[Federal Register Volume 78, Number 112 (Tuesday, June 11, 2013)]
[Notices]
[Pages 35021-35022]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2013-13804]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14486-000]


FFP Project 57, LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On February 1, 2013, FFP Project 57, LLC filed an application for a 
preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), proposing to study the feasibility of a hydropower project 
located at the U.S. Army Corps of Engineers' (Corps)

[[Page 35022]]

Kentucky River Lock & Dam 4, located on the Kentucky River 
near the town of Frankfort in Franklin County, Kentucky. The sole 
purpose of a preliminary permit, if issued, is to grant the permit 
holder priority to file a license application during the permit term. A 
preliminary permit does not authorize the permit holder to perform any 
land-disturbing activities or otherwise enter upon lands or waters 
owned by others without the owners' express permission.
    The proposed project would consist of the following: (1) A 440-
foot-long, 220-foot-wide intake channel with a 145-foot-long retaining 
wall; (2) a 140-foot-long, 90-foot-wide powerhouse containing two 
generating units with a total capacity of 6.8 megawatts; (3) a 300-
foot-long, 125-foot-wide tailrace with a 145-foot-long retaining wall; 
(4) a 4.16/69 kilo-volt (kV) substation; (5) a 200-foot-long, 69kV 
transmission line. The proposed project would have an average annual 
generation of 26,700 megawatt-hours, and operate as directed by the 
Corps.
    Applicant Contact: Ms. Ramya Swaminathan, Free Flow Power 
Corporation, 239 Causeway Street, Suite 300, Boston, MA 02114. (978) 
283-2822.
    FERC Contact: Christiane Casey, [email protected], (202) 
502-8577.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site http://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at [email protected] or toll free at 1-866-208-3676, 
or for TTY, (202) 502-8659. Although the Commission strongly encourages 
electronic filing, documents may also be paper-filed. To paper-file, 
mail an original and five copies to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14486) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: June 5, 2013.
 Kimberly D. Bose,
 Secretary.
[FR Doc. 2013-13804 Filed 6-10-13; 8:45 am]
BILLING CODE 6717-01-P