[Federal Register Volume 77, Number 171 (Tuesday, September 4, 2012)]
[Notices]
[Pages 53885-53886]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2012-21662]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP12-500-000]


CenterPoint Energy Gas Transmission Company, LLC; Notice of 
Request Under Blanket Authorization

    Take notice that on August 15, 2012, CenterPoint Energy Gas 
Transmission Company, LLC (CenterPoint), 1111 Louisiana Street, 
Houston, Texas 77002, filed a prior notice request pursuant to sections 
157.208, 157.211, and 157.216 of the Commission's regulations under the 
Natural Gas Act (NGA) and CenterPoint's blanket certificate issued in 
Docket Nos. CP82-384-000 and CP82-384-001 for authorization to replace 
and abandon certain deteriorated facilities located in Nevada County, 
Arkansas (Line A Replacement Project). Specifically, CenterPoint 
proposes to: (1) Replace a 7.3-mile, 18-inch and 20-inch diameter 
pipeline segment of Line A having an MAOP of 350 psig with 7.4 miles of 
new 12-inch diameter pipeline having an MAOP of 1000 psig; (2) extend 
Line A to a new replacement delivery point by constructing 0.7 miles of 
12-inch diameter pipeline; (3) install replacement delivery taps and 
other appurtenant facilities; and (4) abandon two small lines--Line AM-
189 (205 feet of 2-inch diameter line) and Line AM-10 (204 feet of 6-
inch diameter line)--as well as certain metering and appurtenant 
facilities. It is indicated

[[Page 53886]]

that the Line A Replacement Project will create no new capacity and 
CenterPoint states that the project is necessary to continue to provide 
safe and reliable transportation services. The project is estimated to 
cost approximately $8.1 million, all as more fully set forth in the 
application which is on file with the Commission and open to public 
inspection.
    Any questions concerning this application may be directed to 
Michelle Willis, Manager, Regulatory & Compliance, CenterPoint Energy 
Gas Transmission Company, LLC, P.O. Box 21734, Shreveport, Louisiana 
71151, or call (318) 429-3708, or email at 
[email protected].
    Any person may, within 60 days after the issuance of the instant 
notice by the Commission, file pursuant to Rule 214 of the Commission's 
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of 
intervention. Any person filing to intervene or the Commission's staff 
may, pursuant to section 157.205 of the Commission's regulations under 
the NGA (18 CFR 157.205) file a protest to the request. If no protest 
is filed within the time allowed, the proposed activity shall be deemed 
to be authorized effective the day after the time allowed for protest. 
If a protest is filed and not withdrawn within 30 days after the time 
allowed for filing a protest, the instant request shall be treated as 
an application for authorization pursuant to section 7 of the NGA.
    This filing is available for review at the Commission or may be 
viewed on the Commission's web site at http://www.ferc.gov, using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number filed to access the document. For 
assistance, please contact FERC Online Support at FERC 
[email protected] or call toll-free at (866) 206-3676, or, for 
TTY, contact (202) 502-8659. Comments, protests and interventions may 
be filed electronically via the Internet in lieu of paper. See, 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's web site 
under the ``e-Filing'' link. The Commission strongly encourages 
intervenors to file electronically.

    Dated: August 28, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-21662 Filed 8-31-12; 8:45 am]
BILLING CODE 6717-01-P