[Federal Register Volume 78, Number 66 (Friday, April 5, 2013)]
[Notices]
[Pages 20630-20631]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-07887]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[EPA-HQ-OECA-2012-0688; FRL-9530-2]


Agency Information Collection Activities; Submission to OMB for 
Review and Approval; Comment Request; NESHAP for Plastic Parts and 
Products Surface Coating (Renewal)

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: In compliance with the Paperwork Reduction Act (44 U.S.C. 3501 
et seq.), this document announces that an Information Collection 
Request (ICR) has been forwarded to the Office of Management and Budget 
(OMB) for review and approval. This is a request to renew an existing 
approved collection. The ICR which is abstracted below describes the 
nature of the collection and the estimated burden and cost.

DATES: Additional comments may be submitted on or before May 6, 2013.

ADDRESSES: Submit your comments, referencing docket ID number EPA-HQ-
OECA-2012-0688, to: (1) EPA online, using www.regulations.gov (our 
preferred method), or by email to: docket.oeca@epa.gov, or by mail to: 
EPA Docket Center (EPA/DC), Environmental Protection Agency, 
Enforcement and Compliance Docket and Information Center, mail code 
28221T, 1200 Pennsylvania Avenue NW., Washington, DC 20460; and (2) OMB 
at: Office of Information and Regulatory Affairs, Office of Management 
and Budget (OMB), Attention: Desk Officer for EPA, 725 17th Street NW., 
Washington, DC 20503.

FOR FURTHER INFORMATION CONTACT: Learia Williams, Monitoring, 
Assistance, and Media Programs Division, Office of Compliance, Mail 
Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Avenue 
NW., Washington, DC 20460; telephone number: (202) 564-4113; fax 
number:

[[Page 20631]]

(202) 564-0050; email address: williams.learia@epa.gov.

SUPPLEMENTARY INFORMATION: EPA has submitted the following ICR to OMB 
for review and approval according to the procedures prescribed in 5 CFR 
1320.12. On October 17, 2012 (77 FR 63813), EPA sought comments on this 
ICR pursuant to 5 CFR 1320.8(d). EPA received no comments. Any 
additional comments on this ICR should be submitted to both EPA and OMB 
within 30 days of this notice.
    EPA has established a public docket for this ICR under docket ID 
number EPA-HQ-OECA-2012-0688, which is available for either public 
viewing online at http://www.regulations.gov, or in person viewing at 
the Enforcement and Compliance Docket in the EPA Docket Center (EPA/
DC), EPA West, Room 3334, 1301 Constitution Avenue NW, Washington, DC. 
The EPA Docket Center Public Reading Room is open from 8:30 a.m. to 
4:30 p.m., Monday through Friday, excluding legal holidays. The 
telephone number for the Reading Room is (202) 566-1744, and the 
telephone number for the Enforcement and Compliance Docket is (202) 
566-1752.
    Use EPA's electronic docket and comment system at http://www.regulations.gov to either submit or view public comments, access 
the index listing of the contents of the docket, and to access those 
documents in the docket that are available electronically. Once in the 
system, select ``docket search,'' then key in the docket ID number 
identified above. Please note that EPA's policy is that public 
comments, whether submitted electronically or in paper, will be made 
available for public viewing at http://www.regulations.gov as EPA 
receives them and without change, unless the comment contains 
copyrighted material, Confidentiality of Business Information (CBI), or 
other information whose public disclosure is restricted by statute. For 
further information about the electronic docket, go to 
www.regulations.gov.
    Title: NESHAP for Plastic Parts and Products Surface Coating 
(Renewal).
    ICR Numbers: EPA ICR Number 2044.05, OMB Control Number 2060-0537.
    ICR Status: This ICR is scheduled to expire on June 30, 2013. Under 
OMB regulations, the Agency may continue either to conduct or sponsor 
the collection of information while this submission is pending at OMB.
    Abstract: The affected entities are subject to the General 
Provisions of the NESHAP at 40 CFR part 63, subpart A, and any changes, 
or additions to the Provisions specified at 40 CFR part 63, subpart 
PPPP. Owners or operators of the affected facilities must submit an 
initial notification report, performance tests, and periodic reports 
and results. Owners or operators are also required to maintain records 
of the occurrence and duration of any startup, shutdown, or malfunction 
in the operation of an affected facility, or any period during which 
the monitoring system is inoperative. Reports are required semiannually 
at a minimum.
    Burden Statement: The annual public reporting and recordkeeping 
burden for this collection of information is estimated to average 91 
hours per response. ``Burden'' means the total time, effort, or 
financial resources expended by persons to generate, maintain, retain, 
or disclose or provide information to or for a Federal agency. This 
includes the time needed to review instructions; develop, acquire, 
install, and utilize technology and systems for the purposes of 
collecting, validating, and verifying information, processing and 
maintaining information, and disclosing and providing information; 
adjust the existing ways to comply with any previously-applicable 
instructions and requirements which have subsequently changed; train 
personnel to be able to respond to a collection of information; search 
data sources; complete and review the collection of information; and 
transmit or otherwise disclose the information.
    Respondents/Affected Entities: Plastic parts and products surface 
coating facilities.
    Estimated Number of Respondents: 832.
    Frequency of Response: Initially, occasionally, and semiannually.
    Estimated Total Annual Hour Burden: 322,467.
    Estimated Total Annual Cost: $31,489,594, which includes 
$31,223,994 in labor costs, $16,000 in capital/startup costs, and 
$249,600 in operation and maintenance (O&M) costs.
    Changes in the Estimates: There is an increase in the total 
estimated burden as currently identified in the OMB Inventory of 
Approved Burdens. The adjustment increase in burden from the most-
recently approved ICR is due to an increase in the number of sources 
subject to the NESHAP, as well as to an adjustment increase in labor 
rates. This ICR uses the most recent labor rates in calculating all 
burden costs. The growth in the respondent universe also results in a 
corresponding increase in the total O&M costs.

John Moses,
Director, Collection Strategies Division.
[FR Doc. 2013-07887 Filed 4-4-13; 8:45 am]
BILLING CODE 6560-50-P