[Federal Register Volume 72, Number 169 (Friday, August 31, 2007)]
[Notices]
[Pages 50414-50416]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: E7-17276]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
Revised Notice of Intent To Prepare a Generic Environmental
Impact Statement for Uranium Milling Facilities
AGENCY: United States Nuclear Regulatory Commission (NRC).
ACTION: Revised notice of intent (NOI).
-----------------------------------------------------------------------
SUMMARY: This notice revises a notice published on July 24, 2007 in the
Federal Register (72 FR 141) which informed the public of the NRC's
intent to prepare a Generic Environmental Impact Statement (GEIS) in
accordance with the National Environmental Policy Act (NEPA) and NRC's
NEPA implementing regulations contained in 10 CFR part 51. The purpose
of this revised notice is to (1) Announce that an additional scoping
meeting will be held in Gallup, New Mexico on September 27, 2007 and
(2) extend the scoping comment period to October 8, 2007. The GEIS will
assess the potential environmental impacts associated with uranium
recovery at milling facilities employing the in-situ leach (ISL)
process. The GEIS may also assess the potential environmental impacts
of alternative methods of uranium recovery (including the conventional
milling process).
DATES: The NRC has recently held public meetings in Casper, Wyoming and
Albuquerque, New Mexico as part of the public scoping process required
by NEPA. In response to public requests, the public scoping period for
the GEIS has been extended to October 8, 2007. Written comments
submitted by mail should be postmarked by that date to ensure
consideration. Comments mailed after that date will be considered to
the extent possible.
In addition, the NRC will conduct a third public meeting in Gallup,
New Mexico to assist in defining the appropriate scope of the GEIS,
including the significant environmental issues to be addressed. The
meeting date, time and location are listed below:
Meeting Date: September 27, 2007, 7 p.m. to 9:30 p.m.
Meeting Location: Best Western Inn and Suites, 3009 West Hwy 66,
Gallup, NM 87301-6813, Phone (505) 722-2221.
For this meeting, members of the NRC staff will be available for
informal discussions with members of the public from 6 p.m. to 7 p.m.
The formal meeting and associated NRC presentation will begin at 7 p.m.
For planning purposes, those who wish to present oral comments at the
meeting are encouraged to pre-register by contacting Carol Walls of the
NRC by telephone at 1-800-368-5642, Extension 8028, or by e-mail at
[email protected] no later than September 21, 2007. Interested persons may
also register to speak at the meetings. Depending on the number of
speakers, each speaker may be limited in the amount of time allocated
for their comments so that all speakers will have an opportunity to
offer comments.
ADDRESSES: Members of the public and interested parties are invited and
encouraged to submit comments to the Chief, Rulemaking, Directives, and
Editing Branch, Mail Stop T-6D59, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001. Also, the NRC encourages comments to be
submitted electronically to [email protected]. Please refer to the
``Uranium Recovery GEIS'' when submitting comments.
FOR FURTHER INFORMATION CONTACT: For general information on the NRC
NEPA process, or the environmental review process related to this GEIS,
please contact: Paul Michalak, Project Manager, Division of Waste
Management and Environmental Protection (DWMEP), Mail Stop T-8F5, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, by phone at
1-800-368-5642, Extension 7612, or by e-mail at [email protected], For
general or technical information associated with the safety and
licensing of uranium milling facilities, please contact: William Von
Till, Branch Chief, Uranium Recovery Branch, DWMEP, Mail Stop T-8F5,
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, by phone
at 1-800-368-5642, Extension 0598, or by e-mail at [email protected].
Information and documents associated with the GEIS are available
for public review through the NRC electronic reading room: http://
[[Page 50415]]
www.nrc.gov/reading-rm/adams.html. Documents may also be obtained from
the NRC Public Document Room at U.S. Nuclear Regulatory Commission
Headquarters, 11555 Rockville Pike (first floor), Rockville, Maryland,
20852-2738.
SUPPLEMENTARY INFORMATION:
1.0 Background
The NRC is expecting numerous license applications for in-situ
leach (ISL) uranium milling facilities in the coming 2-3 years. This
GEIS is intended to address the common issues associated with
environmental reviews of such milling facilities located in the western
United States. Because there are environmental issues common to ISL
milling facilities, the NRC staff will be addressing these common
issues generically to aid in a more efficient environmental review for
each separate license application, if and when these applications are
submitted.
ISL milling facilities recover uranium from low grade ores that may
not be economically recoverable by other methods. In this process, a
leaching agent, such as oxygen with sodium bicarbonate, is added to
native ground water for injection through wells into the subsurface ore
body to dissolve the uranium. The leach solution, containing the
dissolved uranium, is pumped back to the surface and sent to the
processing plant, where ion exchange is used to separate the uranium
from the solution. The underground leaching of the uranium also frees
other metals and minerals from the host rock. Operators of ISL
facilities are required to restore the ground water affected by the
leaching operations. The milling process concentrates the recovered
uranium into the product known as ``yellowcake''
(U3O8). This yellowcake is then shipped to
uranium conversion facilities for further processing in the overall
uranium fuel cycle.
One alternative to ISL milling is the conventional uranium milling
process that extracts uranium from mined ore. At conventional mills,
the ore arrives via truck and is crushed, ground, and leached. In most
cases, sulfuric acid is the leaching agent, but alkaline leaching can
also be done. The leaching agent not only extracts uranium from the ore
but also several other constituents (e.g., vanadium, selenium, iron,
lead, and arsenic). Conventional mills extract 90 to 95 percent of the
uranium from the ore. These mills are typically in areas of low
population density, and they typically process ores from mines within
50 kilometers (30 miles). Conventional mills may also produce
significant quantities of waste materials, known as mill tailings, from
the ore processing. These tailings are contained in impoundments which
can be as large as 250 to 300 acres in extent. It is estimated that
roughly 95% of the incoming ore ends as mill tailings. These mill
tailings contain most of the radioactive progeny of uranium and may be
a significant source of radon and radon progeny releases to the
environment.
