DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD13-5-000]


Corbett Water District; Notice of Preliminary Determination of a 
Qualifying Conduit Hydropower Facility and Soliciting Comments and 
Motions To Intervene

    On September 23, 2013, Corbett Water District filed a notice of 
intent to construct a qualifying conduit hydropower facility, pursuant 
to section 30 of the Federal Power Act, as amended by section 4 of the 
Hydropower Regulatory Efficiency Act of 2013 (HREA). The Corbett 
Hydroelectric Project would be located at the existing Corbett Water 
District water treatment facility in Corbett, Multnomah County, Oregon.
    Applicant Contact: James Jans, Corbett Water District, P.O. Box 6, 
Corbett, OR 97019, Phone No. (503) 695-2284.
    FERC Contact: Christopher Chaney, Phone No. (202) 502-6778, email: 
[email protected].
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) A new eight-inch diameter intake pipeline 
receiving water flows from an existing 8-inch diameter filter pond 
diversion pipeline; (2) a new fiberglass shelter containing one 10-
kilowatt generating unit; and (3) appurtenant facilities. The proposed 
project would have an estimated annual generating capacity of 72 
megawatt-hours.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all of the criteria shown in the table below.

                          Table 1--Criteria for Qualifying Conduit Hydropower Facility
----------------------------------------------------------------------------------------------------------------
                                                                                                    Satisfies (Y/
            Statutory provision                                   Description                            N)
----------------------------------------------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by HREA.......  The conduit the facility uses is a tunnel, canal,                 Y
                                             pipeline, aqueduct, flume, ditch, or similar manmade
                                             water conveyance that is operated for the
                                             distribution of water for agricultural, municipal, or
                                             industrial consumption and not primarily for the
                                             generation of electricity.
FPA 30(a)(3)(C)(i), as amended by HREA....  The facility is constructed, operated, or maintained              Y
                                             for the generation of electric power, and uses for
                                             such generation only the hydroelectric potential of a
                                             non-federally owned conduit.
FPA 30(a)(3)(C)(ii), as amended by HREA...  The facility has an installed capacity that does not              Y
                                             exceed 5 megawatts.
FPA 30(a)(3)(C)(iii), as amended by HREA..  On or before August 9, 2013, the facility is not                  Y
                                             licensed, or exempted from the licensing requirements
                                             of Part I of the FPA.
----------------------------------------------------------------------------------------------------------------

    Preliminary Determination: Based upon the above criteria, 
Commission staff preliminarily determines that the proposal satisfies 
the requirements for a qualifying conduit hydropower facility not 
required to be licensed or exempted from licensing.
    Comments and Motions To Intervene: Deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 45 
days from the issuance date of this notice.
    Deadline for filing motions to intervene is 30 days from the 
issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR 
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as 
applicable; (2) state in the heading the name of the applicant and the 
project number of the application to which the filing responds; (3) 
state the name, address, and telephone number of the person filing; and 
(4) otherwise comply with the requirements of sections 385.2001 through 
385.2005 of the Commission's regulations.\1\ All comments contesting 
Commission staff's preliminary determination that the facility meets 
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-385.2005 (2013).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. A copy of all other filings in 
reference to this application must be accompanied by proof of service 
on all persons listed in the service list prepared by the Commission in 
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    Locations of Notice of Intent: Copies of the notice of intent can 
be obtained directly from the applicant or such copies can be viewed 
and reproduced at

[[Page 61988]]

the Commission in its Public Reference Room, Room 2A, 888 First Street 
NE., Washington, DC 20426. The filing may also be viewed on the Web at 
http://www.ferc.gov/docs-filing/elibrary.asp using the ``eLibrary'' 
link. Enter the docket number (e.g., CD13-5) in the docket number field 
to access the document. For assistance, call toll-free 1-866-208-3676 
or email [email protected]. For TTY, call (202) 502-8659.

    Dated: October 2, 2013.
Kimberly D. Bose,
Secretary.