIP and STIP only if funds are “available” or “committed.”</P>
              <P>
                <E T="03">Freight shippers</E> means any business that routinely transports its products from one location to another by providers of freight transportation services or by its own vehicle fleet.</P>
              <P>
                <E T="03">Full funding grant agreement</E> means an instrument that defines the scope of a project, the Federal financial contribution, and other terms and conditions for funding New Starts projects as required by 49 U.S.C. 5309(d)(1).</P>
              <P>
                <E T="03">Governor</E> means the Governor of any of the 50 States or the Commonwealth of Puerto Rico or the Mayor of the District of Columbia.</P>
              <P>
                <E T="03">Illustrative project</E> means an additional transportation project that may (but is not required to) be included in a financial plan for a metropolitan transportation plan, TIP, or STIP if reasonable additional resources were to become available.</P>
              <P>
                <E T="03">Indian Tribal government</E> means a duly formed governing body for an Indian or Alaska Native tribe, band, nation, pueblo, village, or community that the Secretary of the Interior acknowledges to exist as an Indian Tribe pursuant to the Federally Recognized Indian Tribe List Act of 1994, Public Law 103-454.<PRTPAGE P="93"/>
              </P>
              <P>
                <E T="03">Intelligent transportation system (ITS)</E> means electronics, photonics, communications, or information processing used singly or in combination to improve the efficiency or safety of a surface transportation system.</P>
              <P>
                <E T="03">Interim metropolitan transportation plan</E> means a transportation plan composed of projects eligible to proceed under a conformity lapse and otherwise meeting all other applicable provisions of this part, including approval by the MPO.</P>
              <P>
                <E T="03">Interim transportation improvement program (TIP)</E> means a TIP composed of projects eligible to proceed under a conformity lapse and otherwise meeting all other applicable provisions of this part, including approval by the MPO and the Governor.</P>
              <P>
                <E T="03">Long-range statewide transportation plan</E> means the official, statewide, multimodal, transportation plan covering a period of no less than 20 years developed through the statewide transportation planning process.</P>
              <P>
                <E T="03">Maintenance area</E> means any geographic region of the United States that the EPA previously designated as a nonattainment area for one or more pollutants pursuant to the Clean Air Act Amendments of 1990, and subsequently redesignated as an attainment area subject to the requirement to develop a maintenance plan under section 175A of the Clean Air Act, as amended.</P>
              <P>
                <E T="03">Management system</E> means a systematic process, designed to assist decisionmakers in selecting cost effective strategies/actions to improve the efficiency or safety of, and protect the investment in the nation's infrastructure. A management system can include: Identification of performance measures; data collection and analysis; determination of needs; evaluation and selection of appropriate strategies/actions to address the needs; and evaluation of the effectiveness of the implemented strategies/actions.</P>
              <P>
                <E T="03">Metropolitan planning</E> area (MPA) means the geographic area determined by agreement between the metropolitan planning organization (MPO) for the area and the Governor, in which the metropolitan transportation planning process is carried out.</P>
              <P>
                <E T="03">Metropolitan planning organization (MPO)</E> means the policy board of an organization created and designated to carry out the metropolitan transportation planning process.</P>
              <P>
                <E T="03">Metropolitan transportation plan</E> means the official multimodal transportation plan addressing no less than a 20-year planning horizon that is developed, adopted, and updated by the MPO through the metropolitan transportation planning process.</P>
              <P>
                <E T="03">National ambient air quality standard (NAAQS)</E> means those standards established pursuant to section 109 of the Clean Air Act.</P>
              <P>
                <E T="03">Nonattainment area</E> means any geographic region of the United States that has been designated by the EPA as a nonattainment area under section 107 of the Clean Air Act for any pollutants for which an NAAQS exists.</P>
              <P>
                <E T="03">Non-metropolitan area</E> means a geographic area outside a designated metropolitan planning area.</P>
              <P>
                <E T="03">Non-metropolitan local officials</E> means elected and appointed officials of general purpose local government in a non-metropolitan area with responsibility for transportation.</P>
              <P>
                <E T="03">Obligated projects</E> means strategies and projects funded under title 23 U.S.C. and title 49 U.S.C. Chapter 53 for which the supporting Federal funds were authorized and committed by the State or designated recipient in the preceding program year, and authorized by the FHWA or awarded as a grant by the FTA.</P>
              <P>
                <E T="03">Operational and management strategies</E> means actions and strategies aimed at improving the performance of existing and planned transportation facilities to relieve congestion and maximizing the safety and mobility of people and goods.</P>
              <P>
                <E T="03">Project construction grant agreement</E> means an instrument that defines the scope of a project, the Federal financial contribution, and other terms and conditions for funding Small Starts projects as required by 49 U.S.C. 5309(e)(7).</P>
              <P>
                <E T="03">Project selection</E> means the procedures followed by MPOs, States, and public transportation operators to advance projects from the first four years of an approved TIP and/or STIP to implementation, in accordance with agreed upon procedures.<PRTPAGE P="94"/>
              </P>
              <P>
                <E T="03">Provider of freight transportation services</E> means any entity that transports or otherwise facilitates the movement of goods from one location to another for others or for itself.</P>
              <P>
                <E T="03">Public transportation operator</E> means the public entity which participates in the continuing, cooperative, and comprehensive transportation planning process in accordance with 23 U.S.C. 134 and 135 and 49 U.S.C. 5303 and 5304, and is the designated recipient of Federal funds under title 49 U.S.C. Chapter 53 for transportation by a conveyance that provides regular and continuing general or special transportation to the public, but does not include school bus, charter, or intercity bus transportation or intercity passenger rail transportation provided by Amtrak.</P>
              <P>
                <E T="03">Regional ITS architecture</E> means a regional framework for ensuring institutional agreement and technical integration for the implementation of ITS projects or groups of projects.</P>
              <P>
                <E T="03">Regionally significant project</E> means a transportation project (other than projects that may be grouped in the TIP and/or STIP or exempt projects as defined in EPA's transportation conformity regulation (40 CFR part 93)) that is on a facility which serves regional transportation needs (such as access to and from the area outside the region; major activity centers in the region; major planned developments such as new retail malls, sports complexes, or employment centers; or transportation terminals) and would normally be included in the modeling of the metropolitan area's transportation network. At a minimum, this includes all principal arterial highways and all fixed guideway transit facilities that offer a significant alternative to regional highway travel.</P>
              <P>
                <E T="03">Revision</E> means a change to a long-range statewide or metropolitan transportation plan, TIP, or STIP that occurs between scheduled periodic updates. A major revision is an “amendment,” while a minor revision is an “administrative modification.”</P>
              <P>
                <E T="03">State</E> means any one of the fifty States, the District of Columbia, or Puerto Rico.</P>
              <P>
                <E T="03">State implementation plan (SIP)</E> means, as defined in section 302(q) of the Clean Air Act (CAA), the portion (or portions) of the implementation plan, or most recent revision thereof, which has been approved under section 110 of the CAA, or promulgated under section 110(c) of the CAA, or promulgated or approved pursuant to regulations promulgated under section 301(d) of the CAA and which implements the relevant requirements of the CAA.</P>
              <P>
                <E T="03">Statewide transportation improvement program (STIP)</E> means a statewide prioritized listing/program of transportation projects covering a period of four years that is consistent with the long-range statewide transportation plan, metropolitan transportation plans, and TIPs, and required for projects to be eligible for funding under title 23 U.S.C. and title 49 U.S.C. Chapter 53.</P>
              <P>
                <E T="03">Strategic highway safety plan</E> means a plan developed by the State DOT in accordance with the requirements of 23 U.S.C. 148(a)(6).</P>
              <P>
                <E T="03">Transportation control measure (TCM)</E> means any measure that is specifically identified and committed to in the applicable SIP that is either one of the types listed in section 108 of the Clean Air Act or any other measure for the purpose of reducing emissions or concentrations of air pollutants from transportation sources by reducing vehicle use or changing traffic flow or congestion conditions. Notwithstanding the above, vehicle technology-based, fuel-based, and maintenance-based measures that control the emissions from vehicles under fixed traffic conditions are not TCMs.</P>
              <P>
                <E T="03">Transportation improvement program (TIP)</E> means a prioritized listing/program of transportation projects covering a period of four years that is developed and formally adopted by an MPO as part of the metropolitan transportation planning process, consistent with the metropolitan transportation plan, and required for projects to be eligible for funding under title 23 U.S.C. and title 49 U.S.C. Chapter 53.</P>
              <P>
                <E T="03">Transportation management area (TMA)</E> means an urbanized area with a population over 200,000, as defined by the Bureau of the Census and designated by the Secretary of Transportation, or any additional area where TMA designation is requested by the <PRTPAGE P="95"/>Governor and the MPO and designated by the Secretary of Transportation.</P>
              <P>
                <E T="03">Unified planning work program (UPWP)</E> means a statement of work identifying the planning priorities and activities to be carried out within a metropolitan planning area. At a minimum, a UPWP includes a description of the planning work and resulting products, who will perform the work, time frames for completing the work, the cost of the work, and the source(s) of funds.</P>
              <P>
                <E T="03">Update</E> means making current a long-range statewide transportation plan, metropolitan transportation plan, TIP, or STIP through a comprehensive review. Updates require public review and comment, a 20-year horizon year for metropolitan transportation plans and long-range statewide transportation plans, a four-year program period for TIPs and STIPs, demonstration of fiscal constraint (except for long-range statewide transportation plans), and a conformity determination (for metropolitan transportation plans and TIPs in nonattainment and maintenance areas).</P>
              <P>
                <E T="03">Urbanized area</E> means a geographic area with a population of 50,000 or more, as designated by the Bureau of the Census.</P>
              <P>
                <E T="03">Users of public transportation</E> means any person, or groups representing such persons, who use transportation open to the general public, other than taxis and other privately funded and operated vehicles.</P>
              <P>
                <E T="03">Visualization techniques</E> means methods used by States and MPOs in the development of transportation plans and programs with the public, elected and appointed officials, and other stakeholders in a clear and easily accessible format such as maps, pictures, and/or displays, to promote improved understanding of existing or proposed transportation plans and programs.</P>
            </SECTION>
          </SUBPART>
          <SUBPART>
            <HD SOURCE="HED">Subpart B—Statewide Transportation Planning and Programming</HD>
            <SECTION>
              <SECTNO>§ 450.200</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <P>The purpose of this subpart is to implement the provisions of 23 U.S.C. 135 and 49 U.S.C. 5304, as amended, which require each State to carry out a continuing, cooperative, and comprehensive statewide multimodal transportation planning process, including the development of a long-range statewide transportation plan and statewide transportation improvement program (STIP), that facilitates the safe and efficient management, operation, and development of surface transportation systems that will serve the mobility needs of people and freight (including accessible pedestrian walkways and bicycle transportation facilities) and that fosters economic growth and development within and between States and urbanized areas, while minimizing transportation-related fuel consumption and air pollution in all areas of the State, including those areas subject to the metropolitan transportation planning requirements of 23 U.S.C. 134 and 49 U.S.C. 5303.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 450.202</SECTNO>
              <SUBJECT>Applicability.</SUBJECT>
              <P>The provisions of this subpart are applicable to States and any other organizations or entities (e.g., metropolitan planning organizations (MPOs) and public transportation operators) that are responsible for satisfying the requirements for transportation plans and programs throughout the State pursuant to 23 U.S.C. 135 and 49 U.S.C. 5304.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 450.204</SECTNO>
              <SUBJECT>Definitions.</SUBJECT>
              <P>Except as otherwise provided in subpart A of this part, terms defined in 23 U.S.C. 101(a) and 49 U.S.C. 5302 are used in this subpart as so defined.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 450.206</SECTNO>
              <SUBJECT>Scope of the statewide transportation planning process.</SUBJECT>
              <P>(a) Each State shall carry out a continuing, cooperative, and comprehensive statewide transportation planning process that provides for consideration and implementation of projects, strategies, and services that will address the following factors:</P>
              <P>(1) Support the economic vitality of the United States, the States, metropolitan areas, and non-metropolitan areas, especially by enabling global competitiveness, productivity, and efficiency;</P>

              <P>(2) Increase the safety of the transportation system for motorized and non-motorized users;<PRTPAGE P="96"/>
              </P>
              <P>(3) Increase the security of the transportation system for motorized and non-motorized users;</P>
              <P>(4) Increase accessibility and mobility of people and freight;</P>
              <P>(5) Protect and enhance the environment, promote energy conservation, improve the quality of life, and promote consistency between transportation improvements and State and local planned growth and economic development patterns;</P>
              <P>(6) Enhance the integration and connectivity of the transportation system, across and between modes throughout the State, for people and freight;</P>
              <P>(7) Promote efficient system management and operation; and</P>
              <P>(8) Emphasize the preservation of the existing transportation system.</P>
              <P>(b) Consideration of the planning factors in paragraph (a) of this section shall be reflected, as appropriate, in the statewide transportation planning process. The degree of consideration and analysis of the factors should be based on the scale and complexity of many issues, including transportation systems development, land use, employment, economic development, human and natural environment, and housing and community development.</P>
              <P>(c) The failure to consider any factor specified in paragraph (a) of this section shall not be reviewable by any court under title 23 U.S.C., 49 U.S.C. Chapter 53, subchapter II of title 5 U.S.C. Chapter 5, or title 5 U.S.C Chapter 7 in any matter affecting a long-range statewide transportation plan, STIP, project or strategy, or the statewide transportation planning process findings.</P>
              <P>(d) Funds provided under 23 U.S.C. 505 and 49 U.S.C. 5305(e) are available to the State to accomplish activities in this subpart. At the State's option, funds provided under 23 U.S.C. 104(b)(1) and (3) and 105 and 49 U.S.C. 5307 may also be used. Statewide transportation planning activities performed with funds provided under title 23 U.S.C. and title 49 U.S.C. Chapter 53 shall be documented in a statewide planning work program in accordance with the provisions of 23 CFR part 420. The work program should include a discussion of the transportation planning priorities facing the State.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 450.208</SECTNO>
              <SUBJECT>Coordination of planning process activities.</SUBJECT>
              <P>(a) In carrying out the statewide transportation planning process, each State shall, at a minimum:</P>
              <P>(1) Coordinate planning carried out under this subpart with the metropolitan transportation planning activities carried out under subpart C of this part for metropolitan areas of the State. The State is encouraged to rely on information, studies, or analyses provided by MPOs for portions of the transportation system located in metropolitan planning areas;</P>
              <P>(2) Coordinate planning carried out under this subpart with statewide trade and economic development planning activities and related multistate planning efforts;</P>
              <P>(3) Consider the concerns of Federal land management agencies that have jurisdiction over land within the boundaries of the State;</P>
              <P>(4) Consider the concerns of local elected and appointed officials with responsibilities for transportation in non-metropolitan areas;</P>
              <P>(5) Consider the concerns of Indian Tribal governments that have jurisdiction over land within the boundaries of the State;</P>
              <P>(6) Consider related planning activities being conducted outside of metropolitan planning areas and between States; and</P>
              <P>(7) Coordinate data collection and analyses with MPOs and public transportation operators to support statewide transportation planning and programming priorities and decisions.</P>

              <P>(b) The State air quality agency shall coordinate with the State department of transportation (State DOT) to develop the transportation portion of the State Implementation Plan (SIP) consistent with the Clean Air Act (42 U.S.C. 7401 <E T="03">et seq.</E>).</P>

              <P>(c) Two or more States may enter into agreements or compacts, not in conflict with any law of the United States, for cooperative efforts and mutual assistance in support of activities under this subpart related to interstate areas and localities in the States and establishing authorities the States <PRTPAGE P="97"/>consider desirable for making the agreements and compacts effective. The right to alter, amend, or repeal interstate compacts entered into under this part is expressly reserved.</P>
              <P>(d) States may use any one or more of the management systems (in whole or in part) described in 23 CFR part 500.</P>
              <P>(e) States may apply asset management principles and techniques in establishing planning goals, defining STIP priorities, and assessing transportation investment decisions, including transportation system safety, operations, preservation, and maintenance.</P>
              <P>(f) The statewide transportation planning process shall (to the maximum extent practicable) be consistent with the development of applicable regional intelligent transportation systems (ITS) architectures, as defined in 23 CFR part 940.</P>
              <P>(g) Preparation of the coordinated public transit-human services transportation plan, as required by 49 U.S.C. 5310, 5316, and 5317, should be coordinated and consistent with the statewide transportation planning process.</P>
              <P>(h) The statewide transportation planning process should be consistent with the Strategic Highway Safety Plan, as specified in 23 U.S.C. 148, and other transit safety and security planning and review processes, plans, and programs, as appropriate.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 450.210</SECTNO>
              <SUBJECT>Interested parties, public involvement, and consultation.</SUBJECT>
              <P>(a) In carrying out the statewide transportation planning process, including development of the long-range statewide transportation plan and the STIP, the State shall develop and use a documented public involvement process that provides opportunities for public review and comment at key decision points.</P>
              <P>(1) The State's public involvement process at a minimum shall:</P>
              <P>(i) Establish early and continuous public involvement opportunities that provide timely information about transportation issues and decisionmaking processes to citizens, affected public agencies, representatives of public transportation employees, freight shippers, private providers of transportation, representatives of users of public transportation, representatives of users of pedestrian walkways and bicycle transportation facilities, representatives of the disabled, providers of freight transportation services, and other interested parties;</P>
              <P>(ii) Provide reasonable public access to technical and policy information used in the development of the long-range statewide transportation plan and the STIP;</P>
              <P>(iii) Provide adequate public notice of public involvement activities and time for public review and comment at key decision points, including but not limited to a reasonable opportunity to comment on the proposed long-range statewide transportation plan and STIP;</P>
              <P>(iv) To the maximum extent practicable, ensure that public meetings are held at convenient and accessible locations and times;</P>
              <P>(v) To the maximum extent practicable, use visualization techniques to describe the proposed long-range statewide transportation plan and supporting studies;</P>
              <P>(vi) To the maximum extent practicable, make public information available in electronically accessible format and means, such as the World Wide Web, as appropriate to afford reasonable opportunity for consideration of public information;</P>
              <P>(vii) Demonstrate explicit consideration and response to public input during the development of the long-range statewide transportation plan and STIP;</P>
              <P>(viii) Include a process for seeking out and considering the needs of those traditionally underserved by existing transportation systems, such as low-income and minority households, who may face challenges accessing employment and other services; and</P>
              <P>(ix) Provide for the periodic review of the effectiveness of the public involvement process to ensure that the process provides full and open access to all interested parties and revise the process, as appropriate.</P>

              <P>(2) The State shall provide for public comment on existing and proposed processes for public involvement in the development of the long-range statewide transportation plan and the STIP. At a minimum, the State shall allow 45 calendar days for public review and <PRTPAGE P="98"/>written comment before the procedures and any major revisions to existing procedures are adopted. The State shall provide copies of the approved public involvement process document(s) to the FHWA and the FTA for informational purposes.</P>
              <P>(b) The State shall provide for non-metropolitan local official participation in the development of the long-range statewide transportation plan and the STIP. The State shall have a documented process(es) for consulting with non-metropolitan local officials representing units of general purpose local government and/or local officials with responsibility for transportation that is separate and discrete from the public involvement process and provides an opportunity for their participation in the development of the long-range statewide transportation plan and the STIP. Although the FHWA and the FTA shall not review or approve this consultation process(es), copies of the process document(s) shall be provided to the FHWA and the FTA for informational purposes.</P>
              <P>(1) At least once every five years (as of February 24, 2006), the State shall review and solicit comments from non-metropolitan local officials and other interested parties for a period of not less than 60 calendar days regarding the effectiveness of the consultation process and any proposed changes. A specific request for comments shall be directed to the State association of counties, State municipal league, regional planning agencies, or directly to non-metropolitan local officials.</P>
              <P>(2) The State, at its discretion, shall be responsible for determining whether to adopt any proposed changes. If a proposed change is not adopted, the State shall make publicly available its reasons for not accepting the proposed change, including notification to non-metropolitan local officials or their associations.</P>
              <P>(c) For each area of the State under the jurisdiction of an Indian Tribal government, the State shall develop the long-range statewide transportation plan and STIP in consultation with the Tribal government and the Secretary of Interior. States shall, to the extent practicable, develop a documented process(es) that outlines roles, responsibilities, and key decision points for consulting with Indian Tribal governments and Federal land management agencies in the development of the long-range statewide transportation plan and the STIP.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 450.212</SECTNO>
              <SUBJECT>Transportation planning studies and project development.</SUBJECT>

              <P>(a) Pursuant to section 1308 of the Transportation Equity Act for the 21st Century, TEA-21 (Pub. L. 105-178), a State(s), MPO(s), or public transportation operator(s) may undertake a multimodal, systems-level corridor or subarea planning study as part of the statewide transportation planning process. To the extent practicable, development of these transportation planning studies shall involve consultation with, or joint efforts among, the State(s), MPO(s), and/or public transportation operator(s). The results or decisions of these transportation planning studies may be used as part of the overall project development process consistent with the National Environmental Policy Act (NEPA) of 1969 (42 U.S.C. 4321 <E T="03">et seq.</E>) and associated implementing regulations (23 CFR part 771 and 40 CFR parts 1500-1508). Specifically, these corridor or subarea studies may result in producing any of the following for a proposed transportation project:</P>
              <P>(1) Purpose and need or goals and objective statement(s);</P>
              <P>(2) General travel corridor and/or general mode(s) definition (e.g., highway, transit, or a highway/transit combination);</P>
              <P>(3) Preliminary screening of alternatives and elimination of unreasonable alternatives;</P>
              <P>(4) Basic description of the environmental setting; and/or</P>
              <P>(5) Preliminary identification of environmental impacts and environmental mitigation.</P>

              <P>(b) Publicly available documents or other source material produced by, or in support of, the transportation planning process described in this subpart may be incorporated directly or by reference into subsequent NEPA documents, in accordance with 40 CFR 1502.21, if:<PRTPAGE P="99"/>
              </P>
              <P>(1) The NEPA lead agencies agree that such incorporation will aid in establishing or evaluating the purpose and need for the Federal action, reasonable alternatives, cumulative or other impacts on the human and natural environment, or mitigation of these impacts; and</P>
              <P>(2) The systems-level, corridor, or subarea planning study is conducted with:</P>
              <P>(i) Involvement of interested State, local, Tribal, and Federal agencies;</P>
              <P>(ii) Public review;</P>
              <P>(iii) Reasonable opportunity to comment during the statewide transportation planning process and development of the corridor or subarea planning study;</P>
              <P>(iv) Documentation of relevant decisions in a form that is identifiable and available for review during the NEPA scoping process and can be appended to or referenced in the NEPA document; and</P>
              <P>(v) The review of the FHWA and the FTA, as appropriate.</P>
              <P>(c) By agreement of the NEPA lead agencies, the above integration may be accomplished through tiering (as described in 40 CFR 1502.20), incorporating the subarea or corridor planning study into the draft Environmental Impact Statement or Environmental Assessment, or other means that the NEPA lead agencies deem appropriate. Additional information to further explain the linkages between the transportation planning and project development/NEPA processes is contained in appendix A to this part, including an explanation that is non-binding guidance material.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 450.214</SECTNO>
              <SUBJECT>Development and content of the long-range statewide transportation plan.</SUBJECT>
              <P>(a) The State shall develop a long-range statewide transportation plan, with a minimum 20-year forecast period at the time of adoption, that provides for the development and implementation of the multimodal transportation system for the State. The long-range statewide transportation plan shall consider and include, as applicable, elements and connections between public transportation, non-motorized modes, rail, commercial motor vehicle, waterway, and aviation facilities, particularly with respect to intercity travel.</P>
              <P>(b) The long-range statewide transportation plan should include capital, operations and management strategies, investments, procedures, and other measures to ensure the preservation and most efficient use of the existing transportation system. The long-range statewide transportation plan may consider projects and strategies that address areas or corridors where current or projected congestion threatens the efficient functioning of key elements of the State's transportation system.</P>
              <P>(c) The long-range statewide transportation plan shall reference, summarize, or contain any applicable short-range planning studies; strategic planning and/or policy studies; transportation needs studies; management systems reports; emergency relief and disaster preparedness plans; and any statements of policies, goals, and objectives on issues (e.g., transportation, safety, economic development, social and environmental effects, or energy) that were relevant to the development of the long-range statewide transportation plan.</P>
              <P>(d) The long-range statewide transportation plan should include a safety element that incorporates or summarizes the priorities, goals, countermeasures, or projects contained in the Strategic Highway Safety Plan required by 23 U.S.C. 148.</P>
              <P>(e) The long-range statewide transportation plan should include a security element that incorporates or summarizes the priorities, goals, or projects set forth in other transit safety and security planning and review processes, plans, and programs, as appropriate.</P>
              <P>(f) Within each metropolitan area of the State, the long-range statewide transportation plan shall be developed in cooperation with the affected MPOs.</P>

              <P>(g) For non-metropolitan areas, the long-range statewide transportation plan shall be developed in consultation with affected non-metropolitan officials with responsibility for transportation using the State's consultation process(es) established under § 450.210(b).<PRTPAGE P="100"/>
              </P>
              <P>(h) For each area of the State under the jurisdiction of an Indian Tribal government, the long-range statewide transportation plan shall be developed in consultation with the Tribal government and the Secretary of the Interior consistent with § 450.210(c).</P>
              <P>(i) The long-range statewide transportation plan shall be developed, as appropriate, in consultation with State, Tribal, and local agencies responsible for land use management, natural resources, environmental protection, conservation, and historic preservation. This consultation shall involve comparison of transportation plans to State and Tribal conservation plans or maps, if available, and comparison of transportation plans to inventories of natural or historic resources, if available.</P>
              <P>(j) A long-range statewide transportation plan shall include a discussion of potential environmental mitigation activities and potential areas to carry out these activities, including activities that may have the greatest potential to restore and maintain the environmental functions affected by the long-range statewide transportation plan. The discussion may focus on policies, programs, or strategies, rather than at the project level. The discussion shall be developed in consultation with Federal, State, and Tribal land management, wildlife, and regulatory agencies. The State may establish reasonable timeframes for performing this consultation.</P>
              <P>(k) In developing and updating the long-range statewide transportation plan, the State shall provide citizens, affected public agencies, representatives of public transportation employees, freight shippers, private providers of transportation, representatives of users of public transportation, representatives of users of pedestrian walkways and bicycle transportation facilities, representatives of the disabled, providers of freight transportation services, and other interested parties with a reasonable opportunity to comment on the proposed long-range statewide transportation plan. In carrying out these requirements, the State shall, to the maximum extent practicable, utilize the public involvement process described under § 450.210(a).</P>
              <P>(l) The long-range statewide transportation plan may (but is not required to) include a financial plan that demonstrates how the adopted long-range statewide transportation plan can be implemented, indicates resources from public and private sources that are reasonably expected to be made available to carry out the plan, and recommends any additional financing strategies for needed projects and programs. In addition, for illustrative purposes, the financial plan may (but is not required to) include additional projects that would be included in the adopted long-range statewide transportation plan if additional resources beyond those identified in the financial plan were to become available.</P>
              <P>(m) The State shall not be required to select any project from the illustrative list of additional projects included in the financial plan described in paragraph (l) of this section.</P>
              <P>(n) The long-range statewide transportation plan shall be published or otherwise made available, including (to the maximum extent practicable) in electronically accessible formats and means, such as the World Wide Web, as described in § 450.210(a).</P>
              <P>(o) The State shall continually evaluate, revise, and periodically update the long-range statewide transportation plan, as appropriate, using the procedures in this section for development and establishment of the long-range statewide transportation plan.</P>
              <P>(p) Copies of any new or amended long-range statewide transportation plan documents shall be provided to the FHWA and the FTA for informational purposes.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 450.216</SECTNO>
              <SUBJECT>Development and content of the statewide transportation improvement program (STIP).</SUBJECT>

              <P>(a) The State shall develop a statewide transportation improvement program (STIP) for all areas of the State. The STIP shall cover a period of no less than four years and be updated at least every four years, or more frequently if the Governor elects a more frequent update cycle. However, if the STIP covers more than four years, the FHWA and the FTA will consider the projects <PRTPAGE P="101"/>in the additional years as informational. In case of difficulties developing a portion of the STIP for a particular area (e.g., metropolitan planning area, nonattainment or maintenance area, or Indian Tribal lands), a partial STIP covering the rest of the State may be developed.</P>
              <P>(b) For each metropolitan area in the State, the STIP shall be developed in cooperation with the MPO designated for the metropolitan area. Each metropolitan transportation improvement program (TIP) shall be included without change in the STIP, directly or by reference, after approval of the TIP by the MPO and the Governor. A metropolitan TIP in a nonattainment or maintenance area is subject to a FHWA/FTA conformity finding before inclusion in the STIP. In areas outside a metropolitan planning area but within an air quality nonattainment or maintenance area containing any part of a metropolitan area, projects must be included in the regional emissions analysis that supported the conformity determination of the associated metropolitan TIP before they are added to the STIP.</P>
              <P>(c) For each non-metropolitan area in the State, the STIP shall be developed in consultation with affected non-metropolitan local officials with responsibility for transportation using the State's consultation process(es) established under § 450.210.</P>
              <P>(d) For each area of the State under the jurisdiction of an Indian Tribal government, the STIP shall be developed in consultation with the Tribal government and the Secretary of the Interior.</P>
              <P>(e) Federal Lands Highway program TIPs shall be included without change in the STIP, directly or by reference, once approved by the FHWA pursuant to 23 U.S.C. 204(a) or (j).</P>
              <P>(f) The Governor shall provide all interested parties with a reasonable opportunity to comment on the proposed STIP as required by § 450.210(a).</P>
              <P>(g) The STIP shall include capital and non-capital surface transportation projects (or phases of projects) within the boundaries of the State proposed for funding under title 23 U.S.C. and title 49 U.S.C. Chapter 53 (including transportation enhancements; Federal Lands Highway program projects; safety projects included in the State's Strategic Highway Safety Plan; trails projects; pedestrian walkways; and bicycle facilities), except the following that may (but are not required to) be included:</P>
              <P>(1) Safety projects funded under 23 U.S.C. 402 and 49 U.S.C. 31102;</P>
              <P>(2) Metropolitan planning projects funded under 23 U.S.C. 104(f), 49 U.S.C. 5305(d), and 49 U.S.C. 5339;</P>
              <P>(3) State planning and research projects funded under 23 U.S.C. 505 and 49 U.S.C. 5305(e);</P>
              <P>(4) At the State's discretion, State planning and research projects funded with National Highway System, Surface Transportation Program, and/or Equity Bonus funds;</P>
              <P>(5) Emergency relief projects (except those involving substantial functional, locational, or capacity changes);</P>
              <P>(6) National planning and research projects funded under 49 U.S.C. 5314; and</P>
              <P>(7) Project management oversight projects funded under 49 U.S.C. 5327.</P>
              <P>(h) The STIP shall contain all regionally significant projects requiring an action by the FHWA or the FTA whether or not the projects are to be funded with 23 U.S.C. Chapters 1 and 2 or title 49 U.S.C. Chapter 53 funds (e.g., addition of an interchange to the Interstate System with State, local, and/or private funds, and congressionally designated projects not funded under title 23 U.S.C. or title 49 U.S.C. Chapter 53). For informational and conformity purposes, the STIP shall include (if appropriate and included in any TIPs) all regionally significant projects proposed to be funded with Federal funds other than those administered by the FHWA or the FTA, as well as all regionally significant projects to be funded with non-Federal funds.</P>
              <P>(i) The STIP shall include for each project or phase (e.g., preliminary engineering, environment/NEPA, right-of-way, design, or construction) the following:</P>
              <P>(1) Sufficient descriptive material (<E T="03">i.e.</E>, type of work, termini, and length) to identify the project or phase;</P>

              <P>(2) Estimated total project cost, or a project cost range, which may extend beyond the four years of the STIP;<PRTPAGE P="102"/>
              </P>
              <P>(3) The amount of Federal funds proposed to be obligated during each program year (for the first year, this includes the proposed category of Federal funds and source(s) of non-Federal funds. For the second, third, and fourth years, this includes the likely category or possible categories of Federal funds and sources of non-Federal funds); and</P>
              <P>(4) Identification of the agencies responsible for carrying out the project or phase.</P>
              <P>(j) Projects that are not considered to be of appropriate scale for individual identification in a given program year may be grouped by function, work type, and/or geographic area using the applicable classifications under 23 CFR 771.117(c) and (d) and/or 40 CFR part 93. In nonattainment and maintenance areas, project classifications must be consistent with the “exempt project” classifications contained in the EPA's transportation conformity regulation (40 CFR part 93). In addition, projects proposed for funding under title 23 U.S.C. Chapter 2 that are not regionally significant may be grouped in one line item or identified individually in the STIP.</P>
              <P>(k) Each project or project phase included in the STIP shall be consistent with the long-range statewide transportation plan developed under § 450.214 and, in metropolitan planning areas, consistent with an approved metropolitan transportation plan developed under § 450.322.</P>
              <P>(l) The STIP may include a financial plan that demonstrates how the approved STIP can be implemented, indicates resources from public and private sources that are reasonably expected to be made available to carry out the STIP, and recommends any additional financing strategies for needed projects and programs. In addition, for illustrative purposes, the financial plan may (but is not required to) include additional projects that would be included in the adopted STIP if reasonable additional resources beyond those identified in the financial plan were to become available. The State is not required to select any project from the illustrative list for implementation, and projects on the illustrative list cannot be advanced to implementation without an action by the FHWA and the FTA on the STIP. Starting December 11, 2007, revenue and cost estimates for the STIP must use an inflation rate(s) to reflect “year of expenditure dollars,” based on reasonable financial principles and information, developed cooperatively by the State, MPOs, and public transportation operators.</P>
              <P>(m) The STIP shall include a project, or an identified phase of a project, only if full funding can reasonably be anticipated to be available for the project within the time period contemplated for completion of the project. In nonattainment and maintenance areas, projects included in the first two years of the STIP shall be limited to those for which funds are available or committed. Financial constraint of the STIP shall be demonstrated and maintained by year and shall include sufficient financial information to demonstrate which projects are to be implemented using current and/or reasonably available revenues, while federally-supported facilities are being adequately operated and maintained. In the case of proposed funding sources, strategies for ensuring their availability shall be identified in the financial plan consistent with paragraph (l) of this section. For purposes of transportation operations and maintenance, the STIP shall include financial information containing system-level estimates of costs and revenue sources that are reasonably expected to be available to adequately operate and maintain Federal-aid highways (as defined by 23 U.S.C. 101(a)(5)) and public transportation (as defined by title 49 U.S.C. Chapter 53).</P>

              <P>(n) Projects in any of the first four years of the STIP may be advanced in place of another project in the first four years of the STIP, subject to the project selection requirements of § 450.220. In addition, the STIP may be revised at any time under procedures agreed to by the State, MPO(s), and public transportation operator(s) consistent with the STIP development procedures established in this section, as well as the procedures for participation by interested parties (see § 450.210(a)), subject to FHWA/FTA approval (see § 450.218). Changes that affect fiscal constraint must take place by amendment of the STIP.<PRTPAGE P="103"/>
              </P>

              <P>(o) In cases that the FHWA and the FTA find a STIP to be fiscally constrained and a revenue source is subsequently removed or substantially reduced (<E T="03">i.e.</E>, by legislative or administrative actions), the FHWA and the FTA will not withdraw the original determination of fiscal constraint. However, in such cases, the FHWA and the FTA will not act on an updated or amended STIP that does not reflect the changed revenue situation.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 450.218</SECTNO>
              <SUBJECT>Self-certifications, Federal findings, and Federal approvals.</SUBJECT>
              <P>(a) At least every four years, the State shall submit an updated STIP concurrently to the FHWA and the FTA for joint approval. STIP amendments shall also be submitted to the FHWA and the FTA for joint approval. At the time the entire proposed STIP or STIP amendments are submitted to the FHWA and the FTA for joint approval, the State shall certify that the transportation planning process is being carried out in accordance with all applicable requirements of:</P>
              <P>(1) 23 U.S.C. 134 and 135, 49 U.S.C. 5303 and 5304, and this part;</P>
              <P>(2) Title VI of the Civil Rights Act of 1964, as amended (42 U.S.C. 2000d-1) and 49 CFR part 21;</P>
              <P>(3) 49 U.S.C. 5332, prohibiting discrimination on the basis of race, color, creed, national origin, sex, or age in employment or business opportunity;</P>
              <P>(4) Section 1101(b) of the SAFETEA-LU (Pub. L. 109-59) and 49 CFR part 26 regarding the involvement of disadvantaged business enterprises in USDOT funded projects;</P>
              <P>(5) 23 CFR part 230, regarding implementation of an equal employment opportunity program on Federal and Federal-aid highway construction contracts;</P>

              <P>(6) The provisions of the Americans with Disabilities Act of 1990 (42 U.S.C. 12101 <E T="03">et seq.</E>) and 49 CFR parts 27, 37, and 38;</P>
              <P>(7) In States containing nonattainment and maintenance areas, sections 174 and 176 (c) and (d) of the Clean Air Act, as amended (42 U.S.C. 7504, 7506 (c) and (d)) and 40 CFR part 93;</P>
              <P>(8) The Older Americans Act, as amended (42 U.S.C. 6101), prohibiting discrimination on the basis of age in programs or activities receiving Federal financial assistance;</P>
              <P>(9) Section 324 of title 23 U.S.C., regarding the prohibition of discrimination based on gender; and</P>
              <P>(10) Section 504 of the Rehabilitation Act of 1973 (29 U.S.C. 794) and 49 CFR part 27 regarding discrimination against individuals with disabilities.</P>
              <P>(b) The FHWA and the FTA shall review the STIP or the amended STIP, and make a joint finding on the extent to which the STIP is based on a statewide transportation planning process that meets or substantially meets the requirements of 23 U.S.C. 134 and 135, 49 U.S.C. 5303 and 5304, and subparts A, B, and C of this part. Approval of the STIP by the FHWA and the FTA, in its entirety or in part, will be based upon the results of this joint finding.</P>
              <P>(1) If the FHWA and the FTA determine that the STIP or amended STIP is based on a statewide transportation planning process that meets or substantially meets the requirements of 23 U.S.C. 135, 49 U.S.C. 5304, and this part, the FHWA and the FTA may jointly:</P>
              <P>(i) Approve the entire STIP;</P>
              <P>(ii) Approve the STIP subject to certain corrective actions being taken; or</P>
              <P>(iii) Under special circumstances, approve a partial STIP covering only a portion of the State.</P>
              <P>(2) If the FHWA and the FTA jointly determine and document in the planning finding that a submitted STIP or amended STIP does not substantially meet the requirements of 23 U.S.C. 135, 49 U.S.C. 5304, and this part for any identified categories of projects, the FHWA and the FTA will not approve the STIP.</P>

              <P>(c) The approval period for a new or amended STIP shall not exceed four years. If a State demonstrates, in writing, that extenuating circumstances will delay the submittal of a new or amended STIP past its update deadline, the FHWA and the FTA will consider and take appropriate action on a request to extend the approval beyond four years for all or part of the STIP for a period not to exceed 180 calendar days. In these cases, priority consideration will be given to projects and strategies involving the operation and management of the multimodal transportation system. Where the request <PRTPAGE P="104"/>involves projects in a metropolitan planning area(s), the affected MPO(s) must concur in the request. If the delay was due to the development and approval of a metropolitan TIP(s), the affected MPO(s) must provide supporting information, in writing, for the request.</P>
              <P>(d) Where necessary in order to maintain or establish highway and transit operations, the FHWA and the FTA may approve operating assistance for specific projects or programs, even though the projects or programs may not be included in an approved STIP.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 450.220</SECTNO>
              <SUBJECT>Project selection from the STIP.</SUBJECT>
              <P>(a) Except as provided in § 450.216(g) and § 450.218(d), only projects in a FHWA/FTA approved STIP shall be eligible for funds administered by the FHWA or the FTA.</P>
              <P>(b) In metropolitan planning areas, transportation projects proposed for funds administered by the FHWA or the FTA shall be selected from the approved STIP in accordance with project selection procedures provided in § 450.330.</P>
              <P>(c) In non-metropolitan areas, transportation projects undertaken on the National Highway System, under the Bridge and Interstate Maintenance programs in title 23 U.S.C. and under sections 5310, 5311, 5316, and 5317 of title 49 U.S.C. Chapter 53 shall be selected from the approved STIP by the State in consultation with the affected non-metropolitan local officials with responsibility for transportation.</P>
              <P>(d) Federal Lands Highway program projects shall be selected from the approved STIP in accordance with the procedures developed pursuant to 23 U.S.C. 204.</P>
              <P>(e) The projects in the first year of an approved STIP shall constitute an “agreed to” list of projects for subsequent scheduling and implementation. No further action under paragraphs (b) through (d) of this section is required for the implementing agency to proceed with these projects. If Federal funds available are significantly less than the authorized amounts, or where there is significant shifting of projects among years, § 450.330(a) provides for a revised list of “agreed to” projects to be developed upon the request of the State, MPO, or public transportation operator(s). If an implementing agency wishes to proceed with a project in the second, third, or fourth year of the STIP, the procedures in paragraphs (b) through (d) of this section or expedited procedures that provide for the advancement of projects from the second, third, or fourth years of the STIP may be used, if agreed to by all parties involved in the selection process.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 450.222</SECTNO>
              <SUBJECT>Applicability of NEPA to statewide transportation plans and programs.</SUBJECT>
              <P>Any decision by the Secretary concerning a long-range statewide transportation plan or STIP developed through the processes provided for in 23 U.S.C. 135, 49 U.S.C. 5304, and this subpart shall not be considered to be a Federal action subject to review under NEPA.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 450.224</SECTNO>
              <SUBJECT>Phase-in of new requirements.</SUBJECT>
              <P>(a) Long-range statewide transportation plans and STIPs adopted or approved prior to July 1, 2007 may be developed using the TEA-21 requirements or the provisions and requirements of this part.</P>

              <P>(b) For STIPs that are developed under TEA-21 requirements prior to July 1, 2007, the FHWA/FTA action (<E T="03">i.e.</E>, STIP approval) must be completed no later than June 30, 2007. For long-range statewide transportation plans that are completed under TEA-21 requirements prior to July 1, 2007, the State adoption action must be completed no later than June 30, 2007. If these actions are completed on or after July 1, 2007, the provisions and requirements of this part shall take effect, regardless of when the long-range statewide transportation plan or the STIP were developed.</P>

              <P>(c) The applicable action (see paragraph (b) of this section) on any amendments or updates to STIPs or long-range statewide transportation plans on or after July 1, 2007, shall be based on the provisions and requirements of this part. However, administrative modifications may be made to the STIP on or after July 1, 2007 in the <PRTPAGE P="105"/>absence of meeting the provisions and requirements of this part.</P>
            </SECTION>
          </SUBPART>
          <SUBPART>
            <HD SOURCE="HED">Subpart C—Metropolitan Transportation Planning and Programming</HD>
            <SECTION>
              <SECTNO>§ 450.300</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <P>The purposes of this subpart are to implement the provisions of 23 U.S.C. 134 and 49 U.S.C. 5303, as amended, which:</P>
              <P>(a) Sets forth the national policy that the MPO designated for each urbanized area is to carry out a continuing, cooperative, and comprehensive multimodal transportation planning process, including the development of a metropolitan transportation plan and a transportation improvement program (TIP), that encourages and promotes the safe and efficient development, management, and operation of surface transportation systems to serve the mobility needs of people and freight (including accessible pedestrian walkways and bicycle transportation facilities) and foster economic growth and development, while minimizing transportation-related fuel consumption and air pollution; and</P>
              <P>(b) Encourages continued development and improvement of metropolitan transportation planning processes guided by the planning factors set forth in 23 U.S.C. 134(h) and 49 U.S.C. 5303(h).</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 450.302</SECTNO>
              <SUBJECT>Applicability.</SUBJECT>
              <P>The provisions of this subpart are applicable to organizations and entities responsible for the transportation planning and programming processes in metropolitan planning areas.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 450.304</SECTNO>
              <SUBJECT>Definitions.</SUBJECT>
              <P>Except as otherwise provided in subpart A of this part, terms defined in 23 U.S.C. 101(a) and 49 U.S.C. 5302 are used in this subpart as so defined.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 450.306</SECTNO>
              <SUBJECT>Scope of the metropolitan transportation planning process.</SUBJECT>
              <P>(a) The metropolitan transportation planning process shall be continuous, cooperative, and comprehensive, and provide for consideration and implementation of projects, strategies, and services that will address the following factors:</P>
              <P>(1) Support the economic vitality of the metropolitan area, especially by enabling global competitiveness, productivity, and efficiency;</P>
              <P>(2) Increase the safety of the transportation system for motorized and non-motorized users;</P>
              <P>(3) Increase the security of the transportation system for motorized and non-motorized users;</P>
              <P>(4) Increase accessibility and mobility of people and freight;</P>
              <P>(5) Protect and enhance the environment, promote energy conservation, improve the quality of life, and promote consistency between transportation improvements and State and local planned growth and economic development patterns;</P>
              <P>(6) Enhance the integration and connectivity of the transportation system, across and between modes, for people and freight;</P>
              <P>(7) Promote efficient system management and operation; and</P>
              <P>(8) Emphasize the preservation of the existing transportation system.</P>
              <P>(b) Consideration of the planning factors in paragraph (a) of this section shall be reflected, as appropriate, in the metropolitan transportation planning process. The degree of consideration and analysis of the factors should be based on the scale and complexity of many issues, including transportation system development, land use, employment, economic development, human and natural environment, and housing and community development.</P>
              <P>(c) The failure to consider any factor specified in paragraph (a) of this section shall not be reviewable by any court under title 23 U.S.C., 49 U.S.C. Chapter 53, subchapter II of title 5, U.S.C. Chapter 5, or title 5 U.S.C. Chapter 7 in any matter affecting a metropolitan transportation plan, TIP, a project or strategy, or the certification of a metropolitan transportation planning process.</P>
              <P>(d) The metropolitan transportation planning process shall be carried out in coordination with the statewide transportation planning process required by 23 U.S.C. 135 and 49 U.S.C. 5304.</P>

              <P>(e) In carrying out the metropolitan transportation planning process, <PRTPAGE P="106"/>MPOs, States, and public transportation operators may apply asset management principles and techniques in establishing planning goals, defining TIP priorities, and assessing transportation investment decisions, including transportation system safety, operations, preservation, and maintenance, as well as strategies and policies to support homeland security and to safeguard the personal security of all motorized and non-motorized users.</P>
              <P>(f) The metropolitan transportation planning process shall (to the maximum extent practicable) be consistent with the development of applicable regional intelligent transportation systems (ITS) architectures, as defined in 23 CFR part 940.</P>
              <P>(g) Preparation of the coordinated public transit-human services transportation plan, as required by 49 U.S.C. 5310, 5316, and 5317, should be coordinated and consistent with the metropolitan transportation planning process.</P>
              <P>(h) The metropolitan transportation planning process should be consistent with the Strategic Highway Safety Plan, as specified in 23 U.S.C. 148, and other transit safety and security planning and review processes, plans, and programs, as appropriate.</P>
              <P>(i) The FHWA and the FTA shall designate as a transportation management area (TMA) each urbanized area with a population of over 200,000 individuals, as defined by the Bureau of the Census. The FHWA and the FTA shall also designate any additional urbanized area as a TMA on the request of the Governor and the MPO designated for that area.</P>
              <P>(j) In an urbanized area not designated as a TMA that is an air quality attainment area, the MPO(s) may propose and submit to the FHWA and the FTA for approval a procedure for developing an abbreviated metropolitan transportation plan and TIP. In developing proposed simplified planning procedures, consideration shall be given to whether the abbreviated metropolitan transportation plan and TIP will achieve the purposes of 23 U.S.C. 134, 49 U.S.C. 5303, and these regulations, taking into account the complexity of the transportation problems in the area. The simplified procedures shall be developed by the MPO in cooperation with the State(s) and public transportation operator(s).</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 450.308</SECTNO>
              <SUBJECT>Funding for transportation planning and unified planning work programs.</SUBJECT>
              <P>(a) Funds provided under 23 U.S.C. 104(f), 49 U.S.C. 5305(d), 49 U.S.C. 5307, and 49 U.S.C. 5339 are available to MPOs to accomplish activities in this subpart. At the State's option, funds provided under 23 U.S.C. 104(b)(1) and (b)(3) and 23 U.S.C. 105 may also be provided to MPOs for metropolitan transportation planning. In addition, an MPO serving an urbanized area with a population over 200,000, as designated by the Bureau of the Census, may at its discretion use funds sub-allocated under 23 U.S.C. 133(d)(3)(E) for metropolitan transportation planning activities.</P>
              <P>(b) Metropolitan transportation planning activities performed with funds provided under title 23 U.S.C. and title 49 U.S.C. Chapter 53 shall be documented in a unified planning work program (UPWP) or simplified statement of work in accordance with the provisions of this section and 23 CFR part 420.</P>
              <P>(c) Except as provided in paragraph (d) of this section, each MPO, in cooperation with the State(s) and public transportation operator(s), shall develop a UPWP that includes a discussion of the planning priorities facing the MPA. The UPWP shall identify work proposed for the next one- or two-year period by major activity and task (including activities that address the planning factors in § 450.306(a)), in sufficient detail to indicate who (e.g., MPO, State, public transportation operator, local government, or consultant) will perform the work, the schedule for completing the work, the resulting products, the proposed funding by activity/task, and a summary of the total amounts and sources of Federal and matching funds.</P>

              <P>(d) With the prior approval of the State and the FHWA and the FTA, an MPO in an area not designated as a TMA may prepare a simplified statement of work, in cooperation with the State(s) and the public transportation <PRTPAGE P="107"/>operator(s), in lieu of a UPWP. A simplified statement of work would include a description of the major activities to be performed during the next one- or two-year period, who (e.g., State, MPO, public transportation operator, local government, or consultant) will perform the work, the resulting products, and a summary of the total amounts and sources of Federal and matching funds. If a simplified statement of work is used, it may be submitted as part of the State's planning work program, in accordance with 23 CFR part 420.</P>
              <P>(e) Arrangements may be made with the FHWA and the FTA to combine the UPWP or simplified statement of work with the work program(s) for other Federal planning funds.</P>
              <P>(f) Administrative requirements for UPWPs and simplified statements of work are contained in 23 CFR part 420 and FTA Circular C8100.1B (Program Guidance and Application Instructions for Metropolitan Planning Grants).</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 450.310</SECTNO>
              <SUBJECT>Metropolitan planning organization designation and redesignation.</SUBJECT>
              <P>(a) To carry out the metropolitan transportation planning process under this subpart, a metropolitan planning organization (MPO) shall be designated for each urbanized area with a population of more than 50,000 individuals (as determined by the Bureau of the Census).</P>
              <P>(b) MPO designation shall be made by agreement between the Governor and units of general purpose local government that together represent at least 75 percent of the affected population (including the largest incorporated city, based on population, as named by the Bureau of the Census) or in accordance with procedures established by applicable State or local law.</P>
              <P>(c) Each Governor with responsibility for a portion of a multistate metropolitan area and the appropriate MPOs shall, to the extent practicable, provide coordinated transportation planning for the entire MPA. The consent of Congress is granted to any two or more States to:</P>
              <P>(1) Enter into agreements or compacts, not in conflict with any law of the United States, for cooperative efforts and mutual assistance in support of activities authorized under 23 U.S.C. 134 and 49 U.S.C. 5303 as the activities pertain to interstate areas and localities within the States; and</P>
              <P>(2) Establish such agencies, joint or otherwise, as the States may determine desirable for making the agreements and compacts effective.</P>
              <P>(d) Each MPO that serves a TMA, when designated or redesignated under this section, shall consist of local elected officials, officials of public agencies that administer or operate major modes of transportation in the metropolitan planning area, and appropriate State transportation officials. Where appropriate, MPOs may increase the representation of local elected officials, public transportation agencies, or appropriate State officials on their policy boards and other committees as a means for encouraging greater involvement in the metropolitan transportation planning process, subject to the requirements of paragraph (k) of this section.</P>
              <P>(e) To the extent possible, only one MPO shall be designated for each urbanized area or group of contiguous urbanized areas. More than one MPO may be designated to serve an urbanized area only if the Governor(s) and the existing MPO, if applicable, determine that the size and complexity of the urbanized area make designation of more than one MPO appropriate. In those cases where two or more MPOs serve the same urbanized area, the MPOs shall establish official, written agreements that clearly identify areas of coordination and the division of transportation planning responsibilities among the MPOs.</P>
              <P>(f) Nothing in this subpart shall be deemed to prohibit an MPO from using the staff resources of other agencies, non-profit organizations, or contractors to carry out selected elements of the metropolitan transportation planning process.</P>
              <P>(g) An MPO designation shall remain in effect until an official redesignation has been made in accordance with this section.</P>

              <P>(h) An existing MPO may be redesignated only by agreement between the Governor and units of general purpose <PRTPAGE P="108"/>local government that together represent at least 75 percent of the existing metropolitan planning area population (including the largest incorporated city, based on population, as named by the Bureau of the Census).</P>
              <P>(i) Redesignation of an MPO serving a multistate metropolitan planning area requires agreement between the Governors of each State served by the existing MPO and units of general purpose local government that together represent at least 75 percent of the existing metropolitan planning area population (including the largest incorporated city, based on population, as named by the Bureau of the Census).</P>
              <P>(j) For the purposes of redesignation, units of general purpose local government may be defined as elected officials from each unit of general purpose local government located within the metropolitan planning area served by the existing MPO.</P>
              <P>(k) Redesignation of an MPO (in accordance with the provisions of this section) is required whenever the existing MPO proposes to make:</P>
              <P>(1) A substantial change in the proportion of voting members on the existing MPO representing the largest incorporated city, other units of general purpose local government served by the MPO, and the State(s); or</P>
              <P>(2) A substantial change in the decisionmaking authority or responsibility of the MPO, or in decisionmaking procedures established under MPO by-laws.</P>
              <P>(l) The following changes to an MPO do not require a redesignation (as long as they do not trigger a substantial change as described in paragraph (k) of the section):</P>
              <P>(1) The identification of a new urbanized area (as determined by the Bureau of the Census) within an existing metropolitan planning area;</P>
              <P>(2) Adding members to the MPO that represent new units of general purpose local government resulting from expansion of the metropolitan planning area;</P>
              <P>(3) Adding members to satisfy the specific membership requirements for an MPO that serves a TMA; or</P>
              <P>(4) Periodic rotation of members representing units of general-purpose local government, as established under MPO by-laws.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 450.312</SECTNO>
              <SUBJECT>Metropolitan planning area boundaries.</SUBJECT>
              <P>(a) The boundaries of a metropolitan planning area (MPA) shall be determined by agreement between the MPO and the Governor. At a minimum, the MPA boundaries shall encompass the entire existing urbanized area (as defined by the Bureau of the Census) plus the contiguous area expected to become urbanized within a 20-year forecast period for the metropolitan transportation plan. The MPA boundaries may be further expanded to encompass the entire metropolitan statistical area or combined statistical area, as defined by the Office of Management and Budget.</P>

              <P>(b) An MPO that serves an urbanized area designated as a nonattainment area for ozone or carbon monoxide under the Clean Air Act (42 U.S.C. 7401 <E T="03">et seq.</E>) as of August 10, 2005, shall retain the MPA boundary that existed on August 10, 2005. The MPA boundaries for such MPOs may only be adjusted by agreement of the Governor and the affected MPO in accordance with the redesignation procedures described in § 450.310(h). The MPA boundary for an MPO that serves an urbanized area designated as a nonattainment area for ozone or carbon monoxide under the Clean Air Act (42 U.S.C. 7401 et seq.) after August 10, 2005 may be established to coincide with the designated boundaries of the ozone and/or carbon monoxide nonattainment area, in accordance with the requirements in § 450.310(b).</P>
              <P>(c) An MPA boundary may encompass more than one urbanized area.</P>
              <P>(d) MPA boundaries may be established to coincide with the geography of regional economic development and growth forecasting areas.</P>
              <P>(e) Identification of new urbanized areas within an existing metropolitan planning area by the Bureau of the Census shall not require redesignation of the existing MPO.</P>

              <P>(f) Where the boundaries of the urbanized area or MPA extend across two or more States, the Governors with responsibility for a portion of the multistate area, MPO(s), and the public <PRTPAGE P="109"/>transportation operator(s) are strongly encouraged to coordinate transportation planning for the entire multistate area.</P>
              <P>(g) The MPA boundaries shall not overlap with each other.</P>
              <P>(h) Where part of an urbanized area served by one MPO extends into an adjacent MPA, the MPOs shall, at a minimum, establish written agreements that clearly identify areas of coordination and the division of transportation planning responsibilities among and between the MPOs. Alternatively, the MPOs may adjust their existing boundaries so that the entire urbanized area lies within only one MPA. Boundary adjustments that change the composition of the MPO may require redesignation of one or more such MPOs.</P>
              <P>(i) The MPA boundaries shall be reviewed after each Census by the MPO (in cooperation with the State and public transportation operator(s)) to determine if existing MPA boundaries meet the minimum statutory requirements for new and updated urbanized area(s), and shall be adjusted as necessary. As appropriate, additional adjustments should be made to reflect the most comprehensive boundary to foster an effective planning process that ensures connectivity between modes, reduces access disadvantages experienced by modal systems, and promotes efficient overall transportation investment strategies.</P>
              <P>(j) Following MPA boundary approval by the MPO and the Governor, the MPA boundary descriptions shall be provided for informational purposes to the FHWA and the FTA. The MPA boundary descriptions shall be submitted either as a geo-spatial database or described in sufficient detail to enable the boundaries to be accurately delineated on a map.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 450.314</SECTNO>
              <SUBJECT>Metropolitan planning agreements.</SUBJECT>
              <P>(a) The MPO, the State(s), and the public transportation operator(s) shall cooperatively determine their mutual responsibilities in carrying out the metropolitan transportation planning process. These responsibilities shall be clearly identified in written agreements among the MPO, the State(s), and the public transportation operator(s) serving the MPA. To the extent possible, a single agreement between all responsible parties should be developed. The written agreement(s) shall include specific provisions for cooperatively developing and sharing information related to the development of financial plans that support the metropolitan transportation plan (see § 450.322) and the metropolitan TIP (see § 450.324) and development of the annual listing of obligated projects (see § 450.332).</P>
              <P>(b) If the MPA does not include the entire nonattainment or maintenance area, there shall be a written agreement among the State department of transportation, State air quality agency, affected local agencies, and the MPO describing the process for cooperative planning and analysis of all projects outside the MPA within the nonattainment or maintenance area. The agreement must also indicate how the total transportation-related emissions for the nonattainment or maintenance area, including areas outside the MPA, will be treated for the purposes of determining conformity in accordance with the EPA's transportation conformity rule (40 CFR part 93). The agreement shall address policy mechanisms for resolving conflicts concerning transportation-related emissions that may arise between the MPA and the portion of the nonattainment or maintenance area outside the MPA.</P>
              <P>(c) In nonattainment or maintenance areas, if the MPO is not the designated agency for air quality planning under section 174 of the Clean Air Act (42 U.S.C. 7504), there shall be a written agreement between the MPO and the designated air quality planning agency describing their respective roles and responsibilities for air quality related transportation planning.</P>

