MILLENNIUM CHALLENGE CORPORATION

[MCC FR 12-11]


Notice of Quarterly Report (April 1, 2012-June 30, 2012)

AGENCY: Millennium Challenge Corporation.

SUMMARY: The Millennium Challenge Corporation (MCC) is reporting for 
the quarter April 1, 2012, through June 30, 2012, on assistance 
provided under section 605 of the Millennium Challenge Act of 2003 (22 
U.S.C. 7701 et seq.), as amended (the Act), and on transfers or 
allocations of funds to other federal agencies under section 619(b) of 
the Act. The following report will be made available to the public by 
publication in the Federal Register and on the Internet Web site of the 
MCC (www.mcc.gov) in accordance with section 612(b) of the Act.

    Dated: October 16, 2012.
T. Charles Cooper,
Vice President, Congressional and Public Affairs, Millennium Challenge 
Corporation.

                                      Assistance Provided Under Section 605
----------------------------------------------------------------------------------------------------------------
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements         Measures 2
----------------------------------------------------------------------------------------------------------------
                     Country: Nicaragua Year: 2012 Quarter 3 Total Obligation: $112,009,390
----------------------------------------------------------------------------------------------------------------
       Entity to which the assistance is provided: MCA Nicaragua Total Quarterly Disbursements 1: $-28,532
----------------------------------------------------------------------------------------------------------------
Property Regularization Project..      $7,180,454  Increase Investment      $6,713,553  Automated database of
                                                    by strengthening                     registry and cadastre
                                                    property rights.                     installed in the 10
                                                                                         municipalities of Leon.
                                                                                        Value of land, urban.
                                                                                        Value of land, rural.
                                                                                        Time to conduct a land
                                                                                         transaction.
                                                                                        Additional parcels with
                                                                                         a registered title,
                                                                                         urban.
                                                                                        Additional parcels with
                                                                                         a registered title,
                                                                                         rural.
                                                                                        Area covered by
                                                                                         cadastral mapping.
                                                                                        Cost to conduct a land
                                                                                         transaction.

[[Page 63878]]

 
Transportation Project...........     $57,735,608  Reduce                  $56,740,790  Annual Average daily
                                                    transportation                       traffic volume: N-I
                                                    costs between Leon                   Highway, Section R1.
                                                    and Chinandega and                  Annual Average daily
                                                    national, regional                   traffic volume: N-I
                                                    and global markets.                  Highway, Section R2.
                                                                                        Annual Average daily
                                                                                         traffic volume: Port
                                                                                         Sandino (S13).
                                                                                        Annual Average daily
                                                                                         traffic volume:
                                                                                         Villanueva--Guasaule
                                                                                         Annual.
                                                                                        Average daily traffic
                                                                                         volume: Somotillo-Cinco
                                                                                         Pinos (S1).
                                                                                        Annual average daily
                                                                                         traffic volume:
                                                                                         Le[oacute]n-Poneloya-
                                                                                         Las Pe[ntilde]itas.
                                                                                        International Roughness
                                                                                         Index: N-I Highway,
                                                                                         Section R1.
                                                                                        International Roughness
                                                                                         Index: N-I Highway,
                                                                                         Section R2.
                                                                                        International Roughness
                                                                                         Index: Port Sandino
                                                                                         (Section S13).
                                                                                        International roughness
                                                                                         index: Villanueva:
                                                                                         Guasaule.
                                                                                        International roughness
                                                                                         index: Somotillo-Cinco
                                                                                         Pinos.
                                                                                        International roughness
                                                                                         index: Le[oacute]n-
                                                                                         Poneloya-Las
                                                                                         Pe[ntilde]itas.
                                                                                        Kilometers of N-I
                                                                                         upgraded: Sections R1
                                                                                         and R2 and S13.
                                                                                        Kilometers of NI
                                                                                         upgraded: Villanueva--
                                                                                         Guasaule.
                                                                                        Kilometers of S1 road
                                                                                         upgraded.
                                                                                        Kilometers of S9 road
                                                                                         upgraded.
Rural Development Project........     $31,530,722  Increase the value      $31,291,352  Beneficiaries with
                                                    added of farms and                   business plans.
                                                    enterprises in the                  Manzanas (1 manzana =
                                                    region.                              1.7 hectares), by
                                                                                         sector, harvesting
                                                                                         higher-value crops.
                                                                                        Beneficiaries with
                                                                                         business plans prepared
                                                                                         with assistance of
                                                                                         Rural Business
                                                                                         Development Project.
                                                                                        Beneficiaries
                                                                                         implementing forestry
                                                                                         business plans under
                                                                                         Improvement of Water
                                                                                         Supplies Activity.
                                                                                        Manzanas reforested.
                                                                                        Manzanas with trees
                                                                                         planted.
Program Administration,\3\ Due        $15,562,605  ...................     $15,272,285  ........................
 Diligence, Monitoring and
 Evaluation.
Pending subsequent reports \4\...  ..............  ...................      $2,685,101  ........................
----------------------------------------------------------------------------------------------------------------
The negative disbursement relates to a return of funds to MCC upon MCA Nicaragua's closing.
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements         Measures 2
----------------------------------------------------------------------------------------------------------------
                       Country: Benin Year: 2012 Quarter 3 Total Obligation: $307,298,039
----------------------------------------------------------------------------------------------------------------
         Entity to which the assistance is provided: MCA Benin Total Quarterly Disbursements 1: $142,167
----------------------------------------------------------------------------------------------------------------
Access to Financial Services          $17,688,674  Expand Access to        $15,495,910  Value of credits granted
 Project.                                           Financial Services.                  by micro-finance
                                                                                         institutions (MFIs) (at
                                                                                         the national level).
                                                                                        Value of savings
                                                                                         collected by MFIs (at
                                                                                         the national level).
                                                                                        Average portfolio at
                                                                                         risk >90 days of MFIs
                                                                                         at the national level.
                                                                                        Operational self-
                                                                                         sufficiency of MFIs at
                                                                                         the national level.
                                                                                        Institutions receiving
                                                                                         grants through the
                                                                                         established grant
                                                                                         facility.
                                                                                        MFIs inspected by
                                                                                         Cellule Supervision
                                                                                         Microfinance.

[[Page 63879]]

