[Federal Register Volume 78, Number 112 (Tuesday, June 11, 2013)]
[Rules and Regulations]
[Pages 34893-34894]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2013-13852]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[USCG-2013-0416]
Drawbridge Operation Regulations; Reynolds Channel, Lawrence, NY
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the regulations governing the operation of the
Atlantic Beach Bridge, mile 0.4, across Reynolds Channel, at Lawrence,
New York. This temporary deviation authorizes the Atlantic Beach Bridge
to operate under an alternate schedule for 176 days, to facilitate
electrical and structural rehabilitation at the bridge.
DATES: This deviation is effective from June 9, 2013 through December
1, 2013.
ADDRESSES: Documents mentioned in this preamble as being available in
the docket are part of docket USCG-2013-0416 and are available online
at www.regulations.gov, inserting USCG-2013-0416 in the ``Keyword'' and
then clicking ``Search''. They are also available for inspection or
copying at the Docket Management Facility (M-30), U.S. Department of
Transportation, West Building Ground Floor, Room W12-140, 1200 New
Jersey Avenue SE., Washington, DC 20590, between 9 a.m.
[[Page 34894]]
and 5 p.m., Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this rule,
call or email Ms. Judy Leung-Yee, Project Officer, First Coast Guard
District, telephone (212) 668-7165, email [email protected]. If
you have questions on viewing the docket, call Barbara Hairston,
Program Manager, Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: The Atlantic Beach Bridge, across Reynolds
Channel, mile 0.4, at Lawrence, New York, has a vertical clearance in
the closed position of 25 feet at mean high water and 30 feet at mean
low water. The existing drawbridge operation regulations are listed at
33 CFR 117.799(e).
The owner of the bridge, Nassau County Bridge Authority, requested
a temporary deviation to facilitate electrical and structural
rehabilitation at the bridge.
The waterway has commercial and seasonal recreational vessels of
various sizes.
Under this temporary deviation the draw of the Atlantic Beach
Bridge at mile 0.4, across Reynolds Channel shall open on signal as
follows:
(1) From June 9, 2013 through September 30, 2013, Monday through
Friday, the draw may operate a single span on signal, every two hours,
on the even hour, between 6 a.m. and 8 p.m. From 8 p.m. through 6 a.m.
the draw may operate a single span on signal. On weekends and holidays
from Friday at 8 p.m. through Monday at 6 a.m. the bridge shall open
both spans every hour on the hour.
(2) From October 1, 2013 through December 1, 2013, the bridge shall
operate a single span on signal at 6 a.m., 12 p.m., 4 p.m., and 8 p.m.
and at any time between 8 p.m. and 6 a.m. The draw shall open both
spans at all times for commercial vessel traffic after at least a 48
hour advance notice is given by calling the number posted at the
bridge.
The Coast Guard contacted all known commercial waterway users
regarding this deviation and no objections were received.
In accordance with 33 CFR 117.35(e), the bridge must return to its
regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: June 3, 2013.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. 2013-13852 Filed 6-10-13; 8:45 am]