              <P>(d) If more than one MPO has been designated to serve an urbanized area, there shall be a written agreement among the MPOs, the State(s), and the public transportation operator(s) describing how the metropolitan transportation planning processes will be coordinated to assure the development of consistent metropolitan transportation plans and TIPs across the MPA boundaries, particularly in cases in which a <PRTPAGE P="110"/>proposed transportation investment extends across the boundaries of more than one MPA. If any part of the urbanized area is a nonattainment or maintenance area, the agreement also shall include State and local air quality agencies. The metropolitan transportation planning processes for affected MPOs should, to the maximum extent possible, reflect coordinated data collection, analysis, and planning assumptions across the MPAs. Alternatively, a single metropolitan transportation plan and/or TIP for the entire urbanized area may be developed jointly by the MPOs in cooperation with their respective planning partners. Coordination efforts and outcomes shall be documented in subsequent transmittals of the UPWP and other planning products, including the metropolitan transportation plan and TIP, to the State(s), the FHWA, and the FTA.</P>
              <P>(e) Where the boundaries of the urbanized area or MPA extend across two or more States, the Governors with responsibility for a portion of the multistate area, the appropriate MPO(s), and the public transportation operator(s) shall coordinate transportation planning for the entire multistate area. States involved in such multistate transportation planning may:</P>
              <P>(1) Enter into agreements or compacts, not in conflict with any law of the United States, for cooperative efforts and mutual assistance in support of activities authorized under this section as the activities pertain to interstate areas and localities within the States; and</P>
              <P>(2) Establish such agencies, joint or otherwise, as the States may determine desirable for making the agreements and compacts effective.</P>
              <P>(f) If part of an urbanized area that has been designated as a TMA overlaps into an adjacent MPA serving an urbanized area that is not designated as a TMA, the adjacent urbanized area shall not be treated as a TMA. However, a written agreement shall be established between the MPOs with MPA boundaries including a portion of the TMA, which clearly identifies the roles and responsibilities of each MPO in meeting specific TMA requirements (e.g., congestion management process, Surface Transportation Program funds suballocated to the urbanized area over 200,000 population, and project selection).</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 450.316</SECTNO>
              <SUBJECT>Interested parties, participation, and consultation.</SUBJECT>
              <P>(a) The MPO shall develop and use a documented participation plan that defines a process for providing citizens, affected public agencies, representatives of public transportation employees, freight shippers, providers of freight transportation services, private providers of transportation, representatives of users of public transportation, representatives of users of pedestrian walkways and bicycle transportation facilities, representatives of the disabled, and other interested parties with reasonable opportunities to be involved in the metropolitan transportation planning process.</P>
              <P>(1) The participation plan shall be developed by the MPO in consultation with all interested parties and shall, at a minimum, describe explicit procedures, strategies, and desired outcomes for:</P>
              <P>(i) Providing adequate public notice of public participation activities and time for public review and comment at key decision points, including but not limited to a reasonable opportunity to comment on the proposed metropolitan transportation plan and the TIP;</P>
              <P>(ii) Providing timely notice and reasonable access to information about transportation issues and processes;</P>
              <P>(iii) Employing visualization techniques to describe metropolitan transportation plans and TIPs;</P>
              <P>(iv) Making public information (technical information and meeting notices) available in electronically accessible formats and means, such as the World Wide Web;</P>
              <P>(v) Holding any public meetings at convenient and accessible locations and times;</P>

              <P>(vi) Demonstrating explicit consideration and response to public input received during the development of the metropolitan transportation plan and the TIP;<PRTPAGE P="111"/>
              </P>
              <P>(vii) Seeking out and considering the needs of those traditionally underserved by existing transportation systems, such as low-income and minority households, who may face challenges accessing employment and other services;</P>
              <P>(viii) Providing an additional opportunity for public comment, if the final metropolitan transportation plan or TIP differs significantly from the version that was made available for public comment by the MPO and raises new material issues which interested parties could not reasonably have foreseen from the public involvement efforts;</P>
              <P>(ix) Coordinating with the statewide transportation planning public involvement and consultation processes under subpart B of this part; and</P>
              <P>(x) Periodically reviewing the effectiveness of the procedures and strategies contained in the participation plan to ensure a full and open participation process.</P>
              <P>(2) When significant written and oral comments are received on the draft metropolitan transportation plan and TIP (including the financial plans) as a result of the participation process in this section or the interagency consultation process required under the EPA transportation conformity regulations (40 CFR part 93), a summary, analysis, and report on the disposition of comments shall be made as part of the final metropolitan transportation plan and TIP.</P>
              <P>(3) A minimum public comment period of 45 calendar days shall be provided before the initial or revised participation plan is adopted by the MPO. Copies of the approved participation plan shall be provided to the FHWA and the FTA for informational purposes and shall be posted on the World Wide Web, to the maximum extent practicable.</P>
              <P>(b) In developing metropolitan transportation plans and TIPs, the MPO should consult with agencies and officials responsible for other planning activities within the MPA that are affected by transportation (including State and local planned growth, economic development, environmental protection, airport operations, or freight movements) or coordinate its planning process (to the maximum extent practicable) with such planning activities. In addition, metropolitan transportation plans and TIPs shall be developed with due consideration of other related planning activities within the metropolitan area, and the process shall provide for the design and delivery of transportation services within the area that are provided by:</P>
              <P>(1) Recipients of assistance under title 49 U.S.C. Chapter 53;</P>
              <P>(2) Governmental agencies and non-profit organizations (including representatives of the agencies and organizations) that receive Federal assistance from a source other than the U.S. Department of Transportation to provide non-emergency transportation services; and</P>
              <P>(3) Recipients of assistance under 23 U.S.C. 204.</P>
              <P>(c) When the MPA includes Indian Tribal lands, the MPO shall appropriately involve the Indian Tribal government(s) in the development of the metropolitan transportation plan and the TIP.</P>
              <P>(d) When the MPA includes Federal public lands, the MPO shall appropriately involve the Federal land management agencies in the development of the metropolitan transportation plan and the TIP.</P>
              <P>(e) MPOs shall, to the extent practicable, develop a documented process(es) that outlines roles, responsibilities, and key decision points for consulting with other governments and agencies, as defined in paragraphs (b), (c), and (d) of this section, which may be included in the agreement(s) developed under § 450.314.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 450.318</SECTNO>
              <SUBJECT>Transportation planning studies and project development.</SUBJECT>

              <P>(a) Pursuant to section 1308 of the Transportation Equity Act for the 21st Century, TEA-21 (Pub. L. 105-178), an MPO(s), State(s), or public transportation operator(s) may undertake a multimodal, systems-level corridor or subarea planning study as part of the metropolitan transportation planning process. To the extent practicable, development of these transportation planning studies shall involve consultation with, or joint efforts among, the MPO(s), State(s), and/or public <PRTPAGE P="112"/>transportation operator(s). The results or decisions of these transportation planning studies may be used as part of the overall project development process consistent with the National Environmental Policy Act (NEPA) of 1969 (42 U.S.C. 4321 <E T="03">et seq.</E>) and associated implementing regulations (23 CFR part 771 and 40 CFR parts 1500-1508). Specifically, these corridor or subarea studies may result in producing any of the following for a proposed transportation project:</P>
              <P>(1) Purpose and need or goals and objective statement(s);</P>
              <P>(2) General travel corridor and/or general mode(s) definition (e.g., highway, transit, or a highway/transit combination);</P>
              <P>(3) Preliminary screening of alternatives and elimination of unreasonable alternatives;</P>
              <P>(4) Basic description of the environmental setting; and/or</P>
              <P>(5) Preliminary identification of environmental impacts and environmental mitigation.</P>
              <P>(b) Publicly available documents or other source material produced by, or in support of, the transportation planning process described in this subpart may be incorporated directly or by reference into subsequent NEPA documents, in accordance with 40 CFR 1502.21, if:</P>
              <P>(1) The NEPA lead agencies agree that such incorporation will aid in establishing or evaluating the purpose and need for the Federal action, reasonable alternatives, cumulative or other impacts on the human and natural environment, or mitigation of these impacts; and</P>
              <P>(2) The systems-level, corridor, or subarea planning study is conducted with:</P>
              <P>(i) Involvement of interested State, local, Tribal, and Federal agencies;</P>
              <P>(ii) Public review;</P>
              <P>(iii) Reasonable opportunity to comment during the metropolitan transportation planning process and development of the corridor or subarea planning study;</P>
              <P>(iv) Documentation of relevant decisions in a form that is identifiable and available for review during the NEPA scoping process and can be appended to or referenced in the NEPA document; and</P>
              <P>(v) The review of the FHWA and the FTA, as appropriate.</P>
              <P>(c) By agreement of the NEPA lead agencies, the above integration may be accomplished through tiering (as described in 40 CFR 1502.20), incorporating the subarea or corridor planning study into the draft Environmental Impact Statement (EIS) or Environmental Assessment, or other means that the NEPA lead agencies deem appropriate.</P>
              <P>(d) For transit fixed guideway projects requiring an Alternatives Analysis (49 U.S.C. 5309(d) and (e)), the Alternatives Analysis described in 49 CFR part 611 constitutes the planning required by section 1308 of the TEA-21. The Alternatives Analysis may or may not be combined with the preparation of a NEPA document (e.g., a draft EIS). When an Alternatives Analysis is separate from the preparation of a NEPA document, the results of the Alternatives Analysis may be used during a subsequent environmental review process as described in paragraph (a).</P>
              <P>(e) Additional information to further explain the linkages between the transportation planning and project development/NEPA processes is contained in Appendix A to this part, including an explanation that it is non-binding guidance material.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 450.320</SECTNO>
              <SUBJECT>Congestion management process in transportation management areas.</SUBJECT>
              <P>(a) The transportation planning process in a TMA shall address congestion management through a process that provides for safe and effective integrated management and operation of the multimodal transportation system, based on a cooperatively developed and implemented metropolitan-wide strategy, of new and existing transportation facilities eligible for funding under title 23 U.S.C. and title 49 U.S.C. Chapter 53 through the use of travel demand reduction and operational management strategies.</P>

              <P>(b) The development of a congestion management process should result in <PRTPAGE P="113"/>multimodal system performance measures and strategies that can be reflected in the metropolitan transportation plan and the TIP. The level of system performance deemed acceptable by State and local transportation officials may vary by type of transportation facility, geographic location (metropolitan area or subarea), and/or time of day. In addition, consideration should be given to strategies that manage demand, reduce single occupant vehicle (SOV) travel, and improve transportation system management and operations. Where the addition of general purpose lanes is determined to be an appropriate congestion management strategy, explicit consideration is to be given to the incorporation of appropriate features into the SOV project to facilitate future demand management strategies and operational improvements that will maintain the functional integrity and safety of those lanes.</P>
              <P>(c) The congestion management process shall be developed, established, and implemented as part of the metropolitan transportation planning process that includes coordination with transportation system management and operations activities. The congestion management process shall include:</P>
              <P>(1) Methods to monitor and evaluate the performance of the multimodal transportation system, identify the causes of recurring and non-recurring congestion, identify and evaluate alternative strategies, provide information supporting the implementation of actions, and evaluate the effectiveness of implemented actions;</P>
              <P>(2) Definition of congestion management objectives and appropriate performance measures to assess the extent of congestion and support the evaluation of the effectiveness of congestion reduction and mobility enhancement strategies for the movement of people and goods. Since levels of acceptable system performance may vary among local communities, performance measures should be tailored to the specific needs of the area and established cooperatively by the State(s), affected MPO(s), and local officials in consultation with the operators of major modes of transportation in the coverage area;</P>
              <P>(3) Establishment of a coordinated program for data collection and system performance monitoring to define the extent and duration of congestion, to contribute in determining the causes of congestion, and evaluate the efficiency and effectiveness of implemented actions. To the extent possible, this data collection program should be coordinated with existing data sources (including archived operational/ITS data) and coordinated with operations managers in the metropolitan area;</P>
              <P>(4) Identification and evaluation of the anticipated performance and expected benefits of appropriate congestion management strategies that will contribute to the more effective use and improved safety of existing and future transportation systems based on the established performance measures. The following categories of strategies, or combinations of strategies, are some examples of what should be appropriately considered for each area:</P>
              <P>(i) Demand management measures, including growth management and congestion pricing;</P>
              <P>(ii) Traffic operational improvements;</P>
              <P>(iii) Public transportation improvements;</P>
              <P>(iv) ITS technologies as related to the regional ITS architecture; and</P>
              <P>(v) Where necessary, additional system capacity;</P>
              <P>(5) Identification of an implementation schedule, implementation responsibilities, and possible funding sources for each strategy (or combination of strategies) proposed for implementation; and</P>
              <P>(6) Implementation of a process for periodic assessment of the effectiveness of implemented strategies, in terms of the area's established performance measures. The results of this evaluation shall be provided to decisionmakers and the public to provide guidance on selection of effective strategies for future implementation.</P>

              <P>(d) In a TMA designated as nonattainment area for ozone or carbon monoxide pursuant to the Clean Air Act, Federal funds may not be programmed for any project that will result in a significant increase in the carrying capacity for SOVs (<E T="03">i.e.</E>, a new <PRTPAGE P="114"/>general purpose highway on a new location or adding general purpose lanes, with the exception of safety improvements or the elimination of bottlenecks), unless the project is addressed through a congestion management process meeting the requirements of this section.</P>
              <P>(e) In TMAs designated as nonattainment for ozone or carbon monoxide, the congestion management process shall provide an appropriate analysis of reasonable (including multimodal) travel demand reduction and operational management strategies for the corridor in which a project that will result in a significant increase in capacity for SOVs (as described in paragraph (d) of this section) is proposed to be advanced with Federal funds. If the analysis demonstrates that travel demand reduction and operational management strategies cannot fully satisfy the need for additional capacity in the corridor and additional SOV capacity is warranted, then the congestion management process shall identify all reasonable strategies to manage the SOV facility safely and effectively (or to facilitate its management in the future). Other travel demand reduction and operational management strategies appropriate for the corridor, but not appropriate for incorporation into the SOV facility itself, shall also be identified through the congestion management process. All identified reasonable travel demand reduction and operational management strategies shall be incorporated into the SOV project or committed to by the State and MPO for implementation.</P>
              <P>(f) State laws, rules, or regulations pertaining to congestion management systems or programs may constitute the congestion management process, if the FHWA and the FTA find that the State laws, rules, or regulations are consistent with, and fulfill the intent of, the purposes of 23 U.S.C. 134 and 49 U.S.C. 5303.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 450.322</SECTNO>
              <SUBJECT>Development and content of the metropolitan transportation plan.</SUBJECT>
              <P>(a) The metropolitan transportation planning process shall include the development of a transportation plan addressing no less than a 20-year planning horizon as of the effective date. In nonattainment and maintenance areas, the effective date of the transportation plan shall be the date of a conformity determination issued by the FHWA and the FTA. In attainment areas, the effective date of the transportation plan shall be its date of adoption by the MPO.</P>
              <P>(b) The transportation plan shall include both long-range and short-range strategies/actions that lead to the development of an integrated multimodal transportation system to facilitate the safe and efficient movement of people and goods in addressing current and future transportation demand.</P>
              <P>(c) The MPO shall review and update the transportation plan at least every four years in air quality nonattainment and maintenance areas and at least every five years in attainment areas to confirm the transportation plan's validity and consistency with current and forecasted transportation and land use conditions and trends and to extend the forecast period to at least a 20-year planning horizon. In addition, the MPO may revise the transportation plan at any time using the procedures in this section without a requirement to extend the horizon year. The transportation plan (and any revisions) shall be approved by the MPO and submitted for information purposes to the Governor. Copies of any updated or revised transportation plans must be provided to the FHWA and the FTA.</P>
              <P>(d) In metropolitan areas that are in nonattainment for ozone or carbon monoxide, the MPO shall coordinate the development of the metropolitan transportation plan with the process for developing transportation control measures (TCMs) in a State Implementation Plan (SIP).</P>

              <P>(e) The MPO, the State(s), and the public transportation operator(s) shall validate data utilized in preparing other existing modal plans for providing input to the transportation plan. In updating the transportation plan, the MPO shall base the update on the latest available estimates and assumptions for population, land use, travel, employment, congestion, and economic activity. The MPO shall approve transportation plan contents and <PRTPAGE P="115"/>supporting analyses produced by a transportation plan update.</P>
              <P>(f) The metropolitan transportation plan shall, at a minimum, include:</P>
              <P>(1) The projected transportation demand of persons and goods in the metropolitan planning area over the period of the transportation plan;</P>
              <P>(2) Existing and proposed transportation facilities (including major roadways, transit, multimodal and intermodal facilities, pedestrian walkways and bicycle facilities, and intermodal connectors) that should function as an integrated metropolitan transportation system, giving emphasis to those facilities that serve important national and regional transportation functions over the period of the transportation plan. In addition, the locally preferred alternative selected from an Alternatives Analysis under the FTA's Capital Investment Grant program (49 U.S.C. 5309 and 49 CFR part 611) needs to be adopted as part of the metropolitan transportation plan as a condition for funding under 49 U.S.C. 5309;</P>
              <P>(3) Operational and management strategies to improve the performance of existing transportation facilities to relieve vehicular congestion and maximize the safety and mobility of people and goods;</P>
              <P>(4) Consideration of the results of the congestion management process in TMAs that meet the requirements of this subpart, including the identification of SOV projects that result from a congestion management process in TMAs that are nonattainment for ozone or carbon monoxide;</P>
              <P>(5) Assessment of capital investment and other strategies to preserve the existing and projected future metropolitan transportation infrastructure and provide for multimodal capacity increases based on regional priorities and needs. The metropolitan transportation plan may consider projects and strategies that address areas or corridors where current or projected congestion threatens the efficient functioning of key elements of the metropolitan area's transportation system;</P>
              <P>(6) Design concept and design scope descriptions of all existing and proposed transportation facilities in sufficient detail, regardless of funding source, in nonattainment and maintenance areas for conformity determinations under the EPA's transportation conformity rule (40 CFR part 93). In all areas (regardless of air quality designation), all proposed improvements shall be described in sufficient detail to develop cost estimates;</P>
              <P>(7) A discussion of types of potential environmental mitigation activities and potential areas to carry out these activities, including activities that may have the greatest potential to restore and maintain the environmental functions affected by the metropolitan transportation plan. The discussion may focus on policies, programs, or strategies, rather than at the project level. The discussion shall be developed in consultation with Federal, State, and Tribal land management, wildlife, and regulatory agencies. The MPO may establish reasonable timeframes for performing this consultation;</P>
              <P>(8) Pedestrian walkway and bicycle transportation facilities in accordance with 23 U.S.C. 217(g);</P>
              <P>(9) Transportation and transit enhancement activities, as appropriate; and</P>
              <P>(10) A financial plan that demonstrates how the adopted transportation plan can be implemented.</P>
              <P>(i) For purposes of transportation system operations and maintenance, the financial plan shall contain system-level estimates of costs and revenue sources that are reasonably expected to be available to adequately operate and maintain Federal-aid highways (as defined by 23 U.S.C. 101(a)(5)) and public transportation (as defined by title 49 U.S.C. Chapter 53).</P>
              <P>(ii) For the purpose of developing the metropolitan transportation plan, the MPO, public transportation operator(s), and State shall cooperatively develop estimates of funds that will be available to support metropolitan transportation plan implementation, as required under § 450.314(a). All necessary financial resources from public and private sources that are reasonably expected to be made available to carry out the transportation plan shall be identified.</P>

              <P>(iii) The financial plan shall include recommendations on any additional financing strategies to fund projects and programs included in the metropolitan <PRTPAGE P="116"/>transportation plan. In the case of new funding sources, strategies for ensuring their availability shall be identified.</P>
              <P>(iv) In developing the financial plan, the MPO shall take into account all projects and strategies proposed for funding under title 23 U.S.C., title 49 U.S.C. Chapter 53 or with other Federal funds; State assistance; local sources; and private participation. Starting December 11, 2007, revenue and cost estimates that support the metropolitan transportation plan must use an inflation rate(s) to reflect “year of expenditure dollars,” based on reasonable financial principles and information, developed cooperatively by the MPO, State(s), and public transportation operator(s).</P>

              <P>(v) For the outer years of the metropolitan transportation plan (<E T="03">i.e.</E>, beyond the first 10 years), the financial plan may reflect aggregate cost ranges/cost bands, as long as the future funding source(s) is reasonably expected to be available to support the projected cost ranges/cost bands.</P>
              <P>(vi) For nonattainment and maintenance areas, the financial plan shall address the specific financial strategies required to ensure the implementation of TCMs in the applicable SIP.</P>
              <P>(vii) For illustrative purposes, the financial plan may (but is not required to) include additional projects that would be included in the adopted transportation plan if additional resources beyond those identified in the financial plan were to become available.</P>

              <P>(viii) In cases that the FHWA and the FTA find a metropolitan transportation plan to be fiscally constrained and a revenue source is subsequently removed or substantially reduced (<E T="03">i.e.</E>, by legislative or administrative actions), the FHWA and the FTA will not withdraw the original determination of fiscal constraint; however, in such cases, the FHWA and the FTA will not act on an updated or amended metropolitan transportation plan that does not reflect the changed revenue situation.</P>
              <P>(g) The MPO shall consult, as appropriate, with State and local agencies responsible for land use management, natural resources, environmental protection, conservation, and historic preservation concerning the development of the transportation plan. The consultation shall involve, as appropriate:</P>
              <P>(1) Comparison of transportation plans with State conservation plans or maps, if available; or</P>
              <P>(2) Comparison of transportation plans to inventories of natural or historic resources, if available.</P>
              <P>(h) The metropolitan transportation plan should include a safety element that incorporates or summarizes the priorities, goals, countermeasures, or projects for the MPA contained in the Strategic Highway Safety Plan required under 23 U.S.C. 148, as well as (as appropriate) emergency relief and disaster preparedness plans and strategies and policies that support homeland security (as appropriate) and safeguard the personal security of all motorized and non-motorized users.</P>
              <P>(i) The MPO shall provide citizens, affected public agencies, representatives of public transportation employees, freight shippers, providers of freight transportation services, private providers of transportation, representatives of users of public transportation, representatives of users of pedestrian walkways and bicycle transportation facilities, representatives of the disabled, and other interested parties with a reasonable opportunity to comment on the transportation plan using the participation plan developed under § 450.316(a).</P>
              <P>(j) The metropolitan transportation plan shall be published or otherwise made readily available by the MPO for public review, including (to the maximum extent practicable) in electronically accessible formats and means, such as the World Wide Web.</P>
              <P>(k) A State or MPO shall not be required to select any project from the illustrative list of additional projects included in the financial plan under paragraph (f)(10) of this section.</P>

              <P>(l) In nonattainment and maintenance areas for transportation-related pollutants, the MPO, as well as the FHWA and the FTA, must make a conformity determination on any updated or amended transportation plan in accordance with the Clean Air Act and the EPA transportation conformity regulations (40 CFR part 93). During a conformity lapse, MPOs can prepare an <PRTPAGE P="117"/>interim metropolitan transportation plan as a basis for advancing projects that are eligible to proceed under a conformity lapse. An interim metropolitan transportation plan consisting of eligible projects from, or consistent with, the most recent conforming transportation plan and TIP may proceed immediately without revisiting the requirements of this section, subject to interagency consultation defined in 40 CFR part 93. An interim metropolitan transportation plan containing eligible projects that are not from, or consistent with, the most recent conforming transportation plan and TIP must meet all the requirements of this section.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 450.324</SECTNO>
              <SUBJECT>Development and content of the transportation improvement program (TIP).</SUBJECT>
              <P>(a) The MPO, in cooperation with the State(s) and any affected public transportation operator(s), shall develop a TIP for the metropolitan planning area. The TIP shall cover a period of no less than four years, be updated at least every four years, and be approved by the MPO and the Governor. However, if the TIP covers more than four years, the FHWA and the FTA will consider the projects in the additional years as informational. The TIP may be updated more frequently, but the cycle for updating the TIP must be compatible with the STIP development and approval process. The TIP expires when the FHWA/FTA approval of the STIP expires. Copies of any updated or revised TIPs must be provided to the FHWA and the FTA. In nonattainment and maintenance areas subject to transportation conformity requirements, the FHWA and the FTA, as well as the MPO, must make a conformity determination on any updated or amended TIP, in accordance with the Clean Air Act requirements and the EPA's transportation conformity regulations (40 CFR part 93).</P>
              <P>(b) The MPO shall provide all interested parties with a reasonable opportunity to comment on the proposed TIP as required by § 450.316(a). In addition, in nonattainment area TMAs, the MPO shall provide at least one formal public meeting during the TIP development process, which should be addressed through the participation plan described in § 450.316(a). In addition, the TIP shall be published or otherwise made readily available by the MPO for public review, including (to the maximum extent practicable) in electronically accessible formats and means, such as the World Wide Web, as described in § 450.316(a).</P>
              <P>(c) The TIP shall include capital and non-capital surface transportation projects (or phases of projects) within the boundaries of the metropolitan planning area proposed for funding under 23 U.S.C. and 49 U.S.C. Chapter 53 (including transportation enhancements; Federal Lands Highway program projects; safety projects included in the State's Strategic Highway Safety Plan; trails projects; pedestrian walkways; and bicycle facilities), except the following that may (but are not required to) be included:</P>
              <P>(1) Safety projects funded under 23 U.S.C. 402 and 49 U.S.C. 31102;</P>
              <P>(2) Metropolitan planning projects funded under 23 U.S.C. 104(f), 49 U.S.C. 5305(d), and 49 U.S.C. 5339;</P>
              <P>(3) State planning and research projects funded under 23 U.S.C. 505 and 49 U.S.C. 5305(e);</P>
              <P>(4) At the discretion of the State and MPO, State planning and research projects funded with National Highway System, Surface Transportation Program, and/or Equity Bonus funds;</P>
              <P>(5) Emergency relief projects (except those involving substantial functional, locational, or capacity changes);</P>
              <P>(6) National planning and research projects funded under 49 U.S.C. 5314; and</P>
              <P>(7) Project management oversight projects funded under 49 U.S.C. 5327.</P>

              <P>(d) The TIP shall contain all regionally significant projects requiring an action by the FHWA or the FTA whether or not the projects are to be funded under title 23 U.S.C. Chapters 1 and 2 or title 49 U.S.C. Chapter 53 (e.g., addition of an interchange to the Interstate System with State, local, and/or private funds and congressionally designated projects not funded under 23 U.S.C. or 49 U.S.C. Chapter 53). For public information and conformity purposes, the TIP shall include all regionally significant projects proposed to be funded with Federal funds other than <PRTPAGE P="118"/>those administered by the FHWA or the FTA, as well as all regionally significant projects to be funded with non-Federal funds.</P>
              <P>(e) The TIP shall include, for each project or phase (e.g., preliminary engineering, environment/NEPA, right-of-way, design, or construction), the following:</P>
              <P>(1) Sufficient descriptive material (<E T="03">i.e.</E>, type of work, termini, and length) to identify the project or phase;</P>
              <P>(2) Estimated total project cost, which may extend beyond the four years of the TIP;</P>
              <P>(3) The amount of Federal funds proposed to be obligated during each program year for the project or phase (for the first year, this includes the proposed category of Federal funds and source(s) of non-Federal funds. For the second, third, and fourth years, this includes the likely category or possible categories of Federal funds and sources of non-Federal funds);</P>
              <P>(4) Identification of the agencies responsible for carrying out the project or phase;</P>
              <P>(5) In nonattainment and maintenance areas, identification of those projects which are identified as TCMs in the applicable SIP;</P>
              <P>(6) In nonattainment and maintenance areas, included projects shall be specified in sufficient detail (design concept and scope) for air quality analysis in accordance with the EPA transportation conformity regulation (40 CFR part 93); and</P>
              <P>(7) In areas with Americans with Disabilities Act required paratransit and key station plans, identification of those projects that will implement these plans.</P>
              <P>(f) Projects that are not considered to be of appropriate scale for individual identification in a given program year may be grouped by function, work type, and/or geographic area using the applicable classifications under 23 CFR 771.117(c) and (d) and/or 40 CFR part 93. In nonattainment and maintenance areas, project classifications must be consistent with the “exempt project” classifications contained in the EPA transportation conformity regulation (40 CFR part 93). In addition, projects proposed for funding under title 23 U.S.C. Chapter 2 that are not regionally significant may be grouped in one line item or identified individually in the TIP.</P>
              <P>(g) Each project or project phase included in the TIP shall be consistent with the approved metropolitan transportation plan.</P>
              <P>(h) The TIP shall include a financial plan that demonstrates how the approved TIP can be implemented, indicates resources from public and private sources that are reasonably expected to be made available to carry out the TIP, and recommends any additional financing strategies for needed projects and programs. In developing the TIP, the MPO, State(s), and public transportation operator(s) shall cooperatively develop estimates of funds that are reasonably expected to be available to support TIP implementation, in accordance with § 450.314(a). Only projects for which construction or operating funds can reasonably be expected to be available may be included. In the case of new funding sources, strategies for ensuring their availability shall be identified. In developing the financial plan, the MPO shall take into account all projects and strategies funded under title 23 U.S.C., title 49 U.S.C. Chapter 53 and other Federal funds; and regionally significant projects that are not federally funded. For purposes of transportation operations and maintenance, the financial plan shall contain system-level estimates of costs and revenue sources that are reasonably expected to be available to adequately operate and maintain Federal-aid highways (as defined by 23 U.S.C. 101(a)(5)) and public transportation (as defined by title 49 U.S.C. Chapter 53). In addition, for illustrative purposes, the financial plan may (but is not required to) include additional projects that would be included in the TIP if reasonable additional resources beyond those identified in the financial plan were to become available. Starting December 11, 2007, revenue and cost estimates for the TIP must use an inflation rate(s) to reflect “year of expenditure dollars,” based on reasonable financial principles and information, developed cooperatively by the MPO, State(s), and public transportation operator(s).</P>

              <P>(i) The TIP shall include a project, or a phase of a project, only if full funding <PRTPAGE P="119"/>can reasonably be anticipated to be available for the project within the time period contemplated for completion of the project. In nonattainment and maintenance areas, projects included in the first two years of the TIP shall be limited to those for which funds are available or committed. For the TIP, financial constraint shall be demonstrated and maintained by year and shall include sufficient financial information to demonstrate which projects are to be implemented using current and/or reasonably available revenues, while federally supported facilities are being adequately operated and maintained. In the case of proposed funding sources, strategies for ensuring their availability shall be identified in the financial plan consistent with paragraph (h) of this section. In nonattainment and maintenance areas, the TIP shall give priority to eligible TCMs identified in the approved SIP in accordance with the EPA transportation conformity regulation (40 CFR part 93) and shall provide for their timely implementation.</P>
              <P>(j) Procedures or agreements that distribute suballocated Surface Transportation Program funds or funds under 49 U.S.C. 5307 to individual jurisdictions or modes within the MPA by pre-determined percentages or formulas are inconsistent with the legislative provisions that require the MPO, in cooperation with the State and the public transportation operator, to develop a prioritized and financially constrained TIP and shall not be used unless they can be clearly shown to be based on considerations required to be addressed as part of the metropolitan transportation planning process.</P>
              <P>(k) For the purpose of including projects funded under 49 U.S.C. 5309 in a TIP, the following approach shall be followed:</P>
              <P>(1) The total Federal share of projects included in the first year of the TIP shall not exceed levels of funding committed to the MPA; and</P>
              <P>(2) The total Federal share of projects included in the second, third, fourth, and/or subsequent years of the TIP may not exceed levels of funding committed, or reasonably expected to be available, to the MPA.</P>
              <P>(l) As a management tool for monitoring progress in implementing the transportation plan, the TIP should:</P>
              <P>(1) Identify the criteria and process for prioritizing implementation of transportation plan elements (including multimodal trade-offs) for inclusion in the TIP and any changes in priorities from previous TIPs;</P>
              <P>(2) List major projects from the previous TIP that were implemented and identify any significant delays in the planned implementation of major projects; and</P>
              <P>(3) In nonattainment and maintenance areas, describe the progress in implementing any required TCMs, in accordance with 40 CFR part 93.</P>
              <P>(m) During a conformity lapse, MPOs may prepare an interim TIP as a basis for advancing projects that are eligible to proceed under a conformity lapse. An interim TIP consisting of eligible projects from, or consistent with, the most recent conforming metropolitan transportation plan and TIP may proceed immediately without revisiting the requirements of this section, subject to interagency consultation defined in 40 CFR part 93. An interim TIP containing eligible projects that are not from, or consistent with, the most recent conforming transportation plan and TIP must meet all the requirements of this section.</P>
              <P>(n) Projects in any of the first four years of the TIP may be advanced in place of another project in the first four years of the TIP, subject to the project selection requirements of § 450.330. In addition, the TIP may be revised at any time under procedures agreed to by the State, MPO(s), and public transportation operator(s) consistent with the TIP development procedures established in this section, as well as the procedures for the MPO participation plan (see § 450.316(a)) and FHWA/FTA actions on the TIP (see § 450.328).</P>

              <P>(o) In cases that the FHWA and the FTA find a TIP to be fiscally constrained and a revenue source is subsequently removed or substantially reduced (<E T="03">i.e.</E>, by legislative or administrative actions), the FHWA and the FTA will not withdraw the original determination of fiscal constraint. However, in such cases, the FHWA and the <PRTPAGE P="120"/>FTA will not act on an updated or amended TIP that does not reflect the changed revenue situation.</P>
              <CITA>[72 FR 7261, Feb. 14, 2007; 72 FR 11089, Mar. 12, 2007]</CITA>
            </SECTION>
            <SECTION>
              <SECTNO>§ 450.326</SECTNO>
              <SUBJECT>TIP revisions and relationship to the STIP.</SUBJECT>
              <P>(a) An MPO may revise the TIP at any time under procedures agreed to by the cooperating parties consistent with the procedures established in this part for its development and approval. In nonattainment or maintenance areas for transportation-related pollutants, if a TIP amendment involves non-exempt projects (per 40 CFR part 93), or is replaced with an updated TIP, the MPO and the FHWA and the FTA must make a new conformity determination. In all areas, changes that affect fiscal constraint must take place by amendment of the TIP. Public participation procedures consistent with § 450.316(a) shall be utilized in revising the TIP, except that these procedures are not required for administrative modifications.</P>
              <P>(b) After approval by the MPO and the Governor, the TIP shall be included without change, directly or by reference, in the STIP required under 23 U.S.C. 135. In nonattainment and maintenance areas, a conformity finding on the TIP must be made by the FHWA and the FTA before it is included in the STIP. A copy of the approved TIP shall be provided to the FHWA and the FTA.</P>
              <P>(c) The State shall notify the MPO and Federal land management agencies when a TIP including projects under the jurisdiction of these agencies has been included in the STIP.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 450.328</SECTNO>
              <SUBJECT>TIP action by the FHWA and the FTA.</SUBJECT>
              <P>(a) The FHWA and the FTA shall jointly find that each metropolitan TIP is consistent with the metropolitan transportation plan produced by the continuing and comprehensive transportation process carried on cooperatively by the MPO(s), the State(s), and the public transportation operator(s) in accordance with 23 U.S.C. 134 and 49 U.S.C. 5303. This finding shall be based on the self-certification statement submitted by the State and MPO under § 450.334, a review of the metropolitan transportation plan by the FHWA and the FTA, and upon other reviews as deemed necessary by the FHWA and the FTA.</P>
              <P>(b) In nonattainment and maintenance areas, the MPO, as well as the FHWA and the FTA, shall determine conformity of any updated or amended TIP, in accordance with 40 CFR part 93. After the FHWA and the FTA issue a conformity determination on the TIP, the TIP shall be incorporated, without change, into the STIP, directly or by reference.</P>
              <P>(c) If the metropolitan transportation plan has not been updated in accordance with the cycles defined in § 450.322(c), projects may only be advanced from a TIP that was approved and found to conform (in nonattainment and maintenance areas) prior to expiration of the metropolitan transportation plan and meets the TIP update requirements of § 450.324(a). Until the MPO approves (in attainment areas) or the FHWA/FTA issues a conformity determination on (in nonattainment and maintenance areas) the updated metropolitan transportation plan, the TIP may not be amended.</P>
              <P>(d) In the case of extenuating circumstances, the FHWA and the FTA will consider and take appropriate action on requests to extend the STIP approval period for all or part of the TIP in accordance with § 450.218(c).</P>
              <P>(e) If an illustrative project is included in the TIP, no Federal action may be taken on that project by the FHWA and the FTA until it is formally included in the financially constrained and conforming metropolitan transportation plan and TIP.</P>
              <P>(f) Where necessary in order to maintain or establish operations, the FHWA and the FTA may approve highway and transit operating assistance for specific projects or programs, even though the projects or programs may not be included in an approved TIP.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 450.330</SECTNO>
              <SUBJECT>Project selection from the TIP.</SUBJECT>

              <P>(a) Once a TIP that meets the requirements of 23 U.S.C. 134(j), 49 U.S.C. 5303(j), and § 450.324 has been developed and approved, the first year of the TIP shall constitute an “agreed to” list of projects for project selection purposes and no further project selection action <PRTPAGE P="121"/>is required for the implementing agency to proceed with projects, except where the appropriated Federal funds available to the metropolitan planning area are significantly less than the authorized amounts or where there are significant shifting of projects between years. In this case, a revised “agreed to” list of projects shall be jointly developed by the MPO, the State, and the public transportation operator(s) if requested by the MPO, the State, or the public transportation operator(s). If the State or public transportation operator(s) wishes to proceed with a project in the second, third, or fourth year of the TIP, the specific project selection procedures stated in paragraphs (b) and (c) of this section must be used unless the MPO, the State, and the public transportation operator(s) jointly develop expedited project selection procedures to provide for the advancement of projects from the second, third, or fourth years of the TIP.</P>
              <P>(b) In metropolitan areas not designated as TMAs, projects to be implemented using title 23 U.S.C. funds (other than Federal Lands Highway program projects) or funds under title 49 U.S.C. Chapter 53, shall be selected by the State and/or the public transportation operator(s), in cooperation with the MPO from the approved metropolitan TIP. Federal Lands Highway program projects shall be selected in accordance with procedures developed pursuant to 23 U.S.C. 204.</P>
              <P>(c) In areas designated as TMAs, all 23 U.S.C. and 49 U.S.C. Chapter 53 funded projects (excluding projects on the National Highway System (NHS) and projects funded under the Bridge, Interstate Maintenance, and Federal Lands Highway programs) shall be selected by the MPO in consultation with the State and public transportation operator(s) from the approved TIP and in accordance with the priorities in the approved TIP. Projects on the NHS and projects funded under the Bridge and Interstate Maintenance programs shall be selected by the State in cooperation with the MPO, from the approved TIP. Federal Lands Highway program projects shall be selected in accordance with procedures developed pursuant to 23 U.S.C. 204.</P>
              <P>(d) Except as provided in § 450.324(c) and § 450.328(f), projects not included in the federally approved STIP shall not be eligible for funding with funds under title 23 U.S.C. or 49 U.S.C. Chapter 53.</P>
              <P>(e) In nonattainment and maintenance areas, priority shall be given to the timely implementation of TCMs contained in the applicable SIP in accordance with the EPA transportation conformity regulations (40 CFR part 93).</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 450.332</SECTNO>
              <SUBJECT>Annual listing of obligated projects.</SUBJECT>
              <P>(a) In metropolitan planning areas, on an annual basis, no later than 90 calendar days following the end of the program year, the State, public transportation operator(s), and the MPO shall cooperatively develop a listing of projects (including investments in pedestrian walkways and bicycle transportation facilities) for which funds under 23 U.S.C. or 49 U.S.C. Chapter 53 were obligated in the preceding program year.</P>
              <P>(b) The listing shall be prepared in accordance with § 450.314(a) and shall include all federally funded projects authorized or revised to increase obligations in the preceding program year, and shall at a minimum include the TIP information under § 450.324(e)(1) and (4) and identify, for each project, the amount of Federal funds requested in the TIP, the Federal funding that was obligated during the preceding year, and the Federal funding remaining and available for subsequent years.</P>
              <P>(c) The listing shall be published or otherwise made available in accordance with the MPO's public participation criteria for the TIP.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 450.334</SECTNO>
              <SUBJECT>Self-certifications and Federal certifications.</SUBJECT>
              <P>(a) For all MPAs, concurrent with the submittal of the entire proposed TIP to the FHWA and the FTA as part of the STIP approval, the State and the MPO shall certify at least every four years that the metropolitan transportation planning process is being carried out in accordance with all applicable requirements including:</P>

              <P>(1) 23 U.S.C. 134, 49 U.S.C. 5303, and this subpart;<PRTPAGE P="122"/>
              </P>
              <P>(2) In nonattainment and maintenance areas, sections 174 and 176 (c) and (d) of the Clean Air Act, as amended (42 U.S.C. 7504, 7506 (c) and (d)) and 40 CFR part 93;</P>
              <P>(3) Title VI of the Civil Rights Act of 1964, as amended (42 U.S.C. 2000d-1) and 49 CFR part 21;</P>
              <P>(4) 49 U.S.C. 5332, prohibiting discrimination on the basis of race, color, creed, national origin, sex, or age in employment or business opportunity;</P>
              <P>(5) Section 1101(b) of the SAFETEA-LU (Pub. L. 109-59) and 49 CFR part 26 regarding the involvement of disadvantaged business enterprises in USDOT funded projects;</P>
              <P>(6) 23 CFR part 230, regarding the implementation of an equal employment opportunity program on Federal and Federal-aid highway construction contracts;</P>

              <P>(7) The provisions of the Americans with Disabilities Act of 1990 (42 U.S.C. 12101 <E T="03">et seq.</E>) and 49 CFR parts 27, 37, and 38;</P>
              <P>(8) The Older Americans Act, as amended (42 U.S.C. 6101), prohibiting discrimination on the basis of age in programs or activities receiving Federal financial assistance;</P>
              <P>(9) Section 324 of title 23 U.S.C. regarding the prohibition of discrimination based on gender; and</P>
              <P>(10) Section 504 of the Rehabilitation Act of 1973 (29 U.S.C. 794) and 49 CFR part 27 regarding discrimination against individuals with disabilities.</P>
              <P>(b) In TMAs, the FHWA and the FTA jointly shall review and evaluate the transportation planning process for each TMA no less than once every four years to determine if the process meets the requirements of applicable provisions of Federal law and this subpart.</P>
              <P>(1) After review and evaluation of the TMA planning process, the FHWA and FTA shall take one of the following actions:</P>
              <P>(i) If the process meets the requirements of this part and a TIP has been approved by the MPO and the Governor, jointly certify the transportation planning process;</P>
              <P>(ii) If the process substantially meets the requirements of this part and a TIP has been approved by the MPO and the Governor, jointly certify the transportation planning process subject to certain specified corrective actions being taken; or</P>
              <P>(iii) If the process does not meet the requirements of this part, jointly certify the planning process as the basis for approval of only those categories of programs or projects that the FHWA and the FTA jointly determine, subject to certain specified corrective actions being taken.</P>
              <P>(2) If, upon the review and evaluation conducted under paragraph (b)(1)(iii) of this section, the FHWA and the FTA do not certify the transportation planning process in a TMA, the Secretary may withhold up to 20 percent of the funds attributable to the metropolitan planning area of the MPO for projects funded under title 23 U.S.C. and title 49 U.S.C. Chapter 53 in addition to corrective actions and funding restrictions. The withheld funds shall be restored to the MPA when the metropolitan transportation planning process is certified by the FHWA and FTA, unless the funds have lapsed.</P>
              <P>(3) A certification of the TMA planning process will remain in effect for four years unless a new certification determination is made sooner by the FHWA and the FTA or a shorter term is specified in the certification report.</P>
              <P>(4) In conducting a certification review, the FHWA and the FTA shall provide opportunities for public involvement within the metropolitan planning area under review. The FHWA and the FTA shall consider the public input received in arriving at a decision on a certification action.</P>
              <P>(5) The MPO(s), the State(s), and public transportation operator(s) shall be notified of the actions taken under paragraphs (b)(1) and (b)(2) of this section. The FHWA and the FTA will update the certification status of the TMA when evidence of satisfactory completion of a corrective action(s) is provided to the FHWA and the FTA.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 450.336</SECTNO>
              <SUBJECT>Applicability of NEPA to metropolitan transportation plans and programs.</SUBJECT>

              <P>Any decision by the Secretary concerning a metropolitan transportation plan or TIP developed through the processes provided for in 23 U.S.C. 134, 49 U.S.C. 5303, and this subpart shall <PRTPAGE P="123"/>not be considered to be a Federal action subject to review under NEPA.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 450.338</SECTNO>
              <SUBJECT>Phase-in of new requirements.</SUBJECT>
              <P>(a) Metropolitan transportation plans and TIPs adopted or approved prior to July 1, 2007 may be developed using the TEA-21 requirements or the provisions and requirements of this part.</P>

              <P>(b) For metropolitan transportation plans and TIPs that are developed under TEA-21 requirements prior to July 1, 2007, the FHWA/FTA action (<E T="03">i.e.</E>, conformity determinations and STIP approvals) must be completed no later than June 30, 2007. For metropolitan transportation plans in attainment areas that are developed under TEA-21 requirements prior to July 1, 2007, the MPO adoption action must be completed no later than June 30, 2007. If these actions are completed on or after July 1, 2007, the provisions and requirements of this part shall take effect, regardless of when the metropolitan transportation plan or TIP were developed.</P>
              <P>(c) On and after July 1, 2007, the FHWA and the FTA will take action on a new TIP developed under the provisions of this part, even if the MPO has not yet adopted a new metropolitan transportation plan under the provisions of this part, as long as the underlying transportation planning process is consistent with the requirements in the SAFETEA-LU.</P>
              <P>(d) The applicable action (see paragraph (b) of this section) on any amendments or updates to metropolitan transportation plans and TIPs on or after July 1, 2007, shall be based on the provisions and requirements of this part. However, administrative modifications may be made to the metropolitan transportation plan or TIP on or after July 1, 2007 in the absence of meeting the provisions and requirements of this part.</P>
              <P>(e) For new TMAs, the congestion management process described in § 450.320 shall be implemented within 18 months of the designation of a new TMA.</P>
            </SECTION>
            <APPENDIX>
              <EAR>Pt. 450, App. A</EAR>
              <HD SOURCE="HED">Appendix A to Part 450—Linking the Transportation Planning and NEPA Processes</HD>
              <HD SOURCE="HD2">Background and Overview:</HD>
              <P>This Appendix provides additional information to explain the linkage between the transportation planning and project development/National Environmental Policy Act (NEPA) processes. It is intended to be non-binding and should not be construed as a rule of general applicability.</P>
              <P>For 40 years, the Congress has directed that federally-funded highway and transit projects must flow from metropolitan and statewide transportation planning processes (pursuant to 23 U.S.C. 134-135 and 49 U.S.C. 5303-5306). Over the years, the Congress has refined and strengthened the transportation planning process as the foundation for project decisions, emphasizing public involvement, consideration of environmental and other factors, and a Federal role that oversees the transportation planning process but does not second-guess the content of transportation plans and programs.</P>

              <P>Despite this statutory emphasis on transportation planning, the environmental analyses produced to meet the requirements of the NEPA of 1969 (42 U.S.C. 4231 <E T="03">et seq.</E>) have often been conducted <E T="03">de novo,</E> disconnected from the analyses used to develop long-range transportation plans, statewide and metropolitan Transportation Improvement Programs (STIPs/TIPs), or planning-level corridor/subarea/feasibility studies. When the NEPA and transportation planning processes are not well coordinated, the NEPA process may lead to the development of information that is more appropriately developed in the planning process, resulting in duplication of work and delays in transportation improvements.</P>
              <P>The purpose of this Appendix is to change this culture, by supporting congressional intent that statewide and metropolitan transportation planning should be the foundation for highway and transit project decisions. This Appendix was crafted to recognize that transportation planning processes vary across the country. This document provides details on how information, analysis, and products from transportation planning can be incorporated into and relied upon in NEPA documents under existing laws, regardless of when the Notice of Intent has been published. This Appendix presents environmental review as a continuum of sequential study, refinement, and expansion performed in transportation planning and during project development/NEPA, with information developed and conclusions drawn in early stages utilized in subsequent (and more detailed) review stages.</P>

              <P>The information below is intended for use by State departments of transportation <PRTPAGE P="124"/>(State DOTs), metropolitan planning organizations (MPOs), and public transportation operators to clarify the circumstances under which transportation planning level choices and analyses can be adopted or incorporated into the process required by NEPA. Additionally, the FHWA and the FTA will work with Federal environmental, regulatory, and resource agencies to incorporate the principles of this Appendix in their day-to-day NEPA policies and procedures related to their involvement in highway and transit projects.</P>
              <P>This Appendix does not extend NEPA requirements to transportation plans and programs. The Transportation Efficiency Act for the 21st Century (TEA-21) and the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) specifically exempted transportation plans and programs from NEPA review. Therefore, initiating the NEPA process as part of, or concurrently with, a transportation planning study does not subject transportation plans and programs to NEPA.</P>
              <P>Implementation of this Appendix by States, MPOs, and public transportation operators is voluntary. The degree to which studies, analyses, or conclusions from the transportation planning process can be incorporated into the project development/NEPA processes will depend upon how well they meet certain standards established by NEPA regulations and guidance. While some transportation planning processes already meet these standards, others will need some modification.</P>
              <P>The remainder of this Appendix document utilizes a “Question and Answer” format, organized into three primary categories (“Procedural Issues,” “Substantive Issues,” and “Administrative Issues”).</P>
              <HD SOURCE="HD3">I. Procedural Issues:</HD>
              <P>1. In what format should the transportation planning information be included?</P>
              <P>To be included in the NEPA process, work from the transportation planning process must be documented in a form that can be appended to the NEPA document or incorporated by reference. Documents may be incorporated by reference if they are readily available so as to not impede agency or public review of the action. Any document incorporated by reference must be “reasonably available for inspection by potentially interested persons within the time allowed for comment.” Incorporated materials must be cited in the NEPA document and their contents briefly described, so that the reader understands why the document is cited and knows where to look for further information. To the extent possible, the documentation should be in a form such as official actions by the MPO, State DOT, or public transportation operator and/or correspondence within and among the organizations involved in the transportation planning process.</P>
              <P>2. What is a reasonable level of detail for a planning product that is intended to be used in a NEPA document? How does this level of detail compare to what is considered a full NEPA analysis?</P>
              <P>For purposes of transportation planning alone, a planning-level analysis does not need to rise to the level of detail required in the NEPA process. Rather, it needs to be accurate and up-to-date, and should adequately support recommended improvements in the statewide or metropolitan long-range transportation plan. The SAFETEA-LU requires transportation planning processes to focus on setting a context and following acceptable procedures. For example, the SAFETEA-LU requires a “discussion of the types of potential environmental mitigation activities” and potential areas for their implementation, rather than details on specific strategies. The SAFETEA-LU also emphasizes consultation with Federal, State, and Tribal land management, wildlife, and regulatory agencies.</P>
              <P>However, the Environmental Assessment (EA) or Environmental Impact Statement (EIS) ultimately will be judged by the standards applicable under the NEPA regulations and guidance from the Council on Environmental Quality (CEQ). To the extent the information incorporated from the transportation planning process, standing alone, does not contain all of the information or analysis required by NEPA, then it will need to be supplemented by other information contained in the EIS or EA that would, in conjunction with the information from the plan, collectively meet the requirements of NEPA. The intent is not to require NEPA studies in the transportation planning process. As an option, the NEPA analyses prepared for project development can be integrated with transportation planning studies (see the response to Question 9 for additional information).</P>
              <P>3. What type and extent of involvement from Federal, Tribal, State, and local environmental, regulatory, and resource agencies is needed in the transportation planning process in order for planning-level decisions to be more readily accepted in the NEPA process?</P>

              <P>Sections 3005, 3006, and 6001 of the SAFETEA-LU established formal consultation requirements for MPOs and State DOTs to employ with environmental, regulatory, and resource agencies in the development of long-range transportation plans. For example, metropolitan transportation plans now “shall include a discussion of the types of potential environmental mitigation activities and potential areas to carry out these activities, including activities that may have the greatest potential to restore and maintain the environmental functions affected by the <PRTPAGE P="125"/>[transportation] plan,” and that these planning-level discussions “shall be developed in consultation with Federal, State, and Tribal land management, wildlife, and regulatory agencies.” In addition, MPOs “shall consult, as appropriate, with State and local agencies responsible for land use management, natural resources, environmental protection, conservation, and historic preservation concerning the development of a long-range transportation plan,” and that this consultation “shall involve, as appropriate, comparison of transportation plans with State conservation plans or maps, if available, or comparison of transportation plans to inventories of natural or historic resources, if available.” Similar SAFETEA-LU language addresses the development of the long-range statewide transportation plan, with the addition of Tribal conservation plans or maps to this planning-level “comparison.”</P>

              <P>In addition, section 6002 of the SAFETEA-LU established several mechanisms for increased efficiency in environmental reviews for project decision-making. For example, the term “lead agency” collectively means the U. S. Department of Transportation and a State or local governmental entity serving as a joint lead agency for the NEPA process. In addition, the lead agency is responsible for inviting and designating “participating agencies” (<E T="03">i.e.</E>, other Federal or non-Federal agencies that may have an interest in the proposed project). Any Federal agency that is invited by the lead agency to participate in the environmental review process for a project shall be designated as a participating agency by the lead agency unless the invited agency informs the lead agency, in writing, by the deadline specified in the invitation that the invited agency:</P>
              <P>(a) Has no jurisdiction or authority with respect to the project; (b) has no expertise or information relevant to the project; and (c) does not intend to submit comments on the project.</P>
              <P>Past successful examples of using transportation planning products in NEPA analysis are based on early and continuous involvement of environmental, regulatory, and resource agencies. Without this early coordination, environmental, regulatory, and resource agencies are more likely to expect decisions made or analyses conducted in the transportation planning process to be revisited during the NEPA process. Early participation in transportation planning provides environmental, regulatory, and resource agencies better insight into the needs and objectives of the locality. Additionally, early participation provides an important opportunity for environmental, regulatory, and resource agency concerns to be identified and addressed early in the process, such as those related to permit applications. Moreover, Federal, Tribal, State, and local environmental, regulatory, and resource agencies are able to share data on particular resources, which can play a critical role in determining the feasibility of a transportation solution with respect to environmental impacts. The use of other agency planning outputs can result in a transportation project that could support multiple goals (transportation, environmental, and community). Further, planning decisions by these other agencies may have impacts on long-range transportation plans and/or the STIP/TIP, thereby providing important input to the transportation planning process and advancing integrated decision-making.</P>
              <P>4. What is the procedure for using decisions or analyses from the transportation planning process?</P>
              <P>The lead agencies jointly decide, and must agree, on what processes and consultation techniques are used to determine the transportation planning products that will be incorporated into the NEPA process. At a minimum, a robust scoping/early coordination process (which explains to Federal and State environmental, regulatory, and resource agencies and the public the information and/or analyses utilized to develop the planning products, how the purpose and need was developed and refined, and how the design concept and scope were determined) should play a critical role in leading to informed decisions by the lead agencies on the suitability of the transportation planning information, analyses, documents, and decisions for use in the NEPA process. As part of a rigorous scoping/early coordination process, the FHWA and the FTA should ensure that the transportation planning results are appropriately documented, shared, and used.</P>
              <P>5. To what extent can the FHWA/FTA provide up-front assurance that decisions and additional investments made in the transportation planning process will allow planning-level decisions and analyses to be used in the NEPA process?</P>
              <P>There are no guarantees. However, the potential is greatly improved for transportation planning processes that address the “3-C” planning principles (comprehensive, cooperative, and continuous); incorporate the intent of NEPA through the consideration of natural, physical, and social effects; involve environmental, regulatory, and resource agencies; thoroughly document the transportation planning process information, analysis, and decision; and vet the planning results through the applicable public involvement processes.</P>
              <P>6. What considerations will the FHWA/FTA take into account in their review of transportation planning products for acceptance in project development/NEPA?</P>

              <P>The FHWA and the FTA will give deference to decisions resulting from the transportation planning process if the FHWA and FTA determine that the planning process is <PRTPAGE P="126"/>consistent with the “3-C” planning principles and when the planning study process, alternatives considered, and resulting decisions have a rational basis that is thoroughly documented and vetted through the applicable public involvement processes. Moreover, any applicable program-specific requirements (e.g., those of the Congestion Mitigation and Air Quality Improvement Program or the FTA's Capital Investment Grant program) also must be met.</P>
              <P>The NEPA requires that the FHWA and the FTA be able to stand behind the overall soundness and credibility of analyses conducted and decisions made during the transportation planning process if they are incorporated into a NEPA document. For example, if systems-level or other broad objectives or choices from the transportation plan are incorporated into the purpose and need statement for a NEPA document, the FHWA and the FTA should not revisit whether these are the best objectives or choices among other options. Rather, the FHWA and the FTA review would include making sure that objectives or choices derived from the transportation plan were: Based on transportation planning factors established by Federal law; reflect a credible and articulated planning rationale; founded on reliable data; and developed through transportation planning processes meeting FHWA and FTA statutory and regulatory requirements. In addition, the basis for the goals and choices must be documented and included in the NEPA document. The FHWA/FTA reviewers do not need to review whether assumptions or analytical methods used in the studies are the best available, but, instead, need to assure that such assumptions or analytical methods are reasonable, scientifically acceptable, and consistent with goals, objectives, and policies set forth in long-range transportation plans. This review would include determining whether: (a) Assumptions have a rational basis and are up-to-date and (b) data, analytical methods, and modeling techniques are reliable, defensible, reasonably current, and meet data quality requirements.</P>
              <HD SOURCE="HD3">II. Substantive Issues</HD>
              <P>
                <E T="03">General Issues To Be Considered:</E>
              </P>
              <P>7. What should be considered in order to rely upon transportation planning studies in NEPA?</P>
              <P>The following questions should be answered prior to accepting studies conducted during the transportation planning process for use in NEPA. While not a “checklist,” these questions are intended to guide the practitioner's analysis of the planning products:</P>
              <P>• How much time has passed since the planning studies and corresponding decisions were made?</P>
              <P>• Were the future year policy assumptions used in the transportation planning process related to land use, economic development, transportation costs, and network expansion consistent with those to be used in the NEPA process?</P>
              <P>• Is the information still relevant/valid?</P>
              <P>• What changes have occurred in the area since the study was completed?</P>
              <P>• Is the information in a format that can be appended to an environmental document or reformatted to do so?</P>
              <P>• Are the analyses in a planning-level report or document based on data, analytical methods, and modeling techniques that are reliable, defensible, and consistent with those used in other regional transportation studies and project development activities?</P>
              <P>• Were the FHWA and FTA, other agencies, and the public involved in the relevant planning analysis and the corresponding planning decisions?</P>
              <P>• Were the planning products available to other agencies and the public during NEPA scoping?</P>
              <P>• During NEPA scoping, was a clear connection between the decisions made in planning and those to be made during the project development stage explained to the public and others? What was the response?</P>
              <P>• Are natural resource and land use plans being informed by transportation planning products, and vice versa?</P>
              <P>
                <E T="03">Purpose and Need:</E>
              </P>
              <P>8. How can transportation planning be used to shape a project's purpose and need in the NEPA process?</P>
              <P>A sound transportation planning process is the primary source of the project purpose and need. Through transportation planning, State and local governments, with involvement of stakeholders and the public, establish a vision for the region's future transportation system, define transportation goals and objectives for realizing that vision, decide which needs to address, and determine the timeframe for addressing these issues. The transportation planning process also provides a potential forum to define a project's purpose and need by framing the scope of the problem to be addressed by a proposed project. This scope may be further refined during the transportation planning process as more information about the transportation need is collected and consultation with the public and other stakeholders clarifies other issues and goals for the region.</P>