 
Access to Justice Project........     $20,075,580  Improved Ability of     $19,383,915  Average time to enforce
                                                    Justice System to                    a contract.
                                                    Enforce Contracts                   Percent of firms
                                                    and Reconcile                        reporting confidence in
                                                    Claims.                              the judicial system.
                                                                                        Passage of new legal
                                                                                         codes.
                                                                                        Average time required
                                                                                         for Tribunaux de
                                                                                         premiere instance (TPI)
                                                                                         arbitration centers and
                                                                                         courts of first
                                                                                         instance to reach a
                                                                                         final decision on a
                                                                                         case.
                                                                                        Average time required
                                                                                         for Court of Appeals to
                                                                                         reach a final decision
                                                                                         on a case.
                                                                                        Percent of cases
                                                                                         resolved in TPI per
                                                                                         year.
                                                                                        Percent of cases
                                                                                         resolved in Court of
                                                                                         Appeals per year.
                                                                                        Courthouses completed.
                                                                                        Average time required to
                                                                                         register a business
                                                                                         (soci[eacute]t[eacute])
                                                                                         .
                                                                                        Average time required to
                                                                                         register a business
                                                                                         (sole proprietorship).
Access to Land Project...........     $32,182,938  Strengthen property     $30,978,490  Percent of households
                                                    rights and                           investing in targeted
                                                    increase                             urban land parcels.
                                                    investment in                       Percent of households
                                                    rural and urban                      investing in targeted
                                                    land.                                rural land parcels.
                                                                                        Average cost required to
                                                                                         convert occupancy
                                                                                         permit to land title
                                                                                         through systematic
                                                                                         process.
                                                                                        Share of respondents
                                                                                         perceiving land
                                                                                         security in the
                                                                                         Conversions from
                                                                                         Occupancy permit to
                                                                                         land title (PH-TF) or
                                                                                         Rural Land Plan (PFR)
                                                                                         areas.
                                                                                        Preparatory studies
                                                                                         completed.
                                                                                        Legal and Regulatory
                                                                                         Reforms Adopted.
                                                                                        Amount of Equipment
                                                                                         Purchased.
                                                                                        New land titles obtained
                                                                                         by transformation of
                                                                                         occupancy permit.
                                                                                        Land certificates issued
                                                                                         within MCA
                                                                                         implementation.
                                                                                        PFRs established with
                                                                                         MCA Benin
                                                                                         implementation.
                                                                                        Permanent stations
                                                                                         installed.
                                                                                        Stakeholders trained.
                                                                                        Communes with new
                                                                                         cadastres.
                                                                                        Operational land market
                                                                                         information systems.
Access to Markets Project........    $188,866,208  Improve Access to      $188,683,879  Volume of merchandise
                                                    Markets through                      traffic through the
                                                    Improvements to                      Port Autonome de
                                                    the Port of                          Cotonou.
                                                    Cotonou.                            Bulk ship carriers
                                                                                         waiting times at the
                                                                                         port.
                                                                                        Port design-build
                                                                                         contract awarded.
                                                                                        Annual theft cases.
                                                                                        Average time to clear
                                                                                         customs.
                                                                                        Port meets international
                                                                                         port security standards
                                                                                         (International Ship and
                                                                                         Port Facility Security
                                                                                         Code).
Program Administration,\3\ Due        $48,484,639  ...................     $46,877,986  ........................
 Diligence, Monitoring and
 Evaluation.
Pending subsequent reports \4\...  ..............  ...................        $471,714  ........................
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements         Measures 2
----------------------------------------------------------------------------------------------------------------
                       Country: Ghana Year: 2012 Quarter 3 Total Obligation: $547,009,000
----------------------------------------------------------------------------------------------------------------
       Entity to which the assistance is provided: MCA Ghana Total Quarterly Disbursements 1: $42,629,978
----------------------------------------------------------------------------------------------------------------
Agriculture Project..............    $203,234,837  Enhance                $201,898,740  Farmers trained in
                                                    Profitability of                     commercial agriculture.
                                                    cultivation,                        Additional hectares
                                                    services to                          irrigated.
                                                    agriculture and                     Hectares under
                                                    product handling                     production.
                                                    in support of the                   Kilometers of feeder
                                                    expansion of                         road completed.
                                                    commercial                          Percent of contracted
                                                    agriculture among                    feeder road works
                                                    groups of                            disbursed.
                                                    smallholder farms.                  Value of loans disbursed
                                                                                         to clients from
                                                                                         agriculture loan fund.
                                                                                        Portfolio-at-risk of
                                                                                         Agriculture Loan Fund
                                                                                         (percent).
                                                                                        Cooling facilities
                                                                                         installed.
                                                                                        Percent of contracted
                                                                                         irrigation works
                                                                                         disbursed.
                                                                                        Total parcels registered
                                                                                         in the Pilot Land
                                                                                         Registration Areas.
                                                                                        Volume of products
                                                                                         passing through post-
                                                                                         harvest treatment.

[[Page 63880]]

 
Rural Development Project........     $76,521,481  Strengthen the          $75,535,187  Students enrolled in
                                                    rural institutions                   schools affected by
                                                    that provide                         Education Facilities
                                                    services                             Sub-Activity.
                                                    complementary to,                   Additional female
                                                    and supportive of,                   students enrolled in
                                                    agricultural and                     schools affected by
                                                    agriculture                          Education Facilities
                                                    business                             Sub-Activity.
                                                    development.                        Individuals completing
                                                                                         internships at
                                                                                         Ministries, Departments
                                                                                         and Agencies (MDAs) and
                                                                                         Metropolitan, Municipal
                                                                                         and District Assemblies
                                                                                         (MMDAs).
                                                                                        Schools rehabilitated.
                                                                                        School blocks
                                                                                         constructed.
                                                                                        Distance to collect
                                                                                         water.
                                                                                        Households with access
                                                                                         to improved water
                                                                                         supply.
                                                                                        Water points
                                                                                         constructed.
                                                                                        Kilometers of
                                                                                         electricity lines
                                                                                         identified and
                                                                                         diligence.
                                                                                        Inter-bank transactions.
                                                                                        Rural banks automated
                                                                                         under the Automation/
                                                                                         Computerization and
                                                                                         Interconnectivity of
                                                                                         Rural Banks activity.
                                                                                        Rural banks connected to
                                                                                         the wide area network
                                                                                         (WAN).
                                                                                        Agricultural processing
                                                                                         plants in target
                                                                                         districts with
                                                                                         electricity due to
                                                                                         Rural Electrification
                                                                                         Sub-Activity.
                                                                                        N1 Highway: Annualized
                                                                                         average daily traffic.
                                                                                        N1 Highway: Kilometers
                                                                                         of road upgraded.
                                                                                        Trunk roads kilometers
                                                                                         of roads completed.
                                                                                        Percent of contracted
                                                                                         trunk road works
                                                                                         disbursed.
                                                                                        Ferry Activity:
                                                                                         Annualized average
                                                                                         daily traffic vehicles.
                                                                                        Ferry Activity: Annual
                                                                                         average daily traffic
                                                                                         (passengers).
                                                                                        Percent of contracted
                                                                                         road works disbursed:
                                                                                         N1 Highway, Lot 2.
                                                                                        Percent of contracted
                                                                                         road works disbursed:
                                                                                         N1 Highway, Lot 2.
                                                                                        Percent of contracted
                                                                                         work disbursed: Ferry
                                                                                         and floating dock.
                                                                                        Percent of contracted
                                                                                         work disbursed:
                                                                                         Landings and terminals.
Program Administration,\3\ Due        $46,621,604  ...................     $40,704,077  ........................
 Diligence, Monitoring and
 Evaluation.
Pending subsequent reports \4\...  ..............  ...................      $5,181,487  ........................
----------------------------------------------------------------------------------------------------------------


[[Page 63881]]


