[Federal Register Volume 78, Number 203 (Monday, October 21, 2013)]
[Notices]
[Pages 62359-62360]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2013-24514]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13160-004]


Red River Hydro LLC; Notice of Availability of Final 
Environmental Assessment

    In accordance with the National Environmental Policy Act of 1969 
and the Federal Energy Regulatory Commission's (Commission or FERC) 
regulations, 18 Code of Federal Regulations (CFR) Part 380 (Order No. 
486, 52 FR 47897), the Office of Energy Projects has reviewed Red River 
Hydro LLC's application for an original license for the Overton Lock 
and Dam Hydroelectric Project (FERC Project No. 13160-004) and prepared 
a final environmental assessment (EA). The project would be located on 
the Red River in Rapides Parish, Louisiana, at an existing lock and dam 
operated by the U.S. Army Corps of Engineers. The project, if licensed, 
would occupy a total of 38.7 acres of federal land.
    In the EA, Commission staff analyzes the potential environmental 
effects of licensing the project and concludes that licensing the 
project, with appropriate environmental protective measures, would not 
constitute a major federal action that would significantly affect the 
quality of the human environment.
    A copy of the EA is available for review at the Commission in the 
Public Reference Room or may be viewed on the Commission's Web site at 
www.ferc.gov using the ``eLibrary'' link. Enter the docket number 
excluding the last three digits in the docket number field to access 
the document. For assistance, contact FERC Online Support at 
[email protected] or toll-free at 1-866-208-3676, or for TTY, 
202-502-8659.
    You may also register online at www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    Any comments should be filed within 30 days from the date of this 
notice. Comments may be filed electronically via the Internet. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site at  http://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support. Although the Commission strongly encourages electronic filing, 
documents may also be paper-filed. To paper-file, mail an original and 
five copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street NE., Washington, DC 20426. Please affix, 
``Overton Lock and Dam

[[Page 62360]]

Hydroelectric Project, P-13160-004'' to all comments.
    For further information, contact Lesley Kordella by telephone at 
202-502-6406 or by email at [email protected].

    Dated: October 11, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013-24514 Filed 10-18-13; 8:45 am]
BILLING CODE 6717-01-P