[Federal Register Volume 78, Number 112 (Tuesday, June 11, 2013)]
[Rules and Regulations]
[Page 34893]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2013-13755]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[USCG-2013-0490]
Drawbridge Operation Regulations; Saugatuck River, Westport, CT
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
Route 136 Bridge across the Saugatuck River, mile 1.3, at Westport,
Connecticut. The deviation is necessary to facilitate emergency
repairs. Under this temporary deviation, the bridge owner may require a
24 hour advance notice for bridge openings from June 2, 2013 through
July 15, 2013.
DATES: This deviation is effective from June 11, 2013 through July 15,
2013, and has been enforced with actual notice since June 2, 2013.
ADDRESSES: The docket for this deviation, [USCG-2013-0391] is available
at http://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this deviation. You may also visit the Docket
Management Facility in Room W12-140, on the ground floor of the
Department of Transportation West Building, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Ms. Judy Leung-Yee, Project Officer,
First Coast Guard District, [email protected], or (212) 668-
7165. If you have questions on viewing the docket, call Barbara
Hairston, Program Manager, Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: The Route 136 Bridge has a vertical
clearance of 6 feet at mean high water in the closed position. The
existing drawbridge operating regulations are found at 33 CFR
117.221(c).
The bridge owner, Connecticut Department of Transportation,
requested a 24 hour advance notice requirement for bridge openings to
facilitate emergency repairs to the mechanical and electrical
components at the bridge.
The emergency repairs are necessary to repair storm damage from
Hurricane Sandy.
Under this temporary deviation at least a 24 hour advance notice
shall be required for bridge openings at the Route 136 Bridge, mile
1.3, across the Saugatuck River at Westport, Connecticut, from June 2,
2013 through July 15, 2013.
The Saugatuck River is predominantly a recreational waterway. The
bridge rarely opens during the time period this temporary deviation
will be in effect.
In accordance with 33 CFR 117.35(e), the bridge must return to its
regular operating schedule immediately at the end of the designated
repair period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: May 30, 2013.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. 2013-13755 Filed 6-10-13; 8:45 am]
BILLING CODE 9110-04-P