[Federal Register Volume 78, Number 17 (Friday, January 25, 2013)]
[Rules and Regulations]
[Pages 5306-5310]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2013-01209]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Parts 52 and 81
[EPA-R04-OAR-2011-0043; FRL-9771-2]
Approval and Promulgation of Implementation Plans and Designation
of Areas for Air Quality Planning Purposes; Alabama; Redesignation of
the Birmingham 2006 24-Hour Fine Particulate Matter Nonattainment Area
to Attainment
AGENCY: Environmental Protection Agency (EPA).
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: EPA is taking final action to approve a request submitted on
June 17, 2010, from the State of Alabama, through the Alabama
Department of Environmental Management (ADEM), Air Division, to
redesignate the Birmingham fine particulate matter (PM2.5)
nonattainment area (hereafter referred to as the ``Birmingham Area'' or
``Area'') to attainment for the 2006 24-hour PM2.5 national
ambient air quality standards (NAAQS). The Birmingham 2006 24-hour
PM2.5 nonattainment area is comprised of Jefferson and
Shelby Counties in their entireties and a portion of Walker County.
EPA's approval of the redesignation request is based on the
determination that the State of Alabama has met the criteria for
redesignation to attainment set forth in the Clean Air Act (CAA or
Act), including the determination that the Birmingham Area has attained
the 2006 24-hour PM2.5 NAAQS. Additionally, EPA is approving
a revision to the Alabama state implementation plan (SIP) to include
the 2006 24-hour PM2.5 maintenance plan for the Birmingham
Area that contains the new 2024 motor vehicle emission budgets (MVEBs)
for nitrogen oxides (NOX) and PM2.5. This action
also approves the 2009 emissions inventory submitted with the
maintenance plan.
DATES: Effective Date: This rule will be effective February 25, 2013.
ADDRESSES: EPA has established a docket for this action under Docket
Identification No. EPA-R04-OAR-2011-0043. All documents in the docket
are listed on the www.regulations.gov Web site. Although listed in the
index, some information is not publicly available, i.e., Confidential
Business Information or other information whose disclosure is
restricted by statute. Certain other material, such as copyrighted
material, is not placed on the Internet and will be publicly available
only in hard copy form. Publicly available docket materials are
available either electronically through www.regulations.gov or in hard
copy at the Regulatory Development Section, Air Planning Branch, Air,
Pesticides and Toxics Management Division, U.S. Environmental
Protection Agency, Region 4, 61 Forsyth Street SW., Atlanta, Georgia
30303-8960. EPA requests that if at all possible, you contact the
person listed in the FOR FURTHER INFORMATION CONTACT section to
schedule your inspection. The Regional Office's official hours of
business are Monday through Friday, 8:30 to 4:30, excluding Federal
holidays.
FOR FURTHER INFORMATION CONTACT: Joel Huey, Regulatory Development
Section, Air Planning Branch, Air, Pesticides and Toxics Management
Division, U.S. Environmental Protection Agency, Region 4, 61 Forsyth
Street SW., Atlanta, Georgia 30303-8960. Joel Huey may be reached by
phone at (404) 562-9104 or via electronic mail at [email protected].
SUPPLEMENTARY INFORMATION:
Table of Contents
I. What is the background for the actions?
II. What are the actions EPA is taking?
III. Why is EPA taking these actions?
IV. What are the effects of these actions?
[[Page 5307]]
V. Final Action
VI. Statutory and Executive Order Reviews
I. What is the background for the actions?
As stated in our proposed approval notice published on November 10,
2011 (76 FR 70091), this redesignation action addresses the Birmingham
Area's status solely with respect to the 2006 24-hour PM2.5
NAAQS, for which designations were finalized on November 13, 2009 (74
FR 58688). On June 17, 2010, the State of Alabama, through ADEM,
submitted a request to redesignate the Birmingham Area to attainment
for the 2006 24-hour PM2.5 NAAQS and for EPA approval of the
Alabama SIP revisions containing a maintenance plan for the Area. In
the November 10, 2011, notice, EPA proposed to take the following three
separate but related actions, some of which involve multiple elements:
(1) To redesignate the Birmingham Area to attainment for the 2006 24-
hour PM2.5 NAAQS, provided EPA approves the emissions
inventory submitted with the maintenance plan; (2) to approve into the
Alabama SIP, under section 175A of the CAA, Alabama's 2006 24-hour
PM2.5 NAAQS maintenance plan, including the associated
MVEBs; and (3) to approve, under CAA section 172(c)(3), the emissions
inventory submitted with the maintenance plan. No comments were
received on the proposed action. EPA is now taking final action on the
three actions identified above. Additional background for today's
action, and other details regarding the proposed redesignation, is set
forth in EPA's November 10, 2011, proposal and is summarized below. The
following information also: (1) Affirms that the most recent available
ambient monitoring data continue to support this redesignation action,
(2) summarizes the NOX and PM2.5 MVEBs for the
year 2024 for the Birmingham Area, and (3) provides additional
information on events that have occurred since the November 10, 2011,
proposal.