              <P>23 U.S.C. 139(f), as amended by the SAFETEA-LU Section 6002, provides additional focus regarding the definition of the purpose and need and objectives. For example, the lead agency, as early as practicable during the environmental review process, shall provide an opportunity for involvement by participating agencies and the public in defining the purpose and need for a project. <PRTPAGE P="127"/>The statement of purpose and need shall include a clear statement of the objectives that the proposed action is intended to achieve, which may include: (a) Achieving a transportation objective identified in an applicable statewide or metropolitan transportation plan; (b) supporting land use, economic development, or growth objectives established in applicable Federal, State, local, or Tribal plans; and (c) serving national defense, national security, or other national objectives, as established in Federal laws, plans, or policies.</P>
              <P>The transportation planning process can be utilized to develop the purpose and need in the following ways:</P>
              <P>(a) Goals and objectives from the transportation planning process may be part of the project's purpose and need statement;</P>
              <P>(b) A general travel corridor or general mode or modes (e.g., highway, transit, or a highway/transit combination) resulting from planning analyses may be part of the project's purpose and need statement;</P>
              <P>(c) If the financial plan for a metropolitan transportation plan indicates that funding for a specific project will require special funding sources (e.g., tolls or public-private financing), such information may be included in the purpose and need statement; or</P>
              <P>(d) The results of analyses from management systems (e.g., congestion, pavement, bridge, and/or safety) may shape the purpose and need statement.</P>
              <P>The use of these planning-level goals and choices must be appropriately explained during NEPA scoping and in the NEPA document.</P>
              <P>Consistent with NEPA, the purpose and need statement should be a statement of a transportation problem, not a specific solution. However, the purpose and need statement should be specific enough to generate alternatives that may potentially yield real solutions to the problem at-hand. A purpose and need statement that yields only one alternative may indicate a purpose and need that is too narrowly defined.</P>
              <P>Short of a fully integrated transportation decisionmaking process, many State DOTs develop information for their purpose and need statements when implementing interagency NEPA/Section 404 process merger agreements. These agreements may need to be expanded to include commitments to share and utilize transportation planning products when developing a project's purpose and need.</P>
              <P>9. Under what conditions can the NEPA process be initiated in conjunction with transportation planning studies?</P>
              <P>The NEPA process may be initiated in conjunction with transportation planning studies in a number of ways. A common method is the “tiered EIS,” in which the first-tier EIS evaluates general travel corridors, modes, and/or packages of projects at a planning level of detail, leading to the refinement of purpose and need and, ideally, selection of the design concept and scope for a project or series of projects. Subsequently, second-tier NEPA review(s) of the resulting projects would be performed in the usual way. The first-tier EIS uses the NEPA process as a tool to involve environmental, regulatory, and resource agencies and the public in the planning decisions, as well as to ensure the appropriate consideration of environmental factors in these planning decisions.</P>
              <P>Corridor or subarea analyses/studies are another option when the long-range transportation plan leaves open the possibility of multiple approaches to fulfill its goals and objectives. In such cases, the formal NEPA process could be initiated through publication of a NOI in conjunction with a corridor or subarea planning study. Similarly, some public transportation operators developing major capital projects perform the mandatory planning Alternatives Analysis required for funding under FTA's Capital Investment Grant program [49 U.S.C. 5309(d) and (e)] within the NEPA process and combine the planning Alternatives Analysis with the draft EIS.</P>
              <P>
                <E T="03">Alternatives:</E>
              </P>
              <P>10. In the context of this Appendix, what is the meaning of the term “alternatives”?</P>
              <P>This Appendix uses the term “alternatives” as specified in the NEPA regulations (40 CFR 1502.14), where it is defined in its broadest sense to include everything from major modal alternatives and location alternatives to minor design changes that would mitigate adverse impacts. This Appendix does not use the term as it is used in many other contexts (e.g., “prudent and feasible alternatives” under Section 4(f) of the Department of Transportation Act, the “Least Environmentally Damaging Practicable Alternative” under the Clean Water Act, or the planning Alternatives Analysis in 49 U.S.C. 5309(d) and (e)).</P>
              <P>11. Under what circumstances can alternatives be eliminated from detailed consideration during the NEPA process based on information and analysis from the transportation planning process?</P>
              <P>There are two ways in which the transportation planning process can begin limiting the alternative solutions to be evaluated during the NEPA process: (a) Shaping the purpose and need for the project; or (b) evaluating alternatives during planning studies and eliminating some of the alternatives from detailed study in the NEPA process prior to its start. Each approach requires careful attention, and is summarized below.</P>
              <P>(a) <E T="03">Shaping the Purpose and Need for the Project:</E> The transportation planning process should shape the purpose and need and, <PRTPAGE P="128"/>thereby, the range of reasonable alternatives. With proper documentation and public involvement, a purpose and need derived from the planning process can legitimately narrow the alternatives analyzed in the NEPA process. See the response to Question 8 for further discussion on how the planning process can shape the purpose and need used in the NEPA process.</P>
              <P>For example, the purpose and need may be shaped by the transportation planning process in a manner that consequently narrows the range of alternatives that must be considered in detail in the NEPA document when:</P>

              <P>(1) The transportation planning process has selected a <E T="03">general travel corridor</E> as best addressing identified transportation problems and the rationale for the determination in the planning document is reflected in the purpose and need statement of the subsequent NEPA document;</P>

              <P>(2) The transportation planning process has selected a <E T="03">general mode</E> (e.g., highway, transit, or a highway/transit combination) that accomplishes its goals and objectives, and these documented determinations are reflected in the purpose and need statement of the subsequent NEPA document; or</P>

              <P>(3) The transportation planning process determines that the project needs to be funded by <E T="03">tolls or other non-traditional funding sources</E> in order for the long-range transportation plan to be fiscally constrained or identifies goals and objectives that can only be met by toll roads or other non-traditional funding sources, and that determination of those goals and objectives is reflected in the purpose and need statement of the subsequent NEPA document.</P>
              <P>(b) <E T="03">Evaluating and Eliminating Alternatives During the Transportation Planning Process:</E> The evaluation and elimination of alternatives during the transportation planning process can be incorporated by reference into a NEPA document under certain circumstances. In these cases, the planning study becomes part of the NEPA process and provides a basis for screening out alternatives. As with any part of the NEPA process, the analysis of alternatives to be incorporated from the process must have a rational basis that has been thoroughly documented (including documentation of the necessary and appropriate vetting through the applicable public involvement processes). This record should be made available for public review during the NEPA scoping process.</P>
              <P>See responses to Questions 4, 5, 6, and 7 for additional elements to consider with respect to acceptance of planning products for NEPA documentation and the response to Question 12 on the information or analysis from the transportation planning process necessary for supporting the elimination of an alternative(s) from detailed consideration in the NEPA process.</P>
              <P>For instance, under FTA's Capital Investment Grant program, the alternatives considered in the NEPA process may be narrowed in those instances that the planning Alternatives Analysis required by 49 U.S.C. 5309(e) is conducted as a planning study prior to the NEPA review. In fact, the FTA may be able to narrow the alternatives considered in detail in the NEPA document to the No-Build (No Action) alternative and the Locally Preferred Alternative. Alternatives must meet the following criteria if they are deemed sufficiently considered by a planning Alternatives Analysis under FTA's Capital Investment Grant program conducted prior to NEPA without a programmatic NEPA analysis and documentation:</P>
              <P>• During the planning Alternatives Analysis, all of the reasonable alternatives under consideration must be fully evaluated in terms of their transportation impacts; capital and operating costs; social, economic, and environmental impacts; and technical considerations;</P>
              <P>• There must be appropriate public involvement in the planning Alternatives Analysis;</P>
              <P>• The appropriate Federal, State, and local environmental, regulatory, and resource agencies must be engaged in the planning Alternatives Analysis;</P>
              <P>• The results of the planning Alternatives Analysis must be documented;</P>
              <P>• The NEPA scoping participants must agree on the alternatives that will be considered in the NEPA review; and</P>
              <P>• The subsequent NEPA document must include the evaluation of alternatives from the planning Alternatives Analysis.</P>
              <P>The above criteria apply specifically to FTA's Capital Investment Grant process. However, for other transportation projects, if the planning process has included the analysis and stakeholder involvement that would be undertaken in a first tier NEPA process, then the alternatives screening conducted in the transportation planning process may be incorporated by reference, described, and relied upon in the project-level NEPA document. At that point, the project-level NEPA analysis can focus on the remaining alternatives.</P>
              <P>12. What information or analysis from the transportation planning process is needed in an EA or EIS to support the elimination of an alternative(s) from detailed consideration?</P>
              <P>The section of the EA or EIS that discusses alternatives considered but eliminated from detailed consideration should:</P>

              <P>(a) Identify any alternatives eliminated during the transportation planning process (this could include broad categories of alternatives, as when a long-range transportation plan selects a general travel corridor based <PRTPAGE P="129"/>on a corridor study, thereby eliminating all alternatives along other alignments);</P>
              <P>(b) Briefly summarize the reasons for eliminating the alternative; and</P>
              <P>(c) Include a summary of the analysis process that supports the elimination of alternatives (the summary should reference the relevant sections or pages of the analysis or study) and incorporate it by reference or append it to the NEPA document.</P>
              <P>Any analyses or studies used to eliminate alternatives from detailed consideration should be made available to the public and participating agencies during the NEPA scoping process and should be reasonably available during comment periods.</P>
              <P>Alternatives passed over during the transportation planning process because they are infeasible or do not meet the NEPA “purpose and need” can be omitted from the detailed analysis of alternatives in the NEPA document, as long as the rationale for elimination is explained in the NEPA document. Alternatives that remain “reasonable” after the planning-level analysis must be addressed in the EIS, even when they are not the preferred alternative. When the proposed action evaluated in an EA involves unresolved conflicts concerning alternative uses of available resources, NEPA requires that appropriate alternatives be studied, developed, and described.</P>
              <P>
                <E T="03">Affected Environment and Environmental Consequences:</E>
              </P>
              <P>13. What types of planning products provide analysis of the affected environment and environmental consequences that are useful in a project-level NEPA analysis and document?</P>
              <P>The following planning products are valuable inputs to the discussion of the affected environment and environmental consequences (both its current state and future state in the absence of the proposed action) in the project-level NEPA analysis and document:</P>
              <P>• Regional development and growth analyses;</P>
              <P>• Local land use, growth management, or development plans; and</P>
              <P>• Population and employment projections.</P>
              <P>The following are types of information, analysis, and other products from the transportation planning process that can be used in the discussion of the affected environment and environmental consequences in an EA or EIS:</P>
              <P>(a) Geographic information system (GIS) overlays showing the past, current, or predicted future conditions of the natural and built environments;</P>
              <P>(b) Environmental scans that identify environmental resources and environmentally sensitive areas;</P>
              <P>(c) Descriptions of airsheds and watersheds;</P>
              <P>(d) Demographic trends and forecasts;</P>
              <P>(e) Projections of future land use, natural resource conservation areas, and development; and</P>
              <P>(f) The outputs of natural resource planning efforts, such as wildlife conservation plans, watershed plans, special area management plans, and multiple species habitat conservation plans.</P>
              <P>However, in most cases, the assessment of the affected environment and environmental consequences conducted during the transportation planning process will not be detailed or current enough to meet NEPA standards and, thus, the inventory and evaluation of affected resources and the analysis of consequences of the alternatives will need to be supplemented with more refined analysis and possibly site-specific details during the NEPA process.</P>
              <P>14. What information from the transportation planning process is useful in describing a baseline for the NEPA analysis of indirect and cumulative impacts?</P>
              <P>Because the nature of the transportation planning process is to look broadly at future land use, development, population increases, and other growth factors, the planning analysis can provide the basis for the assessment of indirect and cumulative impacts required under NEPA. The consideration in the transportation planning process of development, growth, and consistency with local land use, growth management, or development plans, as well as population and employment projections, provides an overview of the multitude of factors in an area that are creating pressures not only on the transportation system, but on the natural ecosystem and important environmental and community resources. An analysis of all reasonably foreseeable actions in the area also should be a part of the transportation planning process. This planning-level information should be captured and utilized in the analysis of indirect and cumulative impacts during the NEPA process.</P>
              <P>To be used in the analysis of indirect and cumulative impacts, such information should:</P>
              <P>(a) Be sufficiently detailed that differences in consequences of alternatives can be readily identified;</P>
              <P>(b) Be based on current data (e.g., data from the most recent Census) or be updated by additional information;</P>
              <P>(c) Be based on reasonable assumptions that are clearly stated; and/or</P>
              <P>(d) Rely on analytical methods and modeling techniques that are reliable, defensible, and reasonably current.</P>
              <P>
                <E T="03">Environmental Mitigation:</E>
              </P>
              <P>15. How can planning-level efforts best support advance mitigation, mitigation banking, and priorities for environmental mitigation investments?</P>

              <P>A lesson learned from efforts to establish mitigation banks and advance mitigation <PRTPAGE P="130"/>agreements and alternative mitigation options is the importance of beginning interagency discussions during the transportation planning process. Development pressures, habitat alteration, complicated real estate transactions, and competition for potential mitigation sites by public and private project proponents can encumber the already difficult task of mitigating for “like” value and function and reinforce the need to examine mitigation strategies as early as possible.</P>
              <P>Robust use of remote sensing, GIS, and decision support systems for evaluating conservation strategies are all contributing to the advancement of natural resource and environmental planning. The outputs from environmental planning can now better inform transportation planning processes, including the development of mitigation strategies, so that transportation and conservation goals can be optimally met. For example, long-range transportation plans can be screened to assess the effect of general travel corridors or density, on the viability of sensitive plant and animal species or habitats. This type of screening provides a basis for early collaboration among transportation and environmental staffs, the public, and regulatory agencies to explore areas where impacts must be avoided and identify areas for mitigation investments. This can lead to mitigation strategies that are both more economical and more effective from an environmental stewardship perspective than traditional project-specific mitigation measures.</P>
              <HD SOURCE="HD3">III. Administrative Issues:</HD>
              <P>16. Are Federal funds eligible to pay for these additional, or more in depth, environmental studies in transportation planning?</P>
              <P>Yes. For example, the following FHWA and FTA funds may be utilized for conducting environmental studies and analyses within transportation planning:</P>
              <P>• FHWA planning and research funds, as defined under 23 CFR Part 420 (e.g., Metropolitan Planning (PL), Statewide Planning and Research (SPR), National Highway System (NHS), Surface Transportation Program (STP), and Equity Bonus); and</P>
              <P>• FTA planning and research funds (49 U.S.C. 5303 and 49 U.S.C. 5313(b)), urban formula funds (49 U.S.C. 5307), and (in limited circumstances) transit capital investment funds (49 U.S.C. 5309).</P>
              <P>The eligible transportation planning-related uses of these funds may include: (a) Conducting feasibility or subarea/corridor needs studies and (b) developing system-wide environmental information/inventories (e.g., wetland banking inventories or standards to identify historically significant sites). Particularly in the case of PL and SPR funds, the proposed expenditure must be closely related to the development of transportation plans and programs under 23 U.S.C. 134-135 and 49 U.S.C. 5303-5306.</P>
              <P>For FHWA funding programs, once a general travel corridor or specific project has progressed to a point in the preliminary engineering/NEPA phase that clearly extends beyond transportation planning, additional in-depth environmental studies must be funded through the program category for which the ultimate project qualifies (e.g., NHS, STP, Interstate Maintenance, and/or Bridge), rather than PL or SPR funds.</P>
              <P>Another source of funding is FHWA's Transportation Enhancement program, which may be used for activities such as: conducting archeological planning and research; developing inventories such as those for historic bridges and highways, and other surface transportation-related structures; conducting studies to determine the extent of water pollution due to highway runoff; and conducting studies to reduce vehicle-caused wildlife mortality while maintaining habitat connectivity.</P>
              <P>The FHWA and the FTA encourage State DOTs, MPOs, and public transportation operators to seek partners for some of these studies from environmental, regulatory, and resource agencies, non-government organizations, and other government and private sector entities with similar data needs, or environmental interests. In some cases, these partners may contribute data and expertise to the studies, as well as funding.</P>
              <P>17. What staffing or organizational arrangements may be helpful in allowing planning products to be accepted in the NEPA process?</P>

              <P>Certain organizational and staffing arrangements may support a more integrated approach to the planning/NEPA decision-making continuum. In many cases, planning organizations do not have environmental expertise on staff or readily accessible. Likewise, the review and regulatory responsibilities of many environmental, regulatory, and resource agencies make involvement in the transportation planning process a challenge for staff resources. These challenges may be partially met by improved use of the outputs of each agency's planning resources and by augmenting their capabilities through greater use of GIS and remote sensing technologies (see <E T="03">http://www.gis.fhwa.dot.gov/</E> for additional information on the use of GIS). Sharing databases and the planning products of local land use decision-makers and State and Federal environmental, regulatory, and resource agencies also provide efficiencies in acquiring and sharing the data and information needed for both transportation planning and NEPA work.</P>

              <P>Additional opportunities such as shared staff, training across disciplines, and (in some cases) reorganizing to eliminate structural divisions between planning and NEPA practitioners may also need to be considered <PRTPAGE P="131"/>in order to better integrate NEPA considerations into transportation planning studies. The answers to the following two questions also contain useful information on training and staffing opportunities.</P>
              <P>18. How have environmental, regulatory, and resource agency liaisons (Federally- and State DOT-funded positions) and partnership agreements been used to provide the expertise and interagency participation needed to enhance the consideration of environmental factors in the planning process?</P>

              <P>For several years, States have utilized Federal and State transportation funds to support focused and accelerated project review by a variety of local, State, Tribal, and Federal agencies. While Section 1309(e) of the TEA-21 and its successor in SAFETEA-LU section 6002 speak specifically to transportation project streamlining, there are other authorities that have been used to fund positions, such as the Intergovernmental Cooperation Act (31 U.S.C. 6505). In addition, long-term, on-call consultant contracts can provide backfill support for staff that are detailed to other parts of an agency for temporary assignments. At last count (as of 2003), 246 positions were being funded. Additional information on interagency funding agreements is available at: <E T="03">http://environment.fhwa.dot.gov/strmlng/igdocs/index.htm</E>.</P>
              <P>Moreover, every State has advanced a variety of stewardship and streamlining initiatives that necessitate early involvement of environmental, regulatory, and resource agencies in the project development process. Such process improvements have: addressed the exchange of data to support avoidance and impact analysis; established formal and informal consultation and review schedules; advanced mitigation strategies; and resulted in a variety of programmatic reviews. Interagency agreements and workplans have evolved to describe performance objectives, as well as specific roles and responsibilities related to new streamlining initiatives. Some States have improved collaboration and efficiency by co-locating environmental, regulatory, and resource and transportation agency staff.</P>
              <P>19. What training opportunities are available to MPOs, State DOTs, public transportation operators and environmental, regulatory, and resource agencies to assist in their understanding of the transportation planning and NEPA processes?</P>
              <P>Both the FHWA and the FTA offer a variety of transportation planning, public involvement, and NEPA courses through the National Highway Institute and/or the National Transit Institute. Of particular note is the Linking Planning and NEPA Workshop, which provides a forum and facilitated group discussion among and between State DOT; MPO; Federal, Tribal, and State environmental, regulatory, and resource agencies; and FHWA/FTA representatives (at both the executive and program manager levels) to develop a State-specific action plan that will provide for strengthened linkages between the transportation planning and NEPA processes.</P>
              <P>Moreover, the U.S. Fish and Wildlife Service offers Green Infrastructure Workshops that are focused on integrating planning for natural resources (“green infrastructure”) with the development, economic, and other infrastructure needs of society (“gray infrastructure”).</P>
              <P>Robust planning and multi-issue environmental screening requires input from a wide variety of disciplines, including information technology; transportation planning; the NEPA process; and regulatory, permitting, and environmental specialty areas (e.g., noise, air quality, and biology). Senior managers at transportation and partner agencies can arrange a variety of individual training programs to support learning curves and skill development that contribute to a strengthened link of the transportation planning and NEPA processes. Formal and informal mentoring on an intra-agency basis can be arranged. Employee exchanges within and between agencies can be periodically scheduled, and persons involved with professional leadership programs can seek temporary assignments with partner agencies.</P>
              <HD SOURCE="HD3">IV. Additional Information on this Topic</HD>

              <P>Valuable sources of information are FHWA's environment website (<E T="03">http://www.fhwa.dot.gov/environment/index.htm</E>) and FTA's environmental streamlining website (<E T="03">http://www.environment.fta.dot.gov</E>). Another source of information and case studies is NCHRP Report 8-38 (Consideration of Environmental Factors in Transportation Systems Planning), which is available at <E T="03">http://www4.trb.org/trb/crp.nsf/All+Projects/NCHRP+8-38</E>. In addition, AASHTO's Center for Environmental Excellence website is continuously updated with news and links to information of interest to transportation and environmental professionals (<E T="03">www.transportation.environment.org</E>).</P>
            </APPENDIX>
          </SUBPART>
        </PART>
        <PART>
          <EAR>Pt. 460</EAR>
          <HD SOURCE="HED">PART 460—PUBLIC ROAD MILEAGE FOR APPORTIONMENT OF HIGHWAY SAFETY FUNDS</HD>
          <CONTENTS>
            <SECHD>Sec.</SECHD>
            <SECTNO>460.1</SECTNO>
            <SUBJECT>Purpose.</SUBJECT>
            <SECTNO>460.2</SECTNO>
            <SUBJECT>Definitions.</SUBJECT>
            <SECTNO>460.3</SECTNO>
            <SUBJECT>Procedures.</SUBJECT>
          </CONTENTS>
          <AUTH>
            <HD SOURCE="HED">Authority:</HD>
            <P>23 U.S.C. 315, 402(c); 49 CFR 1.48.</P>
          </AUTH>
          <SOURCE>
            <HD SOURCE="HED">Source:</HD>
            <P>40 FR 44322, Sept. 26, 1975, unless otherwise noted.</P>
          </SOURCE>
          <SECTION>
            <PRTPAGE P="132"/>
            <SECTNO>§ 460.1</SECTNO>
            <SUBJECT>Purpose.</SUBJECT>
            <P>The purpose of this part is to prescribe the policies and procedures followed in identifying and reporting public road mileage for utilization in the statutory formula for the apportionment of highway safety funds under 23 U.S.C. 402(c).</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 460.2</SECTNO>
            <SUBJECT>Definitions.</SUBJECT>
            <P>As used in this part:</P>
            <P>(a) <E T="03">Public road</E> means any road under the jurisdiction of and maintained by a public authority and open to public travel.</P>
            <P>(b) <E T="03">Public authority</E> means a Federal, State, county, town, or township, Indian tribe, municipal or other local government or instrumentality thereof, with authority to finance, build, operate or maintain toll or toll-free highway facilities.</P>
            <P>(c) <E T="03">Open to public travel</E> means that the road section is available, except during scheduled periods, extreme weather or emergency conditions, passable by four-wheel standard passenger cars, and open to the general public for use without restrictive gates, prohibitive signs, or regulation other than restrictions based on size, weight, or class of registration. Toll plazas of public toll roads are not considered restrictive gates.</P>
            <P>(d) <E T="03">Maintenance</E> means the preservation of the entire highway, including surfaces, shoulders, roadsides, structures, and such traffic control devices as are necessary for its safe and efficient utilization.</P>
            <P>(e) <E T="03">State</E> means any one of the 50 States, the District of Columbia, Puerto Rico, the Virgin Islands, Guam, American Samoa, and the Commonwealth of the Northern Mariana Islands. For the purpose of the application of 23 U.S.C. 402 on Indian reservations, <E T="03">State</E> and <E T="03">Governor of a State</E> include the Secretary of the Interior.</P>
            <CITA>[40 FR 44322, Sept. 26, 1975, as amended at 76 FR 12849, Mar. 9, 2011]</CITA>
          </SECTION>
          <SECTION>
            <SECTNO>§ 460.3</SECTNO>
            <SUBJECT>Procedures.</SUBJECT>
            <P>(a) <E T="03">General requirements.</E> 23 U.S.C. 402(c) provides that funds authorized to carry out section 402 shall be apportioned according to a formula based on population and public road mileage of each State. Public road mileage shall be determined as of the end of the calendar year preceding the year in which the funds are apportioned and shall be certified to by the Governor of the State or his designee and subject to the approval of the Federal Highway Administrator.</P>
            <P>(b) <E T="03">State public road mileage.</E> Each State must annually submit a certification of public road mileage within the State to the Federal Highway Administration Division Administrator by the date specified by the Division Administrator. Public road mileage on Indian reservations within the State shall be identified and included in the State mileage and in computing the State's apportionment.</P>
            <P>(c) <E T="03">Indian reservation public road mileage.</E> The Secretary of the Interior or his designee will submit a certification of public road mileage within Indian reservations to the Federal Highway Administrator by June 1 of each year.</P>
            <P>(d) <E T="03">Action by the Federal Highway Administrator.</E> (1) The certification of Indian reservation public road mileage, and the State certifications of public road mileage together with comments thereon, will be reviewed by the Federal Highway Administrator. He will make a final determination of the public road mileage to be used as the basis for apportionment of funds under 23 U.S.C. 402(c). In any instance in which the Administrator's final determination differs from the public road mileage certified by a State or the Secretary of the Interior, the Administrator will advise the State or the Secretary of the Interior of his final determination and the reasons therefor.</P>
            <P>(2) If a State fails to submit a certification of public road mileage as required by this part, the Federal Highway Administrator may make a determination of the State's public road mileage for the purpose of apportioning funds under 23 U.S.C. 402(c). The State's public road mileage determined by the Administrator under this subparagraph may not exceed 90 percent of the State's public road mileage utilized in determining the most recent apportionment of funds under 23 U.S.C. 402(c).</P>
          </SECTION>
        </PART>
        <PART>
          <PRTPAGE P="133"/>
          <EAR>Pt. 470</EAR>
          <HD SOURCE="HED">PART 470—HIGHWAY SYSTEMS</HD>
          <CONTENTS>
            <SUBPART>
              <HD SOURCE="HED">Subpart A—Federal-aid Highway Systems</HD>
              <SECHD>Sec.</SECHD>
              <SECTNO>470.101</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <SECTNO>470.103</SECTNO>
              <SUBJECT>Definitions.</SUBJECT>
              <SECTNO>470.105</SECTNO>
              <SUBJECT>Urban area boundaries and highway functional classification.</SUBJECT>
              <SECTNO>470.107</SECTNO>
              <SUBJECT>Federal-aid highway systems.</SUBJECT>
              <SECTNO>470.109</SECTNO>
              <SUBJECT>System procedures—General.</SUBJECT>
              <SECTNO>470.111</SECTNO>
              <SUBJECT>Interstate System procedures.</SUBJECT>
              <SECTNO>470.113</SECTNO>
              <SUBJECT>National Highway System procedures.</SUBJECT>
              <SECTNO>470.115</SECTNO>
              <SUBJECT>Approval authority.</SUBJECT>

              <APP>Appendix A to Subpart A of Part 470—Guidance Criteria for Evaluating Requests for Interstate System Designations under 23 U.S.C. 103(<E T="01">c</E>)(4)(A) and (B)</APP>

              <APP>Appendix B to Subpart A of Part 470—Designation of Segments of Section 332(<E T="01">a</E>)(2) Corridors as Parts of the Interstate System</APP>

              <APP>Appendix C to Subpart A of Part 470—Policy for the Signing and Numbering of Future Interstate Corridors Designated by Section 332 of the NHS Designation Act of 1995 or Designated Under 23 U.S.C. 103(<E T="01">c</E>)(4)(B)</APP>
              <APP>Appendix D to Subpart A of Part 470—Guidance Criteria for Evaluating Requests for Modifications to the National Highway System</APP>
            </SUBPART>
            <SUBPART>
              <RESERVED>Subparts B-C [Reserved]</RESERVED>
            </SUBPART>
          </CONTENTS>
          <AUTH>
            <HD SOURCE="HED">Authority:</HD>
            <P>23 U.S.C. 103(b)(2), 103(c), 134, 135, and 315; and 49 CFR 1.48(b).</P>
          </AUTH>
          <SOURCE>
            <HD SOURCE="HED">Source:</HD>
            <P>40 FR 42344, Sept. 12, 1975, unless otherwise noted. Redesignated at 41 FR 51396, Nov. 22, 1976.</P>
          </SOURCE>
          <SUBPART>
            <HD SOURCE="HED">Subpart A—Federal-aid Highway Systems</HD>
            <SOURCE>
              <HD SOURCE="HED">Source:</HD>
              <P>62 FR 33355, June 19, 1997, unless otherwise noted.</P>
            </SOURCE>
            <SECTION>
              <SECTNO>§ 470.101</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <P>This part sets forth policies and procedures relating to the identification of Federal-aid highways, the functional classification of roads and streets, the designation of urban area boundaries, and the designation of routes on the Federal-aid highway systems.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 470.103</SECTNO>
              <SUBJECT>Definitions.</SUBJECT>
              <P>Except as otherwise provided in this part, terms defined in 23 U.S.C. 101(a) are used in this part as so defined.</P>
              <P>
                <E T="03">Consultation</E> means that one party confers with another identified party and, prior to taking action(s), considers that party's views.</P>
              <P>
                <E T="03">Cooperation</E> means that the parties involved in carrying out the planning, programming and management systems processes work together to achieve a common goal or objective.</P>
              <P>
                <E T="03">Coordination</E> means the comparison of the transportation plans, programs, and schedules of one agency with related plans, programs, and schedules of other agencies or entities with legal standing, and adjustment of plans, programs, and schedules to achieve general consistency.</P>
              <P>
                <E T="03">Federal-aid highway systems</E> means the National Highway System and the Dwight D. Eisenhower National System of Interstate and Defense Highways (the “Interstate System”).</P>
              <P>
                <E T="03">Federal-aid highways</E> means highways on the Federal-aid highway systems and all other public roads not classified as local roads or rural minor collectors.</P>
              <P>
                <E T="03">Governor</E> means the chief executive of the State and includes the Mayor of the District of Columbia.</P>
              <P>
                <E T="03">Metropolitan planning organization</E> (<E T="03">MPO</E>) means the forum for cooperative transportation decisionmaking for the metropolitan planning area in which the metropolitan transportation planning process required by 23 U.S.C. 134 and 49 U.S.C. 5303-5305 must be carried out.</P>
              <P>
                <E T="03">Responsible local officials</E> means—</P>
              <P>(1) In urbanized areas, principal elected officials of general purpose local governments acting through the Metropolitan Planning Organization designated by the Governor, or</P>
              <P>(2) In rural areas and urban areas not within any urbanized area, principal elected officials of general purpose local governments.</P>
              <P>
                <E T="03">State</E> means any one of the fifty States, the District of Columbia, Puerto Rico, or, for purposes of functional classification of highways, the Virgin Islands, American Samoa, Guam, or the Commonwealth of the Northern Marianas.</P>
            </SECTION>
            <SECTION>
              <PRTPAGE P="134"/>
              <SECTNO>§ 470.105</SECTNO>
              <SUBJECT>Urban area boundaries and highway functional classification.</SUBJECT>
              <P>(a) <E T="03">Urban area boundaries.</E> Routes on the Federal-aid highway systems may be designated in both rural and urban areas. Guidance for determining the boundaries of urbanized and nonurbanized urban areas is provided in the FHWA's Functional Classification Guidelines. <SU>1</SU>
                <FTREF/>
              </P>
              <FTNT>
                <P>

                  <SU>1</SU> The Functional Classification Guidelines can be viewed at <E T="03">http://www.fhwa.dot.gov/planning/fctoc.htm.</E>
                </P>
              </FTNT>
              <P>(b) <E T="03">Highway functional classification.</E> (1) The State transportation agency shall have the primary responsibility for developing and updating a statewide highway functional classification in rural and urban areas to determine functional usage of the existing roads and streets. Guidance criteria and procedures are provided in the FHWA's Functional Classification Guidelines. The State shall cooperate with responsible local officials, or appropriate Federal agency in the case of areas under Federal jurisdiction, in developing and updating the functional classification.</P>
              <P>(2) The results of the functional classification shall be mapped and submitted to the Federal Highway Administration (FHWA) for approval and when approved shall serve as the official record for Federal-aid highways and the basis for designation of the National Highway System.</P>
              <CITA>[62 FR 33355, June 19, 1997, as amended at 76 FR 6691, Feb. 8, 2011]</CITA>
            </SECTION>
            <SECTION>
              <SECTNO>§ 470.107</SECTNO>
              <SUBJECT>Federal-aid highway systems.</SUBJECT>
              <P>(a) <E T="03">Interstate System.</E> (1) The Dwight D. Eisenhower National System of Interstate and Defense Highways (Interstate System) shall consist of routes of highest importance to the Nation, built to the uniform geometric and construction standards of 23 U.S.C. 109(h), which connect, as directly as practicable, the principal metropolitan areas, cities, and industrial centers, including important routes into, through, and around urban areas, serve the national defense and, to the greatest extent possible, connect at suitable border points with routes of continental importance in Canada and Mexico.</P>
              <P>(2) The portion of the Interstate System designated under 23 U.S.C. 103(c)(1)(D)(2) shall not exceed 69,230 kilometers (43,000 miles). Additional Interstate System segments are permitted under the provisions of 23 U.S.C. 103(c)(4) and section 1105(e)(5)(A) of the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA), Pub. L. 102-240, 105 Stat. 1914, as amended.</P>
              <P>(b) <E T="03">National Highway System.</E> (1) The National Highway System shall consist of interconnected urban and rural principal arterials and highways (including toll facilities) which serve major population centers, international border crossings, ports, airports, public transportation facilities, other intermodal transportation facilities and other major travel destinations; meet national defense requirements; and serve interstate and interregional travel. All routes on the Interstate System are a part of the National Highway System.</P>
              <P>(2) The National Highway System shall not exceed 286,983 kilometers (178,250 miles).</P>
              <P>(3) The National Highway System shall include the Strategic Highway Corridor Network (STRAHNET) and its highway connectors to major military installations, as designated by the Administrator in consultation with appropriate Federal agencies and the States. The STRAHNET includes highways which are important to the United States strategic defense policy and which provide defense access, continuity, and emergency capabilities for the movement of personnel, materials, and equipment in both peace time and war time.</P>
              <P>(4) The National Highway System shall include all high priority corridors identified in section 1105(c) of the ISTEA.</P>
              <CITA>[62 FR 33355, June 19, 1997, as amended at 76 FR 6691, Feb. 8, 2011]</CITA>
            </SECTION>
            <SECTION>
              <SECTNO>§ 470.109</SECTNO>
              <SUBJECT>System procedures—General.</SUBJECT>

              <P>(a) The State transportation agency, in consultation with responsible local officials, shall have the responsibility for proposing to the Federal Highway Administration all official actions regarding the designation, or revision, of the Federal-aid highway systems.<PRTPAGE P="135"/>
              </P>
              <P>(b) The routes of the Federal-aid highway systems shall be proposed by coordinated action of the State transportation agencies where the routes involve State-line connections.</P>
              <P>(c) The designation of routes on the Federal-aid highway systems shall be in accordance with the planning process required, pursuant to the provisions at 23 U.S.C. 135, and, in urbanized areas, the provisions at 23 U.S.C. 134(a). The State shall cooperate with local and regional officials. In urbanized areas, the local officials shall act through the metropolitan planning organizations designated for such areas under 23 U.S.C. 134.</P>
              <P>(d) In areas under Federal jurisdiction, the designation of routes on the Federal-aid highway systems shall be coordinated with the appropriate Federal agency.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 470.111</SECTNO>
              <SUBJECT>Interstate System procedures.</SUBJECT>
              <P>(a) Proposals for system actions on the Interstate System shall include a route description and a statement of justification. Proposals shall also include statements regarding coordination with adjoining States on State-line connections, with responsible local officials, and with officials of areas under Federal jurisdiction.</P>
              <P>(b) Proposals for Interstate or future Interstate designation under 23 U.S.C. 103(c)(4)(A) or (B), as logical additions or connections, shall consider the criteria contained in appendix A of this subpart. For designation as a part of the Interstate system, 23 U.S.C. 103(c)(4)(A) requires that a highway meet all the standards of a highway on the Interstate System, be a logical addition or connection to the Interstate System, and have the affirmative recommendation of the State or States involved. For designation as a future part of the Interstate System, 23 U.S.C. 103(c)(4)(B) requires that a highway be a logical addition or connection to the Interstate System, have the affirmative recommendation of the State or States involved, and have the written agreement of the State or States involved that such highway will be constructed to meet all the standards of a highway on the Interstate System within twenty-five years of the date of the agreement between the FHWA Administrator and the State or States involved. Such highways must also be on the National Highway System.</P>
              <P>(c) Routes proposed for Interstate designation under section 332(a)(2) of the NHS Designation Act of 1995 (NHS Act) shall be constructed to Interstate standards and connect to the Interstate System. Proposals shall consider the criteria contained in appendix B of this subpart.</P>
              <P>(d) Proposals for Interstate route numbering shall be submitted by the State transportation agency to the Route Numbering Committee of the American Association of State Highway and Transportation Officials.</P>
              <P>(e) Signing of corridors federally designated as future Interstate routes can follow the criteria contained in appendix C of this subpart. No law, rule, regulation, map, document, or other record of the United States, or of any State or political subdivision thereof, shall refer to any highway under 23 U.S.C. 103(c), nor shall any such highway be signed or marked, as a highway on the Interstate System until such time as such highway is constructed to the geometric and construction standards for the Interstate System and has been designated as a part of the Interstate System.</P>
              <CITA>[62 FR 33355, June 19, 1997, as amended at 76 FR 6691, Feb. 8, 2011]</CITA>
            </SECTION>
            <SECTION>
              <SECTNO>§ 470.113</SECTNO>
              <SUBJECT>National Highway System procedures.</SUBJECT>
              <P>(a) Proposals for system actions on the National Highway System shall include a route description, a statement of justification, and statements of coordination with adjoining States on State-line connections, with responsible local officials, and with officials of areas under Federal jurisdiction.</P>
              <P>(b) Proposed modifications to the National Highway System shall enhance the national transportation characteristics of the National Highway System and shall follow the criteria listed in § 470.107. Proposals shall also consider the criteria contained in appendix D of this subpart.</P>
            </SECTION>
            <SECTION>
              <PRTPAGE P="136"/>
              <SECTNO>§ 470.115</SECTNO>
              <SUBJECT>Approval authority.</SUBJECT>
              <P>(a) The Federal Highway Administrator will approve Federal-aid highway system actions involving the designation, or revision, of routes on the Interstate System, including route numbers, future Interstate routes, and routes on the National Highway System.</P>
              <P>(b) The Federal Highway Administrator will approve functional classification actions.</P>
            </SECTION>
            <APPENDIX>
              <EAR>Pt. 470, Subpt. A, App. A</EAR>

              <HD SOURCE="HED">Appendix A to Subpart A of Part 470—Guidance Criteria for Evaluating Requests for Interstate System Designations under 23 U.S.C. 103(<E T="01">c</E>)(4)(A) and (B)</HD>
              <P>Section 103(c)(4)(A) and (B), of title 23, U.S.C., permits States to request the designation of National Highway System routes as parts or future parts of the Interstate System. The FHWA Administrator may approve such a request if the route is a logical addition or connection to the Interstate System and has been, or will be, constructed to meet Interstate standards. The following are the general criteria to be used to evaluate 23 U.S.C. 103(c) requests for Interstate System designations.</P>
              <P>1. The proposed route should be of sufficient length to serve long-distance Interstate travel, such as connecting routes between principal metropolitan cities or industrial centers important to national defense and economic development.</P>
              <P>2. The proposed route should not duplicate other Interstate routes. It should serve Interstate traffic movement not provided by another Interstate route.</P>
              <P>3. The proposed route should directly serve major highway traffic generators. The term “major highway traffic generator” means either an urbanized area with a population over 100,000 or a similar major concentrated land use activity that produces and attracts long-distance Interstate and statewide travel of persons and goods. Typical examples of similar major concentrated land use activities would include a principal industrial complex, government center, military installation, or transportation terminal.</P>
              <P>4. The proposed route should connect to the Interstate System at each end, with the exception of Interstate routes that connect with continental routes at an international border, or terminate in a “major highway traffic generator” that is not served by another Interstate route. In the latter case, the terminus of the Interstate route should connect to routes of the National Highway System that will adequately handle the traffic. The proposed route also must be functionally classified as a principal arterial and be a part of the National Highway System system.</P>
              <P>5. The proposed route must meet all the current geometric and safety standards criteria as set forth in 23 CFR part 625 for highways on the Interstate System, or a formal agreement to construct the route to such standards within 25 years must be executed between the State(s) and the Federal Highway Administration. Any proposed exceptions to the standards shall be approved at the time of designation.</P>
              <P>6. A route being proposed for designation under 23 U.S.C. 103(c)(4)(B) must have an approved final environmental document (including, if required, a 49 U.S.C. 303(c) [Section 4(f)] approval) covering the route and project action must be ready to proceed with design at the time of designation. Routes constructed to Interstate standards are not necessarily logical additions to the Interstate System unless they clearly meet all of the above criteria.</P>
              <CITA>[40 FR 42344, Sept. 12, 1975. Redesignated at 41 FR 51396, Nov. 22, 1976, as amended at 76 FR 6692, Feb. 8, 2011]</CITA>
            </APPENDIX>
            <APPENDIX>
              <EAR>Pt. 470, Subpt. A, App. B</EAR>

              <HD SOURCE="HED">Appendix B to Subpart A of Part 470—Designation of Segments of Section 332(<E T="01">a</E>)(2) Corridors as Parts of the Interstate System</HD>
              <P>The following guidance is comparable to current procedures for Interstate System designation requests under 23 U.S.C. 103(c)(4)(A). All Interstate System additions must be approved by the Federal Highway Administrator. The provisions of section 332(a)(2) of the NHS Act have also been incorporated into the ISTEA as section 1105(e)(5)(A).</P>
              <P>1. The request must be submitted through the appropriate FHWA Division Office to the Associate Administrator for Program Development (HEP-10). Comments and recommendations by the division and regional offices are requested.</P>
              <P>2. The State DOT secretary (or equivalent) must request that the route segment be added to the Interstate System. The exact location and termini must be specified. If the route segment involves more than one State, each affected State must submit a separate request.</P>
              <P>3. The request must provide information to support findings that the segment (a) is built to Interstate design standards and (b) connects to the existing Interstate System. The segment should be of sufficient length to provide substantial service to the travelling public.</P>
              <P>4. The request must also identify and justify any design exceptions for which approval is requested.</P>

              <P>5. Proposed Interstate route numbering for the segment must be submitted to FHWA <PRTPAGE P="137"/>and the American Association of State Highway and Transportation Officials Route Numbering.</P>
              <CITA>[40 FR 42344, Sept. 12, 1975. Redesignated at 41 FR 51396, Nov. 22, 1976, as amended at 76 FR 6692, Feb. 8, 2011]</CITA>
            </APPENDIX>
            <APPENDIX>
              <EAR>Pt. 470, Subpt. A, App. C</EAR>

              <HD SOURCE="HED">Appendix C to Subpart A of Part 470—Policy for the Signing and Numbering of Future Interstate Corridors Designated by Section 332 of the NHS Designation Act of 1995 or Designated Under 23 U.S.C. 103(<E T="01">c</E>)(4)(B)</HD>
              <HD SOURCE="HD1">Policy</HD>
              <P>State transportation agencies are permitted to erect informational Interstate signs along a federally designated future Interstate corridor only after the specific route location has been established for the route to be constructed to Interstate design standards.</P>
              <HD SOURCE="HD1">Conditions</HD>
              <P>1. The corridor must have been designated a future part of the Interstate System under section 332(a)(2) of the NHS Designation Act of 1995 or 23 U.S.C. 103(c)(4)(B).</P>
              <P>2. The specific route location to appropriate termini must have received Federal Highway (FHWA) environmental clearance. Where FHWA environmental clearance is not required or Interstate standards have been met, the route location must have been publicly announced by the State.</P>
              <P>3. Numbering of future Interstate route segments must be coordinated with affected States and be approved by the American Association of State Highway and Transportation Officials and the FHWA at Headquarters. Short portions of a multistate corridor may require use of an interim 3-digit number.</P>
              <P>4. The State shall coordinate the location and content of signing near the State line with the adjacent State.</P>
              <P>5. Signing and other identification of a future Interstate route segment must not indicate, nor imply, that the route is on the Interstate System.</P>
              <P>6. The FHWA Division Office must confirm in advance that the above conditions have been met and approve the general locations of signs.</P>
              <HD SOURCE="HD1">Sign Details</HD>
              <P>1. Signs may not be used to give directions and should be away from directional signs, particularly at interchanges.</P>
              <P>2. An Interstate shield may be located on a green informational sign of a few words. For example: Future Interstate Corridor or Future I-00 Corridor.</P>
              <P>3. The Interstate shield may not include the word “Interstate.”</P>
              <P>4. The FHWA Division Office must approve the signs as to design, wording, and detailed location.</P>
              <CITA>[40 FR 42344, Sept. 12, 1975. Redesignated at 41 FR 51396, Nov. 22, 1976, as amended at 76 FR 6692, Feb. 8, 2011]</CITA>
            </APPENDIX>
            <APPENDIX>
              <EAR>Pt. 470, Subpt. A, App. D</EAR>
              <HD SOURCE="HED">Appendix D to Subpart A of Part 470—Guidance Criteria for Evaluating Requests for Modifications to the National Highway System</HD>
              <P>Section 103(b), of title 23, U.S.C., allows the States to propose modifications to the National Highway System (NHS) and authorizes the Secretary to approve such modifications provided that they meet the criteria established for the NHS and enhance the characteristics of the NHS. In proposing modifications under 23 U.S.C. 103(b), the States must cooperate with local and regional officials. In urbanized areas, the local officials must act through the metropolitan planning organization (MPO) designated for such areas under 23 U.S.C. 134. The following guidance criteria should be used by the States to develop proposed modifications to the NHS.</P>
              <P>1. Proposed additions to the NHS should be included in either an adopted State or metropolitan transportation plan or program.</P>
              <P>2. Proposed additions should connect at each end with other routes on the NHS or serve a major traffic generator.</P>
              <P>3. Proposals should be developed in consultation with local and regional officials.</P>

              <P>4. Proposals to add routes to the NHS should include information on the type of traffic served (<E T="03">i.e.</E>, percent of trucks, average trip length, local, commuter, interregional, interstate) by the route, the population centers or major traffic generators served by the route, and how this service compares with existing NHS routes.</P>
              <P>5. Proposals should include information on existing and anticipated needs and any planned improvements to the route.</P>
              <P>6. Proposals should include information concerning the possible effects of adding or deleting a route to or from the NHS might have on other existing NHS routes that are in close proximity.</P>
              <P>7. Proposals to add routes to the NHS should include an assessment of whether modifications (adjustments or deletions) to existing NHS routes, which provide similar service, may be appropriate.</P>
              <P>8. Proposed modifications that might affect adjoining States should be developed in cooperation with those States.</P>

              <P>9. Proposed modifications consisting of connections to major intermodal facilities should be developed using the criteria set forth below. These criteria were used for <PRTPAGE P="138"/>identifying initial NHS connections to major intermodal terminals. The primary criteria are based on annual passenger volumes, annual freight volumes, or daily vehicular traffic on one or more principal routes that serve the intermodal facility. The secondary criteria include factors which underscore the importance of an intermodal facility within a specific State.</P>
              <HD SOURCE="HD1">Primary Criteria</HD>
              <HD SOURCE="HD2">Commercial Aviation Airports</HD>
              <P>1. Passengers—scheduled commercial service with more than 250,000 annual enplanements.</P>
              <P>2. Cargo—100 trucks per day in each direction on the principal connecting route, or 100,000 tons per year arriving or departing by highway mode.</P>
              <HD SOURCE="HD2">Ports</HD>
              <P>1. Terminals that handle more than 50,000 TEUs (a volumetric measure of containerized cargo which stands for twenty-foot equivalent units) per year, or other units measured that would convert to more than 100 trucks per day in each direction. (Trucks are defined as large single-unit trucks or combination vehicles handling freight.)</P>
              <P>2. Bulk commodity terminals that handle more than 500,000 tons per year by highway or 100 trucks per day in each direction on the principal connecting route. (If no individual terminal handles this amount of freight, but a cluster of terminals in close proximity to each other does, then the cluster of terminals could be considered in meeting the criteria. In such cases, the connecting route might terminate at a point where the traffic to several terminals begins to separate.)</P>
              <P>3. Passengers—terminals that handle more than 250,000 passengers per year or 1,000 passengers per day for at least 90 days during the year.</P>
              <HD SOURCE="HD2">Truck/Rail</HD>
              <P>1. 50,000 TEUs per year, or 100 trucks per day, in each direction on the principal connecting route, or other units measured that would convert to more than 100 trucks per day in each direction. (Trucks are defined as large single-unit trucks or combination vehicles carrying freight.)</P>
              <HD SOURCE="HD2">Pipelines</HD>
              <P>1. 100 trucks per day in each direction on the principal connecting route.</P>
              <HD SOURCE="HD2">Amtrak</HD>
              <P>1. 100,000 passengers per year (entrainments and detrainments). Joint Amtrak, intercity bus and public transit terminals should be considered based on the combined passenger volumes. Likewise, two or more separate facilities in close proximity should be considered based on combined passenger volumes.</P>
              <HD SOURCE="HD2">Intercity Bus</HD>
              <P>1. 100,000 passengers per year (boardings and deboardings).</P>
              <HD SOURCE="HD2">Public Transit</HD>

              <P>1. Stations with park and ride lots with more than 500 vehicle parking spaces, or 5,000 daily bus or rail passengers, with significant highway access (<E T="03">i.e.</E>, a high percentage of the passengers arrive by cars and buses using a route that connects to another NHS route), or a major hub terminal that provides for the transfer of passengers among several bus routes. (These hubs should have a significant number of buses using a principal route connecting with the NHS.)</P>
              <HD SOURCE="HD2">Ferries</HD>
              <P>1. Interstate/international—1,000 passengers per day for at least 90 days during the year. (A ferry which connects two terminals within the same metropolitan area should be considered as local, not interstate.)</P>
              <P>2. Local—see public transit criteria above.</P>
              <HD SOURCE="HD1">Secondary Criteria</HD>
              <P>Any of the following criteria could be used to justify an NHS connection to an intermodal terminal where there is a significant highway interface:</P>
              <P>1. Intermodal terminals that handle more than 20 percent of passenger or freight volumes by mode within a State;</P>
              <P>2. Intermodal terminals identified either in the Intermodal Management System or the State and metropolitan transportation plans as a major facility;</P>
              <P>3. Significant investment in, or expansion of, an intermodal terminal; or</P>
              <P>4. Connecting routes targeted by the State, MPO, or others for investment to address an existing, or anticipated, deficiency as a result of increased traffic.</P>
              <HD SOURCE="HD1">Proximate Connections</HD>
              <P>Intermodal terminals, identified under the secondary criteria noted above, may not have sufficient highway traffic volumes to justify an NHS connection to the terminal. States and MPOs should fully consider whether a direct connection should be identified for such terminals, or whether being in the proximity (2 to 3 miles) of an NHS route is sufficient.</P>
            </APPENDIX>
          </SUBPART>
          <SUBPART>
            <RESERVED>Subparts B-C [Reserved]</RESERVED>
          </SUBPART>
        </PART>
      </SUBCHAP>
      <SUBCHAP TYPE="P">
        <PRTPAGE P="139"/>
        <HD SOURCE="HED">SUBCHAPTER F—TRANSPORTATION INFRASTRUCTURE MANAGEMENT</HD>
        <PART>
          <EAR>Pt. 500</EAR>
          <HD SOURCE="HED">PART 500—MANAGEMENT AND MONITORING SYSTEMS</HD>
          <CONTENTS>
            <SUBPART>
              <HD SOURCE="HED">Subpart A—Management systems</HD>
              <SECHD>Sec.</SECHD>
              <SECTNO>500.101</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <SECTNO>500.102</SECTNO>
              <SUBJECT>Policy.</SUBJECT>
              <SECTNO>500.103</SECTNO>
              <SUBJECT>Definitions.</SUBJECT>
              <SECTNO>500.104</SECTNO>
              <SUBJECT>State option.</SUBJECT>
              <SECTNO>500.105</SECTNO>
              <SUBJECT>Requirements.</SUBJECT>
              <SECTNO>500.106</SECTNO>
              <SUBJECT>PMS.</SUBJECT>
              <SECTNO>500.107</SECTNO>
              <SUBJECT>BMS.</SUBJECT>
              <SECTNO>500.108</SECTNO>
              <SUBJECT>SMS.</SUBJECT>
              <SECTNO>500.109</SECTNO>
              <SUBJECT>CMS.</SUBJECT>
              <SECTNO>500.110</SECTNO>
              <SUBJECT>PTMS.</SUBJECT>
              <SECTNO>500.111</SECTNO>
              <SUBJECT>IMS.</SUBJECT>
            </SUBPART>
            <SUBPART>
              <HD SOURCE="HED">Subpart B—Traffic Monitoring System</HD>
              <SECTNO>500.201</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <SECTNO>500.202</SECTNO>
              <SUBJECT>TMS definitions.</SUBJECT>
              <SECTNO>500.203</SECTNO>
              <SUBJECT>TMS general requirements.</SUBJECT>
              <SECTNO>500.204</SECTNO>
              <SUBJECT>TMS components for highway traffic data.</SUBJECT>
            </SUBPART>
          </CONTENTS>
          <AUTH>
            <HD SOURCE="HED">Authority:</HD>
            <P>23 U.S.C. 134, 135, 303, and 315; 49 U.S.C. 5303-5305; 23 CFR 1.32; and 49 CFR 1.48 and 1.51.</P>
          </AUTH>
          <SOURCE>
            <HD SOURCE="HED">Source:</HD>
            <P>61 FR 67170, Dec. 19, 1996, unless otherwise noted.</P>
          </SOURCE>
          <SUBPART>
            <HD SOURCE="HED">Subpart A—Management Systems</HD>
            <SECTION>
              <SECTNO>§ 500.101</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <P>The purpose of this part is to implement the requirements of 23 U.S.C. 303(a) which directs the Secretary of Transportation (the Secretary) to issue regulations for State development, establishment, and implementation of systems for managing highway pavement of Federal-aid highways (PMS), bridges on and off Federal-aid highways (BMS), highway safety (SMS), traffic congestion (CMS), public transportation facilities and equipment (PTMS), and intermodal transportation facilities and systems (IMS). This regulation also implements 23 U.S.C. 303(b) which directs the Secretary to issue guidelines and requirements for State development, establishment, and implementation of a traffic monitoring system for highways and public transportation facilities and equipment (TMS).</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 500.102</SECTNO>
              <SUBJECT>Policy.</SUBJECT>
              <P>(a) Federal, State, and local governments are under increasing pressure to balance their budgets and, at the same time, respond to public demands for quality services. Along with the need to invest in America's future, this leaves transportation agencies with the task of trying to manage current transportation systems as cost-effectively as possible to meet evolving, as well as backlog needs. The use of existing or new transportation management systems provides a framework for cost-effective decision making that emphasizes enhanced service at reduced public and private life-cycle cost. The primary outcome of transportation management systems is improved system performance and safety. The Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) strongly encourage implementation of transportation management systems consistent with State, metropolitan planning organization, transit operator, or local government needs.</P>

              <P>(b) Whether the systems are developed under the provisions of this part or under a State's own procedures, the following categories of FHWA administered funds may be used for development, establishment, and implementation of any of the management systems and the traffic monitoring system: National highway system; surface transportation program; State planning and research and metropolitan planning funds (including the optional use of minimum allocation funds authorized under 23 U.S.C. 157(c) and restoration funds authorized under § 202(f) of the National Highway System Designation Act of 1995 (Pub.L. 104-59) for carrying out the provisions of 23 U.S.C. 307(c)(1) and 23 U.S.C. 134(a)); congestion mitigation and air quality improvement program funds for those management systems that can be shown to contribute to the attainment of a national ambient air quality standard; and apportioned bridge funds for development <PRTPAGE P="140"/>and establishment of the bridge management system. The following categories of FTA administered funds may be used for development, establishment, and implementation of the CMS, PTMS, IMS, and TMS: Metropolitan planning; State planning and research, and formula transit funds.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 500.103</SECTNO>
              <SUBJECT>Definitions.</SUBJECT>
              <P>Unless otherwise specified in this part, the definitions in 23 U.S.C. 101(a) are applicable to this part. As used in this part:</P>
              <P>
                <E T="03">Federal-aid highways</E> means those highways eligible for assistance under title 23, U.S.C., except those functionally classified as local or rural minor collectors.</P>
              <P>
                <E T="03">Metropolitan planning organization (MPO)</E> means the forum for cooperative transportation decision making for a metropolitan planning area.</P>
              <P>
                <E T="03">National Highway System (NHS)</E> means the system of highways designated and approved in accordance with the provisions of 23 U.S.C. 103(b).</P>
              <P>
                <E T="03">State</E> means any one of the fifty States, the District of Columbia, or Puerto Rico.</P>
              <P>
                <E T="03">Transportation management area (TMA)</E> means an urbanized area with a population over 200,000 (as determined by the latest decennial census) or other area when TMA designation is requested by the Governor and the MPO (or affected local officials), and officially designated by the Administrators of the FHWA and the FTA. The TMA designation applies to the entire metropolitan planning area(s).</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 500.104</SECTNO>
              <SUBJECT>State option.</SUBJECT>
              <P>Except as specified in § 500.105 (a) and (b), a State may elect at any time not to implement any one or more of the management systems required under 23 U.S.C. 303, in whole or in part.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 500.105</SECTNO>
              <SUBJECT>Requirements.</SUBJECT>
              <P>(a) The metropolitan transportation planning process (23 U.S.C. 134 and 49 U.S.C. 5303-5005) in TMAs shall include a CMS that meets the requirements of § 500.109 of this regulation.</P>
              <P>(b) States shall develop, establish, and implement a TMS that meets the requirements of subpart B of this regulation.</P>
              <P>(c) Any of the management systems that the State chooses to implement under 23 U.S.C. 303 and this regulation shall be developed in cooperation with MPOs in metropolitan areas, affected agencies receiving assistance under the Federal Transit Act (49 U.S.C., Chapter 53), and other agencies (including private owners and operators) that have responsibility for operation of the affected transportation systems or facilities.</P>
              <P>(d) The results (e.g., policies, programs, projects, etc.) of any of the management systems that a State chooses to develop under 23 U.S.C. 303 and this regulation shall be considered in the development of metropolitan and statewide transportation plans and improvement programs and in making project selection decisions under title 23, U.S.C., and under the Federal Transit Act. Plans and programs adopted after September 30, 1997, shall demonstrate compliance with this requirement.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 500.106</SECTNO>
              <SUBJECT>PMS.</SUBJECT>
              <P>An effective PMS for Federal-aid highways is a systematic process that provides information for use in implementing cost-effective pavement reconstruction, rehabilitation, and preventative maintenance programs and that results in pavements designed to accommodate current and forecasted traffic in a safe, durable, and cost-effective manner. The PMS should be based on the “AASHTO Guidelines for Pavement Management Systems.” <SU>1</SU>
                <FTREF/>
              </P>
              <FTNT>
                <P>
                  <SU>1</SU>
                  <E T="03">AASHTO Guidelines for Pavement Management Systems,</E> July 1990, can be purchased from the American Association of State Highway and Transportation Officials, 444 N. Capitol Street, NW., Suite 249, Washington, D.C. 20001. Available for inspection as prescribed in 49 CFR part 7, appendix D.</P>
              </FTNT>
            </SECTION>
            <SECTION>
              <SECTNO>§ 500.107</SECTNO>
              <SUBJECT>BMS.</SUBJECT>
              <P>An effective BMS for bridges on and off Federal-aid highways that should be based on the “AASHTO Guidelines for Bridge Management Systems” <SU>2</SU>
                <FTREF/> and <PRTPAGE P="141"/>that supplies analyses and summaries of data, uses mathematical models to make forecasts and recommendations, and provides the means by which alternative policies and programs may be efficiently considered. An effective BMS should include, as a minimum, formal procedures for:</P>
              <FTNT>
                <P>
                  <SU>2</SU>
                  <E T="03">AASHTO Guidelines for Bridge Management Systems,</E> 1992, can be purchased from the American Association of State Highway and Transportation Officials, 444 N. Capitol Street, NW., Suite 249, Washington, D.C. <PRTPAGE/>20001. Available for inspection as prescribed in 49 CFR part 7, appendix D.</P>
              </FTNT>
              <P>(a) Collecting, processing, and updating data;</P>
              <P>(b) Predicting deterioration;</P>
              <P>(c) Identifying alternative actions;</P>
              <P>(d) Predicting costs;</P>
              <P>(e) Determining optimal policies;</P>
              <P>(f) Performing short- and long-term budget forecasting; and</P>
              <P>(g) Recommending programs and schedules for implementation within policy and budget constraints.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 500.108</SECTNO>
              <SUBJECT>SMS.</SUBJECT>
              <P>An SMS is a systematic process with the goal of reducing the number and severity of traffic crashes by ensuring that all opportunities to improve highway safety are identified, considered, implemented as appropriate, and evaluated in all phases of highway planning, design, construction, maintenance, and operation and by providing information for selecting and implementing effective highway safety strategies and projects. The development of the SMS may be based on the guidance in “Safety Management Systems: Good Practices for Development and Implementation.” <SU>3</SU>
                <FTREF/> An effective SMS should include, at a minimum:</P>
              <FTNT>
                <P>
                  <SU>3</SU>
                  <E T="03">Safety Management Systems: Good Practices for Development and Implementation,</E> FHWA and NHTSA, May 1996. Available for inspection and copying as prescribed in 49 CFR part 7, appendix D.</P>
              </FTNT>
              <P>(a) Communication, coordination, and cooperation among the organizations responsible for the roadway, human, and vehicle safety elements;</P>
              <P>(b) A focal point for coordination of the development, establishment, and implementation of the SMS among the agencies responsible for these major safety elements;</P>
              <P>(c) Establishment of short- and long-term highway safety goals to address identified safety problems;</P>
              <P>(d) Collection, analysis, and linkage of highway safety data;</P>
              <P>(e) Identification of the safety responsibilities of units and positions;</P>
              <P>(f) Public information and education activities; and</P>
              <P>(g) Identification of skills, resources, and training needs to implement highway safety programs.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 500.109</SECTNO>
              <SUBJECT>CMS.</SUBJECT>
              <P>(a) For purposes of this part, congestion means the level at which transportation system performance is unacceptable due to excessive travel times and delays. Congestion management means the application of strategies to improve system performance and reliability by reducing the adverse impacts of congestion on the movement of people and goods in a region. A congestion management system or process is a systematic and regionally accepted approach for managing congestion that provides accurate, up-to-date information on transportation system operations and performance and assesses alternative strategies for congestion management that meet State and local needs.</P>
              <P>(b) The development of a congestion management system or process should result in performance measures and strategies that can be integrated into transportation plans and programs. The level of system performance deemed acceptable by State and local officials may vary by type of transportation facility, geographic location (metropolitan area or subarea and/or non-metropolitan area), and/or time of day. In both metropolitan and non-metropolitan areas, consideration needs to be given to strategies that manage demand, reduce single occupant vehicle (SOV) travel, and improve transportation system management and operations. Where the addition of general purpose lanes is determined to be an appropriate congestion management strategy, explicit consideration is to be given to the incorporation of appropriate features into the SOV project to facilitate future demand management strategies and operational improvements that will maintain the functional integrity of those lanes.</P>
              <CITA>[72 FR 7285, Feb. 14, 2007]</CITA>
            </SECTION>
            <SECTION>
              <PRTPAGE P="142"/>
              <SECTNO>§ 500.110</SECTNO>
              <SUBJECT>PTMS.</SUBJECT>
              <P>An effective PTMS for public transportation facilities (e.g., maintenance facilities, stations, terminals, transit related structures), equipment, and rolling stock is a systematic process that collects and analyzes information on the condition and cost of transit assets on a continual basis, identifies needs, and enables decision makers to select cost-effective strategies for providing and maintaining transit assets in serviceable condition. The PTMS should cover public transportation systems operated by the State, local jurisdictions, public transportation agencies and authorities, and private (for profit and non-profit) transit operators receiving funds under the Federal Transit Act and include, at a minimum:</P>
              <P>(a) Development of transit asset condition measures and standards;</P>
              <P>(b) An inventory of the transit assets including age, condition, remaining useful life, and replacement cost; and</P>
              <P>(c) Identification, evaluation, and implementation of appropriate strategies and projects.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 500.111</SECTNO>
              <SUBJECT>IMS.</SUBJECT>
              <P>An effective IMS for intermodal facilities and systems provides efficient, safe, and convenient movement of people and goods through integration of transportation facilities and systems and improvement in the coordination in planning, and implementation of air, water, and the various land-based transportation facilities and systems. An IMS should include, at a minimum:</P>
              <P>(a) Establishment of performance measures;</P>
              <P>(b) Identification of key linkages between one or more modes of transportation, where the performance or use of one mode will affect another;</P>
              <P>(c) Definition of strategies for improving the effectiveness of these modal interactions; and</P>
              <P>(d) Evaluation and implementation of these strategies to enhance the overall performance of the transportation system.</P>
            </SECTION>
          </SUBPART>
          <SUBPART>
            <HD SOURCE="HED">Subpart B—Traffic Monitoring System</HD>
            <SECTION>
              <SECTNO>§ 500.201</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <P>The purpose of this subpart is to set forth requirements for development, establishment, implementation, and continued operation of a traffic monitoring system for highways and public transportation facilities and equipment (TMS) in each State in accordance with the provisions of 23 U.S.C. 303 and subpart A of this part.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 500.202</SECTNO>
              <SUBJECT>TMS definitions.</SUBJECT>
              <P>Unless otherwise specified in this part, the definitions in 23 U.S.C. 101(a) and § 500.103 are applicable to this subpart. As used in this part:</P>
              <P>
                <E T="03">Highway traffic data</E> means data used to develop estimates of the amount of person or vehicular travel, vehicle usage, or vehicle characteristics associated with a system of highways or with a particular location on a highway. These types of data support the estimation of the number of vehicles traversing a section of highway or system of highways during a prescribed time period (traffic volume), the portion of such vehicles that may be of a particular type (vehicle classification), the weights of such vehicles including the weight of each axle and associated distances between axles on a vehicle (vehicle weight), or the average number of persons being transported in a vehicle (vehicle occupancy).</P>
              <P>
                <E T="03">Traffic monitoring system</E> means a systematic process for the collection, analysis, summary, and retention of highway and transit related person and vehicular traffic data.</P>
              <P>
                <E T="03">Transit traffic data</E> means person and vehicular data for public transportation on public highways and streets and the number of vehicles and ridership for dedicated transit rights-of-way (e.g., rail and busways), at the maximum load points for the peak period in the peak direction and for the daily time period.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 500.203</SECTNO>
              <SUBJECT>TMS general requirements.</SUBJECT>