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements         Measures 2
----------------------------------------------------------------------------------------------------------------
                    Country: El Salvador Year: 2012 Quarter 3 Total Obligation: $460,940,000
----------------------------------------------------------------------------------------------------------------
    Entity to which the assistance is provided: MCA El Salvador Total Quarterly Disbursements 1: $26,748,928
----------------------------------------------------------------------------------------------------------------
Human Development Project........     $89,146,523  Increase human and      $77,194,326  Non-formal trained
                                                    physical capital                     students that complete
                                                    of residents of                      the training.
                                                    the Northern Zone                   Students participating
                                                    to take advantage                    in MCC-supported
                                                    of employment and                    education activities.
                                                    business                            Additional school female
                                                    opportunities.                       students enrolled in
                                                                                         MCC-supported
                                                                                         activities.
                                                                                        Instructors trained or
                                                                                         certified through MCC-
                                                                                         supported activities.
                                                                                        Educational facilities
                                                                                         constructed/
                                                                                         rehabilitated and/or
                                                                                         equipped through MCC-
                                                                                         supported activities.
                                                                                        Households with access
                                                                                         to improved water
                                                                                         supply.
                                                                                        Households with access
                                                                                         to improved sanitation.
                                                                                        Persons trained in
                                                                                         hygiene and sanitary
                                                                                         best practices.
                                                                                        Households benefiting
                                                                                         with a connection to
                                                                                         the electricity
                                                                                         network.
                                                                                        Household benefiting
                                                                                         with the installation
                                                                                         of isolated solar
                                                                                         systems.
                                                                                        Kilometers of new
                                                                                         electrical lines with
                                                                                         construction contracts
                                                                                         signed.
                                                                                        Population benefiting
                                                                                         from strategic
                                                                                         infrastructure.
                                                                                        Beneficiaries of
                                                                                         technical assistance
                                                                                         and training--
                                                                                         Agriculture.
                                                                                        Beneficiaries of
                                                                                         technical assistance
                                                                                         and training--
                                                                                         Agribusiness.
                                                                                        Value of agricultural
                                                                                         loans to farmers/
                                                                                         agribusiness.
Connectivity Project.............    $269,212,588  Reduce travel cost     $235,293,663  Average annual daily
                                                    and time within                      traffic on the Northern
                                                    the Northern Zone,                   Transnational Highway.
                                                    with the rest of                    Travel time from
                                                    the country, and                     Guatemala to Honduras
                                                    within the region.                   through the Northern
                                                                                         Zone (hours and
                                                                                         minutes).
                                                                                        Kilometers of roads
                                                                                         completed.
Productive Development Project...     $68,215,522  ...................     $63,079,228  Employment created.
                                                                                        Investment in productive
                                                                                         chains by selected
                                                                                         beneficiaries.
                                                                                        Hectares under
                                                                                         production with MCC
                                                                                         support.
                                                                                        Beneficiaries of
                                                                                         technical assistance
                                                                                         and training--
                                                                                         agriculture.
                                                                                        Beneficiaries of
                                                                                         technical assistance
                                                                                         and training--
                                                                                         agribusiness.
                                                                                        Amount of Investment
                                                                                         Support Fund
                                                                                         (FIDENORTE) approved.
                                                                                        Value of agricultural
                                                                                         loans to farmers/
                                                                                         agribusiness.
                                                                                        Value of loans
                                                                                         guaranteed.
                                                                                        Guarantees granted.
Program Administration \3\ and        $34,365,368  ...................     $25,164,471  ........................
 Control, Monitoring and
 Evaluation.
Pending Subsequent Report \4\....  ..............  ...................              $0  ........................
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements         Measures 2
----------------------------------------------------------------------------------------------------------------
                        Country: Mali Year: 2012 Quarter 3 Total Obligation: $460,811,163
----------------------------------------------------------------------------------------------------------------
        Entity to which the assistance is provided: MCA Mali Total Quarterly Disbursements 1: $33,039,103
----------------------------------------------------------------------------------------------------------------
Bamako-Senou Airport Improvement     $170,669,220  ...................    $121,796,751  Annual foreign visitors,
 Project.                                                                                non-residents.
                                                                                        Percent of work
                                                                                         completed on the
                                                                                         airside infrastructure.
                                                                                        Percent of work
                                                                                         completed on the
                                                                                         landside
                                                                                         infrastructure.
                                                                                        Security and safety
                                                                                         deficiencies corrected
                                                                                         at the airport.

[[Page 63882]]

 
Alatona Irrigation Project.......    $245,467,572  Increase the           $235,822,867  Cultivation intensity
                                                    agricultural                         during the dry season
                                                    production and                       (percent).
                                                    productivity in                     Value of agricultural
                                                    the Alatona zone                     products sold by
                                                    of the ON.                           farmers (millions of
                                                                                         francs CFA).
                                                                                        Percent of works
                                                                                         completed on Niono-Goma
                                                                                         Coura road.
                                                                                        hectares under new
                                                                                         irrigation.
                                                                                        Irrigation system
                                                                                         efficiency on Alatona
                                                                                         Canal.
                                                                                        Percent of contracted
                                                                                         irrigation construction
                                                                                         works disbursed.
                                                                                        Market gardens allocated
                                                                                         in Alatona zones to
                                                                                         populations affected by
                                                                                         the project or New
                                                                                         Settler women.
                                                                                        Five-hectares farms
                                                                                         distributed to new
                                                                                         settlers.
                                                                                        Rural hectares
                                                                                         formalized.
                                                                                        Net primary school
                                                                                         enrollment rate (in
                                                                                         Alatona zone).
                                                                                        Functional producer
                                                                                         organization.
                                                                                        Hectares under
                                                                                         production (rainy
                                                                                         season).
                                                                                        Hectares under
                                                                                         production (dry
                                                                                         season).
                                                                                        Organisation
                                                                                         d'exploitation des
                                                                                         reseaux secondaires
                                                                                         (OERSs) or water user's
                                                                                         associations
                                                                                         established.
                                                                                        Active MFI clients.
Industrial Park Project..........      $2,637,472  Terminated.........      $2,637,472  ........................
Program Administration \3\ and        $42,036,897  ...................     $31,922,678  ........................
 Control, Monitoring and
 Evaluation.
Pending Subsequent Report \4\....  ..............  ...................      $2,580,408  ........................
----------------------------------------------------------------------------------------------------------------
On May 4, 2012, the MCC Board of Directors concurred with the recommendation of MCC to terminate the Mali
 Compact following the undemocratic change of government in the country.
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements         Measures 2
----------------------------------------------------------------------------------------------------------------
                      Country: Mongolia Year: 2012 Quarter 3 Total Obligation: $284,911,363
----------------------------------------------------------------------------------------------------------------
      Entity to which the assistance is provided: MCA Mongolia Total Quarterly Disbursements 1: $20,578,613
----------------------------------------------------------------------------------------------------------------
Property Rights Project..........     $27,802,618  Increase security       $14,469,888  Wells drilled on
                                                    and capitalization                   leaseholds.
                                                    of land assets                      Legal and regulatory
                                                    held by lower-                       reforms adopted.
                                                    income Mongolians,                  Stakeholders trained
                                                    and increased peri-                  (Peri-Urban and Land
                                                    urban herder                         Plots).
                                                    productivity and                    Herder groups limiting
                                                    incomes.                             their livestock
                                                                                         population to the
                                                                                         carrying capacity of
                                                                                         their leases on semi-
                                                                                         intensive farms.
                                                                                        Monetary cost to
                                                                                         register land
                                                                                         (dollars).
                                                                                        Buildings Built/
                                                                                         Rehabilitated.
                                                                                        Urban parcels
                                                                                         formalized.
                                                                                        Stakeholders trained
                                                                                         (Ger Area Land Plots).
                                                                                        Leaseholds Awarded.
Vocational Education Project.....     $47,255,637  Increase employment     $34,057,626  Students participating
                                                    and income among                     in MCC-supported
                                                    unemployed and                       educational facilities.
                                                    underemployed                       Nongovernmental funding
                                                    Mongolians.                          of vocational education
                                                                                         (percent).
                                                                                        Legal, financial and/or
                                                                                         policy reforms adopted.
                                                                                        Instructors trained or
                                                                                         certified through MCC-
                                                                                         supported activities.
                                                                                        Labor market assessment
                                                                                         completed.
                                                                                        Educational facilities
                                                                                         constructed/
                                                                                         rehabilitated or
                                                                                         equipped through MCC-
                                                                                         supported activities.
                                                                                        Amount of contracted
                                                                                         construction/
                                                                                         rehabilitation/
                                                                                         equipping works
                                                                                         disbursed.
Health Project...................     $38,823,258  Increase the            $22,615,809  Amount of budget
                                                    adoption of                          allocated by health
                                                    behaviors that                       center.
                                                    reduce non-                         Civil society
                                                    communicable                         mobilization.
                                                    disease sand                        Training of health staff
                                                    injuries (NCDIs)                     by MCA.
                                                    among target                        Improved services in non-
                                                    populations and                      communicable diseases-
                                                    improved medical                     primary health care
                                                    treatment and                        (NCD-PHC) facilities
                                                    control of NCDIs.                    (percent).
                                                                                        Screening for
                                                                                         hypertension (percent).
                                                                                        Awareness of working
                                                                                         population related to
                                                                                         NCD prevention
                                                                                         (percent).
                                                                                        Early detections of
                                                                                         cervical cancer.

