DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14427-000]


Go Green Go Hydro LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On June 20, 2012, Go Green Go Hydro LLC (Go Green or applicant) 
filed an application for a preliminary permit, pursuant to section 4(f) 
of the Federal Power Act (FPA), proposing to study the feasibility of 
the Black Lassic and Shanty Creeks Hydroelectric Water Power Project 
(Black Lassic Project or project) to be located on Black Lassic, South 
Shanty, and Shanty Creeks within the Six Rivers National Forest, near 
the city of Dinsmore, Trinity County, California. The sole purpose of a 
preliminary permit, if issued, is to grant the permit holder priority 
to file a license application during the permit term. A preliminary 
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by 
others without the owners' express permission.
    The proposed project would consist of the following: (1) Three 5-
foot-high, 25-30-foot-long diversion structures with gravity 
uncontrolled spillways; (2) a 9,000-foot-long penstock; (3) a 30-by-30-
foot powerhouse containing a two-nozzle Pelton wheel coupled to a 
synchronous generator with a capacity of 2,800 kilowatts; (4) a 6-foot-
wide by 120-foot-long tailrace; and (5) a 24,440-foot-long, 12-kilovolt 
transmission line. The proposed project would have an average annual 
generation of 5,000 megawatt-hours.
    Applicant Contact: Mr. David G. DeMera, Go Green Go Hydro LLC, 
18300 Morgan Valley Road, Lower Lake, CA 95457, (707) 953-6400.
    FERC Contact: Shana Murray, [email protected], (202) 502-8333.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site http://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at [email protected] or toll free at 1-866-208-3676, 
or for TTY, (202) 502-8659. Although the Commission strongly encourages 
electronic filing, documents may also be paper-filed. To paper-file, 
mail an original and seven copies to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14427 in the docket number field to access 
the document. For assistance, contact FERC Online Support.


[[Page 59609]]


    Dated: September 24, 2012.
 Kimberly D. Bose,
 Secretary.
[FR Doc. 2012-23938 Filed 9-27-12; 8:45 am]
BILLING CODE 6717-01-P