Notice of Availability of the Record of Decision for the West
Butte Wind Power Right-of-Way, Crook and Deschutes Counties, OR
AGENCY: Bureau of Land Management, Interior.
ACTION: Notice of availability.
-----------------------------------------------------------------------
SUMMARY: The Bureau of Land Management (BLM) announces the availability
of the Record of Decision (ROD) for the project located in the
Prineville District. The Secretary of the Interior approved the ROD on
July 14, 2011, which constitutes the final decision of the Department
of the Interior.
ADDRESSES: Copies of the ROD are available upon request from the
District Manager, Prineville District Office, Bureau of Land
Management, 3050 NE., 3rd Street, Prineville, Oregon 97754 or via the
following Web site: http://www.blm.gov/or/districts/prineville/plans/wbw_power_row/.
FOR FURTHER INFORMATION CONTACT: Steve Storo, BLM West Butte Wind Power
Right-of-Way Project Lead: telephone (541) 416-6885; address 3050 NE.,
3rd Street, Prineville, Oregon 97754; e-mail: [email protected].
SUPPLEMENTARY INFORMATION: The applicant, West Butte Wind Power, LLC,
filed right-of-way (ROW) application OR-065784 to construct 4.5 miles
of road and an adjacent power transmission line on public land to
support the construction of up to 52 wind turbines and ancillary
facilities on adjacent private land. The portion of the project on
public lands is the ``Proposed Action.'' Actions occurring on private
land are called ``connected actions.'' The project is 25 air miles
southeast of Bend, Oregon, located on the north side of US Highway 20.
The BLM has selected the preferred alternative. The BLM preferred
alternative would result in the granting of a 4.5 mile ROW for
construction and operation of an access road and transmission line
across lands administered by the BLM. Consideration of this alternative
includes an analysis of the connected action of West Butte Wind Power
constructing and operating a wind farm and associated facilities (e.g.,
access road, transmission line, substation, and an operations and
maintenance building) on privately held lands.
The Notice of Availability of the Final Environmental Impact
Statement (EIS) was published in the Federal Register on October 1,
2010 (75 FR 60804). Publication of the Notice of Availability for the
Final EIS initiated a 30-day review period on the Final EIS. The BLM
received seven letters during this period that ended on November 1,
2010, and three more letters shortly after period ended. The BLM
analyzed these letters to determine if they contained substantive
comments that were not already addressed in the responses to public
comments received on the Draft
[[Page 43342]]
EIS or that addressed a need for changes between the Draft and Final
EIS. No significant new information was presented in the letters that
would require reissuance of the Draft or Final EIS . The U.S. Fish and
Wildlife Service confirmed that an Avian and Bat Protection Plan (ABPP)
has been developed for the project and that the project applicant has
cooperated with the Service to address golden eagle issues within the
ABPP.
Because this decision is approved by the Secretary of the Interior,
it is not subject to administrative appeal (43 CFR 4.410(a)(3)).
Authority: 40 CFR 1506.6 and 1506.10.
Mike Pool,
Deputy Director, Operations, Bureau of Land Management.
[FR Doc. 2011-18275 Filed 7-19-11; 8:45 am]