With regard to the data, EPA has reviewed the most recent ambient
monitoring data, which indicate that the Birmingham Area continues to
attain the 2006 24-hour PM2.5 NAAQS beyond the 3-year
attainment period of 2007-2009, which was provided with Alabama's June
17, 2010, submittal and request for redesignation. As stated in EPA's
November 10, 2011, proposal notice, the 3-year design values of 34
[mu]g/m\3\ for 2007-2009 and 29 [mu]g/m\3\ for 2008-2010 meet the NAAQS
of 35 [mu]g/m\3\. Quality assured and certified data now in EPA's Air
Quality System (AQS) for 2011 provide a 3-year design value of 27
[mu]g/m\3\ for 2009-2011. Furthermore, preliminary monitoring data for
2012 indicate that the Area is continuing to attain the 2006 24-hour
PM2.5 NAAQS. The 2012 preliminary data are available in AQS
although are not yet quality assured and certified.
The MVEBs, specified in tons per day (tpd), included in the
maintenance plan are as shown in Table 1 below. In the November 10,
2011, proposed action, EPA noted that the period for public comment on
the adequacy of these MVEBs (as contained in Alabama's submittal) began
on March 24, 2011, and closed on April 25, 2011. No comments were
received during the public comment period. Through this final action,
EPA is finding the 2024 NOX and PM2.5 MVEBs
adequate for transportation conformity purposes and finalizing the
approval of the budgets.
Table 1--Birmingham Area PM2.5 NOX MVEBs
(tpd)
------------------------------------------------------------------------
PM2.5 NOX
------------------------------------------------------------------------
2024 On-road Mobile Emissions........................ 0.96 25.20
Safety Margin Allocated to MVEBs..................... 0.245 23.21
2024 Conformity MVEBs................................ 1.21 48.41
------------------------------------------------------------------------
In the November 10, 2011, proposed redesignation of the Birmingham
Area, EPA proposed to determine that the emission reduction
requirements that contributed to attainment of the 2006 24-hour
PM2.5 standard in the nonattainment area could be considered
permanent and enforceable. See 76 FR at 70092, 70097-70099. At the time
of proposal, EPA noted that the requirements of the Clean Air
Interstate Rule (CAIR),\1\ which had been in place since 2005, were to
be replaced, starting in 2012, by the requirements in the then recently
promulgated Cross-State Air Pollution Rule (CSAPR), 76 FR 48208 (August
8, 2011). CSAPR included regulatory changes to sunset (i.e.,
discontinue) the CAIR requirements for control periods in 2012 and
beyond. See 76 FR at 48322. Although Alabama's redesignation request
and maintenance plan included reductions associated with CAIR, EPA
proposed to approve the request based in part on the fact that CSAPR
achieved similar or greater reductions in the relevant areas in 2012
and beyond. See 76 FR at 70092, 70097-70099. Because CSAPR requirements
were expected to replace the CAIR requirements starting in 2012, EPA
considered the impact of CSAPR related reductions on the Birmingham
Area. On this basis, EPA proposed to determine that, pursuant to CAA
section 107(d)(3)(E)(iii), the pollutant transport part of the
reductions that led to attainment in the Birmingham Area could be
considered permanent and enforceable. See 76 FR at 70092, 70097-70099.
---------------------------------------------------------------------------
\1\ On May 12, 2005, EPA published CAIR, which requires
significant reductions in emissions of sulfur dioxide
(SO2) and NOX from electric generating units
to limit the interstate transport of these pollutants and the ozone
and fine particulate matter they form in the atmosphere. See 70 FR
75163. The U.S. Court of Appeals for the District of Columbia
Circuit (D.C. Circuit) initially vacated CAIR, North Carolina v.
