[Federal Register Volume 78, Number 219 (Wednesday, November 13, 2013)]
[Notices]
[Pages 68054-68055]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2013-27056]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[EPA-HQ-OECA-2013-0335; FRL-9902-69-OEI]


Information Collection Request Submitted to OMB for Review and 
Approval; Comment Request; NESHAP for Aerospace Manufacturing and 
Rework Facilities (Renewal)

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: The Environmental Protection Agency has submitted an 
information collection request (ICR), ``NESHAP for Aerospace 
Manufacturing and Rework Facilities (40 CFR Part 63, Subpart GG) 
(Renewal)'' (EPA ICR No. 1687.09, OMB Control No. 2060-0314) to the 
Office of Management and Budget (OMB) for review and approval in 
accordance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq). 
This is a proposed extension of the ICR, which is currently approved 
through December 31, 2013. Public comments were previously requested 
via the Federal Register (78 FR 33409), on June 4, 2013 during a 60-day 
comment period. This notice allows for an additional 30 days for public 
comments. A fuller description of the ICR is given below, including its 
estimated burden and cost to the public. An Agency may not conduct or 
sponsor and a person is not required to respond to a collection of 
information unless it displays a currently valid OMB control number.

DATES: Additional comments may be submitted on or before December 13, 
2013.

ADDRESSES: Submit your comments, referencing Docket ID Number EPA-HQ-
OECA-2013-0335, to: (1) EPA online using www.regulations.gov (our 
preferred method), by email to [email protected], or by mail to: EPA 
Docket Center, Environmental Protection Agency, Mail Code 28221T, 1200 
Pennsylvania Ave. NW., Washington, DC 20460; and (2) OMB via email to 
[email protected]. Address comments to OMB Desk Officer for 
EPA.
    EPA's policy is that all comments received will be included in the 
public docket without change including any personal information 
provided, unless the comment includes profanity, threats, information 
claimed to be Confidential Business Information (CBI), or other 
information whose disclosure is restricted by statute.

FOR FURTHER INFORMATION CONTACT: Learia Williams, Monitoring, 
Assistance, and Media Programs Division, Office of Compliance, Mail 
Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Ave. 
NW., Washington, DC 20460; telephone number: (202) 564-4113; fax 
number: (202) 564-0050; email address: [email protected].

SUPPLEMENTARY INFORMATION:
    Supporting documents which explain in detail the information that 
the EPA will be collecting are available in the public docket for this 
ICR. The docket can be viewed online at www.regulations.gov or in 
person at the EPA Docket Center, EPA West, Room 3334, 1301 Constitution 
Ave. NW., Washington, DC. The telephone number for the Docket Center is 
202-566-1744. For additional information about EPA's public docket, 
visit: http://www.epa.gov/dockets.
    Abstract: Respondents are owners or operators of aerospace 
manufacturing and rework operations. Respondents must submit one-time 
reports of initial performance tests and semiannual reports of 
noncompliance. Record keeping and parameters related to air pollution 
control technologies is required. The reports and records will be used 
to demonstrate compliance with the standards.
    Form Numbers: None.
    Respondents/affected entities: Aerospace manufacturing and rework 
facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart GG).
    Estimated number of respondents: 136 (total).
    Frequency of response: Initially, semiannually, and occasionally.
    Total estimated burden: 140,936 hours (per year). ``Burden'' is 
defined at 5 CFR 1320.3(b).
    Total estimated cost: $13,921,987 (per year), includes $136,000 
annualized capital or operation & maintenance costs.
    Changes in the Estimates: There is an adjustment decrease in 
respondent burden hours and an increase in Agency

[[Page 68055]]

hours in this ICR compared to the previous ICR; however, this is not 
due to any program changes. The changes are a result of several 
corrections; specifically, this ICR: (1) Corrects discrepancies in the 
number of compliance status reports and SSM reports between the 
respondent and the Agency burden tables; (2) corrects rounding errors 
in respondent burden Table 1b in the previous ICR; and (3) changes the 
frequency of reviewing semiannual reports from one to two for the 
Agency. This ICR also uses updated labor rates in calculating all 
costs, which results in an overall increase in burden costs.
    Furthermore, this ICR corrects the number of responses to be 
consistent with the burden calculations. This results in an adjustment 
increase in the total number of responses.

John Moses,
Director, Collection Strategies Division.
[FR Doc. 2013-27056 Filed 11-12-13; 8:45 am]
BILLING CODE 6560-50-P