[Federal Register Volume 77, Number 167 (Tuesday, August 28, 2012)]
[Notices]
[Pages 52053-52054]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2012-21170]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[CACA-51625, LLCAD07000, L51010000, ER0000, LVRWB10B3800]
Notice of Availability of the Record of Decision for San Diego
Gas and Electric's East County Substation Project, San Diego County, CA
AGENCY: Bureau of Land Management, Interior.
ACTION: Notice of availability.
-----------------------------------------------------------------------
SUMMARY: The Bureau of Land Management (BLM) announces the availability
of the Record of Decision (ROD) for San Diego Gas and Electric's
(SDG&E) East County (ECO) Substation Project, located in San Diego
County, California. The Secretary of the Interior approved the ROD on
August 21, 2012, which constitutes the final decision of the
Department.
ADDRESSES: Copies of the ROD have been sent to responsible Federal,
State, and local government agencies and other interested stakholders,
and are available upon request from the Field Manager, BLM El Centro
Field Office, 1661 S. 4th Street, El Centro, California 92243, and the
BLM California Desert District Office, 22835 Calle San Juan de Los
Lagos, Moreno Valley, California 92553, or via the Internet at the
following Web site: http://www.ca.blm.gov/elcentro.
FOR FURTHER INFORMATION CONTACT: R. Brian Paul, Project Manager,
telephone 760-337-4400; address BLM California Desert District Office,
22835 Calle San Juan de Los Lagos, Moreno Valley, California 92553-
9046; email [email protected].
Persons who use a telecommunications device for the deaf (TDD) may
call the Federal Information Relay Service (FIRS) at 1-800-877-8339 to
contact the above individual during normal business hours. The FIRS is
available 24 hours a day, 7 days a week, to leave a message or question
with the above individual. You will receive a reply during normal
business hours.
SUPPLEMENTARY INFORMATION: SDG&E filed right-of-way (ROW) application
CACA-51625 for the ECO Substation Project. The ECO Substation Project
will provide an interconnection hub for renewable generation along
SDG&E's existing Southwest Powerlink (SWPL) 500-kilovolt (kV)
transmission line. The project will consist of a 500/230/138 kV
substation; a SWPL Loop-In (a short loop-in of the existing SWPL
transmission line to the proposed ECO Susbstation); the rebuilt
Boulevard Substation (an existing substation); and a 13.9-mile 138 kV
transmission line connecting the new ECO Substation to the rebuilt
Boulevard Substation, 0.8 mile of which is on public lands administered
by the BLM (the reminder is located on private lands subject to the
permitting authority of the California Public Utilties Commission).
Through the ROD, the BLM approves the 0.8-mile portion of the 138 kV
transmission line on BLM-administered public land, and makes no
decision regarding those portions of the ECO Substation Project or
other projects analyzed in the Final Environmental Impact Statement/
Environmental Impact Report (EIS/EIR) that are not located on BLM-
managed lands.
The project site is located approximately 70 miles east of downtown
San Diego, south of Interstate 8, east of the town of Jacumba and along
Old Highway 80, in San Diego County, California, within Township 18
South, Ranges 8 East, Section(s) 02, 03, 10, and 11.
The BLM preferred alternative would allow the construction,
operation, maintenance, and termination of the 0.8-mile underground
segment of the project's 138 kV transmission line on BLM-managed lands,
which is necessary for the construction of the ECO Substation Project.
In addition to the ECO Substation Project, the Final EIS/EIR evaluated
a ROW application by Tule Wind, LLC to construct the Tule Wind Project,
as well as the Energia Sierra Juarez Project, and Gen-Tie, Campo,
Manzanita wind energy projects. Although these project components were
analyzed in the same EIS/EIR, only the 0.8-mile underground segment of
the ECO Substation Project 138 kV transmission line and portions of the
Tule Wind Project would be located on BLM-managed lands. The BLM issued
a separate decision on Tule Wind, LLC's ROW application on December 20,
2011.
This agency preferred alternative was evaluated in the Final EIS/
EIR. The Notice of Availability of the Final EIS/EIR for the ECO
Substation Project was published in the Federal Register on October 14,
2011 (76 FR 381).
Because this decision is approved by the Secretary of the Interior,
it is not
[[Page 52054]]
subject to administrative appeal (43 CFR 4.410(a) (3)).
Authority: 40 CFR 1506.6
Mike Pool,
Acting Director, Bureau of Land Management.
[FR Doc. 2012-21170 Filed 8-27-12; 8:45 am]
BILLING CODE 4310-40-P