EPA, 531 F.3d 896 (D.C. Cir. 2008), but ultimately remanded the rule
to EPA without vacatur to preserve the environmental benefits
provided by CAIR, North Carolina v. EPA, 550 F.3d 1176, 1178 (D.C.
Cir. 2008).
---------------------------------------------------------------------------
On December 30, 2011, shortly after EPA's proposed approval of the
Birmingham redesignation, the D.C. Circuit issued an order addressing
the status of CSAPR and CAIR in response to motions filed by numerous
parties seeking a stay of CSAPR pending judicial review. In that order,
the court stayed CSAPR pending resolution of the petitions for review
of that rule in EME Homer City Generation, L.P. v. EPA (No. 11-1302 and
consolidated cases), also referred to as EME Homer City. The court also
indicated that EPA was expected to continue to administer CAIR in the
interim until judicial review of CSAPR was completed. Subsequently, on
August 21, 2012, the D.C. Circuit issued a decision in EME Homer City
to vacate and remand CSAPR and to keep CAIR in place. Specifically, the
court ordered EPA to continue administering CAIR pending the
promulgation of a valid replacement. EME Homer City Generation, L.P. v.
EPA, 696 F.3d 7, 38 (D.C. Cir. 2012). The D.C. Circuit has not yet
issued the final mandate in EME Homer City as EPA (as well as several
intervenors) petitioned for rehearing en banc, asking the full court to
review the decision. While rehearing proceedings are pending, EPA
intends to act in accordance with the panel opinion in the EME Homer
City opinion.
Subsequent to the EME Homer City opinion, EPA published several
proposals to redesignate both particulate matter and ozone
nonattainment areas to attainment. These proposals explained the legal
status of CAIR and CSAPR, and provided a basis on which EPA would
consider emissions reductions associated with CAIR to be permanent and
enforceable for redesignation purposes, pursuant to CAA section
107(d)(3)(D)(iii). In those actions, EPA explained that in light of the
August 21, 2012, order by the D.C. Circuit, CAIR remains in place and
enforceable until substituted by a
[[Page 5308]]
``valid'' replacement rule. See, e.g., 77 FR 69409 (November 19, 2012);
77 FR 68087 (November 15, 2012).
Alabama's June 17, 2010, SIP submittal supporting its redesignation
request includes CAIR as a control measure, which became state-
effective on April 3, 2007, and was approved by EPA on October 1, 2007,
for the purpose of reducing SO2 and NOX
emissions. See 72 FR 55659. Due to the legal status of CSAPR at the
time that EPA proposed approval of Alabama's June 17, 2010,
redesignation submittal, EPA was able to rely on CSAPR related
reductions. EPA also recognized that the monitoring data used to
demonstrate the Birmingham Area's attainment of the 2006 24-hour
PM2.5 NAAQS included reductions associated with CAIR. Due to
the uncertainty regarding the legal status of CAIR when Alabama
provided its submittal on June 17, 2010, the State's analysis assumed
that no additional reductions in SO2 or NOX
emissions from utilities would occur above and beyond those achieved
through 2012 as a result of CAIR. To the extent that the Alabama
submittal relies on CAIR reductions that occurred through 2012, the
recent directive from the D.C. Circuit in EME Homer City ensures that
the reductions associated with CAIR will be permanent and enforceable
for the necessary time period for purposes of CAA section
107(d)(3)(E)(iii). EPA has been ordered by the court to develop a new
rule, and the opinion makes clear that after promulgating that new rule
EPA must provide states an opportunity to draft and submit SIPs to
implement that rule. CAIR thus cannot be replaced until EPA has
promulgated a final rule through a notice-and-comment rulemaking
process; states have had an opportunity to draft and submit SIPs; EPA
has reviewed the SIPs to determine if they can be approved; and EPA has
taken action on the SIPs, including promulgating a Federal
Implementation Plan, if appropriate. The court's clear instruction to
EPA is that it must continue to administer CAIR until a ``valid
replacement'' exists, and thus CAIR reductions may be relied upon until
the necessary actions are taken by EPA and states to administer CAIR's
replacement. Furthermore, the court's instruction provides an
additional backstop; by definition, any rule that replaces CAIR and
meets the court's direction would require upwind states to have SIPs
that eliminate significant contributions to downwind nonattainment and
prevent interference with maintenance in downwind areas.
