[Federal Register Volume 76, Number 186 (Monday, September 26, 2011)]
[Notices]
[Page 59394]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2011-24610]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Bonneville Power Administration


Big Eddy-Knight Transmission Project

AGENCY: Bonneville Power Administration (BPA), Department of Energy 
(DOE).

ACTION: Notice of Availability of Record of Decision (ROD).

-----------------------------------------------------------------------

SUMMARY: This notice announces the availability of the ROD to implement 
the Big Eddy-Knight Transmission Project in Wasco County, Oregon and 
Klickitat County, Washington. Construction of the Big Eddy-Knight 
Transmission Project will accommodate long-term firm transmission 
requests that BPA has received by increasing BPA's 500-kV transmission 
capability to move power from the east side of the Cascade Mountains 
(along the Oregon/Washington border) to load centers (such as Portland, 
Oregon) on the west side of the Cascades and to major transmission 
lines serving California.
    As described in the Big Eddy-Knight Transmission Project Final 
Environmental Impact Statement (EIS) (DOE/EIS-0421, July 2011), this 
project consists primarily of constructing a new, approximately 28-
mile-long, 500-kilovolt (kV) transmission line and ancillary facilities 
between BPA's existing Big Eddy Substation in The Dalles, Oregon, to a 
proposed new Knight Substation that would be connected to an existing 
BPA line about 4 miles northwest of Goldendale, Washington. For the 
transmission line, BPA has decided to build East Alternative Option 3. 
For the first 14 miles, the line will use double-circuit towers 
(combining the new line and an existing line on one set of towers) 
mostly on existing right-of-way. The remaining 14 miles of the new line 
will be built with single-circuit towers in a newly-established 150-
foot wide transmission line right-of-way. BPA has also decided to build 
the small (about 1 mile) realignment of the East Alternative on the 
Oregon side of the Columbia River, as described in the final EIS. For 
the proposed new Knight Substation, BPA has decided to build Knight 
Substation on Site 1, which is on private property about 0.5 mile west 
of Knight Road. For the fiber optic cable necessary for system 
communications, BPA has decided to build the Loop Back Option, which 
will string fiber optic cable on the new transmission towers from BPA's 
Big Eddy Substation to the new Knight Substation and back again. The 
project also includes new equipment at BPA's existing Big Eddy and 
Wautoma substations. BPA will install about 134 new lattice-steel 
transmission towers that will have an average span length between 
towers of about 1,200 feet. The double-circuit towers that will be used 
for the first 14 miles will range in height from about 170-250 feet 
tall; the single-circuit towers that will be used for the last 14 miles 
will be about 108-200 feet tall. The towers on either side of the 
Columbia River will be about 407 feet tall on the Oregon side and 232 
feet tall on the Washington side.
    The conductor, fiber optic cable, and overhead ground wire for the 
new transmission line will be placed on these towers, and counterpoise 
(which takes any lightning charge from the overhead ground wire and 
dissipates it into the earth) will be buried in the ground at select 
towers. Marker balls will be placed on the overhead ground wire across 
the Columbia River and bird diverters will be installed on overhead 
ground wire at select locations. The towers on either side of the 
Columbia River will have lighting for aircraft safety. Road 
construction will include about 16 miles of new road, 9 miles of 
temporary road, 13 miles of existing road improvements, and 62 culverts 
in intermittent streams (many stream crossings will have more than 1 
culvert). In addition, portions of county roads that will be used to 
access the line route will be improved as necessary.
    All mitigation measures identified in the EIS that are applicable 
to the selected alternative are adopted.

ADDRESSES: Copies of the ROD and EIS may be obtained by calling BPA's 
toll-free document request line, 1-800-622-4520. The ROD and EIS are 
also available on our Web site, http://www.bpa.gov/go/BEK.

FOR FURTHER INFORMATION CONTACT:  Stacy Mason, Bonneville Power 
Administration--KEC-4, P.O. Box 3621, Portland, Oregon 97208-3621; 
toll-free telephone number 1-800-622-4519; fax number 503-230-5455; or 
e-mail [email protected].

    Issued in Portland, Oregon, on September 16, 2011.
Stephen J. Wright,
Administrator and Chief Executive Officer.
[FR Doc. 2011-24610 Filed 9-23-11; 8:45 am]
BILLING CODE 6450-01-P