NUCLEAR REGULATORY COMMISSION
[Docket No. 030-03754]
Consideration of Amendment Request for Decommissioning the ABB
Prospects, Inc. CE Windsor Site, Building Complexes 2, 5 and 17, in
Windsor, CT, and Opportunity for a Hearing
AGENCY: Nuclear Regulatory Commission.
ACTION: Notice of consideration of amendment request for
decommissioning the ABB Prospects, Inc. CE Windsor Site, Building
Complexes 2, 5 and 17 in Windsor, Connecticut and opportunity for a
hearing.
-----------------------------------------------------------------------
The U.S. Nuclear Regulatory Commission is considering issuance of a
license amendment to By-Product Materials License No. 06-00217-06
(License No. 06-00217-06), issued to ABB Prospects, Incorporated, to
authorize decommissioning of Building Complexes 2, 5 and 17 at the CE
Windsor Site in Windsor, Connecticut.
The licensee has been performing limited decommissioning of
Building Complexes 2, 5 and 17 at the CE Windsor site in accordance
with the conditions described in License No. 06-00217-06. On January 7,
2002, the licensee submitted a Decommissioning Plan for Building
Complexes 2, 5 and 17 at the CE Windsor Site to the NRC for review that
summarized the decommissioning activities that will be undertaken to
de-construct the buildings and remediate the remaining building slabs,
basements, sub-surface utilities, and soil at the CE Windsor Site.
Radioactive contamination at the licensee's CE Windsor Site consists of
soils and building surfaces contaminated with uranium and byproduct
material resulting from licensed operations that occurred from the late
1950s until 2001.
The NRC will require the licensee to remediate Building Complexes
2, 5 and 17 and the surrounding areas to meet the NRC's decommissioning
criteria, and during decommissioning activities, to maintain effluents
and doses within NRC requirements and as low as reasonably achievable.
Prior to approving the decommissioning plan, the NRC will have made
findings required by the Atomic Energy Act of 1954, as amended, and
NRC's regulations. Approval of the Decommissioning Plan for Building
Complexes 2, 5 and 17 at the CE Windsor Site will be documented in an
amendment to License No. 06-00217-06.
The NRC hereby provides notice that this is a proceeding on an
application for amendment of a license falling within the scope of
Subpart L ``Informal Hearing Procedures for Adjudication in Materials
Licensing Proceedings,'' of NRC's rules and practice for domestic
licensing proceedings in 10 CFR part 2. Pursuant to 10 CFR 2.1205(a),
any person whose interest may be affected by this proceeding may file a
request for a hearing in accordance with 10 CFR 2.1205(c). A request
for hearing must be filed within thirty (30) days of the date of
publication of the Federal Register Notice.
The request for the hearing must be filed with the Office of the
Secretary either:
1. By delivery to the Document Control Desk or may be delivered to
the Commission's Public Document Room, 11555 Rockville Pike, Rockville,
MD 20852-2738; or
2. By mail or telegram addressed to the Secretary, U.S. Nuclear
Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemakings & Adjudications Staff.
In addition to meeting other applicable requirements of 10 CFR part
2 of the NRC's regulations, a request for a hearing filed by a person
other than an applicant must describe in detail:
1. The interest of the requester in the proceeding;
2. How that interest may be affected by the results of the
proceeding, including the reasons why the requester should be permitted
a hearing, with particular reference to the factors set out in 10 CFR
2.1205(g);
3. The requesters areas of concern about the licensing activity
that is the subject matter of the proceeding; and
4. The circumstances establishing that the request for a hearing is
timely in accordance with 10 CFR 2.1205(c).
In accordance with 10 CFR 2.1205(e), each request for a hearing
must also be served, by delivering it personally or by mail, to:
1. The applicant, ABB Prospects, Inc., CEP 880-1403, 2000 Day Hill
Road, Windsor, CT 06095-0500, Attention: John Conant; and
2. The NRC staff, by delivery to the Executive Director for
Operations, One White Flint North, 11555 Rockville Pike, Rockville, MD
20852, or by mail, addressed to the Executive Director for Operations,
U.S. Nuclear Regulatory Commission, Washington, DC 20555.
For further details with respect to this action, the
decommissioning plan is available for inspection at the NRC's Public
Document Room, 11555 Rockville Pike, Rm 0-1, F23, Rockville, MD 20852.
Dated at King of Prussia, Pennsylvania, this 3rd day of April,
2002.
For the Nuclear Regulatory Commission.
Francis M. Costello,
Deputy Director, Division of Nuclear Materials Safety, RI.
[FR Doc. 02-8610 Filed 4-9-02; 8:45 am]