ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52
[EPA-R04-OAR-2011-0227; FRL-9734-7]
Approval and Promulgation of Implementation Plans; Kentucky;
Approval of Revisions to the Jefferson County Portion of the Kentucky
SIP; New Source Review; Prevention of Significant Deterioration
AGENCY: Environmental Protection Agency (EPA).
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: EPA is taking final action to approve multiple changes to the
Jefferson County portion of the Kentucky State Implementation Plan
(SIP), submitted by the Commonwealth of Kentucky, through the Kentucky
Division for Air Quality (KDAQ), to EPA in two submittals dated June 1,
2009, and February 8, 2011. These revisions were submitted by KDAQ on
behalf of the Louisville Metro Air Pollution Control District (LMAPCD)
(also referred to as Jefferson County) and modify the LMAPCD New Source
Review (NSR) Prevention of Significant Deterioration (PSD) permitting
regulations. EPA is approving Jefferson County's June 1, 2009, and
February 8, 2011, SIP revisions because the Agency has determined that
these SIP revisions are consistent with the Clean Air Act (CAA or Act)
and EPA regulations regarding the PSD permitting program.
DATES: This rule is effective November 13, 2012.
ADDRESSES: EPA has established a docket for this action under Docket
Identification No. EPA-R04-OAR-2011-0227. All documents in the docket
are listed on the www.regulations.gov Web site. Although listed in the
index, some information is not publicly available, i.e., Confidential
Business Information or other information whose disclosure is
restricted by statute. Certain other material, such as copyrighted
material, is not placed on the Internet and will be publicly available
only in hard copy form. Publicly available docket materials are
available either electronically through www.regulations.gov or in hard
copy at the Regulatory Development Section, Air Planning Branch, Air,
Pesticides and Toxics Management Division, U.S. Environmental
Protection Agency, Region 4, 61 Forsyth Street SW., Atlanta, Georgia
30303-8960. EPA requests that if at all possible, you contact the
person listed in the FOR FURTHER INFORMATION CONTACT section to
schedule your inspection. The Regional Office's official hours of
business are Monday through Friday, 8:30 to 4:30, excluding federal
holidays.
FOR FURTHER INFORMATION CONTACT: For information regarding the
Jefferson County portion of the Kentucky SIP, contact Ms. Twunjala
Bradley, Regulatory Development Section, Air Planning Branch, Air,
Pesticides and Toxics Management Division, U.S. Environmental
Protection Agency, Region 4, 61 Forsyth Street SW., Atlanta, Georgia
30303-8960. Ms. Bradley's telephone number is (404) 562-9352; email
address: [email protected]. For information regarding the GHG
Tailoring Rule, 2002 NSR Reform and NSR PM2.5 Rule, contact
Yolanda Adams, Air Permits Section, at the same address above. Ms.
Adams' telephone number is (404) 562-9214; email address:
[email protected]. For information regarding the Phase II Rule and
ozone NAAQS, contact Jane Spann, Regulatory Development Section, at the
same address above. Ms. Spann's telephone number is (404) 562-9029;
email address: [email protected]. For information regarding the
PM2.5 NAAQS, contact Mr. Joel Huey, Regulatory Development
Section, at the
[[Page 62151]]
same address above. Mr. Huey's telephone number is (404) 562-9104;
email address: [email protected].
SUPPLEMENTARY INFORMATION:
Table of Contents
I. Background
II. EPA's Action on Jefferson County's SIP Revision to Adopt the GHG
Tailoring Rule
III. EPA's Action on Jefferson County's SIP Revision to Adopt the
NSR PM2.5 PSD Permitting Requirements
IV. EPA's Action on Jefferson County's SIP Revisions to Adopt the
Phase II Rule
V. EPA's Action on Jefferson County's SIP Revision to Adopt the
Federal NSR Reform and Reasonable Possibility Provisions
VI. EPA's Action on Jefferson County's Automatic Rescission Clause
VII. Final Action
VIII. Statutory and Executive Order Reviews
I. Background
On June 1, 2009, and February 8, 2011, the Commonwealth of Kentucky
through KDAQ (and on behalf of LMAPCD) submitted two SIP revisions to
EPA for approval into the Jefferson County portion of the Kentucky SIP
to adopt federal NSR PSD permitting requirements. The SIP revisions
consist of changes to the LMAPCD Air Quality Regulations, Regulation 2
Permit Requirements: Regulation 2.05--Prevention of Significant
Deterioration of Air Quality, and incorporate by reference (IBR) \1\
several NSR PSD permitting requirements promulgated at 40 CFR 52.21.
Specifically, the June 1, 2009, SIP revision: (1) Incorporates
provisions for implementing the PSD program for the PM2.5
NAAQS as promulgated in the NSR PM2.5 Rule,\2\ 73 FR 28321
(May 16, 2008); (2) adopts PSD provisions related to the implementation
of the 1997 8-hour ozone Phase II Rule (Phase II Rule), including
nitrogen oxides (NOX) as a precursor to ozone, 70 FR 71612
(November 29, 2005); and (3) adopts federal PSD regulations established
in the 2002 NSR Reform Rules, 67 FR 80186 (December 31, 2002), and the
NSR Reasonable Possibility Rule, 72 FR 72607 (December 21, 2007). These
PSD permitting provisions became effective in Jefferson County on May
20, 2009. The February 8, 2011, SIP revision provides Jefferson County
with the authority to regulate greenhouse gas (GHG) emissions under its
PSD program and establishes appropriate emission thresholds for
determining which new stationary sources and modification projects
become subject to LMAPCD's PSD permitting requirements for their GHG
emissions as promulgated in the GHG Tailoring Rule, 75 FR 31514 (June
3, 2010). These GHG PSD applicability provisions became effective in
Jefferson County on November 17, 2010. In addition, the February 8,
2011, submittal adopts a provision that would automatically render
Jefferson County's Regulation 2.05 or a portion thereof invalid in the
wake of certain court decisions or other events (the ``automatic
rescission clause''). Approval of Jefferson County's GHG permitting
regulations also includes a proposal to simultaneously rescind the
federal implementation plan (FIP) that EPA promulgated on January 14,
2011. See 76 FR 2581.
---------------------------------------------------------------------------
\1\ Throughout this document IBR means incorporate or
incorporates by reference.
