[Federal Register Volume 63, Number 175 (Thursday, September 10, 1998)]
[Notices]
[Pages 48527-48529]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 98-24305]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket No. 50-219]


GPU Nuclear, Inc.; Notice of Consideration of Issuance of 
Amendment to Facility Operating License, Proposed No Significant 
Hazards Consideration Determination, and Opportunity for a Hearing

    The U.S. Nuclear Regulatory Commission (the Commission) is 
considering issuance of an amendment to Facility Operating License No. 
DPR-16 issued to GPU Nuclear, Inc., the licensee) for operation of the 
Oyster Creek Nuclear Generating Station located in Ocean County, New 
Jersey.
    The proposed amendment would remove the requirement for the 
Automatic Depressurization System (ADS) function of the Electromatic 
Relief Valves (EMRV) to be operable during Reactor Vessel Pressure 
Testing. Additionally, note h of Table 3.1.1 will be corrected due to a 
typographical error introduced in the issuance of Amendment 75.
    Before issuance of the proposed license amendment, the Commission 
will have made findings required by the Atomic Energy Act of 1954, as 
amended (the Act) and the Commission's regulations.
    The Commission has made a proposed determination that the amendment 
request involves no

[[Page 48528]]

significant hazards consideration. Under the Commission's regulations 
in 10 CFR 50.92, this means that operation of the facility in 
accordance with the proposed amendment would not (1) involve a 
significant increase in the probability or consequences of an accident 
previously evaluated; or (2) create the possibility of a new or 
different kind of accident from any accident previously evaluated; or 
(3) involve a significant reduction in a margin of safety. As required 
by 10 CFR 50.91(a), the licensee has provided its analysis of the issue 
of no significant hazards consideration, which is presented below:

    1. State the basis for the determination that the proposed 
activity will or will not increase the probability of occurrence or 
consequences of an accident.
    As the ADS is not required to mitigate a [Loss of Coolant 
Accident] LOCA during reactor vessel pressure testing and this 
change will not affect the integrity of the reactor pressure vessel, 
bypassing the ADS during vessel pressure testing will not affect the 
probability of occurrence or the consequences of an accident 
previously evaluated in the [safety analysis report] SAR. Correcting 
the allowed out of service time for the relief function of the EMRVs 
does not impact any of the accidents previously evaluated by the 
SAR.
    2. State the basis for the determination that the activity does 
or does not create the possibility of an accident or malfunction of 
a different type than any previously identified in the SAR.
    This change does not change the ADS system or affect its 
function; therefore, it does not create the possibility for an 
accident or malfunction of a different type than previously 
identified in the SAR.
    3. State the basis for the determination that the margin of 
safety is not reduced.
    The effect of the unavailability of Primary Containment has been 
previously analyzed for Amendment 120 to the Technical 
Specifications. This analysis may be applied to bypassing ADS since 
Primary Containment is required for ADS to initiate. Therefore, the 
Margin of Safety is not reduced by this change. This Technical 
Specification change reestablishes the out of service time to the 
value originally established in Amendment 44.

