DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14467-000]
New England Hydropower Company, LLC; Notice of Preliminary
Permit Application Accepted for Filing and Soliciting Comments, Motions
To Intervene, and Competing Applications
On November 9, 2012, the New England Hydropower Company, LLC, filed
an application for a preliminary permit, pursuant to section 4(f) of
the Federal Power Act (FPA), proposing to study the feasibility of the
Cochrane Dam Hydroelectric Project (Cochrane Dam Project or project) to
be located on the Charles River, near Needham and Dover, Norfolk
County, Massachusetts. The sole purpose of a preliminary permit, if
issued, is to grant the permit holder priority to file a license
application during the permit term. A preliminary permit does not
authorize the permit holder to perform any land-disturbing activities
or otherwise enter upon lands or waters owned by others without the
owners' express permission.
The proposed project would consist of the following: (1) An
existing 15-foot-high, 200-foot-long stone masonry spillway dam with
concrete retaining walls; (2) an existing impoundment with a 5.1-acre
surface area and a normal storage capacity of 640 acre-feet at an
operating elevation of about 102.3 feet above mean sea level (msl); (3)
an existing 30-foot-long, 18-foot-wide, and 10-foot-deep head box and
intake channel; (4) a new 6-foot-high, 14-foot-wide sluice gate
equipped with a 14-foot-high, 21-foot-wide trashrack with 6-inch bar
spacing; (5) a new 50-foot-long, 13-foot wide Archimedes screw
generator unit with an installed capacity of 170 kilowatts; (6) a new
10-foot-high, 18-foot-long, 18-foot-wide powerhouse containing a new
gearbox and electrical controls; (7) an existing 375-foot-long, 20-
foot-wide, and 4-foot-deep tailrace; (8) a new above ground 300-foot-
long, 35-kilovolt transmission line connecting the powerhouse to the
NSTAR regional grid; and (9) appurtenant facilities. The estimated
annual generation of the proposed Cochrane Dam Project would be about
811 megawatt-hours. The existing Cochrane Dam and appurtenant works,
including a former powerhouse foundation and intake structures, are
owned by the Commonwealth of Massachusetts and operated by the
Massachusetts Department of Conservation and Recreation.
Applicant Contact: Mr. Michael C. Kerr, New England Hydropower
Company, LLC, P.O. Box 5524, Beverly Farms, Massachusetts 01915; phone:
(978) 360-2547.
FERC Contact: John Ramer; phone: (202) 502-8969 or email:
john.ramer@ferc.gov.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site http://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14467) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: November 26, 2012.
Kimberly D. Bose,
Secretary.