[Federal Register Volume 77, Number 16 (Wednesday, January 25, 2012)] [Notices] [Pages 3751-3752] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 2012-1467] ======================================================================= ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RD11-10-000] Commission Information Collection Activities (FERC-725A); Comment Request; Submitted for OMB Review AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Notice. ----------------------------------------------------------------------- SUMMARY: In compliance with the requirements of section 3507(a)(1) of the Paperwork Reduction Act of 1995, 44 U.S.C. 3507(a)(1), the Federal Energy Regulatory Commission (Commission or FERC) has submitted the information collection described below to the Office of Management and Budget (OMB) for review. Any interested person may file comments directly with OMB and should address a copy of those comments to the Commission as explained below. In compliance with section 3506 of the Paperwork Reduction Act, the Commission previously issued a Notice in the Federal Register (76 FR 65504, 10/21/2011) requesting public comments. FERC received no comments on FERC-725A and has made this notation in its submission to OMB. DATES: Comments in consideration of the collection of information are due February 24, 2012. ADDRESSES: Comments, identified by docket number, may be filed in the following ways:Electronic Filing through http://www.ferc.gov. Documents created electronically using word processing software should be filed in native applications or print-to-PDF format and not in a scanned format. Mail/Hand Delivery: Those unable to file electronically may mail or hand-deliver an original of their comments to: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE., Washington, DC 20426. FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at [email protected], telephone at (202) 502-8663, and fax at (202) 273-0873. SUPPLEMENTARY INFORMATION: The proposed information collection in Docket No. RD11-10-000 relates to Reliability Standard, FAC-008-3-- Facility Ratings, developed by the North American Electric Reliability Corporation (NERC) and approved by the Commission in an order dated November 17, 2011, with a January 1, 2013 effective date for the mandatory compliance with the revised Reliability Standard.\1\ Reliability Standard FAC-008-3 modifies the currently effective version Reliability Standard FAC-008-1 and subsumes Reliability Standard FAC- 009-1. Concurrent with the effective date of FAC-008-3, Reliability Standards FAC-008-1 and FAC-009-1 will be retired. The information collection requirements contained in Reliability Standards FAC-008 and FAC-009 are contained in FERC-725A (OMB Control Number 1902-0244). --------------------------------------------------------------------------- \1\ North American Electric Reliability Corp., 137 FERC ] 61,123 (2011). --------------------------------------------------------------------------- There is a net increase in information collection and reporting that will result from implementing Reliability Standard FAC-008-3 and retiring the two superseded Reliability Standards. The breakdown is as follows: [[Page 3752]] -------------------------------------------------------------------------------------------------------------------------------------------------------- Additional reporting beyond FAC-008-1 Additional recordkeeping beyond FAC-008-1 FAC-008-3 Applies to: and FAC-009-1 and FAC-009-1 -------------------------------------------------------------------------------------------------------------------------------------------------------- R1.................................. Generator owners............ None, this requirement is derived Retention period increased by 2 years. from R1 of FAC-008-1. R2.................................. Generator owners............ None, this requirement is derived Retention period increased by 2 years. from R1 of FAC-008-1. R3.................................. Transmission owners......... None, this requirement is derived Retention period increased by 2 years. from R1 of FAC-008-1. R4.................................. Generator owners and None, this requirement is derived Retention period increased by 2 years. Transmission owners. from R2 of FAC-008-1. R5.................................. Generator owners and None, this requirement is derived Retention period increased by 2 years. Transmission owners. from R3 of FAC-008-1. R6.................................. Generator owners and None, this requirement is derived Retention period increased by 2 years. Transmission owners. from R1 of FAC-008-1. R7.................................. Generator owners............ None, this requirement is derived Retention period increased by 2 years. from R2 of FAC-008-1. R8.................................. Generator owners that are Newly added reporting of the next New retention period of 3 years. subject to R2 and most limiting equipment and the Transmission owners. thermal rating for the next most limiting equipment. -------------------------------------------------------------------------------------------------------------------------------------------------------- Burden Statement: Public reporting burden for this proposed collection is estimated as: ---------------------------------------------------------------------------------------------------------------- Number of respondents per compliance registry Number of Hours per Total annual Additional proposed burden in FERC- summary as of August responses per respondent hours 725A 29, 2011 respondent per response (A)..................... (B) (C) ( A x B x C) ---------------------------------------------------------------------------------------------------------------- Report the next most limiting \2\ 83 Generator owners. 1 80 6,640 equipment and the thermal rating for the next most limiting equipment. Report the next most limiting 342 Transmission owners. 1 \3\ 20 6,840 equipment and the thermal rating for the next most limiting equipment. Increase in retention time by 2 years 833 Generator owners.... 1 2 1,666 for R1 through R7. Increase in retention time by 2 years 342 Transmission owners. 1 2 684 for R1 through R7. Compliance sub-total.................. ........................ .............. .............. 13,480 Recordkeeping sub-total............... ........................ .............. .............. 2,350 ------------------------------------------------------------------------- Total............................. ........................ .............. .............. 15,830 ---------------------------------------------------------------------------------------------------------------- Estimated cost burden to respondents is $1,683,400; [i.e., (13,480 hours @ $120 an hour (compliance cost)) + (2,350 hours @ $28 an hour (recordkeeping cost))]. The reporting burden includes the total time, effort, or financial resources expended to generate, maintain, retain, or disclose or provide the information including: (1) Reviewing instructions, (2) developing, acquiring, installing, and utilizing technology and systems for the purposes of collecting, validating, verifying, processing, maintaining, disclosing and providing information, (3) adjusting the existing ways to comply with any previously applicable instructions and requirements, (4) training personnel to respond to a collection of information, (5) searching data sources, (6) completing and reviewing the collection of information, and (7) transmitting, or otherwise disclosing the information. --------------------------------------------------------------------------- \2\ Requirement R8 applies to generator owners that own facilities between the step-up transformer and the point of interconnection. We estimate that 10% of all NERC registered generator owners own such facilities. \3\ Transmission Owner estimate based on the supplemental work required to report the next most limiting equipment and assumes all prerequisite work was performed in compliance with currently effective Reliability Standard FAC-008-1. --------------------------------------------------------------------------- The estimate of cost for respondents is based upon salaries for professional and clerical support, as well as direct and indirect overhead costs. Direct costs include all costs directly attributable to providing this information, such as administrative costs and the cost for information technology. Indirect or overhead costs are costs incurred by an organization in support of its mission. These costs apply to activities which benefit the whole organization rather than any particular function or activity. Dated: January 18, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012-1467 Filed 1-24-12; 8:45 am] BILLING CODE 6717-01-P