[Federal Register Volume 76, Number 245 (Wednesday, December 21, 2011)]
[Proposed Rules]
[Page 79145]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: C1-2011-31629]



[[Page 79145]]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT

24 CFR Parts 50, 55, and 58

[Docket No. FR-5423-P-01]
RIN 2501-AD51


Floodplain Management and Protection of Wetlands

Correction

    In proposed rule document 2011-31629 appearing on pages 77162-77175 
in the issue of December 12, 2011, make the following correction:


Sec.  55.11  [Corrected]

    The table on page 77171 is corrected to read as set forth below:

                                                     Table 1
----------------------------------------------------------------------------------------------------------------
                                                             Type of proposed action
                                --------------------------------------------------------------------------------
  Type of proposed action (new                                              Wetlands or 100-   Non-wetlands area
    reviewable action or an                                                  year floodplain     outside of the
         amendment) \1\               Floodways       Coastal high hazard    outside coastal      100-year and
                                                             areas          high hazard area    within the 500-
                                                                              and floodways     year floodplain
----------------------------------------------------------------------------------------------------------------
Critical Actions as defined in   Critical actions     Critical actions     Allowed if the      Allowed if the
 Sec.   55.12(b)(2).              not allowed.         not allowed.         proposed critical   proposed
                                                                            action is           critical action
                                                                            processed under     is processed
                                                                            Sec.   55.20.\2\    under Sec.
                                                                                                55.20.\2\
Non-critical actions not         Allowed only if the  Allowed only if the  Allowed if          Any non-critical
 excluded under Sec.   55.12(b)   proposed non-        proposed non-        proposed non-       action is
 or (c).                          critical action is   critical action:     critical action     allowed without
                                  a functionally      (A)(1) Is either      is processed        processing under
                                  dependent use and   (a) reconstruction    under Sec.          this part.
                                  processed under      of a structure       55.20.\2\
                                  Sec.   55.20.\2\     destroyed by a
                                                       disaster, or
                                                      (b) an improvement
                                                       of an existing
                                                       structure;
                                                      (2) is designed for
                                                       a Coastal High
                                                       Hazard Area under
                                                       Sec.   55.1(c)(3);
                                                       and
                                                      (3) is processed
                                                       under Sec.
                                                       55.20; \2\ or
                                                      (B) Is a
                                                       functionally
                                                       dependent use
                                                       processed under
                                                       Sec.   55.20.
----------------------------------------------------------------------------------------------------------------
\1\ Under E.O. 11990, the decision making process in Sec.   55.20 only applies to Federal assistance for new
  construction in wetlands locations.
\2\ Or those paragraphs of Sec.   55.20 that are applicable to an action listed in Sec.   55.12(a).

[FR Doc. C1-2011-31629 Filed 12-20-11; 8:45 am]
BILLING CODE 1505-01-D