Further, in deciding to vacate CSAPR and to require EPA to continue
administering CAIR, the D.C. Circuit emphasized that the consequences
of vacating CAIR ``might be more severe now in light of the reliance
interests accumulated over the intervening four years.'' EME Homer
City, 696 F.3d at 38. The accumulated reliance interests include the
interests of states who reasonably assumed they could rely on
reductions associated with CAIR, which brought certain nonattainment
areas into attainment with the NAAQS. If EPA were prevented from
relying on reductions associated with CAIR in redesignation actions,
states would be forced to impose additional, redundant reductions on
top of those achieved by CAIR. EPA believes this is precisely the type
of irrational result the court sought to avoid by ordering EPA to
continue administering CAIR. For these reasons also, EPA believes it is
appropriate to allow states to rely on CAIR, and the existing emissions
reductions achieved by CAIR, as sufficiently permanent and enforceable
for purposes such as redesignation. Following promulgation of the
replacement rule, EPA will review SIPs as appropriate to identify
whether there are any issues that need to be addressed.
In light of these unique circumstances and for the reasons
explained above, EPA is approving the redesignation request and the
related SIP revision for Jefferson and Shelby Counties in their
entireties and a portion of Walker County in Alabama, including
Alabama's plan for maintaining attainment of the 2006 24-hour
PM2.5 NAAQS in the Birmingham Area. EPA continues to
implement CAIR in accordance with current direction from the court, and
thus CAIR is in place and enforceable and will remain so until
substituted by a valid replacement rule. Alabama's SIP revision lists
CAIR as a control measure, which became state-effective on April 3,
2007, and was approved by EPA on October 1, 2007, for the purpose of
reducing SO2 and NOX emissions. The monitoring
data used to demonstrate the Area's attainment of the 2006 24-hour
PM2.5 NAAQS by the April 2010 attainment deadline was
impacted by CAIR.
II. What are the actions EPA is taking?
In today's rulemaking, EPA is approving: (1) A change to the legal
designation of the Birmingham Area from nonattainment to attainment for
the 2006 24-hour PM2.5 NAAQS; (2) under CAA section 175A,
Alabama's 2006 24-hour PM2.5 NAAQS maintenance plan,
including the associated MVEBs; and (3) under CAA section 172(c)(3),
the emissions inventory submitted with the maintenance plan for the
Area. The maintenance plan is designed to demonstrate that the
Birmingham Area will continue to attain the 2006 24-hour
PM2.5 NAAQS through 2024. EPA's approval of the
redesignation request is based on EPA's determination that the
Birmingham Area meets the criteria for redesignation set forth in CAA,
sections 107(d)(3)(E) and 175A, including EPA's determination that the
Birmingham Area has attained the 2006 24-hour PM2.5 NAAQS.
EPA's analyses of Alabama's redesignation request, emissions inventory,
and maintenance plan are described in detail in the November 10, 2011,
proposed rule (76 FR 70091).
Consistent with the CAA, the maintenance plan that EPA is approving
also includes 2024 NOX and PM2.5 MVEBs for the
Birmingham Area. In this action, EPA is approving these NOx and
PM2.5 MVEBs for the Birmingham Area for the purposes of
transportation conformity. For required regional emissions analysis
years that involve 2024 or beyond, the applicable budgets will be the
new 2024 NOX and PM2.5 MVEBs.
III. Why is EPA taking these actions?
EPA has determined that the Birmingham Area has attained the 2006
24-hour PM2.5 NAAQS and has also determined that all other
criteria for the redesignation of the Birmingham Area from
nonattainment to attainment of the 2006 24-hour PM2.5 NAAQS
have been met. See CAA section 107(d)(3)(E). One of those requirements
is that the Birmingham Area has an approved plan demonstrating
maintenance of the 2006 24-hour PM2.5 NAAQS. EPA is also
taking final action to approve the maintenance plan for the Birmingham
Area as meeting the requirements of sections 175A and 107(d)(3)(E) of
the CAA. In addition, EPA is approving the new NOX and
PM2.5 MVEBs for the year 2024 for the Birmingham Area as
contained in Alabama's maintenance plan because these MVEBs are
consistent with maintenance of the 2006 24-hour PM2.5
standard in the Birmingham Area. Finally, EPA is approving the
emissions inventory as meeting the requirements of section 172(c)(3) of
the CAA. The detailed rationale for EPA's determinations and actions
are set forth in the proposed rulemaking and in other discussion in
this final rulemaking.