[[Page 63883]]

 
Roads Project....................     $88,440,123  More efficient          $11,144,797  Kilometers of roads
                                                    transport for                        completed.
                                                    trade and access                    Kilometers of roads
                                                    to services.                         under design.
                                                                                        Percent of contracted
                                                                                         roads works disbursed.
Energy and Environmental Project.     $45,266,205  Increased wealth        $26,300,378  Amount of household
                                                    and productivity                     savings from decreased
                                                    through greater                      fuel costs.
                                                    fuel use                            Stoves distributed by
                                                    efficiency and                       MCA.
                                                    decreasing health                   Wind power dispatched
                                                    costs from air.                      from substation
                                                                                         (million kilowatt
                                                                                         hours).
                                                                                        Reduced particulate
                                                                                         matter concentration.
Rail Project.....................        $369,560  Terminated.........        $369,560  Terminated.
Program Administration \3\ and        $37,303,959  ...................     $20,965.342  ........................
 Control, Monitoring and
 Evaluation.
Pending subsequent reports \4\...  ..............  ...................      $6,871,906  ........................
----------------------------------------------------------------------------------------------------------------
In late 2009, the MCC Board of Directors approved the allocation of a portion of the funds originally designated
 for the rail project to the expansion of the health, vocational education and property right projects, and the
 remaining portion to the addition of a road project.
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements         Measures 2
----------------------------------------------------------------------------------------------------------------
                     Country: Mozambique Year: 2012 Quarter 3 Total Obligation: $506,924,053
----------------------------------------------------------------------------------------------------------------
     Entity to which the assistance is provided: MCA Mozambique Total Quarterly Disbursements 1: $24,883,975
----------------------------------------------------------------------------------------------------------------
Water Supply and Sanitation          $207,385,393  Increase access to      $58,617,571  Percent of urban
 Project.                                           reliable and                         population with
                                                    quality water and                    improved water sources.
                                                    sanitation                          Value of municipal
                                                    facilities.                          sanitation and drainage
                                                                                         systems construction
                                                                                         contracts signed.
                                                                                        Amount disbursed for
                                                                                         municipal sanitation
                                                                                         and drainage
                                                                                         construction contracts.
                                                                                        Value of contracts
                                                                                         signed for construction
                                                                                         of water systems.
                                                                                        Percent of construction
                                                                                         contract disbursed for
                                                                                         water systems.
                                                                                        Percent of urban
                                                                                         population with
                                                                                         improved sanitation
                                                                                         facilities.
                                                                                        Percent of rural
                                                                                         population with access
                                                                                         to improved water
                                                                                         sources.
                                                                                        Rural water points
                                                                                         constructed.
                                                                                        Amount disbursed for
                                                                                         rural water points
                                                                                         construction contracts.
                                                                                        Persons trained in
                                                                                         hygiene and sanitary
                                                                                         best practices.
Road Rehabilitation Project......    $176,307,480  Increase access to      $43,519,396  Percent of roads works
                                                    productive                           contracts disbursed.
                                                    resources and                       Kilometers of roads
                                                    markets.                             issued ``Take-over
                                                                                         Certificates''.
Land Tenure Project..............     $39,068,307  Establish               $19,501,034  Proposals for
                                                    efficient, secure                    improvement to land
                                                    land access for                      legislation submitted
                                                    households and                       (land policy reform).
                                                    investors.                          People trained
                                                                                         (paralegal courses at
                                                                                         Centre for Juridical
                                                                                         and Judicial Training
                                                                                         (CFJJ), general
                                                                                         training at National
                                                                                         Directorate of Land and
                                                                                         Forest (DNTF), etc.).
                                                                                        Rural hectares mapped in
                                                                                         site specific activity.
                                                                                        Urban parcels mapped.
                                                                                        Rural hectares
                                                                                         formalized through site
                                                                                         specific activity.
                                                                                        Urban parcels
                                                                                         formalized.
                                                                                        Communities delimited
                                                                                         and formalized.
Farmer Income Support Project....     $18,400,117  Improve coconut         $11,590,924  Coconut seedlings
                                                    productivity and                     planted.
                                                    diversification                     Survival rate of coconut
                                                    into cash crop.                      seedlings.
                                                                                        Hectares of alternate
                                                                                         crops under production.
                                                                                        Farmers trained in pest
                                                                                         and disease control.
                                                                                        Farmers trained in
                                                                                         alternative crop
                                                                                         production and
                                                                                         productivity enhancing
                                                                                         strategies.
                                                                                        Farmers trained in
                                                                                         planting and post-
                                                                                         planting management of
                                                                                         coconuts.
                                                                                        Farmers using
                                                                                         alternative crop
                                                                                         production and
                                                                                         productivity enhancing
                                                                                         strategies.
Program Administration \3\ and        $65,762,756  ...................     $29,229,784  ........................
 Control, Monitoring and
 Evaluation.

[[Page 63884]]

 
Pending Subsequent Report \4\....  ..............  ...................      $7,031,887  ........................
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements      Measures 2 SONYA
----------------------------------------------------------------------------------------------------------------
                      Country: Lesotho Year: 2012 Quarter 3 Total Obligation: $362,550,999
----------------------------------------------------------------------------------------------------------------
      Entity to which the assistance is provided: MCA Lesotho Total Quarterly Disbursements\1\: $21,606,156
----------------------------------------------------------------------------------------------------------------
Water Project....................    $164,027,999  Improve the water       $59,854,827  Physical completion of
                                                    supply for                           Temolong water
                                                    industrial and                       treatment works
                                                    domestic needs,                      contract.
                                                    and enhance rural                   Physical completion of
                                                    livelihoods                          Urban Water supply
                                                    through improved                     works contracts
                                                    watershed                            (percent).
                                                    management.                         Feasibility and/or
                                                                                         detailed design
                                                                                         contracts disbursed for
                                                                                         Urban Water systems.
                                                                                        People with access to
                                                                                         rural water supply.
                                                                                        Ventilated improved pit
                                                                                         (VIP) latrines built.
                                                                                        Rural Water Supply works
                                                                                         contracts disbursed
                                                                                         (percent).
                                                                                        Households with access
                                                                                         to improved latrines.
                                                                                        Knowledge of good
                                                                                         hygiene practices.
                                                                                        Households with reliable
                                                                                         water services.
                                                                                        Enterprises with
                                                                                         reliable water
                                                                                         services.
Health Project...................    $121,377,822  Increase access to      $70,941,491  People with HIV still
                                                    life-extending ART                   alive 12 months after
                                                    and essential                        initiation of
                                                    health services by                   treatment.
                                                    providing a                         Tuberculosis
                                                    sustainable                          notification (per
                                                    delivery platform.                   100,000 people).
                                                                                        People living with HIV/
                                                                                         AIDS receiving
                                                                                         antiretroviral
                                                                                         treatment.
                                                                                        Deliveries conducted in
                                                                                         the health facilities.
                                                                                        Diarrhea notification at
                                                                                         health centers (per
                                                                                         1,000 people).
                                                                                        Physical completion of
                                                                                         health center
                                                                                         facilities (percent).
                                                                                        Physical completion of
                                                                                         outpatient departments
                                                                                         (OPDs) (percent).
                                                                                        Physical completion of
                                                                                         the Botsabelo
                                                                                         facilities (BTS)
                                                                                         (percent).
Private Sector Development            $36,470,318  Stimulate               $14,152,223  Time required to enforce
 Project.                                           investment by                        a contract.
                                                    improving access                    Value of commercial
                                                    to credit,                           cases.
                                                    reducing                            Debit/smart cards
                                                    transaction costs                    issued.
                                                    and increasing the                  Value of registered
                                                    participation of                     mortgage bonds.
                                                    women in the                        Land parcels regularized
                                                    economy.                             and registered.
                                                                                        People trained on gender
                                                                                         equality and economic
                                                                                         rights.
                                                                                        Eligible population with
                                                                                         ID cards.
                                                                                        Percent of population
                                                                                         registered in national
                                                                                         identification
                                                                                         database.
                                                                                        Urban land parcels with
                                                                                         approved cadastral
                                                                                         maps.
                                                                                        Stakeholders trained.
                                                                                        Enterprises owned by
                                                                                         women.
                                                                                        Women holding titles to
                                                                                         land.
Program Administration \3\ and        $40,674,860  ...................     $25,684,861  ........................
 Control, Monitoring and
 Evaluation.
Pending Subsequent Report \4\....  ..............  ...................      $3,341,560  ........................
----------------------------------------------------------------------------------------------------------------


