[Federal Register Volume 59, Number 236 (Friday, December 9, 1994)]
[Unknown Section]
[Page 0]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 94-30306]
[[Page Unknown]]
[Federal Register: December 9, 1994]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. ER94-155-003, et al.]
Catex Vitol Electric Inc., et al.; Electric Rate and Corporate
Regulation Filings
December 1, 1994.
Take notice that the following filings have been made with the
Commission:
1. Catex Vitol Electric Inc.
[Docket No. ER94-155-003]
Take notice that on November 18, 1994, Catex Vitol Electric Inc.
(CVE) tendered for filing copies of its quarterly reports regarding
transactions entered into pursuant to CVE's Rate Schedule FERC No. 1.
Comment date: December 15, 1994, in accordance with Standard
Paragraph E at the end of this notice.
2. Potomac Electric Power Company
[Docket No. ER94-900-000]
Take notice that on November 29, 1994, Potomac Electric Power
Company submitted an amended filing responding to requests for
information and clarification from the Office of Electric Power
Regulation. An effective date of December 1, 1994, with waiver of
notice is requested.
Comment date: December 12, 1994, in accordance with Standard
Paragraph E at the end of this notice.
3. Acme Power Marketing Inc.
[Docket No. ER94-1530-001]
Take notice that on November 16, 1994, Acme Power Marketing, Inc.
tendered for filing copies of its amended rate schedule in the above-
referenced docket.
Comment date: December 15, 1994, in accordance with Standard
Paragraph E at the end of this notice.
4. Destec Power Services, Inc.
[Docket No. ER94-1612-000]
Take notice that on November 23, 1994, Destec Power Services, Inc.
tendered for filing supplemental information to its August 31, 1994,
filing in the above-referenced docket.
Comment date: December 15, 1994, in accordance with Standard
Paragraph E at the end of this notice.
5. Engelhard Power Marketing, Inc.
[Docket No. ER94-1690-000]
Take notice that on November 22, 1994, Engelhard Power Marketing,
Inc. tendered for filing an amendment in the above-referenced docket.
Comment date: December 15, 1994, in accordance with Standard
Paragraph E at the end of this notice.
6. AIG Trading Corporation
[Docket No. ER94-1691-000]
Take notice that on November 23, 1994, AIG Trading Corporation
tendered for filing an amendment in the above-referenced docket.
Comment date: December 15, 1994, in accordance with Standard
Paragraph E at the end of this notice.
7. New England Power Company
[Docket No. ER95-17-000]
Take notice that on November 25, 1994, New England Power Company
tendered for filing an amendment to its October 17, 1994, filing in the
above-referenced docket.
Comment date: December 15, 1994, in accordance with Standard
Paragraph E at the end of this notice.
8. Potomac Edison Company
[Docket No. ER95-39-000]
Take notice that on November 25, 1994, The Potomac Edison Company
supplemented its original filing in this docket in support of proposed
changes in its FERC Electric Tariff, First revised Volume No. 3. The
Potomac Edison Company has also requested a waiver of the sixty day
notice rule for this supplemental filing. The proposed effective date
for the increased rates is January 1, 1995.
Copies of the filing have been provided to all parties of record.
Comment date: December 15, 1994, in accordance with Standard
Paragraph E at the end of this notice.
9. South Carolina Electric & Gas Corporation
[Docket No. ER95-64-000]
Take notice that on November 8, 1994, South Carolina Electric & Gas
Corporation tendered for filing an amendment to its October 24, 1994,
filing in the above-referenced docket.
Comment date: December 15, 1994, in accordance with Standard
Paragraph E at the end of this notice.
10. The Washington Water Power Company
[Docket No. ER95-77-000]
Take notice that on November 25, 1994, The Washington Water Power
Company (WWP), tendered for filing with the Federal Energy Regulatory
Commission an amendment to its transmission wheeling service agreement
for the City of Spokane to Puget Sound Power and Light Company to
include the First Amendment to the Transmission Service Agreement and a
revised Exhibit A.
A copy of this filing was served upon the City of Spokane and Puget
Sound Power and Light Company.
Comment date: December 15, 1994, in accordance with Standard
Paragraph E at the end of this notice.
11. New England Power Company
[Docket No. ER95-95-000]
Take notice that New England Power Company, on October 31, 1994,
tendered for filing a revised Service Agreement between New England
Power Company and Boston Edison Company for transmission service under
NEP's FERC Electric Tariff, Original Volume No. 3.
Comment date: December 15, 1994, in accordance with Standard
Paragraph E at the end of this notice.
12. Northern States Power Company (Minnesota); Northern States Power
Company (Wisconsin)
[Docket No. ER95-147-000]
Take Notice that on November 2, 1994, Northern States Power Company
(Minnesota) and Northern States Power Company (Wisconsin) jointly
tendered for filing the existing Exhibit VII and revised Exhibits VII
and IX to the Agreement to Coordinate Planning and Operations and
Interchange Power and Energy Between Northern States Power Company
(Minnesota) and Northern States Power Company (Wisconsin).
Exhibit VII sets forth the specification of the rate of return on
common equity to determine the overall cost of capital. The return on
common equity for calendar year 1995 is the same as that used for 1994.