IV. What are the effects of these actions?
Approval of the redesignation request changes the legal designation
of the Birmingham Area from nonattainment
[[Page 5309]]
to attainment for the 2006 24-hour PM2.5 NAAQS. EPA is
modifying the regulatory table in 40 CFR 81.301 to reflect a
designation of attainment for these full and partial counties. EPA is
also approving, as a revision to the Alabama SIP, Alabama's plan for
maintaining the 2006 24-hour PM2.5 NAAQS in the Birmingham
Area through 2024. The maintenance plan includes contingency measures
to remedy possible future violations of the 2006 24-hour
PM2.5 NAAQS and establishes NOX and
PM2.5 MVEBs for the year 2024 for the Birmingham Area.
Additionally, this action approves the emissions inventory for the
Birmingham Area pursuant to section 172(c)(3) of the CAA.
V. Final Action
EPA is taking final action to approve three separate but related
actions, some of which involve multiple elements: (1) The redesignation
of the Birmingham Area to attainment for the 2006 24-hour
PM2.5 NAAQS; (2) under CAA section 175A, Alabama's 2006 24-
hour PM2.5 NAAQS maintenance plan, including the associated
MVEBs; and (3) under CAA section 172(c)(3), the emissions inventory
submitted with the maintenance plan for the Area. The 2006 24-hour
PM2.5 maintenance plan for the Birmingham Area includes the
new 2024 NOX and PM2.5 MVEBs of 48.41 tpd and
1.21 tpd, respectively. Within 24 months from the effective date of
EPA's adequacy determination, the transportation partners will need to
demonstrate conformity to the new NOX and PM2.5
MVEBs pursuant to 40 CFR 93.104(e).\2\
---------------------------------------------------------------------------
\2\ The adequacy finding becomes effective upon the date of
publication of this notice in the Federal Register. 40 CFR
93.118(f)(2)(iii).
---------------------------------------------------------------------------
VI. Statutory and Executive Order Reviews
Under the CAA, redesignation of an area to attainment and the
accompanying approval of the maintenance plan under CAA section
107(d)(3)(E) are actions that affect the status of a geographical area
and do not impose any additional regulatory requirements on sources
beyond those required by state law. A redesignation to attainment does
not in and of itself impose any new requirements, but rather results in
the application of requirements contained in the CAA for areas that
have been redesignated to attainment. Moreover, the Administrator is
required to approve a SIP submission that complies with the provisions
of the Act and applicable federal regulations. 42 U.S.C. 7410(k); 40
CFR 52.02(a). Thus, in reviewing SIP submissions, EPA's role is to
approve state choices, provided that they meet the criteria of the CAA.
Accordingly, this action merely approves state law as meeting federal
requirements and does not impose additional requirements beyond those
imposed by state law. For these reasons, these actions:
Are not a ``significant regulatory action'' subject to
review by the Office of Management and Budget under Executive Order
12866 (58 FR 51735, October 4, 1993);
Do not impose an information collection burden under the
provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);
Are certified as not having a significant economic impact
on a substantial number of small entities under the Regulatory
Flexibility Act (5 U.S.C. 601 et seq.);
Do not contain any unfunded mandate or significantly or
uniquely affect small governments, as described in the Unfunded
Mandates Reform Act of 1995 (Pub. L. 104-4);
Do not have Federalism implications as specified in
Executive Order 13132 (64 FR 43255, August 10, 1999);
Are not an economically significant regulatory action
based on health or safety risks subject to Executive Order 13045 (62 FR
19885, April 23, 1997);
Are not significant regulatory action subject to Executive
Order 13211 (66 FR 28355, May 22, 2001);
Are not subject to requirements of Section 12(d) of the
National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272
note) because application of those requirements would be inconsistent
with the CAA; and,
Do not provide EPA with the discretionary authority to
address, as appropriate, disproportionate human health or environmental
effects, using practicable and legally permissible methods, under
Executive Order 12898 (59 FR 7629, February 16, 1994).