              <P>(a) Each State shall develop, establish, and implement, on a continuing basis, a TMS to be used for obtaining highway traffic data when:<PRTPAGE P="143"/>
              </P>
              <P>(1) The data are supplied to the U.S. Department of Transportation (U.S. DOT);</P>
              <P>(2) The data are used in support of transportation management systems;</P>
              <P>(3) The data are used in support of studies or systems which are the responsibility of the U.S. DOT;</P>
              <P>(4) The collection of the data is supported by the use of Federal funds provided from programs of the U.S. DOT;</P>
              <P>(5) The data are used in the apportionment or allocation of Federal funds by the U.S. DOT;</P>
              <P>(6) The data are used in the design or construction of an FHWA funded project; or</P>
              <P>(7) The data are required as part of a federally mandated program of the U.S. DOT.</P>
              <P>(b) The TMS for highway traffic data should be based on the concepts described in the American Association of State Highway and Transportation Officials (AASHTO) “AASHTO Guidelines for Traffic Data Programs” <SU>4</SU>
                <FTREF/> and the FHWA “Traffic Monitoring Guide (TMG),” <SU>5</SU>
                <FTREF/> and shall be consistent with the FHWA “Highway Performance Monitoring System Field Manual.” <SU>6</SU>
                <FTREF/>
              </P>
              <FTNT>
                <P>
                  <SU>4</SU> AASHTO Guidelines for Traffic Data Programs, 1992, ISBN 1-56051-054-4, can be purchased from the American Association of State Highway and Transportation Officials, 444 N. Capitol Street, NW., Suite 249, Washington, D.C. 20001. Available for inspection as prescribed in 49 CFR part 7, appendix D.</P>
              </FTNT>
              <FTNT>
                <P>
                  <SU>5</SU> Traffic Monitoring Guide, DOT/FHWA, publication No. FHWA-PL-95-031, February 1995. Available for inspection and copying as prescribed in 49 CFR part 7, appendix D.</P>
              </FTNT>
              <FTNT>
                <P>
                  <SU>6</SU> Highway Performance Monitoring System (HPMS) Field Manual for the Continuing Analytical and Statistical Data Base, DOT/FHWA, August 30, 1993 (FHWA Order M5600.1B). Available for inspection and copying as prescribed in 49 CFR part 7, appendix D.</P>
              </FTNT>
              <P>(c) The TMS shall cover all public roads except those functionally classified as local or rural minor collector or those that are federally owned. Coverage of federally owned public roads shall be determined cooperatively by the State, the FHWA, and the agencies that own the roads.</P>
              <P>(d) The State's TMS shall apply to the activities of local governments and other public or private non-State government entities collecting highway traffic data within the State if the collected data are to be used for any of the purposes enumerated in § 500.203(a) of this subpart.</P>
              <P>(e) Procedures other than those referenced in this subpart may be used if the alternative procedures are documented by the State to furnish the precision levels as defined for the various purposes enumerated in § 500.203(a) of this subpart and are found acceptable by the FHWA.</P>
              <P>(f) Nothing in this subpart shall prohibit the collection of additional highway traffic data if such data are needed in the administration or management of a highway activity or are needed in the design of a highway project.</P>
              <P>(g) Transit traffic data shall be collected in cooperation with MPOs and transit operators.</P>
              <P>(h) The TMS for highways and public transportation facilities and equipment shall be fully operational and in use by October 1, 1997.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 500.204</SECTNO>
              <SUBJECT>TMS components for highway traffic data.</SUBJECT>
              <P>(a) <E T="03">General.</E> Each State's TMS, including those using alternative procedures, shall address the components in paragraphs (b) through (h) of this section.</P>
              <P>(b) <E T="03">Precision of reported data.</E> Traffic data supplied for the purposes identified in § 500.203(a) of this subpart shall be to the statistical precision applicable at the time of the data's collection as specified by the data users at various levels of government. A State's TMS shall meet the statistical precisions established by FHWA for the HPMS.</P>
              <P>(c) <E T="03">Continuous counter operations.</E> Within each State, there shall be sufficient continuous counters of traffic volumes, vehicle classification, and vehicle weight to provide estimates of changes in highway travel patterns and to provide for the development of day-of-week, seasonal, axle correction, growth factors, or other comparable factors approved by the FHWA that support the development of traffic estimates to meet the statistical precision requirements of the data uses identified in § 500.203(a) of this subpart. As appropriate, sufficient continuous <PRTPAGE P="144"/>counts of vehicle classification and vehicle weight should be available to address traffic data program needs.</P>
              <P>(d) <E T="03">Short term traffic monitoring.</E> (1) Count data for traffic volumes collected in the field shall be adjusted to reflect annual average conditions. The estimation of annual average daily traffic will be through the appropriate application of only the following: Seasonal factors, day-of-week factors, and, when necessary, axle correction and growth factors or other comparable factors approved by the FHWA. Count data that have not been adjusted to represent annual average conditions will be noted as being unadjusted when they are reported. The duration and frequency of such monitoring shall comply to the data needs identified in § 500.203(a) of this subpart.</P>

              <P>(2) Vehicle classification activities on the National Highway System (NHS), shall be sufficient to assure that, on a cycle of no greater than three years, every major system segment (<E T="03">i.e.</E>, segments between interchanges or intersections of principal arterials of the NHS with other principal arterials of the NHS) will be monitored to provide information on the numbers of single-trailer combination trucks, multiple-trailer combination trucks, two-axle four-tire vehicles, buses and the total number of vehicles operating on an average day. If it is determined that two or more continuous major system segments have both similar traffic volumes and distributions of the vehicle types identified above, a single monitoring session will be sufficient to monitor these segments.</P>
              <P>(e) <E T="03">Vehicle occupancy monitoring.</E> As deemed appropriate to support the data uses identified in § 500.203(a) of this subpart, data will be collected on the average number of persons per automobile, light two-axle truck, and bus. The duration, geographic extent, and level of detail shall be consistent with the intended use of the data, as cooperatively agreed to by the organizations that will use the data and the organizations that will collect the data. Such vehicle occupancy data shall be reviewed at least every three years and updated as necessary. Acceptable data collection methods include roadside monitoring, traveler surveys, the use of administrative records (e.g., accident reports or reports developed in support of public transportation programs), or any other method mutually acceptable to the responsible organizations and the FHWA.</P>
              <P>(f) <E T="03">Field operations.</E> (1) Each State's TMS for highway traffic data shall include the testing of equipment used in the collection of the data. This testing shall be based on documented procedures developed by the State. This documentation will describe the test procedure as well as the frequency of testing. Standards of the American Society for Testing and Materials or guidance from the AASHTO may be used. Only equipment passing the test procedures will be used for the collection of data for the purposes identified in § 500.203(a) of this subpart.</P>
              <P>(2) Documentation of field operations shall include the number of counts, the period of monitoring, the cycle of monitoring, and the spatial and temporal distribution of count sites. Copies of the State's documentation shall be provided to the FHWA Division Administrator when it is initially developed and after each revision.</P>
              <P>(g) <E T="03">Source data retention.</E> For estimates of traffic or travel, the value or values collected during a monitoring session, as well as information on the date(s) and hour(s) of monitoring, will remain available until the traffic or travel estimates based on the count session are updated. Data shall be available in formats that conform to those in the version of the TMG current at the time of data collection or as then amended by the FHWA.</P>
              <P>(h) <E T="03">Office factoring procedures.</E> (1) Factors to adjust data from short term monitoring sessions to estimates of average daily conditions shall be used to adjust for month, day of week, axle correction, and growth or other comparable factors approved by the FHWA. These factors will be reviewed annually and updated at least every three years.</P>

              <P>(2) The procedures used by a State to edit and adjust highway traffic data collected from short term counts at field locations to estimates of average traffic volume shall be documented. The documentation shall include the factors discussed in paragraph (d)(1) of this section. The documentation shall remain available as long as the traffic <PRTPAGE P="145"/>or travel estimates discussed in paragraph (g) of this section remain current. Copies of the State's documentation shall be provided to the FHWA Division Administrator when it is initially developed and after each revision.</P>
            </SECTION>
          </SUBPART>
        </PART>
        <PART>
          <EAR>Pt. 505</EAR>
          <HD SOURCE="HED">PART 505—PROJECTS OF NATIONAL AND REGIONAL SIGNIFICANCE EVALUATION AND RATING</HD>
          <CONTENTS>
            <SECHD>Sec.</SECHD>
            <SECTNO>505.1</SECTNO>
            <SUBJECT>Purpose.</SUBJECT>
            <SECTNO>505.3</SECTNO>
            <SUBJECT>Policy.</SUBJECT>
            <SECTNO>505.5</SECTNO>
            <SUBJECT>Definitions.</SUBJECT>
            <SECTNO>505.7</SECTNO>
            <SUBJECT>Eligibility.</SUBJECT>
            <SECTNO>505.9</SECTNO>
            <SUBJECT>Criteria for grants.</SUBJECT>
            <SECTNO>505.11</SECTNO>
            <SUBJECT>Project evaluation and rating.</SUBJECT>
            <SECTNO>505.13</SECTNO>
            <SUBJECT>Federal Government's share of project cost.</SUBJECT>
            <SECTNO>505.15</SECTNO>
            <SUBJECT>Full funding grant agreement.</SUBJECT>
            <SECTNO>505.17</SECTNO>
            <SUBJECT>Applicability of Title 23, U.S. Code.</SUBJECT>
          </CONTENTS>
          <AUTH>
            <HD SOURCE="HED">Authority:</HD>
            <P>Section 1301 of the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (Pub. L. 109-59; 119 Stat. 1144); 23 U.S.C. 315; 49 CFR 1.48.</P>
          </AUTH>
          <SOURCE>
            <HD SOURCE="HED">Source:</HD>
            <P>73 FR 63370, Oct. 24, 2008, unless otherwise noted.</P>
          </SOURCE>
          <SECTION>
            <SECTNO>§ 505.1</SECTNO>
            <SUBJECT>Purpose.</SUBJECT>
            <P>The purpose of this part is to establish evaluation, rating, and selection guidelines for funding proposed Projects of National and Regional Significance (PNRS).</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 505.3</SECTNO>
            <SUBJECT>Policy.</SUBJECT>
            <P>A Project of National and Regional Significance should quantitatively improve the throughput or provide long term congestion relief for passenger or freight movement for a part of the transportation network and clearly connect this improvement to sustainable economic productivity for the nation or the region in which it is located.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 505.5</SECTNO>
            <SUBJECT>Definitions.</SUBJECT>
            <P>Unless otherwise specified in this part, the definitions contained in 23 U.S.C. 101(a) are applicable to this part. In addition, the following definitions apply:</P>
            <P>
              <E T="03">Applicant</E> means either:</P>
            <P>(1) A State Transportation Department, or</P>
            <P>(2) A group of State Transportation Departments, with one State acting as the project lead.</P>
            <P>
              <E T="03">Eligible project</E> means any surface transportation project or set of integrated surface transportation projects closely related in the function they perform eligible for Federal assistance under title 23, United States Code, including public or private rail facilities providing benefits to highway users, surface transportation infrastructure modifications to facilitate intermodal interchange, transfer, and access into and out of ports and other activities eligible under such title.</P>
            <P>
              <E T="03">Eligible project costs</E> means the costs pertaining to an eligible project for:</P>
            <P>(1) Development phase activities, including planning, feasibility analysis, revenue forecasting, environmental review, preliminary engineering and design work, and other preconstruction activities;</P>
            <P>(2) Construction, reconstruction, rehabilitation, and acquisition of real property (including land related to the project and improvements to land), environmental mitigation, construction contingencies, acquisition of equipment, and operational improvements; and</P>
            <P>(3) all debt financing costs authorized by 23 U.S.C. 122.</P>
            <P>
              <E T="03">Full Funding Grant Agreement (FFGA)</E> means the agreement used to provide Federal financial assistance under title 23, United States Code, for Projects of National and Regional Significance. An FFGA defines the scope of the project, establishes the maximum amount of Government financial assistance for the project, covers the period of time for completion of the project, facilitates the efficient management of the project in accordance with applicable Federal statutes, regulations, and policy, including oversight roles and responsibilities, and other terms and conditions.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 505.7</SECTNO>
            <SUBJECT>Eligibility.</SUBJECT>
            <P>To be eligible for assistance under this program:</P>

            <P>(a) A project meeting the definition of an eligible project under 505.5 of this section located fully within one State shall have eligible project costs that <PRTPAGE P="146"/>are quantified in the project proposal as equal to or exceeding the lesser of:</P>
            <P>(1) $500,000,000; or</P>
            <P>(2) 75 percent of the amount of Federal highway assistance funds apportioned for the most recently completed fiscal year to the State in which the project is located.</P>
            <P>(b) A multi-State project meeting the definition of an eligible project under 505.5 of this section shall have eligible project costs that are quantified in the project proposal as equal to or exceeding the lesser of:</P>
            <P>(1) $500,000,000; or</P>
            <P>(2) 75 percent of the amount of Federal highway assistance funds apportioned for the most recently completed fiscal year to the State in which the project is located that has the largest apportionment.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 505.9</SECTNO>
            <SUBJECT>Criteria for grants.</SUBJECT>
            <P>(a) The Secretary will approve a grant for a Project of National and Regional Significance project only if the Secretary determines, based upon information submitted by the applicant, that the project:</P>
            <P>(1) Is based on the results of preliminary engineering;</P>
            <P>(2) Is supported by an acceptable degree of non-Federal financial commitments, including evidence of stable and dependable financing sources to construct, maintain, and operate the infrastructure facility. In evaluating a non-Federal financial commitment, the Secretary shall require that:</P>
            <P>(i) The proposed project plan provides for the availability of contingency amounts that the Secretary determines to be reasonable to cover unanticipated cost increases; and</P>
            <P>(ii) Each proposed non-Federal source of capital and operating financing is stable, reliable, and available within the proposed project timetable. In assessing the stability, reliability, and availability of proposed sources of non-Federal financing, the Secretary will consider:</P>
            <P>(A) Existing financial commitments;</P>
            <P>(B) The degree to which financing sources are dedicated to the purposes proposed;</P>
            <P>(C) Any debt obligation that exists or is proposed by the recipient for the proposed project; and</P>
            <P>(D) The extent to which the project has a non-Federal financial commitment that exceeds the required non-Federal share of the cost of the project.</P>
            <P>(3) Emerges from the metropolitan and Statewide planning process, consistent with 23 CFR Part 450;</P>
            <P>(4) Is justified based on the ability of the project:</P>
            <P>(i) To generate national and/or regional economic benefits, as evidenced by, but not limited to:</P>
            <P>(A) The creation of jobs, expansion of business opportunities, and impacts to the gross domestic product due to quantitatively increased throughput;</P>
            <P>(B) The amount and importance of freight and passenger travel served; and</P>
            <P>(C) The demographic and economic characteristics of the area served.</P>
            <P>(ii) To allocate public and private costs commensurate with the share of public and private benefits and risks;</P>
            <P>(iii) To generate long-term congestion relief that impacts the State, the region, and the Nation, as evidenced by, but not limited to:</P>
            <P>(A) Congestion levels, delay and consequences of delay;</P>
            <P>(B) Efficiency and effectiveness of congestion mitigation; and</P>
            <P>(C) Travel time reliability.</P>
            <P>(iv) To improve transportation safety, including reducing transportation accidents, injuries, and fatalities, as evidenced by, but not limited to, number, rate and consequences of crashes, injuries and fatalities in the affected region and corridor;</P>
            <P>(v) To otherwise enhance the national transportation system by improving throughput; and</P>
            <P>(vi) To garner support for non-Federal financial commitments and provide evidence of stable and dependable financing sources to construct, maintain, and operate the infrastructure facility.</P>
            <P>(b) In selecting projects under this section, the Secretary will consider the extent to which the project:</P>
            <P>(1) Leverages Federal investment by encouraging non-Federal contributions to the project, including contributions from public-private partnerships;</P>

            <P>(2) Uses new technologies, including intelligent transportation systems, <PRTPAGE P="147"/>that enhance the efficiency of the project;</P>
            <P>(3) Helps maintain or protect the environment; and</P>
            <P>(4) Demonstrates that the proposed project cannot be readily and efficiently realized without Federal support and participation.</P>
            <P>(c) All information submitted as part of or in support of an application shall use publicly available data or data that can be made public and methodologies that are accepted by industry practice and standards.</P>
            <P>(d) Measures for the selection criteria shall include projections for both the build and no-build scenarios.</P>
            <P>(e) PNRS solicitations or guidance documents will contain, as needed, additional specific information regarding measures, weighting, and use of these criteria.</P>
            <P>(f) All proposed PNRS projects are required to comply with the requirements of 23 U.S.C. 106(h) regardless of whether the project meets project cost threshold for classification as a major project.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 505.11</SECTNO>
            <SUBJECT>Project evaluation and rating.</SUBJECT>
            <P>(a) The Secretary shall evaluate and rate each proposed project as “highly recommended,” “recommended,” or “not recommended” based on the criteria in section 505.9 of this part. Individual ratings of “highly recommended,” “recommended,” or “not recommended” will be conducted for each of the selection criteria.</P>
            <P>(b) In response to a PNRS project solicitation a State may submit a project for a non-binding preliminary rating and evaluation at any point in the project development after the project's concept plan is developed.</P>
            <P>(c) Non-binding preliminary rating and evaluation will be reported in the appendix of the Secretary's Annual Report on PNRS.</P>
            <P>(d) A rating and evaluation will be considered complete and listed in the Secretary's Annual Report on PNRS only after preliminary engineering is completed.</P>
            <P>(e) The rating and evaluation for a proposed project will remain valid until the closing date of the next PNRS solicitation.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 505.13</SECTNO>
            <SUBJECT>Federal Government's share of project cost.</SUBJECT>
            <P>(a) Based on engineering studies, studies of economic feasibility, and information on the expected use of equipment or facilities, the Secretary shall estimate the project's eligible costs.</P>
            <P>(b) A FFGA for the project shall not exceed 80 percent of the eligible project cost. A refund or reduction of the remainder may only be made if a refund of a proportional amount of the grant of the Federal Government is made at the same time.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 505.15</SECTNO>
            <SUBJECT>Full funding grant agreement.</SUBJECT>
            <P>(a) A proposed project may not be funded under this program unless the Secretary finds that the project meets the requirements of this part and there is a reasonable likelihood that the project will continue to meet such requirements.</P>
            <P>(b) A project financed under this section shall be carried out through a FFGA. The Secretary shall enter into a FFGA based on the evaluations and ratings required herein, and in accordance with the terms specified in section 1301(g)(2) of the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users, (Pub. L. 109-59; 119 Stat. 1144).</P>
            <P>(c) A FFGA will be entered into only after the project has commitments for non-Federal funding in place and all other requirements are met.</P>
            <P>(d) A State may request the use of Advanced Construction for the project and subsequently convert those funds to an eligible Federal-aid funding category or to PNRS funding as part of the FFGA.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 505.17</SECTNO>
            <SUBJECT>Applicability of Title 23, U.S. Code.</SUBJECT>
            <P>Funds made available to carry out this section shall be available for obligation in the same manner as if such funds were apportioned under chapter 1 of title 23, United States Code; except that such funds shall not be transferable to other agencies and shall remain available until expended and the Federal share of the cost of a Project of National and Regional Significance shall be as provided in section 505.13.</P>
          </SECTION>
        </PART>
        <PART>
          <PRTPAGE P="148"/>
          <EAR>Pt. 511</EAR>
          <HD SOURCE="HED">PART 511—REAL-TIME SYSTEM MANAGEMENT INFORMATION PROGRAM</HD>
          <CONTENTS>
            <SUBPART>
              <RESERVED>Subparts A-B [Reserved]</RESERVED>
            </SUBPART>
            <SUBPART>
              <HD SOURCE="HED">Subpart C—Real-Time System Management Information Program</HD>
              <SECHD>Sec.</SECHD>
              <SECTNO>511.301</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <SECTNO>511.303</SECTNO>
              <SUBJECT>Definitions.</SUBJECT>
              <SECTNO>511.305</SECTNO>
              <SUBJECT>Policy.</SUBJECT>
              <SECTNO>511.307</SECTNO>
              <SUBJECT>Eligibility for Federal funding.</SUBJECT>
              <SECTNO>511.309</SECTNO>
              <SUBJECT>Provisions for traffic and travel conditions reporting.</SUBJECT>
              <SECTNO>511.311</SECTNO>
              <SUBJECT>Real-time information program establishment.</SUBJECT>
              <SECTNO>511.313</SECTNO>
              <SUBJECT>Metropolitan Area real-time information program supplement.</SUBJECT>
              <SECTNO>511.315</SECTNO>
              <SUBJECT>Program administration.</SUBJECT>
            </SUBPART>
          </CONTENTS>
          <AUTH>
            <HD SOURCE="HED">Authority:</HD>
            <P>Section 1201, Pub. L. 109-59; 23 U.S.C. 315; 23 U.S.C. 120; 49 CFR 1.48.</P>
          </AUTH>
          <SOURCE>
            <HD SOURCE="HED">Source:</HD>
            <P>75 FR 68427, Nov. 8, 2010, unless otherwise noted.</P>
          </SOURCE>
          <SUBPART>
            <RESERVED>Subparts A-B [Reserved]</RESERVED>
          </SUBPART>
          <SUBPART>
            <HD SOURCE="HED">Subpart C—Real-Time System Management Information Program</HD>
            <SECTION>
              <SECTNO>§ 511.301</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <P>The purpose of this part is to establish the provisions and parameters for the Real-Time System Management Information Program. These provisions implement Subsections 1201(a)(1), (a)(2), and (c)(1) of the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) (Pub. L. 109-59; 119 Stat. 1144), pertaining to Congestion Relief.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 511.303</SECTNO>
              <SUBJECT>Definitions.</SUBJECT>
              <P>Unless otherwise specified in this part, the definitions in 23 U.S.C. 101(a) are applicable to this subpart. As used in this part:</P>
              <P>
                <E T="03">Accuracy</E> means the measure or degree of agreement between a data value or set of values and a source assumed to be correct.</P>
              <P>
                <E T="03">Availability</E> means the degree to which data values are present in the attributes (e.g., speed and travel time are attributes of traffic) that require them. Availability is typically described in terms of percentages or number of data values.</P>
              <P>
                <E T="03">Congestion</E> means the level at which transportation system performance is unacceptable due to excessive travel times and delays.</P>
              <P>
                <E T="03">Data quality</E> means the fitness of data for all purposes that require such data.</P>
              <P>
                <E T="03">Full construction activities</E> mean roadway construction or maintenance activities that affect travel conditions by closing and reopening roadways or lanes.</P>
              <P>
                <E T="03">Metropolitan areas</E> means the geographic areas designated as Metropolitan Statistical Areas by the Office of Management and Budget in the Executive Office of the President with a population exceeding 1,000,000 inhabitants.</P>
              <P>
                <E T="03">Real-time information program</E> means the program by which States gather and make available the data for traffic and travel conditions. Such means may involve State-only activity (including cooperative activities engaging multiple State agencies), State partnership with commercial providers of value-added information products, or other effective means that enable the State to satisfy the provisions for traffic and travel time conditions reporting stated in this section.</P>
              <P>
                <E T="03">Routes of significance</E> are non-Interstate roadways in metropolitan areas that are designated by States as meriting the collection and provision of information related to traffic and travel conditions. Factors to be considered in designating routes of significance include roadway safety (e.g., crash rate, routes affected by environmental events), public safety (e.g., routes used for evacuations), economic productivity, severity and frequency of congestion, and utility of the highway to serve as a diversion route for congestion locations. All public roadways including arterial highways, toll facilities and other facilities that apply end user pricing mechanisms shall be considered when designating routes of significance. In identifying these routes, States shall apply the collaborative practices and procedures that are used for compliance with 23 CFR part 940 and 23 CFR part 420.<PRTPAGE P="149"/>
              </P>
              <P>
                <E T="03">Statewide incident reporting system</E> means a statewide system for facilitating the real-time electronic reporting of surface transportation incidents to a central location for use in monitoring the event, providing accurate traveler information, and responding to the incident as appropriate. This definition is consistent with Public Law 109-59; 119 Stat. 1144, Section 1201(f).</P>
              <P>
                <E T="03">Timeliness</E> means the degree to which data values or a set of values are provided at the time required or specified.</P>
              <P>
                <E T="03">Traffic and travel conditions</E> means the characteristics that the traveling public experiences. Traffic and travel conditions include, but are not limited to, the following characteristics:</P>
              <P>(1) Road or lane closures because of construction, traffic incidents, or other events;</P>
              <P>(2) Roadway weather or other environmental conditions restricting or adversely affecting travel; and</P>
              <P>(3) Travel times or speeds on limited access roadways in metropolitan areas that experience recurring congestion.</P>
              <P>
                <E T="03">Validity</E> means the degree to which data values fall within the respective domain of acceptable values.</P>
              <P>
                <E T="03">Value-added information products</E> means crafted products intended for commercial use, for sale to a customer base, or for other commercial enterprise purposes. These products may be derived from information gathered by States and may be created from other party or proprietary sources. These products may be created using the unique means of the value-added information provider.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 511.305</SECTNO>
              <SUBJECT>Policy.</SUBJECT>
              <P>This part establishes the provisions and parameters for the Real-Time System Management Information Program for State DOTs, other responsible agencies, and partnerships with other commercial entities in establishing real-time information programs that provide accessibility to traffic and travel conditions information by other public agencies, the traveling public, and by other parties who may deliver value-added information products.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 511.307</SECTNO>
              <SUBJECT>Eligibility for Federal funding.</SUBJECT>
              <P>(a) Subject to project approval by the Secretary, a State may obligate funds apportioned to the State under Title 23 U.S.C. sections 104(b)(1), also known as National Highway System funds, 104(b)(2), also known as CMAQ Improvement funds, and 104(b)(3), also known as STP funds, for activities relating to the planning, deployment and operation, including preventative maintenance, of real-time monitoring elements that advance the goals and purposes of the Real-Time System Management Information Program. The SPC funds, apportioned according to 23 U.S.C. 505(a), may be applied to the development and implementation of a real-time information program.</P>
              <P>(b) Those project applications to establish a real-time information program solely for Interstate System highways are entitled to a Federal share of 90 percent of the total project cost, pursuant to 23 U.S.C. 120(a). Those project applications to establish a real-time information program for non-Interstate highways are entitled to a Federal share of 80 percent of the total project cost, as per 23 U.S.C. 120(b).</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 511.309</SECTNO>
              <SUBJECT>Provisions for traffic and travel conditions reporting.</SUBJECT>
              <P>(a) Minimum requirements for traffic and travel conditions made available by real-time information programs are:</P>
              <P>(1) <E T="03">Construction activities.</E> The timeliness for the availability of information about full construction activities that close or reopen roadways or lanes will be 20 minutes or less from the time of the closure for highways outside of Metropolitan Areas. For roadways within Metropolitan Areas, the timeliness for the availability of information about full construction activities that close or reopen roadways or lanes will be 10 minutes or less from the time of the closure or reopening. Short-term or intermittent lane closures of limited duration that are less than the required reporting times are not included as a minimum requirement under this section.</P>
              <P>(2) <E T="03">Roadway or lane blocking incidents.</E> The timeliness for the availability of information related to roadway or lane blocking traffic incidents will be 20 <PRTPAGE P="150"/>minutes or less from the time that the incident is verified for highways outside of Metropolitan Areas. For roadways within Metropolitan Areas, the timeliness for the availability of information related to roadway or lane blocking traffic incidents will be 10 minutes or less from the time that the incident is verified.</P>
              <P>(3) <E T="03">Roadway weather observations.</E> The timeliness for the availability of information about hazardous driving conditions and roadway or lane closures or blockages because of adverse weather conditions will be 20 minutes or less from the time the hazardous conditions, blockage, or closure is observed.</P>
              <P>(4) <E T="03">Travel time information.</E> The timeliness for the availability of travel time information along limited access roadway segments within Metropolitan Areas, as defined under this subpart, will be 10 minutes or less from the time that the travel time calculation is completed.</P>
              <P>(5) <E T="03">Information accuracy.</E> The designed accuracy for a real-time information program shall be 85 percent accurate at a minimum, or have a maximum error rate of 15 percent.</P>
              <P>(6) <E T="03">Information availability.</E> The designed availability for a real-time information program shall be 90 percent available at a minimum.</P>
              <P>(b) Real-time information programs may be established using legacy monitoring mechanisms applied to the highways, using a statewide incident reporting system, using new monitoring mechanisms applied to the highways, using value-added information products, or using a combination of monitoring mechanisms and value-added information products.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 511.311</SECTNO>
              <SUBJECT>Real-time information program establishment.</SUBJECT>
              <P>(a) <E T="03">Requirement.</E> States shall establish real-time information programs that are consistent with the parameters defined under § 511.309. The real-time information program shall be established to take advantage of the existing traffic and travel condition monitoring capabilities, and build upon them where applicable. The real-time information program shall include traffic and travel condition information for, as a minimum, all the Interstate highways operated by the State. In addition, the real-time information program shall complement current transportation performance reporting systems by making it easier to gather or enhance required information.</P>
              <P>(b) <E T="03">Data quality.</E> States shall develop the methods by which data quality can be ensured to the data consumers. The criteria for defining the validity of traffic and travel conditions made available from real-time information programs shall be established by the States in collaboration with their partners for establishing the programs. States shall receive FHWA's concurrence that the selected methods provide reasonable checks of the quality of the information made available by the real-time information program. In requesting FHWA's concurrence, the State shall demonstrate to FHWA how the selected methods gauge the accuracy and availability of the real-time information and the remedial actions if the information quality falls below the levels described in § 511.309(a)(5) and § 511.309(a)(6).</P>
              <P>(c) <E T="03">Participation.</E> The establishment, or the enhancement, of a real-time information program should include participation from the following agencies: Highway agencies; public safety agencies (e.g., police, fire, emergency/medical); transit operators; and other operating agencies necessary to sustain mobility through the region and/or the metropolitan area. Nothing in this subpart is intended to alter the existing relationships among State, regional, and local agencies.</P>
              <P>(d) <E T="03">Update of Regional ITS Architecture.</E> All States and regions that have created a Regional ITS Architecture in accordance with Section 940 in Title 23 CFR shall evaluate their Regional ITS Architectures to determine whether the Regional ITS Architectures explicitly address real-time highway and transit information needs and the methods needed to meet such needs. Traffic and travel conditions monitoring needs for all Interstate system highways shall be considered. If necessary, the Regional ITS Architectures shall be updated to address coverage, monitoring systems, data fusion and archiving, and accessibility to highway and transit information for other <PRTPAGE P="151"/>States and for value added information product providers. The Regional ITS Architecture shall feature the components and functionality of the real-time information program.</P>
              <P>(e) <E T="03">Effective date.</E> Establishment of the real-time information program for traffic and travel conditions on the Interstate system highways shall be completed no later than November 8, 2014.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 511.313</SECTNO>
              <SUBJECT>Metropolitan Area real-time information program supplement.</SUBJECT>
              <P>(a) <E T="03">Applicability.</E> Metropolitan Areas as defined under this subpart.</P>
              <P>(b) <E T="03">Requirement.</E> Metropolitan Areas shall establish a real-time information program for traffic and travel conditions reporting with the same provisions described in § 511.311.</P>
              <P>(c) <E T="03">Routes of significance.</E> States shall designate metropolitan areas, non-Interstate highways that are routes of significance as defined under this subpart. In identifying the metropolitan routes of significance, States shall collaborate with local or regional agencies using existing coordination methods. Nothing in this subpart is intended to alter the existing relationships among State, regional, and local agencies.</P>
              <P>(d) <E T="03">Effective date.</E> Establishment of the real-time information program for traffic and travel conditions reporting along the Metropolitan Area Interstate system highways shall be completed no later than November 8, 2014. Establishment of the real-time information program for traffic and travel conditions reporting along the State-designated metropolitan area routes of significance shall be completed no later than November 8, 2016.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 511.315</SECTNO>
              <SUBJECT>Program administration.</SUBJECT>
              <P>Compliance with this subpart will be monitored under Federal-aid oversight procedures as provided under 23 U.S.C. 106 and 133, 23 CFR 1.36, and 23 CFR 940.13.</P>
            </SECTION>
          </SUBPART>
        </PART>
      </SUBCHAP>
      <SUBCHAP TYPE="P">
        <PRTPAGE P="152"/>
        <HD SOURCE="HED">SUBCHAPTER G—ENGINEERING AND TRAFFIC OPERATIONS</HD>
        <PART>
          <EAR>Pt. 620</EAR>
          <HD SOURCE="HED">PART 620—ENGINEERING</HD>
          <CONTENTS>
            <SUBPART>
              <HD SOURCE="HED">Subpart A—Highway Improvements in the Vicinity of Airports</HD>
              <SECHD>Sec.</SECHD>
              <SECTNO>620.101</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <SECTNO>620.102</SECTNO>
              <SUBJECT>Applicability.</SUBJECT>
              <SECTNO>620.103</SECTNO>
              <SUBJECT>Policy.</SUBJECT>
              <SECTNO>620.104</SECTNO>
              <SUBJECT>Standards.</SUBJECT>
            </SUBPART>
            <SUBPART>
              <HD SOURCE="HED">Subpart B—Relinquishment of Highway Facilities</HD>
              <SECTNO>620.201</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <SECTNO>620.202</SECTNO>
              <SUBJECT>Applicability.</SUBJECT>
              <SECTNO>620.203</SECTNO>
              <SUBJECT>Procedures.</SUBJECT>
            </SUBPART>
          </CONTENTS>
          <AUTH>
            <HD SOURCE="HED">Authority:</HD>
            <P>23 U.S.C. 315 and 318; 49 CFR 1.48, 23 CFR 1.32.</P>
          </AUTH>
          <SOURCE>
            <HD SOURCE="HED">Source:</HD>
            <P>39 FR 33311, Sept. 17, 1974, unless otherwise noted.</P>
          </SOURCE>
          <SUBPART>
            <HD SOURCE="HED">Subpart A—Highway Improvements in the Vicinity of Airports</HD>
            <SOURCE>
              <HD SOURCE="HED">Source:</HD>
              <P>39 FR 35145, Sept. 30, 1974, unless otherwise noted.</P>
            </SOURCE>
            <SECTION>
              <SECTNO>§ 620.101</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <P>The purpose of this section is to implement title 23 U.S.C., section 318 which requires coordination of airport and highway developments to insure (a) that airway-highway clearances are adequate for the safe movement of air and highway traffic, and (b) that the expenditure of public funds for airport and highway improvements is in the public interest.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 620.102</SECTNO>
              <SUBJECT>Applicability.</SUBJECT>
              <P>The requirements of this section apply to all projects on which Federal-aid highway funds are to be expended and to both civil and military airports.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 620.103</SECTNO>
              <SUBJECT>Policy.</SUBJECT>
              <P>(a) Federal-aid highway funds shall not participate in the costs of reconstruction or relocation of any highway to which this section applies unless the Federal Highway Administration (FHWA) and State officials, in cooperation with the Federal Aviation Administration (FAA) or appropriate military authority, or in the case of privately owned airports, the owner of that airport, determine that the location or extension of the airport in question and the consequent relocation or reconstruction of the highway is in the public interest.</P>
              <P>(b) In addition to complying with 23 U.S.C. 318 and insuring the prudent use of public funds, it is the policy of FHWA to provide a high degree of safety in the location, design, construction and operation of highways and airports.</P>
              <P>(c) Federal-aid funds shall not participate in projects where substandard clearances are created or will continue to exist.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 620.104</SECTNO>
              <SUBJECT>Standards.</SUBJECT>
              <P>A finding of public interest by FHWA will be based on compliance with airway-highway clearances which conform to FAA standards for aeronautical safety.</P>
            </SECTION>
          </SUBPART>
          <SUBPART>
            <HD SOURCE="HED">Subpart B—Relinquishment of Highway Facilities</HD>
            <SOURCE>
              <HD SOURCE="HED">Source:</HD>
              <P>39 FR 33311, Sept. 17, 1974, unless otherwise noted.</P>
            </SOURCE>
            <SECTION>
              <SECTNO>§ 620.201</SECTNO>
              <SUBJECT>Purpose.</SUBJECT>
              <P>To prescribe Federal Highway Administration (FHWA) procedures relating to relinquishment of highway facilities.</P>
            </SECTION>
            <SECTION>
              <SECTNO>§ 620.202</SECTNO>
              <SUBJECT>Applicability.</SUBJECT>
              <P>The provisions of this subpart apply to highway facilities where Federal-aid funds have participated in either right-of-way or physical construction costs of a project. The provisions of this subpart apply only to relinquishment of facilities for continued highway purposes. Other real property disposals and modifications or disposal of access rights are governed by the requirements of 23 CFR part 710.</P>
              <CITA>[64 FR 71289, Dec. 21, 1999]</CITA>
            </SECTION>
            <SECTION>
              <SECTNO>§ 620.203</SECTNO>
              <SUBJECT>Procedures.</SUBJECT>

              <P>(a) After final acceptance of a project on the Federal-aid primary, urban, or <PRTPAGE P="153"/>secondary system or after the date that the plans, specifications and estimates (PS&amp;E) for the physical construction on the right-of-way for a Federal-aid Interstate project have been approved by the FHWA, relinquishment of the right-of-way or any change made in control of access shall be in accordance with the provisions of this section. For the purposes of this section, final acceptance for a project involving physical construction is the date of the acceptance of the physical construction by the FHWA and for right-of-way projects, the date the division engineer determines to be the date of the completion of the acquisition of the right-of-way shown on the final plans.</P>

              <P>(b) Other than a conveyance made as part of a concession agreement as defined in section 710.703, for purposes of this section, <E T="03">relinquishment</E> is defined as the conveyance of a portion of a highway right-of-way or facility by a State highway agency (SHA) to another Government agency for highway use.</P>
              <P>(c) The following facilities may be relinquished in accordance with paragraph 203(f):</P>
              <P>(1) Sections of a State highway which have been superseded by construction on new location and removed from the Federal-aid system and the replaced section thereof is approved by the FHWA as the new location of the Federal-aid route. Federal-aid funds may not participate in rehabilitation work performed for the purpose of placing the superseded section of the highway in a condition acceptable to the local authority. The relinquishment of any Interstate mileage shall be submitted to the Federal Highway Administrator as a special case for prior approval.</P>
              <P>(2) Sections of reconstructed local facilities that are located outside the control of access lines, such as turn-arounds of severed local roads or streets adjacent to the Federal-aid project's right-of-way, and local roads and streets crossing over or under said project that have been adjusted in grade and/or alignment, including new right-of-way required for adjustments. Eligibility for Federal-aid participation in the costs of the foregoing adjustments is as determined at the time of PS&amp;E approval under policies of the FHWA.</P>
              <P>(3) Frontage roads or portions thereof that are constructed generally parallel to and outside the control of access lines of a Federal-aid project for the purpose of permitting access to private properties rather than to serve as extensions of ramps to connect said Federal-aid project with the nearest crossroad or street.</P>
              <P>(d) The following facilities may be relinquished only with the approval of the Federal Highway Administrator in accordance with paragraph 203(g).</P>
              <P>(1) Frontage roads or portions thereof located outside the access control lines of a Federal-aid project that are constructed to service (in lieu of or in addition to the purposes outlined under paragraph (c)(3) of this section) as connections between ramps to or from the Federal-aid project and existing public roads or streets.</P>
              <P>(2) Ramps constructed to serve as connections for interchange of traffic between the Federal-aid project and local roads or streets.</P>
              <P>(e) Where a frontage road is not on an approved Federal-aid system title to the right-of-way may be acquired initially in the name of the political subdivision which is to assume control thus eliminating the necessity of a formal transfer later. Such procedure would be subject to prior FHWA approval and would be limited to those facilities which meet the criteria set forth in paragraphs (c) (2) and (3) of this section.</P>
              <P>(f) Upon presentation by a State that it intends to relinquish facilities such as described in paragraph (c) (1), (2) or (3) of this section to local authorities, the division engineer of the FHWA shall have appropriate field and office examination made thereof to assure that such relinquishments are in accordance with the provisions of the cited paragraphs. Relinquishments of the types described in paragraph (c) (1), (2) or (3) of this section may be made on an individual basis or on a project or route basis subject to the following conditions and understandings:</P>

              <P>(1) Immediately following action by the State in approving a relinquishment, it shall furnish to the Division Administrator for record purposes a <PRTPAGE P="154"/>copy of a suitable map or maps identified by the Federal-aid project number, with the facilities to be relinquished and the date of such relinquishment action clearly delineated thereon.</P>
              <P>(2) If it is found at any time after relinquishment that a relinquished facility is in fact required for the safe and proper operation of the Federal-aid highway, the State shall take immediate action to restore such facility to its jurisdiction without cost to Federal-aid highway funds.</P>
              <P>(3) If it is found at any time that a relinquished frontage road or portion thereof or any part of the right-of-way therefor has been abandoned by local governmental authority and a showing cannot be made that such abandoned facility is no longer required as a public road, it is to be understood that the Federal Highway Administrator may cause to be withheld from Federal-aid highway funds due to the State an amount equal to the Federal-aid participation in the abandoned facility.</P>
              <P>(4) In no case shall any relinquishment include any portion of the right-of-way within the access control lines as shown on the plans for a Federal-aid project approved by the FHWA, without the prior approval of the Federal Highway Administrator.</P>
              <P>(5) There cannot be additional Federal-aid participation in future construction or reconstruction on any relinquished “off the Federal-aid system” facility unless the underlying reason for such future work is caused by future improvement of the associated Federal-aid highway.</P>
              <P>(g) In the event that a State desires to apply for approval by the Federal Highway Administrator for the relinquishment of a facility such as described in paragraph (d) (1) and (2) of this section, the facts pertinent to such proposal are to be presented to the division engineer of the FHWA. The division engineer shall have appropriate review made of such presentation and forward the material presented by the State together with his findings thereon through the Regional Federal Highway Administrator for consideration by the Federal Highway Administrator and determination of action to be taken.</P>
              <P>(h) No change may be made in control of access, without the joint determination and approval of the SHA and FHWA. This would not prevent the relinquishment of title, without prior approval of the FHWA, of a segment of the right-of-way provided there is an abandonment of a section of highway inclusive of such segment.</P>
              <P>(i) Relinquishments must be justified by the State's finding concurred in by the FHWA, that:</P>
              <P>(1) The subject land will not be needed for Federal-aid highway purposes in the foreseeable future;</P>
              <P>(2) That the right-of-way being retained is adequate under present day standards for the facility involved;</P>
              <P>(3) That the release will not adversely affect the Federal-aid highway facility or the traffic thereon;</P>
              <P>(4) That the lands to be relinquished are not suitable for retention in order to restore, preserve, or improve the scenic beauty adjacent to the highway consonant with the intent of 23 U.S.C. 319 and Pub. L. 89-285, Title III, sections 302-305 (Highway Beautification Act of 1965).</P>
              <P>(j) If a relinquishment is to a Federal, State, or local government agency for highway purposes, there need not be a charge to the said agency, nor in such event any credit to Federal funds. If for any reason there is a charge, the STD may retain the Federal share of the proceeds if used for projects eligible under title 23 of the United States Code.</P>
              <CITA>[39 FR 33311, Sept. 17, 1974, as amended at 64 FR 71289, Dec. 21, 1999; 73 FR 77502, Dec. 19, 2008]</CITA>
            </SECTION>
          </SUBPART>
        </PART>
        <PART>
          <EAR>Pt. 625</EAR>
          <HD SOURCE="HED">PART 625—DESIGN STANDARDS FOR HIGHWAYS</HD>
          <CONTENTS>
            <SECHD>Sec.</SECHD>
            <SECTNO>625.1</SECTNO>
            <SUBJECT>Purpose.</SUBJECT>
            <SECTNO>625.2</SECTNO>
            <SUBJECT>Policy.</SUBJECT>
            <SECTNO>625.3</SECTNO>
            <SUBJECT>Application.</SUBJECT>
            <SECTNO>625.4</SECTNO>
            <SUBJECT>Standards, policies, and standard specifications.</SUBJECT>
          </CONTENTS>
          <AUTH>
            <HD SOURCE="HED">Authority:</HD>
            <P>23 U.S.C. 109, 315, and 402; Sec. 1073 of Pub. L. 102-240, 105 Stat. 1914, 2012; 49 CFR 1.48(b) and (n).</P>
          </AUTH>
          <SOURCE>
            <HD SOURCE="HED">Source:</HD>
            <P>62 FR 15397, Apr. 1, 1997, unless otherwise noted.</P>
          </SOURCE>
          <SECTION>
            <PRTPAGE P="155"/>
            <SECTNO>§ 625.1</SECTNO>
            <SUBJECT>Purpose.</SUBJECT>
            <P>To designate those standards, policies, and standard specifications that are acceptable to the Federal Highway Administration (FHWA) for application in the geometric and structural design of highways.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 625.2</SECTNO>
            <SUBJECT>Policy.</SUBJECT>
            <P>(a) Plans and specifications for proposed National Highway System (NHS) projects shall provide for a facility that will—</P>
            <P>(1) Adequately serve the existing and planned future traffic of the highway in a manner that is conducive to safety, durability, and economy of maintenance; and</P>
            <P>(2) Be designed and constructed in accordance with criteria best suited to accomplish the objectives described in paragraph (a)(1) of this section and to conform to the particular needs of each locality.</P>
            <P>(b) Resurfacing, restoration, and rehabilitation (RRR) projects, other than those on the Interstate system and other freeways, shall be constructed in accordance with standards which preserve and extend the service life of highways and enhance highway safety. Resurfacing, restoration, and rehabilitation work includes placement of additional surface material and/or other work necessary to return an existing roadway, including shoulders, bridges, the roadside, and appurtenances to a condition of structural or functional adequacy.</P>
            <P>(c) An important goal of the FHWA is to provide the highest practical and feasible level of safety for people and property associated with the Nation's highway transportation systems and to reduce highway hazards and the resulting number and severity of accidents on all the Nation's highways.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 625.3</SECTNO>
            <SUBJECT>Application.</SUBJECT>
            <P>(a) <E T="03">Applicable Standards.</E> (1) Design and construction standards for new construction, reconstruction, resurfacing (except for maintenance resurfacing), restoration, or rehabilitation of a highway on the NHS (other than a highway also on the Interstate System or other freeway) shall be those approved by the Secretary in cooperation with the State highway departments. These standards may take into account, in addition to the criteria described in § 625.2(a), the following:</P>
            <P>(i) The constructed and natural environment of the area;</P>
            <P>(ii) The environmental, scenic, aesthetic, historic, community, and preservation impacts of the activity; and</P>
            <P>(iii) Access for other modes of transportation.</P>
            <P>(2) Federal-aid projects not on the NHS are to be designed, constructed, operated, and maintained in accordance with State laws, regulations, directives, safety standards, design standards, and construction standards.</P>
            <P>(b) The standards, policies, and standard specifications cited in § 625.4 of this part contain specific criteria and controls for the design of NHS projects. Deviations from specific minimum values therein are to be handled in accordance with procedures in paragraph (f) of this section. If there is a conflict between criteria in the documents enumerated in § 625.4 of this part, the latest listed standard, policy, or standard specification will govern.</P>
            <P>(c) Application of FHWA regulations, although cited in § 625.4 of this part as standards, policies, and standard specifications, shall be as set forth therein.</P>
            <P>(d) This regulation establishes Federal standards for work on the NHS regardless of funding source.</P>
            <P>(e) The Division Administrator shall determine the applicability of the roadway geometric design standards to traffic engineering, safety, and preventive maintenance projects which include very minor or no roadway work. Formal findings of applicability are expected only as needed to resolve controversies.</P>
            <P>(f) <E T="03">Exceptions.</E> (1) Approval within the delegated authority provided by FHWA Order M1100.1A may be given on a project basis to designs which do not conform to the minimum criteria as set forth in the standards, policies, and standard specifications for:</P>
            <P>(i) Experimental features on projects; and</P>
            <P>(ii) Projects where conditions warrant that exceptions be made.</P>

            <P>(2) The determination to approve a project design that does not conform to the minimum criteria is to be made only after due consideration is given to <PRTPAGE P="156"/>all project conditions such as maximum service and safety benefits for the dollar invested, compatibility with adjacent sections of roadway and the probable time before reconstruction of the section due to increased traffic demands or changed conditions.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 625.4</SECTNO>
            <SUBJECT>Standards, policies, and standard specifications.</SUBJECT>
            <P>The documents listed in this section are incorporated by reference with the approval of the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51 and are on file at the Office of the Federal Register in Washington, DC. They are available as noted in paragraph (d) of this section. The other CFR references listed in this section are included for cross-reference purposes only.</P>
            <P>(a) <E T="03">Roadway and appurtenances.</E> (1) A Policy on Geometric Design of Highways and Streets, AASHTO 2001. [See § 625.4(d)(1)]</P>
            <P>(2) A Policy on Design Standards Interstate System, AASHTO, January 2005. [See § 625.4(d)(1)]</P>
            <P>(3) The geometric design standards for resurfacing, restoration, and rehabilitation (RRR) projects on NHS highways other than freeways shall be the procedures and the design or design criteria established for individual projects, groups of projects, or all nonfreeway RRR projects in a State, and as approved by the FHWA. The other geometric design standards in this section do not apply to RRR projects on NHS highways other than freeways, except as adopted on an individual State basis. The RRR design standards shall reflect the consideration of the traffic, safety, economic, physical, community, and environmental needs of the projects.</P>
            <P>(4) Erosion and Sediment Control on Highway Construction Projects, refer to 23 CFR part 650, subpart B.</P>
            <P>(5) Location and Hydraulic Design of Encroachments on Flood Plains, refer to 23 CFR part 650, subpart A.</P>
            <P>(6) Procedures for Abatement of Highway Traffic Noise and Construction Noise, refer to 23 CFR part 772.</P>
            <P>(7) Accommodation of Utilities, refer to 23 CFR part 645, subpart B.</P>
            <P>(8) Pavement Design, refer to 23 CFR part 626.</P>
            <P>(b) <E T="03">Bridges and structures.</E> (1) Standard Specifications for Highway Bridges, Fifteenth Edition, AASHTO 1992. [See § 625.4(d)(1)]</P>
            <P>(2) Interim Specifications—Bridges, AASHTO 1993. [See § 625.4(d)(1)]</P>
            <P>(3) Interim Specifications—Bridges, AASHTO 1994. [See § 625.4(d)(1)]</P>
            <P>(4) Interim Specifications—Bridges, AASHTO 1995. [See § 625.4(d)(1)]</P>
            <P>(5) AASHTO LRFD Bridge Design Specifications, First Edition, AASHTO 1994 (U.S. Units). [See § 625.4(d)(1)]</P>
            <P>(6) AASHTO LRFD Bridge Design Specifications, First Edition, AASHTO 1994 (SI Units). [See § 625.4(d)(1)]</P>
            <P>(7) Standard Specifications for Movable Highway Bridges, AASHTO 1988. [See § 625.4(d)(1)]</P>
            <P>(8) Bridge Welding Code, ANSI/AASHTO/AWS D1.5-95, AASHTO. [See § 625.4(d) (1) and (2)]</P>
            <P>(9) Structural Welding Code—Reinforcing Steel, ANSI/AWS D1.4-92, 1992. [See § 625.4(d)(2)]</P>
            <P>(10) Standard Specifications for Structural Supports for Highway Signs, Luminaires and Traffic Signals, AASHTO 1994. [See § 625.4(d)(1)]</P>
            <P>(11) Navigational Clearances for Bridges, refer to 23 CFR part 650, subpart H.</P>
            <P>(c) <E T="03">Materials.</E> (1) General Materials Requirements, refer to 23 CFR part 635, subpart D.</P>
            <P>(2) Standard Specifications for Transportation Materials and Methods of Sampling and Testing, parts I and II, AASHTO 1995. [See § 625.4(d)(1)]</P>
            <P>(3) Sampling and Testing of Materials and Construction, refer to 23 CFR part 637, subpart B.</P>

