DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2149-131]


Public Utility District No. 1 of Douglas County, WA; Notice of 
Intent To File License Application, Filing of Pre-Application Document, 
Commencement of Licensing Proceeding, Scoping, Solicitation of Comments 
on the Pad and Scoping Document, and Identification Issues and 
Associated Study Requests

January 29, 2007.
    a. Type of Filing: Notice of Intent to File License Application for 
a New License and Commencing Licensing Proceeding.
    b. Project No.: 2149-131.
    c. Dated Filed: December 1, 2006.
    d. Submitted By: Public Utility District No. 1 of Douglas County, 
Washington (Douglas County PUD).
    e. Name of Project: Wells Hydroelectric Project.
    f. Location: The project is located on the Columbia River near the 
towns of Pateros and Brewster in Okanogan County, Washington. There are 
232.7 acres of federal lands located within the project boundary that 
are administered by the Bureau of Land Management, U.S. Army Corps of 
Engineers, or the Bureau of Reclamation.
    g. Filed Pursuant to: 18 CFR Part 5 of the Commission's 
Regulations.
    h. Potential Applicant Contact: William C. Dobbins, Manager, 
Douglas County PUD, 1151 Valley Mall Parkway, East Wenatchee, WA 98802.
    i. FERC Contact: Bob Easton at (202) 502-6045 or e-mail at 
[email protected].
    j. We are asking Federal, State, local, and tribal agencies with 
jurisdiction and/or special expertise with respect to environmental 
issues to cooperate with us in the preparation of the environmental 
document. Agencies who would like to request cooperating status should 
follow the instructions for filing comments described in paragraph o 
below. Cooperating agencies should note the Commission's policy that 
agencies that cooperate in the preparation of the environmental 
document cannot also intervene. See, 94 FERC 61,076 (2001).
    k. With this notice, we are initiating informal consultation with: 
(a) The U.S. Fish and Wildlife Service and/or NOAA Fisheries under 
section 7 of the Endangered Species Act and the joint agency 
regulations thereunder at 50 CFR, Part 402 and (b) the State Historic 
Preservation Officer, as required by

[[Page 5699]]

section 106, National Historical Preservation Act, and the implementing 
regulations of the Advisory Council on Historic Preservation at 36 CFR 
800.2.
    l. With this notice, we are designating Douglas County PUD as the 
Commission's non-federal representative for carrying out informal 
consultation, pursuant to section 7 of the Endangered Species Act and 
section 106 of the National Historic Preservation Act.
    m. Douglas County PUD filed a Pre-Application Document (PAD; 
including a proposed process plan and schedule) with the Commission, 
pursuant to 18 CFR 5.6 of the Commission's regulations.
    n. A copy of the PAD is available for review at the Commission in 
the Public Reference Room or may be viewed on the Commission's Web site 
(http://www.ferc.gov), using the ``eLibrary'' link. Enter the docket 
number, excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
[email protected] or toll free at 1-866-208-3676, of for TTY, 
(202) 502-8659. A copy is also available for inspection and 
reproduction at the address in paragraph h.
    Register online at http://ferc.gov/esubscribenow.htm to be notified 
via e-mail of new filing and issuances related to this or other pending 
projects. For assistance, contact FERC Online Support.
    o. With this notice, we are soliciting comments on the PAD and 
Scoping Document 1 (SD1), as well as study requests. All comments on 
the PAD and SD1, and study requests should be sent to the address above 
in paragraph h. In addition, all comments on the PAD and SD1, study 
requests, requests for cooperating agency status, and all 
communications to and from Commission staff related to the merits of 
the potential application (original and eight copies) must be filed 
with the Commission at the following address: Magalie R. Salas, 
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426. All filings with the Commission must include on 
the first page, the project name (Wells Hydroelectric Project) and 
number (P-2149-131), and bear the heading ``Comments on Pre-Application 
Document,'' ``Study Requests,'' ``Comments on Scoping Document 1,'' 
``Request for Cooperating Agency Status,'' or ``Communications to and 
from Commission Staff.'' Any individual or entity interested in 
submitting study requests, commenting on the PAD or SD1, and any agency 
requesting cooperating status must do so by April 2, 2007.
    Comments on the PAD and SD1, study requests, requests for 
cooperating agency status, and other permissible forms of 
communications with the Commission may be filed electronically via the 
Internet in lieu of paper. The Commission strongly encourages 
electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions 
on the Commission's Web site (http://www.ferc.gov) under the ``e-
filing'' link.
    p. Although our current intent is to prepare an environmental 
assessment (EA), there is the possibility that an Environmental Impact 
Statement (EIS) will be required. Nevertheless, this meeting will 
satisfy the NEPA scoping requirements, irrespective of whether an EA or 
EIS is issued by the Commission.

Scoping Meetings

    Commission staff will hold two scoping meetings in the vicinity of 
the project at the time and place noted below. The daytime meeting will 
focus on resource agency, Indian tribes, and non-governmental 
organization concerns, while the evening meeting is primarily for 
receiving input from the public. We invite all interested individuals, 
organizations, and agencies to attend one or both of the meetings, and 
to assist staff in identifying particular study needs, as well as the 
scope of environmental issues to be addressed in the environmental 
document. The times and locations of these meetings are as follows:
    Daytime Scoping Meeting:
    Date: Wednesday, February 28, 2007.
    Time: 9 a.m.
    Location: Douglas County PUD Auditorium, 1151 Valley Mall Parkway, 
East Wenatchee, Washington.
    Evening Scoping Meeting:
    Date: Wednesday, February 28, 2007.
    Time: 7 p.m.
    Location: Columbia Cove Community Center, 601 West Cliff Avenue, 
Brewster, Washington.
    SD1, which outlines the subject areas to be addressed in the 
environmental document, was mailed to the individuals and entities on 
the Commission's mailing list. Copies of SD1 will be available at the 
scoping meetings, or may be viewed on the Web at http://www.ferc.gov, 
using the ``eLibrary'' link. Follow the directions for accessing 
information in paragraph n. Based on all oral and written comments, a 
Scoping Document 2 (SD2) may be issued. SD2 may include a revised 
process plan and schedule, as well as a list of issues, identified 
through the scoping process.

Site Visit

    The potential applicant and Commission staff will conduct a site 
visit of the project on Tuesday, February 27, 2007, starting at 9 a.m. 
All participants should meet at the Wells Dam Visitors Center off of 
U.S. Highway 97. All participants are responsible for their own 
transportation. Anyone with questions about the site visit should 
contact Ms. Mary Mayo of Douglas County PUD at (509) 881-2488 on or 
before February 21, 2007.

Meeting Objectives

    At the scoping meetings, staff will: (1) Initiate scoping of the 
issues; (2) review and discuss existing conditions and resource 
management objectives; (3) review and discuss existing information and 
identify preliminary information and study needs; (4) review and 
discuss the process plan and schedule for pre-filing activity that 
incorporates the time frames provided for in Part 5 of the Commission's 
regulations and, to the extent possible, maximizes coordination of 
Federal, State, and tribal permitting and certification processes; and 
(5) discuss the appropriateness of any federal or state agency or 
Indian tribe acting as a cooperating agency for development of an 
environmental document.
    Meeting participants should come prepared to discuss their issues 
and/or concerns. Please review the PAD in preparation for the scoping 
meetings. Directions on how to obtain a copy of the PAD and SD1 are 
included in item n. of this document.

Meeting Procedures

    The meetings will be recorded by a stenographer and will become 
part of the formal record of the Commission proceeding on the project.

Magalie R. Salas,
Secretary.