[Federal Register Volume 77, Number 201 (Wednesday, October 17, 2012)] [Notices] [Pages 63877-63891] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 2012-25574] ======================================================================= ----------------------------------------------------------------------- MILLENNIUM CHALLENGE CORPORATION [MCC FR 12-11] Notice of Quarterly Report (April 1, 2012-June 30, 2012) AGENCY: Millennium Challenge Corporation. SUMMARY: The Millennium Challenge Corporation (MCC) is reporting for the quarter April 1, 2012, through June 30, 2012, on assistance provided under section 605 of the Millennium Challenge Act of 2003 (22 U.S.C. 7701 et seq.), as amended (the Act), and on transfers or allocations of funds to other federal agencies under section 619(b) of the Act. The following report will be made available to the public by publication in the Federal Register and on the Internet Web site of the MCC (www.mcc.gov) in accordance with section 612(b) of the Act. Dated: October 16, 2012. T. Charles Cooper, Vice President, Congressional and Public Affairs, Millennium Challenge Corporation. Assistance Provided Under Section 605 ---------------------------------------------------------------------------------------------------------------- Cumulative Projects Obligated Objective disbursements Measures 2 ---------------------------------------------------------------------------------------------------------------- Country: Nicaragua Year: 2012 Quarter 3 Total Obligation: $112,009,390 ---------------------------------------------------------------------------------------------------------------- Entity to which the assistance is provided: MCA Nicaragua Total Quarterly Disbursements 1: $-28,532 ---------------------------------------------------------------------------------------------------------------- Property Regularization Project.. $7,180,454 Increase Investment $6,713,553 Automated database of by strengthening registry and cadastre property rights. installed in the 10 municipalities of Leon. Value of land, urban. Value of land, rural. Time to conduct a land transaction. Additional parcels with a registered title, urban. Additional parcels with a registered title, rural. Area covered by cadastral mapping. Cost to conduct a land transaction. [[Page 63878]] Transportation Project........... $57,735,608 Reduce $56,740,790 Annual Average daily transportation traffic volume: N-I costs between Leon Highway, Section R1. and Chinandega and Annual Average daily national, regional traffic volume: N-I and global markets. Highway, Section R2. Annual Average daily traffic volume: Port Sandino (S13). Annual Average daily traffic volume: Villanueva--Guasaule Annual. Average daily traffic volume: Somotillo-Cinco Pinos (S1). Annual average daily traffic volume: Le[oacute]n-Poneloya- Las Pe[ntilde]itas. International Roughness Index: N-I Highway, Section R1. International Roughness Index: N-I Highway, Section R2. International Roughness Index: Port Sandino (Section S13). International roughness index: Villanueva: Guasaule. International roughness index: Somotillo-Cinco Pinos. International roughness index: Le[oacute]n- Poneloya-Las Pe[ntilde]itas. Kilometers of N-I upgraded: Sections R1 and R2 and S13. Kilometers of NI upgraded: Villanueva-- Guasaule. Kilometers of S1 road upgraded. Kilometers of S9 road upgraded. Rural Development Project........ $31,530,722 Increase the value $31,291,352 Beneficiaries with added of farms and business plans. enterprises in the Manzanas (1 manzana = region. 1.7 hectares), by sector, harvesting higher-value crops. Beneficiaries with business plans prepared with assistance of Rural Business Development Project. Beneficiaries implementing forestry business plans under Improvement of Water Supplies Activity. Manzanas reforested. Manzanas with trees planted. Program Administration,\3\ Due $15,562,605 ................... $15,272,285 ........................ Diligence, Monitoring and Evaluation. Pending subsequent reports \4\... .............. ................... $2,685,101 ........................ ---------------------------------------------------------------------------------------------------------------- The negative disbursement relates to a return of funds to MCC upon MCA Nicaragua's closing. ---------------------------------------------------------------------------------------------------------------- Cumulative Projects Obligated Objective disbursements Measures 2 ---------------------------------------------------------------------------------------------------------------- Country: Benin Year: 2012 Quarter 3 Total Obligation: $307,298,039 ---------------------------------------------------------------------------------------------------------------- Entity to which the assistance is provided: MCA Benin Total Quarterly Disbursements 1: $142,167 ---------------------------------------------------------------------------------------------------------------- Access to Financial Services $17,688,674 Expand Access to $15,495,910 Value of credits granted Project. Financial Services. by micro-finance institutions (MFIs) (at the national level). Value of savings collected by MFIs (at the national level). Average portfolio at risk >90 days of MFIs at the national level. Operational self- sufficiency of MFIs at the national level. Institutions receiving grants through the established grant facility. MFIs inspected by Cellule Supervision Microfinance. [[Page 63879]] Access to Justice Project........ $20,075,580 Improved Ability of $19,383,915 Average time to enforce Justice System to a contract. Enforce Contracts Percent of firms and Reconcile reporting confidence in Claims. the judicial system. Passage of new legal codes. Average time required for Tribunaux de premiere instance (TPI) arbitration centers and courts of first instance to reach a final decision on a case. Average time required for Court of Appeals to reach a final decision on a case. Percent of cases resolved in TPI per year. Percent of cases resolved in Court of Appeals per year. Courthouses completed. Average time required to register a business (soci[eacute]t[eacute]) . Average time required to register a business (sole proprietorship). Access to Land Project........... $32,182,938 Strengthen property $30,978,490 Percent of households rights and investing in targeted increase urban land parcels. investment in Percent of households rural and urban investing in targeted land. rural land parcels. Average cost required to convert occupancy permit to land title through systematic process. Share of respondents perceiving land security in the Conversions from Occupancy permit to land title (PH-TF) or Rural Land Plan (PFR) areas. Preparatory studies completed. Legal and Regulatory Reforms Adopted. Amount of Equipment Purchased. New land titles obtained by transformation of occupancy permit. Land certificates issued within MCA implementation. PFRs established with MCA Benin implementation. Permanent stations installed. Stakeholders trained. Communes with new cadastres. Operational land market information systems. Access to Markets Project........ $188,866,208 Improve Access to $188,683,879 Volume of merchandise Markets through traffic through the Improvements to Port Autonome de the Port of Cotonou. Cotonou. Bulk ship carriers waiting times at the port. Port design-build contract awarded. Annual theft cases. Average time to clear customs. Port meets international port security standards (International Ship and Port Facility Security Code). Program Administration,\3\ Due $48,484,639 ................... $46,877,986 ........................ Diligence, Monitoring and Evaluation. Pending subsequent reports \4\... .............. ................... $471,714 ........................ ---------------------------------------------------------------------------------------------------------------- Cumulative Projects Obligated Objective disbursements Measures 2 ---------------------------------------------------------------------------------------------------------------- Country: Ghana Year: 2012 Quarter 3 Total Obligation: $547,009,000 ---------------------------------------------------------------------------------------------------------------- Entity to which the assistance is provided: MCA Ghana Total Quarterly Disbursements 1: $42,629,978 ---------------------------------------------------------------------------------------------------------------- Agriculture Project.............. $203,234,837 Enhance $201,898,740 Farmers trained in Profitability of commercial agriculture. cultivation, Additional hectares services to irrigated. agriculture and Hectares under product handling production. in support of the Kilometers of feeder expansion of road completed. commercial Percent of contracted agriculture among feeder road works groups of disbursed. smallholder farms. Value of loans disbursed to clients from agriculture loan fund. Portfolio-at-risk of Agriculture Loan Fund (percent). Cooling facilities installed. Percent of contracted irrigation works disbursed. Total parcels registered in the Pilot Land Registration Areas. Volume of products passing through post- harvest treatment. [[Page 63880]] Rural Development Project........ $76,521,481 Strengthen the $75,535,187 Students enrolled in rural institutions schools affected by that provide Education Facilities services Sub-Activity. complementary to, Additional female and supportive of, students enrolled in agricultural and schools affected by agriculture Education Facilities business Sub-Activity. development. Individuals completing internships at Ministries, Departments and Agencies (MDAs) and Metropolitan, Municipal and District Assemblies (MMDAs). Schools rehabilitated. School blocks constructed. Distance to collect water. Households with access to improved water supply. Water points constructed. Kilometers of electricity lines identified and diligence. Inter-bank transactions. Rural banks automated under the Automation/ Computerization and Interconnectivity of Rural Banks activity. Rural banks connected to the wide area network (WAN). Agricultural processing plants in target districts with electricity due to Rural Electrification Sub-Activity. N1 Highway: Annualized average daily traffic. N1 Highway: Kilometers of road upgraded. Trunk roads kilometers of roads completed. Percent of contracted trunk road works disbursed. Ferry Activity: Annualized average daily traffic vehicles. Ferry Activity: Annual average daily traffic (passengers). Percent of contracted road works disbursed: N1 Highway, Lot 2. Percent of contracted road works disbursed: N1 Highway, Lot 2. Percent of contracted work disbursed: Ferry and floating dock. Percent of contracted work disbursed: Landings and terminals. Program Administration,\3\ Due $46,621,604 ................... $40,704,077 ........................ Diligence, Monitoring and Evaluation. Pending subsequent reports \4\... .............. ................... $5,181,487 ........................ ---------------------------------------------------------------------------------------------------------------- [[Page 63881]] Cumulative Projects Obligated Objective disbursements Measures 2 ---------------------------------------------------------------------------------------------------------------- Country: El Salvador Year: 2012 Quarter 3 Total Obligation: $460,940,000 ---------------------------------------------------------------------------------------------------------------- Entity to which the assistance is provided: MCA El Salvador Total Quarterly Disbursements 1: $26,748,928 ---------------------------------------------------------------------------------------------------------------- Human Development Project........ $89,146,523 Increase human and $77,194,326 Non-formal trained physical capital students that complete of residents of the training. the Northern Zone Students participating to take advantage in MCC-supported of employment and education activities. business Additional school female opportunities. students enrolled in MCC-supported activities. Instructors trained or certified through MCC- supported activities. Educational facilities constructed/ rehabilitated and/or equipped through MCC- supported activities. Households with access to improved water supply. Households with access to improved sanitation. Persons trained in hygiene and sanitary best practices. Households benefiting with a connection to the electricity network. Household benefiting with the installation of isolated solar systems. Kilometers of new electrical lines with construction contracts signed. Population benefiting from strategic infrastructure. Beneficiaries of technical assistance and training-- Agriculture. Beneficiaries of technical assistance and training-- Agribusiness. Value of agricultural loans to farmers/ agribusiness. Connectivity Project............. $269,212,588 Reduce travel cost $235,293,663 Average annual daily and time within traffic on the Northern the Northern Zone, Transnational Highway. with the rest of Travel time from the country, and Guatemala to Honduras within the region. through the Northern Zone (hours and minutes). Kilometers of roads completed. Productive Development Project... $68,215,522 ................... $63,079,228 Employment created. Investment in productive chains by selected beneficiaries. Hectares under production with MCC support. Beneficiaries of technical assistance and training-- agriculture. Beneficiaries of technical assistance and training-- agribusiness. Amount of Investment Support Fund (FIDENORTE) approved. Value of agricultural loans to farmers/ agribusiness. Value of loans guaranteed. Guarantees granted. Program Administration \3\ and $34,365,368 ................... $25,164,471 ........................ Control, Monitoring and Evaluation. Pending Subsequent Report \4\.... .............. ................... $0 ........................ ---------------------------------------------------------------------------------------------------------------- Cumulative Projects Obligated Objective disbursements Measures 2 ---------------------------------------------------------------------------------------------------------------- Country: Mali Year: 2012 Quarter 3 Total Obligation: $460,811,163 ---------------------------------------------------------------------------------------------------------------- Entity to which the assistance is provided: MCA Mali Total Quarterly Disbursements 1: $33,039,103 ---------------------------------------------------------------------------------------------------------------- Bamako-Senou Airport Improvement $170,669,220 ................... $121,796,751 Annual foreign visitors, Project. non-residents. Percent of work completed on the airside infrastructure. Percent of work completed on the landside infrastructure. Security and safety deficiencies corrected at the airport. [[Page 63882]] Alatona Irrigation Project....... $245,467,572 Increase the $235,822,867 Cultivation intensity agricultural during the dry season production and (percent). productivity in Value of agricultural the Alatona zone products sold by of the ON. farmers (millions of francs CFA). Percent of works completed on Niono-Goma Coura road. hectares under new irrigation. Irrigation system efficiency on Alatona Canal. Percent of contracted irrigation construction works disbursed. Market gardens allocated in Alatona zones to populations affected by the project or New Settler women. Five-hectares farms distributed to new settlers. Rural hectares formalized. Net primary school enrollment rate (in Alatona zone). Functional producer organization. Hectares under production (rainy season). Hectares under production (dry season). Organisation d'exploitation des reseaux secondaires (OERSs) or water user's associations established. Active MFI clients. Industrial Park Project.......... $2,637,472 Terminated......... $2,637,472 ........................ Program Administration \3\ and $42,036,897 ................... $31,922,678 ........................ Control, Monitoring and Evaluation. Pending Subsequent Report \4\.... .............. ................... $2,580,408 ........................ ---------------------------------------------------------------------------------------------------------------- On May 4, 2012, the MCC Board of Directors concurred with the recommendation of MCC to terminate the Mali Compact following the undemocratic change of government in the country. ---------------------------------------------------------------------------------------------------------------- Cumulative Projects Obligated Objective disbursements Measures 2 ---------------------------------------------------------------------------------------------------------------- Country: Mongolia Year: 2012 Quarter 3 Total Obligation: $284,911,363 ---------------------------------------------------------------------------------------------------------------- Entity to which the assistance is provided: MCA Mongolia Total Quarterly Disbursements 1: $20,578,613 ---------------------------------------------------------------------------------------------------------------- Property Rights Project.......... $27,802,618 Increase security $14,469,888 Wells drilled on and capitalization leaseholds. of land assets Legal and regulatory held by lower- reforms adopted. income Mongolians, Stakeholders trained and increased peri- (Peri-Urban and Land urban herder Plots). productivity and Herder groups limiting incomes. their livestock population to the carrying capacity of their leases on semi- intensive farms. Monetary cost to register land (dollars). Buildings Built/ Rehabilitated. Urban parcels formalized. Stakeholders trained (Ger Area Land Plots). Leaseholds Awarded. Vocational Education Project..... $47,255,637 Increase employment $34,057,626 Students participating and income among in MCC-supported unemployed and educational facilities. underemployed Nongovernmental funding Mongolians. of vocational education (percent). Legal, financial and/or policy reforms adopted. Instructors trained or certified through MCC- supported activities. Labor market assessment completed. Educational facilities constructed/ rehabilitated or equipped through MCC- supported activities. Amount of contracted construction/ rehabilitation/ equipping works disbursed. Health Project................... $38,823,258 Increase the $22,615,809 Amount of budget adoption of allocated by health behaviors that center. reduce non- Civil society communicable mobilization. disease sand Training of health staff