    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Major Original License.
    b. Project No.: 13739-002.
    c. Date filed: September 17, 2012.
    d. Applicant: Lock+ Hydro Friends Fund XLII, LLC.
    e. Name of Project: Braddock Locks and Dam Hydroelectric Project.
    f. Location: At the existing U.S. Army Corps of Engineers' Braddock 
Locks and Dam on the Monongahela River, in Allegheny County, 
Pennsylvania. The project would occupy about 0.19 acre of federal 
lands.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)--825(r).
    h. Applicant Contact: Mr. Mark R. Stover, Lock+\TM\ Hydro Friends 
Fund XLII, LLC, c/o Hydro Green Energy, LLC, 900 Oakmont Lane, Suite 
310, Westmont, IL 60559; (877) 556-6566 ext. 711; email_
[email protected].
    i. FERC Contact: John Mudre at (202) 502-8902; or email at 
[email protected].
    j. Deadline for filing comments, recommendations, terms and 
conditions, and prescriptions: 60 days from the issuance date of this 
notice; reply comments are due 105 days from the issuance date of this 
notice.
    All documents may be filed electronically via the Internet. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at [email protected] or toll free at 1-866-208-3676, 
or for TTY, (202) 502-8659. Although the Commission strongly encourages 
electronic filing, documents may also be paper-filed. To paper-file, 
mail an original and seven copies to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted and is now ready for 
environmental analysis.
    l. The proposed project would utilize the existing U.S. Army Corps 
of Engineers' Braddock Locks and Dam and the Braddock Pool, and would 
consist of the following new facilities: (1) A new powerhouse with five 
turbine-generators having a total installed capacity of 3,750 
kilowatts; (2) a new approximately 2,585-foot-long, 23-kilovolt 
electric distribution line; (3) a switchyard and control room; and (4) 
appurtenant facilities. The average annual generation is estimated to 
be 25,020 megawatt-hours.
    The proposed project would deploy hydropower turbines within a 
patented ``Large Frame Module'' (LFM) that would be deployed on the 
south (river left) side of the dam, opposite the location of the 
existing navigational locks and at the upstream face of the existing 
left closure weir. The proposed modular, low environmental impact 
powerhouse would be approximately 60.4 feet long, 16.6 feet wide, and 
40 feet high, and constructed of structural-grade steel. The powerhouse 
will bear on a concrete foundation on rock that is anchored to the 
existing left closure weir. A trash rack with 6-inch openings would be 
placed at the powerhouse intake to increase safety and protect the 
turbines from large debris.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    All filings must (1) bear in all capital letters the title 
``COMMENTS'', ``REPLY COMMENTS'', ``RECOMMENDATIONS,'' ``TERMS AND 
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person submitting the filing; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, recommendations, terms and conditions or prescriptions must 
set forth their evidentiary basis and otherwise comply with the 
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the 
application directly from the applicant. Each filing must be 
accompanied by proof of service on all persons listed on the service 
list prepared by the Commission in this proceeding, in accordance with 
18 CFR 4.34(b), and 385.2010.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Public notice of the filing of the initial development 
application, which has already been given, established the due date for 
filing competing applications or notices of intent. Under the 
Commission's regulations, any competing development application must be 
filed in response to and in compliance with public notice of the 
initial development application. No competing applications or notices 
of intent may be filed in response to this notice.
    o. A license applicant must file no later than 60 days following 
the date of issuance of this notice: (1) A copy of the water quality 
certification; (2) a copy of

[[Page 12305]]

the request for certification, including proof of the date on which the 
certifying agency received the request; or (3) evidence of waiver of 
water quality certification.

    Dated: February 15, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-04080 Filed 2-21-13; 8:45 am]