[Federal Register Volume 72, Number 32 (Friday, February 16, 2007)]
[Notices]
[Pages 7649-7650]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-2702]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2985-004]
MeadWestvaco; Notice of Change in Applicant's Proposal Concerning
the Redevelopment of the Willow Mill Hydroelectric Project
February 9, 2007.
a. Type of Filing: Notice of Intent (NOI) to File Application for a
New License and Commencing Licensing Proceeding.
b. Project No.: 2985-004.
c. Dated Filed: April 14, 2006.
d. Applicant: MeadWestvaco.
e. Name of Project: Willow Mill Hydroelectric Project.
f. Location: On the Housatonic River in Berkshire County,
Massachusetts. The project does not occupy federal lands.
g. Filed Pursuant to: 18 CFR Part 5 of the Commission's
Regulations.
h. Applicant Contact: Mr. Robert Miller, MeadWestvaco, 547A
Sissonville Road, Potsdam, NY 13676, (315) 267-5609.
i. FERC Contact: Kristen Murphy, (202) 502-6236, or via e-mail at
kristen.murphy@ferc.gov.
j. The Willow Mill Project includes: a 14-foot-high, 150-foot-wide
stone masonry gravity dam; an impoundment of approximately 11 surface
acres; a 10-foot-deep, 18-foot-wide rubble and masonry canal that runs
approximately 50 feet to a 10-foot-deep, 18-foot wide, 260-foot long
rubble and masonry underground headrace; two steel penstocks, one
leading to a 100-kW unit, the other leading to a 360-kW unit. The two
generating units are located in the basement of MeadWestvaco's paper
mill, and release flow to an 8-foot-wide underground tailrace that
reconnects to the Housatonic River approximately 700 feet downstream
from Willow Mill Dam. The 360-kW unit has not been operated
[[Page 7650]]
since 1966. The 100-kW unit ceased operating in 2005.
k. In its PAD, MeadWestvaco stated it was evaluating its options
relative to rehabilitating the 100 kW unit, or potentially increasing
the overall hydraulic capacity of the facility. Pursuant to 18 CFR
5.11, MeadWestvaco filed a Proposed Study Plan on September 26, 2006.
The plan included a Hydropower Redevelopment Study to evaluate the
feasibility of rehabilitating the existing facility, replacing the
generator units with newer models, or expanding the overall facility
capacity. In its Revised Study Plan, filed January 23, 2007,
MeadWestvaco withdrew the Hydropower Redevelopment Study proposal.
Rather, MeadWestvaco now states that it will rehabilitate the 100-kW
unit during 2007, and otherwise has no plans to upgrade or expand the
project.
l. Pursuant to 18 CFR 16.7, information on the project is available
at: Ms. Patricia C. Begrowicz, MeadWestvaco, 40 Willow Street, South
Lee, MA 01260.
m. Willow Mill Project information is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site (http://www.ferc.gov), using the ``eLibrary''
link. Enter the docket number, excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support at FERCONlineSupport@ferc.gov or toll free at 1-
866-208-3676, or for TTY, (202) 502-8659. Copies are also available for
inspection and reproduction at the address in paragraph m.
n. Register online at http://ferc.gov/esubscribenow.htm to be
notified via e-mail of new filing and issuances related to this or
other pending projects. For assistance, contact FERC Online Support.
Magalie R. Salas,
Secretary.
[FR Doc. E7-2702 Filed 2-15-07; 8:45 am]