[[Page 63885]]


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements         Measures 2
----------------------------------------------------------------------------------------------------------------
                      Country: Morocco Year: 2012 Quarter 3 Total Obligation: $697,500,000
----------------------------------------------------------------------------------------------------------------
     Entity to which the assistance is provided: MCA Morocco Total Quarterly Disbursements \1\: $51,098,739
----------------------------------------------------------------------------------------------------------------
Fruit Tree Productivity Project..    $328,453,084  Reduce volatility      $178,065,797  Farmers trained
                                                    of agricultural                     Agribusinesses assisted.
                                                    production and                      Hectares under
                                                    increase volume of                   production.
                                                    fruit agricultural                  Value of olive
                                                    production.                          production in rain-fed
                                                                                         areas (dollars/year).
                                                                                        Area in extension
                                                                                         perimeters for which
                                                                                         water and soil
                                                                                         conservation measures
                                                                                         have been implemented
                                                                                         (hectares).
                                                                                        Value of olive
                                                                                         production in irrigated
                                                                                         areas (dollars/year).
                                                                                        Cumulative area of
                                                                                         irrigated perimeters
                                                                                         rehabilitated
                                                                                         (hectares).
                                                                                        Length of irrigation
                                                                                         canals resurfaced/
                                                                                         rehabilitated (meters).
                                                                                        Value of date production
                                                                                         in targeted oasis areas
                                                                                         (dollars/year).
                                                                                        Value of agricultural
                                                                                         production.
                                                                                        Length of irrigation
                                                                                         canals constructed/
                                                                                         rehabilitated (meters).
Small Scale Fisheries Project....    $125,174,973  Improve quality of      $26,651,719  Landing sites and ports
                                                    fish moving                          rehabilitated.
                                                    through domestic                    Mobile fish vendors
                                                    channels and                         supplied with and using
                                                    assure the                           refrigerated carriers.
                                                    sustainable use of                  Volume of fish landed at
                                                    fishing resources.                   landing sites.
                                                                                        Average price of fish at
                                                                                         auction markets.
Artisan and Fez Medina Project...     $94,283,145  Increase value          $25,791,159  Total receiving literacy
                                                    added to tourism                     training.
                                                    and artisan                         Females receiving
                                                    sectors.                             literacy training.
                                                                                        Total receiving
                                                                                         professional training.
                                                                                        Females receiving
                                                                                         professional training.
                                                                                        Gas kilns bought for
                                                                                         artisans.
                                                                                        Small- and medium-sized
                                                                                         enterprise (SME)
                                                                                         artisan sales for
                                                                                         export.
                                                                                        Tourist circuits
                                                                                         improved or created.
                                                                                        Sites rehabilitated.
                                                                                        Training of potters
Enterprise Support Project.......     $26,811,445  Improved survival       $13,822,606  Survival rate after two
                                                    rate of new SMEs                     years.
                                                    and INDH-funded                     Days of individual
                                                    income generating                    coaching.
                                                    activities;                         Beneficiaries trained.
                                                    increased revenue
                                                    for new SMEs and
                                                    INDH-funded income
                                                    generating
                                                    activities.
Financial Services Project.......     $43,700,000  To be determined        $27,168,788  Portfolio at risk at 30
                                                    (``TBD'').                           days.
                                                                                        Clients of microcredit
                                                                                         associations reached
                                                                                         through mobile
                                                                                         branches.
                                                                                        Active clients.
                                                                                        Value of loan
                                                                                         disbursements to Jaida.
Program Administration \3\ and        $79,077,353  ...................     $48,474,119  ........................
 Control, Monitoring and
 Evaluation.
Pending Subsequent Report \4\....  ..............  ...................      $5,847,622  ........................
----------------------------------------------------------------------------------------------------------------


[[Page 63886]]


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements         Measures 2
----------------------------------------------------------------------------------------------------------------
                      Country: Tanzania Year: 2012 Quarter 3 Total Obligation: $698,135,999
----------------------------------------------------------------------------------------------------------------
      Entity to which the assistance is provided: MCA Tanzania Total Quarterly Disbursements 1: $31,790,382
----------------------------------------------------------------------------------------------------------------
Energy Sector Project............    $207,465,542  Increase value          $99,683,291  Current power customers:
                                                    added to                             Morogoro D1, Morogoro
                                                    businesses.                          T1, Morogoro T2 & T3,
                                                                                         Tanga D1, Tanga T1,
                                                                                         Tanga T2 & T3, Mbeya
                                                                                         D1, Mbeya T1, Mbeya T2
                                                                                         & T3, Iringa D1, Iringa
                                                                                         T1, Iringa T2 & T3,
                                                                                         Dodoma D1, Dodoma T1,
                                                                                         Dodoma T2 & T3, Mwanza
                                                                                         D1, Mwanza T1 and
                                                                                         Mwanza T2 & T3.
                                                                                        Collection efficiency
                                                                                         (Morogoro).
                                                                                        Collection efficiency
                                                                                         (Tanga).
                                                                                        Collection efficiency
                                                                                         (Mbeya).
                                                                                        Collection efficiency
                                                                                         (Iringa).
                                                                                        Collection efficiency
                                                                                         (Dodoma).
                                                                                        Collection efficiency
                                                                                         (Mwanza).
                                                                                        Collection efficiency
                                                                                         (Zanzibar).
                                                                                        Technical and
                                                                                         nontechnical losses
                                                                                         (Morogoro).
                                                                                        Technical and
                                                                                         nontechnical losses
                                                                                         (Tanga).
                                                                                        Technical and
                                                                                         nontechnical losses
                                                                                         (Mbeya).
                                                                                        Technical and
                                                                                         nontechnical losses
                                                                                         (Iringa).
                                                                                        Technical and
                                                                                         nontechnical losses
                                                                                         (Dodoma).
                                                                                        Technical and
                                                                                         nontechnical losses
                                                                                         (Mwanza).
                                                                                        Technical and
                                                                                         nontechnical losses
                                                                                         (Zanzibar).
Transport Sector Project.........    $368,847,428  Increase cash crop     $165,791,113  Kilometers upgraded/
                                                    revenue and                          completed: All Mainland
                                                    aggregate visitor                    road segments.
                                                    spending.                           Percent disbursed on
                                                                                         construction works:
                                                                                         Tunduma Sumbawanga.
                                                                                        Percent disbursed on
                                                                                         construction works:
                                                                                         Tanga Horohoro.
                                                                                        Percent disbursed on
                                                                                         construction works:
                                                                                         Namtumbo Songea.
                                                                                        Percent disbursed on
                                                                                         construction works:
                                                                                         Peramiho Mbinga.
                                                                                        Kilometers upgraded/
                                                                                         completed: Pemba.
                                                                                        Percent disbursed on
                                                                                         construction works:
                                                                                         Pemba.
                                                                                        Percent disbursed on
                                                                                         construction works:
                                                                                         Mafia Island.
Water Sector Project.............     $65,692,145  Increase investment     $30,627,441  Customers (domestic and
                                                    in human and                         nondomestic)--Lower
                                                    physical capital                     Ruvu Plant.
                                                    and to reduce the                   Customers (domestic and
                                                    prevalence of                        nondomestic)--Morogoro.
                                                    water-related                       Volume of water
                                                    disease.                             produced--Lower Ruvu
                                                                                         (millions of liters per
                                                                                         day).
                                                                                        Volume of water
                                                                                         produced--Morogoro
                                                                                         (millions of liters per
                                                                                         day).
                                                                                        Operations and
                                                                                         maintenance cost
                                                                                         recovery--Lower Ruvu.
                                                                                        Operations and
                                                                                         maintenance cost
                                                                                         recovery--Morogoro.
                                                                                        Percent disbursed on
                                                                                         construction contract--
                                                                                         Lower Ruvu.
                                                                                        Percent disbursed on
                                                                                         construction contract--
                                                                                         Morogoro.
Program Administration \3\ and        $56,130,884  ...................     $24,549,151  ........................
 Control, Monitoring and
 Evaluation.
Pending Subsequent Report \4\....  ..............  ...................         $99,857  ........................
----------------------------------------------------------------------------------------------------------------


