[Federal Register Volume 77, Number 192 (Wednesday, October 3, 2012)]
[Notices]
[Page 60425]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2012-24366]



[[Page 60425]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[ Project No. 13471-001]


FFP Project 61 LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On September 4, 2012, FFP Project 61, LLC filed an application for 
a preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), proposing to study the feasibility of a hydropower project 
located on the Mississippi River, near Arbroth, in West Baton Rouge and 
East Baton Rouge Parishes, Louisiana. The sole purpose of a preliminary 
permit, if issued, is to grant the permit holder priority to file a 
license application during the permit term. A preliminary permit does 
not authorize the permit holder to perform any land-disturbing 
activities or otherwise enter upon lands or waters owned by others 
without the owners' express permission.
    The proposed Point Menoir hydrokinetic project would consist of the 
following: (1) Up to 1,434 SmarTurbine generating units installed in 
arrays on the bottom of the river; (2) the total capacity of the 
installation would be up to 57,360 kilowatts; (3) flexible cables would 
convey each arrays power to a metering station; and (4) a transmission 
line would interconnect with the power grid. The proposed project would 
have an average annual generation of 130,450,000 kilowatt-hours (kWh), 
which would be sold to a local utility.
    Applicant Contact: Ramya Swaminathan, Free Flow Power Corporation, 
239 Causeway Street, Boston, MA 02114; phone (978) 226-1531.
    FERC Contact: Michael Spencer, (202) 502-6093.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site http://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at [email protected] or toll free at 1-866-208-3676, 
or for TTY, (202) 502-8659. Although the Commission strongly encourages 
electronic filing, documents may also be paper-filed. To paper-file, 
mail an original and seven copies to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-13471) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: September 27, 2012.
 Kimberly D. Bose,
 Secretary.
[FR Doc. 2012-24366 Filed 10-2-12; 8:45 am]
BILLING CODE 6717-01-P