DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2013-0072]
Drawbridge Operation Regulations; Chelsea River, Chelsea and East
Boston, MA
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
regulation governing the operation of the Chelsea Street Bridge across
the Chelsea River, mile 1.2, between Chelsea and East Boston,
Massachusetts. The vertical lift needs to be adjusted to correct an out
of skew condition. This deviation requires the bridge to remain closed
for four hours.
DATES: This deviation is effective from 8 p.m. until midnight on
February 21, 2013.
ADDRESSES: The docket for this notice, USCG-2013-0072, is available
online at www.regulations.gov by typing in the docket number in the
``SEARCH'' box and clicking ``SEARCH.'' Next, click on the Open Docket
Folder on the line associated with this notice. The docket is also
available for inspection or copying at the Docket Management Facility
(M-30), U.S. Department of Transportation, West Building Ground Floor,
Room W12-140, 1200 New Jersey Avenue SE., Washington, DC, 20590,
between 9 a.m. and 5 p.m., Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this notice,
call or email Mr. John McDonald, Project Officer, First Coast Guard
District, telephone (617) 223-8364, [email protected]. If you
have questions on viewing the docket, call Barbara Hairston, Program
Manager, Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: The Chelsea Street Bridge, across the
Chelsea River, mile 1.2, between Chelsea and East Boston,
Massachusetts, has a vertical clearance in the closed position of 7
feet above mean high water and 17 feet above mean low water, and 175
feet above mean high water in the full open position. The bridge opens
on signal at all times as required by 33 CFR 117.593.
The waterway is transited predominantly by commercial operators
delivering petroleum products to
[[Page 11748]]
facilities located upstream from the new bridge.
The lift span at the new bridge is out of skew and must be adjusted
to prevent damage to the operating system. The adjustment maintenance
requires the bridge to remain in the closed position for four hours.
The upstream oil facilities were all advised regarding the four
hour closure. No objections were received.
Under this temporary deviation the bridge may remain in the closed
position from 8 p.m. through midnight on February 21, 2013.
In accordance with 33 CFR 117.35(e), the bridge must return to its
regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.