[[Page 63887]]


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements         Measures 2
----------------------------------------------------------------------------------------------------------------
                    Country: Burkina Faso Year: 2012 Quarter 3 Total Obligation: $478,685,358
----------------------------------------------------------------------------------------------------------------
    Entity to which the assistance is provided: MCA Burkina Faso Total Quarterly Disbursements 1: $18,955,202
----------------------------------------------------------------------------------------------------------------
Roads Project....................    $194,130,681  Enhance access to       $15,227,750  Annual average daily
                                                    markets through                      traffic: Dedougou-
                                                    investments in the                   Nouna.
                                                    road network.                       Annual average daily
                                                                                         traffic: Nouna-
                                                                                         Bomborukuy.
                                                                                        Annual average daily
                                                                                         traffic: Bomborukuy-
                                                                                         Mali border.
                                                                                        Kilometers of road under
                                                                                         works contract.
                                                                                        Kilometers of road under
                                                                                         design/feasibility
                                                                                         contract.
                                                                                        Access time to the
                                                                                         closest market via
                                                                                         paved roads in the
                                                                                         Sourou and Comoe
                                                                                         (minutes).
                                                                                        Kilometers of road under
                                                                                         works contract.
                                                                                        Kilometers of road under
                                                                                         design/feasibility
                                                                                         contract.
                                                                                        Personnel trained in
                                                                                         procurement, contract
                                                                                         management and
                                                                                         financial systems.
                                                                                        Periodic road
                                                                                         maintenance coverage
                                                                                         rate (for all funds)
                                                                                         (percent).
Rural Land Governance Project....     $59,934,615  Increase investment     $14,771,510  Trend in incidence of
                                                    in land and rural                    conflict over land
                                                    productivity                         rights reported in the
                                                    through improved                     17 pilot communes
                                                    land tenure                          (annual percent rate of
                                                    security and land                    change in the
                                                    management.                          occurrence of conflicts
                                                                                         over land rights).
                                                                                        Legal and regulatory
                                                                                         reforms adopted.
                                                                                        Stakeholders reached by
                                                                                         public outreach
                                                                                         efforts.
                                                                                        Personnel trained.
                                                                                        Rural land service
                                                                                         offices installed and
                                                                                         functioning.
                                                                                        Rural hectares
                                                                                         formalized.
                                                                                        Extent of confidence in
                                                                                         land tenure security.
                                                                                        Parcels registered in
                                                                                         Ganzourou project area.
Agriculture Development Project..    $141,910,059  Expand the              $34,891,674  New irrigated perimeters
                                                    productive use of                    developed in Di
                                                    land in order to                     (hectares).
                                                    increase the                        Value of signed
                                                    volume and value                     contracts for
                                                    of agricultural                      irrigation systems
                                                    production in                        works.
                                                    project zones.                      Farmers trained.
                                                                                        Agro-sylvo-pastoral
                                                                                         groups that receive
                                                                                         technical assistance.
                                                                                        Loans provided by the
                                                                                         rural finance facility.
                                                                                        Volume of loans intended
                                                                                         for agro-sylvo-pastoral
                                                                                         borrowers (million
                                                                                         francs CFA).
Bright II Schools Project........     $26,829,669  Increase primary        $26,582,359  Girls/boys graduating
                                                    school completion                    from BRIGHT II primary
                                                    rates.                               schools.
                                                                                        Percent of girls
                                                                                         regularly attending (90
                                                                                         percent attendance)
                                                                                         BRIGHT schools.
                                                                                        Girls enrolled in the
                                                                                         MCC/USAID-supported
                                                                                         BRIGHT schools.
                                                                                        Boys enrolled in the MCC/
                                                                                         USAID-supported BRIGHT
                                                                                         schools.
                                                                                        Additional classrooms
                                                                                         constructed.
                                                                                        Teachers trained through
                                                                                         10 provincial
                                                                                         workshops.
Program Administration \3\ and        $56,138,545  ...................     $28,462,114  ........................
 Control, Monitoring and
 Evaluation.
Pending Subsequent Report \4\....  ..............  ...................              $0  ........................
----------------------------------------------------------------------------------------------------------------


[[Page 63888]]


