[Federal Register Volume 76, Number 98 (Friday, May 20, 2011)]
[Notices]
[Pages 29240-29241]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2011-12450]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-8997-1]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-1399 or http://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements

[[Page 29241]]

Filed 05/09/2011 through 05/13/2011.

Notice

    In accordance with Section 309(a) of the Clean Air Act, EPA is 
required to make its comments on EISs issued by other Federal agencies 
public. Historically, EPA met this mandate by publishing weekly notices 
of availability of EPA comments, which includes a brief summary of 
EPA's comment letters, in the Federal Register. Since February 2008, 
EPA has included its comment letters on EISs on its Web site at: http://www.epa.gov/compliance/nepa/eisdata.html. Including the entire EIS 
comment letters on the Web site satisfies the Section 309(a) 
requirement to make EPA's comments on EISs available to the public. 
Accordingly, on March 31, 2010, EPA discontinued the publication of the 
notice of availability of EPA comments in the Federal Register.

Pursuant to 40 CFR 1506.9.

EIS No. 20110145, Final EIS, USFWS, TX, Hays County Regional Habitat 
Conservation Plan, Application for an Incidental Take Permit, Hays 
County, TX, Review Period Ends: 06/20/2011, Contact: Adam Zerrenner 
512-490-0057.
EIS No. 20110146, Draft EIS, NPS, 00, Yellowstone National Park Draft 
Winter Use Plan, To Establish a Management Framework, Implementation, 
WY, MT and ID, Comment Period Ends: 07/18/2011, Contact: David Jacob 
303-987-6970.
EIS No. 20110147, Final EIS, USACE, MO, PROGRAMMATIC--Mechanical 
Creation and Maintenance of Emergent Sandbar Habitat in the Riverine 
Segments of the Upper Missouri River, To Support Least Tern and Piping 
Plover Populations, Implementation, MO, Review Period Ends: 06/20/2011, 
Contact: Cynthia S. Upah 402-995-2672.
EIS No. 20110148, Final EIS, USACE, TX, Rusk Permit Area, Proposes to 
Construct, Operate, and Reclaim Permit Area, Expansion of Existing 
South Hallsville No. 1 Mine. Issuance of Section 404 Permit, Rusk, 
Harrison and Panola Counties, TX, Review Period Ends: 06/20/2011, 
Contact: Darvin Messer 817-886-1744.
EIS No. 20110149, Draft EIS, USFS, MT, Troy Mine Revised Reclamation 
Plan, Proposed Revision is to Return Lands Disturbed by Mining to a 
Condition Appropriate for Subsequent Use of the Area, Kootenai National 
Forest, MT, Comment Period Ends: 07/05/2011, Contact: Bobbie Loaklen 
406-283-7681.
EIS No. 20110150, Final EIS, DOE, ID, ADOPTION--Areva Eagle Rock 
Enrichment Facility, Construct, Operate, and Decommission, Proposed 
Facility would Enrich Uranium for Use in Commercial Nuclear Fuel for 
Power Reactors, Bonneville County, ID, Review Period Ends: 06/20/2011, 
Contact: Matthew McMillen 202-586-7248.

    U.S. DOE has adopted the NRC'S FEIS 20110045, filed 02/14/
2011.
    DOE was not a Cooperating Agency for the above FEIS; recirculation 
of the document is necessary under 40 CFR Part 1506.3(b).

EIS No. 20110151, Final EIS, USAF, UT, White Elk Military Operations 
Area, Propose to Establish a New Military Operations Area (MOA) Linked 
to the Utah Test, Utah and Training Range (UTTR) Airspaces Nevada, Hill 
Air Force Base, UT and Nevada, Review Period Ends: 06/20/2011, Contact: 
Linda Devine 757-764-9434.
EIS No. 20110152, Final EIS, FHWA, CA, Jepson Parkway Project, Proposes 
to Upgrade and Link a Series of Existing Two and Four-Lane Roadways, 
Right-of-Way, Endangered Species Act Section 7 and U.S. Army COE 
Section 404 Permits, Solano County, CA, Review Period Ends: 06/20/2011, 
Contact: Melanie Brent 510-286-5231.
EIS No. 20110153, Final EIS, DOE, OH, ADOPTION--American Centrifuge 
Plant, Gas Centrifuge Uranium Enrichment Facility, Construction, 
Operation, and Decommission, License Issuance, Piketon, OH, Review 
Period Ends: 06/20/2011, Contact: Mathew McMillen 202-586-7248.

    U.S. DOE has adopted the NRC'S FEIS 20060189, filed 05/11/
2006.
    DOE was not a Cooperating Agency for the above FEIS; recirculation 
of the document is necessary under 40 CFR Part 1506.3(b).

EIS No. 20110154, Final EIS, NRC, MN, Generic--License Renewal of 
Nuclear Plants for the Prairie Island Nuclear Generating Plant, Units 1 
and 2, Supplement 39, NUREG-1437, Implementation, City of Red Wing, 
Dakota County, MN, Review Period Ends: 06/20/2011, Contact: Elaine 
Keegan 301-415-8517.
EIS No. 20110155, Final EIS, NPS, WI, Apostle Islands National 
Lakeshore General Management Plan/Wilderness Management Plan, 
Implementation, Bayfield and Ashland Counties, WI, Review Period Ends: 
06/20/2011, Contact: Nick Chevance 402-661-1844.
EIS No. 20110156, Final EIS, NRC, TX, Comanche Peak Nuclear Power Plant 
Units 3 and 4, Application for Combined Licenses (COLs) for 
Construction Permits and Operating Licenses, (NUREG-1943), Hood and 
Somervell Counties, TX, Review Period Ends: 06/20/2011, Contact: 
Michael H. Willingham 301-415-3924.
EIS No. 20110157, Final EIS, NRC, MD, Calvert Cliffs Nuclear Power 
Plant Unit 3, Application for Combined License for Construct and 
Operate a New Nuclear Unit, NUREG 1936, Calvert County, MD, Review 
Period Ends: 06/20/2011, Contact: Laura Quinn 301-415-2220.

Amended Notices

EIS No. 20110130, Draft Supplement, NNSA, NM, Nuclear Facility of the 
Chemistry and Metallurgy Research Replacement Project, To Address New 
Geologic Information Regarding Seismic Conditions at the Site, Los 
Alamos National Laboratory, Los Alamos, NM, Comment Period Ends: 06/28/
2011, Contact: John Tegtmeier 505-665-0113.
    Review of Notice of FR Published 04/29/2011: Extending Comment 
Period from 06/13/2011 to 06/28/2011.

    Dated: May 17, 2011.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2011-12450 Filed 5-19-11; 8:45 am]
BILLING CODE 6560-50-P