\2\ With respect to the NSR PM2.5 Rule, Phase II Rule
and NSR Reform, Jefferson County's SIP revisions only address PSD
requirements at Regulation 2.05. The nonattainment NSR provisions
for Jefferson County (Regulation 2.04) for these provisions are
still under development by LMAPCD.
---------------------------------------------------------------------------
On June 6, 2012, EPA published a proposed rulemaking to approve the
aforementioned changes to Jefferson County's NSR PSD program. See 77 FR
33363. Comments on the proposed rulemaking were due on or before July
6, 2012. No comments, adverse or otherwise, were received on EPA's June
6, 2012, proposed rulemaking. Pursuant to section 110 of the CAA, EPA
is now taking final action to approve the changes to Jefferson County's
NSR PSD program as provided in EPA's June 6, 2012, proposed rulemaking.
A summary of the background for today's final action is provided below.
EPA's June 6, 2012, proposed rulemaking contains more detailed
information regarding the Jefferson County SIP revisions being approved
today. Please refer to the relevant sections in the proposed rulemaking
for EPA's rationale for this final action. See 77 FR 33363.
In addition to incorporating the changes discussed above, Jefferson
County's proposed SIP revisions include PSD permitting provisions that:
(1) Exclude facilities that produce ethanol through a natural
fermentation process from the definition of ``chemical process plants''
in the major NSR source permitting program as amended in the Ethanol
Rule, 72 FR 24060 (May 1, 2007); and (2) IBR changes pursuant to EPA's
Fugitive Emissions Rule, 73 FR 77882 (December 19, 2008).\3\ In today's
rulemaking, EPA is not taking action on LMAPCD's changes to its PSD
regulations to adopt provisions promulgated in the Ethanol Rule nor is
EPA taking action on LMAPCD's changes to incorporate the provisions of
the Fugitive Emissions Rule.
---------------------------------------------------------------------------
\3\ On March 31, 2010, EPA stayed the Fugitive Emissions Rule
(73 FR 77882) for 18 months to October 3, 2011, to allow the Agency
time to propose, take comment and issue a final action regarding the
inclusion of fugitive emissions in NSR applicability determinations.
This stay was established as a result of EPA granting the Natural
Resource Defense Council's petition for reconsideration on the
original Fugitive Emissions Rule. See 73 FR 77882 (December 19,
2008). On March 30, 2011 (76 FR 17548), EPA proposed an interim rule
which superseded the March 31, 2010, stay and clarified and extended
the stay of the Fugitive Emission Rule until EPA completes its
reconsideration. The interim rule simply reverts the CFR text back
to the language that existed prior to the Fugitive Emissions Rule
changes in the December 19, 2008, rulemaking. EPA plans to issue a
final rule affirming the interim rule as final. The final rule will
remain in effect until EPA completes its reconsideration.
---------------------------------------------------------------------------
Jefferson County's practice for revising its PSD regulations is to
IBR into its SIP the version of the Code of Federal Regulations (at 40
CFR 52.21) that is in effect as of a specified date. LMAPCD's
Regulation 2.05 contains the preconstruction review program that
provides for the prevention of significant deterioration of ambient air
quality as required under part C of title I of the CAA (the PSD
program). Jefferson County's June 1, 2009, SIP revision, which provided
version 9 of LMAPCD's Regulation 2.05, IBR the federal PSD regulations
as set forth at 40 CFR 52.21, and as amended as of July 1, 2008.
Subsequently, the February 8, 2011, SIP revision, which provided
version 10 of LMAPCD's Regulation 2.05, IBR federal PSD regulations as
set forth at 40 CFR 52.21, and as amended as of July 1, 2010, thereby
superseding version 9 of Regulation 2.05. Throughout this rulemaking,
EPA will refer to the June 1, 2009, and February 8, 2011, SIP revisions
as ``Jefferson County's SIP revisions.'' In effect, the Jefferson
County SIP revisions change the LMAPCD's IBR date for Regulation 2.05
to July 1, 2010.
II. EPA's Action on Jefferson County's SIP Revision To Adopt the GHG
Tailoring Rule
As mentioned above, on February 8, 2011, KDAQ, on behalf of LMAPCD,
submitted to EPA a revision to the Jefferson County portion of
Kentucky's SIP to IBR NSR PSD requirements for GHG. Specifically, the
February 8, 2011, SIP revision includes changes to LMAPCD's Regulation
2.05--Prevention of Significant Deterioration of Air Quality (version
10) to provide authority to LMAPCD to regulate GHG under the PSD
program, and establishes appropriate PSD applicability thresholds for
GHGs, consistent with EPA's Tailoring Rule.
[[Page 62152]]
LMAPCD is currently the SIP-approved permitting authority for the
PSD program in Jefferson County, Kentucky, and does not interpret its
current SIP-approved PSD regulations at Regulation 2.05 (i.e., version
9), which IBR the federal PSD regulations, to be applicable to GHG. In
letters dated October 4, 2010, and October 19, 2010, LMAPCD notified
EPA that it did not have the authority to regulate GHG under the PSD
program, and thus was in the process of revising its regulations (the
subject of this final action) to provide LMAPCD with this authority.