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements         Measures 2
----------------------------------------------------------------------------------------------------------------
                      Country: Namibia Year: 2012 Quarter 3 Total Obligation: $304,477,815
----------------------------------------------------------------------------------------------------------------
      Entity to which the assistance is provided: MCA Namibia Total Quarterly Disbursements 1: $13,451,767
----------------------------------------------------------------------------------------------------------------
Education Project................    $144,976,558  Improve the quality     $35,340,885  Students (any level)
                                                    of the workforce                     participating in the 47
                                                    in Namibia by                        schools sub-activity.
                                                    enhancing the                       Percent of contracted
                                                    equity and                           construction works
                                                    effectiveness of                     disbursed for 47
                                                    basic.                               schools.
                                                                                        Textbooks delivered.
                                                                                        Educators trained to be
                                                                                         textbook management
                                                                                         trainers.
                                                                                        Educators trained to be
                                                                                         textbook utilization
                                                                                         trainers.
                                                                                        Percent disbursed
                                                                                         against works contracts
                                                                                         for Regional Study
                                                                                         Resource Centers
                                                                                         Activity (RSRCs).
                                                                                        Percent disbursed
                                                                                         against construction,
                                                                                         rehabilitation, and
                                                                                         equipment contracts for
                                                                                         Community Skills and
                                                                                         Development Centres
                                                                                         (COSDECS).
Tourism Project..................     $66,994,941  Grow the Namibian       $11,872,173  Percent of condition
                                                    tourism industry                     precedents and
                                                    with a focus on                      performance targets met
                                                    increasing income                    for Etosha National
                                                    to households in                     Park (ENP) activity.
                                                    communal.                           Game translocated with
                                                                                         MCA support.
                                                                                        Unique visits on Namibia
                                                                                         Tourism Board (NTB) Web
                                                                                         site.
                                                                                        Leisure tourist
                                                                                         arrivals.
                                                                                        North American tourism
                                                                                         businesses (travel
                                                                                         agencies and tour
                                                                                         operators) that offer
                                                                                         Namibian tours or tour
                                                                                         packages.
                                                                                        Value of grants issued
                                                                                         by the conservancy
                                                                                         grant fund (Namibian
                                                                                         dollars).
                                                                                        Amount of private sector
                                                                                         investment secured by
                                                                                         MCA assisted
                                                                                         conservancies (Namibian
                                                                                         dollars).
                                                                                        Annual gross revenue to
                                                                                         conservancies receiving
                                                                                         MCA assistance.
Agriculture Project..............     $47,835,474  Enhance the health      $15,603,155  Participating households
                                                    and marketing                        registered in the
                                                    efficiency of                        Community-Based
                                                    livestock in the                     Rangeland and Livestock
                                                    NCAs of Namibia                      Management (CBRLM) sub-
                                                    and to increase                      activity.
                                                    income.                             Cattle tagged with radio
                                                                                         frequency
                                                                                         identification (RFID)
                                                                                         tags.
                                                                                        Percent disbursed
                                                                                         against works contracts
                                                                                         for State Veterinary
                                                                                         Offices.
                                                                                        Value of grant
                                                                                         agreements signed under
                                                                                         Livestock Market
                                                                                         Efficiency Fund.
                                                                                        Indigenous natural
                                                                                         product (INP) producers
                                                                                         mobilized and trained.
                                                                                        Value of grant
                                                                                         agreements signed under
                                                                                         INP Innovation Fund.
Program Administration \3\ and        $44,670,841  ...................     $17,792,317  ........................
 Control, Monitoring and
 Evaluation.
Pending Subsequent Report \4\....  ..............  ...................      $6,212,840  ........................
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements         Measures 2
----------------------------------------------------------------------------------------------------------------
                      Country: Moldova Year: 2012 Quarter 3 Total Obligation: $262,000,000
----------------------------------------------------------------------------------------------------------------
       Entity to which the assistance is provided: MCA Moldova Total Quarterly Disbursements 1: $3,914,008
----------------------------------------------------------------------------------------------------------------
Road Rehabilitation Project......    $132,840,000  Enhance                    $606,764  Reduced cost for road
                                                    transportation                       users.
                                                    conditions.                         Average annual daily
                                                                                         traffic.
                                                                                        Road maintenance
                                                                                         expenditure.
                                                                                        Kilometers of roads
                                                                                         completed.
                                                                                        Percent of contracted
                                                                                         roads works disbursed.
                                                                                        Kilometers of roads
                                                                                         under works contracts.
                                                                                        Resettlement action plan
                                                                                         implemented.
                                                                                        Final design.
                                                                                        Trafficking in persons
                                                                                         (TIP) training
                                                                                         participants.

[[Page 63889]]

 
Transition to High Value             $101,773,402  Increase incomes in     $11,549,102  Hectares under improved
 Agriculture Project.                               the agricultural                     or new irrigation.
                                                    sector; Create                      Centralized irrigation
                                                    models for                           systems rehabilitated.
                                                    transition to HVA                   Percent of contracted
                                                    in CIS areas and                     irrigation feasibility
                                                    an enabling                          and/or design studies
                                                    environment                          disbursed.
                                                    (legal, financial                   Value of irrigation
                                                    and market) for                      feasibility and/or
                                                    replication.                         detailed design
                                                                                         contracts signed.
                                                                                        Water user associations
                                                                                         (WUA) achieving
                                                                                         financial
                                                                                         sustainability.
                                                                                        WUA established under
                                                                                         new law.
                                                                                        Revised water management
                                                                                         policy framework--with
                                                                                         long-term water rights
                                                                                         defined--established.
                                                                                        Contracts of association
                                                                                         signed.
                                                                                        Additionality factor of
                                                                                         access to agricultural
                                                                                         finance investments.
                                                                                        Value of agricultural
                                                                                         and rural loans.
                                                                                        All loans.
                                                                                        All loans (female).
                                                                                        High value agriculture
                                                                                         (HVA) Post-Harvest
                                                                                         Credit Facility
                                                                                         launched.
                                                                                        HVA Post-Harvest Credit
                                                                                         Facility Policies and
                                                                                         Procedures Manual (PPM)
                                                                                         Finalized.
                                                                                        Farmers that have
                                                                                         applied improved
                                                                                         techniques (Growing
                                                                                         High Value Agriculture
                                                                                         Sales [GHS]).
                                                                                        Farmers that have
                                                                                         applied improved
                                                                                         techniques (GHS)
                                                                                         (female).
                                                                                        Farmers trained.
                                                                                        Farmers trained
                                                                                         (female).
                                                                                        Enterprises assisted.
                                                                                        Enterprises assisted
                                                                                         (female).
Program Administration \3\ and        $27,386,598  ...................      $3,341,607  ........................
 Monitoring and Evaluation.
Pending Subsequent Report \4\....  ..............  ...................       $-292,108  ........................
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements         Measures 2
----------------------------------------------------------------------------------------------------------------
                    Country: Philippines Year: 2012 Quarter 3 Total Obligation: $432,829,526
----------------------------------------------------------------------------------------------------------------
     Entity to which the assistance is provided: MCA Philippines Total Quarterly Disbursements 1: $9,834,492
----------------------------------------------------------------------------------------------------------------
Kalahi-CIDSS Project.............    $120,000,000  Improve the              $7,500,655  Percent of Municipal
                                                    responsiveness of                    Local Government Units
                                                    local governments                    that provide funding
                                                    to community                         support for Kalahi-
                                                    needs, encourage                     CIDSS (KC) subproject
                                                    communities to                       operations and
                                                    engage in                            maintenance.
                                                    development                         Completed KC subprojects
                                                    activities..                         implemented in
                                                                                         compliance with
                                                                                         technical plans and
                                                                                         within schedule and
                                                                                         budget.
                                                                                        Percent of communities
                                                                                         with KC subprojects
                                                                                         that have
                                                                                         sustainability
                                                                                         evaluation rating of
                                                                                         satisfactory or better.
Secondary National Roads             $213,412,526  Reduce                   $9,699,458  Motorized traffic time
 Development Project.                               transportation                       cost.
                                                    costs and improve                   Maintenance savings.
                                                    access to markets                   Kilometers of road
                                                    and social                           sections completed.
                                                    services.                           Value of road
                                                                                         construction contracts
                                                                                         disbursed.
                                                                                        Value of signed road
                                                                                         feasibility and design
                                                                                         contracts.
                                                                                        Value of road
                                                                                         feasibility and design
                                                                                         contracts disbursed.
Revenue Administration Reform         $54,300,000  Increase tax             $3,928,373  Audits performed.
 Project.                                           revenues over time                  Revenue District Offices
                                                    and support the                      using the electronic
                                                    Department of                        tax information system
                                                    Finance's                            (eTIS).
                                                    initiatives to                      Percent of audit
                                                    detect and deter                     completed in compliance
                                                    corruption within                    with prescribed period
                                                    its revenue                          of 120 days.
                                                    agencies.                           Percent of audit cases
                                                                                         performed using
                                                                                         automated audit tool
                                                                                         (AATs).
                                                                                        Successful case
                                                                                         resolutions.
                                                                                        Personnel charged with
                                                                                         graft, corruption,
                                                                                         lifestyle and/or
                                                                                         criminal cases.
                                                                                        Time taken to complete
                                                                                         investigation
                                                                                         (average).
Program Administration \3\ and        $45,117,000  ...................      $2,149,258  ........................
 Control, Monitoring and
 Evaluation.