            <P>(d) Availability of documents incorporated by reference. The documents listed in § 625.4 are incorporated by reference and are on file and available for inspection at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: <E T="03">http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.</E> These documents may also be reviewed at the Department of Transportation Library. These documents are also available for inspection and copying as provided in 49 CFR part 7, appendix D. Copies of these <PRTPAGE P="157"/>documents may be obtained from the following organizations:</P>
            <P>(1) American Association of State Highway and Transportation Officials (AASHTO), Suite 249, 444 North Capitol Street, NW., Washington, DC 20001.</P>
            <P>(2) American Welding Society (AWS), 2501 Northwest Seventh Street, Miami, FL 33125.</P>
            <CITA>[62 FR 15397, Apr. 1, 1997, as amended at 67 FR 6395, Feb. 12, 2002; 69 FR 18803, Apr. 9, 2004; 71 FR 26414, May 5, 2006; 74 FR 28442, June 16, 2009]</CITA>
          </SECTION>
        </PART>
        <PART>
          <EAR>Pt. 626</EAR>
          <HD SOURCE="HED">PART 626—PAVEMENT POLICY</HD>
          <CONTENTS>
            <SECHD>Sec.</SECHD>
            <SECTNO>626.1</SECTNO>
            <SUBJECT>Purpose.</SUBJECT>
            <SECTNO>626.2</SECTNO>
            <SUBJECT>Definitions.</SUBJECT>
            <SECTNO>626.3</SECTNO>
            <SUBJECT>Policy.</SUBJECT>
          </CONTENTS>
          <AUTH>
            <HD SOURCE="HED">Authority:</HD>
            <P>23 U.S.C. 101(e), 109, and 315; 49 CFR 1.48(b)</P>
          </AUTH>
          <SOURCE>
            <HD SOURCE="HED">Source:</HD>
            <P>61 FR 67174, Dec. 19, 1996, unless otherwise noted.</P>
          </SOURCE>
          <SECTION>
            <SECTNO>§ 626.1</SECTNO>
            <SUBJECT>Purpose.</SUBJECT>
            <P>To set forth pavement design policy for Federal-aid highway projects.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 626.2</SECTNO>
            <SUBJECT>Definitions.</SUBJECT>
            <P>Unless otherwise specified in this part, the definitions in 23 U.S.C. 101(a) are applicable to this part. As used in this part:</P>
            <P>
              <E T="03">Pavement design</E> means a project level activity where detailed engineering and economic considerations are given to alternative combinations of subbase, base, and surface materials which will provide adequate load carrying capacity. Factors which are considered include: Materials, traffic, climate, maintenance, drainage, and life-cycle costs.</P>
          </SECTION>
          <SECTION>
            <SECTNO>§ 626.3</SECTNO>
            <SUBJECT>Policy.</SUBJECT>
            <P>Pavement shall be designed to accommodate current and predicted traffic needs in a safe, durable, and cost effective manner.</P>
          </SECTION>
        </PART>
        <PART>
          <EAR>Pt. 627</EAR>
          <HD SOURCE="HED">PART 627—VALUE ENGINEERING</HD>
          <CONTENTS>
            <SECHD>Sec.</SECHD>
            <SECTNO>627.1</SECTNO>
            <SUBJECT>Purpose and applicability.</SUBJECT>
            <SECTNO>627.3</SECTNO>
            <SUBJECT>Definitions.</SUBJECT>
            <SECTNO>627.5</SECTNO>
            <SUBJECT>General principles and procedures.</SUBJECT>
          </CONTENTS>
          <AUTH>
            <HD SOURCE="HED">Authority:</HD>
            <P>23 U.S.C. 106(d), 106(f), 112(b), 302, 307, and 315; 49 CFR 18.</P>
          </AUTH>
          <SOURCE>
            <HD SOURCE="HED">Source:</HD>
            <P>62 FR 6868, Feb. 14, 1997, unless otherwise noted.</P>
          </SOURCE>
          <EFFDNOTP>
            <HD SOURCE="HED">Effective Date Note:</HD>
            <P>At 77 FR 15254, March 15, 2012, part 627 was revised, effective Apr. 16, 2012. For the convenience of the user, the revised part 627 is set forth following the text currently in effect.</P>
          </EFFDNOTP>
          <SECTION>
            <SECTNO>§ 627.1</SECTNO>
            <SUBJECT>Purpose and applicability.</SUBJECT>
            <P>(a) This regulation will establish a program to improve project quality, reduce project costs, foster innovation, eliminate unnecessary and costly design elements, and ensure efficient investments by requiring the application of value engineering (VE) to all Federal-aid highway projects on the National Highway System (NHS) with an estimated cost of $25 million or more.</P>
            <P>(b) In accordance with the Federal-State relationship established under the Federal-aid highway program, State transportation departments (STDs) shall assure that a VE analysis has been performed on all applicable projects and that all resulting, approved recommendations are incorporated into the plans, specifications and estimate.</P>
            <CITA>[62 FR 6868, Feb. 14, 1997, as amended at 67 FR 75924, Dec. 10, 2002]</CITA>
          </SECTION>
          <SECTION>
            <SECTNO>§ 627.3</SECTNO>
            <SUBJECT>Definitions.</SUBJECT>
            <P>
              <E T="03">Project.</E> A portion of a highway that a State proposes to construct, reconstruct, or improve as described in the preliminary design report or applicable environmental document. A project may consist of several contracts or phases over several years.</P>
            <P>
              <E T="03">Value engineering.</E> The systematic application of recognized techniques by a multi-disciplined team to identify the function of a product or service, establish a worth for that function, generate alternatives through the use of creative thinking, and provide the needed functions to accomplish the original purpose of the project, reliably, and at the lowest life-cycle cost without sacrificing safety, necessary quality, and environmental attributes of the project.</P>
          </SECTION>
          <SECTION>
            <PRTPAGE P="158"/>
            <SECTNO>§ 627.5</SECTNO>
            <SUBJECT>General principles and procedures.</SUBJECT>
            <P>(a) <E T="03">State VE programs.</E> State transportation departments must establish programs to assure that VE studies are performed on all Federal-aid highway projects on the NHS with an estimated cost of $25 million or more. Program procedures should provide for the identification of candidate projects for VE studies early in the development of the State's multi-year Statewide Transportation Improvement Program.</P>
            <P>(1) <E T="03">Project selection.</E> The program may, at the State's discretion, establish specific criteria and guidelines for selecting other highway projects for VE studies.</P>
            <P>(2) <E T="03">Studies.</E> Value engineering studies shall follow the widely recognized systematic problem-solving analysis process that is used throughout private industry and governmental agencies. Studies must be performed using multi-disciplined teams of individuals not personally involved in the design of the project. Study teams should consist of a team leader and individuals from different speciality areas, such as design, construction, environment, planning, maintenance, right-of-way, and other areas depending upon the type of project being reviewed. Individuals from the public and other agencies may also be included on the team when their inclusion is found to be in the public interest.</P>
            <P>(i) Each team leader should be trained and knowledgeable in VE techniques and be able to serve as the coordinator and facilitator of the team.</P>
            <P>(ii) Studies should be employed as early as possible in the project development or design process so that accepted VE recommendations can be implemented without delaying the progress of the project.</P>
            <P>(iii) Studies should conclude with a formal report outlining the study team's recommendations for improving the project and reducing its overall cost.</P>
            <P>(3) <E T="03">Recommendations.</E> The program should include procedures to approve or reject recommendations and ensure the prompt review of VE recommendations by staff offices whose speciality areas are implicated in proposed changes and by offices responsible for implementing accepted recommendations. Reviews by these offices should be performed promptly to minimize delays to the project.</P>
            <P>(4) <E T="03">Incentives.</E> The program may include a VE or cost reduction incentive clause in an STD's standard specifications or project special provisions that allows construction contractors to submit change proposals and share the resulting cost savings with the STD.</P>
            <P>(5) <E T="03">Monitoring.</E> The program should include procedures for monitoring the implementation of VE study team recommendations and VE change proposal recommendations submitted by construction contractors.</P>
            <P>(b) <E T="03">State VE coordinators.</E> Individuals knowledgeable in VE shall be assigned responsibilities to coordinate and monitor the STD's program and be actively involved in all phases of the program.</P>
            <P>(c) <E T="03">Use of consultants.</E> Consultants or firms with experience in VE may be retained by STDs to conduct the studies of Federal-aid highway projects or elements of Federal-aid highway projects required under § 627.1(a) of this part. Consultants or firms should not be retained to conduct studies of their own designs unless they maintain separate and distinct organizational separation of their VE and design sections.</P>
            <P>(d) <E T="03">Funding eligibility.</E> The cost of performing VE studies is project related and is, therefore, eligible for reimbursement with Federal-aid highway funds at the appropriate pro-rata share for the project studied.</P>
            <P>(e) In the case of a Federal-aid design-build project meeting the project criteria in 23 CFR 627.1(a), the STDs shall fulfill the value engineering analysis requirement by performing a value engineering analysis prior to the release of the Request for Proposals document.</P>
            <CITA>[62 FR 6868, Feb. 14, 1997, as amended at 67 FR 75924, Dec. 10, 2002]</CITA>
            <EAR>Pt. 627, Nt.</EAR>
            <EFFDNOTP>
              <HD SOURCE="HED">Effective Date Note:</HD>
              <P>At 77 FR 15254, March 15, 2012, part 627 was revised, effective Apr. 16, 2012. For the convenience of the user, the revised text is set forth as follows:</P>
              <REVTXT>
                <PART>
                  <HD SOURCE="HED">PART 627—VALUE ENGINEERING</HD>
                  <CONTENTS>
                    <SECHD>Sec.</SECHD>
                    <SECTNO>627.1</SECTNO>
                    <SUBJECT>Purpose and applicability.</SUBJECT>
                    <SECTNO>627.3</SECTNO>
                    <SUBJECT>Definitions.</SUBJECT>
                    <SECTNO>627.5</SECTNO>
                    <SUBJECT>Applicable projects.<PRTPAGE P="159"/>
                    </SUBJECT>
                    <SECTNO>627.7</SECTNO>
                    <SUBJECT>VE programs.</SUBJECT>
                    <SECTNO>627.9</SECTNO>
                    <SUBJECT>Conducting a VE analysis.</SUBJECT>
                  </CONTENTS>
                  <AUTH>
                    <HD SOURCE="HED">Authority:</HD>
                    <P>23 U.S.C. 106(e), 106(g), 106(h), 112(a) and (b), 302, 315; and 49 CFR part 18.</P>
                  </AUTH>
                  <SECTION>
                    <SECTNO>§ 627.1</SECTNO>
                    <SUBJECT>Purpose and applicability.</SUBJECT>
                    <P>(a) The purpose of this part is to prescribe the programs, policies and procedures for the integration of value engineering (VE) into the planning and development of all applicable Federal-aid highway projects.</P>
                    <P>(b) Each State transportation agency (STA) shall establish and sustain a VE program. This program shall establish the policies and procedures identifying when a VE analysis is required. These policies and procedures should also identify when a VE analysis is encouraged on all other projects where there is a high potential to realize the benefits of a VE analysis.</P>
                    <P>(c) The STAs shall establish the policies, procedures, functions, and capacity to monitor, assess, and report on the performance of the VE program, along with the VE analyses that are conducted and Value Engineering Change Proposals (VECP) that are accepted. The STAs shall ensure that its subrecipients conduct VE analyses in compliance with this part.</P>
                  </SECTION>
                  <SECTION>
                    <SECTNO>§ 627.3</SECTNO>
                    <SUBJECT>Definitions.</SUBJECT>
                    <P>The following terms used in this part are defined as follows:</P>
                    <P>
                      <E T="03">Bridge project.</E> A bridge project shall include any project where the primary purpose is to construct, reconstruct, rehabilitate, resurface, or restore a bridge.</P>
                    <P>
                      <E T="03">Final design.</E> Final design has the same meaning as defined in 23 CFR 636.103.</P>
                    <P>
                      <E T="03">Project.</E> A portion of a highway that a STA or public authority proposes to construct, reconstruct, or improve as described in the preliminary design report or applicable environmental document. A project is defined as the logical termini in the environmental document and may consist of several contracts, or phases of a project or contract, which are implemented over several years.</P>
                    <P>
                      <E T="03">Total project costs.</E> The costs of all phases of a project including environment, design, right-of-way, utilities and construction.</P>
                    <P>
                      <E T="03">Value Engineering (VE) analysis.</E> The systematic process of reviewing and assessing a project by a multidisciplinary team not directly involved in the planning and development phases of a specific project that follows the VE Job Plan and is conducted to provide recommendations for:</P>
                    <P>(1) Providing the needed functions, considering community and environmental commitments, safety, reliability, efficiency, and overall life-cycle cost (as defined in 23 U.S.C. 106(f)(2));</P>
                    <P>(2) Improving the value and quality of the project; and</P>
                    <P>(3) Reducing the time to develop and deliver the project.</P>
                    <P>
                      <E T="03">Value Engineering (VE) Job Plan.</E> A systematic and structured action plan for conducting and documenting the results of the VE analysis. While each VE analysis shall address each phase in the VE Job Plan, the level of analysis conducted and effort expended for each phase should be scaled to meet the needs of each individual project. The VE Job Plan shall include and document the following seven phases:</P>
                    <P>(1) <E T="03">Information Phase:</E> Gather project information including project commitments and constraints.</P>
                    <P>(2) <E T="03">Function Analysis Phase:</E> Analyze the project to understand the required functions.</P>
                    <P>(3) <E T="03">Creative Phase:</E> Generate ideas on ways to accomplish the required functions which improve the project's performance, enhance its quality, and lower project costs.</P>
                    <P>(4) <E T="03">Evaluation Phase:</E> Evaluate and select feasible ideas for development.</P>
                    <P>(5) <E T="03">Development Phase:</E> Develop the selected alternatives into fully supported recommendations.</P>
                    <P>(6) <E T="03">Presentation Phase:</E> Present the VE recommendation to the project stakeholders.</P>
                    <P>(7) <E T="03">Resolution Phase:</E> Evaluate, resolve, document and implement all approved recommendations.</P>
                    <P>(g) <E T="03">Value Engineering Change Proposal (VECP).</E> A construction contract change proposal submitted by the construction contractor based on a VECP provision in the contract. These proposals may improve the project's performance, value and/or quality, lower construction costs, or shorten the delivery time, while considering their impacts on the project's overall life-cycle cost and other applicable factors.</P>
                  </SECTION>
                  <SECTION>
                    <SECTNO>§ 627.5</SECTNO>
                    <SUBJECT>Applicable projects.</SUBJECT>
                    <P>(a) A VE analysis shall be conducted prior to the completion of final design on each applicable project that utilizes Federal-aid highway funding, and all approved recommendations shall be included in the project's plans, specifications and estimates.</P>
                    <P>(b) Applicable projects shall include the following:</P>
                    <P>(1) Each project located on the National Highway System (NHS) (as specified in 23 U.S.C. 103) where the estimated total project cost is $25 million or more that utilizes Federal-aid highway funding;</P>
                    <P>(2) Each bridge project located on or off of the NHS where the estimated total project cost is $20 million or more that utilizes Federal-aid highway funding;</P>
                    <P>(3) Any major project (as defined in 23 U.S.C. 106(h)), on or off of the NHS, that utilizes Federal-aid highway funding in any contract or phase comprising the major project;</P>

                    <P>(4) Any project for which a VE analysis has not been conducted and a change is made to <PRTPAGE P="160"/>the project's scope or design between the final design and the letting which results in an increase in the project's total cost exceeding the thresholds identified in paragraphs (b)(1), (2) or (3) of this section; and</P>
                    <P>(5) Any other Federal-aid project the FHWA determines to be appropriate.</P>
                    <P>(c) An additional VE analysis is not required if, after conducting the VE analysis required under this part for any project meeting the criteria of paragraph (b) of this section, the project is subsequently split into smaller projects in the design phase or if the project is programmed to be completed by the letting of multiple construction projects. However, the STA may not avoid the requirement to conduct a VE analysis on an applicable project by splitting the project into smaller projects, or multiple construction projects.</P>
                    <P>(d) The STA's VE Program's policies and procedures shall identify when any additional VE analysis should be considered or conducted in the planning and development of transportation projects.</P>
                    <P>(e) For projects utilizing design-build and other alternative project delivery methods for which final design is not complete prior to the release of the final request for proposals or other applicable solicitation documents, the estimated total cost for purposes of the thresholds identified in paragraphs (b)(1) and (2) of this section, shall be based on the best estimate of the cost to construct the project.</P>
                  </SECTION>
                  <SECTION>
                    <SECTNO>§ 627.7</SECTNO>
                    <SUBJECT>VE programs.</SUBJECT>
                    <P>(a) The STA shall establish and sustain a VE program under which VE analyses are conducted for all applicable projects. The STA's VE program shall:</P>
                    <P>(1) Establish and document VE program policies and procedures that ensure the required VE analysis is conducted on all applicable projects, and encourage conducting VE analyses on other projects that have the potential to benefit from this analysis;</P>
                    <P>(2) Ensure the VE analysis is conducted and all approved recommendations are implemented and documented in a final VE report prior to the project being authorized to proceed to a construction letting;</P>
                    <P>(3) Monitor and assess the VE Program, and disseminate an annual report to the FHWA consisting of a summary of all approved recommendations implemented on applicable projects requiring a VE analysis, the accepted VECPs, and VE program functions and activities;</P>
                    <P>(4) Establish and document policies, procedures, and contract provisions that identify when VECP's may be used; identify the analysis, documentation, basis, and process for evaluating and accepting a VECP; and determine how the net savings of each VECP may be shared between the agency and contractor;</P>
                    <P>(5) Establish and document policies, procedures, and controls to ensure a VE analysis is conducted and all approved recommendations are implemented for all applicable projects administered by local public agencies; and ensure the results of these analyses are included in the VE program monitoring and reporting; and</P>
                    <P>(6) Provide for the review of any project where a delay occurs between when the final plans are completed and the project advances to a letting for construction to determine if a change has occurred to the project's scope or design where a VE analysis would be required to be conducted (as specified in 23 CFR 627.5(b)).</P>
                    <P>(b) STAs shall ensure the required VE analysis has been performed on each applicable project including those administered by subrecipients, and shall ensure approved recommendations are implemented into the project's plans, specifications, and estimate.</P>
                    <P>(c) STAs shall designate a VE Program Coordinator to promote and advance VE program activities and functions. The VE Coordinator's responsibilities should include establishing and maintaining the STA's VE policies and procedures; facilitating VE training; ensuring VE analyses are conducted on applicable projects; monitoring, assessing, and reporting on the VE analyses conducted and VE program; participating in periodic VE program and project reviews; submitting the required annual VE report to the FHWA; and supporting the other elements of the VE program.</P>
                  </SECTION>
                  <SECTION>
                    <SECTNO>§ 627.9</SECTNO>
                    <SUBJECT>Conducting a VE analysis.</SUBJECT>
                    <P>(a) A VE analysis should be conducted as early as practicable in the planning or development of a project, preferably before the completion of the project's preliminary design. At a minimum, the VE analysis shall be conducted prior to completing the project's final design.</P>
                    <P>(b) The VE analysis should be closely coordinated with other project development activities to minimize the impact approved recommendations might have on previous agency, community, or environmental commitments; the project's scope; and the use of innovative technologies, materials, methods, plans or construction provisions.</P>
                    <P>(c) For projects utilizing design-build and other alternative project delivery methods that will be advertised prior to the completion of final design, the STA or local public agency shall conduct a VE analysis prior to the release of the final Request for Proposals or other applicable solicitation documents.</P>
                    <P>(d) STAs shall ensure the VE analysis meets the following requirements:</P>

                    <P>(1) Uses a multidisciplinary team not directly involved in the planning or design of the project, with at least one individual who has the training and experience with leading a VE analysis;<PRTPAGE P="161"/>
                    </P>
                    <P>(2) Develops and implements the VE Job Plan;</P>
                    <P>(3) Produces a formal written report outlining, at a minimum:</P>
                    <P>(i) Project information;</P>
                    <P>(ii) Identification of the VE analysis team;</P>
                    <P>(iii) Background and supporting documentation, such as information obtained from other analyses conducted on the project (e.g., environmental, safety, traffic operations, constructability);</P>
                    <P>(iv) Documentation of the stages of the VE Job Plan which would include documentation of the life-cycle costs that were analyzed;</P>
                    <P>(v) Summarization of the analysis conducted;</P>
                    <P>(vi) Documentation of the proposed recommendations and approvals received at the time the report is finalized; and</P>
                    <P>(vii) The formal written report shall be retained for at least 3 years after the completion of the project (as specified in 49 CFR 18.42).</P>
                    <P>(e) For bridge projects, in addition to the requirements in paragraph (d) of this section, the VE analyses shall:</P>
                    <P>(1) Include bridge substructure and superstructure requirements that consider alternative construction materials; and</P>
                    <P>(2) Be conducted based on:</P>
                    <P>(i) An engineering and economic assessment, taking into consideration acceptable designs for bridges; and</P>
                    <P>(ii) An analysis of life-cycle costs and duration of project construction.</P>
                    <P>(f) STAs and local public agencies may employ qualified consultants (as defined in 23 CFR 172) to conduct a VE analysis. The consultant shall possess the training and experience required to lead the VE analysis. A consulting firm or individual shall not be used to conduct or support a VE analysis if they have a conflict of interest (as specified in 23 CFR 1.33).</P>
                    <P>(g) VECPs, STAs, and local public agencies are encouraged to use a VECP clause (or other such clauses under a different name) in an applicable project's contract, allowing the construction contractor to propose changes in the project's plans, specifications, or other contract documents. Whenever such clauses are used, the STA and local authority will consider changes that could improve the project's performance, value and quality, shorten the delivery time, or lower construction costs, while considering impacts on the project's overall life-cycle cost and other applicable factors. The basis for a STA or local authority to consider a VECP is the analysis and documentation supporting the proposed benefits that would result from implementing the proposed change in the project's contract or project plans.</P>
                    <P>(h) Proposals to accelerate construction after the award of the contract will not be considered a VECP and will not be eligible for Federal-aid highway program funding participation. Where it is necessary to accelerate construction, STAs and local public agencies are encouraged to use the appropriate incentive or disincentive clauses so that all proposers will take this into account when preparing their bids or price proposals.</P>
                  </SECTION>
                </PART>
                <PART>
                  <EAR>Pt. 630</EAR>
                  <HD SOURCE="HED">PART 630—PRECONSTRUCTION PROCEDURES</HD>
                  <CONTENTS>
                    <SUBPART>
                      <HD SOURCE="HED">Subpart A—Project Authorization and Agreements</HD>
                      <SECHD>Sec.</SECHD>
                      <SECTNO>630.102</SECTNO>
                      <SUBJECT>Purpose.</SUBJECT>
                      <SECTNO>630.104</SECTNO>
                      <SUBJECT>Applicability.</SUBJECT>
                      <SECTNO>630.106</SECTNO>
                      <SUBJECT>Authorization to proceed.</SUBJECT>
                      <SECTNO>630.108</SECTNO>
                      <SUBJECT>Preparation of agreement.</SUBJECT>
                      <SECTNO>630.110</SECTNO>
                      <SUBJECT>Modification of original agreement.</SUBJECT>
                      <SECTNO>630.112</SECTNO>
                      <SUBJECT>Agreement provisions.</SUBJECT>
                    </SUBPART>
                    <SUBPART>
                      <HD SOURCE="HED">Subpart B—Plans, Specifications, and Estimates</HD>
                      <SECTNO>630.201</SECTNO>
                      <SUBJECT>Purpose.</SUBJECT>
                      <SECTNO>630.203</SECTNO>
                      <SUBJECT>Applicability.</SUBJECT>
                      <SECTNO>630.205</SECTNO>
                      <SUBJECT>Preparation, submission, and approval.</SUBJECT>
                    </SUBPART>
                    <SUBPART>
                      <RESERVED>Subpart C [Reserved]</RESERVED>
                    </SUBPART>
                    <SUBPART>
                      <HD SOURCE="HED">Subpart D—Geodetic Markers</HD>
                      <SECTNO>630.401</SECTNO>
                      <SUBJECT>Purpose.</SUBJECT>
                      <SECTNO>630.402</SECTNO>
                      <SUBJECT>Policy.</SUBJECT>
                      <SECTNO>630.403</SECTNO>
                      <SUBJECT>Initiation of projects.</SUBJECT>
                      <SECTNO>630.404</SECTNO>
                      <SUBJECT>Standards.</SUBJECT>
                    </SUBPART>
                    <SUBPART>
                      <RESERVED>Subparts E-F [Reserved]</RESERVED>
                    </SUBPART>
                    <SUBPART>
                      <HD SOURCE="HED">Subpart G—Advance Construction of Federal-Aid Projects</HD>
                      <SECTNO>630.701</SECTNO>
                      <SUBJECT>Purpose.</SUBJECT>
                      <SECTNO>630.703</SECTNO>
                      <SUBJECT>Eligibility.</SUBJECT>
                      <SECTNO>630.705</SECTNO>
                      <SUBJECT>Procedures.</SUBJECT>
                      <SECTNO>630.707</SECTNO>
                      <SUBJECT>[Reserved]</SUBJECT>
                      <SECTNO>630.709</SECTNO>
                      <SUBJECT>Conversion to a regular Federal-aid project.</SUBJECT>
                    </SUBPART>
                    <SUBPART>
                      <HD SOURCE="HED">Subpart H—Bridges on Federal Dams</HD>
                      <SECTNO>630.801</SECTNO>
                      <SUBJECT>Purpose.</SUBJECT>
                      <SECTNO>630.802</SECTNO>
                      <SUBJECT>Applicability.</SUBJECT>
                      <SECTNO>630.803</SECTNO>
                      <SUBJECT>Procedures.</SUBJECT>
                    </SUBPART>
                    <SUBPART>
                      <RESERVED>Subpart I [Reserved]</RESERVED>
                    </SUBPART>
                    <SUBPART>
                      <HD SOURCE="HED">Subpart J—Work Zone Safety and Mobility</HD>
                      <SECTNO>630.1002</SECTNO>
                      <SUBJECT>Purpose.</SUBJECT>
                      <SECTNO>630.1004</SECTNO>
                      <SUBJECT>Definitions and explanation of terms.</SUBJECT>
                      <SECTNO>630.1006</SECTNO>

                      <SUBJECT>Work zone safety and mobility policy.<PRTPAGE P="162"/>
                      </SUBJECT>
                      <SECTNO>630.1008</SECTNO>
                      <SUBJECT>State-level processes and procedures.</SUBJECT>
                      <SECTNO>630.1010</SECTNO>
                      <SUBJECT>Significant projects.</SUBJECT>
                      <SECTNO>630.1012</SECTNO>
                      <SUBJECT>Project-level procedures.</SUBJECT>
                      <SECTNO>630.1014</SECTNO>
                      <SUBJECT>Implementation.</SUBJECT>
                      <SECTNO>630.1016</SECTNO>
                      <SUBJECT>Compliance date.</SUBJECT>
                    </SUBPART>
                    <SUBPART>
                      <HD SOURCE="HED">Subpart K—Temporary Traffic Control Devices</HD>
                      <SECTNO>630.1102</SECTNO>
                      <SUBJECT>Purpose.</SUBJECT>
                      <SECTNO>630.1104</SECTNO>
                      <SUBJECT>Definitions.</SUBJECT>
                      <SECTNO>630.1106</SECTNO>
                      <SUBJECT>Policy and procedures for work zone safety management.</SUBJECT>
                      <SECTNO>630.1108</SECTNO>
                      <SUBJECT>Work zone safety management measures and strategies.</SUBJECT>
                      <SECTNO>630.1110</SECTNO>
                      <SUBJECT>Maintenance of temporary traffic control devices.</SUBJECT>
                    </SUBPART>
                  </CONTENTS>
                  <AUTH>
                    <HD SOURCE="HED">Authority:</HD>
                    <P>23 U.S.C. 106, 109, 112, 115, 315, 320, and 402(a); Sec. 1501 and 1503 of Public Law 109-59, 119 Stat. 1144; Public Law 105-178, 112 Stat. 193; Public Law 104-59, 109 Stat. 582; Public Law 97-424, 96 Stat. 2106; Public Law 90-495, 82 Stat. 828; Public Law 85-767, 72 Stat. 896; Public Law 84-627, 70 Stat. 380; 23 CFR 1.32 and 49 CFR 1.48(b).</P>
                  </AUTH>
                  <SUBPART>
                    <HD SOURCE="HED">Subpart A—Project Authorization and Agreements</HD>
                    <SOURCE>
                      <HD SOURCE="HED">Source:</HD>
                      <P>66 FR 23847, May 10, 2001, unless otherwise noted.</P>
                    </SOURCE>
                    <SECTION>
                      <SECTNO>§ 630.102</SECTNO>
                      <SUBJECT>Purpose.</SUBJECT>
                      <P>The purpose of this subpart is to prescribe policies for authorizing Federal-aid projects through execution of the project agreement required by 23 U.S.C. 106(a)(2).</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 630.104</SECTNO>
                      <SUBJECT>Applicability.</SUBJECT>
                      <P>(a) This subpart is applicable to all Federal-aid projects unless specifically exempted.</P>
                      <P>(b) Other projects which involve special procedures are to be approved, or authorized as set out in the implementing instructions or regulations for those projects.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 630.106</SECTNO>
                      <SUBJECT>Authorization to proceed.</SUBJECT>
                      <P>(a)(1) The State transportation department (STD) must obtain an authorization to proceed from the FHWA before beginning work on any Federal-aid project. The STD may request an authorization to proceed in writing or by electronic mail for a project or a group of projects.</P>
                      <P>(2) The FHWA will issue the authorization to proceed either through or after the execution of a formal project agreement with the State. The agreement can be executed only after applicable prerequisite requirements of Federal laws and implementing regulations and directives are satisfied. Except as provided in paragraphs (c)(1) through (c)(4) of this section, the FHWA will obligate Federal funds in the project or group of projects upon execution of the project agreement.</P>
                      <P>(3) The State's request that Federal funds be obligated shall be supported by a documented cost estimate that is based on the State's best estimate of costs.</P>
                      <P>(4) The State shall maintain a process to adjust project cost estimates. For example, the process would require a review of the project cost estimate when the bid is approved, a project phase is completed, a design change is approved, etc. Specifically, the State shall revise the Federal funds obligated within 90 days after it has determined that the estimated Federal share of project costs has decreased by $250,000 or more.</P>
                      <P>(5) The State shall review, on a quarterly basis, inactive projects (for the purposes of this subpart an “inactive project” means a project for which no expenditures have been charged against Federal funds for the past 12 months) with unexpended Federal obligations and shall revise the Federal funds obligated for a project within 90 days to reflect the current cost estimate, based on the following criteria:</P>
                      <P>(i) Projects inactive for the past 12 months with unexpended balances more than $500,000,</P>
                      <P>(ii) Projects inactive for the past 24 months with unexpended balances of $50,000 to $500,000, and</P>
                      <P>(iii) Projects inactive for the past 36 months with unexpended balances less than $50,000.</P>

                      <P>(6) If the State fails to comply with the requirements of paragraphs (a)(3), (4), or (5) of this section, then the FHWA shall revise the obligations or take such other action as authorized by 23 CFR 1.36. The FHWA shall advise the State of its proposed actions and provide the State with the opportunity to respond before actions are taken. The FHWA shall not adjust obligations without a State's consent during the <PRTPAGE P="163"/>August redistribution process, August 1 to September 30.</P>
                      <P>(7) For design-build projects, the execution or modification of the project agreement for final design and physical construction, and authorization to proceed, shall not occur until after the completion of the NEPA process. However, preliminary design (as defined in 23 CFR 636.103) and preliminary engineering may be authorized in accordance with this section.</P>
                      <P>(b) Federal funds shall not participate in costs incurred prior to the date of a project agreement except as provided by 23 CFR 1.9(b).</P>
                      <P>(c) The execution of the project agreement shall be deemed a contractual obligation of the Federal government under 23 U.S.C. 106 and shall require that appropriate funds be available at the time of authorization for the agreed Federal share, either pro rata or lump sum, of the cost of eligible work to be incurred by the State except as follows:</P>
                      <P>(1) Advance construction projects authorized under 23 U.S.C. 115.</P>
                      <P>(2) Projects for preliminary studies for the portion of the preliminary engineering and right-of-way (ROW) phase(s) through the selection of a location.</P>
                      <P>(3) Projects for ROW acquisition in hardship and protective buying situations through the selection of a particular location. This includes ROW acquisition within a potential highway corridor under consideration where necessary to preserve the corridor for future highway purposes. Authorization of work under this paragraph shall be in accord with the provisions of 23 CFR part 710.</P>
                      <P>(4) In special cases where the Federal Highway Administrator determines it to be in the best interest of the Federal-aid highway program.</P>
                      <P>(d) For projects authorized to proceed under paragraphs (c)(1) through (c)(4) of this section, the executed project agreement shall contain the following statement: “Authorization to proceed is not a commitment or obligation to provide Federal funds for that portion of the undertaking not fully funded herein.”</P>
                      <P>(e) For projects authorized under paragraphs (c)(2) and (c)(3) of this section, subsequent authorizations beyond the location stage shall not be given until appropriate available funds have been obligated to cover eligible costs of the work covered by the previous authorization.</P>
                      <P>(f)(1) The Federal-aid share of eligible project costs shall be established at the time the project agreement is executed in one of the following manners:</P>
                      <P>(i) Pro rata, with the agreement stating the Federal share as a specified percentage; or</P>
                      <P>(ii) Lump sum, with the agreement stating that Federal funds are limited to a specified dollar amount not to exceed the legal pro rata.</P>
                      <P>(2) The pro-rata or lump sum share may be adjusted before or shortly after contract award to reflect any substantive change in the bids received as compared to the STD's estimated cost of the project at the time of FHWA authorization, provided that Federal funds are available.</P>
                      <P>(3) Federal participation is limited to the agreed Federal share of eligible costs actually incurred by the State, not to exceed the maximum permitted by enabling legislation.</P>
                      <P>(g) The State may contribute more than the normal non-Federal share of title 23, U.S.C. projects. In general, financing proposals that result in only minimal amounts of Federal funds in projects should be avoided unless they are based on sound project management decisions.</P>
                      <P>(h)(1) Donations of cash, land, material or services may be credited to the State's non-Federal share of the participating project work in accordance with title 23, U.S.C., and implementing regulations.</P>
                      <P>(2) Contributions may not exceed the total costs incurred by the State on the project. Cash contributions from all sources plus the Federal funds may not exceed the total cost of the project.</P>
                      <CITA>[66 FR 23847, May 10, 2001, as amended at 71 FR 4995, Jan. 31, 2006; 72 FR 45336, Aug. 14, 2007]</CITA>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 630.108</SECTNO>
                      <SUBJECT>Preparation of agreement.</SUBJECT>
                      <P>(a) The STD shall prepare a project agreement for each Federal-aid project.</P>

                      <P>(b) The STD may develop the project agreement in a format acceptable to <PRTPAGE P="164"/>both the STD and the FHWA provided the following are included:</P>
                      <P>(1) A description of each project location including State and project termini;</P>
                      <P>(2) The Federal-aid project number;</P>
                      <P>(3) The work covered by the agreement;</P>
                      <P>(4) The total project cost and amount of Federal funds under agreement;</P>
                      <P>(5) The Federal-aid share of eligible project costs expressed as either a pro rata percentage or a lump sum as set forth in § 630.106(f)(1);</P>
                      <P>(6) A statement that the State accepts and will comply with the agreement provisions set forth in § 630.112;</P>
                      <P>(7) A statement that the State stipulates that its signature on the project agreement constitutes the making of the certifications set for in § 630.112; and</P>
                      <P>(8) Signatures of officials from both the State and the FHWA, and the date executed.</P>
                      <P>(c) The project agreement should also document, by comment, instances where:</P>
                      <P>(1) The State is applying amounts of credits from special accounts (such as the 23 U.S.C. 120(j) toll credits, 23 U.S.C. 144(n) off-system bridge credits and 23 U.S.C. 323 land value credits) to cover all or a portion of the normal percent non-Federal share of the project;</P>
                      <P>(2) The project involves other arrangements affecting Federal funding or non-Federal matching provisions, including tapered match, donations, or use of other Federal agency funds, if known at the time the project agreement is executed; and</P>
                      <P>(3) The State is claiming finance related costs for bond and other debt instrument financing (such as payments to States under 23 U.S.C. 122).</P>
                      <P>(d) The STD may use an electronic version of the agreement as provided by the FHWA.</P>
                      <APPRO>(Approved by the Office of Management and Budget under control number 2125-0529)</APPRO>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 630.110</SECTNO>
                      <SUBJECT>Modification of original agreement.</SUBJECT>
                      <P>(a) When changes are needed to the original project agreement, a modification of agreement shall be prepared. Agreements should not be modified to replace one Federal fund category with another unless specifically authorized by statute.</P>
                      <P>(b) The STD may develop the modification of project agreement in a format acceptable to both the STD and the FHWA provided the following are included:</P>
                      <P>(1) The Federal-aid project number and State;</P>
                      <P>(2) A sequential number identifying the modification;</P>
                      <P>(3) A reference to the date of the original project agreement to be modified;</P>
                      <P>(4) The original total project cost and the original amount of Federal funds under agreement;</P>
                      <P>(5) The revised total project cost and the revised amount of Federal funds under agreement;</P>
                      <P>(6) The reason for the modifications; and,</P>
                      <P>(7) Signatures of officials from both the State and the FHWA and date executed.</P>
                      <P>(c) The STD may use an electronic version of the modification of project agreement as provided by the FHWA.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 630.112</SECTNO>
                      <SUBJECT>Agreement provisions.</SUBJECT>
                      <P>(a) The State, through its transportation department, accepts and agrees to comply with the applicable terms and conditions set forth in title 23, U.S.C., the regulations issued pursuant thereto, the policies and procedures promulgated by the FHWA relative to the designated project covered by the agreement, and all other applicable Federal laws and regulations.</P>
                      <P>(b) Federal funds obligated for the project must not exceed the amount agreed to on the project agreement, the balance of the estimated total cost being an obligation of the State. Such obligation of Federal funds extends only to project costs incurred by the State after the execution of a formal project agreement with the FHWA.</P>
                      <P>(c) The State must stipulate that as a condition to payment of the Federal funds obligated, it accepts and will comply with the following applicable provisions:</P>
                      <P>(1) <E T="03">Project for acquisition of rights-of-way.</E> In the event that actual construction of a road on this right-of-way is not undertaken by the close of the <PRTPAGE P="165"/>twentieth fiscal year following the fiscal year in which the project is authorized, the STD will repay to the FHWA the sum or sums of Federal funds paid to the transportation department under the terms of the agreement. The State may request a time extension beyond the 20-year limit with no repayment of Federal funds, and the FHWA may approve this request if it is considered reasonable.</P>
                      <P>(2) <E T="03">Preliminary engineering project.</E> In the event that right-of-way acquisition for, or actual construction of, the road for which this preliminary engineering is undertaken is not started by the close of the tenth fiscal year following the fiscal year in which the project is authorized, the STD will repay to the FHWA the sum or sums of Federal funds paid to the transportation department under the terms of the agreement. The State may request a time extension for any preliminary engineering project beyond the 10-year limit with no repayment of Federal funds, and the FHWA may approve this request if it is considered reasonable.</P>
                      <P>(3) <E T="03">Drug-free workplace certification.</E> By signing the project agreement, the STD agrees to provide a drug-free workplace as required by 49 CFR part 29, subpart F. In signing the project agreement, the State is providing the certification required in appendix C to 49 CFR part 29, unless the State provides an annual certification.</P>
                      <P>(4) <E T="03">Suspension and debarment certification.</E> By signing the project agreement, the STD agrees to fulfill the responsibility imposed by 49 CFR 29.510 regarding debarment, suspension, and other responsibility matters. In signing the project agreement, the State is providing the certification for its principals required in appendix A to 49 CFR part 29.</P>
                      <P>(5) <E T="03">Lobbying certification.</E> By signing the project agreement, the STD agrees to abide by the lobbying restrictions set forth in 49 CFR part 20. In signing the project agreement, the State is providing the certification required in appendix A to 49 CFR part 20.</P>
                    </SECTION>
                  </SUBPART>
                  <SUBPART>
                    <HD SOURCE="HED">Subpart B—Plans, Specifications, and Estimates</HD>
                    <SOURCE>
                      <HD SOURCE="HED">Source:</HD>
                      <P>43 FR 58564, Dec. 15, 1978, unless otherwise noted.</P>
                    </SOURCE>
                    <SECTION>
                      <SECTNO>§ 630.201</SECTNO>
                      <SUBJECT>Purpose.</SUBJECT>
                      <P>The purpose of this subpart is to prescribe Federal Highway Administration (FHWA) procedures relating to the preparation, submission, and approval of plans, specifications and estimates (PS&amp;E), and supporting documents for Federal-aid projects.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 630.203</SECTNO>
                      <SUBJECT>Applicability.</SUBJECT>
                      <P>The provisions of this regulation apply to all highway construction projects financed in whole or in part with Federal-aid highway funds and to be undertaken by a State or political subdivision.</P>
                      <CITA>[69 FR 7118, Feb. 13, 2004]</CITA>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 630.205</SECTNO>
                      <SUBJECT>Preparation, submission, and approval.</SUBJECT>
                      <P>(a) The contents and number of copies of the PS&amp;E assembly shall be determined by the FHWA.</P>
                      <P>(b) Plans and specifications shall describe the location and design features and the construction requirements in sufficient detail to facilitate the construction, the contract control and the estimation of construction costs of the project. The estimate shall reflect the anticipated cost of the project in sufficient detail to provide an initial prediction of the financial obligations to be incurred by the State and FHWA and to permit an effectice review and comparison of the bids received.</P>
                      <P>(c) PS&amp;E assemblies for Federal-aid highway projects shall be submitted to the FHWA for approval.</P>
                      <P>(d) The State highway agency (SHA) shall be advised of approval of the PS&amp;E by the FHWA.</P>
                      <P>(e) No project or part thereof for actual construction shall be advertised for contract nor work commenced by force account until the PS&amp;E has been approved by the FHWA and the SHA has been so notified.</P>
                    </SECTION>
                  </SUBPART>
                  <SUBPART>
                    <RESERVED>Subpart C [Reserved]</RESERVED>
                  </SUBPART>
                  <SUBPART>
                    <PRTPAGE P="166"/>
                    <HD SOURCE="HED">Subpart D—Geodetic Markers</HD>
                    <SOURCE>
                      <HD SOURCE="HED">Source:</HD>
                      <P>39 FR 26414, July 19, 1974, unless otherwise noted.</P>
                    </SOURCE>
                    <SECTION>
                      <SECTNO>§ 630.401</SECTNO>
                      <SUBJECT>Purpose.</SUBJECT>
                      <P>The purpose of this subpart is to prescribe procedures for conducting geodetic control surveys when participation with Federal-aid highway funds in the cost thereof is proposed and to encourage inter-agency cooperation in setting station markers, surveying to measure their position, and preserving the control so established.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 630.402</SECTNO>
                      <SUBJECT>Policy.</SUBJECT>
                      <P>(a) Geodetic surveys along Federal-aid highway routes may be programmed as Federal-aid highway projects.</P>
                      <P>(b) All geodetic survey work performed as a Federal-aid highway project will conform to National Ocean Survey (NOS) specifications. NOS will, as the representative of FHWA, be responsible for the inspection and verification of the work to ascertain that the specifications for the work have been met. Final project acceptance by FHWA will be predicated on a finding of acceptability by NOS.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 630.403</SECTNO>
                      <SUBJECT>Initiation of projects.</SUBJECT>
                      <P>All projects shall be coordinated by the FHWA Division Administrator, the State highway department and the National Ocean Survey.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 630.404</SECTNO>
                      <SUBJECT>Standards.</SUBJECT>
                      <P>(a) Highway purposes may best be served by the establishment of station markings for horizontal control along Federal-aid highway routes at spacings of three to eight kilometers (about 2 to 5 miles) and station markers for vertical control of spacings no closer than one kilometer. These requirements may be waived only with the approval of the Administrator.</P>
                      <P>(b) Projects should be of sufficient scope to permit efficient use of field parties. Projects should extend at least 30 kilometers. Projects may be coordinated with adjoining States to attain greater efficiency.</P>
                      <P>(c) Where geodetic station markers cannot be established inititally at points readily accessible from the Federal-aid route, or where unavoidable circumstances result in their being established within construction limits, supplemental projects may later be approved to set and survey markers at satisfactory permanent points, preferably within the right-of-way but at points where their use does not introduce traffic hazards.</P>
                    </SECTION>
                  </SUBPART>
                  <SUBPART>
                    <RESERVED>Subparts E-F [Reserved]</RESERVED>
                  </SUBPART>
                  <SUBPART>
                    <HD SOURCE="HED">Subpart G—Advance Construction of Federal-Aid Projects</HD>
                    <SOURCE>
                      <HD SOURCE="HED">Source:</HD>
                      <P>60 FR 36993, July 19, 1995, unless otherwise noted.</P>
                    </SOURCE>
                    <SECTION>
                      <SECTNO>§ 630.701</SECTNO>
                      <SUBJECT>Purpose.</SUBJECT>
                      <P>The purpose of this subpart is to prescribe procedures for advancing the construction of Federal-aid highway projects without obligating Federal funds apportioned or allocated to the State.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 630.703</SECTNO>
                      <SUBJECT>Eligibility.</SUBJECT>
                      <P>(a) The State Department of Transportation (DOT) may proceed with a project authorized in accordance with title 23, United States Code:</P>
                      <P>(1) Without the use of Federal funds; and</P>
                      <P>(2) In accordance with all procedures and requirements applicable to the project other than those procedures and requirements that limit the State to implementation of a project—</P>
                      <P>(i) With the aid of Federal funds previously apportioned or allocated to the State; or</P>
                      <P>(ii) With obligation authority previously allocated to the State.</P>
                      <P>(b) The FHWA, on the request of a State and execution of a project agreement, may obligate all or a portion of the Federal share of a project authorized to proceed under this section from any category of funds for which the project is eligible.</P>
                      <CITA>[73 FR 50196, Aug. 26, 2008]</CITA>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 630.705</SECTNO>
                      <SUBJECT>Procedures.</SUBJECT>

                      <P>(a) An advance construction project shall meet the same requirements and be processed in the same manner as a regular Federal-aid project, except,<PRTPAGE P="167"/>
                      </P>
                      <P>(1) The FHWA authorization does not constitute any commitment of Federal funds on the project, and</P>
                      <P>(2) The FHWA shall not reimburse the State until the project is converted under § 630.709.</P>
                      <P>(b) Project numbers shall be identified by the letters “AC” preceding the regular project number prefix.</P>
                      <CITA>[60 FR 36993, July 19, 1995, as amended at 68 FR 60033, Oct. 21, 2003]</CITA>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 630.707</SECTNO>
                      <RESERVED>[Reserved]</RESERVED>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 630.709</SECTNO>
                      <SUBJECT>Conversion to a regular Federal-aid project.</SUBJECT>
                      <P>(a) The State Department of Transportation may submit a written request to the FHWA that a project be converted to a regular Federal-aid project at any time provided that sufficient Federal-aid funds and obligation authority are available.</P>
                      <P>(b) Subsequent to FHWA approval the State Department of Transportation may claim reimbursement for the Federal share of project costs incurred, provided the project agreement has been executed. If the State Department of Transportation has previously submitted a final voucher, the FHWA will process the voucher for payment.</P>
                      <CITA>[60 FR 36993, July 19, 1995, as amended at 73 FR 50196, Aug. 26, 2008]</CITA>
                    </SECTION>
                  </SUBPART>
                  <SUBPART>
                    <HD SOURCE="HED">Subpart H—Bridges on Federal Dams</HD>
                    <SOURCE>
                      <HD SOURCE="HED">Source:</HD>
                      <P>39 FR 36474, Oct. 10, 1974, unless otherwise noted.</P>
                    </SOURCE>
                    <SECTION>
                      <SECTNO>§ 630.801</SECTNO>
                      <SUBJECT>Purpose.</SUBJECT>
                      <P>The purpose of this subpart is to prescribe procedures for the construction and financing, by an agency of the Federal Government, of public highway bridges over dams constructed and owned by or for the United States.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 630.802</SECTNO>
                      <SUBJECT>Applicability.</SUBJECT>
                      <P>A proposed bridge over a dam, together with the approach roads to connect the bridge with existing public highways, must be eligible for inclusion in the Federal-aid highway system, if not already a part thereof.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 630.803</SECTNO>
                      <SUBJECT>Procedures.</SUBJECT>
                      <P>A State's application to qualify a project under this subpart will include:</P>
                      <P>(a) A certification that the bridge is economically desirable and needed as a link in the Federal-aid highway system.</P>
                      <P>(b) A statement showing the source and availability of funds to be used in construction of the roadway approaches.</P>
                      <P>(c) A statement of any obligation on the part of the agency constructing the dam to provide such bridge or approach roads to satisfy a legal liability incurred independently of this subpart.</P>
                    </SECTION>
                  </SUBPART>
                  <SUBPART>
                    <RESERVED>Subpart I [Reserved]</RESERVED>
                  </SUBPART>
                  <SUBPART>
                    <HD SOURCE="HED">Subpart J—Work Zone Safety and Mobility</HD>
                    <SOURCE>
                      <HD SOURCE="HED">Source:</HD>
                      <P>69 FR 54569, Sept. 9, 2004, unless otherwise noted.</P>
                    </SOURCE>
                    <SECTION>
                      <SECTNO>§ 630.1002</SECTNO>
                      <SUBJECT>Purpose.</SUBJECT>
                      <P>Work zones directly impact the safety and mobility of road users and highway workers. These safety and mobility impacts are exacerbated by an aging highway infrastructure and growing congestion in many locations. Addressing these safety and mobility issues requires considerations that start early in project development and continue through project completion. Part 6 of the Manual On Uniform Traffic Control Devices (MUTCD) <SU>1</SU>

                        <FTREF/> sets forth basic principles and prescribes standards for the design, application, installation, and maintenance of traffic control devices for highway and street construction, maintenance operation, and utility work. In addition to the provisions in the MUTCD, there are other actions that could be taken to further help mitigate the safety and mobility impacts of work zones. This <PRTPAGE P="168"/>subpart establishes requirements and provides guidance for systematically addressing the safety and mobility impacts of work zones, and developing strategies to help manage these impacts on all Federal-aid highway projects.</P>
                      <FTNT>
                        <P>

                          <SU>1</SU> The MUTCD is approved by the FHWA and recognized as the national standard for traffic control on all public roads. It is incorporated by reference into the Code of Federal Regulations at 23 CFR part 655. It is available on the FHWA's Web site at <E T="03">http://mutcd.fhwa.dot.gov</E> and is available for inspection and copying at the FHWA Washington, DC Headquarters and all FHWA Division Offices as prescribed at 49 CFR part 7.</P>
                      </FTNT>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 630.1004</SECTNO>
                      <SUBJECT>Definitions and explanation of terms.</SUBJECT>
                      <P>As used in this subpart:</P>
                      <P>
                        <E T="03">Highway workers</E> include, but are not limited to, personnel of the contractor, subcontractor, DOT, utilities, and law enforcement, performing work within the right-of-way of a transportation facility.</P>
                      <P>
                        <E T="03">Mobility</E> is the ability to move from place to place and is significantly dependent on the availability of transportation facilities and on system operating conditions. With specific reference to work zones, mobility pertains to moving road users efficiently through or around a work zone area with a minimum delay compared to baseline travel when no work zone is present, while not compromising the safety of highway workers or road users. The commonly used performance measures for the assessment of mobility include delay, speed, travel time and queue lengths.</P>
                      <P>
                        <E T="03">Safety</E> is a representation of the level of exposure to potential hazards for users of transportation facilities and highway workers. With specific reference to work zones, safety refers to minimizing potential hazards to road users in the vicinity of a work zone and highway workers at the work zone interface with traffic. The commonly used measures for highway safety are the number of crashes or the consequences of crashes (fatalities and injuries) at a given location or along a section of highway during a period of time. Highway worker safety in work zones refers to the safety of workers at the work zone interface with traffic and the impacts of the work zone design on worker safety. The number of worker fatalities and injuries at a given location or along a section of highway, during a period of time are commonly used measures for highway worker safety.</P>
                      <P>
                        <E T="03">Work zone</E>
                        <SU>2</SU>
                        <FTREF/> is an area of a highway with construction, maintenance, or utility work activities. A work zone is typically marked by signs, channelizing devices, barriers, pavement markings, and/or work vehicles. It extends from the first warning sign or high-intensity rotating, flashing, oscillating, or strobe lights on a vehicle to the END ROAD WORK sign or the last temporary traffic control (TTC) device.</P>
                      <FTNT>
                        <P>
                          <SU>2</SU> MUTCD, Part 6, “Temporary Traffic Control,” Section 6C.02, “Temporary Traffic Control Zones.”</P>
                      </FTNT>
                      <P>
                        <E T="03">Work zone crash</E>
                        <SU>3</SU>
                        <FTREF/> means a traffic crash in which the first harmful event occurs within the boundaries of a work zone or on an approach to or exit from a work zone, resulting from an activity, behavior, or control related to the movement of the traffic units through the work zone. This includes crashes occurring on approach to, exiting from or adjacent to work zones that are related to the work zone.</P>
                      <FTNT>
                        <P>

                          <SU>3</SU> “Model Minimum Uniform Crash Criteria Guideline” (MMUCC), 2d Ed. (Electronic), 2003, produced by National Center for Statistics and Analysis, National Highway Traffic Safety Administration (NHTSA). Telephone 1-(800)-934-8517. Available at the URL: <E T="03">http://www-nrd.nhtsa.dot.gov.</E> The NHTSA, the FHWA, the Federal Motor Carrier Safety Administration (FMCSA), and the Governors Highway Safety Association (GHSA) sponsored the development of the MMUCC Guideline which recommends voluntary implementation of the 111 MMUCC data elements and serves as a reporting threshold that includes all persons (injured and uninjured) in crashes statewide involving death, personal injury, or property damage of $1,000 or more. The Guideline is a tool to strengthen existing State crash data systems.</P>
                      </FTNT>
                      <P>
                        <E T="03">Work zone impacts</E> refer to work zone-induced deviations from the normal range of transportation system safety and mobility. The extent of the work zone impacts may vary based on factors such as, road classification, area type (urban, suburban, and rural), traffic and travel characteristics, type of work being performed, time of day/night, and complexity of the project. These impacts may extend beyond the physical location of the work zone itself, and may occur on the roadway on which the work is being performed, as well as other highway corridors, <PRTPAGE P="169"/>other modes of transportation, and/or the regional transportation network.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 630.1006</SECTNO>
                      <SUBJECT>Work zone safety and mobility policy.</SUBJECT>
                      <P>Each State shall implement a policy for the systematic consideration and management of work zone impacts on all Federal-aid highway projects. This policy shall address work zone impacts throughout the various stages of the project development and implementation process. This policy may take the form of processes, procedures, and/or guidance, and may vary based on the characteristics and expected work zone impacts of individual projects or classes of projects. The States should institute this policy using a multi-disciplinary team and in partnership with the FHWA. The States are encouraged to implement this policy for non-Federal-aid projects as well.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 630.1008</SECTNO>
                      <SUBJECT>State-level processes and procedures.</SUBJECT>
                      <P>(a) This section consists of State-level processes and procedures for States to implement and sustain their respective work zone safety and mobility policies. State-level processes and procedures, data and information resources, training, and periodic evaluation enable a systematic approach for addressing and managing the safety and mobility impacts of work zones.</P>
                      <P>(b) <E T="03">Work zone assessment and management procedures.</E> States should develop and implement systematic procedures to assess work zone impacts in project development, and to manage safety and mobility during project implementation. The scope of these procedures shall be based on the project characteristics.</P>
                      <P>(c) <E T="03">Work zone data.</E> States shall use field observations, available work zone crash data, and operational information to manage work zone impacts for specific projects during implementation. States shall continually pursue improvement of work zone safety and mobility by analyzing work zone crash and operational data from multiple projects to improve State processes and procedures. States should maintain elements of the data and information resources that are necessary to support these activities.</P>
                      <P>(d) <E T="03">Training.</E> States shall require that personnel involved in the development, design, implementation, operation, inspection, and enforcement of work zone related transportation management and traffic control be trained, appropriate to the job decisions each individual is required to make. States shall require periodic training updates that reflect changing industry practices and State processes and procedures.</P>
                      <P>(e) <E T="03">Process review.</E> In order to assess the effectiveness of work zone safety and mobility procedures, the States shall perform a process review at least every two years. This review may include the evaluation of work zone data at the State level, and/or review of randomly selected projects throughout their jurisdictions. Appropriate personnel who represent the project development stages and the different offices within the State, and the FHWA should participate in this review. Other non-State stakeholders may also be included in this review, as appropriate. The results of the review are intended to lead to improvements in work zone processes and procedures, data and information resources, and training programs so as to enhance efforts to address safety and mobility on current and future projects.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 630.1010</SECTNO>
                      <SUBJECT>Significant projects.</SUBJECT>
                      <P>(a) A significant project is one that, alone or in combination with other concurrent projects nearby is anticipated to cause sustained work zone impacts (as defined in § 630.1004) that are greater than what is considered tolerable based on State policy and/or engineering judgment.</P>

                      <P>(b) The applicability of the provisions in §§ 630.1012(b)(2) and 630.1012(b)(3) is dependent upon whether a project is determined to be significant. The State shall identify upcoming projects that are expected to be significant. This identification of significant projects should be done as early as possible in the project delivery and development process, and in cooperation with the FHWA. The State's work zone policy provisions, the project's characteristics, and the magnitude and extent of the anticipated work zone impacts should be considered when determining if a project is significant or not.<PRTPAGE P="170"/>
                      </P>
                      <P>(c) All Interstate system projects within the boundaries of a designated Transportation Management Area (TMA) that occupy a location for more than three days with either intermittent or continuous lane closures shall be considered as significant projects.</P>
                      <P>(d) For an Interstate system project or categories of Interstate system projects that are classified as significant through the application of the provisions in § 630.1010(c), but in the judgment of the State they do not cause sustained work zone impacts, the State may request from the FHWA, an exception to §§ 630.1012(b)(2) and 630.1012(b)(3). Exceptions to these provisions may be granted by the FHWA based on the State's ability to show that the specific Interstate system project or categories of Interstate system projects do not have sustained work zone impacts.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 630.1012</SECTNO>
                      <SUBJECT>Project-level procedures.</SUBJECT>
                      <P>(a) This section provides guidance and establishes procedures for States to manage the work zone impacts of individual projects.</P>
                      <P>(b) <E T="03">Transportation Management Plan (TMP).</E> A TMP consists of strategies to manage the work zone impacts of a project. Its scope, content, and degree of detail may vary based upon the State's work zone policy, and the State's understanding of the expected work zone impacts of the project. For significant projects (as defined in § 630.1010), the State shall develop a TMP that consists of a Temporary Traffic Control (TTC) plan and addresses both Transportation Operations (TO) and Public Information (PI) components. For individual projects or classes of projects that the State determines to have less than significant work zone impacts, the TMP may consist only of a TTC plan. States are encouraged to consider TO and PI issues for all projects.</P>

                      <P>(1) A TTC plan describes TTC measures to be used for facilitating road users through a work zone or an incident area. The TTC plan plays a vital role in providing continuity of reasonably safe and efficient road user flow and highway worker safety when a work zone, incident, or other event temporarily disrupts normal road user flow. The TTC plan shall be consistent with the provisions under Part 6 of the MUTCD and with the work zone hardware recommendations in Chapter 9 of the American Association of State Highway and Transportation Officials (AASHTO) Roadside Design Guide. Chapter 9 of the AASHTO Roadside Design Guide: “Traffic Barriers, Traffic Control Devices, and Other Safety Features for Work Zones” 2002, is incorporated by reference in accordance with 5 U.S.C. 552(a) and 1 CFR part 51 and is on file at the National Archives and Record Administration (NARA). For information on the availability of this material at NARA call (202) 741-6030, or go to <E T="03">http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.</E> The entire document is available for purchase from the American Association of State Highway and Transportation Officials (AASHTO), 444 North Capitol Street, NW., Suite 249, Washington, DC 20001 or at the URL: <E T="03">http://www.aashto.org/bookstore.</E> It is available for inspection from the FHWA Washington Headquarters and all Division Offices as listed in 49 CFR part 7. In developing and implementing the TTC plan, pre-existing roadside safety hardware shall be maintained at an equivalent or better level than existed prior to project implementation. The scope of the TTC plan is determined by the project characteristics, and the traffic safety and control requirements identified by the State for that project. The TTC plan shall either be a reference to specific TTC elements in the MUTCD, approved standard TTC plans, State transportation department TTC manual, or be designed specifically for the project.</P>

                      <P>(2) The TO component of the TMP shall include the identification of strategies that will be used to mitigate impacts of the work zone on the operation and management of the transportation system within the work zone impact area. Typical TO strategies may include, but are not limited to, demand management, corridor/network management, safety management and enforcement, and work zone traffic management. The scope of the TO component should be determined by the <PRTPAGE P="171"/>project characteristics, and the transportation operations and safety strategies identified by the State.</P>
                      <P>(3) The PI component of the TMP shall include communications strategies that seek to inform affected road users, the general public, area residences and businesses, and appropriate public entities about the project, the expected work zone impacts, and the changing conditions on the project. This may include traveler information strategies. The scope of the PI component should be determined by the project characteristics and the public information and outreach strategies identified by the State. Public information should be provided through methods best suited for the project, and may include, but not be limited to, information on the project characteristics, expected impacts, closure details, and commuter alternatives.</P>
                      <P>(4) States should develop and implement the TMP in sustained consultation with stakeholders (e.g., other transportation agencies, railroad agencies/operators, transit providers, freight movers, utility suppliers, police, fire, emergency medical services, schools, business communities, and regional transportation management centers).</P>
                      <P>(c) The Plans, Specifications, and Estimates (PS&amp;Es) shall include either a TMP or provisions for contractors to develop a TMP at the most appropriate project phase as applicable to the State's chosen contracting methodology for the project. A contractor developed TMP shall be subject to the approval of the State, and shall not be implemented before it is approved by the State.</P>
                      <P>(d) The PS&amp;Es shall include appropriate pay item provisions for implementing the TMP, either through method or performance based specifications.</P>
                      <P>(1) For method-based specifications individual pay items, lump sum payment, or a combination thereof may be used.</P>
                      <P>(2) For performance based specifications, applicable performance criteria and standards may be used (e.g., safety performance criteria such as number of crashes within the work zone; mobility performance criteria such as travel time through the work zone, delay, queue length, traffic volume; incident response and clearance criteria; work duration criteria).</P>
                      <P>(e) <E T="03">Responsible persons.</E> The State and the contractor shall each designate a trained person, as specified in § 630.1008(d), at the project level who has the primary responsibility and sufficient authority for implementing the TMP and other safety and mobility aspects of the project.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 630.1014</SECTNO>
                      <SUBJECT>Implementation.</SUBJECT>
                      <P>Each State shall work in partnership with the FHWA in the implementation of its policies and procedures to improve work zone safety and mobility. At a minimum, this shall involve an FHWA review of conformance of the State's policies and procedures with this regulation and reassessment of the State's implementation of its procedures at appropriate intervals. Each State is encouraged to address implementation of this regulation in its stewardship agreement with the FHWA.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 630.1016</SECTNO>
                      <SUBJECT>Compliance date.</SUBJECT>
                      <P>States shall comply with all the provisions of this rule no later than October 12, 2007. For projects that are in the later stages of development at or about the compliance date, and if it is determined that the delivery of those projects would be significantly impacted as a result of this rule's provisions, States may request variances for those projects from the FHWA, on a project-by-project basis.</P>
                    </SECTION>
                  </SUBPART>
                  <SUBPART>
                    <HD SOURCE="HED">Subpart K—Temporary Traffic Control Devices</HD>
                    <AUTH>
                      <HD SOURCE="HED">Authority:</HD>
                      <P>23 U.S.C. 109(c) and 112; Sec. 1110 of Pub. L. 109-59; 23 CFR 1.32; and 49 CFR 1.48(b).</P>
                    </AUTH>
                    <SOURCE>
                      <HD SOURCE="HED">Source:</HD>
                      <P>72 FR 68489, Dec. 5, 2007, unless otherwise noted.</P>
                    </SOURCE>
                    <SECTION>
                      <SECTNO>§ 630.1102</SECTNO>
                      <SUBJECT>Purpose.</SUBJECT>

