[Federal Register Volume 78, Number 23 (Monday, February 4, 2013)]
[Notices]
[Page 7770]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-02250]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2785-081]
Boyce Hydro Power, LLC; Notice of Application Accepted for
Filing, Soliciting Motions To Intervene, Protests, and Comments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Amendment to License.
b. Project No: 2785-081.
c. Date Filed: September 11, 2012.
d. Applicant: Boyce Hydro Power, LLC.
e. Name of Project: Sanford Hydroelectric Project.
f. Location: On the Tittabawassee River in Midland County,
Michigan.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Lee W. Mueller, Boyce Hydro Power, LLC, 6000
S. M-30, Edenville, MI 48620, (989) 689-3161.
i. FERC Contact: B. Peter Yarrington, (202) 502-6129 or
peter.yarrington@ferc.gov.
j. Deadline for filing motions to intervene, protests, and comments
is 15 days from the issuance date of this notice.
All documents may be filed electronically via the Internet. See 18
CFR 85.2001(a)(1)(iii) and the instructions on the Commission's Web
site at http://www.ferc.gov/docs-filing/efiling.asp. If unable to be
filed electronically, documents may be paper-filed. To paper-file, an
original and seven copies should be mailed to: The Secretary, Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426. Commenters can submit brief comments up to 6,000 characters,
without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and
contact information at the end of your comments.
Please include the project number (P-2785-081) on any motions,
protests, or comments filed.
k. Description of Application: The licensee proposes to replace one
of the project's three existing turbine/generator units with a new
unit. The project's maximum hydraulic capacity would remain the same
but the new unit would be able to operate over a greater range of flows
and the licensee intends to release the required minimum flow through
this unit rather than over the spillway. The proposal would raise the
project's total installed capacity from 3,300 to 3,600 kilowatts.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits
in the docket number field to access the document. You may also
register online at http://www.ferc.gov/docs-filing/esubscription.asp to
be notified via email of new filings and issuances related to this or
other pending projects. For assistance, call (866) 208-3676 or email
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Motions to Intervene, Protests, and Comments: Anyone may submit
a motion to intervene, protest, or comments in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any motions to intervene,
protests, or comments must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must: (1)
Bear in all capital letters the title ``MOTION TO INTERVENE,''
``PROTEST,'' or ``COMMENTS'' as applicable; (2) set forth in the
heading the name of the applicant and the project number of the
application to which the filing responds; (3) furnish the name,
address, and telephone number of the person intervening, protesting, or
commenting; and (4) otherwise comply with the requirements of 18 CFR
385.2001 through 385.2005. All motions to intervene, protests, or
comments must set forth their evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b). All motions to intervene,
protests, or comments should relate to project works which are the
subject of the application. Agencies may obtain copies of the
application directly from the applicant. A copy of any motion to
intervene or protest must be served upon each representative of the
applicant specified in the particular application. If an intervener
files comments or documents with the Commission relating to the merits
of an issue that may affect the responsibilities of a particular
resource agency, they must also serve a copy of the document on that
resource agency. A copy of all other filings in reference to this
application must be accompanied by proof of service on all persons
listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 4.34(b) and 18 CFR 385.2010.
Dated: January 24, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-02250 Filed 2-1-13; 8:45 am]
BILLING CODE 6717-01-P