NUCLEAR REGULATORY COMMISSION

[Docket No. 50-271]


Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear 
Operations, Inc.; Notice of Consideration of Issuance of Amendment to 
Facility Operating License and Opportunity for a Hearing

    The U.S. Nuclear Regulatory Commission (NRC or the Commission) is 
considering issuance of an amendment to Facility Operating License No. 
DPR-28, issued to Entergy Nuclear Vermont Yankee, LLC and Entergy 
Nuclear Operations, Inc. (the licensees), for operation of the Vermont 
Yankee Nuclear Power Station (VYNPS) located in Windham County, 
Vermont.
    The proposed amendment would change the VYNPS operating license to 
increase the maximum authorized power level from 1593 megawatts thermal 
(MWt) to 1912 MWt. This change represents an increase of approximately 
20 percent above the current maximum authorized power level. The 
proposed amendment would also change the VYNPS technical specifications 
to provide for implementing uprated power operation.
    Before issuance of the proposed license amendment, the Commission 
will have made findings required by the Atomic Energy Act of 1954, as 
amended (the Act), and the Commission's regulations.
    Within 60 days after the date of publication of this notice, the 
licensee may file a request for a hearing with respect to issuance of 
the amendment to the subject facility operating license and any person 
whose interest may be affected by this proceeding and who wishes to 
participate as a party in the proceeding must file a written request 
for a hearing and a petition for leave to intervene. Requests for a 
hearing and a petition for leave to intervene shall be filed in 
accordance with the Commission's ``Rules of Practice for Domestic 
Licensing Proceedings'' in 10 CFR Part 2. Interested persons should 
consult a current copy of 10 CFR 2.309, which is available at the 
Commission's Public Document Room (PDR), located at One White Flint 
North, Public File Area 01F21,11555 Rockville Pike (first floor), 
Rockville, Maryland. Publicly available records will be accessible from 
the Agencywide Documents Access and Management System's (ADAMS) Public 
Electronic Reading Room on the Internet at the NRC Web site, http://www.nrc.gov/reading-rm/doc-collections/cfr/. If a request for a hearing 
or petition for leave to intervene is filed by the above date, the 
Commission or a presiding officer designated by the Commission or by 
the Chief Administrative Judge of the Atomic Safety and Licensing Board 
Panel, will rule on the request and/or petition; and the Secretary or 
the Chief Administrative Judge of the Atomic Safety and Licensing Board 
will issue a notice of a hearing or an appropriate order.
    As required by 10 CFR 2.309, a petition for leave to intervene 
shall set forth with particularity the interest of the petitioner/
requestor in the proceeding, and how that interest may be affected by 
the results of the proceeding. The petition should specifically explain 
the reasons why intervention should be permitted with particular 
reference to the following general requirements: (1) The name, address 
and telephone number of the requestor or petitioner; (2) the nature of 
the requestor's/petitioner's right under the Act to be made a party to 
the proceeding; (3) the nature and extent of the requestor's/
petitioner's property, financial, or other interest in the proceeding; 
and (4) the possible effect of any decision or order which may be 
entered in the proceeding on the requestor's/petitioner's interest. The 
petition must also identify the specific contentions which the 
petitioner/requestor seeks to have litigated at the proceeding.
    Each contention must consist of a specific statement of the issue 
of law or fact to be raised or controverted. In addition, the 
petitioner/requestor shall provide a brief explanation of the bases for 
the contention and a concise statement of the alleged facts or expert 
opinion which support the contention and on which the petitioner 
intends to rely in proving the contention at the hearing. The 
petitioner must also provide references to those specific sources and 
documents of which the petitioner is aware and on which the petitioner 
intends to rely to establish those facts or expert opinion. The 
petition must include sufficient information to show that a genuine 
dispute exists with the applicant on a material issue of law or fact. 
Contentions shall be limited to matters within the scope of the 
amendment under consideration. The contention must be one which, if 
proven, would entitle the petitioner/requestor to relief. A petitioner/
requestor who fails to satisfy these requirements with respect to at 
least one contention will not be permitted to participate as a party.
    Those permitted to intervene become parties to the proceeding, 
subject to any limitations in the order granting leave to intervene, 
and have the opportunity to participate fully in the conduct of the 
hearing.
    Nontimely requests and/or petitions and contentions will not be 
entertained absent a determination by the Commission or the presiding 
officer of the Atomic Safety and Licensing Board that the petition, 
request and/or the contentions should be granted based on a balancing 
of the factors specified in 10 CFR 2.309(a)(1)(i)-(viii).
    A request for a hearing or a petition for leave to intervene must 
be filed by: (1) First class mail addressed to the Office of the 
Secretary of the Commission, U.S. Nuclear Regulatory Commission, 
Washington, DC 20555-0001, Attention: Rulemaking and Adjudications 
Staff; (2) courier, express mail, and expedited delivery services: 
Office of the Secretary, Sixteenth Floor, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland, 20852, Attention: Rulemaking and 
Adjudications Staff; (3) E-mail addressed to the Office of the 
Secretary, U.S. Nuclear Regulatory Commission, [email protected]; 
or (4) facsimile transmission addressed to the Office of the Secretary, 
U.S. Nuclear Regulatory Commission, Washington, DC, Attention: 
Rulemakings and Adjudications Staff at (301) 415-1101, verification 
number is (301) 415-1966. A copy of the request for hearing and 
petition for leave to intervene should also be sent to the Office of 
the General Counsel, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001, and it is requested that copies be transmitted either by 
means of facsimile transmission to 301-415-3725 or by email to 
[email protected]. A copy of the request for hearing and petition 
for leave to intervene should also be sent to John M. Fulton, Assistant

[[Page 39977]]

General Counsel, Entergy Nuclear Operations, Inc., 440 Hamilton Avenue, 
White Plains, NY 10601, attorney for the licensee.
    For further details with respect to this action, see the 
application for amendment dated September 10, 2003, as supplemented on 
October 1, 2003, October 28, 2003 (2 letters), January 31, 2004 (2 
letters), March 4, 2004, and May 19, 2004, which are available for 
public inspection at the Commission's PDR, located at One White Flint 
North, Public File Area O1 F21, 11555 Rockville Pike (first floor), 
Rockville, Maryland. Publicly available records will be accessible 
electronically from the ADAMS Public Electronic Reading Room on the 
Internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams.html. 
Persons who do not have access to ADAMS or who encounter problems in 
accessing the documents located in ADAMS, should contact the NRC PDR 
Reference staff by telephone at 1-800-397-4209, 301-415-4737, or by e-
mail to [email protected].

    Dated at Rockville, Maryland, this 25th day of June, 2004.
    For the Nuclear Regulatory Commission.
Richard B. Ennis,
Senior Project Manager, Section 2, Project Directorate I, Division of 
Licensing Project Management, Office of Nuclear Reactor Regulation.
[FR Doc. 04-14908 Filed 6-30-04; 8:45 am]