                      <P>To decrease the likelihood of highway work zone fatalities and injuries to workers and road users by establishing minimum requirements and providing guidance for the use of positive protection devices between the <PRTPAGE P="172"/>work space and motorized traffic, installation and maintenance of temporary traffic control devices, and use of uniformed law enforcement officers during construction, utility, and maintenance operations, and by requiring contract pay items to ensure the availability of funds for these provisions. This subpart is applicable to all Federal-aid highway projects, and its application is encouraged on other highway projects as well.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 630.1104</SECTNO>
                      <SUBJECT>Definitions.</SUBJECT>
                      <P>For the purposes of this subpart, the following definitions apply:</P>
                      <P>
                        <E T="03">Agency</E> means a State or local highway agency or authority that receives Federal-aid highway funding.</P>
                      <P>
                        <E T="03">Exposure Control Measures</E> means traffic management strategies to avoid work zone crashes involving workers and motorized traffic by eliminating or reducing traffic through the work zone, or diverting traffic away from the work space.</P>
                      <P>
                        <E T="03">Federal-aid Highway Project</E> means highway construction, maintenance, and utility projects funded in whole or in part with Federal-aid funds.</P>
                      <P>
                        <E T="03">Motorized Traffic</E> means the motorized traveling public. This term does not include motorized construction or maintenance vehicles and equipment within the work space.</P>
                      <P>
                        <E T="03">Other Traffic Control Measures</E> means all strategies and temporary traffic controls other than Positive Protection Devices and Exposure Control Measures, but including uniformed law enforcement officers, used to reduce the risk of work zone crashes involving motorized traffic.</P>
                      <P>
                        <E T="03">Positive Protection Devices</E> means devices that contain and/or redirect vehicles and meet the crashworthiness evaluation criteria contained in National Cooperative Highway Research Program (NCHRP) Report 350, Recommended Procedures for the Safety Performance Evaluation of Highway Features, 1993, Transportation Research Board, National Research Council. The Director of the Federal Register approves this incorporation by reference in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. This document is available for inspection and copying at FHWA, 1200 New Jersey Avenue, SE., Washington, DC 20590, as provided in 49 CFR part 7. You may also inspect a copy at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call (202) 741 6030, or go to: <E T="03">http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html</E>.</P>
                      <P>
                        <E T="03">Work Zone Safety Management</E> means the entire range of traffic management and control and highway safety strategies and devices used to avoid crashes in work zones that can lead to worker and road user injuries and fatalities, including Positive Protection Devices, Exposure Control Measures, and Other Traffic Control Measures.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 630.1106</SECTNO>
                      <SUBJECT>Policy and procedures for work zone safety management.</SUBJECT>
                      <P>(a) Each agency's policy and processes, procedures, and/or guidance for the systematic consideration and management of work zone impacts, to be established in accordance with 23 CFR 630.1006, shall include the consideration and management of road user and worker safety on Federal-aid highway projects. These processes, procedures, and/or guidance, to be developed in partnership with the FHWA, shall address the use of Positive Protection Devices to prevent the intrusion of motorized traffic into the work space and other potentially hazardous areas in the work zone; Exposure Control Measures to avoid or minimize worker exposure to motorized traffic and road user exposure to work activities; Other Traffic Control Measures including uniformed law enforcement officers to minimize work zone crashes; and the safe entry/exit of work vehicles onto/from the travel lanes. Each of these strategies should be used to the extent that they are possible, practical, and adequate to manage work zone exposure and reduce the risks of crashes resulting in fatalities or injuries to workers and road users.</P>

                      <P>(b) Agency processes, procedures, and/or guidance should be based on consideration of standards and/or guidance contained in the Manual on Uniform Traffic Control Devices (MUTCD) and the AASHTO Roadside Design <PRTPAGE P="173"/>Guide, as well as project characteristics and factors. The strategies and devices to be used may be determined by a project-specific engineering study, or determined from agency guidelines that define strategies and approaches to be used based on project and highway characteristics and factors. The types of measures and strategies to be used are not mutually exclusive, and should be considered in combination as appropriate based on characteristics and factors such as those listed below:</P>
                      <P>(1) Project scope and duration;</P>
                      <P>(2) Anticipated traffic speeds through the work zone;</P>
                      <P>(3) Anticipated traffic volume;</P>
                      <P>(4) Vehicle mix;</P>
                      <P>(5) Type of work (as related to worker exposure and crash risks);</P>
                      <P>(6) Distance between traffic and workers, and extent of worker exposure;</P>
                      <P>(7) Escape paths available for workers to avoid a vehicle intrusion into the work space;</P>
                      <P>(8) Time of day (e.g., night work);</P>
                      <P>(9) Work area restrictions (including impact on worker exposure);</P>
                      <P>(10) Consequences from/to road users resulting from roadway departure;</P>
                      <P>(11) Potential hazard to workers and road users presented by device itself and during device placement and removal;</P>
                      <P>(12) Geometrics that may increase crash risks (e.g., poor sight distance, sharp curves);</P>
                      <P>(13) Access to/from work space;</P>
                      <P>(14) Roadway classification; and</P>
                      <P>(15) Impacts on project cost and duration.</P>
                      <P>(c) Uniformed Law Enforcement Policy. Each agency, in partnership with the FHWA, shall develop a policy addressing the use of uniformed law enforcement on Federal-aid highway projects. The policy may consist of processes, procedures, and/or guidance. The processes, procedures, and/or guidance should address the following:</P>
                      <P>(1) Basic interagency agreements between the highway agency and appropriate law enforcement agencies to address work zone enforcement needs;</P>
                      <P>(2) Interaction between highway and law-enforcement agency during project planning and development;</P>
                      <P>(3) Conditions where law enforcement involvement in work zone traffic control may be needed or beneficial, and criteria to determine the project-specific need for law enforcement;</P>
                      <P>(4) General nature of law enforcement services to be provided, and procedures to determine project-specific services;</P>
                      <P>(5) Appropriate work zone safety and mobility training for the officers, consistent with the training requirements in 23 CFR 630.1008(d);</P>
                      <P>(6) Procedures for interagency and project-level communications between highway agency and law enforcement personnel; and</P>
                      <P>(7) Reimbursement agreements for law enforcement service.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 630.1108</SECTNO>
                      <SUBJECT>Work zone safety management measures and strategies.</SUBJECT>
                      <P>(a) <E T="03">Positive Protection Devices.</E> The need for longitudinal traffic barrier and other positive protection devices shall be based on an engineering study. The engineering study may be used to develop positive protection guidelines for the agency, or to determine the measures to be applied on an individual project. The engineering study should be based on consideration of the factors and characteristics described in section 630.1106(b). At a minimum, positive protection devices shall be considered in work zone situations that place workers at increased risk from motorized traffic, and where positive protection devices offer the highest potential for increased safety for workers and road users, such as:</P>
                      <P>(1) Work zones that provide workers no means of escape from motorized traffic (e.g., tunnels, bridges, etc.);</P>
                      <P>(2) Long duration work zones (e.g., two weeks or more) resulting in substantial worker exposure to motorized traffic;</P>
                      <P>(3) Projects with high anticipated operating speeds (e.g., 45 mph or greater), especially when combined with high traffic volumes;</P>
                      <P>(4) Work operations that place workers close to travel lanes open to traffic; and</P>

                      <P>(5) Roadside hazards, such as drop-offs or unfinished bridge decks, that will remain in place overnight or longer.<PRTPAGE P="174"/>
                      </P>
                      <P>(b) <E T="03">Exposure Control Measures.</E> Exposure Control Measures should be considered where appropriate to avoid or minimize worker exposure to motorized traffic and exposure of road users to work activities, while also providing adequate consideration to the potential impacts on mobility. A wide range of measures may be appropriate for use on individual projects, such as:</P>
                      <P>(1) Full road closures;</P>
                      <P>(2) Ramp closures;</P>
                      <P>(3) Median crossovers;</P>
                      <P>(4) Full or partial detours or diversions;</P>
                      <P>(5) Protection of work zone setup and removal operations using rolling road blocks;</P>
                      <P>(6) Performing work at night or during off-peak periods when traffic volumes are lower; and</P>
                      <P>(7) Accelerated construction techniques.</P>
                      <P>(c) <E T="03">Other Traffic Control Measures.</E> Other Traffic Control Measures should be given appropriate consideration for use in work zones to reduce work zone crashes and risks and consequences of motorized traffic intrusion into the work space. These measures, which are not mutually exclusive and should be considered in combination as appropriate, include a wide range of other traffic control measures such as:</P>
                      <P>(1) Effective, credible signing;</P>
                      <P>(2) Changeable message signs;</P>
                      <P>(3) Arrow panels;</P>
                      <P>(4) Warning flags and lights on signs;</P>
                      <P>(5) Longitudinal and lateral buffer space;</P>
                      <P>(6) Trained flaggers and spotters;</P>
                      <P>(7) Enhanced flagger station setups;</P>
                      <P>(8) Intrusion alarms;</P>
                      <P>(9) Rumble strips;</P>
                      <P>(10) Pace or pilot vehicle;</P>
                      <P>(11) High quality work zone pavement markings and removal of misleading markings;</P>
                      <P>(12) Channelizing device spacing reduction;</P>
                      <P>(13) Longitudinal channelizing barricades;</P>
                      <P>(14) Work zone speed management (including changes to the regulatory speed and/or variable speed limits);</P>
                      <P>(15) Law enforcement;</P>
                      <P>(16) Automated speed enforcement (where permitted by State/local laws);</P>
                      <P>(17) Drone radar;</P>
                      <P>(18) Worker and work vehicle/equipment visibility;</P>
                      <P>(19) Worker training;</P>
                      <P>(20) Public information and traveler information; and</P>
                      <P>(21) Temporary traffic signals.</P>
                      <P>(d) <E T="03">Uniformed Law Enforcement Officers.</E> (1) A number of conditions may indicate the need for or benefit of uniformed law enforcement in work zones. The presence of a uniformed law enforcement officer and marked law enforcement vehicle in view of motorized traffic on a highway project can affect driver behavior, helping to maintain appropriate speeds and improve driver alertness through the work zone. However, such law enforcement presence is not a substitute for the temporary traffic control devices required by Part 6 of the MUTCD. In general, the need for law enforcement is greatest on projects with high traffic speeds and volumes, and where the work zone is expected to result in substantial disruption to or changes in normal traffic flow patterns. Specific project conditions should be examined to determine the need for or potential benefit of law enforcement, such as the following:</P>
                      <P>(i) Frequent worker presence adjacent to high-speed traffic without positive protection devices;</P>
                      <P>(ii) Traffic control setup or removal that presents significant risks to workers and road users;</P>
                      <P>(iii) Complex or very short term changes in traffic patterns with significant potential for road user confusion or worker risk from traffic exposure;</P>
                      <P>(iv) Night work operations that create substantial traffic safety risks for workers and road users;</P>
                      <P>(v) Existing traffic conditions and crash histories that indicate a potential for substantial safety and congestion impacts related to the work zone activity, and that may be mitigated by improved driver behavior and awareness of the work zone;</P>
                      <P>(vi) Work zone operations that require brief stoppage of all traffic in one or both directions;</P>

                      <P>(vii) High-speed roadways where unexpected or sudden traffic queuing is anticipated, especially if the queue forms a considerable distance in advance of the work zone or immediately adjacent to the work space; and<PRTPAGE P="175"/>
                      </P>
                      <P>(viii) Other work site conditions where traffic presents a high risk for workers and road users, such that the risk may be reduced by improving road user behavior and awareness.</P>
                      <P>(2) Costs associated with the provision of uniformed law enforcement to help protect workers and road users, and to maintain safe and efficient travel through highway work zones, are eligible for Federal-aid participation. Federal-aid eligibility excludes law enforcement activities that would normally be expected in and around highway problem areas requiring routine or ongoing law enforcement traffic control and enforcement activities. Payment for the services of uniformed law enforcement in work zones may be included in the construction contract, or be provided by direct reimbursement from the highway agency to the law enforcement agency. When payment is included through the construction contract, the contractor will be responsible for reimbursing the law enforcement agency, and in turn will recover those costs through contract pay items. Direct interagency reimbursement may be made on a project-specific basis, or on a program-wide basis that considers the overall level of services to be provided by the law enforcement agency. Contract pay items for law enforcement service may be either unit price or lump sum items. Unit price items should be utilized when the highway agency can estimate and control the quantity of law enforcement services required on the project. The use of lump sum payment should be limited to situations where the quantity of services is directly affected by the contractor's choice of project scheduling and chosen manner of staging and performing the work. Innovative payment items may also be considered when they offer an advantage to both the highway agency and the contractor. When reimbursement to the law enforcement agency is made by interagency transfer of funds, the highway agency should establish a program-level or project-level budget that is adequate to meet anticipated program or project needs, and include provisions to address unplanned needs and other contingencies.</P>
                      <P>(e) <E T="03">Work Vehicles and Equipment.</E> In addition to addressing risks to workers and road users from motorized traffic, the agency processes, procedures, and/or guidance established in accordance with 23 CFR 630.1006 should also address safe means for work vehicles and equipment to enter and exit traffic lanes and for delivery of construction materials to the work space, based on individual project characteristics and factors.</P>
                      <P>(f) <E T="03">Payment for Traffic Control.</E> Consistent with the requirements of 23 CFR 630.1012, Project-level Procedures, project plans, specifications and estimates (PS&amp;Es) shall include appropriate pay item provisions for implementing the project Transportation Management Plan (TMP), which includes a Temporary Traffic Control (TTC) plan, either through method or performance based specifications. Pay item provisions include, but are not limited to, the following:</P>
                      <P>(1) Payment for work zone traffic control features and operations shall not be incidental to the contract, or included in payment for other items of work not related to traffic control and safety;</P>
                      <P>(2) As a minimum, separate pay items shall be provided for major categories of traffic control devices, safety features, and work zone safety activities, including but not limited to positive protection devices, and uniformed law enforcement activities when funded through the project;</P>
                      <P>(3) For method based specifications, the specifications and other PS&amp;E documents should provide sufficient details such that the quantity and types of devices and the overall effort required to implement and maintain the TMP can be determined;</P>
                      <P>(4) For method-based specifications, unit price pay items, lump sum pay items, or a combination thereof may be used;</P>
                      <P>(5) Lump sum payment should be limited to items for which an estimate of the actual quantity required is provided in the PS&amp;E or for items where the actual quantity required is dependent upon the contractor's choice of work scheduling and methodology;</P>

                      <P>(6) For Lump Sum items, a contingency provision should be included <PRTPAGE P="176"/>such that additional payment is provided if the quantity or nature of the required work changes, either an increase or decrease, due to circumstances beyond the control of the contractor;</P>
                      <P>(7) Unit price payment should be provided for those items over which the contractor has little or no control over the quantity, and no firm estimate of quantities is provided in the PS&amp;Es, but over which the highway agency has control of the actual quantity to be required during the project;</P>
                      <P>(8) Specifications should clearly indicate how placement, movement/relocation, and maintenance of traffic control devices and safety features will be compensated; and</P>
                      <P>(9) The specifications should include provisions to require and enforce contractor compliance with the contract provisions relative to implementation and maintenance of the project TMP and related traffic control items. Enforcement provisions may include remedies such as liquidated damages, work suspensions, or withholding payment for noncompliance.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 630.1110</SECTNO>
                      <SUBJECT>Maintenance of temporary traffic control devices.</SUBJECT>
                      <P>To provide for the continued effectiveness of temporary traffic control devices, each agency shall develop and implement quality guidelines to help maintain the quality and adequacy of the temporary traffic control devices for the duration of the project. Agencies may choose to adopt existing quality guidelines such as those developed by the American Traffic Safety Services Association (ATSSA) or other state highway agencies. <SU>1</SU>
                        <FTREF/> A level of inspection necessary to provide ongoing compliance with the quality guidelines shall be provided.</P>
                      <FTNT>
                        <P>

                          <SU>1</SU> The American Traffic Safety Services Association's (ATSSA) Quality Guidelines for Work Zone Traffic Control Devices uses photos and written descriptions to help judge when a traffic control device has outlived its usefulness. These guidelines are available for purchase from ATSSA through the following URL: <E T="03">http://www.atssa.com/store/bc_item_detail.jsp?productId=1.</E> Similar guidelines are available from various State highway agencies. The Illinois Department of Transportation “Quality Standards for Work Zone Traffic Control Devices” is available online at <E T="03">http://dot.state.il.us/workzone/wztcd2004r.pdf</E>. The Minnesota Department of Transportation “Quality Standards—Methods to determine whether the various traffic control devices are Acceptable, Marginal, or Unacceptable” is available online at <E T="03">http://www.dot.state.mn.us/trafficeng/otepubl/fieldmanual2007/FM-2007-QualityStandards.pdf</E>.</P>
                      </FTNT>
                    </SECTION>
                  </SUBPART>
                </PART>
                <PART>
                  <EAR>Pt. 633</EAR>
                  <HD SOURCE="HED">PART 633—REQUIRED CONTRACT PROVISIONS</HD>
                  <CONTENTS>
                    <SUBPART>
                      <HD SOURCE="HED">Subpart A—Federal-Aid Construction Contracts (Other Than Appalachian Contracts)</HD>
                      <SECHD>Sec.</SECHD>
                      <SECTNO>633.101</SECTNO>
                      <SUBJECT>Purpose.</SUBJECT>
                      <SECTNO>633.102</SECTNO>
                      <SUBJECT>Applicability.</SUBJECT>
                      <SECTNO>633.103</SECTNO>
                      <SUBJECT>Regulatory authority.</SUBJECT>
                      <SECTNO>633.104</SECTNO>
                      <SUBJECT>Availability.</SUBJECT>
                    </SUBPART>
                    <SUBPART>
                      <HD SOURCE="HED">Subpart B—Federal-Aid Contracts (Appalachian Contracts)</HD>
                      <SECTNO>633.201</SECTNO>
                      <SUBJECT>Purpose.</SUBJECT>
                      <SECTNO>633.202</SECTNO>
                      <SUBJECT>Definitions.</SUBJECT>
                      <SECTNO>633.203</SECTNO>
                      <SUBJECT>Applicability of existing laws, regulations, and directives.</SUBJECT>
                      <SECTNO>633.204</SECTNO>
                      <SUBJECT>Fiscal allocation and obligations.</SUBJECT>
                      <SECTNO>633.205</SECTNO>
                      <SUBJECT>Prefinancing.</SUBJECT>
                      <SECTNO>633.206</SECTNO>
                      <SUBJECT>Project agreements.</SUBJECT>
                      <SECTNO>633.207</SECTNO>
                      <SUBJECT>Construction labor and materials.</SUBJECT>
                      <SECTNO>633.208</SECTNO>
                      <SUBJECT>Maintenance.</SUBJECT>
                      <SECTNO>633.209</SECTNO>
                      <SUBJECT>Notices to prospective Federal-aid construction contractors.</SUBJECT>
                      <SECTNO>633.210</SECTNO>
                      <SUBJECT>Termination of contract.</SUBJECT>
                      <SECTNO>633.211</SECTNO>
                      <SUBJECT>Implementation of the Clean Air Act and the Federal Water Pollution Control Act.</SUBJECT>
                      <APP>Appendix A to Subpart B of Part 633—Types of Contracts to Which the Civil Rights Act of 1964 Is Applicable</APP>
                      <APP>Appendix B to Subpart B of Part 633—Required Contract Provisions, Appalachian Development Highway System and Local Access Roads Construction Contracts</APP>
                      <APP>Appendix C to Subpart B of Part 633—Additional Required Contract Provisions, Appalachian Development Highway System and Local Access Roads Contracts Other Than Construction Contracts</APP>
                      <APP>Appendix D to Subpart B of Part 633—Federal-Aid Proposal Notices</APP>
                    </SUBPART>
                  </CONTENTS>
                  <SUBPART>
                    <PRTPAGE P="177"/>
                    <HD SOURCE="HED">Subpart A—Federal-Aid Construction Contracts (Other Than Appalachian Contracts)</HD>
                    <AUTH>
                      <HD SOURCE="HED">Authority:</HD>
                      <P>23 U.S.C. 114 and 315; 49 CFR 1.48.</P>
                    </AUTH>
                    <SOURCE>
                      <HD SOURCE="HED">Source:</HD>
                      <P>52 FR 36920, Oct. 2, 1987, unless otherwise noted.</P>
                    </SOURCE>
                    <SECTION>
                      <SECTNO>§ 633.101</SECTNO>
                      <SUBJECT>Purpose.</SUBJECT>
                      <P>To prescribe for Federal-aid highway proposals and construction contracts the method for inclusion of required contract provisions of existing regulations which cover employment, nonsegregated facilities, record of materials and supplies, subletting or assigning the contract, safety, false statements concerning highway projects, termination of a contract, and implementation of the Clean Air Act and the Federal Water Pollution Control Act, and other provisions as shall from time-to-time be required by law and regulation as conditions of Federal assistance.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 633.102</SECTNO>
                      <SUBJECT>Applicability.</SUBJECT>
                      <P>(a) The required contract provisions and the required proposal notices apply to all Federal-aid construction contracts other than Appalachian construction contracts.</P>
                      <P>(b) Form FHWA-1273, “Required Contract Provisions, Federal-aid Construction Contracts,” contains required contract provisions and required proposal notices that are required by regulations promulgated by the FHWA or other Federal agencies. The required contract provisions of Form FHWA-1273 shall be physically incorporated in each Federal-aid highway construction contract other than Appalachian construction contracts (see § 633.104 for availability of form).</P>
                      <P>(c) [Reserved]</P>
                      <P>(d) The required contract provisions contained in Form FHWA-1273 shall apply to all work performed on the contract by the contractor's own organization and to all work performed on the contract by piecework, station work, or by subcontract.</P>
                      <P>(e) The contractor shall insert in each subcontract, except as excluded by law or regulation, the required contract provisions contained in Form FHWA-1273 and further require their inclusion in any lower tier subcontract that may in turn be made. The required contract provisions of Form FHWA-1273 shall not be incorporated by reference in any case. The prime contractor shall be responsible for compliance by any subcontractor or lower tier subcontractor with the requirements contained in the provisions of Form FHWA-1273.</P>
                      <P>(f) The State highway agency (SHA) shall include the notices concerning certification of nonsegregated facilities and implementation of the Clean Air Act and Federal Water Pollution Control Act, pursuant to 40 CFR part 15, in all bidding proposals for Federal-aid highway construction projects. As the notices are reproduced in Form FHWA-1273, the SHA may include Form FHWA-1273 in its entirety to meet this requirement.</P>
                      <CITA>[52 FR 36920, Oct. 2, 1987, as amended at 69 FR 7118, Feb. 13, 2004]</CITA>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 633.103</SECTNO>
                      <SUBJECT>Regulatory authority.</SUBJECT>
                      <P>All required contract provisions contained in Form FHWA-1273 are requirements of regulations promulgated by the FHWA or other Federal agencies. The authority for each provision will be cited in the text of Form FHWA-1273.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 633.104</SECTNO>
                      <SUBJECT>Availability.</SUBJECT>
                      <P>(a) Form FHWA-1273 will be maintained by the FHWA and as regulatory revisions occur, the form will be updated.</P>
                      <P>(b) Current copies of Form FHWA-1273, Required Contract Provisions, will be made available to the SHAs by the FHWA.</P>
                    </SECTION>
                  </SUBPART>
                  <SUBPART>
                    <HD SOURCE="HED">Subpart B—Federal-Aid Contracts (Appalachian Contracts)</HD>
                    <AUTH>
                      <HD SOURCE="HED">Authority:</HD>
                      <P>40 U.S.C. App. 201, 402; 23 U.S.C. 315; 49 CFR 1.48(b)(35).</P>
                    </AUTH>
                    <SOURCE>
                      <HD SOURCE="HED">Source:</HD>
                      <P>39 FR 35146, Sept. 30, 1974, unless otherwise noted.</P>
                    </SOURCE>
                    <SECTION>
                      <SECTNO>§ 633.201</SECTNO>
                      <SUBJECT>Purpose.</SUBJECT>

                      <P>The purpose of the regulations in this subpart is to establish policies and outline procedures for administering projects and funds for the Appalachian <PRTPAGE P="178"/>Development Highway System and Appalachian local access roads.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 633.202</SECTNO>
                      <SUBJECT>Definitions.</SUBJECT>
                      <P>(a) The word <E T="03">Commission</E> means the Appalachian Regional Commission (ARC) established by the Appalachian Regional Development Act of 1965, as amended (Act).</P>
                      <P>(b) The term <E T="03">division administrator</E>” means the chief Federal Highway Administration (FHWA) official assigned to conduct FHWA business in a particular State.</P>
                      <CITA>[39 FR 35156, Sept. 30, 1974, as amended at 40 FR 49084, Oct. 21, 1975; 41 FR 8769, Mar. 1, 1976]</CITA>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 633.203</SECTNO>
                      <SUBJECT>Applicability of existing laws, regulations, and directives.</SUBJECT>
                      <P>The provisions of title 23 U.S.C., that are applicable to the construction and maintenance of Federal-aid primary and secondary highways, and which the Secretary of Transportation determines are not inconsistent with the Act, shall apply, respectively, to the development highway system and the local access roads. In addition, the Regulations for the Administration of Federal-aid for Highways (title 23, Code of Federal Regulations) and directives implementing applicable provisions of title 23 U.S.C., where not inconsistent with the Act, shall be applicable to such projects.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 633.204</SECTNO>
                      <SUBJECT>Fiscal allocation and obligations.</SUBJECT>
                      <P>(a) Federal assistance to any project under the Act shall be as determined by the Commission, but in no event shall such Federal assistance exceed 70 per centum of the cost of such a project.</P>
                      <P>(b) The division administrator's authorization to proceed with the proposed work shall establish obligation of Federal funds with regard to a particular project.</P>
                      <CITA>[39 FR 35156, Sept. 30, 1974, as amended at 40 FR 49084, Oct. 21, 1975; 41 FR 8769, Mar. 1, 1976]</CITA>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 633.205</SECTNO>
                      <SUBJECT>Prefinancing.</SUBJECT>
                      <P>(a) Under the provisions of subsection 201(h) of the Act, projects located on the Appalachian Development Highway System including preliminary engineering, right-of-way, and/or construction may be programed and advanced with interim State financing.</P>
                      <P>(b) Program approvals, plans, specifications, and estimates (PS&amp;E) approval, authorizations to proceed, concurrence in award of contracts, and all other notifications to the State of advancement of a project shall include the statement, “There is no commitment or obligation on the part of the United States to provide funds for this highway improvement. However, this project is eligible for Federal reimbursement when sufficient funds are available from the amounts allocated by the Appalachian Regional Commission.”</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 633.206</SECTNO>
                      <SUBJECT>Project agreements.</SUBJECT>
                      <P>(a) Project agreements executed for projects under the Appalachian program shall contain the following paragraphs:</P>
                      <P>(1) “For projects constructed under section 201 of the Appalachian Regional Development Act of 1965, as amended, the State highway department agrees to comply with all applicable provisions of said Act, regulations issued thereunder, and policies and procedures promulgated by the Appalachian Regional Commission, and the Federal Highway Administration. Inasmuch as a primary objective of the Appalachian Regional Development Act of 1965 is to provide employment, the State highway department further agrees that in addition to the other applicable provisions of title 49, Code of Federal Regulations, part 21, § 21.5(c)(1), and paragraphs (2)(iii) and (2)(v) of appendix C thereof, shall be applicable to all employment practices in connection with this project, and to the State's employment practices with respect to those employees connected with the Appalachian Highway Program.”</P>

                      <P>(2) “For projects constructed on a section of an Appalachian development route not already on the Federal-aid Primary System, the State highway department agrees to add the section to the Federal-aid Primary System prior to, or upon completion of, construction accomplished with Appalachian funds.”<PRTPAGE P="179"/>
                      </P>
                      <P>(b) For prefinanced projects, the following additional provision shall be incorporated into the project agreement: “Project for Construction on the Appalachian Development Highway System in Advance of the Appropriation of Funds. This project, to be constructed pursuant to subsection 201(h) of the Appalachian Regional Development Act Amendments of 1967, will be constructed in accordance with all procedures and requirements and standards applicable to projects on the Appalachian Development Highway System financed with the aid of Appalachian funds. No obligation of Appalachian funds is created by this agreement, its purpose and intent being to provide that, upon application by the State highway department, and approval thereof by the Federal Highway Administration, any Appalachian development highway funds made available to the State by the Appalachian Regional Commission subsequent to the date of this agreement may be used to reimburse the State for the Federal share of the cost of work done on the project.”</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 633.207</SECTNO>
                      <SUBJECT>Construction labor and materials.</SUBJECT>
                      <P>(a) Construction and materials shall be in accordance with the State highway department standard construction specifications approved for use on Federal-aid primary projects and special provisions and supplemental specifications amendatory thereto approved for use on the specific projects.</P>
                      <P>(b) The provisions of 23 U.S.C. 324 and of title VI of the Civil Rights Act of 1964 (78 Stat. 252; 42 U.S.C. 2000d-2000d-4) and the implementing regulations in 49 CFR part 21, including the provisions of § 21.5(c)(1), and paragraphs (2)(iii) and (2)(v) of appendix C thereof relative to employment practices, shall be applicable to all types of contracts listed in appendix A.</P>
                      <P>(c) The “Required Contract Provisions, Appalachian Development Highway System and Local Access Roads Construction Contracts,” Form PR-1316 (appendix B), shall be included in all construction contracts awarded under the Act.</P>
                      <P>(d) The required contract provisions set forth in Form PR-1317 (appendix C) shall be included in all types of contracts described in appendix A, other than construction contracts.</P>
                      <P>(e) In the design and construction of highways and roads under the Act, the State may give special preference to the use of mineral resource materials native to the Appalachian region. The provisions of § 635.409 of this chapter shall not apply to projects under the Act to the extent such provisions are inconsistent with sections 201(d) and (e) of the Act.</P>
                      <CITA>[39 FR 35146, Sept. 30, 1974, as amended at 40 FR 49084, Oct. 21, 1975; 41 FR 36204, Aug. 27, 1976]</CITA>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 633.208</SECTNO>
                      <SUBJECT>Maintenance.</SUBJECT>
                      <P>Maintenance of all highway projects constructed under the Act, whether on the development system or local access roads, shall be the responsibility of the State. The State may arrange for maintenance of such roads or portions thereof, by agreement with a local governmental unit.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 633.209</SECTNO>
                      <SUBJECT>Notices to prospective Federal-aid construction contractors.</SUBJECT>
                      <P>The State highway department shall include the notices set forth in appendix D in all future bidding proposals for Appalachian Development System and Appalachian local access roads construction contracts.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 633.210</SECTNO>
                      <SUBJECT>Termination of contract.</SUBJECT>
                      <P>All contracts exceeding $2,500 shall contain suitable provisions for termination by the State, including the manner in which the termination will be effected and the basis for settlement. In addition, such contracts shall describe conditions under which the contract may be terminated for default as well as conditions where the contract may be terminated because of circumstances beyond the control of the contractor.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 633.211</SECTNO>
                      <SUBJECT>Implementation of the Clean Air Act and the Federal Water Pollution Control Act.</SUBJECT>

                      <P>Pursuant to regulations of the Environmental Protection Agency (40 CFR part 15) implementing requirements with respect to the Clean Air Act and the Federal Water Pollution Control <PRTPAGE P="180"/>Act are included in appendix B to this part.</P>
                      <CITA>[40 FR 49084, Oct. 21, 1975]</CITA>
                    </SECTION>
                    <APPENDIX>
                      <EAR>Pt. 633, Subpt. B, App. A</EAR>
                      <HD SOURCE="HED">Appendix A to Subpart B of Part 633—Types of Contracts to Which the Civil Rights Act of 1964 Is Applicable</HD>
                      <P>Section 324 of title 23 U.S.C., the Civil Rights Act of 1964, and the implementing regulations of the Department of Transportation (49 CFR part 21), including the provisions of paragraphs (2)(iii) and (2)(v) of appendix C thereof relative to employment practices, are applicable to the following types of contracts awarded by State highway departments, contractors, and first tier subcontractors, including those who supply materials and lease equipment:</P>
                      <P>1. Construction.</P>
                      <P>2. Planning.</P>
                      <P>3. Research.</P>
                      <P>4. Highway Safety.</P>
                      <P>5. Engineering.</P>
                      <P>6. Property Management.</P>
                      <P>7. Fee contracts and other commitments with persons for services incidental to the acquisition of right-of-way including, but not limited to:</P>
                      <P>a. Advertising contracts.</P>
                      <P>b. Agreements for economic studies.</P>
                      <P>c. Contracts for surveys and plats.</P>
                      <P>d. Contracts for abstracts of title certificates and title insurance.</P>
                      <P>e. Contracts for appraisal services and expert witness fees.</P>
                      <P>f. Contracts to negotiate for the acquisition of right-of-way.</P>
                      <P>g. Contracts for disposal of improvements and property management services.</P>
                      <P>h. Contracts for employment of fee attorneys for right-of-way procurement, or preparation and trial of condemnation cases.</P>
                      <P>i. Contracts for escrow and closing services.</P>
                      <CITA>[40 FR 49084, Oct. 21, 1975]</CITA>
                    </APPENDIX>
                    <APPENDIX>
                      <EAR>Pt. 633, Subpt. B, App. B</EAR>
                      <HD SOURCE="HED">Appendix B to Subpart B of Part 633—Required Contract Provisions, Appalachian Development Highway System and Local Access Roads Construction Contracts</HD>
                      <GPOTABLE CDEF="6,r50" COLS="2" OPTS="L0">
                        <ROW>
                          <ENT I="01">I.</ENT>
                          <ENT>Application.</ENT>
                        </ROW>
                        <ROW>
                          <ENT I="01">II.</ENT>
                          <ENT>Employment Preference.</ENT>
                        </ROW>
                        <ROW>
                          <ENT I="01">III.</ENT>
                          <ENT>Equal Opportunity: Employment Practices.</ENT>
                        </ROW>
                        <ROW>
                          <ENT I="01">IV.</ENT>
                          <ENT>Equal Opportunity: Selection of Subcontractors, Procurement of Materials, and Leasing of Equipment.</ENT>
                        </ROW>
                        <ROW>
                          <ENT I="01">V.</ENT>
                          <ENT>Nonsegregated Facilities.</ENT>
                        </ROW>
                        <ROW>
                          <ENT I="01">VI.</ENT>
                          <ENT>Payment of Predetermined Minimum Wages.</ENT>
                        </ROW>
                        <ROW>
                          <ENT I="01">VII.</ENT>
                          <ENT>Statements and Payrolls.</ENT>
                        </ROW>
                        <ROW>
                          <ENT I="01">VIII.</ENT>
                          <ENT>Record of Materials, Supplies and Labor.</ENT>
                        </ROW>
                        <ROW>
                          <ENT I="01">IX.</ENT>
                          <ENT>Subletting or Assigning the Contract.</ENT>
                        </ROW>
                        <ROW>
                          <ENT I="01">X.</ENT>
                          <ENT>Safety: Accident Prevention.</ENT>
                        </ROW>
                        <ROW>
                          <ENT I="01">XI.</ENT>
                          <ENT>False Statements Concerning Highway Projects.</ENT>
                        </ROW>
                        <ROW>
                          <ENT I="01">XII.</ENT>
                          <ENT>Implementation of Clean Air Act and Federal Water Pollution Control Act.</ENT>
                        </ROW>
                      </GPOTABLE>
                      <FP SOURCE="FP-2">I. <E T="03">Application.</E>
                      </FP>
                      <P>1. These contract provisions shall apply to all work performed on the contract by the contractor with his own organization and with the assistance of workmen under his immediate superintendence and to all work performed on the contract by piecework, station work, or by subcontract.</P>
                      <P>2. Except as otherwise provided in sections II, III, and IV hereof, the contractor shall insert in each of his subcontracts all of the stipulations contained in these Required Contract Provisions and also a clause requiring his subcontractors to include these Required Contract Provisions in any lower tier subcontracts which they may enter into, together with a clause requiring the inclusion of these provisions in any further subcontracts that may in turn be made. The Required Contract Provisions shall in no instance be incorporated by reference.</P>
                      <P>3. A breach of any of the stipulations contained in these Required Contract Provisions may be grounds for termination of the contract.</P>
                      <P>4. A breach of the following clauses may also be grounds for debarment as provided in 29 CFR 5.6(b):</P>
                      <P>Section 1, paragraph 2.</P>
                      <P>Section VI, paragraphs 1, 2, 3, 5 and 8a.</P>
                      <P>Section VII, paragraphs 1, 5a, 5b and 5d.
                      </P>
                      <FP SOURCE="FP-2">II. <E T="03">Employment preference.</E>
                      </FP>
                      <P>1. During the performance of this contract, the contractor undertaking to do work which is, or reasonably may be, done as on-site work, shall give preference to qualified persons who regularly reside in the labor area as designated by the United States Department of Labor wherein the contract work is situated, or the subregion, or the Appalachian counties of the State wherein the contract work is situated, except:</P>
                      <P>a. To the extent that qualified persons regularly residing in the area are not available.</P>
                      <P>b. For the reasonable needs of the contractor to employ supervisory or specially experienced personnel necessary to assure an efficient execution of the contract work.</P>
                      <P>c. For the obligation of the contractor to offer employment to present or former employees as the result of a lawful collective bargaining contract, provided that the number of nonresident persons employed under this subparagraph 1c shall not exceed 20 percent of the total number of employees employed by the contractor on the contract work, except as provided in subparagraph 4 below.</P>

                      <P>2. The contractor shall place a job order with the State Employment Service indicating (a) the classifications of laborers, mechanics and other employees he anticipates will be required to perform the contract work, (b) the number of employees required <PRTPAGE P="181"/>in each classification, (c) the date on which he estimates such employees will be required, and (d) any other pertinent information required by the State Employment Service to complete the job order form. The job order may be placed with the State Employment Service in writing or by telephone. If during the course of the contract work, the information submitted by the contractor in the original job order is substantially modified, he shall promptly notify the State Employment Service.</P>
                      <P>3. The contractor shall give full consideration to all qualified job applicants referred to him by the State Employment Service. The contractor is not required to grant employment to any job applicants who, in his opinion, are not qualified to perform the classification of work required.</P>
                      <P>4. If, within one week following the placing of a job order by the contractor with the State Employment Service, the State Employment Service is unable to refer any qualified job applicants to the contractor, or less than the number requested, the State Employment Service will forward a certificate to the contractor indicating the unavailability of applicants. Such certificate shall be made a part of the contractor's permanent project records. Upon receipt of this certificate, the contractor may employ persons who do not normally reside in the labor area to fill the positions covered by the certificate, notwithstanding the provisions of subparagraph 1c above.</P>

                      <P>5. The contractor shall include the provisions of section II-1 through II-4 in every subcontract for work which is, or reasonably may be, done as on-site work.
                      </P>
                      <FP SOURCE="FP-2">III. <E T="03">Equal opportunity: employment practices.</E>
                      </FP>
                      
                      <P>During the performance of this contract, the contractor agrees as follows:</P>
                      <P>a. The contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, color, religion, sex, or national origin. Such action shall include, but not be limited to the following: Employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoffs or termination; rates of pay or other forms of compensation; and selection of training, including apprenticeship. The contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the State highway department setting forth the provisions of this nondiscrimination clause.</P>
                      <P>b. The contractor will, in all solicitations or advertisements for employees placed by or on behalf of the contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, or national origin.</P>
                      <P>c. The contractor will send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding, a notice to be provided by the State highway department advising the said labor union or workers' representative of the contractor's commitments under this section III and shall post copies of the notice in conspicuous places available to employees and applicants for employment.</P>
                      <P>d. The contractor will comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations and relevant orders of the Secretary of Labor.</P>
                      <P>e. The contractor will furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations and orders of the Secretary of Labor or pursuant thereto, and will permit access to his books, records and accounts by the Federal Highway Administration and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations and orders.</P>
                      <P>f. In the event of the contractor's noncompliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations or orders, this contract may be canceled, terminated or suspended in whole or in part and the contractor may be declared ineligible for further Government contracts or federally-assisted construction contracts in accordance with procedures authorized in Executive Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulation or order of the Secretary of Labor, or as otherwise provided by law.</P>

                      <P>g. The contractor will include the provisions of this section III in every subcontract or purchase order unless exempted by rules, regulations or orders of the Secretary of Labor issued pursuant to section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The contractor will take such action with respect to any subcontract or purchase order as the State Highway Department or the Federal Highway Administration may direct as a means of enforcing such provisions including sanctions for noncompliance: <E T="03">Provided, however,</E> That in the event a contractor becomes involved in, or is threatened with litigation with a subcontractor or vendor as a result of such direction by the Federal Highway Administration, the contractor may request the United States to enter into such litigation to protect the interests of the United States.
                        <PRTPAGE P="182"/>
                      </P>
                      <FP SOURCE="FP-2">IV. <E T="03">Equal opportunity selection of subcontractors, procurement of materials, and leasing of equipment.</E>
                      </FP>
                      

                      <P>During the performance of this contract, the contractor, for itself, its assignees and successors in interest (hereinafter referred to as the <E T="03">contractor), agrees as follows:</E>
                      </P>
                      <P>1. <E T="03">Compliance with regulations.</E> The contractor shall comply with the provisions of 23 U.S.C. 324 and with the regulations relative to nondiscrimination in Federally-assisted programs of the Department of Transportation (hereinafter, “DOT”) title 49, Code of Federal Regulations, part 21, as they may be amended from time to time (hereinafter referred to as the Regulations), which are herein incorporated by reference and made a part of this contract.</P>
                      <P>2. <E T="03">Nondiscrimination.</E> The contractor, with regard to the work performed by it during the contract, shall not discriminate on the grounds of race, color, sex, or national origin in the selection and retention of subcontractors, including procurements of materials and leases of equipments. The contractor shall not participate either directly or indirectly in the discrimination prohibited by section 21.5 of the Regulations, including employment practices.</P>
                      <P>3. <E T="03">Solicitations for subcontracts including procurement of materials and equipment.</E> In all solicitations either by competitive bidding or negotiation made by the contractor for work to be performed under a subcontract, including procurements of materials or leases of equipment, each potential subcontractor or supplier, shall be notified by the contractor of the contractor's obligations under this contract and the Regulations relative to nondiscrimination on the grounds of race, color, sex, or national origin.</P>
                      <P>4. <E T="03">Information and reports.</E> The contractor shall provide all information and reports required by the Regulations, or directives issued pursuant thereto, and shall permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the State highway department or the Federal Highway Administration to be pertinent to ascertain compliance with such Regulations, orders and instructions. Where any information required of a contractor is in the exclusive possession of another who fails or refuses to furnish this information, the contractor shall so certify to the State highway department, or the Federal Highway Administration, as appropriate, and shall set forth what efforts it has made to obtain the information.</P>
                      <P>5. <E T="03">Sanctions for noncompliance.</E> In the event of the contractor's noncompliance with the nondiscrimination provisions of this contract, the State highway department shall impose such contract sanctions as it or the Federal Highway Administration may determine to be appropriate, including, but not limited to:</P>
                      <P>a. Withholding of payments to the contractor under the contract until the contractor complies, and/or</P>
                      <P>b. Cancellation, termination or suspension of the contract, in whole or in part.</P>
                      <P>6. <E T="03">Incorporation of provisions.</E> The contractor will include the provisions of paragraphs (1) through (6) in every subcontract, including procurements of materials and leases of equipment, unless exempt by the Regulations, or directives issued pursuant thereto. The contractor shall take such action with respect to any subcontract or procurement, as the State highway department or the Federal Highway Administration may direct as a means of enforcing such provisions including sanctions for noncompliance: <E T="03">Provided, however,</E> That, in the event a contractor becomes involved in, or is threatened with, litigation with a subcontractor or supplier, as a result of such direction, the contractor may request the State to enter into such litigation to protect the interests of the State, and, in addition, the contractor may request the United States to enter into such litigation to protect the interests of the United States.
                      </P>
                      <FP SOURCE="FP-2">V. <E T="03">Nonsegregated facilities.</E>
                      </FP>
                      
                      <P>(Applicable to Federal-aid construction contracts and related subcontracts exceeding $10,000 which are not exempt from the Equal Opportunity clause.)</P>

                      <P>By submission of this bid, the execution of this contract or subcontract, or the consummation of this material supply agreement, as appropriate, the bidder, Federal-aid construction contractor, subcontractor, or material supplier, as appropriate, certifies that he does not maintain or provide for his employees any segregated facilities at any of his establishments, and that he does not permit his employees to perform their services at any location, under his control, where segregated facilities are maintained. He certifies further that he will not maintain or provide for his employees any segregated facilities at any of his establishments, and that he will not permit his employees to perform their services at any location, under his control, where segregated facilities are maintained. He agrees that a breach of this certification is a violation of the Equal Opportunity clause in this contract. As used in this certification, the term <E T="03">segregated facilities</E> means any waiting rooms, work areas, restrooms and washrooms, restaurants and other eating areas, timeclocks, locker rooms and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees which are segregated by explicit directive or are in fact segregated on the basis of race, creed, color, or national origin, because of habit, local custom, or otherwise. He agrees that (except <PRTPAGE P="183"/>where he has obtained identical certifications from proposed subcontractors and material suppliers for specific time periods), he will obtain identical certifications from proposed subcontractors or material suppliers prior to the award of subcontracts or the consummation of material supply agreements, exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity clause, and that he will retain such certification in his files.
                      </P>
                      <FP SOURCE="FP-2">VI. <E T="03">Payment of predetermined minimum wages.</E>
                      </FP>
                      
                      <P>1. <E T="03">General.</E> All mechanics and laborers employed or working upon the site of the work will be paid unconditionally and not less than once a week, and without subsequent deduction or rebate on any account, except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3), the full amounts due at time of payment computed at wage rates not less than those contained in the wage determination decision of the Secretary of Labor which is attached hereto and made a part thereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics; and the wage determination decision shall be posted by the contractor at the site of the work in a prominent place where it can be easily seen by the workers. For the purpose of this clause, contributions made or costs reasonably anticipated under section 1(b)(2) of the Davis-Bacon Act on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions of section VI, paragraph 3b, hereof. Also for the purpose of this clause, regular contributions made or costs incurred for more than a weekly period under plans, funds, or programs, but covering the particular weekly period, are deemed to be constructively made or incurred during such weekly period.</P>
                      <P>2. <E T="03">Classifications</E>—a. The State highway department contracting officer shall require that any class of laborers or mechanics which is not listed in the wage determination and which is to be employed under the contract, shall be classified or reclassified conformably to the wage determination, and a report of the action taken shall be sent by the State highway department contracting officer to the Secretary of Labor.</P>
                      <P>b. In the event the interested parties cannot agree on the proper classification or reclassification of a particular class of laborers and mechanics to be used, the question accompanied by the recommendation of the State highway department contracting officer shall be referred to the Secretary for final determination.</P>
                      <P>3. <E T="03">Payment of fringe benefits</E>—a. The State highway department contracting officer shall require, whenever the minimum wage rate prescribed in the contract for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly wage rate and the contractor is obligated to pay a cash equivalent of such a fringe benefit, an hourly cash equivalent thereof to be established. In the event the interested parties cannot agree upon a cash equivalent of the fringe benefits, the question, accompanied by the recommendation of the contracting officer, shall be referred to the Secretary of Labor for determination.</P>

                      <P>b. If the contractor does not make payments to a trustee or other third person, he may consider as part of the wage of any laborer or mechanic the amount of any costs reasonably anticipated in providing benefits under a plan or program of a type expressly listed in the wage determination decision of the Secretary of Labor which is part of this contract: <E T="03">Provided, however,</E> The Secretary of Labor has found, upon the written request of the contractor, that the applicable standards of the Davis-Bacon Act have been met. The Secretary of Labor may require the contractor to set aside in a separate account assets for the meeting of obligations under the plan or program.</P>
                      <P>4. <E T="03">Payment of excess wages.</E> While the wage rates shown are the minimum rates required by the contract to be paid during its life, this is not a representation that labor can be obtained at these rates. No increase in the contract price shall be allowed or authorized on account of the payment of wage rates in excess of those listed herein.</P>
                      <P>5. <E T="03">Apprentices and trainees (Programs of Department of Labor).</E> a. Apprentices will be permitted to work at less than the predetermined rate for the work they performed when they are employed and individually registered in a bona fide apprenticeship program registered with the U.S. Department of Labor, Manpower Administration, Bureau of Apprenticeship and Training, or with a State Apprenticeship Agency recognized by the Bureau, or if a person is employed in his first 90 days of probationary employment as an apprentice in such an apprenticeship program, who is not individually registered in the program, but who has been certified by the Bureau of Apprenticeship and Training or a State Apprenticeship Agency (where appropriate) to be eligible for probationary employment as an apprentice. The allowable ratio of apprentices to journeymen in any craft classification shall not be greater than the ratio permitted to the contractor as to his entire work force under the registered program. Any employee listed on a payroll at an apprentice wage rate, who is not a trainee as defined in 29 CFR 5.2(c)(2) or is not registered or otherwise employed as stated above, shall be paid the wage rate determined by the Secretary of Labor for the classification of work he actually performed. <PRTPAGE P="184"/>The contractor or subcontractor will be required to furnish to the State highway department or to a representative of the Wage-Hour Division of the U.S. Department of Labor written evidence of the registration of his program and apprentices as well as the appropriate ratios and wage rates (expressed in percentages of the journeyman hourly rates), for the area of construction prior to using any apprentices on the contract work. The wage rate paid apprentices shall be not less than the appropriate percentage of the journeyman's rate contained in the applicable wage determination.</P>
                      <P>b. Trainees, except as provided in 29 CFR 5.15, will not be permitted to work at less than the predetermined rate for the work performed unless they are employed pursuant to and individually registered in a program which has received prior approval, evidenced by formal certification, by the U.S. Department of Labor, Manpower Administration, Bureau of Apprenticeship and Training. The ratio of trainees to journeymen shall not be greater than permitted under the plan approved by the Bureau of Apprenticeship and Training. Every trainee must be paid at not less than the rate specified in the approved program for his level of progress. Any employee listed on the payroll at a trainee rate who is not registered and participating in a training plan approved by the Bureau of Apprenticeship and Training shall be paid not less than the wage rate determined by the Secretary of Labor for the classification of work he actually performed. The contractor or subcontractor will be required to furnish the State highway department or a representative of the Wage-Hour Division of the U.S. Department of Labor written evidence of the certification of his program, the registration of the trainees, and the ratios and wage rates prescribed in that program. In the event the Bureau of Apprenticeship and Training withdraws approval of a training program, the contractor will no longer be permitted to utilize trainees at less than the applicable predetermined rate for the work performed until an acceptable program is approved.</P>
                      <P>c. The utilization of apprentices, trainees and journeymen shall be in conformity with the equal employment opportunity requirements of Executive Order 11246, as amended, and 29 CFR part 30.</P>
                      <P>6. <E T="03">Apprentices and trainees (Programs of Department of Transportation).</E> Apprentices and trainees working under apprenticeship and skill training programs which have been certified by the Secretary of Transportation as promoting equal opportunity in connection with Federal-aid highway construction programs are not subject to the requirements of section VI, paragraph 5 above. The straight time hourly wage rates for apprentices and trainees under such programs will be established by the particular programs.</P>
                      <P>7. <E T="03">Withholding for unpaid wages.</E> The State highway department contracting officer may withhold or cause to be withheld from the contractor so much of the accrued payments or advances as may be considered necessary to pay laborers, mechanics, (including apprentices and trainees) watchmen, or guards employed by the contractor or any subcontractor on the work the full amount of wages required by the contract. In the event of failure to pay any laborer, mechanic, (including apprentices and trainees) watchman or guard employed or working on the site of the work, all or part of the wages required by the contract, the State highway department contracting officer may, after written notice to the contractor, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds until such violations have ceased.</P>
                      <P>8. <E T="03">Overtime requirements.</E> a. No contractor or subcontractor contracting for any part of the contract work which may require or involve the employment of laborers, mechanics, watchmen or guards (including apprentices and trainees described in paragraphs 5 and 6 above) shall require or permit any laborer, mechanic, watchman or guard in any workweek in which he is employed on such work, to work in excess of eight hours in any calendar day or in excess of forty hours in such workweek unless such laborer, mechanic, watchman or guard receives compensation at a rate not less than one and one-half times his basic rate of pay for all hours worked in excess of eight hours in any calendar day or in excess of forty hours in such workweek, as the case may be.</P>
                      <P>b. In the event of any violation of paragraph 8a, the contractor and any subcontractor responsible therefor shall be liable to any affected employee for his unpaid wages. In addition, such contractor and subcontractor shall be liable to the United States for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer, mechanic, watchman or guard employed in violation of paragraph 8a, in the sum of $10 for each calendar day on which such employee was required or permitted to work in excess of eight hours or in excess of the standard workweek of forty hours without payment of the overtime wages required by paragraph 8a.</P>

                      <P>c. The State highway department contracting officer may withhold or cause to be withheld, from any moneys payable on account of work performed by the contractor or subcontractor, such sums as may administratively be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for liquidated damages as provided in paragraph 8b.
                      </P>
                      <FP SOURCE="FP-2">VII. <E T="03">Statements and payrolls.</E>
                      </FP>
                      
                      <P>1. <E T="03">Compliance with Copeland Regulations (29 CFR part 3).</E> The contractor shall comply <PRTPAGE P="185"/>with the Copeland Regulations (29 CFR part 3) of the Secretary of Labor which are herein incorporated by reference.</P>
                      <P>2. <E T="03">Weekly statement.</E> Each contractor or subcontractor shall furnish each week a statement to the State highway department resident engineer with respect to the wages paid each of its employees, including apprentices and trainees described in section VI, paragraphs 5 and 6, and watchmen and guards on work covered by the Copeland Regulations during the preceding weekly payroll period. The statement shall be executed by the contractor or subcontractor or by an authorized officer or employee of the contractor or subcontractor who supervises the payment of wages. Contractors and subcontractors must use the certification set forth on U.S. Department of Labor Form WH-348, or the same certification appearing on the reverse of Optional U.S. Department of Labor Form WH-347, or on any form with identical wording.</P>
                      <P>3. <E T="03">Final labor summary.</E> The contractor and each subcontractor shall furnish, upon the completion of the contract, a summary of all employment, indicating for the completed project the total hours worked and the total amount earned. This data shall be submitted to the State highway department resident engineer on Form PR-47 together with the data required in section VIII, hereof, relative to materials and supplies.</P>
                      <P>4. <E T="03">Final certificate.</E> Upon completion of the contract, the contractor shall submit to the State highway department contracting officer, for transmission to the Federal Highway Administration with the voucher for final payment for any work performed under the contract, a certificate concerning wages and classifications for laborers, mechanics, watchmen and guards employed on the project, in the following form:<STARS/>
                      </P>
                      <P>The undersigned, contractor on</P>
                      <HD SOURCE="HD3">(Project No.)</HD>
                      <FP>hereby certifies that all laborers, mechanics, apprentices, trainees, watchmen and guards employed by him or by any subcontractor performing work under the contract on the project have been paid wages at rates not less than those required by the contract provisions, and that the work performed by each such laborer, mechanic, apprentice or trainee conformed to the classifications set forth in the contract or training program provisions applicable to the wage rate paid.</FP>
                      
                      <FP SOURCE="FP-DASH">Signature and title</FP>
                      <STARS/>
                      <P>5. <E T="03">Payrolls and payroll records</E>—a. Payrolls and basic records relating thereto will be maintained during the course of the work and preserved for a period of three years thereafter for all laborers, mechanics, apprentices, trainees, watchmen and guards working at the site of the work.</P>
                      <P>b. The payroll records shall contain the name, social security number and address of each such employee, his correct classification, rates of pay (including rates of contributions or costs anticipated of the types described in section 1(b)(2) of the Davis-Bacon Act), daily and weekly number of hours worked, deductions made and actual wages paid. Whenever the Secretary of Labor, pursuant to section VI, paragraph 3.b., has found that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated in providing benefits under a plan or program described in section I(b)(2)(B) of the Davis-Bacon Act, the contractor shall maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs anticipated or the actual cost incurred in providing such benefits.</P>
                      <P>c. The payrolls shall contain the following information:</P>
                      <P>1. The employee's full name, address and social security number and a notation indicating whether the employee does, or does not, normally reside in the labor area as defined in section II, paragraph 1.a. (The employee's full name and social security number need only appear on the first payroll on which his name appears. The employee's address need only be shown on the first submitted payroll on which the employee's name appears, unless a change of address necessitates a submittal to reflect the new address.)</P>
                      <P>2. The employee's classification.</P>
                      <P>3. Entries indicating the employee's basic hourly wage rate and, where applicable, the overtime hourly wage rate. The payroll should indicate separately the amounts of employee and employer contributions to fringe benefits funds and/or programs. Any fringe benefits paid to the employee in cash must be indicated. There is no prescribed or mandatory form for showing the above information on payrolls.</P>
                      <P>4. The employee's daily and weekly hours worked in each classification, including actual overtime hours worked (not adjusted).</P>
                      <P>5. The itemized deductions made and</P>
                      <P>6. The net wages paid.</P>

                      <P>d. The contractor will submit weekly a copy of all payrolls to the State highway department resident engineer. The copy shall be accompanied by a statement signed by the employer or his agent indicating that the payrolls are correct and complete, that the wage rates contained therein are not less <PRTPAGE P="186"/>than those determined by the Secretary of Labor and the classifications set forth for each laborer or mechanic conform with the work he performed. Submission of a weekly statement which is required under this contract by section VII, paragraph 2, and the Copeland Regulations of the Secretary of Labor (29 CFR part 3) and the filing with the initial payroll or any subsequent payroll of a copy of any findings by the Secretary of Labor pursuant to section VI, paragraph 3b, shall satisfy this requirement. The prime contractor shall be responsible for the submission of copies of payrolls of all subcontractors. The contractor will make the records required under the labor standards clauses of the contract available for inspection by authorized representatives of the State highway department, the Federal Highway Administration and the Department of Labor, and will permit such representatives to interview employees during working hours on the job.</P>
                      <P>e. The wages of labor shall be paid in legal tender of the United States, except that this condition will be considered satisfied if payment is made by negotiable check, on a solvent bank, which may be cashed readily by the employee in the local community for the full amount, without discount or collection charges of any kind. Where checks are used for payment, the contractor shall make all necessary arrangements for them to be cashed and shall given information regarding such arrangements.</P>
                      <P>f. No fee of any kind shall be asked or accepted by the contractor or any of his agents from any person as a condition of employment on the project.</P>
                      <P>g. No laborers shall be charged for any tools used in performing their respective duties except for reasonably avoidable loss or damage thereto.</P>
                      <P>h. Every employee on the work covered by this contract shall be permitted to lodge, board and trade where and with whom he elects and neither the contractor nor his agents, nor his employees shall, directly or indirectly, require as a condition of employment that an employee shall lodge, board or trade at a particular place or with a particular person.</P>
                      <P>i. No charge shall be made for any transportation furnished by the contractor, or his agents, to any person employed on the work.</P>

