DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP11-480-000]
Columbia Gas Transmission, LLC; Notice of Application
Take notice that on May 11, 2011, Columbia Gas Transmission, LLC
(Columbia), 5151 San Felipe, Suite 2500, Houston, Texas 77056, pursuant
to section 7(c) of the Natural Gas Act (NGA), filed an application for
a certificate of public convenience and necessity, seeking authority to
continue to test and evaluate its Coco C storage field located in
Kanawha County, West Virginia. Columbia will continue to collect and
analyze the information it obtains to validate using this storage field
to develop further storage services, all as more fully set forth in the
application which is on file with the Commission and open to public
inspection.
Any questions regarding this application should be directed to
Fredric J. George, Senior Counsel, Columbia Gas Transmission
Corporation, PO Box 1273, Charleston, West Virginia 25325 at (304) 357-
2359 or fax (304) 357-3206.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below, file with the Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit seven copies of filings made with the Commission and must mail a
copy to the applicant and to every other party in the proceeding. Only
parties to the proceeding can ask for court review of Commission orders
in the proceeding.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental cementers will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental cementers will not be required to serve copies of filed
documents on all other parties. However, the nonparty commenters will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at http://www.ferc.gov. Persons unable to fileelectronically should submit an
original and seven copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426. This filing is accessible on-line at http://www.ferc.gov using
the ``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
[email protected], or call (866) 208-3676 (toll free) or TTY,
call (202) 502-8659.
Comment Date: 5 p.m. Eastern Time on May 23, 2011.
Dated: May 12, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-12295 Filed 5-18-11; 8:45 am]
BILLING CODE 6717-01-P