injuries (NCDIs) by MCA. among target Improved services in non- populations and communicable diseases- improved medical primary health care treatment and (NCD-PHC) facilities control of NCDIs. (percent). Screening for hypertension (percent). Awareness of working population related to NCD prevention (percent). Early detections of cervical cancer. [[Page 63883]] Roads Project.................... $88,440,123 More efficient $11,144,797 Kilometers of roads transport for completed. trade and access Kilometers of roads to services. under design. Percent of contracted roads works disbursed. Energy and Environmental Project. $45,266,205 Increased wealth $26,300,378 Amount of household and productivity savings from decreased through greater fuel costs. fuel use Stoves distributed by efficiency and MCA. decreasing health Wind power dispatched costs from air. from substation (million kilowatt hours). Reduced particulate matter concentration. Rail Project..................... $369,560 Terminated......... $369,560 Terminated. Program Administration \3\ and $37,303,959 ................... $20,965.342 ........................ Control, Monitoring and Evaluation. Pending subsequent reports \4\... .............. ................... $6,871,906 ........................ ---------------------------------------------------------------------------------------------------------------- In late 2009, the MCC Board of Directors approved the allocation of a portion of the funds originally designated for the rail project to the expansion of the health, vocational education and property right projects, and the remaining portion to the addition of a road project. ---------------------------------------------------------------------------------------------------------------- Cumulative Projects Obligated Objective disbursements Measures 2 ---------------------------------------------------------------------------------------------------------------- Country: Mozambique Year: 2012 Quarter 3 Total Obligation: $506,924,053 ---------------------------------------------------------------------------------------------------------------- Entity to which the assistance is provided: MCA Mozambique Total Quarterly Disbursements 1: $24,883,975 ---------------------------------------------------------------------------------------------------------------- Water Supply and Sanitation $207,385,393 Increase access to $58,617,571 Percent of urban Project. reliable and population with quality water and improved water sources. sanitation Value of municipal facilities. sanitation and drainage systems construction contracts signed. Amount disbursed for municipal sanitation and drainage construction contracts. Value of contracts signed for construction of water systems. Percent of construction contract disbursed for water systems. Percent of urban population with improved sanitation facilities. Percent of rural population with access to improved water sources. Rural water points constructed. Amount disbursed for rural water points construction contracts. Persons trained in hygiene and sanitary best practices. Road Rehabilitation Project...... $176,307,480 Increase access to $43,519,396 Percent of roads works productive contracts disbursed. resources and Kilometers of roads markets. issued ``Take-over Certificates''. Land Tenure Project.............. $39,068,307 Establish $19,501,034 Proposals for efficient, secure improvement to land land access for legislation submitted households and (land policy reform). investors. People trained (paralegal courses at Centre for Juridical and Judicial Training (CFJJ), general training at National Directorate of Land and Forest (DNTF), etc.). Rural hectares mapped in site specific activity. Urban parcels mapped. Rural hectares formalized through site specific activity. Urban parcels formalized. Communities delimited and formalized. Farmer Income Support Project.... $18,400,117 Improve coconut $11,590,924 Coconut seedlings productivity and planted. diversification Survival rate of coconut into cash crop. seedlings. Hectares of alternate crops under production. Farmers trained in pest and disease control. Farmers trained in alternative crop production and productivity enhancing strategies. Farmers trained in planting and post- planting management of coconuts. Farmers using alternative crop production and productivity enhancing strategies. Program Administration \3\ and $65,762,756 ................... $29,229,784 ........................ Control, Monitoring and Evaluation. [[Page 63884]] Pending Subsequent Report \4\.... .............. ................... $7,031,887 ........................ ---------------------------------------------------------------------------------------------------------------- Cumulative Projects Obligated Objective disbursements Measures 2 SONYA ---------------------------------------------------------------------------------------------------------------- Country: Lesotho Year: 2012 Quarter 3 Total Obligation: $362,550,999 ---------------------------------------------------------------------------------------------------------------- Entity to which the assistance is provided: MCA Lesotho Total Quarterly Disbursements\1\: $21,606,156 ---------------------------------------------------------------------------------------------------------------- Water Project.................... $164,027,999 Improve the water $59,854,827 Physical completion of supply for Temolong water industrial and treatment works domestic needs, contract. and enhance rural Physical completion of livelihoods Urban Water supply through improved works contracts watershed (percent). management. Feasibility and/or detailed design contracts disbursed for Urban Water systems. People with access to rural water supply. Ventilated improved pit (VIP) latrines built. Rural Water Supply works contracts disbursed (percent). Households with access to improved latrines. Knowledge of good hygiene practices. Households with reliable water services. Enterprises with reliable water services. Health Project................... $121,377,822 Increase access to $70,941,491 People with HIV still life-extending ART alive 12 months after and essential initiation of health services by treatment. providing a Tuberculosis sustainable notification (per delivery platform. 