                      <P>j. No individual shall be employed as a laborer or mechanic on this contract except on a wage basis, but this shall not be construed to prohibit the rental of teams, trucks, or other equipment from individuals.
                      </P>
                      <FP SOURCE="FP-2">VIII. <E T="03">Record of materials, supplies and labor.</E>
                      </FP>
                      
                      <P>1. The contractor shall maintain a record of the total cost of all materials and supplies purchased for and incorporated in the work, and also of the quantities of those specific materials and supplies listed on Form PR-47 and in the units shown. Upon completion of the contract, this record, together with the final labor summary required in section VII, paragraph 3, hereof, shall be transmitted to the State highway department resident engineer for the project on Form PR-47 in accordance with instructions attached thereto, which will be furnished for this purpose upon request. The quantities for the listed items shall be reported separately for roadway and for structures over 20 feet long as measured along the centerline of the roadway.</P>
                      <P>2. The contractor shall become familiar with the list of specific materials and supplies contained in Form PR-47 prior to the commencement of work under this contract. Any additional materials information required will be solicited through revisions of Form PR-47 with attendant explanations.</P>

                      <P>3. Where subcontracts are involved the contractor shall submit either a single report covering work both by himself and all his subcontractors, or he may submit separate reports for himself and for each of his subcontractors.
                      </P>
                      <FP SOURCE="FP-2">IX. <E T="03">Subletting or assigning the contract.</E>
                      </FP>
                      

                      <P>1. The contractor shall perform with his own organization contract work amounting to not less than 50 percent of the original total contract price, except that any items designated by the State as <E T="03">Specialty Items</E> may be performed by subcontract and the amount of any such <E T="03">Specialty Items</E> so performed may be deducted from the original total contract price before computing the amount of work required to be performed by the contractor with his own organization.</P>
                      <P>a. <E T="03">His own organization</E> shall be construed to include only workmen employed and paid directly by the prime contractor and equipment owned or rented by him, with or without operators.</P>
                      <P>b. <E T="03">Specialty items</E> shall be construed to be limited to work that requires highly specialized knowledge, craftsmanship or equipment not ordinarily available in contracting organizations qualified to bid on the contract as a whole and in general are to be limited to minor components of the overall contract.</P>
                      <P>2. In addition to the 50 percent requirements set forth in paragraph 1 above, the contractor shall furnish (a) a competent superintendent or foreman who is employed by him, who has full authority to direct performance of the work in accordance with the contract requirements, and who is in charge of all construction operations (regardless of who performs the work), and (b) such other of his own organizational capability and responsibility (supervision, management, and engineering services) as the State highway department contracting officer determines is necessary to assure the performance of the contract.</P>

                      <P>3. The contract amount upon which the 50 percent requirement set forth in paragraph 1 <PRTPAGE P="187"/>is computed includes the cost of materials and manufactured products which are to be purchased or produced by the contractor under the contract provisions.</P>
                      <P>4. Any items that have been selected as <E T="03">Specialty Items</E> for the contract are listed as such in the Special Provisions, bid schedule, or elsewhere in the contract documents.</P>

                      <P>5. No portion of the contract shall be sublet, assigned or otherwise disposed of except with the written consent of the State highway department contracting officer, or his authorized representative, and such consent when given shall not be construed to relieve the contractor of any responsibility for the fulfillment of the contract. Request for permission to sublet, assign or otherwise dispose of any portion of the contract shall be in writing and accompanied by (a) a showing that the organization which will perform the work is particularly experienced and equipped for such work, and (b) an assurance by the contractor that the labor standards provisions set forth in thiscontract shall apply to labor performed on all work encompassed by the request.
                      </P>
                      <FP SOURCE="FP-2">X. <E T="03">Safety: Accident prevention.</E>
                      </FP>
                      
                      <P>In the performance of this contract, the contractor shall comply with all applicable Federal, State and local laws governing safety, health and sanitation. The contractor shall provide all safeguards, safety devices and protective equipment and take any other needed actions, on his own responsibility, or as the State highway department contracting officer may determine, reasonably necessary to protect the life and health of employees on the job and the safety of the public and to protect property in connection with the performance of the work covered by the contract.</P>

                      <P>It is a condition of this contract, and shall be made a condition of each subcontract entered into pursuant to this contract, that the contractor and any subcontractor shall not require any laborer or mechanic employed in performance of the contract to work in surroundings or under working conditions which are unsanitary, hazardous, or dangerous to his health or safety, as determined under construction safety and health standards (title 29, Code of Federal Regulations, part 1926, formerly part 1518, as revised from time to time), promulgated by the United States Secretary of Labor, in accordance with section 107 of the Contract Work Hours and Safety Standards Act (83 Stat. 96).
                      </P>
                      <FP SOURCE="FP-2">XI. <E T="03">False statements concerning highway projects.</E>
                      </FP>
                      
                      <P>In order to assure high quality and durable construction in conformity with approved plans and specifications and a high degree of reliability on statements and representations made by engineers, contractors, suppliers, and workers on Federal-aid highway projects, it is essential that all persons concerned with the project perform their functions as carefully, thoroughly and honestly as possible. Willfull falsification, distortion, or misrepresentation with respect to any facts related to the project is a violation of Federal law. To prevent any misunderstanding regarding the seriousness of these and similar acts, the following notice shall be posted on each Federal-aid highway project in one or more places where it is readily available to all personnel concerned with the project:<STARS/>
                      </P>
                      <HD SOURCE="HD1">Notice to All Personnel Engaged on Federal-Aid Highway Projects</HD>
                      <P>Title 18 U.S.C., section 1020, reads as follows:</P>
                      <P>“Whoever, being an officer, agent, or employee of the United States, or of any State or Territory, or whoever, whether a person, association, firm, or corporation, knowingly makes any false statement, false representation, or false report as to the character, quality, quantity, or cost of the material used or to be used, or the quantity or quality of the work performed or to be performed or the costs thereof in connection with the submission of plans, maps, specifications, contracts, or costs of construction of any highway or related project submitted for approval to the Secretary of Transportation; or</P>
                      <P>“Whoever knowingly makes any false statement, false representation, false report, or false claim with respect to the character, quality, quantity, or cost of any work performed or to be performed, or materials furnished or to be furnished, in connection with the construction of any highway or related project approved by the Secretary of Transportation; or</P>
                      <P>“Whoever knowingly makes any false statement or false representation as to a material fact in any statement, certificate, or report submitted pursuant to provisions of the Federal-Aid Road Act approved July 1, 1916 (39 Stat. 355), as amended and supplemented;</P>

                      <P>“Shall be fined not more than $10,000 or imprisoned not more than five years, or both.”
                      </P>
                      <FP SOURCE="FP-2">XII. <E T="03">Implementation of Clean Air Act and Federal Water Pollution Control Act (applicable to contracts and subcontracts which exceed $100,000).</E>
                      </FP>
                      

                      <P>1. The contractor stipulates that any facility to be utilized in the performance of this contract, unless such contract is exempt under the Clean Air Act, as amended (42 U.S.C. 1857 <E T="03">et seq.,</E> as amended by Pub. L. 91-604), and under the Federal Water Pollution Control Act, as amended (33 U.S.C. 1251 <E T="03">et seq.,</E> as amended by Pub. L. 92-500), Executive Order 11738, and regulations in implementation thereof (40 CFR part 15), is listed <PRTPAGE P="188"/>not on the date of contract award, on the U.S. Environmental Protection Agency (EPA) List of Violating Facilities Pursuant to 40 CFR part 15.20.</P>
                      <P>2. The contractor agrees to comply with all the requirements of section 114 of the Clean Air Act and section 308 of the Federal Water Pollution Control Act and all regulations and guidelines listed thereunder.</P>
                      <P>3. The contractor shall promptly notify the State highway department of the receipt of any communication from the Director, Office of Federal Activities, EPA, indicating that a facility to be utilized for the contract is under consideration to be listed on the EPA List of Violating Facilities.</P>
                      <P>4. The contractor agrees to include or cause to be included the requirements of subparagraphs 1 through 4 of this paragraph XII in every subcontract which exceeds $100,000, and further agrees to take such action as Government may direct as a means of enforcing such requirements.</P>
                      <CITA>[40 FR 49084, Oct. 21, 1975]</CITA>
                    </APPENDIX>
                    <APPENDIX>
                      <EAR>Pt. 633, Subpt. B, App. C</EAR>
                      <HD SOURCE="HED">Appendix C to Subpart B of Part 633—Additional Required Contract Provisions, Appalachian Development Highway System and Local Access Roads Contracts Other Than Construction Contracts</HD>
                      <HD SOURCE="HD1">Equal Opportunity: Employment Practices and Selection of Subcontractors, Suppliers of Materials, and Lessors of Equipment</HD>

                      <P>During the performance of this contract, the contractor agrees as follows:
                      </P>
                      <FP SOURCE="FP-2">1. <E T="03">Compliance with regulations.</E>
                      </FP>

                      <P>The contractor will comply with the provisions of 23 U.S.C. 324 and with the Regulations of the Department of Transportation relative to nondiscrimination in Federally-assisted programs of the Department of Transportation (Title 49, Code of Federal Regulations, part 21, hereinafter referred to as the regulations), which are herein incorporated by reference and made a part of this contract.
                      </P>
                      <FP SOURCE="FP-2">2. <E T="03">Employment practices</E>
                      </FP>
                      <P>a. The contractor will not discriminate against any employee or applicant for employment because of race, color, sex, or national origin. The contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, color, sex, or national origin. Such action shall include, but not be limited to the following: recruitment or recruitment advertising, hiring, firing, upgrading, promotion, demotion, transfer, layoff, termination, rates of pay or other forms of compensation or benefits, selection for training or apprenticeship, use of facilities and treatment of employees. The contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices setting forth the provisions of this employment practices clause.</P>
                      <P>b. The contractor will, in all solicitations or advertisements for employees placed by or on behalf of the contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, sex, or national origin.</P>

                      <P>c. The contractor will send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding, a notice advising the said labor union or workers representative of the contractor's commitments under the employment practices provision, and shall post copies of the notice in conspicuous places available to employees and applicants for employment.
                      </P>
                      <FP SOURCE="FP-2">3. <E T="03">Selection of subcontractors, procurement of materials and leasing of equipment.</E>
                      </FP>
                      <P>a. The contractor, with regard to the work performed by him after award and prior to completion of the contract work, will not discriminate on the ground of race, color, sex, or national origin in the selection and retention of subcontractors, including procurements of materials and leases of equipment. The contractor will not participate either directly or indirectly in the discrimination prohibited by Section 21.5 of the Regulations.</P>

                      <P>b. In all solicitations either by competitive bidding or negotiation made by the contractor for work to be performed under a subcontract, including procurements of materials or leases of equipment, each potential subcontractor, supplier, or lessor shall be notified by the contractor of the contractor's obligations under this contract and the Regulations relative to nondiscrimination on the ground of race, color, sex, or national origin.
                      </P>
                      <FP SOURCE="FP-2">4. <E T="03">Information and reports.</E>
                      </FP>

                      <P>The contractor will provide all information and reports required by the Regulations, or orders and instructions issued pursuant thereto, and will permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the State highway department or the Federal Highway Administration to be pertinent to ascertain compliance with such Regulations, orders and instructions. Where any information required of a contractor is in the exclusive possession of another who fails or refuses to furnish this information, the contractor shall so certify to the State highway department, or the Federal Highway Administration as appropriate, and shall set forth what efforts it has made to obtain the information.
                      </P>
                      <FP SOURCE="FP-2">5. <E T="03">Incorporation of provisions.</E>
                        <PRTPAGE P="189"/>
                      </FP>

                      <P>The contractor will include these additional required contract provisions in every subcontract, including procurements of materials and leases of equipment, unless exempt by the Regulations or orders, or instructions issued pursuant thereto. The contractor will take such action with respect to any subcontract, procurement, or lease as the State highway department or the Federal Highway Administration may direct as a means of enforcing such provisions including sanctions for non-compliance: <E T="03">Provided, however,</E> That, in the event a contractor becomes involved in, or is threatened with, litigation with a subcontractor, supplier, or lessor as a result of such directed action, the contractor may request the State to enter into such litigation to protect the interest of the State, and, in addition, the contractor may request the United States to enter into such litigation to protect the interest of the United States.
                      </P>
                      <FP SOURCE="FP-2">6. <E T="03">Sanctions for noncompliance.</E>
                      </FP>
                      <P>In the event of the contractor's noncompliance with sections 1 through 5 above, the State highway department shall impose such contract sanctions as it or the Federal Highway Administration may determine to be appropriate, including but not limited to.</P>
                      <P>a. Withholding of payments to the contractor under the contract until the contractor complies, and/or</P>
                      <P>b. Cancellation, termination or suspension of the contract in whole or in part.</P>
                      <CITA>[40 FR 49088, Oct. 21, 1975]</CITA>
                    </APPENDIX>
                    <APPENDIX>
                      <EAR>Pt. 633, Subpt. B, App. D</EAR>
                      <HD SOURCE="HED">Appendix D to Subpart B of Part 633—Federal-Aid Proposal Notices</HD>
                      <HD SOURCE="HD1">Notices to Prospective Federal-Aid Construction Contractors</HD>
                      <FP SOURCE="FP-2">I. <E T="03">Certification of nonsegregated facilities.</E>
                      </FP>
                      <P>(a) A Certification of Nonsegregated Facilities, as required by the May 9, 1967, Order of the Secretary of Labor (32 FR 7439, May 19, 1967) on Elimination of Segregated Facilities (is included in the proposal and must be submitted prior to the award of a Federal-aid highway construction contract exceeding $10,000 which is not exempt from the provisions of the Equal Opportunity clause).</P>
                      <P>(b) Bidders are cautioned as follows: By signing this bid, the bidder will be deemed to have signed and agreed to the provisions of the “Certification of Nonsegregated Facilities” in this proposal. This certification provides that the bidder does not maintain or provide for his employees facilities which are segregated on a basis of race, creed, color, or national origin, whether such facilities are segregated by directive or on a de facto basis. The certification also provides that the bidder will not maintain such segregated facilities.</P>
                      <P>(c) Bidders receiving Federal-aid highway construction contract awards exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity clause, will be required to provide for the forwarding of the following notice to prospective subcontractors for construction contracts and material suppliers where the subcontracts or material supply agreements exceed $10,000 and are not exempt from the provisions of the Equal Opportunity clause.</P>
                      <HD SOURCE="HD1">Notice to Prospective Subcontractors and Material Suppliers of Requirement for Certification of Nonsegregated Facilities</HD>
                      <P>(a) A Certification of Nonsegregated Facilities is required by the May 9, 1967, Order of the Secretary of Labor (32 FR 7431, May 19, 1967) on Elimination of Segregated Facilities, which is included in the proposal, or attached hereto, must be submitted by each subcontractor and material supplier prior to the award of the subcontract or consummation of a material supply agreement if such subcontract or agreement exceeds $10,000 and is not exempt from the provisions of the Equal Opportunity clause.</P>
                      <P>(b) Subcontractors and material suppliers are cautioned as follows: By signing the subcontract or entering into a material supply agreement, the subcontractor or material supplier will be deemed to have signed and agreed to the provisions of the “Certification of Nonsegregated Facilities” in the subcontract or material supply agreement. This certification provides that the subcontractor or material supplier does not maintain or provide for his employees facilities which are segregated on the basis of race, creed, color, or national origin, whether such facilities are segregated by directive or on a de facto basis. The certification also provides that the subcontractor or material supplier will not maintain such segregated facilities.</P>

                      <P>(c) Subcontractors or material suppliers receiving subcontract awards or material supply agreements exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity clause will be required to provide for the forwarding of this notice to prospective subcontractors for construction contracts and material suppliers where the subcontracts or material supply agreements exceed $10,000 and are not exempt from the provisions of the Equal Opportunity clause.
                      </P>
                      <FP SOURCE="FP-2">II. <E T="03">Implementation of Clean Air Act.</E>
                      </FP>
                      <P>(a) By signing this bid, the bidder will be deemed to have stipulated as follows:</P>

                      <P>(1) That any facility to be utilized in the performance of this contract, unless such contract is exempt under the Clean Air Act, as amended (42 U.S.C. 1857 <E T="03">et seq.,</E> as by Pub. L. 91-604), Executive order 11738, and regulations in implementation thereof (40 CFR part 15, is not listed on the U.S. Environmental Protection Agency (EPA) List of Violating Facilities pursuant to 40 CFR 15.20.<PRTPAGE P="190"/>
                      </P>
                      <P>(2) That the State highway department shall be promptly notified prior to contract award of the receipt by the bidder of any communication from the Director, Office of Federal Activities, EPA, indicating that a facility to be utilized for the contract is under consideration to be listed on the EPA List of Violating Facilities.</P>
                    </APPENDIX>
                  </SUBPART>
                </PART>
                <PART>
                  <EAR>Pt. 635</EAR>
                  <HD SOURCE="HED">PART 635—CONSTRUCTION AND MAINTENANCE</HD>
                  <CONTENTS>
                    <SUBPART>
                      <HD SOURCE="HED">Subpart A—Contract Procedures</HD>
                      <SECHD>Sec.</SECHD>
                      <SECTNO>635.101</SECTNO>
                      <SUBJECT>Purpose.</SUBJECT>
                      <SECTNO>635.102</SECTNO>
                      <SUBJECT>Definitions.</SUBJECT>
                      <SECTNO>635.103</SECTNO>
                      <SUBJECT>Applicability.</SUBJECT>
                      <SECTNO>635.104</SECTNO>
                      <SUBJECT>Method of construction.</SUBJECT>
                      <SECTNO>635.105</SECTNO>
                      <SUBJECT>Supervising agency.</SUBJECT>
                      <SECTNO>635.106</SECTNO>
                      <SUBJECT>Use of publicly owned equipment.</SUBJECT>
                      <SECTNO>635.107</SECTNO>
                      <SUBJECT>Participation by disadvantaged business enterprises.</SUBJECT>
                      <SECTNO>635.108</SECTNO>
                      <SUBJECT>Health and safety.</SUBJECT>
                      <SECTNO>635.109</SECTNO>
                      <SUBJECT>Standardized changed condition clauses.</SUBJECT>
                      <SECTNO>635.110</SECTNO>
                      <SUBJECT>Licensing and qualification of contractors.</SUBJECT>
                      <SECTNO>635.111</SECTNO>
                      <SUBJECT>Tied bids.</SUBJECT>
                      <SECTNO>635.112</SECTNO>
                      <SUBJECT>Advertising for bids and proposals.</SUBJECT>
                      <SECTNO>635.113</SECTNO>
                      <SUBJECT>Bid opening and bid tabulations.</SUBJECT>
                      <SECTNO>635.114</SECTNO>
                      <SUBJECT>Award of contract and concurrence in award.</SUBJECT>
                      <SECTNO>635.115</SECTNO>
                      <SUBJECT>Agreement estimate.</SUBJECT>
                      <SECTNO>635.116</SECTNO>
                      <SUBJECT>Subcontracting and contractor responsibilities.</SUBJECT>
                      <SECTNO>635.117</SECTNO>
                      <SUBJECT>Labor and employment.</SUBJECT>
                      <SECTNO>635.118</SECTNO>
                      <SUBJECT>Payroll and weekly statements.</SUBJECT>
                      <SECTNO>635.119</SECTNO>
                      <SUBJECT>False statements.</SUBJECT>
                      <SECTNO>635.120</SECTNO>
                      <SUBJECT>Changes and extra work.</SUBJECT>
                      <SECTNO>635.121</SECTNO>
                      <SUBJECT>Contract time and contract time extensions.</SUBJECT>
                      <SECTNO>635.122</SECTNO>
                      <SUBJECT>Participation in progress payments.</SUBJECT>
                      <SECTNO>635.123</SECTNO>
                      <SUBJECT>Determination and documentation of pay quantities.</SUBJECT>
                      <SECTNO>635.124</SECTNO>
                      <SUBJECT>Participation in contract claim awards and settlements.</SUBJECT>
                      <SECTNO>635.125</SECTNO>
                      <SUBJECT>Termination of contract.</SUBJECT>
                      <SECTNO>635.126</SECTNO>
                      <SUBJECT>[Reserved]</SUBJECT>
                      <SECTNO>635.127</SECTNO>
                      <SUBJECT>Agreement provisions regarding overruns in contract time.</SUBJECT>
                    </SUBPART>
                    <SUBPART>
                      <HD SOURCE="HED">Subpart B—Force Account Construction</HD>
                      <SECTNO>635.201</SECTNO>
                      <SUBJECT>Purpose.</SUBJECT>
                      <SECTNO>635.202</SECTNO>
                      <SUBJECT>Applicability.</SUBJECT>
                      <SECTNO>635.203</SECTNO>
                      <SUBJECT>Definitions.</SUBJECT>
                      <SECTNO>635.204</SECTNO>
                      <SUBJECT>Determination of more cost effective method or an emergency.</SUBJECT>
                      <SECTNO>635.205</SECTNO>
                      <SUBJECT>Finding of cost effectiveness.</SUBJECT>
                    </SUBPART>
                    <SUBPART>
                      <HD SOURCE="HED">Subpart C—Physical Construction Authorization</HD>
                      <SECTNO>635.301</SECTNO>
                      <SUBJECT>Purpose.</SUBJECT>
                      <SECTNO>635.303</SECTNO>
                      <SUBJECT>Applicability.</SUBJECT>
                      <SECTNO>635.305</SECTNO>
                      <SUBJECT>Physical construction.</SUBJECT>
                      <SECTNO>635.307</SECTNO>
                      <SUBJECT>Coordination.</SUBJECT>
                      <SECTNO>635.309</SECTNO>
                      <SUBJECT>Authorization.</SUBJECT>
                    </SUBPART>
                    <SUBPART>
                      <HD SOURCE="HED">Subpart D—General Material Requirements</HD>
                      <SECTNO>635.401</SECTNO>
                      <SUBJECT>Purpose.</SUBJECT>
                      <SECTNO>635.403</SECTNO>
                      <SUBJECT>Definitions.</SUBJECT>
                      <SECTNO>635.405</SECTNO>
                      <SUBJECT>Applicability.</SUBJECT>
                      <SECTNO>635.407</SECTNO>
                      <SUBJECT>Use of materials made available by a public agency.</SUBJECT>
                      <SECTNO>635.409</SECTNO>
                      <SUBJECT>Restrictions upon materials.</SUBJECT>
                      <SECTNO>635.410</SECTNO>
                      <SUBJECT>Buy America requirements.</SUBJECT>
                      <SECTNO>635.411</SECTNO>
                      <SUBJECT>Material or product selection.</SUBJECT>
                      <SECTNO>635.413</SECTNO>
                      <SUBJECT>Guaranty and warranty clauses.</SUBJECT>
                      <SECTNO>635.417</SECTNO>
                      <SUBJECT>Convict produced materials.</SUBJECT>
                    </SUBPART>
                  </CONTENTS>
                  <AUTH>
                    <HD SOURCE="HED">Authority:</HD>

                    <P>Sec. 1503 of Pub. L. 109-59, 119 Stat. 1144; 23 U.S.C. 101 (note), 109, 112, 113, 114, 116, 119, 128, and 315; 31 U.S.C. 6505; 42 U.S.C. 3334, 4601 <E T="03">et seq.</E>; Sec. 1041 (a), Pub. L. 102-240, 105 Stat. 1914; 23 CFR 1.32; 49 CFR 1.48(b).</P>
                  </AUTH>
                  <EDNOTE>
                    <HD SOURCE="HED">Editorial Note:</HD>
                    <P>Nomenclature changes to part 635 appear at 67 FR 75924, Dec. 10, 2002.</P>
                  </EDNOTE>
                  <SUBPART>
                    <HD SOURCE="HED">Subpart A—Contract Procedures</HD>
                    <SOURCE>
                      <HD SOURCE="HED">Source:</HD>
                      <P>56 FR 37004, Aug. 2, 1991, unless otherwise noted.</P>
                    </SOURCE>
                    <SECTION>
                      <SECTNO>§ 635.101</SECTNO>
                      <SUBJECT>Purpose.</SUBJECT>
                      <P>To prescribe policies, requirements, and procedures relating to Federal-aid highway projects, from the time of authorization to proceed to the construction stage, to the time of final acceptance by the Federal Highway Administration (FHWA).</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.102</SECTNO>
                      <SUBJECT>Definitions.</SUBJECT>
                      <P>As used in this subpart:</P>
                      <P>
                        <E T="03">Administrator</E> means the Federal Highway Administrator.</P>
                      <P>
                        <E T="03">Calendar day</E> means each day shown on the calendar but, if another definition is set forth in the State contract specifications, that definition will apply.</P>
                      <P>
                        <E T="03">Contract time</E> means the number of workdays or calendar days specified in a contract for completion of the contract work. The term includes authorized time extensions.</P>
                      <P>
                        <E T="03">Design-build project</E> means a project to be developed using one or more design-build contracts.</P>
                      <P>
                        <E T="03">Division Administrator</E> means the chief FHWA official assigned to conduct business in a particular State. A State is as defined in 23 U.S.C. 101.<PRTPAGE P="191"/>
                      </P>
                      <P>
                        <E T="03">Force account</E> means a basis of payment for the direct performance of highway construction work with payment based on the actual cost of labor, equipment, and materials furnished and consideration for overhead and profit.</P>
                      <P>
                        <E T="03">Formal approval</E> means approval in writing or the electronic transmission of such approval.</P>
                      <P>
                        <E T="03">Incentive/disincentive for early completion</E> as used in this subpart, describes a contract provision which compensates the contractor a certain amount of money for each day identified critical work is completed ahead of schedule and assesses a deduction for each day the contractor overruns the incentive/disincentive time. Its use is primarily intended for those critical projects where traffic inconvenience and delays are to be held to a minimum. The amounts are based upon estimates of such items as traffic safety, traffic maintenance, and road user delay costs.</P>
                      <P>
                        <E T="03">Liquidated damages</E> means the daily amount set forth in the contract to be deducted from the contract price to cover additional costs incurred by a State transportation department because of the contractor's failure to complete the contract work within the number of calendar days or workdays specified. The term may also mean the total of all daily amounts deducted under the terms of a particular contract.</P>
                      <P>
                        <E T="03">Local public agency</E> means any city, county, township, municipality, or other political subdivision that may be empowered to cooperate with the State transportation department in highway matters.</P>
                      <P>
                        <E T="03">Major change or major extra work</E> means a change which will significantly affect the cost of the project to the Federal Government or alter the termini, character or scope of the work.</P>
                      <P>
                        <E T="03">Materially unbalanced bid</E> means a bid which generates a reasonable doubt that award to the bidder submitting a mathematically unbalanced bid will result in the lowest ultimate cost to the Federal Government.</P>
                      <P>
                        <E T="03">Mathematically unbalanced bid</E> means a bid containing lump sum or unit bid items which do not reflect reasonable actual costs plus a reasonable proportionate share of the bidder's anticipated profit, overhead costs, and other indirect costs.</P>
                      <P>
                        <E T="03">Public agency</E> means any organization with administrative or functional responsibilities which are directly or indirectly affiliated with a governmental body of any nation, State, or local jurisdiction.</P>
                      <P>
                        <E T="03">Publicly owned equipment</E> means equipment previously purchased or otherwise acquired by the public agency involved primarily for use in its own operations.</P>
                      <P>
                        <E T="03">Specialty items</E> means work items identified in the contract which are not normally associated with highway construction and require highly specialized knowledge, abilities or equipment not ordinarily available in the type of contracting organizations qualified and expected to bid on the contract; in general, these items are to be limited to minor components of the overall contract.</P>
                      <P>
                        <E T="03">State transportation department (STD)</E> means that department, commission, board, or official of any State charged by its laws with the responsibility for highway construction. The term “State” should be considered equivalent to “State transportation department” if the context so implies.</P>
                      <P>
                        <E T="03">Workday</E> means a calendar day during which construction operations could proceed for a major part of a shift, normally excluding Saturdays, Sundays, and State-recognized legal holidays.</P>
                      <CITA>[62 FR 6873, Feb. 14, 1997, as amended at 67 FR 75924, Dec. 10, 2002]</CITA>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.103</SECTNO>
                      <SUBJECT>Applicability.</SUBJECT>
                      <P>The policies, requirements, and procedures prescribed in this subpart shall apply to all Federal-aid highway projects.</P>
                      <CITA>[69 FR 7118, Feb. 13, 2004]</CITA>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.104</SECTNO>
                      <SUBJECT>Method of construction.</SUBJECT>

                      <P>(a) Actual construction work shall be performed by contract awarded by competitive bidding; unless, as provided in § 635.104(b), the STD demonstrates to the satisfaction of the Division Administrator that some other method is more cost effective or that <PRTPAGE P="192"/>an emergency exists. The STD shall assure opportunity for free, open, and competitive bidding, including adequate publicity of the advertisements or calls for bids. The advertising or calling for bids and the award of contracts shall comply with the procedures and requirements set forth in §§ 635.112 and 635.114.</P>
                      <P>(b) Approval by the Division Administrator for construction by a method other than competitive bidding shall be requested by the State in accordance with subpart B of part 635 of this chapter. Before such finding is made, the STD shall determine that the organization to undertake the work is so staffed and equipped as to perform such work satisfactorily and cost effectively.</P>
                      <P>(c) In the case of a design-build project, the requirements of 23 CFR part 636 and the appropriate provisions pertaining to design-build contracting in this part will apply. However, no justification of cost effectiveness is necessary in selecting projects for the design-build delivery method.</P>
                      <CITA>[56 FR 37004, Aug. 2, 1991, as amended at 67 FR 75925, Dec. 10, 2002]</CITA>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.105</SECTNO>
                      <SUBJECT>Supervising agency.</SUBJECT>
                      <P>(a) The STD has responsibility for the construction of all Federal-aid projects, and is not relieved of such responsibility by authorizing performance of the work by a local public agency or other Federal agency. The STD shall be responsible for insuring that such projects receive adequate supervision and inspection to insure that projects are completed in conformance with approved plans and specifications.</P>
                      <P>(b) Although the STD may employ a consultant to provide construction engineering services, such as inspection or survey work on a project, the STD shall provide a full-time employed State engineer to be in responsible charge of the project.</P>
                      <P>(c) When a project is located on a street or highway over which the STD does not have legal jurisdiction, or when special conditions warrant, the STD, while not relieved of overall project responsibility, may arrange for the local public agency having jurisdiction over such street or highway to perform the work with its own forces or by contract; provided the following conditions are met and the Division Administrator approves the arrangements in advance.</P>
                      <P>(1) In the case of force account work, there is full compliance with subpart B of this part.</P>
                      <P>(2) When the work is to be performed under a contract awarded by a local public agency, all Federal requirements including those prescribed in this subpart shall be met.</P>
                      <P>(3) The local public agency is adequately staffed and suitably equipped to undertake and satisfactorily complete the work; and</P>
                      <P>(4) In those instances where a local public agency elects to use consultants for construction engineering services, the local public agency shall provide a full-time employee of the agency to be in responsible charge of the project.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.106</SECTNO>
                      <SUBJECT>Use of publicly owned equipment.</SUBJECT>
                      <P>(a) Publicly owned equipment should not normally compete with privately owned equipment on a project to be let to contract. There may be exceptional cases, however, in which the use of equipment of the State or local public agency for highway construction purposes may be warranted or justified. A proposal by any STD for the use of publicly owned equipment on such a project must be supported by a showing that it would clearly be cost effective to do so under the conditions peculiar to the individual project or locality.</P>
                      <P>(b) Where publicly owned equipment is to be made available in connection with construction work to be let to contract, Federal funds may participate in the cost of such work provided the following conditions are met:</P>
                      <P>(1) The proposed use of such equipment is clearly set forth in the Plans, Specifications and Estimate (PS&amp;E) submitted to the Division Administrator for approval.</P>
                      <P>(2) The advertised specifications specify the items of publicly owned equipment available for use by the successful bidder, the rates to be charged, and the points of availability or delivery of the equipment; and</P>

                      <P>(3) The advertised specifications include a notification that the successful bidder has the option either of renting <PRTPAGE P="193"/>part or all of such equipment from the State or local public agency or otherwise providing the equipment necessary for the performance of the contract work.</P>
                      <P>(c) In the rental of publicly owned equipment to contractors, the State or local public agency shall not profit at the expense of Federal funds.</P>
                      <P>(d) Unforeseeable conditions may make it necessary to provide publicly owned equipment to the contractor at rental rates agreed to between the contractor and the State or local public agency after the work has started. Any such arrangement shall not form the basis for any increase in the cost of the project on which Federal funds are to participate.</P>
                      <P>(e) When publicly owned equipment is used on projects constructed on a force account basis, costs may be determined by agreed unit prices or on an actual cost basis. When agreed unit prices are applied the equipment need not be itemized nor rental rates shown in the estimate. However, if such work is to be performed on an actual cost basis, the STD shall submit to the Division Administrator for approval the scheduie of rates proposed to be charged, exclusive of profit, for the publicly owned equipment made available for use.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.107</SECTNO>
                      <SUBJECT>Participation by disadvantaged business enterprises.</SUBJECT>
                      <P>(a) The STD shall schedule contract lettings in a balanced program providing contracts of such size and character as to assure an opportunity for all sizes of contracting organizations to compete. In accordance with Title VI of the Civil Rights Act of 1964, subsequent Federal-aid Highway Acts, and 49 CFR part 26, the STD shall ensure equal opportunity for disadvantaged business enterprises (DBEs) participating in the Federal-aid highway program.</P>
                      <P>(b) In the case of a design-build project funded with title 23 funds, the requirements of 49 CFR part 26 and the State's approved DBE plan apply. If DBE goals are set, DBE commitments above the goal must not be used as a proposal evaluation factor in determining the successful offeror.</P>
                      <CITA>[67 FR 75925, Dec. 10, 2002]</CITA>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.108</SECTNO>
                      <SUBJECT>Health and safety.</SUBJECT>
                      <P>Contracts for projects shall include provisions designed:</P>
                      <P>(a) To insure full compliance with all applicable Federal, State, and local laws governing safety, health and sanitation; and</P>
                      <P>(b) To require that the contractor shall provide all safeguards, safety devices, and protective equipment and shall take any other actions reasonably necessary to protect the life and health of persons working at the site of the project and the safety of the public and to protect property in connection with the performance of the work covered by the contract.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.109</SECTNO>
                      <SUBJECT>Standardized changed condition clauses.</SUBJECT>
                      <P>(a) Except as provided in paragraph (b) of this section, the following changed conditions contract clauses shall be made part of, and incorporated in, each highway construction project approved under 23 U.S.C. 106:</P>
                      <P>(1) <E T="03">Differing site conditions.</E> (i) During the progress of the work, if subsurface or latent physical conditions are encountered at the site differing materially from those indicated in the contract or if unknown physical conditions of an unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent in the work provided for in the contract, are encountered at the site, the party discovering such conditions shall promptly notify the other party in writing of the specific differing conditions before the site is disturbed and before the affected work is performed.</P>
                      <P>(ii) Upon written notification, the engineer will investigate the conditions, and if it is determined that the conditions materially differ and cause an increase or decrease in the cost or time required for the performance of any work under the contract, an adjustment, excluding anticipated profits, will be made and the contract modified in writing accordingly. The engineer will notify the contractor of the determination whether or not an adjustment of the contract is warranted.</P>

                      <P>(iii) No contract adjustment which results in a benefit to the contractor will be allowed unless the contractor <PRTPAGE P="194"/>has provided the required written notice.</P>
                      <P>(iv) No contract adjustment will be allowed under this clause for any effects caused on unchanged work. (This provision may be omitted by the STD's at their option.)</P>
                      <P>(2) <E T="03">Suspensions of work ordered by the engineer.</E> (i) If the performance of all or any portion of the work is suspended or delayed by the engineer in writing for an unreasonable period of time (not originally anticipated, customary, or inherent to the construction industry) and the contractor believes that additional compensation and/or contract time is due as a result of such suspension or delay, the contractor shall submit to the engineer in writing a request for adjustment within 7 calendar days of receipt of the notice to resume work. The request shall set forth the reasons and support for such adjustment.</P>
                      <P>(ii) Upon receipt, the engineer will evaluate the contractor's request. If the engineer agrees that the cost and/or time required for the performance of the contract has increased as a result of such suspension and the suspension was caused by conditions beyond the control of and not the fault of the contractor, its suppliers, or subcontractors at any approved tier, and not caused by weather, the engineer will make an adjustment (excluding profit) and modify the contract in writing accordingly. The contractor will be notified of the engineer's determination whether or not an adjustment of the contract is warranted.</P>
                      <P>(iii) No contract adjustment will be allowed unless the contractor has submitted the request for adjustment within the time prescribed.</P>
                      <P>(iv) No contract adjustment will be allowed under this clause to the extent that performance would have been suspended or delayed by any other cause, or for which an adjustment is provided or excluded under any other term or condition of this contract.</P>
                      <P>(3) <E T="03">Significant changes in the character of work.</E> (i) The engineer reserves the right to make, in writing, at any time during the work, such changes in quantities and such alterations in the work as are necessary to satisfactorily complete the project. Such changes in quantities and alterations shall not invalidate the contract nor release the surety, and the contractor agrees to perform the work as altered.</P>
                      <P>(ii) If the alterations or changes in quantities significantly change the character of the work under the contract, whether such alterations or changes are in themselves significant changes to the character of the work or by affecting other work cause such other work to become significantly different in character, an adjustment, excluding anticipated profit, will be made to the contract. The basis for the adjustment shall be agreed upon prior to the performance of the work. If a basis cannot be agreed upon, then an adjustment will be made either for or against the contractor in such amount as the engineer may determine to be fair and equitable.</P>
                      <P>(iii) If the alterations or changes in quantities do not significantly change the character of the work to be performed under the contract, the altered work will be paid for as provided elsewhere in the contract.</P>
                      <P>(iv) The term “significant change” shall be construed to apply only to the following circumstances:</P>
                      <P>(A) When the character of the work as altered differs materially in kind or nature from that involved or included in the original proposed construction; or</P>
                      <P>(B) When a major item of work, as defined elsewhere in the contract, is increased in excess of 125 percent or decreased below 75 percent of the original contract quantity. Any allowance for an increase in quantity shall apply only to that portion in excess of 125 percent of original contract item quantity, or in case of a decrease below 75 percent, to the actual amount of work performed.</P>
                      <P>(b) The provisions of this section shall be governed by the following:</P>
                      <P>(1) Where State statute does not permit one or more of the contract clauses included in paragraph (a) of this section, the State statute shall prevail and such clause or clauses need not be made applicable to Federal-aid highway contracts.</P>

                      <P>(2) Where the State transportation department has developed and implemented one or more of the contract <PRTPAGE P="195"/>clauses included in paragraph (a) of this section, such clause or clauses, as developed by the State transportation department may be included in Federal-aid highway contracts in lieu of the corresponding clause or clauses in paragraph (a) of this section. The State's action must be pursuant to a specific State statute requiring differing contract conditions clauses. Such State developed clause or clauses, however, must be in conformance with 23 U.S.C., 23 CFR and other applicable Federal statutes and regulations as appropriate and shall be subject to the Division Administrator's approval as part of the PS&amp;E.</P>
                      <P>(c) In the case of a design-build project, STDs are strongly encouraged to use “suspensions of work ordered by the engineer” clauses, and may consider “differing site condition” clauses and “significant changes in the character of work” clauses which are appropriate for the risk and responsibilities that are shared with the design-builder.</P>
                      <CITA>[56 FR 37004, Aug. 2, 1991; 57 FR 10062, Mar. 23, 1992, as amended at 67 FR 75925, Dec. 10, 2002]</CITA>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.110</SECTNO>
                      <SUBJECT>Licensing and qualification of contractors.</SUBJECT>
                      <P>(a) The procedures and requirements a STD proposes to use for qualifying and licensing contractors, who may bid for, be awarded, or perform Federal-aid highway contracts, shall be submitted to the Division Administrator for advance approval. Only those procedures and requirements so approved shall be effective with respect to Federal-aid highway projects. Any changes in approved procedures and requirements shall likewise be subject to approval by the Division Administrator.</P>
                      <P>(b) No procedure or requirement for bonding, insurance, prequalification, qualification, or licensing of contractors shall be approved which, in the judgment of the Division Administrator, may operate to restrict competition, to prevent submission of a bid by, or to prohibit the consideration of a bid submitted by, any responsible contractor, whether resident or nonresident of the State wherein the work is to be performed.</P>
                      <P>(c) No contractor shall be required by law, regulation, or practice to obtain a license before submission of a bid or before the bid may be considered for award of a contract. This, however, is not intended to preclude requirements for the licensing of a contractor upon or subsequent to the award of the contract if such requirements are consistent with competitive bidding. Prequalification of contractors may be required as a condition for submission of a bid or award of contract only if the period between the date of issuing a call for bids and the date of opening of bids affords sufficient time to enable a bidder to obtain the required prequalification rating.</P>
                      <P>(d) Requirements for the prequalification, qualification or licensing of contractors, that operate to govern the amount of work that may be bid upon by, or may be awarded to, a contractor, shall be approved only if based upon a full and appropriate evaluation of the contractor's capability to perform the work.</P>
                      <P>(e) Contractors who are currently suspended, debarred or voluntarily excluded under 49 CFR part 29 or otherwise determined to be ineligible, shall be prohibited from participating in the Federal-aid highway program.</P>
                      <P>(f) In the case of a design-build project, the STDs may use their own bonding, insurance, licensing, qualification or prequalification procedure for any phase of design-build procurement.</P>
                      <P>(1) The STDs may not impose statutory or administrative requirements which provide an in-State or local geographical preference in the solicitation, licensing, qualification, pre-qualification, short listing or selection process. The geographic location of a firm's office may not be one of the selection criteria. However, the STDs may require the successful design-builder to establish a local office after the award of contract.</P>

                      <P>(2) If required by State statute, local statute, or administrative policy, the STDs may require prequalification for construction contractors. The STDs may require offerors to demonstrate the ability of their engineering staff to become licensed in that State as a condition of responsiveness; however, licensing procedures may not serve as a <PRTPAGE P="196"/>barrier for the consideration of otherwise responsive proposals. The STDs may require compliance with appropriate State or local licensing practices as a condition of contract award.</P>
                      <CITA>[56 FR 37004, Aug. 2, 1991, as amended at 67 FR 75925, Dec. 10, 2002]</CITA>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.111</SECTNO>
                      <SUBJECT>Tied bids.</SUBJECT>
                      <P>(a) The STD may tie or permit the tying of Federal-aid highway projects or Federal-aid and State-financed highway projects for bidding purposes where it appears that by so doing more favorable bids may be received. To avoid discrimination against contractors desiring to bid upon a lesser amount of work than that included in the tied combinations, provisions should be made to permit bidding separately on the individual projects whenever they are of such character as to be suitable for bidding independently.</P>
                      <P>(b) When Federal-aid and State-financed highway projects are tied or permitted to be tied together for bidding purposes, the bid schedule shall set forth the quantities separately for the Federal-aid work and the State-financed work. All proposals submitted for the tied projects must contain separate bid prices for each project individually. Federal participation in the cost of the work shall be on the basis of the lowest overall responsive bid proposal unless the analysis of bids reveals that mathematical unbalancing has caused an unsupported shift of cost liability to the Federal-aid work. If such a finding is made, Federal participation shall be based on the unit prices represented in the proposal by the individual contractor who would be the lowest responsive and responsible bidder if only the Federal-aid project were considered.</P>
                      <P>(c) Federal-aid highway projects and State-financed highway projects may be combined in one contract if the conditions of the projects are so similar that the unit costs on the Federal-aid projects should not be increased by such combinations of projects. In such cases, like quantities should be combined in the proposal to avoid the possibility of unbalancing of bids in favor of either of the projects in the combination.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.112</SECTNO>
                      <SUBJECT>Advertising for bids and proposals.</SUBJECT>
                      <P>(a) No work shall be undertaken on any Federal-aid project, nor shall any project be advertised for bids, prior to authorization by the Division Administrator.</P>
                      <P>(b) The advertisement and approved plans and specifications shall be available to bidders a minimum of 3 weeks prior to opening of bids except that shorter periods may be approved by the Division Administrator in special cases when justified.</P>
                      <P>(c) The STD shall obtain the approval of the Division Administrator prior to issuing any addenda which contain a major change to the approved plans or specifications during the advertising period. Minor addenda need not receive prior approval but should be identified by the STD at the time of or prior to requesting FHWA concurrence in award. The STD shall provide assurance that all bidders have received all issued addenda.</P>
                      <P>(d) Nondiscriminatory bidding procedures shall be afforded to all qualified bidders regardless of National, State or local boundaries and without regard to race, color, religion, sex, national origin, age, or handicap. If any provisions of State laws, specifications, regulations, or policies may operate in any manner contrary to Federal requirements, including title VI of the Civil Rights Act of 1964, to prevent submission of a bid, or prohibit consideration of a bid submitted by any responsible bidder appropriately qualified in accordance with § 635.110, such provisions shall not be applicable to Federal-aid projects. Where such nonapplicable provisions exist, notices of advertising, specifications, special provisions or other governing documents shall include a positive statement to advise prospective bidders of those provisions that are not applicable.</P>
                      <P>(e) Except in the case of a concession agreement, as defined in section 710.703 of this title, no public agency shall be permitted to bid in competition or to enter into subcontracts with private contractors.</P>

                      <P>(f) The STD shall include a noncollusion provision substantially as follows in the bidding documents:
                      </P>
                      <EXTRACT>
                        <PRTPAGE P="197"/>
                        <P>Each bidder shall file a statement executed by, or on behalf of the person, firm, association, or corporation submitting the bid certifying that such person, firm, association, or corporation has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action, in restraint of free competitive bidding in connection with the submitted bid. Failure to submit the executed statement as part of the bidding documents will make the bid nonresponsive and not eligible for award consideration.</P>
                      </EXTRACT>
                      
                      <P>(1) The required form for the statement will be provided by the State to each prospective bidder.</P>
                      <P>(2) The statement shall either be in the form of an affidavit executed and sworn to by the bidder before a person who is authorized by the laws of the State to administer oaths or in the form of an unsworn declaration executed under penalty of perjury of the laws of the United States.</P>
                      <P>(g) The STD shall include the lobbying certification requirement pursuant to 49 CFR part 20 and the requirements of 49 CFR part 29 regarding suspension and debarment certification in the bidding documents.</P>
                      <P>(h) The STD shall clearly identify in the bidding documents those requirements which the bidder must assure are complied with to make the bid responsive. Failure to comply with these identified bidding requirements shall make the bid nonresponsive and not eligible for award consideration.</P>
                      <P>(i) In the case of a design-build project, the following requirements apply:</P>
                      <P>(1) When a Request for Proposals document is issued after the NEPA process is complete, the FHWA Division Administrator's approval of the Request for Proposals document will constitute the FHWA's project authorization and the FHWA's approval of the STD's request to release the document. This approval will carry the same significance as plan, specification and estimate approval on a design-bid-build Federal-aid project.</P>
                      <P>(2) Where a Request for Proposals document is issued prior to the completion of the NEPA process, the FHWA's approval of the document will only constitute the FHWA's approval of the STD's request to release the document.</P>
                      <P>(3) The STD may decide the appropriate solicitation schedule for all design-build requests. This includes all project advertising, the release of the Request for Qualifications document, the release of the Request for Proposals document and all deadlines for the receipt of qualification statements and proposals. Typical advertising periods range from six to ten weeks and can be longer for large, complicated projects.</P>
                      <P>(4) The STD must obtain the approval of the Division Administrator prior to issuing addenda which result in major changes to the Request for Proposals document. Minor addenda need not receive prior approval but may be identified by the STD at the time of or prior to requesting the FHWA's concurrence in award. The STD must provide assurance that all offerors have received all issued addenda.</P>
                      <CITA>[56 FR 37004, Aug. 2, 1991, as amended at 67 FR 75925, Dec. 10, 2002; 72 FR 45336, Aug. 14, 2007; 73 FR 77502, Dec. 19, 2008]</CITA>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.113</SECTNO>
                      <SUBJECT>Bid opening and bid tabulations.</SUBJECT>
                      <P>(a) All bids received in accordance with the terms of the advertisement shall be publicly opened and announced either item by item or by total amount. If any bid received is not read aloud, the name of the bidder and the reason for not reading the bid aloud shall be publicly announced at the letting. Negotiation with contractors, during the period following the opening of bids and before the award of the contract shall not be permitted.</P>
                      <P>(b) The STD shall prepare and forward tabulations of bids to the Division Administrator. These tabulations shall be certified by a responsible STD official and shall show:</P>
                      <P>(1) Bid item details for at least the low three acceptable bids and</P>
                      <P>(2) The total amounts of all other acceptable bids.</P>
                      <P>(c) In the case of a design-build project, the following requirements apply:</P>

                      <P>(1) All proposals received must be opened and reviewed in accordance with the terms of the solicitation. The STD must use its own procedures for the following:<PRTPAGE P="198"/>
                      </P>
                      <P>(i) The process of handling proposals and information;</P>
                      <P>(ii) The review and evaluation of proposals;</P>
                      <P>(iii) The submission, modification, revision and withdrawal of proposals; and</P>
                      <P>(iv) The announcement of the successful offeror.</P>
                      <P>(2) The STD must submit a post-award tabulation of proposal prices to the FHWA Division Administrator. The tabulation of price proposal information may include detailed pricing information when available or lump sum price information if itemized prices are not used.</P>
                      <CITA>[56 FR 37004, Aug. 2, 1991, as amended at 67 FR 75925, Dec. 10, 2002]</CITA>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.114</SECTNO>
                      <SUBJECT>Award of contract and concurrence in award.</SUBJECT>
                      <P>(a) Federal-aid contracts shall be awarded only on the basis of the lowest responsive bid submitted by a bidder meeting the criteria of responsibility as may have been established by the STD in accordance with § 635.110. Award shall be within the time established by the STD and subject to the prior concurrence of the Division Administrator.</P>
                      <P>(b) The STD shall formally request concurrence by the Division Administrator in the award of all Federal-aid contracts. Concurrence in award by the Division Administrator is a prerequisite to Federal participation in construction costs and is considered as authority to proceed with construction, unless specifically stated otherwise. Concurrence in award shall be formally approved and shall only be given after receipt and review of the tabulation of bids.</P>
                      <P>(c) Following the opening of bids, the STD shall examine the unit bid prices of the apparent low bid for reasonable conformance with the engineer's estimated prices. A bid with extreme variations from the engineer's estimate, or where obvious unbalancing of unit prices has occurred, shall be thoroughly evaluated.</P>
                      <P>(d) Where obvious unbalanced bid items exist, the STD's decision to award or reject a bid shall be supported by written justification. A bid found to be mathematically unbalanced, but not found to be materially unbalanced, may be awarded.</P>
                      <P>(e) When a low bid is determined to be both mathematically and materially unbalanced, the Division Administrator will take appropriate steps to protect the Federal interest. This action may be concurrence in a STD decision not to award the contract. If, however, the STD decides to proceed with the award and requests FHWA concurrence, the Division Administrator's action may range from nonconcurrence to concurrence with contingency conditions limiting Federal participation.</P>
                      <P>(f) If the STD determines that the lowest bid is not responsive or the bidder is not responsible, it shall so notify and obtain the Division Administrator's concurrence before making an award to the next lowest bidder.</P>
                      <P>(g) If the STD rejects or declines to read or consider a low bid on the grounds that it is not responsive because of noncompliance with a requirement which was not clearly identified in the bidding documents, it shall submit justification for its action. If such justification is not considered by the Division Administrator to be sufficient, concurrence will not be given to award to another bidder on the contract at the same letting.</P>
                      <P>(h) Any proposal by the STD to reject all bids received for a Federal-aid contract shall be submitted to the Division Administrator for concurrence, accompanied by adequate justification.</P>
                      <P>(i) In the event the low bidder selected by the STD for contract award forfeits the bid guarantee, the STD may dispose of the amounts of such forfeited guarantees in accordance with its normal practices.</P>
                      <P>(j) A copy of the executed contract between the STD and the construction contractor should be furnished to the Division Administrator as soon as practicable after execution.</P>

                      <P>(k) In the case of a design-build project, the following requirements apply: Design-build contracts shall be awarded in accordance with the Request for Proposals document. <E T="03">See</E> 23 CFR Part 636, Design-build Contracting, for details.</P>
                      <CITA>[56 FR 37004, Aug. 2, 1991, as amended at 67 FR 75925, Dec. 10, 2002]</CITA>
                    </SECTION>
                    <SECTION>
                      <PRTPAGE P="199"/>
                      <SECTNO>§ 635.115</SECTNO>
                      <SUBJECT>Agreement estimate.</SUBJECT>
                      <P>(a) Following the award of contract, an agreement estimate based on the contract unit prices and estimated quantities shall be prepared by the STD and submitted to the Division Administrator as soon as practicable for use in the preparation of the project agreement. The agreement estimate shall also include the actual or best estimated costs of any other items to be included in the project agreement.</P>
                      <P>(b) An agreement estimate shall be submitted by the STD for each force account project (see 23 CFR part 635, subpart B) when the plans and specifications are submitted to the Division Administrator for approval. It shall normally be based on the estimated quantities and the unit prices agreed upon in advance between the STD and the Division Administrator, whether the work is to be done by the STD or by a local public agency. Such agreed unit prices shall constitute a commitment as the basis for Federal participation in the cost of the project. The unit prices shall be based upon the estimated actual cost of performing the work but shall in no case exceed unit prices currently being obtained by competitive bidding on comparable highway construction work in the same general locality. In special cases involving unusual circumstances, the estimate may be based upon the estimated costs for labor, materials, equipment rentals, and supervision to complete the work rather than upon agreed unit prices. This paragraph shall not be applicable to agreement estimates for railroad and utility force account work.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.116</SECTNO>
                      <SUBJECT>Subcontracting and contractor responsibilities.</SUBJECT>
                      <P>(a) Contracts for projects shall specify the minimum percentage of work that a contractor must perform with its own organization. This percentage shall be not less than 30 percent of the total original contract price excluding any identified specialty items. Specialty items may be performed by subcontract and the amount of any such specialty items so performed may be deducted from the total original contract before computing the amount of work required to be performed by the contractor's own organization. The contract amount upon which the above requirement is computed includes the cost of materials and manufactured products which are to be purchased or produced by the contractor under the contract provisions.</P>
                      <P>(b) The STD shall not permit any of the contract work to be performed under a subcontract, unless such arrangement has been authorized by the STD in writing. Prior to authorizing a subcontract, the STD shall assure that each subcontract is evidenced in writing and that it contains all pertinent provisions and requirements of the prime contract. The Division Administrator may permit the STD to satisfy the subcontract assurance requirements by concurrence in a STD process which requires the contractor to certify that each subcontract arrangement will be in the form of a written agreement containing all the requirements and pertinent provisions of the prime contract. Prior to the Division Administrator's concurrence, the STD must demonstrate that it has an acceptable plan for monitoring such certifications.</P>
                      <P>(c) To assure that all work (including subcontract work) is performed in accordance with the contract requirements, the contractor shall be required to furnish:</P>
                      <P>(1) A competent superintendent or supervisor who is employed by the firm, has full authority to direct performance of the work in accordance with the contract requirements, and is in charge of all construction operations (regardless of who performs the work), and;</P>
                      <P>(2) Such other of its own organizational resources (supervision, management, and engineering services) as the STD contracting officer determines are necessary to assure the performance of the contract.</P>
                      <P>(d) In the case of a design-build project, the following requirements apply:</P>
                      <P>(1) The provisions of paragraph (a) of this section are not applicable to design-build contracts;</P>

                      <P>(2) At their discretion, the STDs may establish a minimum percentage of work that must be done by the design-builder. For the purpose of this section, <PRTPAGE P="200"/>the term design-builder may include any firms that are equity participants in the design-builder, their sister and parent companies, and their wholly owned subsidiaries;</P>
                      <P>(3) No procedure, requirement or preference shall be imposed which prescribes minimum subcontracting requirements or goals (other than those necessary to meet the Disadvantaged Business Enterprise program requirements of 49 CFR part 26).</P>
                      <CITA>[56 FR 37004, Aug. 2, 1991, as amended at 67 FR 75925, Dec. 10, 2002]</CITA>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.117</SECTNO>
                      <SUBJECT>Labor and employment.</SUBJECT>
                      <P>(a) No construction work shall be performed by convict labor at the work site or within the limits of any Federal-aid highway construction project from the time of award of the contract or the start of work on force account until final acceptance of the work by the STD unless it is labor performed by convicts who are on parole, supervised release, or probation.</P>
                      <P>(b) No procedures or requirement shall be imposed by any State which will operate to discriminate against the employment of labor from any other State, possession or territory of the United States, in the construction of a Federal-aid project.</P>
                      <P>(c) The selection of labor to be employed by the contractor on any Federal-aid project shall be by the contractor without regard to race, color, religion, sex, national origin, age, or handicap and in accordance with 23 CFR part 230, 41 CFR part 60 and Exec. Order No. 11246 (Sept. 24, 1965), 3 CFR 339 (1964-1965), as amended.</P>
                      <P>(d) Pursuant to 23 U.S.C. 140(d), it is permissible for STD's to implement procedures or requirements which will extend preferential employment to Indians living on or near a reservation on eligible projects as defined in paragraph (e) of this section. Indian preference shall be applied without regard to tribal affiliation or place of enrollment. In no instance should a contractor be compelled to layoff or terminate a permanent core-crew employee to meet a preference goal.</P>
                      <P>(e) Projects eligible for Indian employment preference consideration are projects located on roads within or providing access to an Indian reservation or other Indian lands as defined under the term “Indian Reservation Roads” in 23 U.S.C. 101 and regulations issued thereunder. The terminus of a road “providing access to” is that point at which it intersects with a road functionally classified as a collector or higher classification (outside the reservation boundary) in both urban and rural areas. In the case of an Interstate highway, the terminus is the first interchange outside the reservation.</P>
                      <P>(f) The advertisement or call for bids on any contract for the construction of a project located on the Federal-aid system either shall include the minimum wage rates determined by the Secretary of Labor to be prevailing on the same type of work on similar construction in the immediate locality or shall provide that such rates are set out in the bidding documents and shall further specify that such rates are a part of the contract covering the project.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.118</SECTNO>
                      <SUBJECT>Payroll and weekly statements.</SUBJECT>
                      <P>For all projects, copies of payrolls and statements of wages paid, filed with the State as set forth in the required contract provisions for the project, are to be retained by the STD for the time period pursuant to 49 CFR part 18 for review as needed by the Federal Highway Administration, the Department of Labor, the General Accounting Office, or other agencies.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.119</SECTNO>
                      <SUBJECT>False statements.</SUBJECT>
                      <P>The following notice shall be posted on each Federal-aid highway project in one or more places where it is readily available to and viewable by all personnel concerned with the project:</P>
                      <EXTRACT>
                        <HD SOURCE="HD1">Notice to All Personnel Engaged on Federal-Aid Highway Projects</HD>
                        <P>United States Code, title 18, section 1020, reads as follows:</P>