The February 8, 2011, SIP revision IBR the federal PSD regulations at
40 CFR 52.21 as of July 2010 into Jefferson County Regulation 2.05 to
include the relevant federal GHG Tailoring Rule changes that provide
LMAPCD with the authority to regulate GHG under the PSD program and
establish the thresholds for GHG permitting applicability. The GHG
Tailoring Rule changes that this final action incorporates into the
Jefferson County portion of Kentucky's SIP define the term ``subject to
regulation'' for the PSD program and define ``greenhouse gases'' and
``tons per year (tpy) carbon dioxide equivalent emissions''
(CO2e). Additionally, the changes specify the methodology
for calculating an emissions increase for GHG, the applicable
thresholds for GHG emissions subject to PSD, and the schedule for when
the applicability thresholds take effect. See 75 FR at 31606-31607. EPA
has determined that these provisions, which provide LMAPCD with the
authority to regulate GHG under the PSD program and establish the
thresholds for GHG permitting applicability, are consistent with EPA's
PSD regulations for GHG emitting sources as promulgated in the GHG
Tailoring Rule and section 110 of the CAA. Therefore, EPA is approving
the GHG PSD permitting revision into the Jefferson County portion of
Kentucky's SIP. In addition, EPA is rescinding the FIP promulgated
January 14, 2011, codified in 40 CFR 52.37(b)(7), that ensures the
availability of a PSD-permitting authority for GHG-emitting sources in
Jefferson County, Kentucky. This FIP is no longer necessary since the
GHG PSD permitting revision is being approved into the Jefferson County
portion of Kentucky's SIP. Therefore, this final action removes
Jefferson County from the list at 40 CFR section 52.37.
III. EPA's Action on Jefferson County's SIP Revision To Adopt the NSR
PM2.5 PSD Permitting Requirements
Jefferson County's Regulation 2.05--Prevention of Significant
Deterioration of Air Quality IBR the provisions at 40 CFR 52.21, as
amended in the NSR PM2.5 Rule for PSD. Specifically,
Jefferson County's June 1, 2009, and February 8, 2011, SIP revisions
IBR the following NSR PM2.5 provisions for PSD: (1)
Requirement for NSR permits to address directly emitted
PM2.5 and precursor pollutants; (2) significant emission
rates for direct PM2.5 and precursor pollutants
(SO2 and NOX); (3) PSD and NNSR requirement of
states to address condensable PM in establishing enforceable emission
limits for PM10 or PM2.5; and (4)
PM2.5 emission offsets regarding the PM10
``grandfathering'' provision. In the February 8, 2011, SIP revision,
LMAPCD elected to IBR the grandfathering provision at 40 CFR
52.21(i)(1)(xi) in its PSD regulations at Regulation 2.05. EPA took
final action to repeal the PM10 grandfathering provision on
May 18, 2011. See 76 FR 28646. Therefore, EPA is not taking action to
approve this provision into the Jefferson County portion of the
Kentucky SIP. Jefferson County will need to update its PSD provisions
to reflect the repeal of the PM10 grandfathering provision
in federal regulations at 40 CFR 52.21. At this time Jefferson County's
PSD regulations are approvable because they are at least as stringent
as the current federal regulations and are consistent with section 110
of the CAA.
Jefferson County's February 11, 2011, SIP revision also IBR, into
the Jefferson County portion of the Kentucky SIP, PSD regulations
regarding the requirement to address condensable PM in applicability
determinations and in establishing enforceable emission limits in PSD
and nonattainment NSR permits, as established in the NSR
PM2.5 Rule. As discussed above in Section III.B, under a
separate action, EPA has proposed to correct the inadvertent inclusion
of ``particulate matter emissions'' in the definition of ``regulated
NSR pollutant'' as an indicator for which condensable emissions must be
addressed. See 77 FR 75656 (March 16, 2012). Further, on May 14, 2012,
the Commonwealth of Kentucky, on behalf of LMAPCD, provided a letter to
EPA with clarification of Jefferson County's intent in light of EPA's
March 12, 2012, proposed rulemaking. Specifically, in the letter
Kentucky requested that EPA not approve (into the Jefferson County
portion of the SIP) the term ``particulate matter emissions'' (at
Regulation 2.05) as part of the definition for ``regulated NSR
pollutant'' that condensable emissions be accounted for in
applicability determinations and in establishing emissions limitations
for PM. Therefore, given the Commonwealth's and LMAPCD's request and
EPA's intention to amend the definition of ``regulated NSR pollutant,''
EPA is not taking action to approve the terminology ``particulate
matter emissions'' into the Jefferson County portion of the Kentucky
SIP (at Regulation 2.05) for the condensable provision at the
definition of ``regulated NSR pollutant.'' EPA is, however, approving
into the SIP at Regulation 2.05 the remaining condensable requirement
at 40 CFR 51.166(b)(49)(vi) that condensable emissions be accounted for
in applicability determinations and in establishing emissions
limitations for PM2.5 and PM10. EPA has
determined that Jefferson County's June 1, 2009, and February 8, 2011,
SIP revisions are consistent with the NSR PM2.5 Rule for PSD
and with section 110 of the CAA. See NSR PM2.5 Rule, 75 FR
31514.
IV. EPA's Analysis of Jefferson County's SIP Revisions To Adopt the
Phase II Rule
Jefferson County's June 1, 2009, SIP revision updated LMAPCD's PSD
program to include NOX as an ozone precursor for PSD
permitting, consistent with changes to the federal regulations set
forth in the Phase II Rule at 40 CFR 52.21. Subsequently, on February
8, 2011, KDAQ submitted a SIP revision which included the June 1, 2009,
changes in addition to other federal PSD permitting updates to the
Jefferson County portion of the Kentucky SIP. Jefferson County's SIP
revisions IBR the federal PSD regulations (at 40 CFR 52.21) to include
the NOX as a precursor PSD-only permitting provisions
promulgated in the Phase II Rule into the Jefferson County portion of
the Kentucky SIP at Regulation 2.05--Prevention of Significant
Deterioration of Air Quality (version 10) as of July 1, 2010. EPA has
determined that Jefferson County's SIP revisions are consistent with
the PSD Phase II Rule permitting requirements and section 110 of the
CAA.