100,000 people). People living with HIV/ AIDS receiving antiretroviral treatment. Deliveries conducted in the health facilities. Diarrhea notification at health centers (per 1,000 people). Physical completion of health center facilities (percent). Physical completion of outpatient departments (OPDs) (percent). Physical completion of the Botsabelo facilities (BTS) (percent). Private Sector Development $36,470,318 Stimulate $14,152,223 Time required to enforce Project. investment by a contract. improving access Value of commercial to credit, cases. reducing Debit/smart cards transaction costs issued. and increasing the Value of registered participation of mortgage bonds. women in the Land parcels regularized economy. and registered. People trained on gender equality and economic rights. Eligible population with ID cards. Percent of population registered in national identification database. Urban land parcels with approved cadastral maps. Stakeholders trained. Enterprises owned by women. Women holding titles to land. Program Administration \3\ and $40,674,860 ................... $25,684,861 ........................ Control, Monitoring and Evaluation. Pending Subsequent Report \4\.... .............. ................... $3,341,560 ........................ ---------------------------------------------------------------------------------------------------------------- [[Page 63885]] Cumulative Projects Obligated Objective disbursements Measures 2 ---------------------------------------------------------------------------------------------------------------- Country: Morocco Year: 2012 Quarter 3 Total Obligation: $697,500,000 ---------------------------------------------------------------------------------------------------------------- Entity to which the assistance is provided: MCA Morocco Total Quarterly Disbursements \1\: $51,098,739 ---------------------------------------------------------------------------------------------------------------- Fruit Tree Productivity Project.. $328,453,084 Reduce volatility $178,065,797 Farmers trained of agricultural Agribusinesses assisted. production and Hectares under increase volume of production. fruit agricultural Value of olive production. production in rain-fed areas (dollars/year). Area in extension perimeters for which water and soil conservation measures have been implemented (hectares). Value of olive production in irrigated areas (dollars/year). Cumulative area of irrigated perimeters rehabilitated (hectares). Length of irrigation canals resurfaced/ rehabilitated (meters). Value of date production in targeted oasis areas (dollars/year). Value of agricultural production. Length of irrigation canals constructed/ rehabilitated (meters). Small Scale Fisheries Project.... $125,174,973 Improve quality of $26,651,719 Landing sites and ports fish moving rehabilitated. through domestic Mobile fish vendors channels and supplied with and using assure the refrigerated carriers. sustainable use of Volume of fish landed at fishing resources. landing sites. Average price of fish at auction markets. Artisan and Fez Medina Project... $94,283,145 Increase value $25,791,159 Total receiving literacy added to tourism training. and artisan Females receiving sectors. literacy training. Total receiving professional training. Females receiving professional training. Gas kilns bought for artisans. Small- and medium-sized enterprise (SME) artisan sales for export. Tourist circuits improved or created. Sites rehabilitated. Training of potters Enterprise Support Project....... $26,811,445 Improved survival $13,822,606 Survival rate after two rate of new SMEs years. and INDH-funded Days of individual income generating coaching. activities; Beneficiaries trained. increased revenue for new SMEs and INDH-funded income generating activities. Financial Services Project....... $43,700,000 To be determined $27,168,788 Portfolio at risk at 30 (``TBD''). days. Clients of microcredit associations reached through mobile branches. Active clients. Value of loan disbursements to Jaida. Program Administration \3\ and $79,077,353 ................... $48,474,119 ........................ Control, Monitoring and Evaluation. Pending Subsequent Report \4\.... .............. ................... $5,847,622 ........................ ---------------------------------------------------------------------------------------------------------------- [[Page 63886]] Cumulative Projects Obligated Objective disbursements Measures 2 ---------------------------------------------------------------------------------------------------------------- Country: Tanzania Year: 2012 Quarter 3 Total Obligation: $698,135,999 ---------------------------------------------------------------------------------------------------------------- Entity to which the assistance is provided: MCA Tanzania Total Quarterly Disbursements 1: $31,790,382 ---------------------------------------------------------------------------------------------------------------- Energy Sector Project............ $207,465,542 Increase value $99,683,291 Current power customers: added to Morogoro D1, Morogoro businesses. T1, Morogoro T2 & T3, Tanga D1, Tanga T1, Tanga T2 & T3, Mbeya D1, Mbeya T1, Mbeya T2 & T3, Iringa D1, Iringa T1, Iringa T2 & T3, Dodoma D1, Dodoma T1, Dodoma T2 & T3, Mwanza D1, Mwanza T1 and Mwanza T2 & T3. Collection efficiency (Morogoro). Collection efficiency (Tanga). Collection efficiency (Mbeya). Collection efficiency (Iringa). Collection efficiency (Dodoma). Collection efficiency (Mwanza). Collection efficiency (Zanzibar). Technical and nontechnical losses (Morogoro). Technical and nontechnical losses (Tanga). Technical and nontechnical losses (Mbeya). Technical and nontechnical losses (Iringa). Technical and nontechnical losses (Dodoma). Technical and nontechnical losses (Mwanza). Technical and nontechnical losses (Zanzibar). Transport Sector Project......... $368,847,428 Increase cash crop $165,791,113 Kilometers upgraded/ revenue and completed: All Mainland aggregate visitor road segments. spending. Percent disbursed on construction works: Tunduma