[Federal Register Volume 77, Number 216 (Wednesday, November 7, 2012)]
[Notices]
[Pages 66829-66830]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2012-27153]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[ Docket Nos. ER13-187-000; ER13-187-001, et al.]
Notice of Compliance Filings
------------------------------------------------------------------------
Docket Nos.
------------------------------------------------------------------------
Midwest Independent Transmission System ER13-187-000 Docket No. ER13-
Operator, Inc. 187-001.
ISO New England Inc.................... ER13-193-000.
PJM Transmission Owners................ ER13-195-000.
ISO New England Inc.................... ER13-196-000.
PJM Interconnection, LLC............... ER13-198-000.
------------------------------------------------------------------------
Take notice that on October 25, 2012, Midwest Independent
Transmission System Operator, Inc., ISO New England Inc., PJM
Transmission Owners,\1\ and PJM Interconnection, LLC submitted filings
to comply with the requirements of Order Nos. 1000 and 1000-A.\2\
---------------------------------------------------------------------------
\1\ The PJM Transmission Owners that joined the filing are:
Exelon Corporation; Jersey Central Power & Light Company,
Metropolitan Edison Company, Pennsylvania Electric Company,
Monongahela Power Company, The Potomac Edison Company, West Penn
Power Company, and American Transmission Systems, Incorporated;
Pepco Holdings, Inc. on behalf of its affiliates Potomac Electric
Power Company, Delmarva Power & Light Company and Atlantic City
Electric Company; PPL Electric Utilities Corporation; Public Service
Electric and Gas Company; UGI Utilities, Inc.--Electric Division;
and Virginia Electric and Power Company.
\2\ Transmission Planning and Cost Allocation by Transmission
Owning and Operating Public Utilities, Order No. 1000, FERC Stats. &
Regs. ] 31,323 (2011), order on reh'g, Order No. 1000-A, 139 FERC ]
61,132; order on reh'g, Order No. 1000-B, 141 FERC ] 61,044 (2012).
---------------------------------------------------------------------------
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date. On or
before the comment date, it is not necessary to serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at http://www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the
[[Page 66830]]
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
This filing is accessible on-line at http://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
[email protected], or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern Time on December 10, 2012.
Dated: November 1, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012-27153 Filed 11-6-12; 8:45 am]
BILLING CODE 6717-01-P