V. EPA's Action on Jefferson County's SIP Revision To Adopt the Federal
NSR Reform and Reasonable Possibility Provisions
As mentioned in Section I, LMAPCD's PSD Program at Regulation
2.05--Prevention of Significant Deterioration for Air Quality
establishes the preconstruction review program as
[[Page 62153]]
required under part C of title I of the CAA. The changes to LMAPCD's
PSD rules, which EPA is now approving into the Jefferson County portion
of the Kentucky SIP, were established to update the existing PSD
Program to meet the requirements of the 2002 NSR Reform Rules.
Jefferson County's SIP revisions IBR the 2002 NSR Reform PSD changes
regarding baseline actual emissions, actual-to-projected-actual
applicability tests, and plantwide applicability limit provisions.
Jefferson County's June 1, 2009, and February 8, 2011, SIP revisions
both address the federal PSD requirements promulgated in the 2002 NSR
Reform Rules. The proposed revisions explicitly exclude the pollution
control projects and clean unit portions of the 2002 NSR Reform Rules
that were vacated by the D.C. Circuit Court. See New York v. EPA, 413
F.3d 3 (D.C. Cir. 2005).
With regard to the remanded portions of the 2002 NSR Reform Rules
related to recordkeeping and EPA's December 21, 2007, clarification of
the term ``reasonable possibility'' (72 FR 72607), Jefferson County's
SIP revisions IBR the federal revised ``reasonable possibility''
provisions at 40 CFR 52.21(r)(6). Thus, LMAPCD's recordkeeping and
reporting provisions are the same as the federal requirements
promulgated in EPA's December 21, 2007, final action.
In addition to incorporating the federal PSD regulations, Jefferson
County's February 8, 2011, SIP revision includes a technical support
document (TSD), which assesses the impact of adopting the 2002 NSR
Reform provisions into Jefferson County's PSD permitting program and
the air quality impacts. As mentioned above, LMAPCD has a SIP-approved
PSD program. However, due to the limited number of sources in Jefferson
County, the permitting program does not assess many major PSD permits.
In fact, in nearly ten years, LMAPCD has only analyzed two projects
under PSD. Most sources in Jefferson County are permitted through
LMAPCD's minor source program, which allows sources to take emission
limits to avoid PSD permitting. Additionally, regarding criteria
pollutants, the TSD explains that sources typically subject to PSD
permitting (i.e., point sources) have not been the primary driver for
past or current nonattainment NAAQS designations in Jefferson County.
See the TSD in the Docket ID No. EPA-R04-OAR-2011-0227.
LMAPCD's TSD concluded that adoption of the 2002 NSR Reform
improvements would not impede the LMAPCD's ability to comply with the
NAAQS or any reasonable progress towards continued maintenance. After
evaluating Jefferson County's SIP revision and the TSD provided with
the February 8, 2011, SIP revision, EPA has determined that the SIP
revisions to adopt NSR Reform and reasonable possibility provisions are
consistent with the requirements for the preparation, adoption and
submittal of implementation plans for the federal PSD program at 40 CFR
52.21 and the 2002 NSR Reform Rule.
VI. EPA's Action for Jefferson County's Automatic Rescission Clause
Jefferson County's February 8, 2011, SIP revision adds a new
section to Regulation 2.05, Section 2 ``Effect of Stay, Vacatur, or
Withdrawal,'' also known as an automatic rescission clause. This clause
provides that in the event that EPA or a federal court stays, vacates,
or withdraws any section or subsection of 40 CFR 52.21, that section or
subsection shall automatically be deemed stayed, vacated or withdrawn
from Jefferson County's SIP-approved PSD program at Regulation 2.05.
The period of delay resulting from a stay would begin and end for
purposes of Jefferson County's SIP on the date specified by EPA in a
Federal Register notice announcing the stay. Likewise, any provision
that is vacated or withdrawn shall be null and void for purposes of
Jefferson County's SIP as of the date specified in the notice of
vacatur or withdrawal published by EPA in a Federal Register notice.
EPA has determined that Jefferson County's automatic rescission
clause is approvable. In assessing the approvability of this provision,
EPA considered two key factors: (1) Whether the public will be given
reasonable notice of any change to the SIP that occurs as a result of
the automatic rescission clause, and (2) whether any future change to
the SIP that occurs as a result of the automatic rescission clause
would be consistent with EPA's interpretation of the effect of the
triggering EPA or federal court action (e.g., the extent of an
administrative or judicial stay). These criteria are derived from the
SIP revision procedures set forth in the CAA and federal regulations.
Regarding public notice, CAA section 110(l) provides that any
revision to a SIP submitted by a state to EPA for approval ``shall be
adopted by such State after reasonable notice and public hearing.'' In
accordance with CAA section 110(l), the LMAPCD followed applicable
notice-and-comment procedures prior to adopting the automatic
rescission clause. Thus, the public is on notice that the Jefferson
County portion of the Kentucky SIP will automatically update to reflect
any EPA or federal action that stays, withdraws, or vacates any portion
of 40 CFR 52.21. In addition, the automatic rescission clause provides
that no change to the SIP will occur until EPA publishes a Federal
Register notice announcing that a portion of 40 CFR 52.21 has been
stayed, vacated, or withdrawn. Thus, the timing and extent of any
future SIP change resulting from the automatic rescission clause will
be clear to both the regulated community and the general public.
