[Federal Register Volume 77, Number 247 (Wednesday, December 26, 2012)]
[Notices]
[Pages 76027-76028]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2012-30996]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12119-000]
PowerWheel Associates; Notice of Termination of Exemption by
Implied Surrender and Soliciting Comments and Motions To Intervene
Take notice that the following hydroelectric proceeding has been
initiated by the Commission:
a. Type of Proceeding: Termination of Exemption by Implied
Surrender.
b. Project No.: 12119-000.
c. Date Initiated: November 20, 2012.
d. Exemptee: PowerWheel Associates.
e. Name and Location of Project: The Powerwheel Demonstration
Project is located on Semitropic Water Storage District's (SWSD) main
intake canal at Station 70+50 in Kern County, California.
f. Issued Pursuant to: 18 CFR 6.4 (2011).
g. Exemptee Contact Information: Mr. Kenneth R. Broome, PowerWheel
Associates, 100 Rocky Creek Road, Woodside, CA 94062; phone (650) 529-
1810.
h. FERC Contact: Anthony DeLuca, (202) 502-6632.
i. Deadline for filing comments, protests, and motions to intervene
is 30 days from the issuance date of this notice. All documents may be
filed electronically via the Internet in lieu of paper. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
at http://www.ferc.gov/docs-filing/efiling.asp. The Commission strongly
encourages electronic filings. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and seven
copies should be sent to: The Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Washington, DC 20426. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. Please include the project number (P-
12119-000) on any documents or motions filed.
j. Description of Project Facilities: The project consists of an
existing concrete-lined canal, a waterwheel, 7 feet in external
diameter, 3\1/2\ feet in internal diameter and 14[frac12] feet long,
that is operated in a ``run-of-conduit'' mode. It has one 75-kW
generating unit installed at the sloping drop structure located at
Station 70+50 of the Semitropic Water Storage District's (SWSD) main
intake canal.
k. Description of Proceeding: The Powerwheel Demonstration Project
was constructed by the exemptee in 2003. The project was built for
demonstration purposes and not intended to be a permanent hydroelectric
facility. In several letters to the Commission in 2010 and 2011, the
exemptee requested removal of the project from Commission jurisdiction,
and stated that it was previously dismantled and removed from the canal
drop. Efforts by Commission staff to contact the exemptee to request a
formal application to surrender the exemption have been unanswered.
l. This notice is available for review and reproduction at the
Commission in the Public Reference Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may also be viewed on the Commission's
Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the
Docket number (P-2927) in the docket number field to access the notice.
You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, call toll-
free 1-866-208-3676 or email [email protected]. For TTY, call
(202) 502-8659.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene -- Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining the appropriate action to take,
the Commission will consider all protests filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any protests or motions to
intervene must be received on or before the specified deadline date for
the particular proceeding.
[[Page 76028]]
o. Filing and Service of Responsive Documents -- Any filing must:
(1) Bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or
``MOTION TO INTERVENE,'' as applicable; (2) set forth in the heading
the project number of the proceeding to which the filing responds; (3)
furnish the name, address, and telephone number of the person
commenting, protesting or intervening; and (4) otherwise comply with
the requirements of 18 CFR 385.2001 through 385.2005. All comments,
protests or motions to intervene must set forth their evidentiary basis
and otherwise comply with the requirements of 18 CFR 4.34(b). All
comments, protests, or motions to intervene should relate to project
works, which are the subject of the termination of exemption. A copy of
any protest or motion to intervene must be served upon each
representative of the exemptee specified in item g above. If an
intervener files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency. A copy of all other filings in reference to
this notice must be accompanied by proof of service on all persons
listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
p. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described proceeding. If any agency does not
file comments within the time specified for filing comments, it will be
presumed to have no comments.
Dated: December 19, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-30996 Filed 12-21-12; 4:15 pm]
BILLING CODE 6717-01-P