In addition, this final rule does not have tribal implications as
specified by Executive Order 13175 (65 FR 67249, November 9, 2000),
because the SIP is not approved to apply in Indian country located in
the State, and EPA notes that it will not impose substantial direct
costs on tribal governments or preempt tribal law.
The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the
Small Business Regulatory Enforcement Fairness Act of 1996, generally
provides that before a rule may take effect, the agency promulgating
the rule must submit a rule report, which includes a copy of the rule,
to each House of the Congress and to the Comptroller General of the
United States. EPA will submit a report containing this action and
other required information to the U.S. Senate, the U.S. House of
Representatives, and the Comptroller General of the United States prior
to publication of the rule in the Federal Register. A major rule cannot
take effect until 60 days after it is published in the Federal
Register. This action is not a ``major rule'' as defined by 5 U.S.C.
804(2).
Under section 307(b)(1) of the CAA, petitions for judicial review
of this action must be filed in the United States Court of Appeals for
the appropriate circuit by March 26, 2013. Filing a petition for
reconsideration by the Administrator of this final rule does not affect
the finality of this action for the purposes of judicial review nor
does it extend the time within which a petition for judicial review may
be filed, and shall not postpone the effectiveness of such rule or
action. This action may not be challenged later in proceedings to
enforce its requirements. See section 307(b)(2).
List of Subjects
40 CFR Part 52
Environmental protection, Air pollution control, Incorporation by
reference, Intergovernmental relations, Reporting and recordkeeping
requirements, and Particulate matter.
40 CFR Part 81
Environmental protection, Air pollution control, National parks.
Dated: January 9, 2013.
Gwendolyn Keyes Fleming,
Regional Administrator, Region 4.
40 CFR parts 52 and 81 are amended as follows:
PART 52--[AMENDED]
0
1. The authority citation for part 52 continues to read as follows:
Authority: 42 U.S.C. 7401 et seq.
Subpart B--Alabama
0
2. Section 52.50(e) is amended by adding a new entry for ``2006 24-hour
PM2.5 Maintenance Plan for the Birmingham Area'' at the end
of the table to read as follows:
[[Page 5310]]
Sec. 52.50 Identification of plan.
* * * * *
(e) * * *
EPA-Approved Alabama Non-Regulatory Provisions
----------------------------------------------------------------------------------------------------------------
Applicable State submittal
Name of non-regulatory SIP geographic or non- date/effective EPA approval date Explanation
provision attainment area date
----------------------------------------------------------------------------------------------------------------
* * * * * * *
2006 24-hour PM2.5 Maintenance Birmingham PM2.5 6/17/10 1/25/13 [Insert
Plan for the Birmingham Area. Nonattainment Area. citation of
publication].
----------------------------------------------------------------------------------------------------------------
PART 81--[AMENDED]
0
3. The authority citation for part 81 continues to read as follows:
Authority: 42 U.S.C. 7401 et seq.
0
4. In Sec. 81.301, the table entitled ``Alabama--PM2.5 (24-
hour NAAQS)'' is amended under ``Birmingham, AL'' by revising the
entries for ``Jefferson County'', ``Shelby County'', and ``Walker
County (part)'' to read as follows:
Sec. 81.301 Alabama.
* * * * *
Alabama--PM2.5 (24-Hour NAAQS)
----------------------------------------------------------------------------------------------------------------
Designation for the 1997 NAAQS \a\ Designation for the 2006 NAAQS \a\
Designation area --------------------------------------------------------------------------------
Date \1\ Type Date \2\ Type
----------------------------------------------------------------------------------------------------------------
Birmingham, AL:
Jefferson County........... Unclassifiable/ This action is Attainment.
Attainment. effective 1/25/
13.
Shelby County.............. Unclassifiable/ This action is Attainment.
Attainment. effective 1/25/
13.
Walker County (part). The Unclassifiable/ This action is Attainment.
area described by U.S. Attainment. effective 1/25/
Census 2000 block group 13.
identifiers 01-127-0214-5,
01-127-0215-4, and 01-127-
0216-2.
* * * * * * *
----------------------------------------------------------------------------------------------------------------
\a\ Includes Indian Country located in each county or area, except as otherwise specified.
\1\ This date is 90 days after January 5, 2005, unless otherwise noted.
\2\ This date is 30 days after November 13, 2009, unless otherwise noted.
* * * * *
[FR Doc. 2013-01209 Filed 1-24-13; 8:45 am]