EPA's consideration of whether any SIP change resulting from the
proposed automatic rescission clause would be consistent with EPA's
interpretation of the effect of the triggering action on federal
regulations is based on 40 CFR 51.105. Under 40 CFR 51.105,
``[r]evisions of a plan, or any portion thereof, will not be considered
part of an applicable plan until such revisions have been approved by
the Administrator in accordance with this part.'' See 40 CFR 51.105.
While EPA is approving the automatic updating of the Jefferson County
portion of the Kentucky SIP to reflect the stay, withdrawal or vacatur
of any section or subsection of 40 CFR 52.21, there could be varying
interpretations of the timing and extent of changes to 40 CFR 52.21
resulting from a given EPA or federal court action. By tying the
automatic updating of the SIP to EPA's publication of a Federal
Register notice announcing the change to 40 CFR 52.21, the automatic
rescission clause ensures that any change to the SIP will be consistent
with EPA's interpretation of the triggering action.
VII. Final Action
Pursuant to section 110 of the CAA, EPA is taking final action to
approve Jefferson County's June 1, 2009, and February 8, 2011, SIP
revisions which IBR (into the Jefferson County portion of the Kentucky
SIP) federal requirements for NSR PSD permitting. Jefferson County's
SIP revisions consist of changes to the LMAPCD Air Quality Regulation
2.05--Prevention of Significant Deterioration of Air Quality and
address several NSR PSD permitting requirements promulgated at 40 CFR
52.21. Specifically, Jefferson County's June 1, 2009, SIP revision
adopts federal regulations relating to PSD requirements for the NSR
PM2.5 Rule, the Phase II Rule, the 2002 NSR Reform Rule, and
the NSR Reasonable Possibility Rule into the Jefferson County portion
of the Kentucky SIP. Jefferson County's February 8, 2011, SIP revision
includes all of the aforementioned updates to
[[Page 62154]]
LMAPCD's PSD regulations but also provides Jefferson County with the
authority to regulate GHG emissions under its PSD program, establishes
appropriate emissions thresholds for determining PSD applicability with
respect to new and modified GHG-emitting sources (in accordance with
EPA's Tailoring Rule), and incorporates an automatic rescission clause
for 40 CFR 52.21 regulations. EPA has determined that these SIP
revisions are approvable because they are consistent with the CAA and
EPA regulations regarding PSD permitting. In addition, EPA is
rescinding the FIP promulgated on January 14, 2011, at 40 CFR
52.37(b)(7); therefore, this final rule removes Jefferson County from
the PSD GHG FIP listing at 40 CFR section 52.37.
VIII. Statutory and Executive Order Reviews
Under the CAA, the Administrator is required to approve a SIP
submission that complies with the provisions of the Act and applicable
federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in
reviewing SIP submissions, EPA's role is to approve state choices,
provided that they meet the criteria of the CAA. Accordingly, this
action merely approves state law as meeting federal requirements and
does not impose additional requirements beyond those imposed by
Commonwealth law. For that reason, this action:
Is not a ``significant regulatory action'' subject to
review by the Office of Management and Budget under Executive Order
12866 (58 FR 51735, October 4, 1993);
Does not impose an information collection burden under the
provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);
Is certified as not having a significant economic impact
on a substantial number of small entities under the Regulatory
Flexibility Act (5 U.S.C. 601 et seq.);
Does not contain any unfunded mandate or significantly or
uniquely affect small governments, as described in the Unfunded
Mandates Reform Act of 1995 (Pub. L. 104-4);
Does not have Federalism implications as specified in
Executive Order 13132 (64 FR 43255, August 10, 1999);
Is not an economically significant regulatory action based
on health or safety risks subject to Executive Order 13045 (62 FR
19885, April 23, 1997);
Is not a significant regulatory action subject to
Executive Order 13211 (66 FR 28355, May 22, 2001);
Is not subject to requirements of Section 12(d) of the
National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272
note) because application of those requirements would be inconsistent
with the CAA; and
Does not provide EPA with the discretionary authority to
address, as appropriate, disproportionate human health or environmental
effects, using practicable and legally permissible methods, under
Executive Order 12898 (59 FR 7629, February 16, 1994).
In addition, this rule does not have tribal implications as specified
by Executive Order 13175 (65 FR 67249, November 9, 2000), because the
SIP is not approved to apply in Indian country located in the state,
and EPA notes that it will not impose substantial direct costs on
tribal governments or preempt tribal law.
The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the
Small Business Regulatory Enforcement Fairness Act of 1996, generally
provides that before a rule may take effect, the agency promulgating
the rule must submit a rule report, which includes a copy of the rule,
to each House of the Congress and to the Comptroller General of the
United States. EPA will submit a report containing this action and
other required information to the U.S. Senate, the U.S. House of
Representatives, and the Comptroller General of the United States prior
to publication of the rule in the Federal Register. A major rule cannot
take effect until 60 days after it is published in the Federal
Register. This action is not a ``major rule'' as defined by 5 U.S.C.
804(2).
Under section 307(b)(1) of the CAA, petitions for judicial review
of this action must be filed in the United States Court of Appeals for
the appropriate circuit by December 11, 2012. Filing a petition for
reconsideration by the Administrator of this final rule does not affect
the finality of this action for the purposes of judicial review nor
does it extend the time within which a petition for judicial review may
be filed, and shall not postpone the effectiveness of such rule or
action. This action may not be challenged later in proceedings to
enforce its requirements. See section 307(b)(2).
List of Subjects in 40 CFR Part 52
Environmental protection, Air pollution control, Greenhouse gases,
Incorporation by reference, Intergovernmental relations, Particulate
matter, Nitrogen Oxides, Reporting and recordkeeping requirements and
Volatile organic compounds.
Dated: September 12, 2012.