Exhibit VIII sets forth the specification of average monthly
coincident peak demands for calendar year 1995 for each of the
Companies. A statement of the impacts off these coincident peak demands
on each company has been filed. These coincident peak demands were
determined upon three year data consisting of 18 months actual and 18
months projected. The changed from the use of the average of the 12
monthly peak demand allocation method to the use of the 36 months was
approved IX sets forth a specification of depreciation rates certified
by the Wisconsin Public Service Commission (PSCW) and the depreciation
rates currently proposed to and pending before the Minnesota Public
Utilities Commission (MPUC). A statement of the impact of the
depreciation rates on each company has been filed.
The NSP Companies request an effective date of January 1, 1995, for
this filing. Copies of the filing letter and Exhibits VII, VIII, and IX
have been served upon the wholesale and wheeling customers of the
Companies. Copies of the filing have been mailed to the State
Commissions of Michigan, Minnesota, North Dakota, South Dakota and
Wisconsin.
In addition, on November 21, 1994, Northern States tendered for
filing supplemental information to its November 2, 1994, filing this
docket.
Comment date: December 15, 1994, in accordance with Standard
Paragraph E at the end of this notice.
13. KCS Energy Marketing Services, Inc.
[Docket No. ER95-209-000]
Take notice that on November 18, 1994, KCS Energy Marketing
Services, Inc. tendered for filing an application for blanket
authorizations, of certain waivers, and order approving rate schedule.
Comment date: December 15, 1994, in accordance with Standard
Paragraph E at the end of this notice.
14. Atlantic City Electric Company
[Docket No. ER95-210-000]
Take notice that on November 18, 1994, Atlantic City Electric
Company (ACE) tendered for filing an Agreement for Short-Term Energy
Transactions between ACE and LG&E Power Marketing, Inc. ACE requests
that the Agreement be accepted to become effective November 21, 1994.
Copies of the filing were served on the New Jersey Board of
Regulatory Commissioners.
Comment date: December 15, 1994, in accordance with Standard
Paragraph E at the end of this notice.
15. Public Service Company of Oklahoma
[Docket No. ER95-211-000]
Take notice that on November 18, 1994, Public Service Company of
Oklahoma (PSO) tendered for filing three Notices of Termination stating
that the power sales and service agreements between PSO and the City of
New Cordell, Oklahoma (New Cordell), the City of Kaw City, Oklahoma
(Kaw City) and the City of Pawhuska, Oklahoma (Pawhuska), respectively,
filed with the Commission and designed as PSO Rate Schedule Numbers
170, 171, and 176, were cancelled. The effective dates of cancellation
are as follows: (1) January 1, 1991, for New Cordell; (2) September 1,
1990, for Kaw City; and (3) July 1, 1985, for Pawhuska.
Copies of the filing have been sent to the Oklahoma Corporation
Commission, Kaw City, New Cordell and Pawhuska.
Comment date: December 15, 1994, in accordance with Standard
Paragraph E at the end of this notice.
16. Wisconsin Electric Power Company
[Docket No. ER95-212-000]
Take notice that Wisconsin Electric Power Company (Wisconsin
Electric) on November 18, 1994, tendered for filing an Electric Service
Agreement between itself and Citizen's Power & Light Corporation
(Citizens). The Electric Service Agreement provides for service under
Wisconsin Electric's Coordination Sales Tariff.
Wisconsin Electric requests an effective date of sixty days from
date of filing. Copies of the filing have been served on Citizen's and
the Public Service Commission of Wisconsin.
Comment date: December 15, 1994, in accordance with Standard
Paragraph E at the end of this notice.
17. PSI Energy, Inc.
[Docket No. ER95-213-000]
Take notice that PSI Energy, Inc. (PSI) on November 18, 1994,
tendered for filing the Transmission and Local Facilities (T&LF)
Agreement Calendar Year 1993 Reconciliation between PSI and Wabash
Valley Power Association, Inc. (WVPA) and Indiana Municipal Power
Agency (IMPA). The T&LF Agreement has been designated as PSI's Rate
Schedule FERC No. 253.
Copies of the filing were served on Wabash Valley Power
Association, Inc., the Indiana Municipal Power Agency and the Indiana
Utility Regulatory Commission.
Comment date: December 15, 1994, in accordance with Standard
Paragraph E at the end of this notice.
18. Southern California Edison Company
[Docket No. ER95-215-000]
Take notice that on November 18, 1994, Southern California Edison
Company (Edison) tendered for filing the Western Systems Coordinating
Council (WSCC) Unscheduled Flow Mitigation plan (Plan). Montana Power
Corporation, Nevada Power Corporation, PacifiCorp, Pacific Gas and
Electric Company, and Sierra Pacific Power Company have tendered
Certificates of Concurrence supporting the filing.
The Plan, which was adopted by the WSCC, governs a means by which
the WSCC will mitigate Unscheduled Flow over WSCC Members' electric
systems. The Plan also sets forth the compensation that will be paid to
the WSCC Members that own the Controllable Devices that play an
integral role in reducing Unscheduled Flow, and the methodology for
determining each WSCC Member's contribution to those costs.
Copies of the filing were served upon all of the WSCC Members and
all of the state utility commissions that govern states in which the
WSCC Members provide retail electric service.
Comment date: December 15, 1994, in accordance with Standard
Paragraph E at the end of this notice.
Standard Paragraphs
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 825 North Capitol Street, NE., Washington, DC
20426, in accordance with Rules 211 and 214 of the Commission's Rules
of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 94-30306 Filed 12-8-94; 8:45 am]
BILLING CODE 6717-01-P