Sutton Hydroelectric Company, LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On March 1, 2013, Sutton Hydroelectric Company, LLC filed an
application for a successive preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA), proposing to study the feasibility
of the Sutton Hydroelectric Project (project) to be located at the U.S.
Army Corps of Engineers Sutton Dam, on the Elk River, in Sutton,
Braxton County, West Virginia. The sole purpose of a preliminary
permit, if issued, is to grant the permit holder priority to file a
license application during the permit term. A preliminary permit does
not authorize the permit holder to perform any land-disturbing
activities or otherwise enter upon lands or waters owned by others
without the owners' express permission.
The proposed project would utilize the existing U.S. Army Corps of
Engineers' Sutton Dam and would consist of: (1) A proposed powerhouse
containing three generating units with a total generating capacity of
9.2 megawatts; (2) a 12-foot-diameter penstock; (3) a proposed 4,000-
foot-long, 138-kilovolt transmission line; (4) a tailrace, and (5)
appurtenant facilities. The project would have an estimated average
annual generation of 36.0 gigawatt-hours.
Applicant Contact: Mr. David C. Sinclair, President, Advanced Hydro
Solutions, LLC, 3000 Auburn Drive, Suite 430, Beachwood, OH 4122-4340;
phone: (216) 472-5581.
FERC Contact: Tim Looney; phone: (202) 502-6096.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-12693-003.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-12693) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: August 30, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-21830 Filed 9-6-13; 8:45 am]