A. Stanley Meiburg,
Acting Regional Administrator, Region 4.
40 CFR part 52 is amended as follows:
PART 52--[AMENDED]
0
1. The authority citation for part 52 continues to read as follows:
Authority: 42.U.S.C. 7401 et seq.
Subpart A--General Provisions
Sec. 52.37 [Amended]
0
2. Section 52.37 is amended by removing and reserving paragraph (b)(7).
Subpart S--Kentucky
0
3. Section 52.920(c) Table 2 is revised to read as follows:
Sec. 52.920 Identification of plan.
* * * * *
(c) * * *
Table 2--EPA-Approved Jefferson County Regulations for Kentucky
----------------------------------------------------------------------------------------------------------------
Federal
Reg Title/subject EPA approval Register District Explanation
date notice effective date
----------------------------------------------------------------------------------------------------------------
Reg 1--General Provisions
----------------------------------------------------------------------------------------------------------------
1.01................. General Application 10/23/01 66 FR 53660 03/17/99 ...................
of Regulations and
Standards.
1.02................. Definitions......... 11/19/02 67 FR 69688 12/19/01 ...................
1.03................. Abbreviations and 11/19/02 67 FR 69688 05/15/02 ...................
Acronyms.
1.04................. Performance Tests... 10/23/01 66 FR 53660 11/19/97 ...................
1.05................. Compliance with 10/23/01 66 FR 53660 11/18/92 ...................
Emission Standards
and Maintenance
Requirements.
[[Page 62155]]
1.06................. Source Self- 10/23/01 66 FR 53660 12/15/93 ...................
Monitoring and
Reporting.
1.07................. Emissions During 10/23/01 66 FR 53660 01/17/96 ...................
Startups,
Shutdowns,
Malfunctions and
Emergencies.
1.08................. Administrative 11/03/03 68 FR 62236 06/19/02 ...................
Procedures.
1.09................. Prohibition of Air 10/23/01 66 FR 53660 11/16/83 ...................
Pollution.
1.10................. Circumvention....... 10/23/01 66 FR 53660 04/19/72 ...................
1.11................. Control of Open 10/23/01 66 FR 53660 02/22/90 ...................
Burning.
1.14................. Control of Fugitive 10/23/01 66 FR 53660 01/20/88 ...................
Particulate
Emissions.
1.18................. Rule Effectiveness.. 10/23/01 66 FR 53689 09/21/94 ...................
1.19................. Administrative 11/19/02 67 FR 69688 05/15/02 ...................
Hearings.
----------------------------------------------------------------------------------------------------------------
Reg 2--Permit Requirements
----------------------------------------------------------------------------------------------------------------
2.01................. General Application. 10/23/01 66 FR 53660 04/21/82 ...................
2.02................. Air Pollution 10/23/01 66 FR 53660 06/21/95 ...................
Regulation
Requirements and
Exemptions.
2.03................. Permit Requirements-- 10/23/01 66 FR 53660 12/15/93 ...................
Non-Title V
Construction and
Operating Permits
and Demolition/
Renovation Permits.
2.04................. Construction or 10/23/01 66 FR 53660 03/17/93 ...................
Modification of
Major Sources in or
Impacting Upon Non-
Attainment Areas
(Emission Offset
Requirements).
2.05................. Prevention of 10/12/12 [Insert 11/17/10 This approval does
Significant citation of not include
Deterioration of publication] Jefferson County's
Air Quality. revisions to
incorporate by
reference the
Ethanol Rule (72
FR 24060, May 1,
2007), Fugitives
Emissions Rule (73
FR 77882, December
19, 2008), the
PM10
Grandfathering
Provision and the
term ``particulate
matter emissions''
(at 40 CFR
52.21(i)(1)(xi)
and
51.166(b)(49)(vi)
respectively in
the NSR PM2.5 Rule
(73 FR 28321, May
16, 2008).
2.06................. Permit Requirements-- 10/23/01 66 FR 53660 11/16/83 ...................
Other Sources.
2.07................. Public Notification 10/23/01 66 FR 53660 06/21/95 ...................
for Title V, PSD,
and Offset Permits;
SIP Revisions; and
Use of Emission
Reduction Credits.
2.09................. Causes for Permit 11/03/03 68 FR 62236 06/19/02 ...................
Suspension.
2.10................. Stack Height 10/23/01 66 FR 53660 07/19/89 ...................
Considerations.
2.11................. Air Quality Model 10/23/01 66 FR 53660 05/19/99 ...................
Usage.
2.17................. Federally 11/03/03 68 FR 62236 06/19/02 ...................
Enforceable
District Origin
Operating Permits.
----------------------------------------------------------------------------------------------------------------
Reg 3--Ambient Air Quality Standards
----------------------------------------------------------------------------------------------------------------
3.01................. Purpose of Standards 10/23/01 66 FR 53660 06/13/79 ...................
and Expression of
Non-Degradation
Intention.
3.02................. Applicability of 10/23/01 66 FR 53660 06/13/79 ...................
Ambient Air Quality
Standards.
3.03................. Definitions......... 10/23/01 66 FR 53660 06/13/79 ...................
3.04................. Ambient Air Quality 10/23/01 66 FR 53660 04/20/88 ...................
Standards.
3.05................. Methods of 10/23/01 66 FR 53660 04/20/88 ...................
Measurement.
----------------------------------------------------------------------------------------------------------------
Reg 4--Emergency Episodes
----------------------------------------------------------------------------------------------------------------
4.01................. General Provisions 10/23/01 66 FR 53660 06/13/79 ...................
for Emergency
Episodes.
4.02................. Episode Criteria.... 10/23/01 66 FR 53660 04/20/88 ...................
4.03................. General Abatement 10/23/01 66 FR 53660 02/16/83 ...................
Requirements.