Sumbawanga. Percent disbursed on construction works: Tanga Horohoro. Percent disbursed on construction works: Namtumbo Songea. Percent disbursed on construction works: Peramiho Mbinga. Kilometers upgraded/ completed: Pemba. Percent disbursed on construction works: Pemba. Percent disbursed on construction works: Mafia Island. Water Sector Project............. $65,692,145 Increase investment $30,627,441 Customers (domestic and in human and nondomestic)--Lower physical capital Ruvu Plant. and to reduce the Customers (domestic and prevalence of nondomestic)--Morogoro. water-related Volume of water disease. produced--Lower Ruvu (millions of liters per day). Volume of water produced--Morogoro (millions of liters per day). Operations and maintenance cost recovery--Lower Ruvu. Operations and maintenance cost recovery--Morogoro. Percent disbursed on construction contract-- Lower Ruvu. Percent disbursed on construction contract-- Morogoro. Program Administration \3\ and $56,130,884 ................... $24,549,151 ........................ Control, Monitoring and Evaluation. Pending Subsequent Report \4\.... .............. ................... $99,857 ........................ ---------------------------------------------------------------------------------------------------------------- [[Page 63887]] Cumulative Projects Obligated Objective disbursements Measures 2 ---------------------------------------------------------------------------------------------------------------- Country: Burkina Faso Year: 2012 Quarter 3 Total Obligation: $478,685,358 ---------------------------------------------------------------------------------------------------------------- Entity to which the assistance is provided: MCA Burkina Faso Total Quarterly Disbursements 1: $18,955,202 ---------------------------------------------------------------------------------------------------------------- Roads Project.................... $194,130,681 Enhance access to $15,227,750 Annual average daily markets through traffic: Dedougou- investments in the Nouna. road network. Annual average daily traffic: Nouna- Bomborukuy. Annual average daily traffic: Bomborukuy- Mali border. Kilometers of road under works contract. Kilometers of road under design/feasibility contract. Access time to the closest market via paved roads in the Sourou and Comoe (minutes). Kilometers of road under works contract. Kilometers of road under design/feasibility contract. Personnel trained in procurement, contract management and financial systems. Periodic road maintenance coverage rate (for all funds) (percent). Rural Land Governance Project.... $59,934,615 Increase investment $14,771,510 Trend in incidence of in land and rural conflict over land productivity rights reported in the through improved 17 pilot communes land tenure (annual percent rate of security and land change in the management. occurrence of conflicts over land rights). Legal and regulatory reforms adopted. Stakeholders reached by public outreach efforts. Personnel trained. Rural land service offices installed and functioning. Rural hectares formalized. Extent of confidence in land tenure security. Parcels registered in Ganzourou project area. Agriculture Development Project.. $141,910,059 Expand the $34,891,674 New irrigated perimeters productive use of developed in Di land in order to (hectares). increase the Value of signed volume and value contracts for of agricultural irrigation systems production in works. project zones. Farmers trained. Agro-sylvo-pastoral groups that receive technical assistance. Loans provided by the rural finance facility. Volume of loans intended for agro-sylvo-pastoral borrowers (million francs CFA). Bright II Schools Project........ $26,829,669 Increase primary $26,582,359 Girls/boys graduating school completion from BRIGHT II primary rates. schools. Percent of girls regularly attending (90 percent attendance) BRIGHT schools. Girls enrolled in the MCC/USAID-supported BRIGHT schools. Boys enrolled in the MCC/ USAID-supported BRIGHT schools. Additional classrooms constructed. Teachers trained through 10 provincial workshops. Program Administration \3\ and $56,138,545 ................... $28,462,114 ........................ Control, Monitoring and Evaluation. Pending Subsequent Report \4\.... .............. ................... $0 ........................ ---------------------------------------------------------------------------------------------------------------- [[Page 63888]] Cumulative Projects Obligated Objective disbursements Measures 2 ---------------------------------------------------------------------------------------------------------------- Country: Namibia Year: 2012 Quarter 3 Total Obligation: $304,477,815 ---------------------------------------------------------------------------------------------------------------- Entity to which the assistance is provided: MCA Namibia Total Quarterly Disbursements 1: $13,451,767 ---------------------------------------------------------------------------------------------------------------- Education Project................ $144,976,558 Improve the quality $35,340,885 Students (any level) of the workforce participating in the 47 in Namibia by schools sub-activity. enhancing the Percent of contracted equity and construction works effectiveness of disbursed for 47 basic. schools. Textbooks delivered. Educators trained to be textbook management trainers. Educators trained to be textbook utilization trainers. Percent disbursed against works contracts for Regional Study Resource Centers Activity (RSRCs). Percent disbursed against construction, rehabilitation, and equipment contracts for Community Skills and Development Centres (COSDECS). Tourism Project.................. $66,994,941 Grow the Namibian $11,872,173 Percent of condition tourism industry precedents and with a focus on performance targets met increasing income for Etosha National to households in Park (ENP) activity. communal. Game translocated with MCA support. Unique visits on Namibia Tourism Board (NTB) Web site. Leisure tourist arrivals. North American tourism businesses (travel agencies and tour operators) that offer Namibian tours or tour packages. Value of grants issued by the conservancy grant fund (Namibian dollars). Amount of private sector investment secured by MCA assisted conservancies (Namibian dollars). Annual gross revenue to conservancies receiving MCA assistance. Agriculture Project.............. $47,835,474 Enhance the health $15,603,155 Participating households and marketing registered in the efficiency of Community-Based livestock in the Rangeland and Livestock NCAs of Namibia Management (CBRLM) sub- and to increase activity. income. Cattle tagged with radio frequency identification (RFID) tags. Percent disbursed against works contracts for State Veterinary Offices. Value of grant agreements signed under Livestock Market Efficiency Fund. Indigenous natural product (INP) producers mobilized and trained. Value of grant agreements signed under INP Innovation Fund. Program Administration \3\ and $44,670,841 ................... $17,792,317 ........................ Control, Monitoring and Evaluation. Pending Subsequent Report \4\.... .............. ................... $6,212,840 ........................ ---------------------------------------------------------------------------------------------------------------- Cumulative Projects Obligated Objective disbursements Measures 2 ---------------------------------------------------------------------------------------------------------------- Country: Moldova Year: 2012 Quarter 3 Total Obligation: $262,000,000 ---------------------------------------------------------------------------------------------------------------- Entity to which the assistance is provided: MCA Moldova Total Quarterly Disbursements 1: $3,914,008 ---------------------------------------------------------------------------------------------------------------- Road Rehabilitation Project...... $132,840,000 Enhance $606,764 Reduced cost for road transportation users. conditions. Average annual daily traffic. Road maintenance expenditure. Kilometers of roads completed. Percent of contracted roads works disbursed. Kilometers of roads under works contracts. Resettlement action plan implemented. Final design. Trafficking in persons (TIP) training participants. [[Page 63889]] Transition to High Value $101,773,402 Increase incomes in $11,549,102 Hectares under improved Agriculture Project. the agricultural or new irrigation. sector; Create Centralized irrigation models for systems rehabilitated. transition to HVA Percent of contracted in CIS areas and irrigation feasibility an enabling and/or design studies environment disbursed. (legal, financial Value of irrigation and market) for feasibility and/or replication. detailed design contracts signed. Water user associations (WUA) achieving financial sustainability. WUA established under new law. Revised water management policy framework--with long-term water rights defined--established. Contracts of association signed. Additionality factor of access to agricultural finance investments. Value of agricultural and rural loans. All loans. All loans (female). High value agriculture (HVA) Post-Harvest Credit Facility launched. HVA Post-Harvest Credit Facility Policies and Procedures Manual (PPM) Finalized. Farmers that have applied improved techniques (Growing High Value Agriculture Sales [GHS]). Farmers that have applied improved techniques (GHS) (female). Farmers trained. Farmers trained (female). Enterprises assisted. Enterprises assisted (female). Program Administration \3\ and $27,386,598 ................... $3,341,607 ........................ Monitoring and Evaluation. Pending Subsequent Report \4\.... .............. ................... $-292,108 ........................ ---------------------------------------------------------------------------------------------------------------- Cumulative Projects Obligated Objective disbursements Measures 2 ---------------------------------------------------------------------------------------------------------------- Country: Philippines Year: 2012 Quarter 3 Total Obligation: $432,829,526 ---------------------------------------------------------------------------------------------------------------- Entity to which the assistance is provided: MCA Philippines Total Quarterly Disbursements 1: $9,834,492 ---------------------------------------------------------------------------------------------------------------- Kalahi-CIDSS Project............. $120,000,000 Improve the $7,500,655 Percent of Municipal responsiveness of Local Government Units local governments that provide funding to community support for Kalahi- needs, encourage CIDSS (KC) subproject communities to operations and engage in maintenance. development Completed KC subprojects activities.. implemented in compliance with technical plans and within schedule and budget. Percent of communities with KC subprojects that have sustainability evaluation rating of satisfactory or better. Secondary National Roads $213,412,526 Reduce $9,699,458 Motorized traffic time Development Project. transportation cost. costs and improve Maintenance savings. access to markets Kilometers of road and social sections completed. services. Value of road construction contracts disbursed. Value of signed road feasibility and design contracts. Value of road feasibility and design contracts disbursed. Revenue Administration Reform $54,300,000 Increase tax $3,928,373 Audits performed. Project. revenues over time Revenue District Offices and support the using the electronic Department of tax information system Finance's (eTIS). initiatives to Percent of audit detect and deter completed in compliance corruption within with prescribed period its revenue of 120 days. agencies. Percent of audit cases performed using automated audit tool (AATs). Successful case resolutions. Personnel charged with graft, corruption, lifestyle and/or criminal cases. Time taken to complete investigation (average). Program Administration \3\ and $45,117,000 ................... $2,149,258 ........................ Control, Monitoring and Evaluation. [[Page 63890]] Pending Subsequent Reports \4\... .............. ................... $12,074,532 ........................ ---------------------------------------------------------------------------------------------------------------- Cumulative Projects Obligated Objective disbursements Measures 2 ---------------------------------------------------------------------------------------------------------------- Country: Senegal Year: 2012 Quarter 3 Total Obligation: $540,000,000 ---------------------------------------------------------------------------------------------------------------- Entity to which the assistance is provided: MCA Senegal Total Quarterly Disbursements 1: $1,937,680 ---------------------------------------------------------------------------------------------------------------- Road Rehabilitation Project...... $324,712,499 Expand Access to $2,067,948 Value of contracts Markets and signed for the Services. feasibility, design, supervision and program management of the RN2 and RN6 National Roads. Value of contracts signed for construction of the RN2 and RN6 National Roads. Kilometers of roads rehabilitated on the RN2 National Road. Annual average daily traffic Richard-Toll-- Ndioum. Percent change in travel time on the RN2. International Roughness Index on the RN2 (lower number = smoother road). Kilometers of roads covered by the contract for the studies, the supervision and management of the RN2 National Road. Kilometers of roads rehabilitated on the RN6 National Road. Annual average daily traffic Ziguinchor-- Tanaff. Annual average daily traffic Tanaff--Kolda. Annual average daily traffic Kolda-- Kounkan[eacute]. Percent change in travel time on the RN6 National Road. International Roughness Index on the RN6 National Road (lower number = smoother road). Kilometers of roads covered by the contract for the studies, the supervision and management of the RN6 National Road. Irrigation and Water Resources $170,008,860 Improve $416,317 Tons of irrigated rice Management Project. productivity of production. the agricultural Potentially irrigable sector. lands area (Delta and Ngallenka). Hectares under production. Total value of feasibility, design and environmental study contracts signed for the Delta and the Ngallenka (including resettlement action plans). Cropping intensity (hectares under production per year/ cultivable hectares) (Delta and Ngallenka). Hectares mapped to clarify boundaries and land use types. Percent of new conflicts resolved. People trained on land security tools. Program Administration \3\ and $45,278,641 ................... $6,893,667 ........................ Monitoring and Evaluation. Pending Subsequent Report \4\.... .............. ................... $1,413,529 ........................ ---------------------------------------------------------------------------------------------------------------- [[Page 63891]] Cumulative Projects Obligated Objective disbursements Measures 2 ---------------------------------------------------------------------------------------------------------------- Country: Jordan Year: 2012 Quarter 3 Total Obligation: $547,009,000 ---------------------------------------------------------------------------------------------------------------- Entity to which the assistance is provided: MCA Jordan Total Quarterly Disbursements 1: $102,261 ---------------------------------------------------------------------------------------------------------------- Water Network Project............ $102,570,034 Improve the overall .............. Network water drinking water consumption per capita system efficiency (residential and non- in Jordan's Zarqa residential); liters/ Governorate. capita/day. Operating cost coverage-- Water Authority Jordan Zarqa. Non-revenue water. Continuity of supply time; hours per week. Restructure and rehabilitate primary and secondary pipelines (kilometers). Restructure and rehabilitate tertiary pipelines (kilometers). Value disbursed of water construction contracts-- Infrastructure Activity and Water Smart Homes Activity. Wastewater Network Project....... $58,224,386 Improve the overall .............. Sewer blockage events waste water system (annual). efficiency in Volume of wastewater Jordan's Zarqa collected; cubic meters/ Governorate. year/million. Residential population connected to the sewer system. Expand Network (kilometers). Value disbursed of sanitation construction contracts. As Samra Wastewater Treatment $97,521,000 Increase the volume .............. Treated wastewater used Plant Expansion Project. of treated waste in agriculture (as a water available as percent of all water a substitute for used for irrigation in fresh water in Northern and Middle agriculture use. Jordan Valley). Value disbursed of construction contracts. Total engineering, procurement and construction (EPC) cost of As-Samra Expansion. Program Administration \3\ and $19,784,580 ................... $102,261 ........................ Control, Monitoring and Evaluation. Pending subsequent reports \4\... ---------------------------------------------------------------------------------------------------------------- \1\ In this report, due to accounting changes, MCC shows disbursements, which are cash outlays, rather than expenditures. \2\ These measures are the same Key Performance Indicators that MCC reports each quarter. The Key Performance Indicators may change over time to more accurately reflect compact implementation progress. The unit for these measures is ``number of'' unless otherwise specified. \3\ Program administration funds are used to pay items such as salaries, rent, and the cost of office equipment. \4\ These amounts represent disbursements made that will be allocated to individual projects in the subsequent quarter(s) and reported as such in subsequent quarterly report(s). The following MCC Compacts are closed and, therefore, do not have any quarterly disbursements: Armenia, Cape Verde, Georgia, Honduras, Madagascar, and Vanuatu. 619(b) Transfer or Allocation of Funds ------------------------------------------------------------------------- United States Agency to which Funds were Description of program Transferred or Amount or project Allocated ------------------------------------------------------------------------ None None None ------------------------------------------------------------------------ [FR Doc. 2012-25574 Filed 10-16-12; 8:45 am] BILLING CODE 9211-03-P