DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project Nos. 14269-000; 14270-000]


Riverbank Hydro No. 22 LLC; FFP Project 93 LLC; Notice of 
Competing Preliminary Permit Applications Accepted for Filing and 
Soliciting Comments, Motions To Intervene, and Competing Applications

    On September 1, 2011, Riverbank Hydro No. 22 LLC (Riverbank), and 
FFP Project 93 LLC (FFP 93) filed preliminary permit applications, 
pursuant to section 4(f) of the Federal Power Act, proposing to study 
the feasibility of a hydropower project at the U.S. Army Corps of 
Engineers' (Corps) Green River Lock & Dam No. 5, located on the Green 
River in Butler and Warren Counties, Kentucky. The sole purpose of a 
preliminary permit, if issued, is to grant the permit holder priority 
to file a license application during the permit term. A preliminary 
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by 
others without the owners' express permission.
    Riverbank's Project No. 14269-000 would consist of: (1) A forebay; 
(2) an intake structure; (3) a powerhouse containing two generating 
units with a total capacity of 3.8 megawatts (MW); (4) a tailrace 
structure; and (5) a 0.25-mile-long, 25 kilo-volt (KV) transmission 
line. The project would have an estimated average annual generation of 
17.8 gigawatt-hours (GWh), and operate run-of-river utilizing surplus 
water from the Green River Lock & Dam No. 5, as directed by the Corps.
    Applicant Contact: Mr. Vincent Lamarra, Riverbank Power USA, 975 
South State Highway 89/91, Logan, UT 84321. (435) 752-2580.
    FFP 93's Project No. 14270-000 would consist of: (1) An 680-foot-
long, 50-foot-wide approach channel; (2) a powerhouse, located on the 
north side of the dam, containing one generating units with a total 
capacity of 5.3 MW; (3) a 210-foot-long, 90-foot-wide tailrace; (4) a 
4.16/34.5 KV substation; and (5) a 1.0-mile-long, 34.5 kV transmission 
line. The proposed project would have an average annual generation of 
26.7 GWh, and operate run-of-river utilizing surplus water from the 
Green River Lock & Dam No. 5, as directed by the Corps.
    Applicant Contact: Ms. Ramya Swaminathan, Free Flow Power Corp., 
239 Causeway Street, Suite 300, Boston, MA 02114. (978) 283-2822.
    FERC Contact: Michael Spencer, [email protected], (202) 502-
6093.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site http://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support. Although the Commission strongly encourages electronic filing, 
documents may also be paper-filed. To paper-file, mail an original and 
seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street, NE., Washington, DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14269-000, or P-14270-000) in the docket 
number field to access the

[[Page 73618]]

document. For assistance, contact FERC Online Support.

    Dated: November 22, 2011.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2011-30673 Filed 11-28-11; 8:45 am]
BILLING CODE 6717-01-P