4.04................. Particulate and 10/23/01 66 FR 53660 04/19/72 ...................
Sulfur Dioxide
Reduction
Requirements.
[[Page 62156]]
4.05................. Hydrocarbon and 10/23/01 66 FR 53660 02/16/83 ...................
Nitrogen Oxides
Reduction
Requirements.
4.06................. Carbon Monoxide 10/23/01 66 FR 53660 02/16/83 ...................
Reduction
Requirements.
4.07................. Episode Reporting 10/23/01 66 FR 53660 06/13/79 ...................
Requirements.
----------------------------------------------------------------------------------------------------------------
Reg 6--Standards of Performance for Existing Affected Facilities
----------------------------------------------------------------------------------------------------------------
6.01................. General Provisions.. 10/23/01 66 FR 53660 11/16/83 ...................
6.02................. Emission Monitoring 10/23/01 66 FR 53660 11/16/83 ...................
for Existing
Sources.
6.07................. Standards of 10/23/01 66 FR 53660 06/13/79 ...................
Performance for
Existing Indirect
Heat Exchangers.
6.08................. Standard of 10/23/01 66 FR 53660 06/13/79 ...................
Performance for
Existing
Incinerators.
6.09................. Standards of 10/23/01 66 FR 53660 03/17/99 ...................
Performance for
Existing Process
Operations.
6.10................. Standard of 10/23/01 66 FR 53660 11/16/83 ...................
Performance for
Existing Process
Gas Streams.
6.12................. Standard of 10/23/01 66 FR 53661 05/15/91 ...................
Performance for
Existing Asphalt
Paving Operations.
6.13................. Standard of 10/23/01 66 FR 53661 05/15/91 ...................
Performance for
Existing Storage
Vessels for
Volatile Organic
Compounds.
6.14................. Standard of 10/23/01 66 FR 53661 04/21/82 ...................
Performance for
Selected Existing
Petroleum Refining
Processes and
Equipment.
6.15................. Standard of 01/25/80 45 FR 6092 06/13/79 ...................
Performance for
Gasoline Transfer
to Existing Service
Station Storage
Tanks (Stage I
Vapor Recovery).
6.16................. Standard of 10/23/01 66 FR 53661 05/15/91 ...................
Performance for
Existing Large
Appliance Surface
Coating Operations.
6.17................. Standard of 10/23/01 66 FR 53661 11/18/92 ...................
Performance for
Existing Automobile
and Truck Surface
Coating Operations.
6.18................. Standards of 11/19/02 67 FR 69688 05/15/02 ...................
Performance for
Existing Solvent
Metal Cleaning
Equipment.
6.19................. Standard of 10/23/01 66 FR 53661 05/15/91 ...................
Performance for
Existing Metal
Furniture Surface
Coating Operations.
6.20................. Standard of 10/23/01 66 FR 53661 11/16/83 ...................
Performance for
Existing Bulk
Gasoline Plants.
6.21................. Standard of 10/23/01 66 FR 53661 11/16/83 ...................
Performance for
Existing Gasoline
Loading Facilities
at Bulk Terminals.
6.22................. Standard of 10/23/01 66 FR 53661 03/17/93 ...................
Performance for
Existing Volatile
Organic Materials
Loading Facilities.
6.24................. Standard of 10/23/01 66 FR 53661 03/17/93 ...................
Performance for
Existing Sources
Using Organic
Materials.
6.26................. Standards of 10/23/01 66 FR 53661 06/13/79 ...................
Performance for
Existing Volatile
Organic Compound
Water Separators.
6.27................. Standards of 10/23/01 66 FR 53661 06/13/79 ...................
Performance for
Existing Liquid
Waste Incinerators.
6.28................. Standard of 10/23/01 66 FR 53661 03/18/81 ...................
Performance for
Existing Hot Air
Aluminum
Atomization
Processes.
6.29................. Standard of 10/23/01 66 FR 53661 05/15/91 ...................
Performance for
Existing Graphic
Arts Facilities
Using Rotogravure
and Flexography.
6.30................. Standard of 10/23/01 66 FR 53661 05/15/91 ...................
Performance for
Existing Factory
Surface Coating
Operations of Flat
Wood Paneling.
[[Page 62157]]
6.31................. Standard of 10/23/01 66 FR 53661 04/23/96 ...................
Performance for
Existing
Miscellaneous Metal
Parts and Products
Surface-Coating
Operations.
6.32................. Standard of 10/23/01 66 FR 53661 05/15/91 ...................
Performance for
Leaks from Existing
Petroleum Refinery
Equipment.
6.33................. Standard of 10/23/01 66 FR 53661 05/15/91 ...................
Performance for
Existing
Synthesized
Pharmaceutical
Product
Manufacturing
Operations.
6.34................. Standard of 10/23/01 66 FR 53661 05/15/91 ...................
Performance for
Existing Pneumatic
Rubber Tire
Manufacturing
Plants.
6.35................. Standard of 10/23/01 66 FR 53661 05/15/91 ...................
Performance for
Existing Fabric,
Vinyl and Paper
Surface Coating
Operations.
6.38................. Standard of 10/23/01 66 FR 53661 12/17/86 ...................
Performance for
Existing Air
Oxidation Processes
in Synthetic
Organic Chemical
Manufacturing
Industries.
6.39................. Standard of 10/23/01 66 FR 53661 07/17/96 ...................
Performance for
Equipment Leaks of
Volatile Organic
Compounds in
Existing Synthetic
Organic Chemical
and Polymer
Manufacturing
Plants.
6.40................. Standards of 10/23/01 66 FR 53661 08/18/93 ...................
Performance for
Gasoline Transfer
to Motor Vehicles
(Stage II Vapor
Recovery and
Control).
6.42................. Reasonably Available 10/23/01 66 FR 53661 03/17/99 ...................