The GEIS will focus on the construction, operation, and
decommissioning of ISL mills and also assess alternative methods of
uranium recovery. It is noted that the hardrock mining associated with
conventional uranium milling is regulated by other entities (e.g., the
U.S. Bureau of Land Management, and various state agencies)
For more information on the uranium fuel cycle, please see
Regulating Nuclear Fuel, NUREG/BR-0280, Rev. 1, (which can be found
online at: http://www.nrc.gov/reading-rm/doc-collections/nuregs/brochures/br0280/).
2.0 Alternatives To Be Evaluated
No action--The no-action alternative would be to not build nor
license potential uranium milling facilities. Under this alternative
the NRC would not approve future license applications. This alternative
serves as a baseline for comparison of the potential environmental
impacts.
Proposed action--The proposed action is the construction,
operation, and decommissioning of an ISL uranium mill. Implementation
of the proposed action would require the issuance of an NRC license
under the provisions of 10 CFR part 40.
Alternatives--The conventional milling process is one alternative.
Other alternatives not listed in this notice may be identified through
the scoping process.
3.0 Environmental Impact Areas To Be Analyzed
The following resource areas have been tentatively identified for
analysis in the GEIS:
--Public and Occupational Health: addressing the potential public and
occupational consequences from construction, routine operation,
transportation, and credible accident scenarios (including natural
events), and decommissioning;
--Waste Management: addressing the types of wastes expected to be
generated, handled, stored and subject to re-use or disposal;
--Land Use: addressing land use plans, policies and controls;
--Transportation: addressing the transportation modes, routes,
quantities, and risk estimates;
--Geology and Soils: addressing the physical geography, topography,
geology and soil characteristics;
--Water Resources: addressing the surface and ground water hydrology,
water use and quality, and the potential for degradation;
--Ecology: addressing wetlands, aquatic, terrestrial, economically and
recreationally important species, and threatened and endangered
species;
--Air Quality: addressing meteorological conditions, ambient
background, pollutant sources, and the potential for degradation;
--Noise: addressing ambient noises, sources, and sensitive receptors;
--Historical and Cultural Resources: addressing historical,
archaeological, and traditional cultural resources;
--Visual and Scenic Resources: addressing landscape characteristics,
man-made features and viewshed;
--Socioeconomics: addressing the demography, economic base, labor pool,
housing, transportation, utilities, public services/facilities,
education, recreation, and cultural resources;
--Environmental Justice: addressing the potential disproportionately
high and adverse impacts to minority and low-income populations; and
--Cumulative Effects: addressing the impacts from past, present, and
reasonably foreseeable actions at and near the site.
The examples under each resource area are not intended to be all
inclusive, nor is this list an indication that environmental impacts
will occur. The list is presented to facilitate comments on the scope
of the GEIS. Additions to, or deletions from, this list may occur as a
result of the public scoping process.
4.0 Scoping Meetings
This NOI is to encourage public involvement in the GEIS process and
to solicit public comments on the proposed scope and content of the
GEIS. NRC will hold public scoping meetings as described above to
solicit both oral and written comments from interested parties.
Scoping is an early and open process designed to determine the
range of actions, alternatives, and potential impacts to be considered
in the GEIS, and to identify the significant issues related to the
proposed action. Scoping is intended to solicit input from the public
and other agencies so that the analysis can be more clearly focused on
issues of genuine concern. The principal goals of the scoping process
are to:
[[Page 50416]]
--Identify public concerns;
--Ensure that concerns are identified early and are properly studied;
--Identify alternatives that will be examined;
--Identify significant issues that need to be analyzed; and
--Eliminate unimportant issues.
The scoping meetings will begin with NRC staff providing a
description of NRC's role and mission followed by a brief overview of
NRC's environmental review process and goals of the scoping meeting.
The bulk of the meeting will be allotted for attendees to make oral
comments.
5.0 Scoping Comments
Written comments should be mailed to the address listed above in
the ADDRESSES section. Scoping comments may also be submitted
electronically via e-mail to [email protected]. The NRC staff will
prepare a scoping summary report in which it will summarize public
comments. The NRC will make the scoping summary report and project-
related materials available for public review through its electronic
reading room: http://www.nrc.gov/reading-rm/adams.html. Further, an NRC
Web site will be established in the near future to keep the public
abreast of the current schedule and to post important documents.
6.0 The NEPA Process
The GEIS will be prepared according to NEPA and NRC's NEPA
implementing regulations contained in 10 CFR part 51.
After the scoping process is complete, the NRC will prepare a draft
GEIS. The draft GEIS is scheduled to be published by April 2008. A 45-
day comment period on the draft GEIS is planned, and a public
meeting(s) to receive comments will be held approximately three weeks
after publication of the draft GEIS. Availability of the draft GEIS,
the dates of the public comment period, and information about the
public meeting will be announced in the Federal Register, on NRC's Web
page, and in the local news media. The final GEIS is expected to be
published in January 2009 and will incorporate, as appropriate, public
comments received on the draft GEIS.
Dated at Rockville, Maryland this 22nd day of August, 2007.
For the Nuclear Regulatory Commission.
Gregory Suber,
Branch Chief, Environmental Review Branch, Environmental Protection and
Performance Assessment Directorate, Division of Waste Management and
Environmental Protection, Office of Federal and State Materials and
Environmental Management Programs.
[FR Doc. E7-17276 Filed 8-30-07; 8:45 am]
BILLING CODE 7590-01-P