[[Page 63890]]

 
Pending Subsequent Reports \4\...  ..............  ...................     $12,074,532  ........................
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements         Measures 2
----------------------------------------------------------------------------------------------------------------
                      Country: Senegal Year: 2012 Quarter 3 Total Obligation: $540,000,000
----------------------------------------------------------------------------------------------------------------
       Entity to which the assistance is provided: MCA Senegal Total Quarterly Disbursements 1: $1,937,680
----------------------------------------------------------------------------------------------------------------
Road Rehabilitation Project......    $324,712,499  Expand Access to         $2,067,948  Value of contracts
                                                    Markets and                          signed for the
                                                    Services.                            feasibility, design,
                                                                                         supervision and program
                                                                                         management of the RN2
                                                                                         and RN6 National Roads.
                                                                                        Value of contracts
                                                                                         signed for construction
                                                                                         of the RN2 and RN6
                                                                                         National Roads.
                                                                                        Kilometers of roads
                                                                                         rehabilitated on the
                                                                                         RN2 National Road.
                                                                                        Annual average daily
                                                                                         traffic Richard-Toll--
                                                                                         Ndioum.
                                                                                        Percent change in travel
                                                                                         time on the RN2.
                                                                                        International Roughness
                                                                                         Index on the RN2 (lower
                                                                                         number = smoother
                                                                                         road).
                                                                                        Kilometers of roads
                                                                                         covered by the contract
                                                                                         for the studies, the
                                                                                         supervision and
                                                                                         management of the RN2
                                                                                         National Road.
                                                                                        Kilometers of roads
                                                                                         rehabilitated on the
                                                                                         RN6 National Road.
                                                                                        Annual average daily
                                                                                         traffic Ziguinchor--
                                                                                         Tanaff.
                                                                                        Annual average daily
                                                                                         traffic Tanaff--Kolda.
                                                                                        Annual average daily
                                                                                         traffic Kolda--
                                                                                         Kounkan[eacute].
                                                                                        Percent change in travel
                                                                                         time on the RN6
                                                                                         National Road.
                                                                                        International Roughness
                                                                                         Index on the RN6
                                                                                         National Road (lower
                                                                                         number = smoother
                                                                                         road).
                                                                                        Kilometers of roads
                                                                                         covered by the contract
                                                                                         for the studies, the
                                                                                         supervision and
                                                                                         management of the RN6
                                                                                         National Road.
Irrigation and Water Resources       $170,008,860  Improve                    $416,317  Tons of irrigated rice
 Management Project.                                productivity of                      production.
                                                    the agricultural                    Potentially irrigable
                                                    sector.                              lands area (Delta and
                                                                                         Ngallenka).
                                                                                        Hectares under
                                                                                         production.
                                                                                        Total value of
                                                                                         feasibility, design and
                                                                                         environmental study
                                                                                         contracts signed for
                                                                                         the Delta and the
                                                                                         Ngallenka (including
                                                                                         resettlement action
                                                                                         plans).
                                                                                        Cropping intensity
                                                                                         (hectares under
                                                                                         production per year/
                                                                                         cultivable hectares)
                                                                                         (Delta and Ngallenka).
                                                                                        Hectares mapped to
                                                                                         clarify boundaries and
                                                                                         land use types.
                                                                                        Percent of new conflicts
                                                                                         resolved.
                                                                                        People trained on land
                                                                                         security tools.
Program Administration \3\ and        $45,278,641  ...................      $6,893,667  ........................
 Monitoring and Evaluation.
Pending Subsequent Report \4\....  ..............  ...................      $1,413,529  ........................
----------------------------------------------------------------------------------------------------------------


[[Page 63891]]


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements         Measures 2
----------------------------------------------------------------------------------------------------------------
                       Country: Jordan Year: 2012 Quarter 3 Total Obligation: $547,009,000
----------------------------------------------------------------------------------------------------------------
        Entity to which the assistance is provided: MCA Jordan Total Quarterly Disbursements 1: $102,261
----------------------------------------------------------------------------------------------------------------
Water Network Project............    $102,570,034  Improve the overall  ..............  Network water
                                                    drinking water                       consumption per capita
                                                    system efficiency                    (residential and non-
                                                    in Jordan's Zarqa                    residential); liters/
                                                    Governorate.                         capita/day.
                                                                                        Operating cost coverage--
                                                                                         Water Authority Jordan
                                                                                         Zarqa.
                                                                                        Non-revenue water.
                                                                                        Continuity of supply
                                                                                         time; hours per week.
                                                                                        Restructure and
                                                                                         rehabilitate primary
                                                                                         and secondary pipelines
                                                                                         (kilometers).
                                                                                        Restructure and
                                                                                         rehabilitate tertiary
                                                                                         pipelines (kilometers).
                                                                                        Value disbursed of water
                                                                                         construction contracts--
                                                                                         Infrastructure Activity
                                                                                         and Water Smart Homes
                                                                                         Activity.
Wastewater Network Project.......     $58,224,386  Improve the overall  ..............  Sewer blockage events
                                                    waste water system                   (annual).
                                                    efficiency in                       Volume of wastewater
                                                    Jordan's Zarqa                       collected; cubic meters/
                                                    Governorate.                         year/million.
                                                                                        Residential population
                                                                                         connected to the sewer
                                                                                         system.
                                                                                        Expand Network
                                                                                         (kilometers).
                                                                                        Value disbursed of
                                                                                         sanitation construction
                                                                                         contracts.
As Samra Wastewater Treatment         $97,521,000  Increase the volume  ..............  Treated wastewater used
 Plant Expansion Project.                           of treated waste                     in agriculture (as a
                                                    water available as                   percent of all water
                                                    a substitute for                     used for irrigation in
                                                    fresh water in                       Northern and Middle
                                                    agriculture use.                     Jordan Valley).
                                                                                        Value disbursed of
                                                                                         construction contracts.
                                                                                        Total engineering,
                                                                                         procurement and
                                                                                         construction (EPC) cost
                                                                                         of As-Samra Expansion.
Program Administration \3\ and        $19,784,580  ...................        $102,261  ........................
 Control, Monitoring and
 Evaluation.
Pending subsequent reports \4\...
----------------------------------------------------------------------------------------------------------------
\1\ In this report, due to accounting changes, MCC shows disbursements, which are cash outlays, rather than
  expenditures.
\2\ These measures are the same Key Performance Indicators that MCC reports each quarter. The Key Performance
  Indicators may change over time to more accurately reflect compact implementation progress. The unit for these
  measures is ``number of'' unless otherwise specified.
\3\ Program administration funds are used to pay items such as salaries, rent, and the cost of office equipment.
\4\ These amounts represent disbursements made that will be allocated to individual projects in the subsequent
  quarter(s) and reported as such in subsequent quarterly report(s).
The following MCC Compacts are closed and, therefore, do not have any quarterly disbursements: Armenia, Cape
  Verde, Georgia, Honduras, Madagascar, and Vanuatu.


 
                 619(b) Transfer or Allocation of Funds
-------------------------------------------------------------------------
United States Agency to
    which Funds were                              Description of program
     Transferred or               Amount                or project
       Allocated
------------------------------------------------------------------------
                None                     None                    None
------------------------------------------------------------------------