 FFP Project 131, LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions to Intervene, and 
Competing Applications

    On May 20, 2013, FFP Project 131, LLC filed an application for a 
preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), proposing to study the feasibility of a hydropower project to be 
located at the US Army Corps of Engineers' (Corps) Felsenthal Lock & 
Dam on the Ouachita River near the town of Felsenthal in Union County, 
Arkansas. The sole purpose of a preliminary permit, if issued, is to 
grant the permit holder priority to file a license application during 
the permit term. A preliminary permit does not authorize the permit 
holder to perform any land-disturbing activities or otherwise enter 
upon lands or waters owned by others without the owners' express 
permission.
    The proposed project would consist of the following: (1) A 300-
foot-long, 150-foot-wide intake channel; (2) a 100-foot-long, 150-foot-
wide powerhouse containing two generating units with a total capacity 
of 5 megawatts; (3) a 500-foot-long, 150-foot-wide tailrace; (4) a 
4.16/69 kilo-Volt (kV) substation; and (5) a 1.0-mile-long, 69kV 
transmission line. The proposed project would have an average annual 
generation of 18,000 megawatt-hours, and operate as directed by the 
Corps.
    Applicant Contact: Mr. Daniel Lissner, Free Flow Power Corporation, 
239 Causeway Street, Suite 300, Boston, MA 02114. (978) 283-2822
    FERC Contact: Christiane Casey, [email protected], (202) 
502-8577.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site http://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at http://

[[Page 44110]]

www.ferc.gov/docs-filing/ecomment.asp. You must include your name and 
contact information at the end of your comments. For assistance, please 
contact FERC Online Support at [email protected] or toll free 
at 1-866-208-3676, or for TTY, (202) 502-8659. Although the Commission 
strongly encourages electronic filing, documents may also be paper-
filed. To paper-file, mail an original and five copies to: Kimberly D. 
Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street 
NE., Washington, DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14525) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: July 16, 2013.
 Kimberly D. Bose,
 Secretary.
[FR Doc. 2013-17585 Filed 7-22-13; 8:45 am]