    The NRC staff has reviewed the licensee's analysis and, based on 
this review, it appears that the three standards of 10 CFR 50.92(c) are 
satisfied. Therefore, the NRC staff proposes to determine that the 
amendment request involves no significant hazards consideration.
    The Commission is seeking public comments on this proposed 
determination. Any comments received within 30 days after the date of 
publication of this notice will be considered in making any final 
determination.
    Normally, the Commission will not issue the amendment until the 
expiration of the 30-day notice period. However, should circumstances 
change during the notice period such that failure to act in a timely 
way would result, for example, in derating or shutdown of the facility, 
the Commission may issue the license amendment before the expiration of 
the 30-day notice period, provided that its final determination is that 
the amendment involves no significant hazards consideration. The final 
determination will consider all public and State comments received. 
Should the Commission take this action, it will publish in the Federal 
Register a notice of issuance and provide for opportunity for a hearing 
after issuance. The Commission expects that the need to take this 
action will occur very infrequently.
    Written comments may be submitted by mail to the Chief, Rules and 
Directives Branch, Division of Administrative Services, Office of 
Administration, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001, and should cite the publication date and page number of 
this Federal Register notice. Written comments may also be delivered to 
Room 6D59, Two White Flint North, 11545 Rockville Pike, Rockville, 
Maryland, from 7:30 a.m. to 4:15 p.m. Federal workdays. Copies of 
written comments received may be examined at the NRC Public Document 
Room, the Gelman Building, 2120 L Street, NW., Washington, DC.
    The filing of requests for hearing and petitions for leave to 
intervene is discussed below.
    By October 9, 1998, the licensee may file a request for a hearing 
with respect to issuance of the amendment to the subject facility 
operating license and any person whose interest may be affected by this 
proceeding and who wishes to participate as a party in the proceeding 
must file a written request for a hearing and a petition for leave to 
intervene. Requests for a hearing and a petition for leave to intervene 
shall be filed in accordance with the Commission's ``Rules of Practice 
for Domestic Licensing Proceedings'' in 10 CFR Part 2. Interested 
persons should consult a current copy of 10 CFR 2.714 which is 
available at the Commission's Public Document Room, the Gelman 
Building, 2120 L Street, NW., Washington, DC, and at the local public 
document room located at the Reference Department, Ocean County 
Library, 101 Washington Street, Toms River, NJ 08753. If a request for 
a hearing or petition for leave to intervene is filed by the above 
date, the Commission or an Atomic Safety and Licensing Board, 
designated by the Commission or by the Chairman of the Atomic Safety 
and Licensing Board Panel, will rule on the request and/or petition; 
and the Secretary or the designated Atomic Safety and Licensing Board 
will issue a notice of hearing or an appropriate order.
    As required by 10 CFR 2.714, a petition for leave to intervene 
shall set forth with particularity the interest of the petitioner in 
the proceeding, and how that interest may be affected by the results of 
the proceeding. The petition should specifically explain the reasons 
why intervention should be permitted with particular reference to the 
following factors: (1) The nature of the petitioner's right under the 
Act to be made party to the proceeding; (2) the nature and extent of 
the petitioner's property, financial, or other interest in the 
proceeding; and (3) the possible effect of any order which may be 
entered in the proceeding on the petitioner's interest. The petition 
should also identify the specific aspect(s) of the subject matter of 
the proceeding as to which petitioner wishes to intervene. Any person 
who has filed a petition for leave to intervene or who has been 
admitted as a party may amend the petition without requesting leave of 
the Board up to 15 days prior to the first prehearing conference 
scheduled in the proceeding, but such an amended petition must satisfy 
the specificity requirements described above.
    Not later than 15 days prior to the first prehearing conference 
scheduled in the proceeding, a petitioner shall file a supplement to 
the petition to intervene which must include a list of the contentions 
which are sought to be litigated in the matter. Each contention must 
consist of a specific statement of the issue of law or fact to be 
raised or controverted. In addition, the petitioner shall provide a 
brief explanation of the bases of the contention and a concise 
statement of the alleged facts or expert opinion which support the 
contention and on which the petitioner intends to rely in proving the 
contention at the hearing. The petitioner must also provide references 
to those specific sources and documents of which the petitioner is 
aware and on which the petitioner intends to rely to establish those 
facts or expert opinion. Petitioner must provide sufficient information 
to show that a genuine dispute exists with the applicant on a material 
issue of law or fact. Contentions shall be limited to matters within 
the scope of the amendment under consideration. The contention must be 
one which, if proven, would entitle the petitioner to

[[Page 48529]]

relief. A petitioner who fails to file such a supplement which 
satisfies these requirements with respect to at least one contention 
will not be permitted to participate as a party.
    Those permitted to intervene become parties to the proceeding, 
subject to any limitations in the order granting leave to intervene, 
and have the opportunity to participate fully in the conduct of the 
hearing, including the opportunity to present evidence and cross-
examine witnesses.
    If a hearing is requested, the Commission will make a final 
determination on the issue of no significant hazards consideration. The 
final determination will serve to decide when the hearing is held.
    If the final determination is that the amendment request involves 
no significant hazards consideration, the Commission may issue the 
amendment and make it immediately effective, notwithstanding the 
request for a hearing. Any hearing held would take place after issuance 
of the amendment.
    If the final determination is that the amendment request involves a 
significant hazards consideration, any hearing held would take place 
before the issuance of any amendment.
    A request for a hearing or a petition for leave to intervene must 
be filed with the Secretary of the Commission, U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001, Attention: Rulemakings and 
Adjudications Staff, or may be delivered to the Commission's Public 
Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC, 
by the above date. A copy of the petition should also be sent to the 
Office of the General Counsel, U.S. Nuclear Regulatory Commission, 
Washington, DC 20555-0001, and to Shaw, Pittman, Potts & Trowbridge, 
2300 N Street, NW., Washington, DC 20037, attorney for the licensee.
    Nontimely filings of petitions for leave to intervene, amended 
petitions, supplemental petitions and/or requests for hearing will not 
be entertained absent a determination by the Commission, the presiding 
officer or the presiding Atomic Safety and Licensing Board that the 
petition and/or request should be granted based upon a balancing of the 
factors specified in 10 CFR 2.714(a)(1)(i)-(v) and 2.714(d).
    For further details with respect to this action, see the 
application for amendment dated August 21, 1998, which is available for 
public inspection at the Commission's Public Document Room, the Gelman 
Building, 2120 L Street, NW., Washington, DC, and at the local public 
document room located at the Reference Department, Ocean County 
Library, 101 Washington Street, Toms River, NJ 08753.

    Dated at Rockville, Maryland, this 3rd day of September 1998.

For the Nuclear Regulatory Commission.
Ronald B. Eaton,
Senior Project Manager, Project Directorate I-3, Division of Reactor 
Projects--I/II, Office of Nuclear Reactor Regulation.
[FR Doc. 98-24305 Filed 9-9-98; 8:45 am]