[Federal Register Volume 78, Number 222 (Monday, November 18, 2013)]
[Notices]
[Pages 69081-69082]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2013-27527]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13679-004]


JD Products, LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On October 1, 2013, JD Products, LLC (JD Products) filed an 
application for a successive preliminary permit, pursuant to section 
4(f) of the Federal Power Act, proposing to study the feasibility of 
the proposed San Onofre Electricity Farm Project (project). The 
proposed project would utilize up to 1,314 generation units, with an 
estimated installed capacity of 2,000 megawatts with a projected 
average annual generation of about 17,519 megawatthours. The requested 
project boundary comprises of approximately 6 square nautical miles of 
coastal waters and lands located along the coast of San Diego County, 
California, near the towns of San Onofre and San Clemente, and include 
portions of the San Onofre California State Park and the United States 
Marine Corps Base Camp Pendleton.
    The sole purpose of a preliminary permit, if issued, is to grant 
the permit holder priority to file a license application during the 
permit term. A preliminary permit does not authorize the permit holder 
to perform any land disturbing or construction activities or to 
otherwise enter upon lands or waters owned by others without the 
owners' express permission.
    Applicant Contact: Chong Hun Kim, JD Products, LLC., 16807 
Woodridge Circle, Fountain Valley, CA 92708; (714)964-5419.
    FERC Contact: Kenneth Hogan, (202) 502-8434, or via email at: 
[email protected].
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60

[[Page 69082]]

days from the issuance of this notice. Competing applications and 
notices of intent must meet the requirements of 18 CFR 4.36. Comments, 
motions to intervene, notices of intent, and competing applications may 
be filed electronically via the Internet. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
(http://www.ferc.gov/docs-filing/ferconline.asp) under the ``eFiling'' 
link.
    For a simpler method of submitting text only comments, click on 
``Quick Comment.'' For assistance, please contact FERC Online Support 
at [email protected]; call toll-free at (866) 208-3676; or, 
for TTY, contact (202) 502-8659. Although the Commission strongly 
encourages electronic filing, documents may also be paper-filed. To 
paper-file, mail an original and 5 copies to: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-13679) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: November 8, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-27527 Filed 11-15-13; 8:45 am]
BILLING CODE 6717-01-P