[Federal Register Volume 77, Number 177 (Wednesday, September 12, 2012)]
[Notices]
[Pages 56229-56230]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2012-22416]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Fish and Wildlife Service
[FWS-R4-R-2011-N267; FXRS12650400000-123-FF04R02000]
White River National Wildlife Refuge, AR; Final Comprehensive
Conservation Plan and Finding of No Significant Impact for
Environmental Assessment
AGENCY: Fish and Wildlife Service, Interior.
ACTION: Notice of availability.
-----------------------------------------------------------------------
SUMMARY: We, the Fish and Wildlife Service (Service), announce the
availability of our final comprehensive conservation plan (CCP) and
finding of no significant impact (FONSI) for the environmental
assessment for White River National Wildlife Refuge (NWR) in Desha,
Monroe, Phillips, and Arkansas Counties, AR. In the final CCP, we
describe how we will manage this refuge for the next 15 years.
ADDRESSES: You may obtain a copy of the CCP by writing to: Mr. Dennis
Sharp, Refuge Manager, White River NWR, 57 CC Camp Road, St. Charles,
AR 72140. Alternatively, you may download the document from our
Internet Site: http://southeast.fws.gov/planning under ``Final
Documents.''
FOR FURTHER INFORMATION CONTACT: Mr. Mike Dawson, Refuge Planner,
Jackson, MS, at 601/955-1518 (telephone), or [email protected]
(email).
SUPPLEMENTARY INFORMATION:
Introduction
With this notice, we finalize the CCP process for White River NWR.
We started this process through a notice in the Federal Register on
January 21, 2009 (74 FR 3628). For more about the process, see that
notice.
White River Migratory Waterfowl Refuge was established by Executive
Order 7173 of President Franklin D. Roosevelt on September 5, 1935. The
purpose of the refuge is to protect and conserve migratory birds and
other wildlife resources. White River NWR contains 160,000 acres and 90
miles of the White River lie within the boundaries of the refuge.
We announce our decision and the availability of the final CCP and
FONSI for White River NWR in accordance with the National Environmental
Policy Act (NEPA) (40 CFR 1506.6(b)) requirements. We completed a
thorough analysis of impacts on the human environment, which we
included in the draft comprehensive conservation plan and environmental
assessment (Draft CCP/EA).
The CCP will guide us in managing and administering White River NWR
for the next 15 years. Alternative C, as we described in the final CCP,
is the foundation for the CCP.
The compatibility determinations for the following can be found in
the final CCP: (1) Hunting, (2) fishing, (3) wildlife observation and
photography, (4) environmental education and interpretation, (5)
amateur ham radio operation, (6) camping, (7) commercial guiding for
wildlife observation and photography, (8) commercial video and
photography, (9) commercial waterfowl guiding, (10) commercial fishing,
(11) cooperative farming, (12) field trials, (13) forest products
harvesting, (14) furbearer trapping, (15) haying, (16) nuisance animal
control, (17) research and monitoring, and (18) tournament fishing.
Background
The CCP Process
The National Wildlife Refuge System Administration Act of 1966 (16
U.S.C. 668dd-668ee) (Administration Act), as amended by the National
Wildlife Refuge System Improvement Act of 1997, requires us to develop
a CCP for each national wildlife refuge. The
[[Page 56230]]
purpose for developing a CCP is to provide refuge managers with a 15-
year plan for achieving refuge purposes and contributing toward the
mission of the National Wildlife Refuge System, consistent with sound
principles of fish and wildlife management, conservation, legal
mandates, and our policies. In addition to outlining broad management
direction on conserving wildlife and their habitats, CCPs identify
wildlife-dependent recreational opportunities available to the public,
including opportunities for hunting, fishing, wildlife observation,
wildlife photography, and environmental education and interpretation.
We will review and update the CCP at least every15 years in accordance
with the Administration Act.
Comments
Approximately 100 copies of the Draft CCP/EA were made available
for a 30-day public review and comment period via a Federal Register
notice on October 14, 2011 (76 FR 63945). Fifty seven public comments
and two agency comments were received.
Selected Alternative
After considering the comments we received and based on our
professional judgment, we selected Alternative C for implementation.
This alternative is judged to be the most effective management action
for meeting the purposes of the refuge by optimizing habitat management
and visitor services throughout the refuge. Over the life of the CCP,
this management action will balance an enhanced wildlife management
program with increased opportunities for public use on the refuge. This
alternative will pursue the same five broad refuge goals as each of the
other alternatives described in the Draft CCP/EA.
We selected Alternative C for implementation because it directs the
development of programs to best achieve the refuge's purpose and goals;
emphasizes a landscape approach to land management; collects habitat
and wildlife data; and ensures long-term achievement of refuge and
Service objectives. At the same time, its management actions provide
balanced levels of compatible public use opportunities consistent with
existing laws, Service policies, and sound biological principles. It
provides the best mix of program elements to achieve the desired long-
term conditions within the anticipated funding and staffing levels, and
positively addresses significant issues and concerns expressed by the
public.
Authority
This notice is published under the authority of the National
Wildlife Refuge System Improvement Act of 1997, Public Law 105-57.
Dated: January 4, 2012.
Mark J. Musaus,
Acting Regional Director.
[FR Doc. 2012-22416 Filed 9-11-12; 8:45 am]
BILLING CODE 4310-55-P