                        <P>Whoever, being an officer, agent, or employee of the United States, or of any State or Territory, or whoever, whether a person, association, firm, or corporation, knowingly makes any false statement, false representation, or false report as to the character, quality, quantity, or cost of the material used or to be used, or the quantity or quality of the work performed or to be performed, or <PRTPAGE P="201"/>the costs thereof in connection with the submission of plans, maps, specifications, contracts, or costs of construction of any highway or related project submitted for approval to the Secretary of Transportation; or</P>
                        <P>Whoever, knowingly makes any false statement, false representation, false report, or false claim with respect to the character, quality, quantity, or cost of any work performed or to be performed, or materials furnished or to be furnished, in connection with the construction of any highway or related project approved by the Secretary of Transportation; or</P>
                        <P>Whoever, knowingly makes any false statement or false representation as to a material fact in any statement, certificate, or report submitted pursuant to the provisions of the Federal-aid Road Act approved July 11, 1916 (39 Stat. 355), as amended and supplemented,</P>
                        <P>Shall be fined not more than $10,000 or imprisoned not more than five years, or both.</P>
                      </EXTRACT>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.120</SECTNO>
                      <SUBJECT>Changes and extra work.</SUBJECT>
                      <P>(a) Following authorization to proceed with a project, all major changes in the plans and contract provisions and all major extra work shall have formal approval by the Division Administrator in advance of their effective dates. However, when emergency or unusual conditions justify, the Division Administrator may give tentative advance approval orally to such changes or extra work and ratify such approval with formal approval as soon thereafter as practicable.</P>
                      <P>(b) For non-major changes and non-major extra work, formal approval is necessary but such approval may be given retroactively at the discretion of the Division Administrator. The STD should establish and document with the Division Administrator's concurrence specific parameters as to what constitutes a non-major change and non-major extra work.</P>
                      <P>(c) Changes in contract time, as related to contract changes or extra work, should be submitted at the same time as the respective work change for approval by the Division Administrator.</P>
                      <P>(d) In establishing the method of payment for contract changes or extra work orders, force account procedures shall only be used when strictly necessary, such as when agreement cannot be reached with the contractor on the price of a new work item, or when the extent of work is unknown or is of such character that a price cannot be determined to a reasonable degree of accuracy. The reason or reasons for using force account procedures shall be documented.</P>
                      <P>(e) The STD shall perform and adequately document a cost analysis of each negotiated contract change or negotiated extra work order. The method and degree of the cost analysis shall be subject to the approval of the Division Administrator.</P>
                      <P>(f) Proposed changes and extra work involved in nonparticipating operations that may affect the design or participating construction features of a project, shall be subject to review and concurrence by the Division Administrator.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.121</SECTNO>
                      <SUBJECT>Contract time and contract time extensions.</SUBJECT>
                      <P>(a) The STD should have adequate written procedures for the determination of contract time. These procedures should be submitted for approval to the Division Administrator within 6 months of the effective date of this Final Rule.</P>
                      <P>(b) Contract time extensions granted by a STD shall be subject to the concurrence of the Division Administrator and will be considered in determining the amount of Federal participation. Contract time extensions submitted for approval to the Division Administrator, shall be fully justified and adequately documented.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.122</SECTNO>
                      <SUBJECT>Participation in progress payments.</SUBJECT>
                      <P>(a) Federal funds will participate in the costs to the STD of construction accomplished as the work progresses, based on a request for reimbursement submitted by State transportation departments. When the contract provisions provide for payment for stockpiled materials, the amount of the reimbursement request upon which participation is based may include the appropriate value of approved specification materials delivered by the contractor at the project site or at another designated location in the vicinity of such construction, provided that:</P>

                      <P>(1) The material conforms with the requirements of the plans and specifications.<PRTPAGE P="202"/>
                      </P>
                      <P>(2) The material is supported by a paid invoice or a receipt for delivery of materials. If supported by a receipt of delivery of materials, the contractor must furnish the paid invoice within a reasonable time after receiving payment from the STD; and</P>
                      <P>(3) The quantity of a stockpiled material eligible for Federal participation in any case shall not exceed the total estimated quantity required to complete the project. The value of the stockpiled material shall not exceed the appropriate portion of the value of the contract item or items in which such materials are to be incorporated.</P>
                      <P>(b) The materials may be stockpiled by the contractor at a location not in the vicinity of the project, if the STD determines that because of required fabrication at an off-site location, it is not feasible or practicable to stockpile the materials in the vicinity of the project.</P>
                      <P>(c) In the case of a design-build project, the STD must define its procedures for making progress payments on lump sum contracts in the Request for Proposal document.</P>
                      <CITA>[56 FR 37004, Aug. 2, 1991, as amended at 67 FR 75925, Dec. 10, 2002]</CITA>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.123</SECTNO>
                      <SUBJECT>Determination and documentation of pay quantities.</SUBJECT>
                      <P>(a) The STD shall have procedures in effect which will provide adequate assurance that the quantities of completed work are determined accurately and on a uniform basis throughout the State. All such determinations and all related source documents upon which payment is based shall be made a matter of record.</P>
                      <P>(b) Initial source documents pertaining to the determination of pay quantities are among those records and documents which must be retained pursuant to 49 CFR part 18.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.124</SECTNO>
                      <SUBJECT>Participation in contract claim awards and settlements.</SUBJECT>
                      <P>(a) The eligibility for and extent of Federal-aid participation up to the Federal statutory share in a contract claim award made by a State to a Federal-aid contractor on the basis of an arbitration or mediation proceeding, administrative board determination, court judgment, negotiated settlement, or other contract claim settlement shall be determined on a case-by-case basis. Federal funds will participate to the extent that any contract adjustments made are supported, and have a basis in terms of the contract and applicable State law, as fairly construed. Further, the basis for the adjustment and contractor compensation shall be in accord with prevailing principles of public contract law.</P>
                      <P>(b) The FHWA shall be made aware by the STD of the details of the claim at an early stage so that coordination of efforts can be satisfactorily accomplished. It is expected that STDs will diligently pursue the satisfactory resolution of claims within a reasonable period of time. Claims arising on exempt non-NHS projects should be processed in accordance with the State's approved Stewardship Plan.</P>
                      <P>(c) When requesting Federal participation, the STD shall set forth in writing the legal and contractual basis for the claim, together with the cost data and other facts supporting the award or settlement. Federal-aid participation in such instances shall be supported by a STD audit of the actual costs incurred by the contractor unless waived by the FHWA as unwarranted. Where difficult, complex, or novel legal issues appear in the claim, such that evaluation of legal controversies is critical to consideration of the award or settlement, the STD shall include in its submission a legal opinion from its counsel setting forth the basis for determining the extent of the liability under local law, with a level of detail commensurate with the magnitude and complexity of the issues involved.</P>
                      <P>(d) In those cases where the STD receives an adverse decision in an amount more than the STD was able to support prior to the decision or settles a claim in an amount more than the STD can support, the FHWA will participate up to the appropriate Federal matching share, to the extent that it involves a Federal-aid participating portion of the contract, provided that:</P>
                      <P>(1) The FHWA was consulted and concurred in the proposed course of action;</P>
                      <P>(2) All appropriate courses of action had been considered; and</P>

                      <P>(3) The STD pursued the case diligently and in a professional manner.<PRTPAGE P="203"/>
                      </P>
                      <P>(e) Federal funds will not participate:</P>
                      <P>(1) If it has been determined that STD employees, officers, or agents acted with gross negligence, or participated in intentional acts or omissions, fraud, or other acts not consistent with usual State practices in project design, plan preparation, contract administration, or other activities which gave rise to the claim;</P>
                      <P>(2) In such cost items as consequential or punitive damages, anticipated profit, or any award or payment of attorney's fees paid by a State to an opposing party in litigation; and</P>
                      <P>(3) In tort, inverse condemnation, or other claims erroneously styled as claims “under a contract.”</P>
                      <P>(f) Payment of interest associated with a claim will be eligible for participation provided that the payment to the contractor for interest is allowable by State statute or specification and the costs are not a result of delays caused by dilatory action of the State or the contractor. The interest rates must not exceed the rate provided for by the State statute or specification.</P>
                      <P>(g) In cases where STD's affirmatively recover compensatory damages through contract claims, cross-claims, or counter claims from contractors, subcontractors, or their agents on projects on which there was Federal-aid participation, the Federal share of such recovery shall be equivalent to the Federal share of the project or projects involved. Such recovery shall be credited to the project or projects from which the claim or claims arose.</P>
                      <CITA>[56 FR 37004, Aug. 2, 1991, as amended at 62 FR 6873, Feb. 14, 1997; 69 FR 7118, Feb. 13, 2004]</CITA>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.125</SECTNO>
                      <SUBJECT>Termination of contract.</SUBJECT>
                      <P>(a) All contracts exceeding $10,000 shall contain suitable provisions for termination by the State, including the manner by which the termination will be effected and the basis for settlement. In addition, such contracts shall describe conditions under which the contract may be terminated for default as well as conditions where the contract may be terminated because of circumstances beyond the control of the contractor.</P>
                      <P>(b) The STD prior to termination of a Federal-aid contract shall consult with and receive the concurrence of the Division Administrator. The extent of Federal-aid participation in contract termination costs, including final settlement, will depend upon the merits of the individual case. However, under no circumstances shall Federal funds participate in anticipated profit on work not performed.</P>
                      <P>(c) Except as provided for in paragraph (e) of this section, normal Federal-aid plans, specifications, and estimates, advertising, and award procedures are to be followed when a STD awards the contract for completion of a terminated Federal-aid contract.</P>
                      <P>(d) When a STD awards the contract for completion of a Federal-aid contract previously terminated for default, the construction amount eligible for Federal participation on the project should not exceed whichever amount is the lesser, either:</P>
                      <P>(1) The amount representing the payments made under the original contract plus payments made under the new contract; or</P>
                      <P>(2) The amount representing what the cost would have been if the construction had been completed as contemplated by the plans and specifications under the original contract.</P>
                      <P>(e) If the surety awards a contract for completion of a defaulted Federal-aid contract or completes it by some other acceptable means, the FHWA will consider the terms of the original contract to be in effect and that the work will be completed in accordance with the approved plans and specifications included therein. No further FHWA approval or concurrence action will therefore be needed in connection with any defaulted Federal-aid contract awarded by a surety. Under this procedure, the construction amount eligible for Federal participation on the project should not exceed the amount representing what the cost would have been if the construction had been completed as contemplated by the plans and specifications under the original contract.</P>
                    </SECTION>
                    <SECTION>
                      <PRTPAGE P="204"/>
                      <SECTNO>§ 635.126</SECTNO>
                      <RESERVED>[Reserved]</RESERVED>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.127</SECTNO>
                      <SUBJECT>Agreement provisions regarding overruns in contract time.</SUBJECT>
                      <P>(a) Each State transportation department (STD) shall establish specific liquidated damages rates applicable to projects in that State. The rates may be project-specific or may be in the form of a table or schedule developed for a range of project costs and/or project types. These rates shall, as a minimum, be established to cover the estimated average daily construction engineering (CE) costs associated with the type of work encountered on the project. The amounts shall be assessed by means of deductions, for each calendar day or workday overrun in contract time, from payments otherwise due to the contractor for performance in accordance with the contract terms.</P>
                      <P>(b) The rates established shall be subject to FHWA approval either on a project-by-project basis, in the case of project-specific rates, or on a periodic basis after initial approval where a rate table or schedule is used. In the latter case, the STD shall periodically review its cost data to ascertain if the rate table/schedule closely approximates, at a minimum, the actual average daily CE costs associated with the type and size of the projects in the State. Where rate schedules or other means are already included in the STD specifications or standard special provisions, verification by the STD that the amounts are adequate shall be submitted to the FHWA for review and approval. After initial approval by the FHWA of the rates, the STD shall review the rates at least every 2 years and provide updated rates, when necessary, for FHWA approval. If updated rates are not warranted, justification of this fact is to be sent to the FHWA for review and acceptance.</P>
                      <P>(c) The STD may, with FHWA concurrence, include additional amounts as liquidated damages in each contract to cover other anticipated costs of project related delays or inconveniences to the STD or the public. Costs resulting from winter shutdowns, retaining detours for an extended time, additional demurrage, or similar costs as well as road user delay costs may be included.</P>
                      <P>(d) In addition to the liquidated damages provisions, the STD may also include incentive/disincentive for early completion provisions in the contract. The incentive/disincentive amounts shall be shown separately from the liquidated damages amounts.</P>
                      <P>(e) Where there has been an overrun in contract time, the following principles shall apply in determining the cost of a project that is eligible for Federal-aid reimbursement:</P>
                      <P>(1) A proportional share, as used in this section, is the ratio of the final contract construction costs eligible for Federal participation to the final total contract construction costs of the project.</P>
                      <P>(2) Where CE costs are claimed as a participating item based upon actual expenses incurred or where CE costs are not claimed as a participating item, and where the liquidated damages rates cover only CE expenses, the total CE costs for the project shall be reduced by the assessed liquidated damages amounts prior to figuring any Federal pro rata share payable. If the amount of liquidated damages assessed is more than the actual CE totals for the project, a proportional share of the excess shall be deducted from the federally participating contract construction cost before determining the final Federal share.</P>
                      <P>(3) Where the STD is being reimbursed for CE costs on the basis of an approved percentage of the participating construction cost, the total contract construction amount that would be eligible for Federal participation shall be reduced by a proportional share of the total liquidated damages amounts assessed on the project.</P>

                      <P>(4) Where liquidated damages include extra anticipated non-CE costs due to contractor caused delays, the amount assessed shall be used to pay for the actual non-CE expenses incurred by the STD, and, if a Federal participating item(s) is involved, to reduce the Federal share payable for that item(s). If the amount assessed is more than the actual expenses incurred by the STD, a proportional share of the excess shall be deducted from the federally participating contract construction cost of the project before the Federal share is figured.<PRTPAGE P="205"/>
                      </P>
                      <P>(f) When provisions for incentive/disincentive for early completion are used in the contract, a proportion of the increased project costs due to any incentive payments to the contractor shall be added to the federally participating contract construction cost before calculating the Federal share. When the disincentive provision is applicable, a proportion of the amount assessed the contractor shall be deducted from the federally participating contract construction cost before the Federal share calculation. Proportions are to be calculated in the same manner as set forth in paragraph (e)(1) of this section.</P>
                      <CITA>[52 FR 31390, Aug. 20, 1987. Redesignated at 62 FR 6872, Feb. 14, 1997]</CITA>
                    </SECTION>
                  </SUBPART>
                  <SUBPART>
                    <HD SOURCE="HED">Subpart B—Force Account Construction</HD>
                    <SECTION>
                      <SECTNO>§ 635.201</SECTNO>
                      <SUBJECT>Purpose.</SUBJECT>
                      <P>The purpose of this subpart is to prescribe procedures in accordance with 23 U.S.C. 112(b) for a State transportation department to request approval that highway construction work be performed by some method other than contract awarded by competitive bidding.</P>
                      <CITA>[48 FR 22912, May 23, 1983]</CITA>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.202</SECTNO>
                      <SUBJECT>Applicability.</SUBJECT>
                      <P>This subpart applies to all Federal-aid and other highway construction projects financed in whole or in part with Federal funds and to be constructed by a State transportation department or a subdivision thereof in pursuant of agreements between any other State transportation department and the Federal Highway Administration (FHWA).</P>
                      <CITA>[69 FR 7119, Feb. 13, 2004]</CITA>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.203</SECTNO>
                      <SUBJECT>Definitions.</SUBJECT>
                      <P>The following definitions shall apply for the purpose of this subpart:</P>
                      <P>(a) A <E T="03">State transportation department</E> is that department, commission, board, or official of any State charged by its laws with the responsibility for highway construction. The term <E T="03">State</E> should be considered equivalent to <E T="03">State transportation department</E> if the context so implies.</P>

                      <P>(b) Except as provided for as emergency repair work in § 668.105(i) and in § 635.204(b), the term <E T="03">some other method</E> of construction as used in 23 U.S.C. 112(b) shall mean the <E T="03">force account</E> method of construction as defined herein. In the unlikely event that circumstances are considered to justify a negotiated contract or another unusual method of construction, the policies and procedures prescribed herein for force account work will apply.</P>
                      <P>(c) The term <E T="03">force account</E> shall mean the direct performance of highway construction work by a State transportation department, a county, a railroad, or a public utility company by use of labor, equipment, materials, and supplies furnished by them and used under their direct control.</P>
                      <P>(d) The term <E T="03">county</E> shall mean any county, township, municipality or other political subdivision that may be empowered to cooperate with the State transportation department in highway matters.</P>
                      <P>(e) The term <E T="03">cost effective</E> shall mean the efficient use of labor, equipment, materials and supplies to assure the lowest overall cost.</P>
                      <P>(f) For the purpose of this part, an <E T="03">emergency</E> shall be deemed to exist when emergency repair work as provided for in § 668.105(i) is necessary or when a major element or segment of the highway system has failed and the situation is such that competitive bidding is not possible or is impractical because immediate action is necessary to:</P>
                      <P>(1) Minimize the extent of the damage,</P>
                      <P>(2) Protect remaining facilities, or</P>
                      <P>(3) Restore essential travel.</P>
                      <FP>This definition of <E T="03">emergency</E> has no applicability to the Emergency Relief Program of 23 CFR part 668.</FP>
                      <CITA>[39 FR 35158, Sept. 30, 1974, as amended at 48 FR 22912, May 23, 1983; 52 FR 45172, Nov. 25, 1987]</CITA>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.204</SECTNO>
                      <SUBJECT>Determination of more cost effective method or an emergency.</SUBJECT>

                      <P>(a) Congress has expressly provided that the contract method based on competitive bidding shall be used by a State transportation department or county for performance of highway work financed with the aid of Federal <PRTPAGE P="206"/>funds unless the State transportation department demonstrates, to the satisfaction of the Secretary, that some other method is more cost effective or that an emergency exists.</P>
                      <P>(b) When a State transportation department determines it necessary due to an emergency to undertake a federally financed highway construction project by force account or negotiated contract method, it shall submit a request to the Division Administrator identifying and describing the project, the kinds of work to be performed, the method to be used, the estimated costs, the estimated Federal Funds to be provided, and the reason or reasons that an emergency exists.</P>
                      <P>(c) Except as provided in paragraph (b) of this section, when a State transportation department desires that highway construction work financed with the aid of Federal funds, other than the kinds of work designated under § 635.205(b), be undertaken by force account, it shall submit a request to the Division Administrator identifying and describing the project and the kind of work to be performed, the estimated costs, the estimated Federal funds to be provided, and the reason or reasons that force account for such project is considered cost effective.</P>
                      <P>(d) The Division Administrator shall notify the State transportation department in writing of his/her determination.</P>
                      <CITA>[52 FR 45172, Nov. 25, 1987]</CITA>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.205</SECTNO>
                      <SUBJECT>Finding of cost effectiveness.</SUBJECT>
                      <P>(a) It may be found cost effective for a State transportation department or county to undertake a federally financed highway construction project by force account when a situation exists in which the rights or resposibilities of the community at large are so affected as to require some special course of action, including situations where there is a lack of bids or the bids received are unreasonable.</P>
                      <P>(b) Pursuant to authority in 23 U.S.C. 112(b), it is hereby determined that by reason of the inherent nature of the operations involved, it is cost effective to perform by force account the adjustment of railroad or utility facilities and similar types of facilities owned or operated by a public agency, a railroad, or a utility company provided that the organization is qualified to perform the work in a satisfactory manner. The installation of new facilities shall be undertaken by competitive bidding except as provided in § 635.204(c). Adjustment of railroad facilities shall include minor work on the railroad's operating facilities routinely performed by the railroad with its own forces such as the installation of grade crossing warning devices, crossing surfaces, and minor track and signal work. Adjustment of utility facilities shall include minor work on the utility's existing facilities routinely performed by the utility with its own forces and includes minor installations of new facilities to provide power, minor lighting, telephone, water and similar utility service to a rest area, weigh-station, movable bridge, or other highway appurtenance, provided such installation cannot feasibly be done as incidental to a major installation project such as an extensive highway lighting system.</P>
                      <CITA>[52 FR 45173, Nov. 25, 1987]</CITA>
                    </SECTION>
                  </SUBPART>
                  <SUBPART>
                    <HD SOURCE="HED">Subpart C—Physical Construction Authorization</HD>
                    <SOURCE>
                      <HD SOURCE="HED">Source:</HD>
                      <P>40 FR 17251, Apr. 18, 1975, unless otherwise noted.</P>
                    </SOURCE>
                    <SECTION>
                      <SECTNO>§ 635.301</SECTNO>
                      <SUBJECT>Purpose.</SUBJECT>
                      <P>To prescribe the policies and procedures under which a State transportation department may be authorized to advance a Federal-aid highway project to the physical construction stage.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.303</SECTNO>
                      <SUBJECT>Applicability.</SUBJECT>
                      <P>The provisions of this subpart are applicable to all Federal-aid highway construction projects.</P>
                      <CITA>[69 FR 7119, Feb. 13, 2004]</CITA>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.305</SECTNO>
                      <SUBJECT>Physical construction.</SUBJECT>

                      <P>For purposes of this subpart the physical construction of a project is considered to consist of the actual construction of the highway itself with its appurtenant facilities. It includes any removal, adjustment or demolition of buildings or major obstructions, and utility or railroad work that is a part <PRTPAGE P="207"/>of the contract for the physical construction.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.307</SECTNO>
                      <SUBJECT>Coordination.</SUBJECT>
                      <P>(a) The right-of-way clearance, utility, and railroad work are to be so coordinated with the physical construction that no unnecessary delay or cost for the physical construction will occur.</P>
                      <P>(b) All right-of-way clearance, utility, and railroad work performed separately from the contract for the physical construction of the project are to be accomplished in accordance with provisions of the following:</P>
                      <P>(1) 23 CFR part 140, subpart I;</P>
                      <P>(2) 23 CFR part 646, subpart B;</P>
                      <P>(3) 23 CFR 710.403; and</P>
                      <P>(4) 23 CFR part 645, subpart A.</P>
                      <CITA>[40 FR 17251, Apr. 18, 1975, as amended at 40 FR 25585, June 17, 1975; 64 FR 71289, Dec. 21, 1999]</CITA>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.309</SECTNO>
                      <SUBJECT>Authorization.</SUBJECT>
                      <P>Authorization to advertise the physical construction for bids or to proceed with force account construction thereof shall normally be issued as soon as, but not until, all of the following conditions have been met:</P>
                      <P>(a) The plans, specifications, and estimates (PS&amp;E) therefor have been approved.</P>
                      <P>(b) A statement is received from the State, either separately or combined with the information required by § 635.309(c), that either all right-of-way clearance, utility, and railroad work has been completed or that all necessary arrangements have been made for it to be undertaken and completed as required for proper coordination with the physical construction schedules. Where it is determined that the completion of such work in advance of the highway construction is not feasible or practical due to economy, special operational problems and the like, there shall be appropriate notification provided in the bid proposals identifying the right-of-way clearance, utility, and railroad work which is to be underway concurrently with the highway construction.</P>
                      <P>(c) A statement is received from the State certifying that all individuals and families have been relocated to decent, safe and sanitary housing or the State has made available to relocatees adequate replacement housing in accordance with the provisions of the current Federal Highway Administration (FHWA) directive(s) covering the administration of the Highway Relocation Assistance Program and that one of the following has application:</P>
                      <P>(1) All necessary rights-of-way, including control of access rights when pertinent, have been acquired including legal and physical possession. Trial or appeal of cases may be pending in court but legal possession has been obtained. There may be some improvements remaining on the right-of-way but all occupants have vacated the lands and improvements and the State has physical possession and the right to remove, salvage, or demolish these improvements and enter on all land.</P>
                      <P>(2) Although all necessary rights-of-way have not been fully acquired, the right to occupy and to use all rights-of-way required for the proper execution of the project has been acquired. Trial or appeal of some parcels may be pending in court and on other parcels full legal possession has not been obtained but right of entry has been obtained, the occupants of all lands and improvements have vacated and the State has physical possession and right to remove, salvage, or demolish these improvements.</P>

                      <P>(3) The acquisition or right of occupancy and use of a few remaining parcels is not complete, but all occupants of the residences on such parcels have had replacement housing made available to them in accordance with 49 CFR 24.204. The State may request authorization on this basis only in very unusual circumstances. This exception must never become the rule. Under these circumstances, advertisement for bids or force-account work may be authorized if FHWA finds that it will be in the public interest. The physical construction may then also proceed, but the State shall ensure that occupants of residences, businesses, farms, or non-profit organizations who have not yet moved from the right-of-way are protected against unnecessary inconvenience and disproportionate injury or any action coercive in nature. When the State requests authorization to advertise for bids and to proceed <PRTPAGE P="208"/>with physical construction where acquisition or right of occupancy and use of a few parcels has not been obtained, full explanation and reasons therefor including identification of each such parcel will be set forth in the State's request along with a realistic date when physical occupancy and use is anticipated as well as substantiation that such date is realistic. Appropriate notification shall be provided in the bid proposals identifying all locations where right of occupancy and use has not been obtained.</P>
                      <P>(d) The State transportation department in accord with 23 CFR 771.111(h), has submitted public hearing transcripts, certifications and reports pursuant to 23 U.S.C. 128.</P>
                      <P>(e) An affirmative finding of cost effectiveness or that an emergency exists has been made as required by 23 U.S.C. 112, when construction by some method other than contract based on competitive bidding is contemplated.</P>
                      <P>(f) Minimum wage rates determined by the Department of Labor in accordance with the provisions of 23 U.S.C. 113, are in effect and will not expire before the end of the period within which it can reasonably be expected that the contract will be awarded.</P>
                      <P>(g) A statement has been received that right-of-way has been acquired or will be acquired in accordance with the current FHWA directive(s) covering the acquisition of real property or that acquisition of right-of-way is not required.</P>
                      <P>(h) A statement has been received that the steps relative to relocation advisory assistance and payments as required by the current FHWA directive(s) covering the administration of the Highway Relocation Assistance Program have been taken, or that they are not required.</P>
                      <P>(i) The FHWA Division Administrator has determined that appropriate measures have been included in the PS&amp;E in keeping with approved guidelines, for minimizing possible soil erosion and water pollution as a result of highway construction operations.</P>
                      <P>(j) The FHWA Division Administrator has determined that requirements of 23 CFR part 771 have been fulfilled and appropriate measures have been included in the PS&amp;E to ensure that conditions and commitments made in the development of the project to mitigate environmental harm will be met.</P>
                      <P>(k) Where utility facilities are to use and occupy the right-of-way, the State has demonstrated to the satisfaction of the FHWA Division Administrator that the provisions of 23 CFR 645.119(b) have been fulfilled.</P>
                      <P>(l) The FHWA Division Administrator has verified the fact that adequate replacement housing is in place and has been made available to all affected persons.</P>
                      <P>(m) Where applicable, areawide agency review has been accomplished as required by 42 U.S.C. 3334 and 4231 through 4233.</P>
                      <P>(n) The FHWA Division Administrator has determined that the PS&amp;E provide for the erection of only those information signs and traffic control devices that conform to the standards developed by the Secretary of Transportation or mandates of Federal law and do not include promotional or other informational signs regarding such matters as identification of public officials, contractors, organizational affiliations, and related logos and symbols.</P>
                      <P>(o) The FHWA Division Administrator has determined that, where applicable, provisions are included in the PS&amp;E that require the erection of funding source signs, for the life of the construction project, in accordance with section 154 of the Surface Transportation and Uniform Relocation Assistance Act of 1987.</P>
                      <P>(p) In the case of a design-build project, the following certification requirements apply:</P>
                      <P>(1) The FHWA's project authorization for final design and physical construction will not be issued until the following conditions have been met:</P>
                      <P>(i) All projects must conform with the statewide and metropolitan transportation planning requirements (23 CFR part 450).</P>
                      <P>(ii) All projects in air quality nonattainment and maintenance areas must meet all transportation conformity requirements (40 CFR parts 51 and 93).</P>

                      <P>(iii) The NEPA review process has been concluded. (<E T="03">See</E> 23 CFR 636.109).<PRTPAGE P="209"/>
                      </P>
                      <P>(iv) The Request for Proposals document has been approved.</P>
                      <P>(v) A statement is received from the STD that either all right-of-way, utility, and railroad work has been completed or that all necessary arrangements will be made for the completion of right of way, utility, and railroad work.</P>
                      <P>(vi) If the STD elects to include right-of-way, utility, and/or railroad services as part of the design-builder's scope of work, then the Request for Proposals document must include:</P>
                      <P>(A) A statement concerning scope and current status of the required services, and</P>
                      <P>(B) A statement which requires compliance with the Uniform Relocation and Real Property Acquisition Policies Act of 1970, as amended, and 23 CFR part 710.</P>
                      <P>(2) During a conformity lapse, a design-build project (including right-of-way acquisition activities) may continue if, prior to the conformity lapse, the NEPA process was completed and the project has not changed significantly in design scope, the FHWA authorized the design-build project and the project met transportation conformity requirements (40 CFR parts 51 and 93).</P>
                      <P>(3) Changes to the design-build project concept and scope may require a modification of the transportation plan and transportation improvement program. The project sponsor must comply with the metropolitan and statewide transportation planning requirements in 23 CFR part 450 and the transportation conformity requirements (40 CFR parts 51 and 93) in air quality nonattainment and maintenance areas, and provide appropriate approval notification to the design-builder for such changes.</P>
                      <CITA>[40 FR 17251, Apr. 18, 1975; 40 FR 36319, Aug. 20, 1975, as amended at 47 FR 47239, Oct. 25, 1982; 49 FR 28550, July 13, 1984; 50 FR 34093, Aug. 23, 1985; 52 FR 32669, Aug. 28, 1987; 52 FR 45173, Nov. 25, 1987; 53 FR 1921, Jan. 25, 1988; 54 FR 47075, Nov. 9, 1989; 67 FR 75926, Dec. 10, 2002; 72 FR 45336, Aug. 14, 2007]</CITA>
                    </SECTION>
                  </SUBPART>
                  <SUBPART>
                    <HD SOURCE="HED">Subpart D—General Material Requirements</HD>
                    <SOURCE>
                      <HD SOURCE="HED">Source:</HD>
                      <P>41 FR 36204, Aug. 27, 1976, unless otherwise noted.</P>
                    </SOURCE>
                    <SECTION>
                      <SECTNO>§ 635.401</SECTNO>
                      <SUBJECT>Purpose.</SUBJECT>
                      <P>The purpose of this subpart is to prescribe requirements and procedures relating to product and material selection and use on Federal-aid highway projects.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.403</SECTNO>
                      <SUBJECT>Definitions.</SUBJECT>
                      <P>As used in this subpart, the following terms have the meanings indicated:</P>
                      <P>(a) <E T="03">FHWA Division Administrator</E> means the chief Federal Highway Administration (FHWA) official assigned to conduct business in a particular State;</P>
                      <P>(b) <E T="03">Material</E> means any tangible substance incorporated into a Federal-aid highway project;</P>
                      <P>(c) <E T="03">PS&amp;E</E> means plans, specifications, and estimates;</P>
                      <P>(d) <E T="03">Special provisions</E> means additions and revisions to the standard and supplemental specifications applicable to an individual project;</P>
                      <P>(e) <E T="03">Standard specifications</E> means a compilation in book form of specifications approved for general application and repetitive use;</P>
                      <P>(f) <E T="03">State</E> has the meaning set forth in 23 U.S.C. 101;</P>
                      <P>(g) <E T="03">State transportation department</E> means that department, commission, board, or official of any State charged by its laws with the responsibility for highway construction;</P>
                      <P>(h) <E T="03">Supplemental specifications</E> means approved additions and revisions to the standard specifications.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.405</SECTNO>
                      <SUBJECT>Applicability.</SUBJECT>
                      <P>The requirements and procedures prescribed in this subpart apply to all contracts relating to Federal-aid highway projects.</P>
                      <CITA>[69 FR 7119, Feb. 13, 2004]</CITA>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.407</SECTNO>
                      <SUBJECT>Use of materials made available by a public agency.</SUBJECT>

                      <P>(a) Contracts for highway projects shall require the contractor to furnish all materials to be incorporated in the work and shall permit the contractor <PRTPAGE P="210"/>to select the sources from which the materials are to be obtained. Exception to this requirement may be made when there is a definite finding by the State transportation department and concurred in by the FHWA Division Administrator, that it is in the public interest to require the contractor to use material furnished by the State transportation department or from sources designated by the State transportation department. In cases such as this, the FHWA does not expect mutual sharing of costs unless the State transportation department receives a related credit from another agency or political subdivision of the State. Where such a credit does accrue to the State transportation department, it shall be applied to the Federal-aid project involved. The designation of a mandatory material source may be permitted based on environmental considerations, provided the environment would be substantially enhanced without excessive cost. Otherwise, if a State transportation department proposal to designate a material source for mandatory use would result in higher project costs, Federal-aid funds shall not participate in the increase even if the designation would conserve other public funds.</P>
                      <P>(b) The provisions of paragraph (a) of this section will not preclude the designation in the plans and specifications of sources of local natural materials, such as borrow aggregates, that have been investigated by the State transportation department and found to contain materials meeting specification requirements. The use of materials from such designated sources shall not be mandatory unless there is a finding of public interest as stated in paragraph (a) of this section.</P>
                      <P>(c) Federal funds may participate in the cost of specifications materials made available by a public agency when they have been actually incorporated in accepted items of work, or in the cost of such materials meeting the criteria and stockpiled at the locations specified in § 635.114 of this chapter.</P>
                      <P>(d) To be eligible for Federal participation in its cost, any material, other than local natural materials, to be purchased by the State transportation department and furnished to the contractor for mandatory use in the project, must have been acquired on the basis of competitive bidding, except when there is a finding of public interest justifying the use of another method of acquisition. The location and unit price at which such material will be available to the contractor must be stated in the special provisions for the benefit of all prospective bidders. The unit cost eligible for Federation participation will be limited to the unit cost of such material to the State transportation department.</P>
                      <P>(e) When the State transportation department or another public agency owns or has control over the source of a local natural material the unit price at which such material will be made available to the contractor must be stated in the plans or special provisions. Federal participation will be limited to (1) the cost of the material to the State transportation department or other public agency; or (2) the fair and reasonable value of the material, whichever is less. Special cases may arise that will justify Federal participation on a basis other than that set forth above. Such cases should be fully documented and receive advance approval by the FHWA Division Administrator.</P>
                      <P>(f) Costs incurred by the State transportation department or other public agency for acquiring a designated source or the right to take materials from it will not be eligible for Federal participation if the source is not used by the contractor.</P>
                      <P>(g) The contract provisions for one or a combination of Federal-aid projects shall not specify a mandatory site for the disposal of surplus excavated materials unless there is a finding by the State transportation department with the concurrence of the FHWA Division Administrator that such placement is the most economical except that the designation of a mandatory site may be permitted based on environmental considerations, provided the environment would be substantially enhanced without excessive cost.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.409</SECTNO>
                      <SUBJECT>Restrictions upon materials.</SUBJECT>

                      <P>No requirement shall be imposed and no procedure shall be enforced by any <PRTPAGE P="211"/>State transportation department in connection with a project which may operate:</P>
                      <P>(a) To require the use of or provide a price differential in favor of articles or materials produced within the State, or otherwise to prohibit, restrict or discriminate against the use of articles or materials shipped from or prepared, made or produced in any State, territory or possession of the United States; or</P>
                      <P>(b) To prohibit, restrict or otherwise discriminate against the use of articles or materials of foreign origin to any greater extent than is permissible under policies of the Department of Transportation as evidenced by requirements and procedures prescribed by the FHWA Administrator to carry out such policies.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.410</SECTNO>
                      <SUBJECT>Buy America requirements.</SUBJECT>
                      <P>(a) The provisions of this section shall prevail and be given precedence over any requirements of this subpart which are contrary to this section. However, nothing in this section shall be construed to be contrary to the requirements of § 635.409(a) of this subpart.</P>
                      <P>(b) No Federal-aid highway construction project is to be authorized for advertisement or otherwise authorized to proceed unless at least one of the following requirements is met:</P>
                      <P>(1) The project either: (i) Includes no permanently incorporated steel or iron materials, or (ii) if steel or iron materials are to be used, all manufacturing processes, including application of a coating, for these materials must occur in the United States. Coating includes all processes which protect or enhance the value of the material to which the coating is applied.</P>
                      <P>(2) The State has standard contract provisions that require the use of domestic materials and products, including steel and iron materials, to the same or greater extent as the provisions set forth in this section.</P>
                      <P>(3) The State elects to include alternate bid provisions for foreign and domestic steel and iron materials which comply with the following requirements. Any procedure for obtaining alternate bids based on furnishing foreign steel and iron materials which is acceptable to the Division Administrator may be used. The contract provisions must (i) require all bidders to submit a bid based on furnishing domestic steel and iron materials, and (ii) clearly state that the contract will be awarded to the bidder who submits the lowest total bid based on furnishing domestic steel and iron materials unless such total bid exceeds the lowest total bid based on furnishing foreign steel and iron materials by more than 25 percent.</P>
                      <P>(4) When steel and iron materials are used in a project, the requirements of this section do not prevent a minimal use of foreign steel and iron materials, if the cost of such materials used does not exceed one-tenth of one percent (0.1 percent) of the total contract cost or $2,500, whichever is greater. For purposes of this paragraph, the cost is that shown to be the value of the steel and iron products as they are delivered to the project.</P>
                      <P>(c)(1) A State may request a waiver of the provisions of this section if;</P>
                      <P>(i) The application of those provisions would be inconsistent with the public interest; or</P>
                      <P>(ii) Steel and iron materials/products are not produced in the United States in sufficient and reasonably available quantities which are of a satisfactory quality.</P>
                      <P>(2) A request for waiver, accompanied by supporting information, must be submitted in writing to the Regional Federal Highway Administrator (RFHWA) through the FHWA Division Administrator. A request must be submitted sufficiently in advance of the need for the waiver in order to allow time for proper review and action on the request. The RFHWA will have approval authority on the request.</P>
                      <P>(3) Requests for waivers may be made for specific projects, or for certain materials or products in specific geographic areas, or for combinations of both, depending on the circumstances.</P>
                      <P>(4) The denial of the request by the RFHWA may be appealed by the State to the Federal Highway Administrator (Administrator), whose action on the request shall be considered administratively final.</P>

                      <P>(5) A request for a waiver which involves nationwide public interest or <PRTPAGE P="212"/>availability issues or more than one FHWA region may be submitted by the RFHWA to the Administrator for action.</P>

                      <P>(6) A request for waiver and an appeal from a denial of a request must include facts and justification to support the granting of the waiver. The FHWA response to a request or appeal will be in writing and made available to the public upon request. Any request for a nationwide waiver and FHWA's action on such a request may be published in the <E T="04">Federal Register</E> for public comment.</P>
                      <P>(7) In determining whether the waivers described in paragraph (c)(1) of this section will be granted, the FHWA will consider all appropriate factors including, but not limited to, cost, administrative burden, and delay that would be imposed if the provision were not waived.</P>
                      <P>(d) Standard State and Federal-aid contract procedures may be used to assure compliance with the requirements of this section.</P>
                      <CITA>[48 FR 53104, Nov. 25, 1983, as amended at 49 FR 18821, May 3, 1984; 58 FR 38975, July 21, 1993]</CITA>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.411</SECTNO>
                      <SUBJECT>Material or product selection.</SUBJECT>
                      <P>(a) Federal funds shall not participate, directly or indirectly, in payment for any premium or royalty on any patented or proprietary material, specification, or process specifically set forth in the plans and specifications for a project, unless:</P>
                      <P>(1) Such patented or proprietary item is purchased or obtained through competitive bidding with equally suitable unpatented items; or</P>
                      <P>(2) The State transportation department certifies either that such patented or proprietary item is essential for synchronization with existing highway facilities, or that no equally suitable alternate exists; or</P>
                      <P>(3) Such patented or proprietary item is used for research or for a distinctive type of construction on relatively short sections of road for experimental purposes.</P>
                      <P>(b) When there is available for purchase more than one nonpatented, nonproprietary material, semifinished or finished article or product that will fulfill the requirements for an item of work of a project and these available materials or products are judged to be of satisfactory quality and equally acceptable on the basis of engineering analysis and the anticipated prices for the related item(s) of work are estimated to be approximately the same, the PS&amp;E for the project shall either contain or include by reference the specifications for each such material or product that is considered acceptable for incorporation in the work. If the State transportation department wishes to substitute some other acceptable material or product for the material or product designated by the successful bidder or bid as the lowest alternate, and such substitution results in an increase in costs, there will not be Federal-aid participation in any increase in costs.</P>
                      <P>(c) A State transportation department may require a specific material or product when there are other acceptable materials and products, when such specific choice is approved by the Division Administrator as being in the public interest. When the Division Administrator's approval is not obtained, the item will be nonparticipating unless bidding procedures are used that establish the unit price of each acceptable alternative. In this case Federal-aid participation will be based on the lowest price so established.</P>
                      <P>(d) Reference in specifications and on plans to single trade name materials will not be approved on Federal-aid contracts.</P>
                      <P>(e) In the case of a design-build project, the following requirements apply: Federal funds shall not participate, directly or indirectly, in payment for any premium or royalty on any patented or proprietary material, specification, or process specifically set forth in the Request for Proposals document unless the conditions of paragraph (a) of this section are applicable.</P>
                      <CITA>[41 FR 36204, Aug. 27, 1976, as amended at 67 FR 75926, Dec. 10, 2002; 71 FR 66454, Nov. 15, 2006]</CITA>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.413</SECTNO>
                      <SUBJECT>Guaranty and warranty clauses.</SUBJECT>

                      <P>The STD may include warranty provisions in National Highway System (NHS) construction contracts in accordance with the following:<PRTPAGE P="213"/>
                      </P>
                      <P>(a) Warranty provisions shall be for a specific construction product or feature. Items of maintenance not eligible for Federal participation shall not be covered.</P>
                      <P>(b) All warranty requirements and subsequent revisions shall be submitted to the Division Administrator for advance approval.</P>
                      <P>(c) No warranty requirement shall be approved which, in the judgment of the Division Administrator, may place an undue obligation on the contractor for items over which the contractor has no control.</P>
                      <P>(d) A STD may follow its own procedures regarding the inclusion of warranty provisions in non-NHS Federal-aid contracts.</P>
                      <P>(e) In the case of a design-build project, the following requirements will apply instead of paragraphs (a) through (d) of this section.</P>
                      <P>(1) General project warranties may be used on NHS projects, provided:</P>
                      <P>(i) The term of the warranty is short (generally one to two years); however, projects developed under a public-private agreement may include warranties that are appropriate for the term of the contract or agreement.</P>
                      <P>(ii) The warranty is not the sole means of acceptance;</P>
                      <P>(iii) The warranty must not include items of routine maintenance which are not eligible for Federal participation; and,</P>
                      <P>(iv) The warranty may include the quality of workmanship, materials and other specific tasks identified in the contract.</P>
                      <P>(2) Performance warranties for specific products on NHS projects may be used at the STD's discretion. If performance warranties are used, detailed performance criteria must be provided in the Request for Proposal document.</P>
                      <P>(3) The STD may follow its own procedures regarding the inclusion of warranty provisions on non-NHS Federal-aid design-build contracts.</P>
                      <P>(4) For best value selections, the STD may allow proposers to submit alternate warranty proposals that improve upon the warranty terms in the RFP document. Such alternate warranty proposals must be in addition to the base proposal that responds to the RFP requirements.</P>
                      <CITA>[60 FR 44274, Aug. 25, 1995, as amended at 67 FR 75926, Dec. 10, 2002; 72 FR 45336, Aug. 14, 2007]</CITA>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 635.417</SECTNO>
                      <SUBJECT>Convict produced materials.</SUBJECT>
                      <P>(a) Materials produced after July 1, 1991, by convict labor may only be incorporated in a Federal-aid highway construction project if such materials have been:</P>
                      <P>(1) Produced by convicts who are on parole, supervised release, or probation from a prison or</P>
                      <P>(2) Produced in a qualified prison facility and the cumulative annual production amount of such materials for use in Federal-aid highway construction does not exceed the amount of such materials produced in such facility for use in Federal-aid highway construction during the 12-month period ending July 1, 1987.</P>
                      <P>(b) <E T="03">Qualified prison facility</E> means any prison facility in which convicts, during the 12-month period ending July 1, 1987, produced materials for use in Federal-aid highway construction projects.</P>
                      <CITA>[53 FR 1923, Jan. 25, 1988, as amended at 58 FR 38975, July 21, 1993]</CITA>
                    </SECTION>
                  </SUBPART>
                </PART>
                <PART>
                  <EAR>Pt. 636</EAR>
                  <HD SOURCE="HED">PART 636—DESIGN-BUILD CONTRACTING</HD>
                  <CONTENTS>
                    <SUBPART>
                      <HD SOURCE="HED">Subpart A—General</HD>
                      <SECHD>Sec.</SECHD>
                      <SECTNO>636.101</SECTNO>
                      <SUBJECT>What does this part do?</SUBJECT>
                      <SECTNO>636.102</SECTNO>
                      <SUBJECT>Does this part apply to me?</SUBJECT>
                      <SECTNO>636.103</SECTNO>
                      <SUBJECT>What are the definitions of terms used in this part?</SUBJECT>
                      <SECTNO>636.104</SECTNO>
                      <SUBJECT>Does this part apply to all Federal-aid design-build projects?</SUBJECT>
                      <SECTNO>636.105</SECTNO>
                      <SUBJECT>Is the FHWA requiring the use of design-build?</SUBJECT>
                      <SECTNO>636.106</SECTNO>
                      <SUBJECT>[Reserved]</SUBJECT>
                      <SECTNO>636.107</SECTNO>
                      <SUBJECT>May contracting agencies use geographic preference in Federal-aid design-build or public-private partnership projects?</SUBJECT>
                      <SECTNO>636.108</SECTNO>
                      <SUBJECT>[Reserved]</SUBJECT>
                      <SECTNO>636.109</SECTNO>
                      <SUBJECT>How does the NEPA process relate to the design-build procurement process?</SUBJECT>
                      <SECTNO>636.110</SECTNO>
                      <SUBJECT>What procedures may be used for solicitations and receipt of proposals?</SUBJECT>
                      <SECTNO>636.111</SECTNO>
                      <SUBJECT>Can oral presentations be used during the procurement process?</SUBJECT>
                      <SECTNO>636.112</SECTNO>
                      <SUBJECT>May stipends be used?</SUBJECT>
                      <SECTNO>636.113</SECTNO>

                      <SUBJECT>Is the stipend amount eligible for Federal participation?<PRTPAGE P="214"/>
                      </SUBJECT>
                      <SECTNO>636.114</SECTNO>
                      <SUBJECT>What factors should be considered in risk allocation?</SUBJECT>
                      <SECTNO>636.115</SECTNO>
                      <SUBJECT>May I meet with industry to gather information concerning the appropriate risk allocation strategies?</SUBJECT>
                      <SECTNO>636.116</SECTNO>
                      <SUBJECT>What organizational conflict of interest requirements apply to design-build projects?</SUBJECT>
                      <SECTNO>636.117</SECTNO>
                      <SUBJECT>What conflict of interest standards apply to individuals who serve as selection team members for the owner?</SUBJECT>
                      <SECTNO>636.118</SECTNO>
                      <SUBJECT>Is team switching allowed after contract award?</SUBJECT>
                      <SECTNO>636.119</SECTNO>
                      <SUBJECT>How does this part apply to a project developed under a public-private partnership?</SUBJECT>
                    </SUBPART>
                    <SUBPART>
                      <HD SOURCE="HED">Subpart B—Selection Procedures, Award Criteria</HD>
                      <SECTNO>636.201</SECTNO>
                      <SUBJECT>What selection procedures and award criteria may be used?</SUBJECT>
                      <SECTNO>636.202</SECTNO>
                      <SUBJECT>When are two-phase design-build selection procedures appropriate?</SUBJECT>
                      <SECTNO>636.203</SECTNO>
                      <SUBJECT>What are the elements of two-phase selection procedures for competitive proposals?</SUBJECT>
                      <SECTNO>636.204</SECTNO>
                      <SUBJECT>What items may be included in a phase-one solicitation?</SUBJECT>
                      <SECTNO>636.205</SECTNO>
                      <SUBJECT>Can past performance be used as an evaluation criteria?</SUBJECT>
                      <SECTNO>636.206</SECTNO>
                      <SUBJECT>How do I evaluate offerors who do not have a record of relevant past performance?</SUBJECT>
                      <SECTNO>636.207</SECTNO>
                      <SUBJECT>Is there a limit on short listed firms?</SUBJECT>
                      <SECTNO>636.208</SECTNO>
                      <SUBJECT>May I use my existing prequalification procedures with design-build contracts?</SUBJECT>
                      <SECTNO>636.209</SECTNO>
                      <SUBJECT>What items must be included in a phase-two solicitation?</SUBJECT>
                      <SECTNO>636.210</SECTNO>
                      <SUBJECT>What requirements apply to projects which use the modified design-build procedure?</SUBJECT>
                      <SECTNO>636.211</SECTNO>
                      <SUBJECT>When and how should tradeoffs be used?</SUBJECT>
                      <SECTNO>636.212</SECTNO>
                      <SUBJECT>To what extent must tradeoff decisions be documented?</SUBJECT>
                    </SUBPART>
                    <SUBPART>
                      <HD SOURCE="HED">Subpart C—Proposal Evaluation Factors</HD>
                      <SECTNO>636.301</SECTNO>
                      <SUBJECT>How should proposal evaluation factors be selected?</SUBJECT>
                      <SECTNO>636.302</SECTNO>
                      <SUBJECT>Are there any limitations on the selection and use of proposal evaluation factors?</SUBJECT>
                      <SECTNO>636.303</SECTNO>
                      <SUBJECT>May pre-qualification standards be used as proposal evaluation criteria in the RFP?</SUBJECT>
                      <SECTNO>636.304</SECTNO>
                      <SUBJECT>What process may be used to rate and score proposals?</SUBJECT>
                      <SECTNO>636.305</SECTNO>
                      <SUBJECT>Can price information be provided to analysts who are reviewing technical proposals?</SUBJECT>
                    </SUBPART>
                    <SUBPART>
                      <HD SOURCE="HED">Subpart D—Exchanges</HD>
                      <SECTNO>636.401</SECTNO>
                      <SUBJECT>What types of information exchange may take place prior to the release of the RFP document?</SUBJECT>
                      <SECTNO>636.402</SECTNO>
                      <SUBJECT>What types of information exchange may take place after the release of the RFP document?</SUBJECT>
                      <SECTNO>636.403</SECTNO>
                      <SUBJECT>What information may be exchanged with a clarification?</SUBJECT>
                      <SECTNO>636.404</SECTNO>
                      <SUBJECT>Can a competitive range be used to limit competition?</SUBJECT>
                      <SECTNO>636.405</SECTNO>
                      <SUBJECT>After developing a short list, can I still establish a competitive range?</SUBJECT>
                      <SECTNO>636.406</SECTNO>
                      <SUBJECT>Are communications allowed prior to establishing the competitive range?</SUBJECT>
                      <SECTNO>636.407</SECTNO>
                      <SUBJECT>Am I limited in holding communications with certain firms?</SUBJECT>
                      <SECTNO>636.408</SECTNO>
                      <SUBJECT>Can communications be used to cure proposal deficiencies?</SUBJECT>
                      <SECTNO>636.409</SECTNO>
                      <SUBJECT>Can offerors revise their proposals during communications?</SUBJECT>
                    </SUBPART>
                    <SUBPART>
                      <HD SOURCE="HED">Subpart E—Discussions, Proposal Revisions and Source Selection</HD>
                      <SECTNO>636.501</SECTNO>
                      <SUBJECT>What issues may be addressed in discussions?</SUBJECT>
                      <SECTNO>636.502</SECTNO>
                      <SUBJECT>Why should I use discussions?</SUBJECT>
                      <SECTNO>636.503</SECTNO>
                      <SUBJECT>Must I notify offerors of my intent to use/not use discussions?</SUBJECT>
                      <SECTNO>636.504</SECTNO>
                      <SUBJECT>If the solicitation indicated my intent was to award contract without discussions, but circumstances change, may I still hold discussions?</SUBJECT>
                      <SECTNO>636.505</SECTNO>
                      <SUBJECT>Must a contracting agency establish a competitive range if it intends to have discussions with offerors?</SUBJECT>
                      <SECTNO>636.506</SECTNO>
                      <SUBJECT>What issues must be covered in discussions?</SUBJECT>
                      <SECTNO>636.507</SECTNO>
                      <SUBJECT>What subjects are prohibited in discussions, communications and clarifications with offerors?</SUBJECT>
                      <SECTNO>636.508</SECTNO>
                      <SUBJECT>Can price or cost be an issue in discussions?</SUBJECT>
                      <SECTNO>636.509</SECTNO>
                      <SUBJECT>Can offerors revise their proposals as a result of discussions?</SUBJECT>
                      <SECTNO>636.510</SECTNO>
                      <SUBJECT>Can the competitive range be further defined once discussions have begun?</SUBJECT>
                      <SECTNO>636.511</SECTNO>
                      <SUBJECT>Can there be more than one round of discussions?</SUBJECT>
                      <SECTNO>636.512</SECTNO>
                      <SUBJECT>What is the basis for the source selection decision?</SUBJECT>
                      <SECTNO>636.513</SECTNO>
                      <SUBJECT>Are limited negotiations allowed prior to contract execution?</SUBJECT>
                      <SECTNO>636.514</SECTNO>
                      <SUBJECT>How may I provide notifications and debriefings?</SUBJECT>
                    </SUBPART>
                  </CONTENTS>
                  <AUTH>
                    <HD SOURCE="HED">Authority:</HD>
                    <P>Sec. 1503 of Pub. L. 109-59, 119 Stat. 1144; Sec. 1307 of Pub. L. 105-178, 112 Stat. 107; 23 U.S.C. 101, 109, 112, 113, 114, 115, 119, 128, and 315; 49 CFR 1.48(b).</P>
                  </AUTH>
                  <SOURCE>
                    <HD SOURCE="HED">Source:</HD>
                    <P>67 FR 75926, Dec. 10, 2002, unless otherwise noted.</P>
                  </SOURCE>
                  <SUBPART>
                    <PRTPAGE P="215"/>
                    <HD SOURCE="HED">Subpart A—General</HD>
                    <SECTION>
                      <SECTNO>§ 636.101</SECTNO>
                      <SUBJECT>What does this part do?</SUBJECT>
                      <P>This part describes the FHWA's policies and procedures for approving design-build projects financed under title 23, United States Code (U.S.C.). This part satisfies the requirement of section 1307(c) of the Transportation Equity Act for the 21st Century (TEA-21), enacted on June 9, 1998. The contracting procedures of this part apply to all design-build project funded under title 23, U.S.C.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 636.102</SECTNO>
                      <SUBJECT>Does this part apply to me?</SUBJECT>
                      <P>(a) This part uses a plain language format to make the rule easier for the general public and business community to use. The section headings and text, often in the form of questions and answers, must be read together.</P>
                      <P>(b) Unless otherwise noted, the pronoun “you” means the primary recipient of Federal-aid highway funds, the State Transportation Department (STD). Where the STD has an agreement with a local public agency (or other governmental agency) to administer a Federal-aid design-build project, the term “you” will also apply to that contracting agency.</P>
                    </SECTION>
                    <SECTION>
                      <SECTNO>§ 636.103</SECTNO>
                      <SUBJECT>What are the definitions of terms used in this part?</SUBJECT>
                      <P>Unless otherwise specified in this part, the definitions in 23 U.S.C. 101(a) are applicable to this part. Also, the following definitions are used:</P>
                      <P>
                        <E T="03">Adjusted low bid</E> means a form of best value selection in which qualitative aspects are scored on a 0 to 100 scale expressed as a decimal; price is then divided by qualitative score to yield an “adjusted bid” or “price per quality point.” Award is made to offeror with the lowest adjusted bid.</P>
                      <P>
                        <E T="03">Best value selection</E> means any selection process in which proposals contain both price and qualitative components and award is based upon a combination of price and qualitative considerations.</P>
                      <P>
                        <E T="03">Clarifications</E> means a written or oral exchange of information which takes place after the receipt of proposals when award without discussions is contemplated. The purpose of clarifications is to address minor or clerical revisions in a proposal.</P>
                      <P>
                        <E T="03">Communications</E> are exchanges, between the contracting agency and offerors, after receipt of proposals, which lead to the establishment of the competitive range.</P>
                      <P>
                        <E T="03">Competitive acquisition</E> means an acquisition process which is designed to foster an impartial and comprehensive evaluation of offerors' proposals, leading to the selection of the proposal representing the best value to the contracting agency.</P>
                      <P>
                        <E T="03">Competitive range</E> means a list of the most highly rated proposals based on the initial proposal rankings. It is based on the rating of each proposal against all evaluation criteria.</P>
                      <P>
                        <E T="03">Contracting agency</E> means the public agency awarding and administering a design-build contract. The contracting agency may be the STD or another State or local public agency.</P>
                      <P>
                        <E T="03">Deficiency</E> means a material failure of a proposal to meet a contracting agency requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.</P>
                      <P>
                        <E T="03">Design-bid-build</E> means the traditional project delivery method where design and construction are sequential steps in the project development process.</P>
                      <P>
                        <E T="03">Design-build contract</E> means an agreement that provides for design and construction of improvements by a contractor or private developer. The term encompasses design-build-maintain, design-build-operate, design-build-finance and other contracts that include services in addition to design and construction. Franchise and concession agreements are included in the term if they provide for the franchisee or concessionaire to develop the project which is the subject of the agreement.</P>
                      <P>
                        <E T="03">Design-builder</E> means the entity contractually responsible for delivering the project design and construction.</P>
                      <P>
                        <E T="03">Discussions</E> mean written or oral exchanges that take place after the establishment of the competitive range with the intent of allowing the offerors to revise their proposals.</P>
                      <P>
                        <E T="03">Final design</E> means any design activities following preliminary design and expressly includes the preparation of final construction plans and detailed <PRTPAGE P="216"/>specifications for the performance of construction work.</P>
                      <P>
                        <E T="03">Fixed price/best design</E> means a form of best value selection in which contract price is established by the owner and stated in the Request for Proposals document. Design solutions and other qualitative factors are evaluated and rated, with award going to the firm offering the best qualitative proposal for the established price.</P>
                      <P>
                        <E T="03">Intelligent Transportation System (ITS) services</E> means services which provide for the acquisition of technologies or systems of technologies (e.g., computer hardware or software, traffic control devices, communications link, fare payment system, automatic vehicle location system, etc.) that provide or contribute to the provision of one or more ITS user services as defined in the National ITS Architecture.</P>
                      <P>
                        <E T="03">Modified design-build</E> means a variation of design-build in which the contracting agency furnishes offerors with partially complete plans. The design-builders role is generally limited to the completion of the design and construction of the project.</P>
                      <P>
                        <E T="03">Organizational conflict of interest</E> means that because of other activities or relationships with other persons, a person is unable or potentially unable to render impartial assistance or advice to the owner, or the person's objectivity in performing the contract work is or might be otherwise impaired, or a person has an unfair competitive advantage.</P>
                      <P>
                        <E T="03">Preliminary design</E> defines the general project location and design concepts. It includes, but is not limited to, preliminary engineering and other activities and analyses, such as environmental assessments, topographic surveys, metes and bounds surveys, geotechnical investigations, hydrologic analysis, hydraulic analysis, utility engineering, traffic studies, financial plans, revenue estimates, hazardous materials assessments, general estimates of the types and quantities of materials, and other work needed to establish parameters for the final design. Prior to completion of the NEPA review process, any such preliminary engineering and other activities and analyses must not materially affect the objective consideration of alternatives in the NEPA review process.</P>
                      <P>
                        <E T="03">Prequalification</E> means the contracting agency's process for determining whether a firm is fundamentally qualified to compete for a certain project or class of projects. The prequalification process may be based on financial, management and other types of qualitative data. Prequalification should be distinguished from short listing.</P>
                      <P>
                        <E T="03">Price proposal</E> means the price submitted by the offeror to provide the required design and construction services.</P>
                      <P>
                        <E T="03">Price reasonableness</E> means the determination that the price of the work for any project or series of projects is not excessive and is a fair and reasonable price for the services to be performed.</P>
                      <P>
                        <E T="03">Proposal modification</E> means a change made to a proposal before the solicitation closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.</P>
                      <P>
                        <E T="03">Proposal revision</E> means a change to a proposal made after the solicitation closing date, at the request of or as allowed by a contracting officer, as the result of negotiations.</P>
                      <P>
                        <E T="03">Public-private agreement</E> means an agreement between a public agency and a private party involving design and construction of transportation improvements by the private party to be paid for in whole or in part by Federal-aid highway funds. The agreement may also provide for project financing, at-risk equity investment, operations, or maintenance of the project.</P>
                      <P>
                        <E T="03">Qualified project</E> means any design-build project (including intermodal projects) funded under Title 23, United States Code, which meets the requirements of this part and for which the contracting agency deems to be appropriate on the basis of project delivery time, cost, construction schedule, or quality.</P>
                      <P>
                        <E T="03">Request for Proposals (RFP)</E> means the document that describes the procurement process, forms the basis for the final proposals and may potentially become an element in the contract.</P>
                      <P>
                        <E T="03">Request for Qualification (RFQ)</E> means the document issued by the owner in Phase I of the two-phased selection <PRTPAGE P="217"/>proc