DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13629-002]


Coleman Hydro, LLC; Notice of Application Ready for Environmental 
Analysis and Soliciting Comments, Recommendations, Terms and 
Conditions, and Prescriptions

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Minor Original License.
    b. Project No.: 13629-002.
    c. Date filed: April 22, 2011.
    d. Applicant: Coleman Hydro, LLC.
    e. Name of Project: Coleman Hydroelectric Project.
    f. Location: On Little Timber Creek near the Town of Leodore in 
Lemhi County, Idaho. The project would be located on private lands.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
    h. Applicant Contact: Mr. Nicholas E. Josten, c/o Geosense, 2742 
Saint Charles Avenue, Idaho Falls, ID 83404; (208) 528-6152; email_
[email protected].
    i. FERC Contact: Joseph Hassell at (202) 502-8079; or email at 
[email protected].
    j. Deadline for filing comments, recommendations, terms and 
conditions, and prescriptions: 60 days from the issuance date of this 
notice; reply comments are due 105 days from the issuance date of this 
notice.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene and protests, comments, terms and conditions, 
recommendations, and prescriptions using the Commission's eFiling 
system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. The first page of any filing should 
include docket number P-13629-002.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted and is now ready for 
environmental analysis.
    l. The proposed project would use the water from two existing 
irrigation diversions from Little Timber Creek, and would consist of 
the following new facilities: (1) A new intake structure and fish 
screen; (2) a new 26,700-foot-long penstock; (3) a powerhouse 
containing a 750-kilowatt Pelton turbine and 750-kilowatt generator; 
(4) a new 6.7-mile-long, 12.5-kilovolt electric transmission line; and 
(5) appurtenant facilities. The project would produce an estimated 
2,200 megawatt-hours annually.
    The proposed project would use water that currently flows into two 
unlined irrigation ditches that divert water from Little Timber Creek. 
The project would combine those two diversions into a single diversion 
at a new screened intake. The location of the new intake structure 
would be at the same location as the most downstream ditch diversion. 
Water would flow through the new intake structure into a 26,700-foot-
long steel and plastic penstock to the powerhouse. After passing 
through the powerhouse, the water would be used for irrigation.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.

[[Page 65306]]

    All filings must (1) bear in all capital letters the title 
``COMMENTS'', ``REPLY COMMENTS'', ``RECOMMENDATIONS,'' ``TERMS AND 
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person submitting the filing; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, recommendations, terms and conditions or prescriptions must 
set forth their evidentiary basis and otherwise comply with the 
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the 
application directly from the applicant. Each filing must be 
accompanied by proof of service on all persons listed on the service 
list prepared by the Commission in this proceeding, in accordance with 
18 CFR 4.34(b), and 385.2010.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Public notice of the filing of the initial development 
application, which has already been given, established the due date for 
filing competing applications or notices of intent. Under the 
Commission's regulations, any competing development application must be 
filed in response to and in compliance with public notice of the 
initial development application. No competing applications or notices 
of intent may be filed in response to this notice.
    o. Procedural Schedule:
    The application will be processed according to the following 
revised Hydro Licensing Schedule. Revisions to the schedule may be made 
as appropriate.

------------------------------------------------------------------------
                 Milestone                           Target date
------------------------------------------------------------------------
Filing of Comments, Recommendations, Terms   December 24, 2013.
 and Conditions, and Prescriptions.
Filing of Reply Comments...................  February 7, 2014.
Commission issues EA.......................  May 8, 2014.
------------------------------------------------------------------------

    p. A license applicant must file no later than 60 days following 
the date of issuance of this notice: (1) A copy of the water quality 
certification; (2) a copy of the request for certification, including 
proof of the date on which the certifying agency received the request; 
or (3) evidence of waiver of water quality certification.

    Dated: October 24, 2013.
 Kimberly D. Bose,
 Secretary.
[FR Doc. 2013-25855 Filed 10-30-13; 8:45 am]