Control Technology
Requirements for
Major Volatile
Organic Compound-
and Nitrogen Oxides-
Emitting Facilities.
6.43................. Volatile Organic 10/23/01 66 FR 53689 05/21/97 ...................
Compound Reduction
Requirements.
6.45................. Standards of 10/23/01 66 FR 53689 02/02/94 ...................
Performance for
Existing Solid
Waste Landfills.
6.44................. Standards of 10/23/01 66 FR 53661 09/20/95 ...................
Performance for
Existing Commercial
Motor Vehicle and
Mobile Equipment
Refinishing
Operations.
6.46................. Standards of 10/23/01 66 FR 53661 12/21/94 ...................
Performance for
Existing Ferroalloy
and Calcium Carbide
Production
Facilities.
6.48................. Standard of 10/23/01 66 FR 53661 07/19/95 ...................
Performance for
Existing Bakery
Oven Operations.
6.49................. Standards of 10/23/01 66 FR 53664 06/20/01 ...................
Performance for
Reactor Processes
and Distillation
Operations
Processes in the
Synthetic Organic
Chemical
Manufacturing
Industry.
6.50................. NOX Requirements for 11/19/02 67 FR 69688 03/20/02 ...................
Portland Cement
Kilns.
----------------------------------------------------------------------------------------------------------------
Reg 7--Standards of Performance for New Affected Facilities
----------------------------------------------------------------------------------------------------------------
7.01................. General Provisions.. 10/23/01 66 FR 53661 05/17/00 ...................
7.06................. Standards of 10/23/01 66 FR 53661 04/21/82 ...................
Performance for New
Indirect Heat
Exchangers.
7.07................. Standard of 10/23/01 66 FR 53661 09/15/93 ...................
Performance for New
Incinerators.
7.08................. Standards of 10/23/01 66 FR 53661 03/17/99 ...................
Performance for New
Process Operations.
7.09................. Standards of 10/23/01 66 FR 53661 06/18/97 ...................
Performance for New
Process Gas Streams.
7.11................. Standard of 10/23/01 66 FR 53661 05/15/91 ...................
Performance for New
Asphalt Paving
Operations.
7.12................. Standard of 10/23/01 66 FR 53661 05/15/91 ...................
Performance for New
Storage Vessels for
Volatile Organic
Compounds.
[[Page 62158]]
7.14................. Standard of 10/23/01 66 FR 53661 06/13/79 ...................
Performance for
Selected New
Petroleum Refining
Processes and
Equipment.
7.15................. Standards of 10/23/01 66 FR 53662 04/20/88 ...................
Performance for
Gasoline Transfer
to New Service
Station Storage
Tanks (Stage I
Vapor Recovery).
7.18................. Standards of 10/23/01 66 FR 53662 05/15/91 ...................
Performance for New
Solvent Metal
Cleaning Equipment.
7.20................. Standard of 10/23/01 66 FR 53662 11/16/83 ...................
Performance for New
Gasoline Loading
Facilities at Bulk
Plants.
7.22................. Standard of 10/23/01 66 FR 53662 03/17/93 ...................
Performance for New
Volatile Organic
Materials Loading
Facilities.
7.25................. Standard of 10/23/01 66 FR 53662 03/17/93 ...................
Performance for New
Sources Using
Volatile Organic
Compounds.
7.34................. Standard of 10/23/01 66 FR 53662 06/13/79 ...................
Performance for New
Sulfite Pulp Mills.
7.35................. Standard of 10/23/01 66 FR 53662 06/13/79 ...................
Performance for New
Ethylene Producing
Plants.
7.36................. Standard of 10/23/01 66 FR 53662 06/13/79 ...................
Performance for New
Volatile Organic
Compound Water
Separators.
7.51................. Standard of 10/23/01 66 FR 53662 01/20/88 ...................
Performance for New
Liquid Waste
Incinerators.
7.52................. Standard of 10/23/01 66 FR 53662 05/15/91 ...................
Performance for New
Fabric, Vinyl, and
Paper Surface
Coating Operations.
7.55................. Standard of 10/23/01 66 FR 53662 03/17/93 ...................
Performance for New
Insulation of
Magnet Wire.
7.56................. Standard of 10/23/01 66 FR 53662 05/15/91 ...................
Performance for
Leaks from New
Petroleum Refinery
Equipment.
7.57................. Standard of 10/23/01 66 FR 53662 05/15/91 ...................
Performance for New
Graphic Arts
Facilities Using
Rotogravure and
Flexography.
7.58................. Standard of 10/23/01 66 FR 53662 05/15/91 ...................
Performance for New
Factory Surface
Coating Operations
of Flat Wood
Paneling.
7.59................. Standard of 10/23/01 66 FR 53662 04/23/96 ...................
Performance for New
Miscellaneous Metal
Parts and Products
Surface Coating
Operations.
7.60................. Standard of 10/23/01 66 FR 53662 05/15/91 ...................
Performance for New
Synthesized
Pharmaceutical
Product
Manufacturing
Operations.
7.77................. Standards of 10/23/01 66 FR 53662 10/20/93 ...................
Performance for New
Blast Furnace
Casthouses.
7.79................. Standards of 10/23/01 66 FR 53690 02/02/94 ...................
Performance for New
Commercial Motor
Vehicles and Mobile
Equipment
Refinishing
Operations.
7.81................. Standard of 10/23/01 66 FR 53662 05/17/00 ...................
Performance for New
or Modified Bakery
Oven Operations.
----------------------------------------------------------------------------------------------------------------
Reg 8--Mobile Source Emissions Control
----------------------------------------------------------------------------------------------------------------
* * * * *
[FR Doc. 2012-24096 Filed 10-11-12; 8:45 am]
BILLING CODE 6560-50-P